Loading...
HomeMy WebLinkAboutFAIRBROOKE PUD SIXTH - Filed GC-GENERAL CORRESPONDENCE - 2003-07-31Norti —rn Engineering Services, inc. November 16, 1992 Ms. Kathy Mailer Stormwater Utility City of Fort Collins 235 Mathews P.O. Box 580 Fort Collins, Colorado 80522-0580 re: o aur< Fifth and Sixth Filings Drainage Improvements Dear Kathy: Northern Engineering has conducted a field inspection of the completed drainage improvements at Fairbrooke Fourth, Fifth and Sixth Filings. Surveys were conducted on November 3 and 13 of the concrete pans which were installed as part of these projects. The pan elevations are marked on the attached blueline drawings. Lot grading was not surveyed as part of this work. This investigation found the finished construction to be in substantial compliance with the approved design for the drainage improvements for this project. Although the Vee Pans were placed with a depth of 3 1/2 inches, rather than the designed 4 1/2 inches, the attached calculations show that the pans will carry the required flows for the 2-year and 100-year storm events. If you have any questions or comments concerning this work, please contact this office at your earliest convenience. \ \011111IIIIII1!l11////z� ��;j;'%.,; Sincerely, NORTHERN ENGINEERING S VICES, INC. �p``•V•Z•4E` • ° '� e • 25033 • Michael F. Jodi P.E. ON At 420 S. Howes • Suite 106 • Fort Collins, Colorado 80521 • (303) 221-4158 • Fax (303) 221-4159 Nort...,rn Engineering Services, inc. 0 a,f dC,�ar�nu/a7�L November 16, 1992 Ms. Kathy Mailer Stormwater Utility City of Fort Collins 235 Mathews P.O. Box 580 Fort Collins, Colorado 80522-0580 re: Fairbrooke Fourth, Fifth and Sixth Filings Drainage Improvements Dear Kathy: Northern Engineering has conducted a field inspection of the completed drainage improvements at Fairbrooke Fourth, Fifth and Sixth Filings. Surveys were conducted on November 3 and 13 of the concrete pans which were installed as part of these projects. The pan elevations are marked on the attached blueline drawings. Lot grading was not surveyed as part of this work. This investigation found the finished construction to be in substantial compliance with the approved design for the drainage improvements for this project. Although the Vee Pans were placed with a depth of 3 1/2 inches, rather than the designed 4 1/2 inches, the attached calculations show that the pans will carry the required flows for the 2-year and 100-year storm events. If you have any questions or comments concerning this work, please contact this office at your earliest convenience. Nx Sincerely, `�OQ••E� f ail NORTHERN ENGINEERING S VICES, INC. `V�•�rP yO• 25033 r Michael F. Jo e , P.E. ��•• e,; 420 S Howes • Sdite 106 • Fon Coilins. Colorado 80521 • (303) 221 4158 • Fax (303) 221-4159