HomeMy WebLinkAboutCHILDRENS WORLD AT DRAKE LANDING PUD - Filed DA-DEVELOPMENT AGREEMENT - 2003-07-07)EVELOPI.BT AGREEIENT
THIS AGREEMENT, made and entered into this �day of C.�cTDi'z ,
A-10. 194, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal
Corporation, hereinafter referred to as "the City," and ANDERSO;N
INVESPiIENTS DEVELOPMENT DIVISION, a Colorado corporation, hereinafter
referred to as "the Developer,"
1A T 7N]C CCCTLJ
11HEREAS, the Developer is the owner of certain property situate in
the County of Larimer, State of Colorado, and legally described as
follows, to -wit:
Children's World at Drake Landing , a P.U.O.,
located in the Southeast Quarter of Section 21,
To4nship 7 North, Range 69 West, of the Sixth P.'l.,
City of Fort Collins, County of Larimer, State of
Colorado.
WHEREAS, the developer desires to develop said property and has
submitted to the City a subdivision plat and/or a site plan, a copy of
which is on file in the Office of the City Engineer and made a part hereof
by reference: and
WHEREAS, the Developer has further submitted to the City a utility
plan for said lands, a copy of which is on file in the office of the City
Engineer and made a part hereof by reference; and
WHEREAS, the parties hereto have agreed that the development of said
lands will require increased municipal services from the City in order to
serve such area and will further require the installation of certain
improvements primarily of benefit to the lands to be developed and not to
-1-
The Develccment Agreement for Children's World at Drake Landing.
This exm 4t does not apply to this development.
COST ESTIMATE FOR "MAJOR DRAINAGE 7PROVErENTS
Include only those major storm drainage basin improvements required by an adopted basin
master ^lan.
ITC'' DESCRIPTION QUANTITY UNIT COST TOTAL COST
1. Storm sewer, manholes, end sections, etc.
(h)
L.f.
(c)
Ea.
Ea. S
(d)
Ea.
Ea. S
Sub -Total
S
Z. Channel excavation, detention pond
excavation and riprap
(a) C.Y. $ /C.Y. S
(b) C.Y. S /C.Y. S
(c) C.Y. S /C.Y. S
Sub -Total
5
EXHIBIT B - Page 2
ITEM DESCRIPTION
3. Right-of-way & easement acquisition
(a)
(b)
Sub -Total
4. Professional Design
( a)
5. Other
QUANTITY UNIT COST TCT,'L COST
S.F. S /S.F.
Ac. S /Ac. S
S
Lump Sum S
Total estimated cost of Storm Drainage improvements eligible for
credit or City repayment
S
Prepared by: Title:
Address:
the City of Fort Collins as a wnole; and
WHEREAS, the City has approved the subdivision plat and/or site plan
submitted by the Developer subject to certain requirements and conditions
which involve the installation of and construction of utilities and other
municipal improvements in connection with said lands.
NOW, THEREFORE, in consideration of the premises and the terms and
conditions acknowledge by the parties hereto, it is agreed as follows:
1. General Conditions.
A. All water lines, sanitary sewer collection lines, storm
sewer lines and facilities, streets, curbs, gutters,
sidewalks, and bikepaths shall be installed as shown on the
approved utility plans and in full compliance with the
Council approved standard specifications of the City on file
in the Office of the City Engineer at the time of
construction of the utility plans relating to the specific
utility, subject to any time limitations as provided by
Ordinance.
B. No building permit for the construction of any structure
within the development shall be issued by the City until the
water lines, fire hydrants, sanitary sewer and streets (with
at least the base course completed) serving such structure
have seen completed and accepted by the City. No building
permits shall be issued for any structure located in excess
of six hundred sixty feet (660') from a single point of
access.
C. Any water lines, sanitary sewer lines, storm drainage lines,
-2-
and/or streets ,:escribed on Exhibit "A", attached hereto,
shall be installed within the time and/or sequence required
on Exhibit "�". if the City Engineer has determined that any
water lines, sanitary sewer lines, storm sewer facilities
and/or streets are required to provide service or access to
other areas of the City, those facilities shall be shovin on
the utility plans and shall be installed by the Developer
within the time as established under "Special Conditions" in
this document.
D. Except as otherwise herein specifically agreed, the
Developer agrees to install and pay for all water, sanitary
sewer and storm sewer facilities and appurtenances, and all
streets, curbing, gutter, sidewalks, bikeways and other
municipal facilities necessary to serve the lands within the
development.
E. Street improvements (except curbing, gutter and walks)
shall not be installed until all utility lines to be placed
therein have been completely installed, including all
individual lot service lines leading in and from the main to
the property line.
F. The installation of all utilities shown on the utility
drawings shall be inspected by the Engineering Division of
the City and shall be subjected to such department's
approval. The Developer agrees to correct any deficiencies
in such installations in order to meet the requirements of
the plans and/or specifications applicable to such
-3-
installation. In case of conflict, the utility drawings
shall supercede the standard specifications.
u, all storm drainage facilities shall be so designed and
constructed by the Developer as to protect downstream and
adjacent properties against injury and to adequately serve
the property to he developed (and other lands as may be
required, if any). The Developer has met or exceeded minimum
requirements for storm drainage facilities as have been
established by the City in its Drainage Master Plans and
Design Criteria. The Developer does hereby indemnify and
hold harmless the City from any and all claims that might
arise, directly or indirectly, as a result of the discharge
of injurious storm drainage or seepage waters from the
development in a manner or quantity different from that
which was historically discharged and caused by the design
or construction of the storm drainage facilities, except for
(1) such claims and damages as are caused by the acts or
omissions of the City in maintenance of such facilities as
have been accepted by the City for maintenance; (2) errors,
if any, in the general concept of the City's master plans
(but not to include any details of such plans, which details
shall be the responsibility of the Developer); and (3)
specific directives as may be given to the Developer by the
City. Approval of and acceptance by the City of any storm
drainage facility design or construction shall in no manner
be deemed to constitute a waiver or relinquishment by the
-4-
City of the aforesaid indemnification. The Developer shall
engage a licensed professional engineer to design the storm
drainage facilities as aforesaid and it is expressly
affirmed hereby that such engagement shall be intended for
the benefit of the City, subsequent purchasers of property
in the development and downstream and adjacent property
owners all of whom shall be third party beneficiaries of
said agreement between the Developer and Engineer.
H. The Developer shall pay storm drainage basin fees in
accordance with Chapter 93 of the City Code. Storm drainage
improvements eligible for credit or City repayment under
provisions of Chapter 93 are described together with the
estimated cost of the improvements on the attached Exhibit
"B", which improvements shall include right of way, design
and construction costs. The basin fee payable by the
Developer shall be reduced by the estimated cost or said
eligible improvements. Upon completion of such eligible
improvements, the amount of such reduction shall be adjusted
to reflect the actual cost. If the cost of the eligible
improvements constructed by the Developer and described in
the above mentioned exhibit exceeds the amount of the storm
drainage fees payable for the development, the City shall
reimburse the excess cost out of the Storm Drainage fund upon
completion of the improvements and approval of the
construction by the City.
I. The Developer shall provide the City Engineer with certified
Record Utility Drawing Transparencies on Black Image Diazo
Reverse jNylars upon completion of any phase of the
construction.
2. Snec-ial Conditions.
A. Storm drainage lines and appurtenances.
All storm drainage facilities shall be completed by the
Developer and approved by the City prior to the release of
the Certificate of Occupancy.
3. Miscellaneous.
A. The Developer agrees to provide and install, at his expense,
adequate barricades, warning signs and similar safety devices
at all construction sites within the public right-of-way
and/or other areas as deemed necessary by the City Engineer
in accordance with the City's "Work Area Traffic Control
Handbook" and shall not remove said safety devices until the
construction has been approved by the City Engineer.
B. 'The Developer shall, at all times, keep the public
right-of-way free from accumulation of waste material or
rubbish caused by his operation, shall remove such rubbish no
less than weekly and, at the completion of the work, shall
remove all such waste materials, rubbish, tools, construction
equipment, machinery, and surplus materials from the public
right-of-way. He further agrees to maintain the finished
street surfaces free from dirt caused by his operation. Any
excessive accumulation of dirt and/or construction materials
shall be considered sufficient cause for the City to withhold
building permits and/or certificates of occupancy until
corrected to the satisfaction of the City Engineer. If the
Developer fails to adequately clean such streets within two
(2) days after receipt of written notice, the City may have
the streets cleaned at his expense and he shall be
responsible for prompt payment of all such costs.
C. The Developer hereby insures that his subcontractors shall
cooperate with the City's construction inspectors by ceasing
operations when winds are of sufficient velocity to create
blowing dust which, in the inspector's opinion, is hazardous
to the public health and welfare.
D. When the inspector determines that erosion (either by wind or
water) is likely to be a problem, the surface area of
erodable earth material exposed at any one time shall not
exceed 200,000 square feet for earthworks operations.
Temporary or permanent erosion control shall be incorporated
into the subdivision at the earliest practicable time. By way
of explanation and without limitation, said control may
consist of seeding of approved grasses, temporary dikes,
gabions, and/or other devices.
E. The Developer shall, pursuant to the terms of this agreement,
complete all improvements and perform all other obligations
required herein, as such improvements or obligations may be
shown on the original plat, or on any replat subsequently
filed by the Developer, and the City may withhold such
building permits and certificates of occupancy as it deems
necessary to ensure performance hereof.
SO
F. This greement snail -;e binding upon the parties hereto,
their successors, jranLees, heirs, personal representatives,
and assigns and shall --e doemea to run with the real property
above described.
G. Nothing herein contained shall be construed as a waiver of
any requirements of the City Code, and the Developer agrees
to comply with all requirements of the same.
ATTEST:
14kw
City Clerk
APPROVED:
City Engineer.
City Attorney
THE CITY OF FORT COLLINS, COLORADO
A f1uni ci 1 Cor orati
dy
ity Manager
ANDERSON INVESTMENTS DEVELOPMENT
DIVISION, a Colorado Corporation
tt-
t' ful
Pamela G. Webb, Vice President
(Corporate sea])
-8-
- YfATi?TT "Ati
1. Scneoule of water lines to be installed out of sequence.
riot Applicable.
`schedule of sanitary sewer lines to be installed out of sequence.
riot Applicaole.
?. schedule of street i{iprovements to be installed out of sequence.
,ot appIicabie.
Storm drainage improvements to he installed out of sequence.
See paragraph 2.A.