Loading...
HomeMy WebLinkAboutCLARENDON HILLS THIRD - Filed OA-OTHER AGREEMENTS - 2003-07-07i AGREEMENTS L KNOW ALL, MEN BY THESE PRESENTS: That the undersigned being the owners cf property east of and immediately adjacent to Clarendon Hills Third Filing, City of Fort Collins, County of Larimer, State of Colorado do hereby agree to the following: 1. The irrigation ditch currently located on the Clarendon Hills Third Filing property shall be abandoned. The irrigation ditch shall be replaced on our adjacent properties with an enclosed irrigation pipe system to be provided and installed by the owner of the Clarendon Hills Third Filing. 2. The storm drainage runoff from the Clarendon Hills Third Filing, as designed and shown on the Utility Plans for Clarendon Hills Third Filing, is acceptable to us as the adjacent property owners. This is the extent of our agreement as to these matters. AGREED TO ANDyTED as of t=18hof nary, 1989. / i ` James C. She and r Hornozd Ghobadi Ronald Erbes STATE OF COLORADO ) ss COUNTY OF LARIMER ) The foregoing instrument was acknowledged before me this 18th day of January, 1989 by James C. Shepard, Hornozd Ghodadi & Ronald Erbes. nM_ I n IA My commission expires: 6-15-91 Notary Public t RCPTN 4 R9013998 014/13/9,9 14:21'14 4 OF PAGES - 2 FEE M. RODENBERGER, RFCORnFR - LARIMFR COUNTY CO STAT" DOC FEE- APPL]:CATION FOR ENCROACHMENT UPON PUBLIC RIGHT-OF-WAY in the CITY OF FORT COLLINS, COLORADO Number' Date January 19, 1989 Application is hereby made by the undersigned for a permit for an encroachment upon a public right-of-way as indicated below, subject to the provision that the applicant agrees to abide by the provisions of Chapter 23, Section 81-85 of Code of the City of Fort Collins. 1. Enection, construction, remodeling or demolition of buildings 2. X Bui-Iding, fence, barrier or post, underground irrigation system crossing A. APPLICANT Clarendon Hills Associate ADDRESS 309 W. Harmony Rd., Fort Collins, CO 80526 TELEPHONE :303) 226-2266 B. LOCATION OF ENCROACHMENT Under ,li nsdale Drive and cul-de-sacs A, B, C, D & E (See Utility Plans) . C. TYPE OF ENCROACHMENT, OBSTRUCTION OR STRUCTURE A single 6 inch Polyvinyl - Chloride (PVC) pipe conduit of schedule 200 at each crossing at a depth of 2 feet below pavement grade. D. PURPOSE OF THE ENCROACHMENT To accomodate irrigation (sprinkler) lines (2% inch or less) and controller wiring crossings. E. SPECIAL CONDITIONS At the time of installation the low end of the conduit, or sleeve shall have a vertical 2 inch conduit filled with pea gravel extendinq to the surface. The conduit crossi shall extend from back of easement to rack of easement. Permission is hereby granted for the indicated encroachment upon a public right- of-way. d App icant City of fort Collins— Y�rrctor of En Bering APPLICATION FOR ENCROACHMENT UPON PUBLIC RIGHT-OF-WAY in the CITY OF FORT COLLINS, COLORADO Number /— 2"/' Date January 19, 1989 Application is hereby made by the undersigned for a permit for an encroachment upon a public right-of-way as indicated below, subject to the provision that the applicant agrees to abide by the provisions of Chapter 23, Section 81-85 of the Code of the Cite of Fort Collins. 1. Erection, construction, remodeling or demolition of buildings 2. X Building, fence, barrier or post, underground irrigation system crossing A. APPLICANT ('larendon Hills Associates ADDRESS 309 W. Harmony Rd., Fort Collins, CO 80526 TELEPHONE 1:303) 226-2266 B. LOCATION OF ENCROACHMENT Tinder 'linsdale Drive and cul-de-sacs A, B, C, D & E (See utility Plans). C. TYPE OF ENCROACHMENT, OBSTRUCTION OR STRUCTURE A single 6 inch Polyvinyl - Chloride (PVC) pipe conduit of schedule 200 at each crossing at a depth of 2 feet below pavement grade. D. PURPOSE OF THE ENCROACHMENT To accomodate irrigation (sprinkler) lines (22 inch or less) and controller wiring crossings. E. SPECIAL CONDITIONS At the time of installation the low end of the conduit, or sleeve shall have a vertical 2 inch conduit filled with pea aravel extending to the surface. The conduit crossin hall extend from back of easement to 'rack of easement. Permission is hereby granted for the indicated encroachment upon a public right- of-way. ^� i \ pp icant Citv of Fort Collins i ctor of En Bering CERTIFICATION OF STORM DRAINAGE IMPROVEMENTS FOR CLARENDON HILLS SUBDIVISION - THIRD FILING This LETTER OF CERTIFICATION is provided by the undersigned Registered Professional Engineer as required by the Subdivision Agreement for the Third Filing of Clarendon Hills to establish that the storm drainage improvements contained within the Third Filing have been completed in substantial compliance with the project plans and specifications. Further it is certified that the improvements will function properly during minor and major storm events essentially as required by the City of Fort Collins and by the Final Storm Drainage Report prepared by the undersigned. The 100 year design storm will be passed through the storm drainage system as now constructed with negligible chance of any damage to property or persons resulting. It is recommended that this certification allow for Engineering Releases to be granted relative to storm drainage requirements so that building permits can be issued by the City of Fort Collins for all lots except Lots 4, 5, 84 and 85. These lots have minor improvements that have yet to be completed. A separate certification will be provided upon completion of the required improvements on the excepted lots. The un-completed improvements do not affect the other Tots and their is no reason to restrict permits to any lots other than those identified here. The storm drainage improvements on Lots subject to the subdivision agreement place a hold on Certificates of Occupancy from the City until the final site grading, after home construction, has been certified to adequately contain and pass the 100 year design storm. This CERTIFICATION is provided this bth day of December, 1989. �• �f�i r C4 Dy'� .0 �.2 CERTIFICATION OF STORM DRAINAGE IMPROVEMENTS FOR CLARENDON HILLS SUBDIVISION - THIRD FILING LOT 10 - 839 Langdale Drive This LETTER OF CERTIFICATION is provided by the undersigned Registered Professional Engineer to certify that the storm drainage improvements on the referenced Lot are, as of this date, still in substantial compliance with the project plans and specifications. This remains true after completion of the final grading and as of today's request by the lot owner for a Certificate of Occupancy for the home constructed on said Lot. Further it is certified that the improvements will function properly during minor and major storm events essentially as required by the City of Fort Collins and by the Final Storm Drainage Report prepared by the undersigned. The 100 year design storm will be passed through the storm drainage system as now constructed with negligible chance of any damage to property or persons resulting. It is recommended that this certification allow for an Engineering :Release to be granted relative to storm drainage requirements so that a Certificate of Occupancy can be issued by the City of :Fort Collins for the referenced Lot. This CERTIFICATION is provided this 25th day of July, 1990. CERTIFICATION OF STORM DRAINAGE IMPROVEMENTS FOR CLARENDON HILLS SUBDIVISION - THIRD FILING LOT 21 - 721 Langdale Drive This LETTER OF CERTIFICATION is provided b;J the undersigned Registered Professional Engineer to certify that the storm drainage improvements on the referenced Lot are, as of this date, still in substantial compliance with the project plans and specifications. This remains true after completion of the final grading and as of today's request by the lot owner for a Certificate of Occupancy for the home constructed on said Lot. Further it is certified that the improvements will function properly during minor and major storm events essentially as required by the City of Fort Collins and by the Final Storm Drainage Report prepared by the undersigned. The 100 year design storm will be passed through the storm drainage system as now constructed with negligible chance of any damage to property or persons resulting. It is recommended that this certification allow for an Engineering Release to be granted relative to storm drainage requirements so that a Certificate of Occupancy can be issued by the City of Fort Collins for the referenced Lot. This CERTIFICATION is provided this 9th day of July, 1990. CERTIFICATION OF STORM DRAINAGE IMPROVEMENTS FOR CLARENDON HILLS SUBDIVISION - THIRD FILING LOT 30 - 4924 Hinsdale Drive This LETTER OF CERTIFICATION is provided by the undersigned Registered Professional Engineer to certify that the storm drainage improvements on the referenced Lot are, as of this date, still in substantial compliance with the project plans and specifications. This remains true after completion of the final grading and as of today's request by the lot owner for a Certificate of Occupancy for the home constructed on said Lot. F+irther it is certified that the improvements will function properly during minor and major storm events essentially as required by the City of Fort Collins and by the Final Storm Drainage Report prepared by the undersigned. The 100 year design storm -will be passed through the storm drainage system as now constructed with negligible chance of any damage to property or persons resulting. It is recommended that this certification allow for an Engineering Release to be granted relative to storm drainage requirements so that a Certificate of Occupancy can be issued by the City of Fort Collins for the referenced Lot. This CERTIFICATION is provided this oth day of December, 1989. C. JUN 13 199 CERTIFICATION OF STORM DRAINAGE IMPROVEMENTS FOR CLARENDON HILLS SUBDIVISION - THIRD FILING LOT 33 - 609 Langdale Drive This LETTER OF CERTIFICATION is provided by the undersigned Registered Professional Engineer to certify that the storm drainage improvements on the referenced Lot are, as of this date, still in substantial compliance with the project plans and specifications. This remains true after completion of the final grading and as of today's request by the lot owner for a Certificate of Occupancy for the home constructed on said Lot. Further it is certified that the improvements will function properly during minor and major storm events essentially as required by the City of Fort Collins and by the Final Storm Drainage Report prepared by the undersigned. The 100 year design storm will be passed through the storm drainage system as now constructed with negligible chance of any damage to property or persons resulting. It is recommended that this certification allow for an Engineering Release to be granted relative to storm drainage requirements so that a Certificate of Occupancy can be issued by the City of Fort Collins for the referenced Lot. This CERTIFICATION is provided this 12th day of June, 1991.