Loading...
HomeMy WebLinkAboutFAIRBROOKE PUD SEVENTH - Filed GC-GENERAL CORRESPONDENCE - 2003-07-31Utility F vices Water & VVastewater City of Fort Collins November 18, 1993 Mark Linder Linder Real Estate 3500 JFK Parkway Fort Collins, Colorado 80525 Re: Fairbrook Subdivision Dear Mark: The City is willing to establish a reimbursement agreement for the 12-inch water main which must be built in Prospect Road as a part of the above referenced development. This agreement will enable you to collect half of the costs associated with the 12-inch water main from anyone on the north side of Prospect who connects to the water main at some future date. I have enclosed a copy of the section of the City Code which deals with reimbursement agreements so that you are aware of all of the requirements which must be met in order to create the agreement. If you have any questions or comments, please call me at 221-6681. Sincerely, M 4� T...�l�. Mark Taylor Civil Engineer II cc: Brian Hahn, Utility Development Administrator Mike Herzig, Development Engineering Manager � Linder Real Estate September 20, 1994 Mr. Dave stringer City of Fort Collins Building Inspection Department P.O. Box 580 Fort Collins, CO 80522 Dear Dave: Enclosed please find a copy of Stewart and Associates final certification for the stormwater utility for my Fairbrooke P.U.D. 7th Filing project. Previously, I furnished them an as built (copy attached) for the drainage facilities with the exception of the Prospect Road curb and gutter and walk. That work is now complete. The only uncompleted work in the development is the 12 foot walk between Lots 9 and 10, which my development agreement ties to the first certificate of occupancy on either of these lots, and the Prospect Road landscape improvements. The walk will be done with the flatwork of the first house on either of these lots to avoid breakage. I have provided Peter Barnes a letter of financial guarantee for 125% of the cost of the landscape improvements (this came up due to a site plan note concerning certificate of occupancy) to assure completion. The fence, columns and landscaping are all contracted for and scheduled to be done in October/November to coincide with the building of the first home on one of these Prospect lots, which will provide a water source for the ''andscaping. I realize that when the landscaping is complete a final city inspection and acceptance is required per the development agreement. I have made my payments to the water department for the 121, line and to Matt Baker for the paving on Prospect Road (copies enclosed). Please make your final inspection and release me for all 20 permits in the development. Please consider this as my request for return of the applicable portion of my $5,037 escrow that I posted. If you have any questions concerning any of this, please call. Very truly yourp, Mark Linder ML:cll Enclosures Specializing in Development Properties 3500 J.F.K. Parkway #221 C Fort Collins, Colorado 80525 ❑ (303) 229-0544 STEWART&kSSOCIATES Consultin3 En3ineers and Surveyors September 20, '1994 Mr. Basil Hamdan Storm Water Utility P.O. Box 580 Fort Collins, CO 80522 Dear Basil: This is to follow up my letter and red lined plan for Fairbrook P.U.D., 7th Filing, dated September 7, 1994. At this date the curb and gutter on Prospect Road has been completed. The pan across Cedarwood Drive at Prospect Road and the Prospect Road sidewalk have also been completed. The postal pad has also been poured. The Swale from the East end of the Prospect Road curb and gutter has been graded to drain Easterly along the Bauder School portion of the Prospect Road right- of-way. Therefore all of the drainage facilities and public improvements have been completed in substantial compliance with the approved utility plans and the City of Fort Collins Standard Specifications. If you have any questions regarding this project, please call. Sincerely, Richard A. Rutherford President /rsc James H. Stewart and Associates, Inc. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 3031482-9331 Fax 303/482-9382 3/4/95 City of Fort Collins Planing and Zoning Board RE: variance for changing the lot side yard set back and side yard easements from 5 feet to 4 feet on lot 7, Fairbrooke 7th Filing. As the adjacent property owner on Lot 6, Fairbrooke 7th Filing, I hereby support the proposed variance of changing the side yard set back and easement from 5 feet to 4 feet. Since this proposed change is only 1 foot, I feel there is no implications to my property with this proposed variance. Thank You, Dan Broersma 1001 Cypress Drive Fort Collins, CO 80521 PH: 482-7893 3/6/95 City of Fort Collins Planning and. Zoning Board RE: Request for variance for changing the lot side yard set back and side yard easements from 5 feet to 4 feet on lot 7, Fairbrooke 7th Filing. As the architectural control committee for Fairbrooke 7th Filing, I hereby support the proposed variance. Since the adjacent property is offset by 9 feet, this proposed change still allows for 13 feet between structures, which maintains the side yard standards of the filing. Since this variance affects only lots 6 and 7, I feel there is no implications to other properties. Thank You Rick Myers