Loading...
HomeMy WebLinkAboutBURGER KING AT RAINTREE PUD - Filed GC-GENERAL CORRESPONDENCE - 2003-07-31Dever nent Services Planning Department December 22, 1989 Robert Huffsrnith Lobar, Inc. P. O. Box 1987 Fort Collins, CO. 80522 Dear Robert, City staff has reviewed the Burger King at Raintree PUD Administrative Change request. The following items requested in the administrative change application have been approved: - change in building elevations; - relocation of handicapped parking stalls; - modification to the outdoor dining area; and - building lighting. The request to delete the drain from the trash receptacle area and the deletion of the walk have been denied by the Engineering Department. Engineering staff has indicated that a change in the location of this sidewalk may be considered, as an alternative. The Planning Department has denied the request to change the mansard roof materials to asphalt/fiberglass shingles and suggests that in lieu of the originally proposed "metal shingles", a standing seam metal roof be utilized. If relocation of the sidewalk, or a change from the roofing material of metal shingles is proposed, a new administrative change request addressing these and/or other items must be submitted. If you have any questions regarding this matter, please do not hesitate to contact me. Sincerely, Sherry Albertson -Clark, AICP Senior City Planner xc: Mick Richter, Engineering Dan Coldiron, Building Permits and Inspections File )00 1-Worte Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (30,) 221-hi�0