HomeMy WebLinkAboutBURGER INN PUD - Filed DA-DEVELOPMENT AGREEMENT - 2003-07-31DEVELOPMENT AGREEMENT
THIS AGREEMENT, made and entered into this / 1 day of
A.D. 198 by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal
Corporation, hereinafter referred to as "the City," and LARRY K. MICKELSON,
owner, hereinafter referred to as "the Developer,"
1ATTNICCCCTU .
WHEREAS, the Developer is the owner of certain property situate in
the County of Larimer, State of Colorado, and legally described as
follows, to -wit:
Burger Inn P.U.D., located in the Northwest Quarter of Section 1,
Township 7 North, Range 69 West of the Sixth P.P., City Of Fort
Collins, Larimer County, Colorado.
WHEREAS, the developer desires to develop said property and has
submitted to the City a subdivision plat and/or a site plan, a copy of
which is on file in the Office of the City Engineer and made a part hereof
by reference: and
WHEREAS, the Developer has further submitted to the City a utility
plan for said lands, a copy of which is on file in the office of the City
Engineer and made a part hereof by reference; and
WHEREAS, the parties hereto have agreed that the development of said
lands will require increased municipal services from the City in order to
serve such area and will further require the installation of certain
improvements primarily of benefit to the lands to he developed and not to
the City of Fort. Collins as a whole; and
WHEREAS, the City has approved the subdivision plat and/or site plan
submitted by the Developer subject to certain requirements and conditions
EXHIBIT "A"
1. Schedule of water lines to be installed out of sequence.
Not Applicable.
2. Schedule of sanitary sewer lines to be installed out of sequence.
Not Applicable.
3. Schedule of street improvements to be installed out of sequence,
See paragraph 2.B.
4. Storm drainage improvements to be installed out of sequence.
See paragraph 2.A.
-10-
EXHIBIT "B"
The Development Agreement for Burger Inn P.U.D.
This exhibit does not apply to this development.
COST ESTIMATE FOR MAJOR DRAINAGE IMPROVEMENTS
Include only those major storm drainage basin improvements required by an adopted basin
master plan.
ITEM DESCRIPTION
1. Storm sewer, manholes, end sections, etc.
Sub -Total
2. Channel excavation, detention pond
excavation and riprap
UANTITY UNIT COST TOTAL COST
L.f.
/L.f.
$
L.f.
/L.f.
$
Ea.
Ea.
$
Ea.
Ea.
$
$
C.Y.
$
/C.Y. $
C.Y.
$
/C.Y. $
C.Y.
$
/C.Y. $
Sub -Total $
EXHIBIT B - Page 2
ITEM
3
4.
( a)
DESCRIPTION
Right-of-way & easement acquisition
Sub -Total
Professional Design
Other
QUANTITY UNIT COST TOTAL COST
S.F.
$
/S.F. $
Ac.
$
/Ac. $
Lump Sum $
Total estimated cost of Storm Drainage improvements eligible for
credit or City repayment
Prepared by:
Address:
Title:
$
RCPTN # 85056428 11/- 15 13:43:28 # OF PAGT 1 FEE — $3.00
J. ULVANG, RECORDER — ...,IMER COUNTY, CO. DOC. FEL— $.00
NOTICE
Please take notice that on July 2-4, 1985, the Planning and Zoning Board of
the City of Fort Collins, Colorado, approved the _ PUD Plan known
as Burger Inn PUD , which development was submitted
and processed in accordance with Section 118-83 of the Code of the City of
Fort Collins. The PUD Plan of the subject property together with
the development agreement dated July 15, 19F5 between the City of Fort
Collins and the developer, out of which documents accrue certain rights and
obligations of the developer and/or subsequent owners of the subject
property, are on file in the office of the Clerk of the City of Fort
Collins.
The subject property is more particularly described as follows:
A tract of land situated in the NW 1/4 of Section
1, T6)N, R69W of the 6th P.M., Larimer County, Colorado.
iU1xVr1X-=S ".
Secr tary Planning and Zoning
Cit of F rt Collins
Dated : 40 oo 4fo�7
f� e
Citv of Fort Collins
DEVELOPMENT AGREEMENT
THIS AGREEMENT, is made and entered into this � day of
2006, by and between the CITY OF FORT COLLINS, COLORADO, a Municipal
Corporation, hereinafter referred to as the "City'; and Western States Bank, A Branch of
Valley Bank and Trust Co., hereinafter referred to as the "Developer."
WITNESSETH:
WHEREAS, the Developer is the owner of certain real property situated in the
County of Larimer, State of Colorado, (hereafter sometimes referred to as the "Property"
or "Development") and legally described as follows, to wit:
Burger Inn PUD, situated in the NW'/< of Section 1, Township 7 North, Range 69
West of the 6th P.M., City of Fort Collins, County of Larimer, State of Colorado.
WHEREAS, the Developer desires to develop the Property and has submitted to
the City all plats, plans (including utility plans), reports and other documents required for
the approval of a final plan according to the City's development application submittal
requirements master list (the "Final Development Plan Documents') copies of which are
on file in the office of the City Engineer and made a part hereof by reference; and
WHEREAS, the parties hereto have agreed that the development of the Property
will require increased municipal services from the City in order to serve such area and
will further require the installation of certain improvements primarily of benefit to the
lands to be developed and not to the City of Fort Collins as a whole; and
WHEREAS, the City has approved the Final Development Plan Documents
submitted by the Developer subject to certain requirements and conditions, which
involve the installation of and construction of utilities and other municipal improvements
in connection with the Property.
NOW, THEREFORE, in consideration of the promises of the parties hereto and
other good and valuable consideration, the receipt and adequacy of which are hereby
acknowledged, it is agreed as follows:
General Conditions
A. The terms of this Agreement shall govern all development activities of the
Developer pertaining to the Property. For the purposes of this Agreement,
"development activities" shall include, but not be limited to, the following: (1) the actual
construction of improvements, (2) obtaining a permit therefor, or (3) any change in
grade, contour or appearance of the Property caused by, or on behalf of, the Developer
with the intent to construct improvements thereon.
B. All water lines, sanitary sewer collection lines, storm sewer lines and
facilities, streets, curbs, gutters, sidewalks, and bikepaths shall be installed as shown on
the Final Development Plan Documents and in full compliance with the standards and
specifications of the City on file in the office of the City Engineer at the time of approval
of the utility plans relating to the specific utility, subject to a three (3) year time limitation
from the date of approval of the site specific development plan. In the event that the
Developer commences or performs any construction pursuant hereto after the passage
of three (3) years from the date of approval of the site specific development plan, the
Developer shall resubmit the utility plans to the City Engineer for reexamination. The
City may then require the Developer to comply with the approved standards and
specifications of the City on file in the office of the City Engineer at the time of the
resubmittal.
C. No building permit for the construction of any structure within the Property
shall be issued by the City until the public water lines and stubs to each lot, fire
hydrants, electrical lines, sanitary sewer lines and stubs to each lot, and public streets
(including curb, gutter, and pavement with at least the base course completed) serving
such structure have been completed and accepted by the City. No building permits
shall be issued for any structure located in excess of six hundred and sixty feet (660')
from a single point of access, unless the structures contain sprinkler systems that are
approved by the Poudre Fire Authority.
D. Any water lines, sanitary sewer lines, storm drainage lines, electrical lines,
and/or streets described on Exhibit 'A" attached hereto, shall be installed within the
time and/or sequence required on Exhibit "A." If the City Engineer has determined that
any water lines, sanitary sewer lines, storm drainage facilities and/or streets are
required to provide service or access to other areas of the City, those facilities shall be
shown on the Final Development Plan Documents and shall be installed by the
Developer within the time as established under "Special Conditions" in this document.
E. Except as otherwise herein specifically agreed, the Developer agrees to
install and pay for all water, sanitary sewer, and storm drainage facilities and
appurtenances, and all streets, curbs, gutters, sidewalks, bikeways and other public
improvements required by this Development as shown on the Final Development Plan
Documents and other approved documents pertaining to this Development on file with
the City.
2
F. Street improvements shall not be installed until all utility lines to be placed
therein have been completely installed, including all individual lot service lines (water
and sewer) leading in and from the main to the property line and all electrical lines.
G. The installation of all utilities shown on the Final Development Plan
Documents shall be inspected by the Engineering Department of the City and shall be
subject to such department's approval. The Developer agrees to correct any
deficiencies in such installations in order to meet the requirements of the plans and/or
specifications applicable to such installation. In case of conflict, the Final Development
Plan Documents shall supersede the standard specifications, except that if the conflicts
are a result of Federal or State mandated requirements, then the Federal or State
mandated requirements shall prevail.
H. All storm drainage facilities shall be so designed and constructed by the
Developer as to protect downstream and adjacent properties against injury and to
adequately serve the Property (and other lands as may be required, if any). The
Developer shall meet or exceed the minimum requirements for storm drainage facilities
as have been established by the City in its Drainage Master Plans and Design Criteria.
The Developer, for itself and its successor(s) in interest, does hereby indemnify and
hold harmless the City from any and all claims that might arise, directly or indirectly, as
a result of the discharge of injurious storm drainage or seepage waters from the
Property in a manner or quantity different from that which was historically discharged
and caused by the design or construction of the storm drainage facilities, except for (1)
such claims and damages as are caused by the acts or omissions of the City in
maintenance of such facilities as have been accepted by the City for maintenance; (2)
errors, if any, in the: general concept of the City's master plans (but not to include any
details of such plans, which details shall be the responsibility of the Developer); and (3)
specific written or otherwise documented directives that may be given to the Developer
by the City. The City agrees to give notice to the Developer of any claim made against
it to which this indemnity and hold harmless agreement by the Developer could apply,
and the Developer shall have the right to defend any lawsuit based on such claim and to
settle any such claim provided Developer must obtain a complete discharge of all City
liability through such settlement. Failure of the City to give notice of any such claim to
the Developer within ninety (90) days after the City first receives a notice of such claim
under the Colorado Governmental Immunity Act for the same, shall cause this indemnity
and hold harmless agreement by the Developer to not apply to such claim and such
failure shall constitute a release of this indemnity and hold harmless agreement as to
such claim. Approval of and acceptance by the City of any storm drainage facility
design or construction shall in no manner be deemed to constitute a waiver or
relinquishment by the City of the aforesaid indemnification. The Developer shall engage
a Colorado licensed professional engineer to design the storm drainage facilities as
aforesaid and it is expressly affirmed hereby that such engagement shall be intended
for the benefit of the City, and subsequent purchasers of property in the Development.
I. The Developer shall pay storm drainage basin fees in accordance with
Chapter 26, Article VII of the City Code. Storm drainage improvements eligible for
3
credit or City repayment under the provisions of Chapter 26 are described together with
the estimated cost of the improvements on the attached Exhibit "B," which
improvements, if applicable, shall include right-of-way, design and construction costs.
See Section II.C, Special Conditions, Storm Drainage Lines and Appurtenances, for
specific instructions.
J. The Developer shall provide the City Engineer with certified Record Plan
Transparencies on Black Image Diazo Reverse Mylars upon completion of each phase
of the construction. Utilities will not be initially accepted prior to as -built drawings being
submitted to and approved by the City of Fort Collins.
K. The Developer specifically represents that to the best of its knowledge all
property dedicated (both in fee simple and as easements) to the City associated with
this Development (whether on or off -site) is in compliance with all environmental
protection and anti -pollution laws, rules, regulations, orders or requirements, including
solid waste requirements, as defined by the U. S. Environmental Protection Agency
Regulations at 40 C.F.R., Part 261, and that such property as is dedicated to the City
pursuant to this Development, is in compliance with all such requirements pertaining to
the disposal or existence in or on such dedicated property of any hazardous
substances, pollutants or contaminants, as defined by the Comprehensive
Environmental Response Compensation and Liability Act of 1980, as amended, and
regulations promulcated thereunder. The Developer, for itself and its successor(s) in
interest, does here b,f ndemnify and hold harmless the City from any liability whatsoever
that may be imposed upon the City by any governmental authority or any third party,
pertaining to the disposal of hazardous substances, pollutants or contaminants, and
cleanup necessitate d by leaking underground storage tanks, excavation and/or backfill
of hazardous su'oA nces, pollutants or contaminants, or environmental cleanup
responsibilities of any nature whatsoever on, of, or related to any property dedicated to
the City in connec!i::n with this Development, provided that such damages or liability are
not caused by cimLlrm;tances arising entirely after the date of acceptance by the City of
the public improvements constructed on the dedicated property, except to the extent
that such circumstances are the result of acts or omissions of the Developer. Said
indemnification shall not extend to claims, actions or other liability arising as a result of
any hazardous substance, pollutant or contaminant generated or deposited by the City,
its agents or representatives, upon the property dedicated to the City in connection with
this Development. The City agrees to give notice to the Developer of any claim made
against it to which this indemnity and hold harmless agreement by the Developer could
apply, and the Developer shall have the right to defend any lawsuit based on such claim
and to settle any sucl- claim provided the Developer must obtain a complete discharge
of all City liability through such settlement. Failure of the City to give notice of any such
claim to the Developer within ninety (90) days after the City first receives a notice of
such claim under the Colorado Governmental Immunity Act for the same, shall cause
this indemnity and 'hold harmless agreement by the Developer to not apply to such
claim and such failure shall constitute a release of this indemnity and hold harmless
agreement as to such claim.
4
L. The Developer acknowledges and agrees that the City, as the owner of
any adjacent property (the "City Property") on which off -site improvements may be
constructed, or that may be damaged by the Developer's activities hereunder, expressly
retains (and does nct by this Development Agreement waive) its rights as property
owner. The City's rights as owner may include without limitation those rights
associated with the protection of the City Property from damage, and/or the
enforcement of restrictions, limitations and requirements associated with activities on
the City Property by the Developer as an easement recipient.
II. Special Conditions
A. Water Lines
Not Applicable
B. Sewer Lines
Not Applicable
C. Storm Drainage Lines and Appurtenances
1. A'I on -site and off -site storm drainage improvements associated
with this Developrnen', as shown on the Final Development Plan Documents, shall be
completed by the Ceveloper in accordance with said Final Development Plan
Documents prior to the issuance any certificate of occupancy. Completion of
improvements shall include the certification by a professional engineer licensed in
Colorado that the drainage facilities which serve this development have been
constructed in conformance with said Final Development Plan Documents. Said
certification shall be submitted to the City at least two weeks prior to the issuance of any
certificate of occupancy in this development.
2. The Developer shall be responsible for maintaining the structural
integrity and operational functions of all drainage facilities throughout the build -out of
this Development. 'f at any time following certification (as required pursuant to
paragraph one (1) above) of said drainage facilities and during the construction of
structures and /or lots within this Development the City reasonably decides that said
drainage facilities no !onger comply with the approved plans, the City shall give written
notice to the Developer of all items which do not comply with the approved plans.
Unless the Developer successfully appeals the decision of non-compliance, it shall bring
such facilities back up to the standards and specifications as shown on the approved
plans. Failure to maintain the structural integrity and operational function of said
drainage facilities following certification shall result in the withholding of the issuance of
additional building permits and/ or certificates of occupancy until such drainage facilities
are repaired to the operational function and structural integrity which was approved by
the City.
5
3. The Developer shall be responsible for maintenance of all storm
drainage facilities that are constructed outside of the public right-of-way.
4. This property is in the 100-year floodplain and is thus subject to the
floodplain regulations found in Chapter 10 of City Code. It is understood that the owner
is applying to FEMA for a Letter of Map Amendment (LOMA) that, if approved, would
show part of the property out of the flocdplain. If the LOMA is approved, the property
will no longer be subject to the floodplain regulations.
D. Streets.
1. In accordance with Section 24-95 of the City Code the Developer is
responsible for constructing the public streets adjacent to the site at the time that the
Property is developed or redeveloped and prior to the issuance of the first building
permit. Pursuant to the adopted US 287/ SH 14 Access Management Report, a local
street shall be provided along the northern boundary of this property. Notwithstanding
the foregoing, the Developer shall have the option to postpone the dedication and
construction of this street along the northern boundary of the property until such time as
this Development needs said street for overall circulation, since the exact location and
design of this street is not know at this time. The Developer shall file a Notice of Future
Street Alignment with the Larimer County Clerk and Recorder providing notice to any
future owners that a public street may exist along the northern portion of this property in
accordance with the US 287/ SH 14 Access Management Report. At such time as said
street is needed to serve the adjacent properties the above paragraph does not
categorically deny the Developer adequate compensation for any future right-of-way
that maybe needed from the Development, nor does the foregoing require the City to
pay for any future right-of-way.
2. No street oversizing reimbursement from the City is due the
Developer for this Development.
3. Notwithstanding any provision herein to the contrary, the Developer
shall be responsible for all costs for the initial installation of traffic signing and striping
for this Development, including both signing and striping related to the Developer's
internal street operations and the signing and striping of any adjacent or adjoining local,
collector or arterial streets that is made necessary because of the Development.
4. Following completion of all public infrastructure improvements, the
Developer shall continue to have responsibility for maintenance and repair of said
improvements in accordance with for LUC projects, Sections 2.2.3, 3.3.1 and 3.3.2 of
the Land Use Code of the City.
E. Natural Resources
Not Applicable
6
which involve the installation of and construction of utilities and other
municipal improvements in connection with said lands.
NOW, THEREFORE, in consideration of the promises of the parties
hereto and other good and valuable consideration, the receipt and adequacy
of which is hereby acknowledged, it is agreed as follows:
1. General Conditions.
A. All water lines, sanitary sewer collection lines, storm
sewer lines and facilities, streets, curbs, gutters,
sidewalks, and bi kepaths shall be installed as shown on the
approved utility plans and in full compliance with the
Council -approved standards and specifications of the City on
file in the Office of the City Engineer at the time of
approval of the utility plans relating to the specific
utility, subject to a two (2) year time limitation from the
date of execution of this agreement. In the event that the
Developer commences or performs any construction pursuant
hereto after two (2) years from the date of execution of this
agreement, the Developer shall resubmit the project utility
plans to the City Engineer for reexamination. The City may
require the Developer to comply with approved standards and
specifications of the City on file in the Office of the City
Engineer at the time of resubmittal.
B. No building permit for the construction of any structure
within the development shall be issued by the City until the
water lines, fire hydrants, sanitary sewer and streets (with
al. least the base course completed) serving such structure
have seen completed and accepted by the City. No building
-2-
F. Ground Water, Subdrains and Water Rights
1. The City shall not be responsible for, and the Developer (for itself
and its successor(s) in interest) hereby agrees to indemnify and hold harmless the City
against any damages or injuries sustained in the Development as a result of ground
water seepage or flooding, structural damage, or other damage unless such damages
or injuries are proximately caused by the City's negligent operation or maintenance of its
storm drainage facilities in the Development. However, nothing herein shall be deemed
a waiver by the City of its immunities, defenses, and limitations to liability under the
Colorado Governmental Immunity Act (Section 24-20-101 CRS, et. seq.) or under any
other law.
2. If the Development includes a subdrain system, any such subdrain
system, whether located within private property or within public property such as street
rights -of -way or utility or other easements, shall not be owned, operated, maintained,
repaired or reconstructed by the City and it is agreed that all ownership, operation,
maintenance, repair and reconstruction obligations shall be those of the Developer or
the Developer's successor(s) in interest. Such subdrain system is likely to be located
both upon private and public property and, to the extent that it is located on public
property, all maintenance, operation, repair or reconstruction shall be conducted in such
a manner that such public property shall not be damaged, or if damaged, shall, upon
completion of any such project, be repaired in accordance with then existing City
standards. The City shall not be responsible for, and the Developer, for itself and its
successor(s) in interest, hereby agrees to indemnify and hold harmless the City against
any damages or injuries sustained in the Development as the result of groundwater
seepage or flooding, structural damage or other damage resulting from failure of any
such subdrain system.
3. Without admitting or denying any duty to protect water rights, the
Developer, for itself and its successor(s) in interest, hereby agrees to indemnify and
hold harmless the City against any damages or injuries to water rights caused, directly
or indirectly by the construction, establishment, maintenance or operation of the
Development.
4. The City agrees to give notice to the Developer of any claim made
against it to which the foregoing indemnities and hold harmless agreements by the
Developer could apply, and the Developer shall have the right to defend any lawsuit
based on such claim and to settle any such claim provided the Developer must obtain a
complete discharge of all City liability through such settlement. Failure of the City to
give notice of any such claim to the Developer within ninety (90) days after the City first
receives notice of such claim under the Colorado Governmental Immunity Act for the
same, shall cause the forgoing indemnities and hold harmless agreements by the
Developer to not apply to such claim and such failure shall constitute a release of the
foregoing indemnities and hold harmless agreements as to such claim.
G. Hazards and Emergency Access
1. No combustible material will be allowed on the site until a
permanent water system is installed by the Developer and approved by the City.
2. Prior to beginning any building construction, and throughout the
build -out of this Development, the Developer shall provide and maintain at all times an
accessway to said building or buildings. Such accessway shall be adequate to handle
any emergency vehicles or equipment, and the accessway shall be kept open during all
phases of construction. Such accessway shall be constructed to an unobstructed width
of at least 20 feet with 4 inches of aggregate base course material compacted according
to city standards and with an 100 foot diameter turnaround at the building end of said
accessway. The turnaround is not required if an exit point is provided at the end of the
accessway. Prior to the construction of said accessway, a plan for the accessway shall
be submitted to and approved by the Poudre Fire Authority and City Engineer. (Three
plan sets shall be submitted to the Poudre Fire Authority at 102 Remington Street for
review and processing.) If such accessway is at any time deemed inadequate by the
Poudre Fire Authority or City Engineer, the accessway shall be promptly brought into
compliance and until such time that the accessway is brought into compliance, the City
and/or the Poudre Fire Authority may issue a stop work order for all or part of the
Development.
Development Construction Permit
1. The Developer shall apply for and obtain a Development
Construction Permit for this Development, in accordance with Division 2.6 of the Land
Use Code (or Section 29-12 of the Transitional Land Use Regulations, if applicable),
prior to the Developer commencing construction. The Developer shall pay the required
fees for said Permit and construction inspection, and post security to guarantee
completion of the public improvements required for this Development, prior to issuance
of the Development Construction Permit.
J. Maintenance and Repair Guarantees
1. The Developer agrees to provide a two-year maintenance
guarantee and a five-year repair guarantee covering all errors or omissions in the
design and/or construction of the public improvements required for this Development,
which guarantees shall run concurrently and shall commence upon the date of
completion of the public improvements and acceptance thereof by the City. More
specific elements of these guarantees are noted in Exhibit "C." Security for the
maintenance guarantee and the repair guarantee shall be as provided in Section
3.3.2(C) of the Land Use Code, or Section 29-14 of the Transitional Land Use
Regulations, as applicable. Notwithstanding the provisions of paragraphs III (H) and (1)
of this Agreement to the contrary, the obligations of the Developer pursuant to this
paragraph and Exhibit "C" may not be assigned or transferred to any other person or
y
entity unless the warranted improvements are completed by, and a letter of acceptance
of the warranted improvements is received from the City by, such other person or entity.
III. Miscellaneous
A. The Developer agrees to provide and install, at its expense, adequate
barricades, warning signs and similar safety devices at all construction sites within the
public right-of-way and/or other areas as deemed necessary by the City Engineer and
Traffic Engineer in accordance with the City's "Work Area Traffic Control Handbook"
and shall not remove said safety devices until the construction has been completed.
B. As required pursuant to Chapter 20, Article IV of the City Code, the
Developer shall, at all times, keep the public right-of-way free from accumulation of
waste material, rubbish, or building materials caused by the Developer's operation, or
the activities of individual builders and/or subcontractors; shall remove such rubbish as
often as necessary, but no less than daily and; at the completion of the work, shall
remove all such waste materials, rubbish, tools, construction equipment, machinery,
and surplus materials from the public right-of-way. The Developer further agrees to
maintain the finished street surfaces so that they are free from dirt caused by the
Developer's operation or as a result of building activity. Any excessive accumulation of
dirt and/or construction materials shall be considered sufficient cause for the City to
withhold building permits and/or certificates of occupancy until the problem is corrected
to the satisfaction of the City Engineer. If the Developer fails to adequately clean such
streets within two (2) days after receipt of written notice, the City may have the streets
cleaned at the Developer's expense and the Developer shall be responsible for prompt
payment of all such costs. The Developer also agrees to require all contractors within
the Development to keep the public right-of-way clean and free from accumulation of
dirt, rubbish, and building materials.
C. The Developer hereby agrees that it will require its contractors and
subcontractors to cooperate with the City's construction inspectors by ceasing
operations when winds are of sufficient velocity to create blowing dust which, in the
inspector's opinion, is hazardous to the public health and welfare.
D. The Developer shall, pursuant to the terms of this Agreement, complete all
improvements and perform all other obligations required herein, as such improvements
or obligations may be shown on the Final Development Plan Documents, or any
documents executed in the future that are required by the City for the approval of an
amendment to a development plan, and the City may withhold (or to the extent
permitted by law, revoke) such building permits and certificates of occupancy as it
deems necessary to ensure performance in accordance with the terms of this
Development Agreement. The processing and "routing for approval" of the various
development plan documents may result in certain of said documents carrying dates of
approval and/or execution that are later than the date of execution of this Development
Agreement or the Memorandum Of Agreement (if any) recorded to give record notice of
9
this Agreement. The Developer hereby waives any right to object to any such
discrepancy in dates.
E. Nothing herein contained shall be construed as a waiver of any
requirements of the City Code, Land Use Code, or Transitional Land Use Regulations
(as applicable) and the Developer agrees to comply with all requirements of the same.
F. In the event the City waives any breach of this Agreement, no such waiver
shall be held or construed to be a waiver of any subsequent breach hereof.
G. All financial obligations of the City arising under this Agreement that are
payable after the current fiscal year are contingent upon funds for that purpose being
annually appropriated, budgeted and otherwise made available by the Fort Collins City
Council, in its discretion.
H. This Agreement shall run with the Property and shall be binding upon and
inure to the benefit of the parties hereto, their respective personal representatives,
heirs, successors, grantees and assigns. It is agreed that all improvements required
pursuant to this Agreement touch and concern the Property regardless of whether such
improvements are located on the Property. Assignment of interest within the meaning
of this paragraph shall specifically include, but not be limited to, a conveyance or
assignment of any portion of the Developer's legal or equitable interest in the Property,
as well as any assignment of the Developer's rights to develop the Property under the
terms and conditions of this Agreement.
I. In the event the Developer transfers title to the Property and is thereby
divested of all equitable and legal interest in the Property, the Developer shall be
released from liability under this Agreement with respect to any breach of the terms and
conditions of this Agreement occurring after the date of any such transfer of interest. In
such event, the succeeding property owner shall be bound by the terms of this
Agreement.
J. Each and every term of this Agreement shall be deemed to be a material
element hereof. In the event that either party shall fail to perform according to the terms
of this Agreement, such party may be declared in default. In the event that a party has
been declared in default hereof, such defaulting party shall be given written notice
specifying such default and shall be allowed a period of ten (10) days within which to
cure said default. In the event the default remains uncorrected, the party declaring
default may elect to: (a) terminate the Agreement and seek damages; (b) treat the
Agreement as continuing and require specific performance or; (c) avail itself of any
other remedy at law or equity.
K. In the event of the default of any of the provisions hereof by either party
which shall require the party not in default to commence legal or equitable action
against said defaulting party, the defaulting party shall be liable to the non -defaulting
party for the non -defaulting party's reasonable attorney's fees and costs incurred by
10
reason of the default. Nothing herein shall be construed to prevent or interfere with the
City's rights and remedies specified in Paragraph III.D of this Agreement.
L. Except as may be otherwise expressly provided herein, this Agreement
shall not be construed as or deemed to be an agreement for the benefit of any third
party or parties, and no third party or parties shall have any right of action hereunder for
any cause whatsoever.
M. It is expressly understood and agreed by and between the parties hereto
that this Agreement shall be governed by and its terms construed under the laws of the
State of Colorado and the City of Fort Collins, Colorado.
N. Any notice or other communication given by any party hereto to any other
party relating to this Agreement shall be hand -delivered or sent by certified mail, return
receipt requested, addressed to such other party at their respective addresses as set
forth below; and such notice or other communication shall be deemed given when so
hand -delivered jr three (3) days after so mailed:
If to the City: Engineering Development Review
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522
With a copy to: City Attorney's Office
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522
If to the Developer: Valley Bank and Trust
c/o John Stinner
1425 10th Street
Gering, NE 69341
With a ccpy to: Western States Bank
c/o Larry Meier
1520 East Mulberry
Fort Collins, Co 80524
Notwithstanding the foregoing, if any party to this Agreement, or its successors,
grantees or assigns, wishes to change the person, entity or address to which notices
under this Agreement are to be sent as provided above, such party shall do so by giving
the other parties to this Agreement written notice of such change.
O. When used in this Agreement, words of the masculine gender shall
include the feminine and neuter gender, and when the sentence so indicates, words of
the neuter gender shall refer to any gender; and words in the singular shall include the
plural and vice versa. This Agreement shall be construed according to its fair meaning,
and as if prepared by all parties hereto, and shall be deemed to be and contain the
entire understanding and agreement between the parties hereto pertaining to the
matters addressed in this Agreement. There shall be deemed to be no other terms,
conditions, promises, understandings, statements, representations, expressed or
implied, concerning this Agreement, unless set forth in writing signed by all of the
parties hereto. Further, paragraph headings used herein are for convenience of
reference and shall in no way define, limit, or prescribe the scope or intent of any
provision under this Agreement.
A TEST: o
City Clerk
APPROVED AS TO CONTENT:
City En nee
APPROV S TO FORM:
D pu y City Attorney
ATTEST:
By: �rP
A. &2o w mj
THE CITY OF FORACCOLLINS, COLORADO,
a Murkioal Corpora i n
0
DEVELOPER:
Western States Bank, A Branch of Valley Bank
And Trust Coo —'0<' 'X -,
12
EXHIBIT "A"
1. Schedule of electrical service installation.
Not Applicable.
2. Schedule of water lines to be installed out of sequence.
Not Applicable.
3. Schedule of sanitary sewer lines to be installed out of sequence.
Not Applicable.
4. Schedule of street improvements to be installed out of sequence.
Not Applicable
5. Schedule of storm drainage improvements to be installed out of sequence.
Not Applicable.
13
EXHIBIT "B"
Not Applicable
14
EXHIBIT "C"
MAINTENANCE GUARANTEE:
The Developer hereby warrants and guarantees to the City, for a period of two (2) years
from the date of completion and first acceptance by the City of the public improvements
warranted hereunder, the full and complete maintenance and repair of the public
improvements constructed for this Development. This warranty and guarantee is made
in accordance with the City of Fort Collins Land Use Code and/or the Transitional Land
Use Regulations, as applicable. This guarantee applies to the streets and all other
appurtenant structures and amenities lying within the rights -of -way, easements and
other public properties, including, without limitation, all curbing, sidewalks, bike paths,
drainage pipes, culverts, catch basins, drainage ditches and landscaping. Any
maintenance and/or repair required on utilities shall be coordinated with the owning
utility company or city department.
The Developer shall maintain said public improvements in a manner that will assure
compliance on a consistent basis with all construction standards, safety requirements
and environmental protection requirements of the City. The Developer shall also correct
and repair, or cause to be corrected and repaired, all damages to said public
improvements resulting from development -related or building -related activities. In the
event the Developer fails to correct any damages within thirty (30) days after written
notice thereof, then said damages may be corrected by the City and all costs and
charges billed to and paid by the Developer. The City shall also have any other
remedies available to it as authorized by this Agreement. Any damages which occurred
prior to the end of said two (2) year period and which are unrepaired at the termination
of said period shall remain the responsibility of the Developer.
REPAIR GUARANTEE:
The Developer agrees to hold the City of Fort Collins, Colorado, harmless for a five (5)
year period, commencing upon the date of completion and acceptance by the City of the
public improvements constructed for this Development, from any and all claims,
damages, or demands arising on account of the design and construction of public
improvements of the Property shown on the approved plans and documents for this
Development; and the Owner furthermore commits to make necessary repairs to said
public improvements, to include, without limitation, the roads, streets, fills,
embankments, ditches, cross pans, sub -drains, culverts, walls and bridges within the
right-of-way easements and other public properties, resulting from failures caused by
design and/or construction defects. This agreement to hold the City harmless includes
defects in materials and workmanship, as well as defects caused by or consisting of
settling trenches, fills or excavations.
15
Further, the Developer agrees that the City shall not be liable to the Developer during
the warranty period, for any claim of damages resulting from negligence in exercising
engineering techniques and due caution in the construction of cross drains, drives,
structures or buildings, the changing of courses of streams and rivers, flooding from
natural creeks and rivers, and any other matter whatsoever on private property. Any
and all monetary liability occurring under this paragraph shall be the liability of the
Developer.
The obligations of the Developer pursuant to the "maintenance guarantee" and "repair
guarantee" provisions set forth above may not be assigned or transferred to any other
person or entity unless the warranted improvements are completed by, and a letter of
acceptance of the warranted improvements is received from the City by, such other
person or entity.
16
permits shall be issued for any structure located in excess
of six hundred sixty feet (660') from a single point of
access.
C. Any water lines, sanitary sewer lines, storm drainage lines,
and/or streets described on Exhibit "A", attached hereto,
shall be installed within the time and/or sequence required
on Exhibit "A". If the City Engineer has determined that any
water lines, sanitary sewer lines, storm sewer facilities
and/or streets are required to provide service or access to
other areas of the City, those facilities shall be shown on
the utility plans and shall be installed by the Developer
within the time as established under "Special Conditions" in
this document.
D. Except as otherwise herein specifically agreed, the Developer
agrees to install and pay for all water, sanitary sewer and
storm sewer facilities and appurtenances, and all streets,
curbing, gutter, sidewalks, bikeways and other municipal
facilities necessary to serve the lands within the
development.
E. Street improvements (except curbing, gutter and walks) shall
not be installed until all utility lines to be placed therein
have been completely installed, including all individual lot
service lines leading in and from the main to the property
line.
F. The installation of all utilities shown on the utility
drawings shall be inspected by the Engineering Division of
-3-
the City and shall be subjected to such department's
approval. The Developer agrees to correct any deficiencies
in such installations in order to meet the requirements of
the plans and/or specifications applicable to such
installation. In case of conflict, the utility drawings
shall supersede the standard specifications.
G. All storm drainage facilities shall be so designed and
constructed by the Developer as to protect downstream and
adjacent properties against injury and to adequately serve
the property to be developed (and other lands as may be
required, if any). The Developer has met or exceeded minimum
requirements for storm drainage facilities as have been
established by the City in its Drainage Master Plans and
Design Criteria. The Developer does hereby indemnify and
hold harmless the City from any and all claims that might
arise, directly or indirectly, as a result of the discharge
of injurious storm drainage or seepage waters from the
development in a manner or quantity different from that which
was historically discharged and caused by the design or
construction of the storm drainage facilities, except for (1)
such claims and damages as are caused by the acts or
omissions of the City in maintenance of such facilities as
have been accepted by the City for maintenance; (2) errors,
if any, in the general concept of the City's master plans
(but not to include any details of such plans, which details
shall be the responsibility of the Developer); and (3)
specific directives as may be given to the Developer by the
-4-
City. Approval of and acceptance by the City of any storm
drainage facility design or construction shall in no manner
be deemed to constitute a waiver or relinquishment by the
City of the aforesaid indemnification. The Developer shall
engage a licensed professional engineer to design the storm
drainage facilities as aforesaid and it is expressly affirmed
hereby that such engagement shall be intended for the benefit
of the City, subsequent purchasers of property in the
development and downstream and adjacent property owners
all of whom shall be third party beneficiaries of said
agreement between the Developer and Engineer.
H. The Developer shall pay storm drainage basin fees in
accordance with Chapter 93 of the City Code. Storm drainage
improvements eligible for credit or City repayment under
provisions of Chapter 93 are described together with the
estimated cost of the improvements on the attached Exhibit
"B", which improvements shall include right of way, design
and construction costs. The basin fee payable by the
Developer shall be reduced by the estimated cost of said
eligible improvements. Upon completion of such eligible
improvements, the amount of such reduction shall be adjusted
to reflect the actual cost. If the cost of the eligible
improvements constructed by the Developer and described in
the above mentioned exhibit exceeds the amount of the storm
drainage fees payable for the development, the City shall
reimburse the excess cost out of the Storm Drainage fund upon
-5-
completion of the improvements and approval of the
construction by the City.
I. The Developer shall provide the City Engineer with certified
Record Utility Drawing Transparencies on Black Image Diazo
Reverse Mylars upon completion of any phase of the
construction.
2. Special Conditions.
A. Storm drainage lines and appurtenances.
The developer agrees to abide by Article 93 of the Code of
the City of Fort Collins. Prior to the release of any
building permit within a regulatory floodplain, a floodplain
use permit must be obtained from the City Engineer's office.
Prior to the release of any Certificate of Occupancy within a
regulatory floodplain, a post construction elevation certi-
ficate/flood-proofing certificate must be submitted to the
City Engineer's office.
B. Streets.
(i). The City agrees to repay the Developer for oversizing
the sidewalk adjacent to College to arterial standards in
lieu of local street standards in accordance with Section
99-6.F. of the Code of the City of Fort Collins. When
payment is requested by the Developer, the City's obligation
for payment shall be limited to those funds then budgeted,
appropriated, and available by the City for that development
or work then completed.
(ii). The Developer agrees participate in a future alley
improvement district to improve the alley adjacent to this
development. The Developer agrees to participate in a
future improvement district to improve to North College
Avenue.
3. Miscellaneous
A. The Developer agrees to provide and install, at his expense,
adequate barricades, warning signs and similar safety devices
at all construction sites within the public right-of-way
and/or other areas as deemed necessary by the City Engineer
in accordance with the City's "Work Area Traffic Control
Handbook" and shall not remove said safety devices until the
construction has been approved by the City Engineer.
B„ The Developer shall, at all times, keep the public
right-of-way free from accumulation of waste material or
rubbish caused by his operation, shall remove such rubbish no
less than weekly and, at the completion of the work, shall
remove all such waste materials, rubbish, tools, construction
equipment, machinery, and surplus materials from the public
right -of -way. He further agrees to maintain the finished
street surfaces free from dirt caused by his operation. Any
excessive accumulation of dirt and/or construction materials
shall be considered sufficient cause for the City to withhold
building permits and/or certificates of occupancy until
corrected to the satisfaction of the City Engineer. If the
Developer fails to adequately clean such streets within two
(2) days after receipt of written notice, the City may have
the streets cleaned at his expense and he shall be
responsible for prompt payment of all such costs.
C„ The Developer hereby insures that his subcontractors shall
cooperate with the City's construction inspectors by ceasing
operations when winds are of sufficient velocity to create
blowing dust which, in the inspector's opinion, is hazardous
to the public health and welfare.
D„ When the inspector determines that erosion (either by wind or
water) is likely to be a problem, the surface area of
erodable earth material exposed at any one time shall not
-7-
exceed 200,000 square feet for earthworks operations.
Temporary or permanent erosion control shall be incorporated
into the subdivision at the earliest practicable time. By way
of explanation and without limitation, said control may
consist of seeding of approved grasses, temporary dikes,
gabions, and/or other devices.
F. The Developer shall, pursuant to the terms of this agreement,
complete all improvements and perform all other obligations
required herein, as such improvements or obligations may be
shown on the original plat, or on any replat subsequently
filed by the Developer, and the City may withhold such
building permits and certificates of occupancy as it deems
necessary to ensure performance hereof. In addition, it is
agreed and understood between the developer and the City that
the City shall have the right to refuse issuance of building
permits and certificates of occupancy in the subject
development as the City, in its sole discretion, shall deem
necessary in order to insure performance by the developer of
any other obligation the developer may have to the City,
whether pursuant to other development agreements, or
otherwise.
F. Nothing herein contained shall be construed as a waiver of
any requirements of the City Code, and the Developer agrees
to comply with all requirements of the same.
G„ In the event the City waives any breach of this Agreement, no
such waiver shall be held or construed to be a waiver of any
subsequent breach hereof.
H, Financial obligations of the City of Fort Collins payable
after the current fiscal year and/or not appropriated or
budgeted .are contingent upon funds for that purpose being
appropriated, budgeted and otherwise made available.
I-- This; Agreement shall be binding upon the parties hereto,
their successors, grantees, heirs, personal representatives,
and assigns and shall be deemed to run with the real property
above described.
ATTEST:
City Clerk
APPROVED:
DEVELOPER
LaMickel,on
Date
THE CIT OF F T COLLINS, COLORADO
A Mini ' 1 orpora on
BY":
-, •, , . ,-� ....
City nager
OWNER
a yK iceson'