Loading...
HomeMy WebLinkAboutMemo - Mail Packet - 9/15/2020 - Memorandum From Kraig Bader Re: Overhead Electric Lines In Fort Collins Light & Power Service Territory Utilities Light & Power 700 Wood Street PO Box 580 Fort Collins, CO 80522 970.221.6700 970.221.6619 - fax fcgov.com M E M O R A N D U M DATE: September 9, 2020 TO: Mayor and City Councilmembers THROUGH: Darin Atteberry, City Manager Theresa Connor, Interim Utilities Executive Director Tim McCollough, Utilities Deputy Director FROM: Kraig Bader, Director, Electrical Engineering RE: Overhead Electric Lines in Fort Collins Light & Power Service Territory This memorandum is a response to a recent question from Leadership Planning Team (LPT) on August 24 regarding the status for conversion of electric lines from overhead to underground installations. Consistent with Fort Collins’ legacy and with the City Council’s current priority to convert overhead electric lines to underground electric lines, Staff requested an off-cycle appropriation of funds to support the conversion of the remaining overhead lines to underground in January of 2020. As the work is now divided, there are eight projects that are either in design or construction in Light & Power’s service territory, with a plan to complete the conversion by 31 January 2022. There are approximately 4 miles of primary overhead circuits identified in the electric distribution system, representing 0.3% of the existing plant. Following the appropriation in January 2020, staff started work to plan, design, and construct the overhead to underground conversion projects. The status for each of the projects funded under the off-cycle appropriation is shown below. Project Name Status Length in Feet (% of Remaining OH) Taft and Drake Conversion (Milfred) In Construction 1,230 (5.82%) Taft and Drake Conversion (Craws) In Construction 1,043 (4.94%) Taft and Drake Conversion (Tefft) In Design 4,499 (21.30%) Taft and Drake Conversion (Drake) In Design 402 (1.90%) College and Trilby Conversion In Design / Planning 8,144 (38.56%) Overland Trail and Mulberry Conversion In Design 1,045 (4.95%) North College and Willox Conversion In Planning 650 (3.08%) DocuSign Envelope ID: FAB5C227-73F0-4E4E-B21F-9083855C5FB4 West Vine and Shields Conversion In Planning 650 (3.08%) Work to convert overhead electric distribution areas not only improves electric reliability and resilience, but also allows cooperative installation of conduit pathways that will also support future Connexion customers. From that perspective, some work has been prioritized to coordinate with Connexion’s construction schedule. Some other work prioritized ahead of the planned conversion includes overhead areas where development will call for the removal of the overhead electric system serving agricultural or undeveloped land specifically with proposed developments in Northeast Fort Collins. cc: Travis Walker, Director Electric Field Services DocuSign Envelope ID: FAB5C227-73F0-4E4E-B21F-9083855C5FB4