HomeMy WebLinkAboutDAKOTA RIDGE PUD THIRD - Filed CS-COMMENT SHEETS - 2003-07-31Comn_ _city Planning and Environment. Services
Planning Department
City of Fort Collins
May 23, 1994
CDL Partnership
2412 Rolling Wood Lane
Fort Collins, CO. 80525
To Whom It May Concern:
Staff has reviewed your documents for Dakota Ridge P.U.D., Filing No. 3 - Preliminary that
were submitted on May 2, 1994, and would like to offer the following comments:
1. Public Service Company of Colorado has stated that the title of the subdivision plat
should be R68W, not R67W.
2. A copy of the comments received from U.S. West is attached to this letter.
3. Plant Note 6 on the Site and Landscape Plan should end with prior to issuance of
certificate of occupancy. The reference to "more than 25 % of the units in this phase"
should be eliminated.
4. The comments received from the Engineering Department are as follows:
a. No pavement design was included in the soils report. It must be submitted for
City review prior to subgrade preparation.
b. There are no apparent groundwater problems.
C. No update to the Dakota Ridge traffic study was submitted for this filing.
Please contact Kerrie Ashbeck if you have questions about these Engineering comments.
Kerrie can be reached at 221-6750.
5. This proposal does not meet the requirements of the Solar Orientation Ordinance (a
minimum of 65 % of the lots must comply); therefore, a variance request is necessary and
must be supported by one of the three variance criteria in the ordinance.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
6. The street configuration appears to isolate the City park from this neighborhood. At one
time, were not cul-de-sacs planned from Pinecone Circle to the southwest that allowed
bicycle/pedestrian connections to occur from this filing to the park? Bicycle/pedestrian
connections should be provided.
7. The plan should be reduced in size, possibly going to a scale of 1 " = 80' or 1 " =100' , to
enable the plan to put this filing in the context of the surrounding area and Pinecone
O.D.P.
8. Plan Note 7 would more appropriately belong under the Project Notes. It really does not
have any relationship to the landscaping. Also, this street width variance request needs
to be submitted in written form to the Engineering Department.
9. The reference to the New Fort Collins High School to the southwest, on the Site and
Landscape Plan, should be City of Fort Collins Neighborhood Park. Also, the
referenced C.S.U. Property to the northeast is actually CSURF Property.
10. Bicycle/pedestrian access should be provided from this development to the north and
east. There is a major drainage channel in that area that has a bicycle/pedestrian trail that
should be connected to.
11. The Pinecone overall drainage report and plan had different drainage configurations than
this plan shows. There is no on -site detention being proposed for this filing, which will
increase the detention requirements on the church site. Is there an agreement with the
church site to shift the detention requirements? This filing cannot be approved without
an agreement in place.
This completes the review comments at this time. Additional comments may be forthcoming as
the various departments and reviewing agencies continue to review this request. Please be aware
of the following dates and deadlines to assure your ability to stay on schedule for the June 27,
1994 Planning and Zoning Board hearing:
******************************************************************
Plan revisions are due no later than June 9, 1994. Please contact me for the number of
folded revisions required for each document. ,
PMT's, renderings, and 8 folded copies of final revisions (for the Planning and Zoning
Board packets) are due by 3:00 p.m. on June 20, 1994.
Please contact me at 221-6750 if you have questions or concerns related to these comments. I
would like to schedule a meeting with you as soon as possible, if necessary, to discuss these
comments.
Sincerely,
Steve Olt
Project Planner
xc: Ron Phillips
Kerrie Ashbeck
Advance Planning
Stormwater Utility
Transportation
Parks & Recreation
TST Engineers
file/Project Planner
PROJECT
'M COMMENT SHEET
City of Fart Collins
DATE: 2 May 1994 DEPARTMENT: OSW eA "
PROJECT: DAKOTA RIDGE, 3rd Filing - Preliminary
PLANNER: Steve Olt
All comments must be received by Friday, May 13,1994
❑ No Problems
❑ Problems or Concerns (see below)
Review of these plans should not be construed as a commitment
that telephone facilities sufficient to serve this project are
presently available. U S WEST will provide telephone service in
accordance with the rates and tariffs on file with the Colorado
Public Utilities Commission.
The developer is responsible for provision of all trench, street
crossings, and ditch crossings for telephone facilities within
the project, and the developer pays up front construction costs
for facilities within the development.
Telephone facilities generally occupy rear lot utility easements,
which must be located on terrain which permits trenching
operations.
Any relocation of existing telephone facilities required by these
plans will be paid for by the developer.
Susan M. Peterson
Manager, Network & Technology Services 303-224-7473
Date: Signature: /61�
b
CHECK IF YOU WISH TO RECEIVE 'M PLAT
COPIES OF REVISIONS:
SITE
LANDSCAPE
U'IIT rrY
DEVELOPMENT SERVICES
PLANNING DEPARTMENT 28I NORTH COLLEGE P.O.BOX 580 FORTCOLLINS, COLORADO80522-0580 (303)221-6750
Coinmt. tv Planning and Pnvironmenta. ervices
Planning Department
June 22, 1994
Chuck Betters
CDL Partnership
2412 Rollingwood Lane
Fort Collins, CO. 80525
Dear Chuck,
Staff has reviewed your documents for the Dakota Ridge, Third
Filing - Final. that were submitted to the City on June 6, 1994, and
would like to offer the following comments:
1. A copy of the comments received from U.S. West is attached to
this letter.
2. Both Shavano Court and Milner Court street names exist in
Livermore, with the same hundred blocks. For City/County
Emergency Services dispatching purposes clarity needs to be
maintained.
3. The Stormwater Utility has stated that this project cannot
proceed without the Pinecone O.D.P. update that is still
outstanding. This update could determine whether this site
will require detention or not and could significantly alter
the site layout. Without the completed O.D.P. update this site
cannot be recommended for even preliminary approval by the
Planning and Zoning Board. Please address the comments that
were givE!n as part of their preliminary review of this project
in your future submittal to them.
Also, how does this site impact the park site from a drainage
standpoint? This needs to be clearly defined. Enough contours
and grading must be provided to show how the park site and
Dakota Ridge, Third Filing is affected. The updated O.D.P.
will show how the park site will drain. Please contact Glen
Schlueter or Basil Hamdan with questions about the storm
drainage concerns. They can be reached at 221-6589.
4. Lots 35 through 39 fall along the Foothills Basin drainage
channel. The developer needs to contact the Natural Resources
Department regarding a possible need for a transition zone
between the development and this drainage channel. Please
contact Rob Wilkinson at 221-6288 to discuss their concerns.
281 \'nrt1. (I- i)d ge Avenue • P.O. Box 780 • Fart Collins, CO 80 22-0-780 • (303) 221-67;0
5. The Mapping Department has the following comments:
a. The "Basis of Bearing" line needs two points in order to
re -construct the line.
b. The "Monument to be Set" must be described.
C. The legal description does not match the map and it does
not close.
A redlined set of the final plat, reflecting these comments,
has been forwarded to TST.
6. Street tree plantings should be added along Pinecone Circle,
within the parkways between curb and sidewalk, similar to the
treatment on previous Dakota Ridge filings (attachments to
letter sent to Chuck Betters).
7. The Pinecone O.D.P. indicated bicycle/pedestrian access from
this part of Dakota Ridge to the CSURF property to the north.
The need for these connections is still valid and should be
provided.
8. There aria 5 PLANT NOTES on the Site & Landscape Plan. Where
are the plants?
9. More information is needed on the Site & Landscape Plan about
the land uses and improvements on the properties completely
surrounding this site. It is difficult, from the information
ion the plan, to put the Dakota Ridge, Third Filing into the
context of the surrounding area.
This completE�s the review comments at this time. Additional
comments may be forthcoming as the various departments and
reviewing agencies continue to review this request. The Dakota
Ridge, Third Filing - Preliminary has been continued to the July
25, 1994 Planning and Zoning Board hearing. The Dakota Ridge, Third
Filing - Final. would then be heard by the Board on August 22, 1994.
Please be aware of the following dates and deadlines to assure your
ability to stay on schedule for that hearing date:
Plan revisions are due no later than August 3, 1994. Please contact
me for the number of folded revisions required for each document.
PMT's, renderings, and 8 folded copies of final revisions (for the
Planning and :3oning Board packets) are due by 3:00 p.m. on August
15, 1994.
Please contact me at 221-6750 if you have questions or concerns
related to these comments. I will be out of my office from June
30th to July llth. I am certain that any of the other planners
would be able to assist you should you have questions during my
absence.
Sincerely,
a MO*
Steve Olt
Project Planner
xc: Bob Blanchard, Chief Planner
Kerrie Ashbeck
Advance Planning
Stormwater Utility
Transportation
Parks & Recreation
TST Engineers
file/Project Planner