HomeMy WebLinkAboutCENTRE FOR ADVANCED TECHNOLOGY PUD THIRD - Filed GC-GENERAL CORRESPONDENCE - 2003-07-31CITY OF FORT COLLINS
DEVELOPMENT SERVICES — ENGINEERING
March 16, 1988
Mr. Bob Zakely
Everitt Companies
P.O. Box 2125
Ft. Collins, CO 80522
TO WHOM IT MAY CONCERN:
Re: Centre for Advanced Technology
Special Improvement District
It is standard policy for the City of Fort Collins to accept for
perpetual maintenance those public right-of-way constructions which
have been approved by the City and which have passed all required
guarantee periods. This includes the water main, sanitary sewer
mains, storm sewer lines and facilities, street pavements, street
lights, and street signs.
Yours truly, `
Rodney Albers
Construction Inspector
do
DEVELOPMENT SERVICES --
ENGINEERING
300 LaPorte Ave. PO. Box 580 Fort Collins, Colorado 80522 (303) 221-6605
Develop :nt �ervices
Engineering Department
City of Fort Collins
August 18, 1988
Bob Zakely
Everitt Enterprises Inc.
3000 South College Avenue
Fort Collins, CO
Re: Centre for Advanced Technology P.U.D. Third Filing
Dear Bob:
In reviewing the development agreement for the Centre for
Advanced Technology P.U.D. Third Filing development, I believe
the conditions as outlined in the agreement have been met. This
includes that portion of Meadowlark Avenue (now Research Blvd.)
between Drake Road and Center Avenue which was constructed
as part of Special Improvement District #90.
If you have any questions please do not hesitate to contact me
at 221-6605.
Sincerely,
n
David Stringer
Chief Construction Inspector
300 LaPorte Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6605
k m9RrCA5
fLUC�
ow
I,
i
� y
t-1 7' 11
yos. c v .
k} we tin w .n E5