Loading...
HomeMy WebLinkAboutARAPAHOE FARM TOWNHOMES PUD - Filed CS-COMMENT SHEETS - 2003-05-27Commurury Planning and Environmental services Planning Department City of Fort Collins _ March 2, 1994 Mr. Eldon Ward Cityscape Urban Design 3555 Stanford Road, Suite 105 Fort Collins, CO 80525 Dear Eldon: Staff has reviewed the request for Final P.U.D. for Arapahoe Townhomes and offers the following comments: 1. The General Notes on the Utility Plans contain errors and omissions. Please correct. 2. Harmony Road design needs to be completed. This includes flowline profiles, centerline profiles, and cross -sections every 50 feet. Grading to proper grades for future paving should be done now. Sidewalk, curb, and gutter for future Harmony should be constructed with this P.U.D. 3. The pedestrian connection to Hilburn Drive may need some modification that should be discussed with the Development Review Division. 4. Details regarding the geometries of sidewalks and parking lot layout are needed. 5. Other comments have been forwarded to the consulting engineer. 6. The following comments apply to the Plat: A. The "lot" must be called out ("Lot One") even though it is only one lot. B. The outer boundary monuments must be described. C. The! 40 feet and 24 feet access, drainage, and utility easements are confusing as to where the 40 foot and 24 foot are measured. Can the plat add some arrows or distances to make it more self-explanatory? D. The! original will need to have dense lines in order to make good quality reproducible copies. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 17. Prior to the Final P & Z, a meeting should take place between the developer, consultant and the Regency Park property owners to discuss revised plans. 18. The Director of Engineering has determined that the unused portion of Hilburn Drive should be vacated back to the adjacent two property owners. This will require the removal of asphalt, grading and re -seeding for erosion control, and abandonment of utilities as per the affected utility providers. A north -south sidewalk, curb, and gutter must be constructed to close off the old right-of-way and connect both sides of Hilburn Court. This may involve modification of existing,improvements in order to make a safe transition. Please contact the Engineering Department for complete details. This concludes Staff comments at this time. In order to stay on schedule for the March 28, 1994 Planning and Zoning Board meeting, please note the following deadlines: Plan revisions are due March 9, 1994. P.M.T.'s,, 10 prints, renderings are due March 21, 1994. As always, please feel free to call to discuss these comments or to set up a meeting to discuss these comments in depth. Sincerely: Ted Shepard Senior Planner xc: Joe Frank, Chief Planner Kerrie Ashbeck, Civil Engineer