HomeMy WebLinkAboutASPEN KNOLLS - Filed OA-OTHER AGREEMENTS - 2003-07-31-+'
DECLARATION OF PROTECTIVE COVENANTS FOR ASPEN KNOLLS
KNO14 ALL MEN BY THESE PRESENTS: That the undersigned, Taft Hill Development
Corp., being the owner in fee simple of all lands in Aspen Knolls as shown on
the official plat and described in the statement thereon, do hereby establish
these Protective Covenants for the benefit and protection of said Aspen Knolls
and of the undersigned and of each and every person hereinafter acquiring
ownership of land therein.
1. LAND USE AND BUILDING TYPE: No lot shall be used except for residential
purposes and no building shall be erected, altered, placed, or permitted on any
lot other than one detached single family dwelling not to exceed two and one-
half stories in height and a private garage for at least two cars, but no more
than three cars, either attached or detached.
2. DWELLING QUALITY AND SIZE: All improvements shall be constructed of good
and suitable material of first class workmanship. The plans of any structure
placed on any lot shall be subject to approval by the Architectural Control
Committee and the ground floor area of any single family residence exclusive
of open porches and garages, shall not be less than 800 square feet.
3. BUILDING LOCATION: No building shall be located on any lot unless said
location compliers with the setback regulations of the City of Fort Collins,
Colorado. For the purposes of this covenant, eaves, steps, open porches (not
roofed) shall not be considered as part of the building; provided, however,
that this shall not be construed to permit any portion of a building on a lot
to encroach upon another lot.
4. TEMPORARY STRUCTURES: No structure of a temporary character, trailer,
basement, shack, barn, or other outbuildings shall be used on any lot at any
time as a residence, either temporarily or permanently.
5. EASEMENTS FOR UTILITIES: Easements for the installation and maintenance
of utilities and drainage facilities are reserved as shown on the plat. Within
these easements no structure, planting or other material shall be placed or
permitted to remain which may damage or interfere with the installation or
maintenance of utilities or which may change the direction or flow of drainage
canals in the easements, or which may obstruct or retard the flow of water
through drainage canals in the easements. The easement area in each lot and
all improvements in it shall be maintained continuously by the owner of the
lot, except improvements for which the public authority or utility company is
responsible.
6. NUISANCES: No noxious or offensive activity shall be carried upon any
lot, nor shall anything be done thereon which may be or may become an annoyance
or nuisance to the neighborhood.
7. SIGNS: No signs of any kind shall be displayed to the public view on any
lot except one professional sign of not more than one square foot, one sign of
not more than five square feet, advertising the real property for sale or rent,
or signs used by a builder to advertise the property during the construction
and sales period..
8. LIVESTOCK AND POULTRY: No animals, livestock or poultry of any kind shall
be raised, kept or bred on any lot, except that dogs, cats or other household
pets may be kept provided that they are not kept, bred or maintained for any
commercial purposes.
9. SIGHT DISTANCE AT INTERSECTIONS: No fence, wall, hedge, or shrub planting
which obstructs eight lines at elevations between two and six feet above the
roadways shall be placed or permitted to remain on any corner lot within the
triangular area formed by the street property lines and the line connecting them
at a point 25 feet from the intersection of the street lines, or in the case of
a rounded property corner from the intersection of the street property lines
extended. The same sight line limitation shall apply on any lot within 10 feet
from the intersection of a street property line which is at the edge of a drive-
way or alleyway pavement. No tree shall be permitted to remain within such
distance of such intersections unless the foliage line is maintained at sufficient
.1 r
height to prevent obstructions of such lines.
10. GARBAGE AND REFUSE DISPOSAL: No lot shall be used or maintained as a
dumping ground for rubbish, trash, garbage, or other wastes and shall not be
kept except in sanitary containers. All incinerators or other equipment for
storage and/or disposal of such material shall be kept in a clean and sanitary
condition.
11. OIL AND MINING OPERATIONS: No oil drilling, oil development operations,
oil refining, quarrying or mining operations of any kind shall be permitted
upon any lot, nor shall oil wells, tanks, tunnels, mineral excavations, or
shafts be permitted upon or in any lot. No derrick or other structure which is
designated for use in boring for oil or natural gas shall be erected, maintained
or permitted upon any lot.
12. FENCES: No yard fence of any kind shall be located or extended nearer to
the front lot line than a minimum front lot line setback as provided in section
three hereof; and must be erected in accordance with the ordinances of the City
of Fort Collins„ Colorado, and shall be subject to the review and approval of the
Architectural Control Committee. The fences shall be made of either masonry,
rod -iron, or non -deteriorating wood, such as redwood or cedar, and of first class
quality.
13. ARCHITECTURAL CONTROL: No buildings shall be erected, placed or altered
on any lot until the construction plans and specifications and plans showing
the location of the proposed structure have been approved by the Architectural
Control Committee as to quality of workmanship and materials, harmony of external
design with existing structures and the location with respect to topography, and
finished grade elevation in existing setback lines.
14. MEMBERSHIP TO COMMITTEE: The Architectural Control Committee is composed
of Marc Middel, John H. Middel and William R. Katzenmeyer, and the majority of
the committee may designate a representative for it. In the event of the death
or resignation of any member of the committee, the remaining members shall have
full authority to designate a successor to fill the vacancy. Neither the members
of the committee nor its designated representative shall be entitled to any
compensation for services rendered under this covenant. At any time the then
recorded owners of a majority of the lots shall have the power through a duly
recorded, written instrument to change the membership of the committee or to
withdraw from the committee or to restore to it any of its powers and duties.
15. PROCEDURE: The Architectural Control Committee's approval or disapproval,
as required by these covenants, shall be in writing. In the event the Committee
or its designated representative fails to approve or disapprove within thirty
days after plans and specifications have been submitted to it, or in any event,
if no suit to enjoin the construction has been commenced prior to the completion
thereof, approval will not be required, and the related covenants shall be deemed
to have been fully complied with.
16. TERM: These covenants are to run with the land and shall be binding upon
all persons claiming under them for a period of 25 years from date, at which time
said covenants shall automatically be extended for successive periods of 10
years, unless by vote of a majority of the then owners of the lots, it fs then
agreed to change said covenants in whole or in part. Each owner shall be entitled
to one vote for each lot owned.
17. SEPARABILITY: If the parties hereto, or any of them, or their heirs or
assigns shall violate or attempt to violate any of the covenants herein, it shall
be lawful for any other person or persons owning any real property situated in
said subdivision or development to prosecute any proceedings at law or in equity
against the person or persons violating any such covenants, and either to prevent
him or them from so doing or to recover damages or other dues for such violation.
18. SEVARABILITY: Invalidation of any of these covenants by judgment or Court
Order shall in no wise affect any of the other provisions which shall remain in
full force and effect.
-2-
0.1 q
19. LANDSCAPING: Sixty days after the issuance of the certificate of
occupancy by the City of Fort Collins, Colorado, the owner of the developed
lot, said lot having been built upon, shall have commenced with the installa-
tion of sod, trees, shrubbery, and other landscaping materials which are
acceptable to the Architectural Control Committee. All lots within the
subdivision shall be mowed, maintained and kept in a slightly manner at all
times.
IN WITNESS WHEREOF, the said Taft Hill Development Corp., has caused its
corporate name to be hereunto subscribed by its President and its corporate
seal o be hereunto affixed, attested to by its Secretary, this /S f day
of A. D. , 1978.
ATTE `
By: /
iddel, cretary-
Treasurer
STATE OF COLORADO )
)ss.
COUNTY OF LARIMER )
TAFT HILL DEVELOPMENT CORP.
John H. Middel, President
The foregoing Protective Covenants f Aspen Knolls Subdivision was
acknowledged before me this q: - day of 'r� z-,.i , A.D., 1978, by John
H. Middel as President, and Marc Middel as Secretary -Treasurer, of Taft Hill
Development Corp.
WITNESS MY HAND AND OFFICIAL SEAL.
�.
NOTARY PUBLIC
My Commission Expires: 0 -�
-3-
MEMORANDUM
THIS MEMORANDUM is entered into this - day of
March, 1979, between THE CITY OF FORT COLLINS, COLORADO, a
Municipal Corporation (the "City") and NORTRAN, LTD., a
joint venture, and TAFT HILL DEVELOP T CORP., a Colorado
corporation (the "Developers"), and vidences agreements of
the parties relating to storm drainage requirements in
connection with the subdivision of Vi�lage West Ninth Filing
and Aspen Knolls subdivisions in the ¢ity.
l
1. The Developers have agreed to construct a storm
detention pond in accordance with plans prepared by James A.
Stewart & Associates, Consulting Engineers, which plans have
been previously submitted to and approved by the City. Such
detention pond shall be constructed upon a portion of Lot
10, Sonoran View Estates, described on Exhibit A attached
hereto. The construction of the detention pond will include
all facilities shown on the plans, including the inlet pipe
crossing the New Mercer Canal and the bridge also crossing
the canal.
2. The parties anticipate that construction of the
detention pond will be completed by April 15, 1979 and that
irrigation water will not be run in the New Mercer Canal
until after that date. Developers shall use their best
efforts to complete the detention pond by that date. In the
event it. is not possible to complete such construction prior
to the time irrigation water is run in the New Mercer Canal,
Developers agree to complete construction of the detention
pond and all allied facilities as soon as possible after the
irrigation season for 1979 closes, and no further water will
be run in the New Mercer Canal.
3. In the event the detention pond is not completely
constructed and in operation prior to the time irrigation
water is run in the New Mercer Canal, the Developers agree
to construct a temporary detention pond in the northeast
corner of the Aspen Knolls Subdivision in accordance with
the City's design requirements. It is understood that this
will be a temporary detention pond, and the City's requirements
will be imposed with the temporary nature of the pond to be
a consideration considered in determining the requirements.
If the temporary detention pond is required, Developers
agree to commence construction of the temporary detention
pond immediately upon determining that the permanent detention
pond will not be completed before irrigation water is run in
the New Mercer Canal and to pursue such construction expedi-
ently and complete the temporary detention pond as soon as
possible.
4. Developers understand that the City is concerned
that it may have liability to third parties on account of
storm runoff from the subdivisions prior to the time the
-2-
detention pond is completed. Although Developers contend
that there will be no liability to the City on this account
since the natural drainage from the subdivisions will continue
to flow to the same point and across the same lands as it
historically has flowed, the Developers do agree to indemnify
the City and hold it harmless from any loss, claim or expense
on account of any claim because of storm runoff without
detention facilities prior to the time the detention facilities
are constructed. The City agrees to notify Developers
immediately upon receiving any such claim, and Developers
shall have full right to contest, compromise, settle or
otherwise adjust any such claim in the name of the City but
at the expense of the Developers.
5. The City agrees to release building permits in the
subdivisions prior to completion of the detention pond, it
being understood that certificates of occupancy will not be
granted in the subdivisions until either the permanent
detention pond or a temporary detention pond is constructed
and completed as provided herein. Building permits to be
issued shall not exceed the following limitations:
Subdivision
Maximum Number of
Building Permits
Village West Ninth Filing 35
Aspen Knolls Subdivision 31
-3-
DATED the � �h day of March, 1979.
ATTEST:
MMI
N,,i 11
THE CITY OF FORT COLLINS,
COLORADO
By
Ing i y anager
NORTRAN, LTD., a Joint Venture
By BARTRAN HOMES, INC., member
of Joint Venture
By
Bernar Cain, Jr.,
Vice President
TAFT HILL DEVELOPMENT CORP.,
a or do corpor ion
e ,
ATTEST:,
i
Donna J. 66hogsow, Vice -President
-4-
EXHIBIT A
A portion of Lot 10, Sonoran View Estates situate in the
Northwest 1/4 of Section 22, Township 7 North, Range 69 West
of the Sixth P.M., Fort Collins, Colorado, which considering
the East line of said Lot 10 as bearing N 00*23' W and with
all bearings contained herein, relative thereto, is contained
within the boundary lines which begin at the Southeast
corner of said Lot 10 and run thence N 00*23' W 440.00 feet;
thence West 100 feet; thence S 38*00' W 56.50 feet; thence S
26030' W 51.00 feet; thence S 21030' W 54.50 feet; thence S
10°00' W 90.00 feet; thence S 02*30' E 61.00 feet; thence S
17015' E 82.00 feet; thence S 43045' E 21.46 feet; thence S
15037' W 56.59 feet to the South line of said Lot 10; thence
S 89*35' E 169.51 feet along the South line of said Lot 10
to the point of beginning, containing 1.7067 acres, more or
less.