Loading...
HomeMy WebLinkAboutCENTRE FOR ADVANCED TECHNOLOGY PUD THIRD - Filed GC-GENERAL CORRESPONDENCE - 2003-07-31CITY OF FORT COLLINS DEVELOPMENT SERVICES — ENGINEERING March 16, 1988 Mr. Bob Zakely Everitt Companies P.O. Box 2125 Ft. Collins, CO 80522 TO WHOM IT MAY CONCERN: Re: Centre for Advanced Technology Special Improvement District It is standard policy for the City of Fort Collins to accept for perpetual maintenance those public right-of-way constructions which have been approved by the City and which have passed all required guarantee periods. This includes the water main, sanitary sewer mains, storm sewer lines and facilities, street pavements, street lights, and street signs. Yours truly, ` Rodney Albers Construction Inspector do DEVELOPMENT SERVICES -- ENGINEERING 300 LaPorte Ave. PO. Box 580 Fort Collins, Colorado 80522 (303) 221-6605 Develop :nt �ervices Engineering Department City of Fort Collins August 18, 1988 Bob Zakely Everitt Enterprises Inc. 3000 South College Avenue Fort Collins, CO Re: Centre for Advanced Technology P.U.D. Third Filing Dear Bob: In reviewing the development agreement for the Centre for Advanced Technology P.U.D. Third Filing development, I believe the conditions as outlined in the agreement have been met. This includes that portion of Meadowlark Avenue (now Research Blvd.) between Drake Road and Center Avenue which was constructed as part of Special Improvement District #90. If you have any questions please do not hesitate to contact me at 221-6605. Sincerely, n David Stringer Chief Construction Inspector 300 LaPorte Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6605 k m9RrCA5 fLUC� ow I, i � y t-1 7' 11 yos. c v . k} we tin w .n E5