Loading...
HomeMy WebLinkAboutBUFFALO RUN APARTMENTS PUD - Filed GC-GENERAL CORRESPONDENCE - 2003-05-28APPLICATION FOR PRELIMINARY PLANNED UNIT DEVELOPMENT FOR THE BUFFALO RUN APARTMENTS Buffalo Run Apartments Land Development Guidance System Criteria Anah'sis ENGINEERING CRITERIA A-3.1: The site is adjacent to natural gas, electric, water and sanitary sewer facilities with sufficient capacity for this development. Storm drainage on site will follow the existing natural pattern of flow to the east. A-3.2: Water Supply: Yes Sanitary Sewer: Yes Mass Transit: Not applicable Fire Protection: Yes Flood Hazard Areas: Yes Telephone: Yes Walks/Bikeways: Yes Irrigation Companies: Yes Electricity: Yes Natural Gas: Yes Storm Drainage: Yes Cable Television: Yes Streets/Pedestrian: Yes A-3.3: There is a canal which runs to the property currently and it will be vacated as part of this development. A-3.4: Not Applicable. Buffalo Run Apartments Residential Density Chart DENSITY CHART— Maxirnam Earned Credit Credit Cn[enon 2_0_%_ 2000 feet of an existing c' approved neighborhood shopping center, or — — — — — — — — — — — — — — — — 1090 C1 2pW fee[ of an approved, but not constructed neighborhood shopp ng center ensity of at least six [6] dwelling 2090 b 650 feet of an existing transit stop (applicable only to projects having a d units per acre on a gross acreage basis) 1090 1 C 40W feet of an existing or approved regional shopping center _ 2_0_%_ 20 —, 3500 feet of an existing neighborhood or community park; or _ _ _ _ — — — — — — — — — (� — -- --- — — — 10% 3500 fact of a publicly owned but not developed, neighborhood or community pack rado compulsory education 1090 LU 62500 feet of an existing school, meeting all requirements of the State of Colo laws 20% 20 Qf 3000 feet of a major employment center 5% m g 1000 feet of a child care center it P ti' = 2090 20 h "North" Fort Collins 20% j The Central Business District j A project whose boundary is contiguous yexisting urban ban development. gretyt may be earned as follows: 30% 090 For projects whose property boundaryhas 0 - 10% contiguity' 20 10 - 159'o For projects whose property boundary has 20 - 3t0% contiguity; 15 - 20% For projects whose property boundary 20 - 25% For projects whose property boundary has 30 - 40% contiguity; 25 - 30% For projects whose property boundary has 40 - 50% contiguity. If i[ can be demonstrated that the project will reduce non-renewable energy usage either through the application of k alternative energy systems or through committed energy conservation measures beyond hose normally required by City Code, a 5% bonus may be earned for every 5% reduction in energy use. Calculate a 1% bonus for every 50 acres included in the project. n l Calculate the percentage of the total acres in the project that are devoted to recreationat al use. Enter 112 of th percentage as a bonus. lie oen s ace that meets the City's rrunimum requirements, n ifthe applicant the percentage of this bonus.open gspacee acreageftosthe total development acreage and enter this percentage calculate as a bonus. if part of the total development budgets [o be spent on neighborhood public transit facilities which are not O U part of required development City Code, enter s 290 bonus for every $100 per dwelling unit invested. p if part of the total development budget is to be spent on neighborhoodties end services which are not otherwise facili required by City Code, enter a 190 bonus for every $100 per dwelling unit invested. if a commitment is being made to develop a specullea percentage of the total number of dwelling units for low Q (n Income families, enter that percentage as a bonus, up to a maximum of 3096. numbs of dwelling units for Type "A" If a commitment is being made to develop a specified percentage of the total ._ f and Type "B" handicapped housing as defined by the City of Fort Collins, calculate the bonus as follows: 7 (� Type "A" .5 x Tv a "A"Units l� Total Units In no case shall the combined bonus be greater than 30% Type "B" 1.0 x lnz "B" Units Total Units S if the site or adjacent property contains a historic building or place, a bonus may be earned for the following: 396 For preventing or mitigating outside influences adverse to its preservation (e.g. environmental, land use, aesthetic, economic and social factors); in with the character of the building or place, while 3% For assuring that new structures will be in keep g avoiding total units; face that will lead to its contintiance preservation and 390 For proposing adaptive tueB or P improvement in an appropriate mariner. le fair E —ii ed the t If a building.n r all of the ll elevated parkined g structure asking in acicessoryusee too the primary structure underground. bonus may be earned as follows: 99n For providing 75% or more of the parking in a structure; 6% For providing 50 - 74% of the parking in a structure; N 3% For providing 25 - 49% of the parking in a structure. U If a commiunent ts being made to provide approved automatic fire extinguishing systems for the dwelling units, Z enter a bonus of 10%. OIf the applicant commits to providing adequate, safe and convenient pedestrian and bicycle connections between the (�] V project end any of the desination points described below, calculate the bonus as follows: 5% For connecting to the nearest existing City sidewalk,and transiand t stocle p within the distances as defined in this 5% For connoting to any existing public school, park Density Chart 5% For connecting to an existing City bicycle trail `.which is adjacent to or traverses the project. TOTAL 10 WE Buffalo Run Apartments Energy Conservation Worksheet Method Two Energy Conservation Measures: 6. The overall) U-value for wall is .07 which is less than .2. 1 pt. 7. The overall U-value for the roof is .3 which is less than .6. .3 pt Total score 1.3 Buffalo Run Apartments Development Phasing Schedule W J W a D W N Q W J Z Q Z 0 U M w U) Z 0 U H a+ C CD R C. Q ❑ 0 m � o o is U r N m U is L H LL n rn o 0 0 0 0l i n II 0 0 0 0 0 0 0 0 Q ❑ I i n Of ' > 0 0 0 0 0 0 0 0 Z n V 0 0 0 0 0 0 0 O 0 a 0 0 0 0 0 0 o, 0 N' I n c.0 o o o 0 Q O o o 0 0 0 0 3' n T 0 o o O o 0 0 O 0 a n T >'0 0 0 0,00 0l0 n o a o 0 o o 0' o, p Q, n 0 R o 0 0 0 0 0 0 a o o O O- O o LLI r Q7 C 0 0 0 o o �p O O A S O LU - ❑ � a G J uW < O U 2 ❑ Q - O >w-iw EL > > U > W W< H~ W U~ a 0 J Z J in 0 J= to > > > Q N = U f. J F- n•O Z M uJ M Z m U Z U o U o J co T It V A -e P, ~ II ao T . p c p c C7 C O V r- O ❑ OGo O > 0 11 r III OI rn rn Z'Go Oa p p a O pN o III ON �O N m �I II Of R O p o p p o C q;r N N'M:N W '.. d ao co y' Go v" O 0 O O a 9 w ar 00 o' o' O. M O cpn m.I' iD O m M o V a cc in fR ' o N CIO OINO OM,'_ J '.. M N col i o c �la°i COlo o'cv n o 2'', A d a a E co CVt O c> V �iN N',O O o .0 O,o C Q 0 ` O t) O Go 1 to O O D O O �' ❑ v I Go Ali o 0 �OO O o.0 LL Go' mi R' O O �� d R � ❑ H ❑ Z Z ❑ tl Z W O Q W m.0 �_ >I0 U) 0 �, y V'. O J W Q, U' .0 N w o¢ � a 0 o C >>Q > > w = a uj W J Z J U) Z J 0 C NI ❑ >,O RUJ Z 5 W ❑' J ui o V J S U Z U o Z U o .�. N..j Transportation Services Engineering Department City of Fort Collins July 25, 1997 Mr. Scott McFadden The Brisben Companies 4891 Independence Street, #149 Wheat Ridge, CO 80033 Re: Mulberry Lemay Crossings, Buffalo Run Apartments P.U.D. Dear Scott, This letter is to inform you of the requirements this development is responsible for completing prior to the City approval of the final utility plans and the signing of the development agreement. At this time we have to assume that no other development will be occurring within the area of the intersection of E. Lincoln Avenue and N. Lemay Avenue. Therefore this project must be able to "stand" alone once it has been constructed. In order for this to happen, the public improvements to E. Lincoln Avenue and N. Lemay Avenue must be complied with while meeting the City of Fort Collins standards. These include: N. Lemay Avenue - A complete design of N. Lemay Avenue must be done along the frontage of the Buffalo Run property and 1000' north and south of the site. This will include the design for both sides of the street, curb, gutter, and sidewalk, cross -sections every 50', and the design of any transitions into the existing roadway. At this time the Buffalo Run development will not be responsible for the construction of the median along N. Lemay Avenue, however, this will need to be accommodated into the design. The appropriate amount of R.O.W. will need to be dedicated as well as any R.O.W. needing to be acquired for the transition of the improvements back into the existing roadway. E. Lincoln Avenue - This development will be required to provide a complete design of E. Lincoln Avenue (the north and south side of the street) along the frontage of the property as well as 1000' east and west of the site. The design will need to include the placement of curb, gutter, and sidewalk along the property frontage, the design of the median along E. Lincoln Avenue, cross -sections every 50', and the design of the transitions back into the existing roadway. This development will not be required to build the median along E. Lincoln Avenue at this time, however it may be determined at a later date that the median will be necessary. If in such event this development is required to construct the median, the Street Oversizing Department will reimburse you the 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 appropriate amount for the construction. The appropriate amount of R.O.W. will need to be dedicated as well as the acquisition of any R.O.W. required for transitioning the improvements back into the existing roadway. N. Lemay Avenue/E. Lincoln Avenue intersection - You will need to provide a design of the intersection so that we have an idea of how the travel lanes will line up with each other and how the proposed lanes on N. Lemay Avenue and E. Lincoln Avenue will transition back into the existing travel lanes. I would suggest that your engineer coordinate with the engineer of the Lincoln East project on the design of the intersection of N. Lemay Avenue and E. Lincoln Avenue and the design of E. Lincoln Avenue itself. By doing this, we are hoping to avoid any discrepancies in the construction of these areas. If you should have any further questions or concerns, please contact this office at (970) 221-6750. Since y, Tim R. Blandford Civil Engineer I cc: File Dave Stringer, Development Engineering Manager Ted Shepard, Current Planner THE SEAR -BROWN GROUP FULL -SERVICE DESIGN PROFESSIONALS FORMERLY R13D, INC. 209 SOUTH MELDRUM FORT COLLINS, COLORADO 8D521-2603 970-482-5922 FAX:970-482-6368 CLIENT: W.O. Brisben Companies, Inc. JOB TITLE: Buffalo Run Apartments P.U.D. AUTHORIZATION FOR ADDITIONAL SERVICES NO. I DATE: September 2, 1997 JOB #: 769-001 All provisions of referenced Agreement and/or Authorization for Service remain in full force and effect except as modified herein. This Authorization For Additional Services replaces in full the prior submitted document by the same name dated July 18, 1997. Re: Contract for Engineering Services by and between The Sear -Brown Group and the W.O. Brisben Companies, Inc. dated March 3, 1997. Additional Services were determined from: Agreed -upon requirements set forth by the Fort Collins Stormwater Utility and Transportation Department subsequent to the Preliminary P.U.D. submittal. NOTE: This Authorization For Additional Services No. 1 does NOT represent the work anticipated to complete the Full design of Lincoln Avenue, Lemay Avenue and their intersection as set forth as being required by the City of Fort Collins in their letter to you dated July 25, 1997. That work will be represented in a future Authorization For Additional Services to be prepared closer to the time of design. 1. Assist during the presentation of Option #1 (see Preliminary Drainage Report) to neighboring property owner. 2. Assist with roadway alternative evaluation for increased right of way on Lemay at Lincoln and Lincoln at 12th. Includes coordination of and attendance at meetings, field investigation, mapping and ROW information procurement and the development and refinement of design alternatives. 3. Revise boundary and easement information per up to date research and coordinate with CLC to correct legals of the overall boundary. 4. Field locate existing sanitary MH omitted from the provided topography and revise sanitary layout accordingly. 5. Additional drainage design resulting from unanticipated Larimer County design requirements. COMPENSATION Fee for accumulated services completed to date representing the described Additional Services: $7,500 Lump Sum ACCEPTANCE AND AUTHORITY Your prompt response is greatly appreciated as this work has already been completed. The Sear -Brown Grou Signature: ' �J Name: Stan A. Myers Signature: Name: Title: Civil Division Manager Title: Date: ( / g 7 Date: ACCEPTED: NEW YORK • PENNSYLVANIA COL.ORADO • UTAH STANDARDS IN EXCELLENCE EQUAL OPPORTUNITY EMPLOYER 9 T H E SEAR -BROWN G RO U P FULL -SERVICE DESIGN PROFESSIONALS FORMERLY R13D, INC. 209 SOUTH MELDRUM FORT COLLINS, COLORADO 80521-2603 970-482-5922 FAX:970-482-6368 CLIENT: W.O. Brisben Companies, Inc. JOB TITLE: Buffalo Run Apartments P.U.D. AUTHORIZATION FOR ADDITIONAL SERVICES NO. 1 DATE: September 2, 1997 JOB #: 769-001 All provisions of referenced Agreement and/or Authorization for Service remain in full force and effect except as modified herein. This Authorization For Additional Services replaces in full the prior submitted document by the same name dated July 18, 1997. Re: Contract for Engineering Services by and between The Sear -Brown Group and the W.O. Brisben Companies, Inc. dated March 3, 1997. Additional Services were determined from: Agreed -upon requirements set forth by the Fort Collins Stormwater Utility and Transportation Department subsequent to the Preliminary P.U.D. submittal. NOTE: This Authorization For Additional Services No. 1 does NOT represent the work anticipated to complete the Full design of Lincoln Avenue, Lemay Avenue and their intersection as set forth as being required by the City of Fort Collins in their letter to you dated July 25, 1997. That work will be represented in a future Authorization For Additional Services to be prepared closer to the time of design. 1. Assist during the presentation of Option #1 (see Preliminary Drainage Report) to neighboring property owner. 2. Assist with roadway alternative evaluation for increased right of way on Lemay at Lincoln and Lincoln at 12th. Includes coordination of and attendance at meetings, field investigation, mapping and ROW information procurement and the development and refinement of design alternatives. 3. Revise boundary and easement information per up to date research and coordinate with CLC to correct legals of the overall boundary. 4. Field locate existing sanitary MH omitted from the provided topography and revise sanitary layout accordingly. 5. Additional drainage design resulting from unanticipated Larimer County design requirements. COMPENSATION Fee for accumulated services completed to date representing the described Additional Services: $7,500 Lump Sum ACCEPTANCE AND AUTHORITY Your prompt response is greatly appreciated as this work has already been completed. The Sear -Brown Group Signature: C \ Y Name: Stan A. M, emirs Title: Civil Division Manager Date: c L2 /-q 2 ACCEPTED: Signature: Name: Title: Date: NF:W YORK • PENNSYLVANIA COLORADO • UTAf i STANDARDS IN EXCELLENCE EQUAL OPPORTUNITY EMPLOYER Buffalo Run Apartments Statement of Planning Objectives Summary a. Please see enclosed Land Use Policy Analysis b. The site will be owned by the applicant upon completion of the development review process with only the right of way for 12'h Street to be owned by City upon that street's dedication. c. The multifamily community will provide five full time jobs. Two full time and one part time employee will be in the property management functions and two full time and one part time employee will be in the property maintenance function. d. The Buffalo Run Apartments were conceived to correspond with the Land Use Policies in the City of Fort Collins. The applicant investigated numerous locations for this type of project throughout the city and was drawn to this site for its availability of utilities and location near two major employment centers and services. The community's affordable component with 86 units deed restricted to residents making no more than 50% of the area median income will provide a unique housing opportunity in this area of Fort Collins. See enclosed analysis of Land Development Guidance System criteria. e. See enclosed residential density chart and overall development criteria chart. The high density residential use is the less intense use of the surrounding existing and proposed uses. The land to the north and east is or will be industrial. The development is mitigating impacts from those uses with significant setbacks and landscaping along the northern property boundary and locating a .25 acre retention pond on the eastern portion of the property closest to the existing industrial use. The western boundary of the property, we believe, offers an amenity to the Buffalo Run Apartments with the Link-n-Greens golf course providing views of open green space and the mountains to the west. The commercial use to the south will be mitigated by this development primarily with the different elevations between the two properties. The commercial center is proposed at an elevation over 4 feet above the grade of the Buffalo Run Apartments which will provide a strong visual and noise barrier between these two uses. g. See enclosed energy conservation worksheet. Ti, Transpor on Services Engineering Department City of Fort Collins Mr. E. Scott McFadden Development Director Brisben Companies 7500 East Kemper Road Cincinnati, Ohio 45249 RE: Buffalo Run - I.emay Avenue Alignment Dear Scott: September 17, 1997 I have been reviewing the alignment of Lemay Avenue at the intersection of Lincoln in conjunction with your proposed development project on the southeast corner of the intersection. Although studies indicate your projected traffic volumes will not require intersection improvements above normal development requirements, it was important for me to set the alignment of Lemay Avenue to provide for the ultimate intersection configuration. As you are aware there is a large overhead power distribution line adjacent to your site and crossing the intersection. We have met with owner's representative, Tom McCormick of Platte River Power Authority on the possibility of relocating these lines. It is my opinion that the best interests of the City would be to shift the alignment to the west approximately 10' to avoid the power line tower. This will not impact your site design, but will have impacts in the future on the property owner on the west side of Lemay Avenue. We have met with this property owner, Dan Ellsworth, and informed him of the probable future alignment of Lemay and its impact on his property. If you have any questions or concerns regarding this matter please feel free to contact me. Sincerely, Matt Baker Coordinator, /treetOversizing 281 North Celle-e :avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-h605 OCT-02-1997 14:22 ;0=2E?G ::�?CFE.. :EE JZ r) rr. gib- J f October 2, 1997 Ted Shepard Planning Department City of Fort Collins 281 N. CoUege Avenue Fort Collins, Colorado 47 A HAND DELIVERY RE.: Letter of Intent in Connection with Off -site Easements for Buffalo Run PUD Dear Mr. Shepard: The purpose of this letter is to connrm with the City the intention of the undersigned owner and the contract purchaser of the property or their assigns to grant certain easements to the developer of Buffalo Run PUD and/or the City. The easements are briefly su:mn ized as follows: A temporary, nonexc!usive easement for the conveyance of storm drainage water from BufEalo Run PUD into an existing irrigation Swale which would automatically terminate when 12" Street is improved adjacent to the undersigned's property and a storm drainage pipe in conformance with City standards to accommodate drainage from Buffalo Run PUD installed within the 12' Street right -of --way. The developer of Buffalo Run PUD will be required to pay the cost of installing this storm drainage Ent m the I2`* Street right-of-way. Since the developer will be improving the Swale, a temporary construction easement would also be needed. This easement is shown on the attached Exhibit A. A temporary easemMt permitting the sheatflowing of storm drainage water from Buffalo Run PUD onto property of the undersigned as legally described on the attached Extibit B. This drainage will come from only a portion or -Buffalo Run PUD as depicted on Exhibit B. T'ss easement will automatically terminate when the private drive along the northern boundary ofthe undersigned's property is constructed, which will :hen convey this water west in the right-of-way and into the detention pond for Buffalo Run PUD. A temporary grading and temporary slope easement, in varying widths, running along the northern boundary of the undersigned's property as shown on the attached Exhibit C. The slope casement will automatically terminate when the undersigned's property is graded to an elevation sufficiently compatible with that of Buffalo Run so that a slope easement is no longer needed. Ul. , -10L-177 I - 4 : e 3 ky.. Dcr<u r <ur cr< i : =0 -- ` - ' "' Ted Shepard October 2, 1997 Page 2 4. An access and temporary construction casement to complete the realignment of 3lock Drive to connect with that portion of 12° Street adjacent to Buffalo Rust PUD in the area depicted on the attached Exhibit D. The construction easement will terminate on December 1, 1997. This letter is to be construed as a letter of intent to negotiate mutually -acceptable easenxtis as described above and not as a binding contract. Our intention to grant the above -referenced easements is expressly conditioned on the execution of a binding agreement for such grants of easement. Sincerely, OWNER.. SPRINGER FISHER, INC., a Colorado Corporation By: , Harold S. Fisher, President CONTRACT PURCHASER: GOLDBERG PROPERTY ASSOCIATES, NC., a Colorado corporation BY ;vier A GoWl.,em President TOTAL P.07 APR 09 '98 1O:41W SEAR-F 'JN GROUP FC P.2 Author: Tim Blandford <tblandfordOCI.FORT-COLLINS.CO.US> at Internet Date: 4/7/98 4.40 FM Priority: Normal TO: Jim Allen -Morley at SBGFTC Subject: Buffalo Run interim improvements ---------------------------- ------ Message Contents --------------------------------- ** Reply Requested when Convenient ** Hi Jim This message is to relay to you the necessary interim improvements required of the Buffalo Run Developer. As we agreed at our last meeting, the improvements necessary at this time are two (2) six (6) foot bike lanes on both sides of Lincoln Avenue. The lengths of theme bike lanes will need to be the length of the Buffalo Run property that abuts Lincoln Avenue. These interim improvements will be spelled out in detail at the time the Development Agreement is drafted. Please be aware that the Developer is still responsible for escrowing the appropriate funds required to improve Lincoln Avenue to the proper street section per the City's street standards and per the City's Code. You may forward this on to the Developer and any interested parties. If you should have any additional questions regarding this matter, please contact this office. Sincerely, Tim Blandford. 04/16/1998 12:10 3034328661 Apx=15-98 09:45P OR- . SYCAMORE CONSTRUCTIN PAGE 03 ALLEN-MORLEY +970 93-7030 P-01 'ti . THE SEAR -BROWN GROUP Far w#-& RBD, Inc. 209 South Makkum Fort Cakne, Coorado 80521 (970) 482-5972 FAX (970) 48243M Denver (303) 458-552.6 FAX/MEMO LETTER DATE: TO: COMPANY: FAX NO.: FROW PROJECT: PROJECT NO.: April 15, 1999 Mr. Brock Chapman W.O. Brisban (303) 432-8661 Jim Allen -Morley Buffalo Run 769-001 Total number of pages transmitted (including cover sheet): 2 Here is the estimated costs for the bikepaths and the extra 2 feet of side walk along Lincoln. They are as follows: Bike Path $41,000 2' of sidewalk S81000 Please note that the actual cost for installing the asphalt and road base is only approximately $15,000.00, which is in line with Matt Baker's calculations. But, we need to acid in the ditch grading, contingency, engineering and mobilization. You may want to present a range of costs. I am enclosing the spreadsheet for your reference. I have also had a preliminary look at how much of the roadway work would need to be redone at final design. I based this on the preliminary design that we completed. H the preliminary design is changed, as well might be the case, the amount of redone road will change also. l estimate that 3 to 400 feet of curb and gutter, 25 to 33% of the total, will need to be torn out. And that 30 to 40 % of the roadway it self will have to be redone. Plus in the area of the median for the entire length, the added asphalt may need to he torn out for landscaping purposes. I hope this is sufficient for you to finish your letter. I will be around for most of the day Thursday, but in meetings most of Friday. Please call if you nerd any clarificatiota. 04/16/1998 12:10 3034328661 SYCAMORE CONSTRUCTIN PAGE 02 BRISBEN COMPANIES 7800 EAST KEMPER. ROAD CINCINNATI. OHIO 45249 15t3) 289-1990 FAX (513) 439-2780 Mr Matt Baiter April 16, 1998 City of Fort Collins 281 1`. College Ave. Fort Collins, CO 80522 Dear Matt: Thank you for taking time to meet with us yesterday to discuss the issue of interim Lincoln Avenue improvements. This letter outlines our dilemma with the proposed interim requirements and provides estimated costs associated with such improvements, which were prepared by Sear Brown Group, Inc. The City has requested that we pay for and construct two, 6 foot wide (4" depth) asphalt bike lanes to be added to each side of Lincoln Ave, along the Buffalo Run propert - frontage. This cost is estimated to be $44 SN, which is nor applicable toward future road improvements. it is our belief that in the current condition, and even after Buffalo Run is constructed_ there is minimal bicycle traffic along Lincoln AN taut. Regardless. as au interim improvement, the bike lanes are cost prohibitive to Buffalo Run Since we beliv.,e the bike lanes are hkelk• unnecessary in the near term, WO propose an interim solution of w•idelnne the sideivalk alone Lincoln Avenue from 6' to 8' This solution meets the Citv's LAGS standard for multi -modal traffic (sec enclosed LDGS standard) tlowver, we will be further study)na the cost of constructing Lincoln Avenue in it's final condition concurrent Mth Buffalo Run. If there is a cost benefit to escrowin-> Brisben's contribution to Lincoln Avenue Improvements and constructing the interim improvements versus constructing Lincoln Avenue at cin arterial standard concurrent with Buffalo Run- we would hope the City would allow Brisben to share in that benefit The enclosed memorandum estimates the scope of replacing Lincoln Avenue at time of improvement to the Lincola/1-I nlay interdiction x4hich we estimate to cost at least $60,000. Sear Brown Group, Inc, is preparing additional cost estimates_ which will be forwarded to you early next week _'_Matt, we are all very Nvom out on this development but are very close to a successful resolution. We hope to achieve a situation which is fiscally responsible for both parties and believe there is a solution to that cad. Thank you for your time and patience. Sinc_erel _ L� E- Scott McFadden Development Director- Western Region Enclosures- Fort Collins LDGS language Engineers cost estimates cc Lucia Liley R,E G,ONAL OrriCES: 2525 PERIMETER PLACE DRIVE • SU1TF. 129 - NASHVILLE, TENNESSBB 37214 (615) 889-1978 FAX 1615) 889-3334 4400-1 STUART ANDRE`•V 8OVLR.vAR0 - CHARLOTTE, NORTH CAROL,INA 26217 - (7041 523-4115 - FAX f704) 523-4415 4891 IucKPYN _m S_mT - Sv_j. 149 • 06*,VER, COLGR 80033 • (303) 421.9900 - FAX (302t) 432-8661 2325 N. W. 33RD STREET FT. LAVOEROALZ, FLORIDA 33309 • (954) 739-0000 • FAX (914) 739-7563 4051 EXECUTIVE PARK DRIVE HARRISCVRC. PENNSYLVANIA 171 ) 1 - (717) 561-2555 • FAX (717) 561-2580 Tim Blandford - meetingm.doc Page 1 THE SEAR -BROWN GROUP MEETING MINUTES SUBJECT: Buffalo Run DATE: 5/29/98 TIME: 10:00 am PLACE: City of Fort Collins ATTENDEES REPRESENTING Matt Baker — Tim Blandford Jim Allen -Morley PURPOSE: City of Fort Collins City of Fort Collins Sear Brown Group Project No. 769-001 Date Issued: 6/2/98 To Discuss the exact scope of work required by the City of Fort Collins for improvements to Lincoln Avenue adjacent to the Buffalo Run Project. All agreed that we would base the design of Lincoln on the Preliminary Design of Lincoln and Lemay. The extent of Lincoln would be as follows: 1. Match the existing horizontal and vertical alignment at the West Side of the Lemay Lincoln intersection. _ w.K6-4 2. Transition vertically at 2% to match the Preliminary Plans of Lincoln and Lemay. ,'�`r> j 1'�wtA7 �jc�yr<,0,,A'•��Ttt TNa I",0"'�:r-re 17; crnl4 �i7ntc a' 'ITS 71•ctr. 3. The Road Section to be built would be from the North Property Line of Buffalo Run. (including the sidewalk) to the north edge of the existing pavement of Lincoln. No Median will be constructed at this time. �D THE SEAR -BROWN GROUP FULL -SERVICE DESIGN PROFESSIONALS FORMERLY R13D, INC. 20�1 SOUI'11 MITI)RUM FORTCOLI.INS, COI.OI:ADO,S0521-2603 970-482-5922 FAX:970-482-4i368 August 17, 1998 Dave Stringer City of Fort Collins Engineering Department 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522-0580 RE: Buffalo Run Apartments P.U.D. Dear Dave: The purpos:- of this letter is to request a design variance from the City of Fort Collins Design and Construction Criteria, July' 1996 for the above reference project currently under review. The variance requested pertains to the alignment of proposed 12rh Street at its intersection with Lincoln A\ enue at the eastern limit of the project. History 12th Street, as currently represented, is designed is to provide access to the large parcel bounded by Lincoln Avenue, Lemav Avenue and East -Mulberry Street (hereafter referred to as the Fisher property). The intended alignment for 12`h is to follow the east line of the Fisher property to also allow access to properties bordering to the east. The initial design for 12rh Street followed this property line resulting in a skewed intersection with Lincoln. As a result of design meetings with City staff it was agreed to have the alignment modified to create a perpendicular intersection with Lincoln Avcnuc. This layout exercise require the relocation of the intersection Nvest%vard bisecting the proposed Buffalo Run project. In order to maintain a functional density for the bond funded affordable housing project, the tangent section extending back from the intersection was minimized in order to allow the road alignment to swing back: to the preferred alignment along the east property line. Variances Requested Section1.02.03.03 Reference Table 2 of the Design and Construction Criteria. Standards and Srecifications for Streets. Sidewalks. Alleys and Other Public Nays, City Engineering Office, July 1996 requires a minimum radius of'610 feet for a collector street. 'We are requesting a variance to allow a centerline radius of 236 feet. P,T,�.,s STANDARDS IN EXCELLENCE Dave Stringer August 17, 1998 Page 2 2. Section1.02.03.04 Reference Table 2 of the Design and Construction Criteria, Standards and Specifications for Streets, Sidewalks, Alleys and Other Public Ways, City Engineering Office, July 1996 requires a minimum tangent length of 150 feet from the right of way. We are requesting a distance tangent distance of 46.24 feet. Justification The nature of the intersection, a "Tee" configuration, creates a stop condition and also restricts speeds in either direction. based on deceleration or acceleration to an assumed range of 15 to 25 mph, which is a safe speed for the designed centerline radius. The 46.24 feet of tangent does allow two cars to approach at 90 degrees to the intersection. The 90-degree intersection configuration at Lincoln and 12th Street is preferred to a non - perpendicular condition and allows Block Drive traffic (minimal) to more safely us the intersection. Mitigation. We will install advance signing to alert motorists approaching 12th Street of the upcoming stop sign. Summary As you are aware the Buffalo Run Project has been in the City of Fort Collin's review process for over 18 months and the owner is very anxious to begin work in order to avoid the complications with winter construction and maintain the affordable financing for this project. We have been moving forward with the current design since preliminary approval and a redesign at this late time will bankrupt the project. Any assistance you can afford to accelerate the review and approval of this variance and the utility plan submittal would be greatly appreciated by the entire team. Sincerely, The Sear -Brown Group - L��%�- • /ice`. Robert Hume, P.E. Enclosure cc: Scott McFadden — W.O. Brisben Companies Lucia Liley — March and Liley Jim Allen -Morley — Sear Brown Transpo. tion Services Engineering Department City of Fort Collins 18 August, 1998 Jim Allen -Morley, P.E. The Sear -Brown Croup 209 South Meldrum Fort Collins, CO 80521-2603 Re: Buffalo Run Apartments - 12th Street Variance Request Dear Jim: Thank you for submitting the variance request for Buffalo Run Apartments, more particular, 12th Street. The current street standards state that whenever an industrial local or commercial local street intersects another street, the Engineer will provide a tangent length of 150 feet for safe sight distancE� and safe traffic operation. The standards also state that the minimum centerline radius for a commercial local street will be a minimum of 610 feet. The City is currently classifying 121h Street as a commercial local street. However, since it is not anticipated that the speed of vehicles along this street will be greater than 25 mph, the street will essentially function as a residential local street. Therefore, the design requirements for 121h street are to meet those standards of a residential local street. After reviewing the traffic study and analyzing the sight distance, the City Engineer believes that the intersection of 121h Street and Lincoln Avenue will operate safely. He will therefore grant your request: to vary the tangent length and centerline radius upon the compliance of two conditions. Those conditions are as follows: 1. The (Developer of this project will install appropriate signs to notify motorists that a "stop" condition occurs at the intersection of 12th Street and Lincoln Avenue. 2. The City will restrict the desired speed limit along 12th Street to 20 mph with a maximum posted speed limit of 25 mph. It will be the responsibility of this Developer to install the appropriate signs. Please address the above conditions on both the utility plans and site and landscape plans. If you should have any questions or concerns regarding this matter, please do not hesitate to contact this office at 221-6605. 281 North College Avenue • P.O. Box 580 0 Fort Collins, CO 80522-0580 • (970) 221-6605 Buffalo Run Apartments Statement of Land Use Policies Achieved by Planned Unit Development 12. Urban density residential development usually at three units or more units per acre should be encouraged in the urban growth area. The Buffalo Run Apartments density will be 17 units per acre in a location already served by utilities and adjacent to complementary commercial and industrial land uses. 22. Preferential consideration should be given to urban development proposals which are contiguous to existing development within the city limits or consistent with the phasing plan for the urban growth area. The Buffalo Run Apartments is located on an infill parcel within the urban growth area. 39. The City should direct efforts to promote improved traffic and pedestrian circulation and public transit areas north and northeast of the City. 41. The City should encourage residential development in the northeast, particularly giving special consideration to the undeveloped industrially zoned land in the area adjacent to the existing residential neighborhoods. The Buffalo Run Apartments are located in the northeast quadrant of the City of Fort Collins and is adjacent to the industrial corridors along Lincoln Avenue. 49. The City's (Land Use Policies Plan shall be directed toward minimizing the use of private automobiles and toward alleviating and mitigating the air quality impacts of concentrated use of automobiles. The Buffalo Run Apartments are located adjacent to service and employment centers which will reduce the traffic generated by the development by allowing multimodal transportation options. 80. Higher Density residential uses should locate: a. Near the core area, regional/community shopping centers, CSU main campus, or the hospital; The Buffalo Run Apartments are located next to a site which has Overall Development Plan Approval for a regional shopping center and is approximately 2 miles north of the hospital. b. Within close proximity to community and neighborhood park facilities; The project is'/z mile to the east of the c. Where water and sewer facilities can be adequately provided; Water and sanitary sewer facilities are located along both Lincoln Avenue and Lemay Avenue. d. Within easy access to major employment centers; The Buffalo Run Apartments are 1 mile west of the Fort Collins downtown area and is immediately adjacent to the west of the Lincoln Avenue industrial corridor e. With access to public transportation; The site is not on current Transfort bus routes, however the commercial center to the south will likely provide a bus service shelter for future expansion of the system to the site. Transpor' ion Services Engineering Department City of Fort Collins August 20, 1998 Mr. Jim Allen -Morley The Sear -Brown Group 209 South Meldrurn Fort Collins, CO 80521-2603 Re: Buffalo Run Apartments P.U.D. Dear Jim: This letter is concerning the resubmittal of the Buffalo Run Apartments P.U.D. utility plans. As stated at our August 11, 1998 meeting, City staff still had some outstanding issues that needed addressing and were not ready to request mylars then. After talking with the various departments, we feel at this time we would prefer to review the utility plans again. OncE? our review is completed and we feel that this project is ready to move forward we will request mylars. Until such time, our engineering intern will route your utility plans. These plans will have a two -week turnaround with comments being due on September 2, 1998. If you need clarification on anything, or have any additional questions or concerns, please do not hesitate to contact me at 221-6605. S' r 1 Tim R. Blandford Engineering Department City of Fort Collins cc: Dave Stringer, Development Review Manager Ted Shepard, City Planner Eric Bracke, Traffic Systems Technician Kathleen Reavis, Transportation Planner II Matt Baker. SIC Coordinator 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 EARTH ENGINEERING CONSULTANTS, INC. August 19, 1999 City of Fort Collins Engineering Department P.O. Box 580 Fort Collins, Colorado 80522 Attn: Mr. Rick Richter Re: Buffalo Run Pavement Sections EEC Project No. 1984024 Mr. Richter: Our subsurface exploration and pavement design reports for the Lincoln Avenue widening project adjacent to the Buffalo Run development were submitted to your attention on June 25 and July 8, 1999, respectively. Twelfth Avenue will be extended a short distance south of Lincoln Avenue on the east side of that project. Lincoln Avenue was designed using an EDLA of 200. It is our opinion the recommendations for Lincoln Avenue paving; could extend to the short stretch of 121h Street being constructed as a part of this project. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this letter, or if we can be of further service to you in any other way, please do not hesitate to contact us. Very truly yours, Earth Engineering Consultants, Inc. Y AF"PR0"XTPDV z= A s� �..!' BY: DATE: C J �u --T-- Lesfr"'Io E. City of Fort Collins Principal Engineer �gwun �m8 eat lEu cc: Jeff Hiser - Sycamore Construction CENTRE FOR ADVANCED TECHNOLOGY 2301 RESEARCH BOULEVARD, SUITE 1 04 FORT COLLINS, COLORADO 80526 (970) 224- 1 522 (FAx) 224-4564 Buffalo Run Apartments Overall Development Review Criteria Chart (Land Development Guidance System Criteria Analysis Activity k ALL DEVELOPMENT CRITERIA ALL CRITERIA I •, APPLICASLE CRITERIA ONLY s :he =enan lvru the rrt • �cCr�ucte� Oe satisriev� . CRITERION i ==ION 3 3 Yes �No If no. please ex -lain A1. CONINIUNITY-WIDE CRITERIA. I 1 1.1 Sclar OnencEtion I I 1.2 Ccmorehensive Plan IXI I I X I I 1.3 Wildlife Habitat ( I I x V I I 1.4 Mineral Deocsit I I I 1..3 Ecclocically Sensitive Ares I X I Lands cf Agricultural Imocrance j .r 1.7 E.-jerc-v Conservation 1.e A-ir Quality I ' I IxI I 1. C W�tvr QuallTy I X I I I 0 S=Wace _rd 1 i� s,ee I x t I I - 1 1 �N"-f ,�n�tiotl X I I X 1.12 Residential Density I x► 11 x l 2. NE!Gr•1EORH OCO COMP.• T 1EILI T Y CR1T_R,IAI I Ps=es;ran. Eike Transoeration I X I I I x I Euiicinr P!acerr.s,It and Orient =_tier, x l I I x I — •- - 1-- u r _al Jr9s I X I i I I x l =. a Venicul2r Circuiation anc Parking I xl ! I 1 X 1 I I X j I racestrian Cir;;laticn IXI I ( x I I 2. ; ._rz ;itec,.Ura IxI X I ccilcing He!Cnt and Views I xl ► IxI I I I I 2-� . Shading IXI I I I I 2.1C =clarAc:zass x 2.1 1 Historic Resouro s I I I x 2.12 S=hacks 2.13 Landscape 2.1 Signs I x 1 I I 1 1 I I I 2.15 Site Lighting 1 x x I 2.16 Ncise and Vibration I IXI I I 2.17 Glare or Heat 2.18 Hazardous Materials I l 1 l x l x l 1 A 3. ENGINE:=RING CRl TER lA 3.1 Utility Capacity 3.2 Design Standards X I 1 3.3 Warer Hazards I I I I 3 Geologic Hazards I I Land Development Guidance System for Manned Unit Developments The City of Fort Collins. Colorado. Revised 71,12 1111 I994 •61 • %�US� Buffalo Run Apartments Land Development Guidance System Criteria Analysis COMMUNITY WIDE CRITERIA A-1.1: Not Applicable A-1.2: Yes, please see enclosed analysis of project's compliance with The City of Fort Collins Land Use Policies. A-1.3: Not Applicable A-1.4: Not Applicable A-1.5: Not Applicable A-1.6: Not Applicable A-1.7: The buildings can accommodate rooftop solar energy collectors. A-1.8: The project will not generate any gaseous, liquid or solid pollution A-1.9: The project will conform to all state, local and federal water quality standards. Runoff from this development will be minimal and will be retained on site in a single large storm water retention area. A-1.10: The development will utilize the City of Fort Collins sanitary sewer system. There will be no industrial waste generated by the development. A-1.11-The landscape plan for The Buffalo Run Apartments has been designed to incorporate the following water conservation criteria: • Plant material selections will emphasize the use of native or adapted species with proven draught tolerance. • Plants with similar water and exposure requirements will be grouped together and irrigated on the same zone to facilitate water conservation. • Shrubs will be planted in mulched beds and irrigated with separate zones than turf areas in response to lower water requirements and different irrigation intervals. • Irrigation design to provide rotor heads for large areas and spray heads for smaller irregular areas. Drip irrigation will be utilized for shrub beds next to building foundations. • The irrigation plan will be prepared by a certified professional familiar with equipment specifications and a working knowledge of local irrigation practices and conditions. Buffalo Run Apartments Land Development Guidance System Criteria Analysis A-1.12: The overall average residential density for the project is 17 units per acre. NEIGHBORHOOD COMPATABILTY CRITERIA A-2.1: The Buffalo Run Apartments will promote multimodal transportation within the City of Fort Collins by locating a residential land use near employment and services which will intent residents to use alternative methods to vehicular transportation. In addition, the development will incorporate facilities such as easy access to the Poudre River Trail and bike racks within the development to make it easier for residents to utilize the existing Fort Collins multimodal transportation system. A detailed vehicular transportation analysis has been prepared by Krager and Associates Inc. In general, the site is located at the intersection of two arterial streets which have sufficient capacity for the vehicular traffic generated by the development. Pedestrian transportation needs are addressed within the development by an extensive internal sidewalk system (the "secondary system" as described in Section 2.4) which connects to the "primary system" along South Lemay Avenue and Lincoln Avenue. The secondary system will also connect to the internal commercial development adjacent to the south at two locations. These connections will provide residents access to the Poudre River Trail at the intersection of South Lemay Avenue and Mulberry Street. Handicap access to the sidewalk along Lincoln Avenue and to the retail project to the south will also be provided. Bicycle transportation will utilize the internal driveways within the community and then access to the bicycle lane on the eastern boundary of Lemay Avenue to connect to the Poudre River Trail. The site will also incorporate multiple bicycle parking areas. A-2.2: The surrounding uses for the this property are: retail to the south, industrial to the east, retail and industrial and some residential to the north and retail and a golf course to the west. Consequently, the character of this neighborhood is difficult to describe as it includes a such broad mixture of uses. However, the commercial project to the south will provide an opportunity to utilize complimentary design features as further described in Section 2.7. A-2.3: The site is currently utilized for agriculture and is very flat. The development will improve the appearance of the site by incorporating topographic features into its landscape design. A-2.4:The Buffalo Run Apartments pedestrian circulation hierarchy will have two classifications: Primary and Secondary; Primary: This system will construct large sidewalks along Lincoln Avenue and South Lemay Avenue and serve the general public as well as Buffalo Run residents. The primary system has been designed to provide linkages to the surrounding community Buffalo Run Apartments Land Development Guidance System Criteria Analvsis Secondary: While not private in its design, the secondary system is intended to serve the residents of the Buffalo Run community. Located throughout the interior of the community this system will connect the buildings to the parking areas, recreation areas and the primary system. In the secondary system, bicycles will utilize the asphalt drive areas which connect to bike parking nodes. A-2.5: The site plan does provide adequate access for emergency vehicles and has been designed utilizing the criteria in the LDGS. A-2.6: The secondary pedestrian circulation system has been designed to allow full access within the site and connection to large sidewalks which will run along Lincoln Avenue and Lemay Avenue. Sidewalks are located in areas to allow efficient access between parking and living areas and to safely feed pedestrian traffic from living areas to the recreation amenities. (e.g. clubhouse, tot -lot, and green space in southeast corner.) Sidewalks will be designed to promote safety, but also to be placed in locations which allow landscaping to maximize the attractiveness of the development. A-2.7: The architecture at the Buffalo Run Apartments has been created to interact with the general character of the neighborhood which is generally the eastern portion of downtown Fort Collins. This neighborhood contains a mixture of mostly commercial uses with limited single family north of the property along Lemay Avenue. The project will address consistency with the commercial uses by incorporating period architectural features such as red brick in the clubhouse building. The clubhouse is the most visible point in the project and will transition the project to the downtown area's architecture. The project scale has been designed to blend with the residential uses north of the site on Lemay Avenue. The buildings along Lemay Avenue will be one and two stories in height and are compact in width so as to resemble a single family structure. The building forms and materials are intentionally composed to reinforce traditional, historic character. In addition, there will be a transition from one and two stories along Lemay Avenue to three stories in the eastern side of the development which will provide vertical relief as one moves from east to west along Lincoln Avenue. A-2.8: The buildings will exceed 40' in height at some locations but average much less than 40' overall. The architecture of the buildings allows variable roof lines of different heights. The maximum height for any building is '42, but that is only on the highest roof areas which typically is only 30% to 40% of the total area. A-2.9: The buildings in this project will not cast a shadow on other surrounding buildings. The tallest buildings at this community are over 200 feet from any other buildings to the north and consequently any shadow created by those buildings will not affect other property. A-2.10: Should solar energy systems become feasible, the layout of the building will allow the use of solar energy systems. A-2.11: Not applicable. Buffalo Run Apartments Land Development Guidance System Criteria Analysis A-2.13: The Landscape design at the Buffalo Run Apartments has been created to compliment the building, parking and walkway elements and enhance the aesthetic appearance of the project. Landscape plantings will be utilized in a functional manner to achieve the following: • Soften project edges and building architecture. • Screen off -site views into parking areas and trash enclosures. • Provide privacy between living areas and parking areas, living areas and external transportation corridors and between separate living areas. • Provide visual transition from the multifamily land use to the adjacent retail and industrial land use. • Reduce the scale and surface parking areas through the use of landscape islands. Landscape design will emphasize aesthetics in the following manner; • Both evergreen and deciduous trees will be used to provide year around interest while respecting solar access. • Formal street tree planting around the perimeter of the site to establish an urban character along Lincoln Avenue and Lemay Avenue. • Detail planting of small ornamental trees, shrubs and flowers to provide interest and human scale. • Tree spacing and placement to recognize city standards and utility requirements. A- 2.14: The project is within the Residential Neighborhood Sign District. The flushwall signs which will identify the buildings will correspond with signage throughout the remainder of the site. The coloring of the signs will correspond with that of the buildings. Please see enclosed signage elevations. A-2.15: The Buffalo Run Apartments will utilize a combination of low level, intermediate height fixtures for internal street and parking area lighting. Building access areas will be illuminated with residential scale lighting to appropriate demarcation for evening use. The site plan of the project allows for the lighting on site to be focused internally which will not adversely affect surrounding properties. A-2.16: As a residential use, there will be limited noise generated by this development. Any noise would be generated by residents and would be mitigated by the on site property management at the community. A-2.17; Not applicable. A-2.18: Not applicable.