HomeMy WebLinkAboutCENTRE FOR ADVANCED TECHNOLOGY PUD ELEVENTH - Filed DCP-DEV. CONSTRUCTION PERMIT - 2003-07-07City of Fort Collins
Transportation Services
Engineering Department
Development Construction Permit, Page 1/6
DEVELOPMENT CONSTRUCTION PERMIT
i%% - ""
Permit Number.' 6&2-7-8A Issuance Date:
Project Name: Center for Advanced Technology P.U. D. 11th Filing Parcel U
Project Location: North of Drake and East of Research Boluvard
Permittee: Sinnett Builders, Inc.
City and developer contacts: See attached Exhibits A & B for names and phone
numbers of all contact persons for this project.
Fees: Erosion Control ( to be paid to Storm Water Utility prior to permit issuance
Permit Application Fee (paid at the time of application)
$300.00
Construction Inspection Fee (paid prior to issuance of this permit) $5,525.20
Street excavation fee ,not required $0.00
Total
$5, 525.00
Development Bond or other approved security.
Amount of security deposited with the City to guarantee the completion of all
public improvements to be constructed as shown on the approved plans for
the development. $33,316.00
Form of security deposited with the City: (.f�.
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into
all design drawings and specifications the certification of all materials testing by an
Engineer. The Permittee shall have an Engineer prepare revised design drawings and
secure City approval for all revisions to the Utility Plans and related documents. The
Permittee shall have an Engineer represent, as required by the City in the Development
Agreement, that the improvements are constructed in conformance with the approved
Utility Plans and the standards and specifications of the City. The Permittee shall provide
Aas-constructed@ plans prepared by an Engineer prior to the City's acceptance of the
281 \01 th C011( It� ;�V011LIC • PC)_ Rm� ;S(l • F��rt Cnllin�, CCU 05?2 (l�u(1 • 19�(l; ?^i-�;6f1
Phone number(s):
Office: _
Cellphone:
Fax number:
Email:
Utility contractor:
Individual Name:
Company Name:
Address:
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
Concrete contractor for flat work:
Individual Name:
Company Name
Address: _
Phone number(s):
Office: _
Cellphone:
Fax number:
Email:
Concrete contractor for structures:
Individual Name:
Company Name
Address: _
Phone number(s):
Office:
Cellphone: _
Fax number:
Email:
Paving contractor:
Individual Name:
Company dame
Address:
Phone number(s):
Office: _
Cellphone:
Fax number:
Email:
Landscape contractor:
Individual Name:
Company Name:
Address:
Phone number(s):
Office:
Cellphone: _
Fax number:
Email:
Other contractors; and parties involved in the project:
SUBMIT THE FOLLOWING ITEMS (Required for all projects):
• 81/2"xI I" copy of the Site Plan
• Proposed Project Schedule
• Project quantities and cost estimate for all of the public improvements to be constructed.
In addition, include all private improvements that are required to be inspected by the City
Construction Inspectors. This information must be submitted in the format shown on the
attached form titled "Project Quantities and Cost Estimate Sheet."
ADDITIONAL SUBMITTALS (Required if checked):
❑ Traffic control plan(s) for the project
❑ Proposed haul routes shown on a City map
❑ Shop drawings
❑ Other
CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to
discuss plans and special requirements for your project, is required for all development projects.
The people required to attend the meeting are the Project Manager, Project Engineer, Developer,
Architect/Land Planner and General Contractor (if no General Contractor, representatives for each
of the contractors expected to work on this project)
People to Attend: List the peoples names and titles for those who will attend the pre -
construction meeting:
Name
11
Title
David Stolte Proiect Manaeer
Jim Clark SupeY
,Jim Allen Morley Engineer
Bill Nichols Gerrard Excavating
Name
Title
ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated
value of all public infrastructure improvements that will be constructed and accepted by the City to
own and maintain. In addition provide the 1 alue o all private infrastructure improvements that the
City will inspect and require certification ior. The estimate shall be in the same format as the
attached sheet titled "Project Quantities and Cost Estimate Sheet.'
Public infrastructure, estimated cost:
Private infrastructure, estimated cost
I certify that the information on this permit application along with the required additional submittals
are true and correct to the best of my knowledge, and that in filing this application I am acting with the
knowledge, consent, and authority of the owners of the property (including all owners having legal or
equitable interest in the real property, as defined in Section 1-2 of the City Code; and including
common areas legally connected to or associated with the property which is the subject of this
application) without whose consent and authority the requested action could not lawfully be
accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for
purposes of inspection and, if necessary, to enter upon such property to perform work required of the
applicant if the applicant were to it t perform the required work.
Applicant Signature:Date: 10/23/00
5
10/23/00 11:12 FAX 970 482 6368 THE SEAR -BROWN GROUP
10002
LEGEM
... ._ ... PROPOSED EASLYWT PROPOSED SIMS DRAIN RIE m EtOSTING TELCPNONE RISER
��— pDSRNc SWITaR7 SEWER •/ YwMOLE
E2ISTIMC UNDERGROUND EECIPIC 0 EXISTNC MH
taA� ROAD RMjT-OF-'PAT OR PROPER" UNE aI l E-A-"NC UrITY SIGNAL
E7JSTING WaT[RUNE C.NAL`E AND hRE HTDRdMn �••—_
_._._._-------
SUNE
. -aa PROPO� WATERLINE ./ vLrC SOUND OUNDA>eT a:FNlLT REMOVAL
FIRE HYD IT wrEYBLT �,„��„.mv.e DNA$ UNE
./ TNRUST BLOOC MIR. AsfT a T.B.)
�— PROPOSED SANITARY SEWER ./ MANHOLL • AIR REIEAX VALVE
PRaPOStD SUSDRAIN ./ CUGANOUT 0 EUXnNC M%EFMa,E YwHOLE
S.wITARY SEVER EERVICs Ume E2ISTNC CABLE TV RI
— — — — — wATER srimcl UNE O EASDNc ELECTRIC Box
ESISTINC 9TORW GRAIN DIPS E? ESISTNG zTORY INLET .C:ALE 11-01
IT
T9 d 9 ar li 4, + 1 �, ` L ;y , 1b1 REMOVE E116TNG e•
A q' 'III JJ • P.K .�SSY \0\ \ , Ab's 2.2 7/2.EHOS
i� I �I "''�•�',I �'1', ,`t� AIN EJSS'IINO 9'
WATER
UNE UNE BT
IVY. OJT S7.40':
(SEE l NC B• Bc' OeNO
DMP'L li' PLiNS)- ` '" '�+'t \u,'CU'aC YGCNWICAL JOINTS)
CAwCENC�ENT.• \ ••\'� V
SEF;OETI LV. AMT 17 t� 5 SEE S11CLT 5
., T i l . 0'
I.I j l' y 57•oD L.F O 205; D• ow DCND
SZR
Pl.� w. 9clY W/ TES,
ERv."r% �CCs'q'F Bd'(. p � - •' • +\ f �„ , ,
INLET I -AD 1.�
`LOT 1 �•`\\ _ \\,
RE),OK CLSTINC
INv. 3A.02 NTORiNT & 20 LF 2CF a LDS
'tl 'r f \ qp• / or CxISr.Nc B• / `
3
DIP WATER UNE. \ ,'L,, a' PVC EaM. rtnv.
CAPt ANDS-KAXETEND OF UNC
ANDCJRB . oP t 1\4C \ ` I'1 Wv_ O END OF UNC 3LBa
y ME DETAIL 2NCZT ty +' /
LOT �2
INL7 I-A7
CCNC. EN tLASEYEWr
SEL DET. L'S EET S. B ASB SAM. '.EN.N,
,.
y is". do' j TEE ./ S. `: ~
_HERCP \�. 4 i 0• uC AB ODE
INLET Salo A 'yeALr - r+ti;•, lY.v °OpIYFJ+T
DaET I- 1
! _� INLCT L-A2 OvS n• cv. •� „^�
- i� 12��' � -rr"� G• vIJ'e �9 ?" ^. �'.`C J�,L?�' t ;:, P' � ,. H\i � ,\. 9t"eET 5
COI bl'o
1r1,r I' 0
yC�gN4 CNC "'� p ST7+N-3 OVER E70SiNp tDK�
�— 11� }', • 6 .D'.e' T.veL TEE `3b Y-EE 'AI\ S.N, SCM(',4E
•• o TNa s>,E2 f) I� I
AI'io'T�PD� • ]E I \ L
I ' y T.fl` SHEET 3'.it \ '>�• ,
...T� ti
•Z2 Y•" 9cmc •�,FU RNION AND INST.I. L'F
\ \ W/ Ta. ,!, ; ' GI^'B• PVC 9AM.
'q� SETy
. \ •\ TTPL SE^i. 3MCTOe `� \. • REYoif E7u5 �0 (PATCH F713S1M01NN,I1`, ''°• `t,
\. UPSTREAW� 'Au PROFl.E�
n �• 1' �• \ wo CURB STOP PWO AND ry. i'I \ `
vi ^.� 'L �, ` c DETAa S.iFZT 1a TIFi IN TO EIOST1Nl� THIS J¢CT FOR VNv,, AT
•, \ Ym S B' WATER UNE BT
-IBENDi%G 221f
T.B,
M \ '(\\ " \ _ CLEAN O �i V• PopD,o67UT STRUCTURE
WV, 37-79
'�.• ,%•��.�'�vvvA� v' 'r;,F+' ��a II���
I t
: C). C:): p. O:
: O.
p.
w
dl
O;
CD
OE O; O; O;
O;
!
O;
f O; OI
p
L
III
i r`i
04 i Oi i CD:
CD;G).
i Oi
i
Oi
i
i Oi OI
i
(r)i
tii i CDi Vi Oi
Ni ti Ni co!
i OE
. O)i
i
i
ti.
CD:i
E i i i i
E E i i
i Vi f�l
i CDi '7
W aO+
(0
V
71
i
T;
i
-I.; Q M M iQ
a:
Q
Q �E
QE
NE
Q? QP QQQ_ Q_
Q Q Q_ Q
Q_ O_S (D
69'
Z' Z:
Z:
Z'
Zt
Z; Z; Z' Z' Z; Z;
_Q
: Z; Z' Z: Z' Z:
Z: (fl' "I
c
C:)
CD;
OO
_-
(01
CD 1
OI
co O
O
d:l
O,
�.:
�I
�.
OI
�:
O OI
O
O
C
L„
�'
�•
�I D
00Lt�I
O O' O
(D
�I
..-...-_.
1
O N.
O'
r-
NI
CO! —i d; CD
I N 1
M' V
69 6H
�. �.
i
�:
M1
d
71
,. 1� Q Q
in
V
N
toll, N N
__.. tol
,,
a
cj i
CL
L
Q
Q Q
69
tol
69
69 a
Z
fA i
69 EH I 699
Z
Cl)E'
691
a
i1I
d
w
O. O'' C0 O I O O 1 O O O O O O O I O i 01 0 1 0 O' CD 0. O I G i O I O O' 0 O
00 00 O O O O I (D O O O1. O G I O I O O I O O' O O 01 O I O OI 0'. 0 O N I
r- CD co 0.. 0 0 0 00 o, o O l 61 (ri o l o i (ri 61 (ri I o i o 61 0 l 0 0 C) �
Q !, 00 169(D i (c); 1- i rl- N CO V 00 N 1 � 1 LO G) 1 'It1 r- N 1 N i to toll toll toll 691 69 N LO
C-)I -1- 'I, 'ITO O 1 i O) (D rl CO 1 O_ 00 I CDU')1 ,-- : (D ti G) 00!,
Lr (r)' MI co: NI V7 a ! NI NI �' N! Ni toll p <}I,
O1' co:691 6'> 6l 6l 69 esi EA EA d4 tol toll Vl 6ri
1 ; 1 i I toll
Oi C OI O C) O O� O O O OI O OI OI O) OI O OI O!4,z))
OI O O' OI O� O OI
O O 00 00, O 1 O O I C) (D 0. O 0: O O O I O O j O O i O I O I O! O O j OIL O O N
0 M 1 O O N O 00 O I O 0 0 1 O O O O 1 0 1 O 61 O! O 61 61 61 O 61
tol vi 1 N 1 r- ! Q) N V 00 N_ I r--00 (n 'IT LO ! N_ 1 to tol 69 6l 6). toll 69 00 N !
dll r-, r-:ri N V (D NI N 619I N 1 N U')
N 691 601 W-1 toil vi [A EA te: tol toll 6lLL 69 tol eAi 6H to
m
F— d O O I C) I O! O O O O O O' O O I O O I O O O 0 1 ! O I O 00 C:) 0 1 O
LL
) (D (O 1 0' O ! O I (D (D (D 0 0 O O 0 1 O O O O M W 00 CO�. (DO MI MI C?'OI O O O. O 0� O 0' O O' O O -00'I N NI 01. O 0. OI 0 O
C L. EA' be. toll EA 0) G)1 60 69 Wl CD'.. (D (D1 a) I (O () () (M M 1 0)' 2), (A' 6H 69' toll 6l1 ul
O C 1 6l 69 _ 69l6l 69I tol tol to to 69I(A.- R
Z
> a a rl Z '
L — ' CD O: C� I C� CD ! C) O O 0 0 O O O O O f O O. O [ O O O O O O O O O' O O OI O O O'
O O } j I O O OI,
� r l' fl- N I C) O O I o f 00 O O 0! 0.. 0! 0 U') O (O I O I U7 O O I O O'�. O O N I
O : G) r- toll (D V 1 0 : r 0 N O. O O O n N (D N 69 691 toi 69 64 'T M I
,� (O r-: N 00 r- N (' f� 00 1 (0_1 M_! V (D M
M CO j _ .. U-) VT _. vi N N N O OBI
-W =II m 6:i ! 69 toll (A' 69 toll .toY!` j 69I Efi' 6%i1 toll OI
co) 11
_CD Imo.._ C)C) Oar 1 ^!
U 1 1 —1
r r 01 C:) CD' O O. O, OI p, O O I O OI O C:) 0 I'I
U Q)' O �I of 0. pl p O 0 OI OI OI, O OI O (D O O
O C O �' O CD aD 0 1 O CO : O U7 O 1 1 O U7 I O O 1 U) I u7 I (O !i
♦_� Q� = V �'. '7' NIC) N, COD 6V1, N1 O'I M. Q) N O O' ccl)I COI t Cl)
•� ,L 'O _. .. - •-�- --- --�; �' 69 �- tol toll 6l! Hil 69j to9i 6911 �I ERi V�I. tol 1•I
L L >+ rn
A 2O d w 1 I � I it
Li. 7 .fC C ('7Cl) 1 1' a c a: a a a a O
m C)I �'' 0coNMI '. Vj I I M MI 00 U7 � ! Z: Z. Z• Z• Z: Z OO
OD Cl)Cl)p lI
N
I1'I 1 p p
W4.0
'+'+ o ��
U cn (n.1 r� d!Q :� �'� Q ¢Ia Q1Q ¢ld a dla vi } � � Q �i�
W C CO J J W W J J J W W W1 W WI WI W W W I W J U) J J WI (A N
}Li N = ujI W
_ -u -� �_ c �_ c ml_ ----
VI _ I C Co!� YI tl)I O) C
U C. (17. 7 fl, O R R C R O C C'� : Ri O. R
cL
d' T) C) �'. C� i d V1 N -0 = N N: m1 3 �' V 1�9I �I, 7. �' �. �IW
O a: F- 0 « R d d F- U U 1 �+ R fn N_ to C i d (� -0 a, d NO
V �' 3 m c C91
c .:'' m to �' m m. L > i� = a,, •` �I L
O a+ V t.: .. LL' lL C N V L N C +.
CL u �! Q m m >' m, ii.l R1 QI O, y, O R
L co
d 01
V C)Il i LI ❑ a
ccw al r-71 R 3 RI75 Q,
Y.r d C7 ! � Q
t� O 0CL
E
.O 9
,oa
n
— ,
L
y h:
m
ow
C)
C).
CD
o
op
0•
r,�
C\i,
CD
C).
"T
C)
C)
O.
0
CY)
a
c).
co;
EA.
<
<
m
0:
(D
CL
U)
L-
Z:
Z!
Z;
Z;
Z;
Gq;
Z;
Z;
Z;
Z; Z; Z;
z;
Z;
Z; Z.
Z;
7;
to
64.
Ln
d)
m
CD
0
0
CD
00..._
0
C)
01
CD!
.
0
. . .
C) 1 0 CD
. .
CD
.
C)
. .
CD
..
C)
CD
0
CD
0
C)
CD
CD
(D
(D
CD i
0
C)
0 CD 0'
C)
CD
o CD
C)
.
CD I
. I
C):
m
6
L6
6
6
Lri 6 6
6
6
1
6 1 61
C)
c-),
co
0
r--
C)
N
0
CD
61>
I-
C)
C)
N 0 (N
uq�EHtr)
U
rr
m
G�
C\
�
I-
cl)
u
a)
LI)
't
C\[
C4
C\i
Cl)
CL
z
69�
V),
6.). U=,
z
69
z
z
z
z
z
Ln
CD
(D
D
C
C
i D
D
C
C
(D
D
C
.
.
.
. S
D
C
D' C
C
CC
0
COO�QCCC
PCcCCCCC
C
C
COC
.C.
.
CC
C
C0
N
C
r-
0
lD
C)
C
C
C
C
00
C
D
C:
(D
LO
0
C
O; C) O
D
0
CD
CD
ol C
r-
O
(H
(D
(0
r-
r-
N
n
IT
co
N
r-
LO
m
'T
r- I N N
6->
69
U91,! 60-
EA
69- C4
Lf)!
'T
0)
CD
m M
(0
r-
M
CD
00
C)
In
-
(D
r-- 'zT
m
00
O
(n
U)
C15
CO
cl�
Lo-
,t-
C\I
cli
61)
C\T
C\
i
Cl)
69
61)
69
69
U�,
63.
V),
ei
GF)
61)
U=l
6-> fA
Efi
a
C)
0
(D'
C:)
C)
CD;
(D
CD
CD
C)
0
C)
0
C:)
C)
CD
C:) C) C)
C)
o
c� CD
ol
(D (D
c):
cl�
cl�
(Z�
C�
m (q
C�
(Z�
C�
C�
9
C�
C�
C�
C�
C� C� C�
C�:
C�
C� (D
C) I
C� C�
C�
0 0
L�2
M
CD
(D
0
(D
C)
CD:
CD
CD
C) 0: (D
CD
C)
C- (D
CD
CD C:)
LO
0
Y>
C4
r-
C'j
j-
00
C\l
r-
00,
0-)
-T
I
LO C\J, u:�
ee
0):
ua 00
N
N
LO
6F>
ea
60
U=l
m U
ea
(o
Qj
W,
GG�
6A
61)
ce
e-,
bq
CL
LL
p
r
(Z>
(Z)
(Z)
CD
C)
C)
C)
(D
CD
CD
C)
C)
0
C>
0
C) CD
C)
CD
c)
c)
(0
(D
Z)
C)
C)
C)
QD
(D
(0
CD
C)
CD
(D
C)
0
C)
0 C�
C?
0
C) (z):
(D
C)
CD
(Z)
C)
ua
V>
(11>
ta
m
m
V)
CD
(o
(D
0)
(D
M
M
CO cn
ua 03,
U9,
(113, 61),
bl)
V�
60).
ell
619,
bl>
619�
ul.�
U�l 69
0
o
m
I.
C)
C)
'o
c):
C)
(D
m CD
CD
CD
C)
O.
(D
O.
0
(D i
(D
(D
CD C)
CD:
(D
C)
0:
CD 0
CD
CD
CD
ID
0
C)
(D
(D
CD
C)
(D
(D
CD
CD
0
C)!
CD
CD 0 CD
.
C)
(D 0
CD
0 0
C)
m
.
.
C14
.
.
CD
.
CD:
.
0
. .
00
.
0
.
C:)
.
CD
.
0
.
CD
.
0
.
LO
.
0
.
0
. .
U): CD LO
r-
5)
.4
(D
Zt
C)
r-
CD
N
CD
CD
(Z)
C)
r-
0
CD
N (D N
'IT
U')
ua Gr,
U-3
61). 'T
Cl)
LO
Tt
N
0(5
00:
r-
N
M
r-
N
00
M
-
zT
ci:
(D M
m
05
co
EA
EA
EA
EH
Ef3
EA6q
U)
6F)
6pi
U9�
i:& U).
CD
C)
CD
c:)
(Z� (Z)
(Z)
C�'
C)
0
CZ)
(D
CD
C)
0
C) C)
C)
N
C)
(D
C5
(D
(Z)
C:)
CD
CD
C�
C�
CD
(D
CD
C)
c):
LO
O�
uj
4
QD
00
(D
C-)
06
�2
4
LO
F.-
(Z)
o
Ln
(Z)
N
c-)
(Z)
N Cj N
co
C/3
Ill-
C\�
QD
V)
6")
N
m
(D
�
r-
M
C) C) �
bq
E
EA
04
U�l
V9, 61)
(D
0 15
colip
0
(D
.
. .
.
CD
O
co
m
N
CD
'IT
co
N
co:
co
co
00
LO
'IT
z z
z
z OD
C4
O CY
4.0 w
a
LL
LL
LL7
<
<
<
toLLI
'E
LU
LU
_j
W
W
W
W
w
w
w
w
w
ui
L6
C6, C6
4-
(/)
C"
C"
w
c
0)
all
CL
0
m
0
CL
u
r
m
4)
(1)
E
(1)
>
0
-0
5
5. cl
'a
-C
C
t5
m
m
M
M rl)
wo
u
u
>,
M
cn
cn
0)
CD
FL
r
r-
0
Cl)
r_
4-
c
(j) 0
u
a
4)
a,-
a)
S
.
a)
U)
a)
cn
(1)
(n
LL
>
(D
u
r
Z
0
C-)
LL
LL
a
CA
U
ID
r-
0
w
m
-0
E
U)
u
0
0
m
0 0
aC)
Q.CY
CD
cn
4"
Qo
cn
cn;
co,
0'ca
cn
Development Construction Permit, Page 2/6
constructed public improvements. (All references above to the terms "Project Engineer
and Engineer shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions: Normal work hours as allowed by City Muncipal Code
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this
project (utility plans, site plan, landscape plan, development agreement, soils report,
pavement design, traffic study, drainage report, plat easements and any other official
documents), shall be kept on the development site available for use by City staff doing
inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of
this permit, this permit shall expire and the applicant will forfeit the permit fee paid
for this permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The
applicant may apply for an extension by reapplication at least two weeks prior to the
expiration date. Such application shall contain information sufficient to justify the
granting of the extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use
Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever
is applicable, are met. If the Development Agreement does not specify times for
completion of public improvements, or if there is no Development Agreement, then the
improvement requirements specified in Section 24-95 of the City Code shall apply, which
provides that construction of all improvements shall be required prior to the time of
issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection
has been conducted by the City; (2) punch list items from the final inspection are
completed and accepted by the City; and (3) required certifications from the licensed
professional engineer that improvements are completed to City standards, specifications
and approved Utility Plans; and the Aas-constructed@ plans have been received and
Development Construction Permit, Page 3/6
accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance
by the City of the completed improvements, in accordance with Sections 29-13 and 29-14
of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and
3.3.2(C) of the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours
prior to any planned construction on this project. All required perimeter silt fencing and
other erosion/sediment control best management practices (BMP=s) that can be installed
prior to construction must be in place and inspected by the City Erosion Control Inspector
before any land dlisturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a
permit is issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions: Applicant is required to obtain a Street Excavation Permit prior to
the cutting of all existing City streets . Contact the Engineering Department, Chief
Construction Inspector Lance Newlin for permit and associated fees
Permittees acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and
authority of the owners of the property (including all owners having legal or equitable
interest in the real property, as defined in Section 1-2 of the City Code; and including
common areas legally connected to or associated with the property which is the subject of
this application) without whose consent and authority the requested action could not
lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter
upon the property for purposes of inspection and, if necessary, to enter upon such property
to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements
and conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project M
Signature: --> Dater
Approval fo iss nce:
City Engineer
Approval: Date: 2 4al
Permit Issuance Date)
Development Construction Permit, Page 4/6
EXHIBIT A
Project Name: Center for Advance Technology Filing 11, Parcel U
Project AKA: Cat llth
City Staff contacts:
Development Engineer: Dave Stringer
281 N. College Ave. Fort Collins, Co. 80524
970 221- 6765
Construction Inspector: Lance Newlin
281 N. College
970 221-6605
970 222- 0854
Water utilities Engineer: Roger Buffington
700 Wood Street
970 221- 6854
Erosion Control Inspector: Bob Zakley
700 Wood Street
970 221- 6063
Traffic Operations: Ward Stanford
625 Ninth Street
970 221 - 6615
Street Closures: Sly Mireles
625 Ninth Street
970 221- 6815
Transportation Planner: Kathleen Reavis
210 E. Olive
970 221- 6140
Forestry: Tim Buchanan
281 N. College
970 221- 6361
Development Construction Permit, Page 5/6
EXHIBIT A (continued)
Light & Power:
700 Wood Street
970 224 — 6700
US West: Eric Handcock- 970 377- 6401
Development Construction Permit, Page 6/6
EXHIBIT B
Property Owner(At the time of this permit issuance):
Individual Name: Tom Livingston
Company Name : Everitt Companies
Address:_ 3030 South College Ave., Fort Collins- CO 90525
Phone nurber(s):
Office: (970) 226-1500
Cellphone:
Fax number: (970) 223-4156
Email:
Applicant/Project Manager (The primary contact person for all matters regarding this project, and
the person responsible for all matters referencing "the Developer" in the Development Agreement
for this project):
Individual Name: David Stolte
Company Name: Sinnett Builders, Inc.
Address : P.O. Box 1969 Fort Collins, CO 80522
Phone number(s):
Office: (970) 493-1770
Cellphone:
Project Engineer (A Colorado licensed professional engineer who is the civil engineer the person
responsible for the design of this project, responsible for certification that improvements are
constructed in accordance with approved plans, responsible for making revisions to plans with City
approval and for providing as -constructed plans):
Individual Name: Jim Allen Morley
Company Name : Sear Brown
Address: 209 South Meldrum, Fort Collins, CO 8.0521
Phone number(s):
Office: (970) 482-5922
Cellphone:
Fax: number: (970) 482-6386
Email:
Professional License Number:
�viiapauy tvai[1C
Address:
2
0!
0:
CD!
CD:
(Z)
(D:
CD:
.
. .
. .
.
.
C)
(D
C)!
CD,
CD,
0,
C:)!
.
. .
. .
.
.
0
00
q r-
N
O.
C)
CD,
CD
ci ; .
.
. ;
. .
i i
. .
. .
; ;
. .
.
. m
.
a
w
m
a
m
6
oi
o-):
r-'
r-
co':
'T.
*';
CC
c).
00
C)
G)
r-
CD
r-
m
<;
M;
co;
<
<q
<
< .
.
Q. .
Cli
<;
<;
<;
CD:
Ln >
U�I-
69- -
W
Z.
Z.
Z;
Z.
Z;
Z:
Z: Z:
Z: Z:
Z:
Z.
z;
Z;
Z; .
Z; .
Z;
. 69;
r-
b'>
fA
.
.
.
.
. .
. .
.
.
.
.
.
.
.
.
r.
. .
.
. .
a a
i m
m
a
i
a
m
(D
CD
0
0
0
..
0
.
0
..
0
. .
0 0
. .
0 C)
.
CD
.
.
CD
.
CD
.
CD
.
c)
.
0
0
0,
C)
0
0
0
0
0
0
0
C) C)
C� C�
C�
CD
0
0
0
0
0
C)
C:)
C)
C)
C)
LO CD
Ln
o
o
o
61
6
6
CO
0
Efl
64
un,
e).
Ge,
6,
ce
Q .2
C�
cll�
P-
m
V),
-,t
(0 m
-'T
U�l
co
CO
L
<
<
<
Leo).
C\i
C\T C\�
61>
—' �
U�l U�
<
m
CL
Z
z
z
z
z
z
el'r)
a
CD
0
(D
0
CD
0
i
C)
CD
C)
CD
CD
CD
C)
C)
CD CD
(D 0
Q
i
CD 1
(D
0
0
0
0 C)
C)
CO
CO
O
CD
CD
CD
i
(fl
O
O
O
S
O
O
O
O
O
O
CIA
rl-
C)
CO
CD
CD
0
0
co
0
0
0
0
Lr)
O C:)
Lr) O
Lr)
i
(Z)
c)
(::)
CD
c)
(Z)
O
r-
-
cl�
cc)
u.)
(D
(D
G�
rl_
CI
-
C
N
(q
m
r�
-,t
C'�
w
CD
N
00
r-
CD
LO
LO
m -'t
- QO
r- C',
rl-�
N
V>
61)
U3
61),
Efl
Ufl
N
0')
Lo
co:
O
LO
LO
m
00
C'4
LO
1-
-
-7
NN6"
N NEAm
ea
-
Vy
w
bg>
6e.
6e.
Ge.
U�,
69 6-,
bf3 6->
69
CD
CD
(D
CD
CD
CD
0
0
0
CD
0
0
0
0
C) C)
ol: C)
c:>
CD
C)
C)
(D
C)
CD
0
0
X .
CO .
<D .
0 .
0
.
0
-
.
-
C)
C)
C)
c-)
CD
(Z)
(D CD i
C) CD
C)
CD
:� 1
C�
C)
CIJ
LO
LO
C)
CY)
CD
0
m
CN
6
C6
C5
cs
6
6
6
6 6
6 6
6
6
0:
(D
(D
0
CD
O L)�-D
i�:
(Al
Gq
C14
r-
Nj-
-
'T
C-0
N
r -
CO
(3)' �t
Lr) C\j
61�1
a
U�,
6s
6q
64>
6-Y
61)
00
N
(1) (1)
LL
r
U)
6f>
61>
V>
U!>
Le
U9,
Z;
(N
ell
;;:
GO.:
b9l
6 1), bel
LO
CL
C:)
C)
C)
CD
0'
C)
C)
C)
C)
C)
C)
C)
C)
C)
C)
CD
C)
C>
C:)
C)
(D
O
C)
CD
N
CD
(D
(D
(D
C)
CZ)
(D
(D
(D
(D
C)
o
CD!
C)
C) C)
C) C)
m
C0
00
CO
LL
6
6
(Y5
C'5
6
6
a
6
6
6
C5
6
C5
6,
6
C5! CD
C:) 6
0
a)
CD
CD
CD
(D
CD
'
U3,
U)
0)
0)
bq
bq
61>
m
m
m
m
m
m m
m m
Gr,
bs,
6,:�
6-�
0'3�!
69
E
O
2
6 t>
69�
a
(A)'
69
6'>
613.
U!31
GPI 6r>
V> 64>
.
0I
> y
CL
0
0
z
a
z
ol
o
(D
o
c) 1
o
0
0
c):
C)
oil
o
o
t
o
c): CD
(D C)
(D
t
C)
g
0C)
C)
c)
(Z)
CD
I
CD
0
0P,
P
0
0
0
C�
C�
cz�
C�
C� i
O O
O. (Z)
(D
�'
m
04
P-
(D
u)
(D
(D
C)
't
CD
C:)
a
I
00
C)
C)
CD
N
C)
(Z)
0
C)
0
C)
0
C)
LO!
I-
C) � 0
C) C)
LO CD
N C)
LO
C\j
CD
V>
C>
U),
C)
U),
C)
Ul
C)
V>
C)
'IT
N
cl)
O
LO
r-
'IT
C4
00
r-
N
-
r-
w
m
(D
Cl)
4
vi
CC T
-7
Lri
4
NU�,
N N64
C5
d
co
U!>
EA
V>
w
60
V>
61>
w
bl> U-:�
6.3V>
0
a
a
m
a
m
CD
(3)
CD
CD
CD
C)
C,
C)
C)
C)
0:
O.
C�
C)!
CD.
C?
C:) C)
C?
c) CD
C�
(D
C)
C 0
C14
C)
(D
C:)
00
C)
CD
CD
(D
U)
C)
C)
Lo
C)
LO
C) CD
C�
D L)
Gr,
-4
It
C\�
(D
CO
c6
r-
CD
cl!
C)
(D C)
CIJ! N
C\l
a
co
69
cli
C\j
(D
m
N
CY)
(D
I C')
n C')
t
Gq
CO
co
C)
<
<
<
0
c)
CO
co!
N
C)
Cl)
0
�t
CY)
C,4
m
c) co 1
LO 'It
z
-
Z q
-
Z
-
Z r
-
Z m
-
Z
CD
co
.
.
.
.
.
.
04
r
U) CY
a
0
a
a
m
'E
LL:
LL:
<
<
LL
LL
LL
.
.
<
.
<
. .
<
.
<
C/5
LL:
LL: i
<I
LL'
LL
w
LU
LU
w
w
w
w
w
ui Lu
ui Lu
Lu
uj:
U)
co
LU
M
:=
4)
(A
(D
—
C
C
M
M
M
a
0
—
0
a
0)
"
�d
(n
tm
r-
CL
L)
'M
4)
0
m
m
0
0
a) r-
> 4)
0
CL
r-
q
iE
c
3:
CL
-r-
N 4)
m
4)
F-
-
p
>
E
-5
rL
V)
a)
m
m
0
(D
>,
C
m
m
CL
a)
M
U)
4)
3:
CD
—
m
u
.—
0
.—
it
a
a
—
—
06
0
L)
>
m
'r-
q)
0
L>l
U)
U)
LL
>
LL
CL
m
a)
.2
q
M
a
C
FL
t.)
(D
o
L)
Lo
L)
C W♦
u
-Zt .
Q) a
I -I
4)
a.
E
-j
E
0
(j),
U)
Q
(D
0
0
(D
fl
U)
E
U)
.2
CL
U).
0
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(2/ 16/99)
For City use only: Application Number: ft�C'L Application DaterV' - C�
Permit application fee: $ 300.00
INSTRUCTIONS:
1. Complete this form (some questions may not apply to you) and attach all necessary
documents and submit to the Development Engineering Section of the City.
2. If you have any questions contact the Development Engineer
Sheri Warnhoff at 221-6750.
3. Submit the Application and pay the Application Fee at the fee at the Engineering
counter at 281 No. Col Iege Avenue.
PROJECT INFOIIZMATION:
Project Name (as approved by t;ie City):
Centre For Advanced Technology P U D 11th Filing
Project A.K.A. (Marketing name if different from Project Name):
n/a
Project Location: Research Boulevard & DrakP Rnnd - 1 block North
Property Owner(.At the time of this permit issuance):
Individual Name: Tom Livingston
Company Name : Everitt Companies
Address: _3030 South College Ave Fort Collin-. CO 80525
Phone number(s):
Office: (970) 226-1500
Cellphone:
Fax number: (970) 223-4156
Email:
Applicant/Project Manager (The primary contact person for all matters regarding this project, and
the person responsible for all matters referencing "the Developer" in the Development Agreement
for this project):
Individual Name: David Stolte
Company Name : Sinnett Builders. Inc
Address: P.O. Box 1969 Fort Collins, CO 80522
Phone number(s):
Office: (970) 493-1770
Cellphone:
Fax number:
Email:
(970) 482-4537
Project Engineer (A Colorado licensed professional engineer who is the civil engineer the person
responsible for the design of this project, responsible for certification that improvements are
constructed in accordance with approved plans, responsible for making revisions to plans with City
approval and for providing as -constructed plans):
Individual Name: Jim Allen Morley
Company Name : Sear Brown
Address: 209 South Meldrum, Fort Collins, CO 80
Phone number(s):
Office: (970) 482-5922
Cellphone:
Fax number: (970) 482-6386
Email:
Professional License Number:
Developer (The party or parties referenced in the Development Agreement who are responsible for
the Developer's obligations contained in the Agreement —add additional names below):
Individual Name:
Company Name : Everitt Companies
Address:
Phone number(s):
Office: _
Cellphone:
Fax number:
Email:
General Contractor (The contractor in overall charge of the public infrastructure construction):
Individual Name:
Company Name : sinnett Builders Inc.
Addre-,s:
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
If you have no General Contractor, list all other contractors below.
Grading contractor:
Individual Name:
Company Name:
Address:
P