AGENDA
Council Finance & Audit Committee
December 16, 2019
10:00 am - noon
CIC Room - City Hall
Approval of Minutes from the November 18, 2019 Council Finance Committee meeting.
1. Utility LTFP & CIP – Electric & Stormwater 45 mins. L. Smith
2. Purchasing Policy Update 30 mins. G. Paul
3. Sales Tax on Mobile Homes 20 mins. J. Poznanovic
4. Utility Off Cycle Budget Items 25 mins. J. Phelan
K. Bader
L. Smith
Council Finance Committee
Agenda Planning Calendar 2019
RVSD 12/11/19 mb
Dec. 16P
th
P
Utility LTFP & CIP – Electric & Stormwater 45 min L. Smith
Purchasing Policy Update 30 min G. Paul
Sales Tax on Mobile Homes 20 min J. Poznanovic
Utility Off Cycle Budget Items 25 min L. Smith
Jan 27P
th
P
Utility LTFP & CIP – Water and Wastewater 45 min L. Smith
Affordable Housing Support Process (Fees) 20 min S. Beck-Ferkiss
V. Shaw
EPIC 15 Year Loan Program 25 min T. Storin
S. Carpenter
Feb 24P
th
P
GASB 87 Implementation Update 20 min T. Storin
2019 Re-appropriations 30 min L. Pollack
Digital Equity Program Review 30 min N. Bodenhamer
Mar 16P
th
P
B-Dam Alternatives and Recommendation 30 min T. Connor
Prior BFO Headcount Addition Review 15 min L. Pollack
City Give Portfolio Process Review 30 min N. Bodenhamer
Future Council Finance Committee Topics:
• Park/Median Design Standards & Maintenance Costs – TBD
• Metro District Policy Update – TBD 2020
• BFO Assumptions Review – July 2020
• Annual Adjustment Ordinance – Sep 2020
Finance Administration
215 N. Mason
2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6788
970.221.6782 - fax
fcgov.com
Finance Committee Meeting Minutes
11/18/19
10 am - noon
CIC Room - City Hall
Council Attendees: Mayor Wade Troxell, Ross Cunniff, Ken Summers
Staff: Darin Atteberry, Jeff Mihelich, Kelly DiMartino, Mike Beckstead, Travis Storin, Blaine
Dunn, Jennifer Poznanovic, Dave Lenz, Zach Mozer, Mark Kempton, Liesel Hans, Victoria
Shaw, Carol Webb, Lance Smith, Dean Klingner, Noelle Currell, Cody Forst, Jennifer
Selenske, Kerri Ishmeal, Renee Callas, John Duval, Tyler Marr, Jo Cech, Katie Ricketts,
Carolyn Koontz
Others: Kevin Jones, Chamber of Commerce
Dale Adamy, R1st.org
______________________________________________________________________________
Meeting called to order at 10:02 am
Approval of Minutes from the October 21, 2019 Council Finance Committee Meeting. Ken Summers moved for
approval of the minutes as presented. Mayor Troxell seconded the motion. Minutes were approved unanimously.
A. 2020 Long Term Financial Plan Outlook (excluding Utilities)
David Lenz, Director, Financial Planning & Analysis
Zach Moser, Analyst, Financial Planning & Analysis
SUBJECT FOR DISCUSSION
2020 Long Term Financial Plan Outlook (excluding Utilities)
EXECUTIVE SUMMARY
The City updates the Long-Term Financial Plan (LTFP) outlook every two years as part of the Strategic Planning
Process. The objective is to highlight potential challenges and aid in philosophical decision-making on strategies
that span the longer term (5 – 10 plus years). The City has enjoyed a strong economic base and has done an
excellent job in managing its expenditures and maintains a Aaa Moody’s credit rating.
However, due to a general slowdown in actual and projected revenue growth, escalating cost pressures in
serving a growing population base and a prior modeling error, the projected financial position (city reserves)
come under more pressure in the mid-term than highlighted in the 2018 LTFP. This updated outlook fully
accounts for the addition of approximately 100 FTE positions added over the last two BFO cycles and the
requirement to continue to add more FTE positions to serve the increasing population base.
2
The baseline scenario assumes current operating conditions and service level delivery, as well as no outlier
impacts (severe recession, natural disaster, etc.). Given our requirement to balance our expenses against
revenues, the Strategic Plan will need to address a combination of options to contain costs, improve
productivities and look for revenue enhancement opportunities.
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
Does Council Finance have any questions related to the 2020 Long-Term Financial Plan Outlook?
BACKGROUND/DISCUSSION
During the last two Strategic Plan updates, a key component of uncertainty was the potential for the KFCG tax to
sunset in 2020. The potential loss of that revenue source would have put severe pressure on the City’s finances.
However, even with an extension of the tax (which ultimately was approved by voters), the projections were for
City expenditures to exceed revenues over the long term (reaching approximately $10 million per year in the
2016 Plan and $15 million per year in the adjusted 2018 Plan by the year 2025).
These pressures on longer term fund reserves continue in the 2020 Plan - the actual and expected increases to
costs continue to accelerate and the estimates of revenue growth from existing sources have softened
somewhat. Our projected deficit by year 2025 could reach $35 to $40 million per year.
Below are the major drivers of changes to the 2020 LTFP outlook compared to the prior 2018 LTFP:
• Lower Tax Revenues:
o Slowing Sales Tax revenue growth – projected at 2.5% annual increase vs 2.8% prior.
o Lower Use tax revenue – still increasing but driven off a lower base due to declines in 2015 – 2018
timeframe.
o Offset by slightly higher property taxes from higher valuations.
• Higher Personnel costs:
o Increased salary and benefits costs – reflecting higher current actual FTE levels and increased future
FTE levels to support services for the growing population base.
• Modeling issues corrected from the 2018 plan:
o Adjustments to fully account for all fund groups and correct for erroneous data inputs in year 2016
that carried thru the projections.
DISCUSSION / NEXT STEPS;
Mike Beckstead; gap in revenue vs. expenditures to spending is the issue and is reflective of the difficult
challenges we will face in the upcoming BFO cycle such as Police Services, Parks & Maintenance.
We have added approximately 50 FTEs in each of the last 2 BFO cycles to scale services to serve an increasing
population - this gap grows to between $35 and $40M per year in out years. The LTFP influences the Strategic
Plan - the Strategic Plan results in specific objectives which influences BFO offers / priorities – we are not
recommending any action - we just want Council to be aware - the kinds of solutions we will work on should
come out of the BFO process. We will have 1 or 2 Strategic Objectives in the Strategic Plan that will address the
staffing side and the revenue side.
3
Mayor Troxell; thank you for the thinking, the set up and for bringing it to us there.
Ross Cunniff; appreciate the attention to detail - question re: Slides 8 & 9 (see above) – we have been because
of the salaries and benefits are above CPI
Mike Beckstead; yes, we were in a tight period of growth from 2000 to 2010. Sales Tax grew 1.7% during this
time. From 2010-2015 we grew at an average of 5 ½ % and then property tax started growing. The service
4
requirements that are coming out of the community - we were able to meet it because we had some pretty
strong growth years.
Ross Cunniff; one of the reasons I wanted us to find other revenue opportunities / options to try to meet those
service levels. Based on current trends, our sales tax will continue to flatten out but I don’t think our service
demands will decrease regardless of population.
Mike Beckstead; the bigger the city the more complex the service offerings need to be.
Ross Cunniff; would be interesting to provide Council with metrics to help them understand a need for revenue
diversification and a caution for trying to promote growth in Fort Collins - the more growth we promote the
farther behind we could end up getting.
Mike Beckstead; I agree - there is a lot of ‘spade work’ economic and statistical analysis that we need to spend
some time analyzing the data before we jump into solution mode - we could try to implement the wrong
solution.
Ross Cunniff; I am not suggesting policy change at this time - We do have population growth - Service level
demands and dollar amounts grow faster than population growth.
Darin Atteberry; if we were seeing a flat population - we would still be seeing labor costs going up, fuel costs go
up.
Ken Summers; adding 50 employees every 2 years are being added to those things outside of public safety. It
would be helpful to look at a breakdown of the last 100 added FTEs added over last 2 budget cycles- what
categories they fall into and direct benefit. We should have a discussion on what we need to do to enhance the
revenue areas that we have. Sales Tax revenue – watch it continue to stagnant and decline. We don’t want
growth but that is the funding source for our use tax. I would like a breakdown on the added FTEs over the last
two BFO cycles to see what categories they fall into.
Darin Atteberry; we absolutely have that information - I appreciate the comment about public safety as well -
the city has been very conservative about adding FTEs, - We know that the leakage is occurring – we don’t have
a clear solution right now – the city has been very conservative with FTE adds - 4+ years ago Council was
concerned that we were being too thin around certain things (FTEs)- appreciate the thoughts that Ken and Ross
shared - we have really good data and part of the purpose of this is to stimulate this type of conversation - we
are going to have a thorough analysis of sales tax leakage and will come back to Council Finance with more
information.
Background growth - Parks Master Plan that we are looking at with Council now - we will look at some of the
very basic assumptions - frustrating to all is the diversification of revenue
Ross Cunniff; we have some difficult options in that space - asking people to spend more for something-
When we tie that directly to service it is funding - that way it could fluctuate with that service. Nothing about
sales tax decline - we have engaged with some large retailers – certainly we are engaged at a legislative level -
statewide internet sales tax solution – we don’t yet understand the model - communities around us that are
more competitive in the retail space. Previous Councils were concerned about the number of FTEs but that has
never been a metric – it has always been service levels.
5
Darin Atteberry; I am with you on the public safety issues – the challenge is that when you hire police officers,
you also need more back-office support such as dispatchers, more accountants, purchasing, etc. I do have
confidence around our transparency, our dashboards and new FTEs. I am proud that in Fort Collins models we
have a great deal of visibility / transparency. You will be very well equipped as we further this conversation –
ultimately Council will have the ability to make important decisions - I think we are well informed and we are in
a solid position. We need to be very intentional.
Mike Beckstead; this is not a sky is falling kind of conversation, this is we have a trend coming at us and
we have time to prepare and react There will not be one single thing we do to get in front of it – it will involve
lots of time. We spent a lot of time in 2014-2015 regarding revenue diversification. In all of the outreach for
that when we were talking with the community it was positioned as revenue neutral. As Ross said – there will be
a revenue enhancement necessary to help resolve this issue and to keep service levels up. We will be coming
back with some proposals on what we want to do.
Ross Cunniff; disruptions - I think automation is on a tear right now - there are lots of things that could be
automated and in the next 5-10 years that could help drive the cost side – efficiencies.
Mayor Troxell; we do have another revenue diversification strategy that we are using now and that is City Give-
– I could see that as a measurable percentage of the annual budget – example is CSERV at CSU which accounts
for $400M which is 1/3 of their budget.
Mike Beckstead; there will be some art in the community conversation - the way we message that to our
community givers - is City Give backfilling a budget – one time or is it enhancing strategic opportunities.
Mayor Troxell; not simply going to the same pot - really the globe - with Bloomberg - $1M - there are other
funds that support things in urban municipalities - not so much operational – maybe pilots and other sorts of
things -
Ken Summers; I would like to understand more what level of service speaks to. It is easy to look at police / parks
/ maintainance workers OR are we talking about administration. Added 100 FTEs - What is the fully loaded cost?
What are the parameters that dictate adding? What is the number of employees we need to maintain a certain
amount of park space? Those dynamics don’t always fit in terms of some of the back office functions.
Where do these 100 FTEs come from? What dictates when we need to add more? Let’s evaluate our
organization based on these issues - service levels / service being provided – how valuable is it to the
community.
Darin Atteberry; we are prepared to have these conversations - we don’t add FTEs without Council approval /
budget approval- We can show you what budget offer an FTE is tied to and what it is hoping to accomplish and
the total cost and ongoing costs. We can go through each of the 100 FTEs and say here is what strategy they
were tied to for example; X number of parks this budget cycle - we will show you how many additional people
we add.
Mike Beckstead; We have a meeting in March where we plan to review the 2021-2022 budget assumptions with
Council Finance - I think it would be good to add a topic to review historical FTE additions during that
presentation- the majority of FTEs added have been for service delivery around code enforcement, parks
maintenance, new police but have not gone to back office management. An example from my shop we have 7
purchasing staff which hasn’t changed in 6 years - the volume has gone up 73% in last 6 years and we haven’t
6
added any staff. One buyer has 17 RFPs on his desk – there is pressure in some of the back office functions
because we haven’t added staff because we been focused more on service delivery.
Ken Summers; Nexxus between staff member and growth – diminishing returns – you can be so effective at a
volume of work – important for us to be sensitive to how we address that.
Ross Cunniff; revenue growth projections are at 1.7% and expenditures 3.4%
Dave Lenz; that is over a 10-year period - annualized it is about a 2.1% on revenue and 3% on costs all in.
Rate of growth 3 versus 2.1%
B. Water – Horsetooth Shutdown
Mark Kempton, Director of Plant Operations
Liesel Hans, Water Conservation Manager
Lance Smith, Director Utilities Finance
SUBJECT FOR DISCUSSION
Appropriation of $3.2 million of reserve funds from the Water Fund for the construction of a temporary
emergency backup drinking water supply system associated with the Horsetooth Outlet Project.
EXECUTIVE SUMMARY
The purpose of this item is to request an appropriation of $3.2 million from Water Fund Reserves to design and
construct a project to provide a temporary backup drinking water supply pumping system during a planned
October-November 2020 closure of the Soldier Canyon Dam Outlet pipeline from Horsetooth Reservoir. The
pipeline provides drinking water to the two drinking water treatment plants serving the City of Fort Collins and
surrounding areas, serving about 250,000 people. The pumping system is intended as an emergency backup
supply system to the primary Cache la Poudre River water supply during the 60-day long planned outage of the
Horsetooth Reservoir water supply line. The City will be reimbursed approximately 40 to 50% of the project
costs by our project partners at the conclusion of construction.
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
Does the Committee support the appropriation of Water Fund reserves to construct an emergency backup
water supply system for the City and our partners, the Tri-Districts and Platte River Power Authority (PRPA)?
Does the Committee support implementation of water use reduction measures to lower water demands to
typical winter levels of 15 million gallons per day for the duration of the project?
BACKGROUND
Northern Water, which operates the 54-inch Soldier Canyon Dam Outlet pipeline from Horsetooth Reservoir to
the City's Fort Collins Water Treatment Facility and the Tri-District's (Fort-Collins Loveland, East Larimer County,
and North Weld County water districts) Soldier Canyon Water Treatment Plant, is planning to perform necessary
maintenance on the water line in October and November of 2020. This maintenance will require a full closure of
the line for up to 60 days, which will result in both treatment plants relying on the Cache la Poudre River
("Poudre River") as the sole water source for the City's and the Tri-District's respective water service areas.
Platte River Power Authority’s (PRPA) Rawhide Plant also receives process water from the Horsetooth line and
could be affected by a long-term loss of water.
7
Historically, the Poudre River has been a reliable source of high-quality water; however, it can be susceptible to
water quality impairing incidents such as forest fires, vehicle crashes, chemical spills, and other incidents that
may cause the treatment plants to shut off the water intakes from the River. If one or more of these such
incidents were to occur and cause a prolonged shutdown of the Poudre River intakes during the planned outlet
project, the City and the Tri-Districts could be at risk of a drinking water shortage. PRPA’s Rawhide Plant could
also be affected by a longer-term water outage shortage and is a working partner in this project. The City has
sufficient treated water storage to withstand short term outages (up to 8 hours); however, the Tri-Districts do
not have similar storage and may be susceptible to water shortages during a short loss of the Poudre supply.
To mitigate the potential water supply risk, the City, the Tri-Districts, and PRPA are proposing to construct a
temporary emergency water supply project. Low cost, operational mitigation measures will also be
implemented to help mitigate risks associated with the Poudre supply. Examples include stockpiling additional
water treatment chemicals, installing containment booms in the river etc.
The Hansen Supply Canal project includes a temporary backup emergency pump station on the Hansen Canal
that both the City and the Tri-Districts have agreed to design and construct as an alternative supply of
Horsetooth Reservoir water to both treatment plants in the case of a loss of water supply from the Poudre River.
The anticipated total cost of the project of $3.2 million is to be shared between the City, the Tri-Districts, and
PRPA as outlined in separate Inter Governmental Agreements (IGAs).
In the case of a sustained loss of the Poudre River supply (in excess of 8 hours), water will be pumped from the
Hansen Supply Canal (the canal that flow out the north end of Horsetooth Reservoir) via a new temporary pump
station to be constructed by summer 2020. Water will then be pumped into the existing Pleasant Valley Pipeline
(PVP) or to the City’s two existing Poudre River pipelines through a newly constructed pipeline connection that
will transport water to both treatment plants to serve the City’s and the Tri-District’s customers, as well as PRPA.
COST SHARING & PARTNERING STATUS
The anticipated cost share percentages, based on million gallons per day (MGD) of flow to each partner for the
project are approximately as follows;
• NWCWD - 12 MGD (34%) - $1.1 million
• ELCO - 3 MGD (8.5%) - $0.25 million
• FCLWD – 5 MGD (14.2%) - $0.45 million
• Fort Collins – 15 MGD (winter use; 42.4%) - $1.4 million
• PRPA - 0.3 MGD (0.9%) - $0.03 million
• UTotal needed = 35.3 MGD (100%)
Based on the percentages above, the net cost to the City upon completion of the project is estimated to be $1.4
million to $1.6 million. There are some items in the project cost that do not pertain to all parties e.g. water
conservation measures within the City will not apply to NWCWD.
To date both ELCO, NWCWD, and PRPA have verbally committed to paying for their portions of the project.
FCLWD has also indicated interest in the project but has not formally approved their participation in the project.
An Intergovernmental Agreement (IGA) has been developed between the City and the Tri-Districts which
outlines the general ownership, operation, and payment terms for the project. The final details of percentages
will be added to the IGA closer to selection of a final design alternative for the project.
8
DEMAND MANAGEMENT
The Horsetooth Outlet Project is an opportunity to share information about:
• the importance of proactive maintenance to sustain high quality, reliable water supplies;
• the source of our water supply;
• the collective responsibility to use our water resources wisely;
• and, the value of a community-owned water utility.
The proposed back-up supply project will provide 15 to 20 million gallons per day (MGD) of water to Fort Collins.
Typical demands in early October are approximately 20 to 22 MGD and typically drop to 15 MGD toward the
middle-to-end of October as irrigation and other seasonal uses end. Staff suggests the following water demand
management approach to mitigate risk:
• Goal: Reduce water demand to typical winter levels (15 MGD) by October 1st and sustain this winter level
throughout the Horsetooth Outlet Project.
1. Perform extensive public outreach and education in the months leading up to and throughout the
project.
o Tactics may include, but is not limited to, utility bill inserts, direct mailers, local articles/ads,
emails, newsletters, staff presence/activities at a variety of events throughout the year,
community presentations (targeted and upon request), posters, promotion of
programs/services and rebates, collaboration with City, commercial, and key accounts, etc.
2. Mandatory or voluntary requirement for all customers to end all irrigation by October 1st, with limited
exceptions.
With proactive outreach, communication and engagement, we believe the community will do their part to
minimize some of the necessary risk of the project. Many communities across the nation only have one water
supply and we are fortunate to have two reliable, high-quality sources. It is our responsibility to protect our
community by protecting and proactively managing our water resources. Water is an essential ingredient to the
many activities and businesses that make Fort Collins special. Investments we make today in our water
resources, infrastructure, and community education help maintain clean, reliable water resources and protect
the very thing our community was built upon – and continues to thrive upon.
While the goal is to achieve temporary water reductions, this effort stands to drive lasting efficiency and
conservation impacts, benefiting our utility and residents alike. Additionally, the Water Supply Shortage
Response Plan (WSSRP) update project identified the need to develop an approach for water shortages outside
of the typical summer irrigation season. The Horsetooth Outlet Project provides an opportunity to collect
information that will inform that approach for the next WSSRP update, currently slated for after the recently
kicked-off Water Supply and Demand Management Policy update. Outreach will be performed in cooperation
with the Tri-Districts where feasible, and these conversations have already started. Additional risk reduction
measures such as restricting truck traffic in the Poudre Canyon during the shutdown are being discussed with
the Colorado Department of Transportation (CDOT).
The City will initially fund and manage the construction of the project. The Tri-Districts and PRPA will reimburse the
City at appropriate milestones for their portion of the project costs. The pipelines and appurtenances will be
permanent connections, though, at this time, the pumps associated with the pump station will be temporary and
will be removed from the site at the completion of the Horsetooth Outlet Repair Project.
9
DISSCUSSION / NEXT STEPS:
Work is scheduled to start on October 15, 2020 and is scheduled to last 60 days – no flow during that time -
mitigating loss of supply
Will restrict large trucks and smaller trucks carrying toxic chemicals
Winter demand = 15 MGD (Million Gallons per Day)
Weather controls October demand
Irrigation restrictions - mandatory vs voluntary - mandatory has 4x greater impact / effectiveness
Darin Atteberry; our intent is to fund the project and then we will get 100% reimbursed from our partners once
the project is completed
10
Significant amount over next decade includes Halligan
Darin Atteberry; there is a big capital play coming with Halligan - we are not through the permitting process yet
but it is looking very positive - as we are talking about using 1.4M here - this mitigates risk and does not take
away from other capital needs.
Ross Cunniff; have we modeled the impact to our revenue? decreased revenue over summer
Lance Smith; I have not done that at this point
Ross Cunniff; for October restrictions to be effective we need to start education program in July – it wouldn’t
surprise me to see revenue impact - bring back in January to talk about
Mike Beckstead; will we implement the restrictions effective 10/1? Do we implement restrictions before there
is an issue with the normal supply?
Liesel Hans: the intent is to have the restrictions in place on 10/1 – whether we end of needing it or not
project starts 10/15 - disruption
Ross Cunniff; they need for citizens to plan ahead in response - what garden to plant, make repairs need to be
made to sprinklers. Have we considered any additional tiered price signals that might help as well?
Lance Smith; we do water shortage response plan
Liesel Hans; the existing plan does not address this sort of shortage - so if we tried to utilize that we would have
a price increase right away - that is part of the gap that we have identified
Ross Cunniff; may be a policy change
11
Mayor Troxell; are the other regions doing the same things? Are we coordinating in relation to restrictions?
Liesel Hans; we are starting those conversations and will makes sure we move forward together - they are very
motivated to be partners for this project.
Liesel Hans; we don’t have common branding but we do include all logos
Mayor Troxell; thinking of the branding of Efficiency Works - Platt River - we may want to have a common brand
which should be seamless especially to users
Darin Atteberry; I like the idea of co-branding and doing it early
Liesel Hans; we hear from customers that they are confused with Efficiency Works
Ross Cunniff; thank you for being on top of this
Ken Summers; mandatory restriction for 60 days makes sense - I like the education piece
If we begin through the summer with encouraging less water use - what happens to the water, we don’t use?
Liesel Hans; early education - getting them ready - not just a switch October 1P
st
P -making the most of those
supplies
Ken Summers; Is Joe Wright at capacity?
Mark Kempton; at that time of year it is close to capacity - we will intentionally hold back water - we will be
storing extra water next summer to release during October and November
Carol Webb; working now to position water up high in the canyon – also working with tri districts regarding
storage so they can also have their water high - working together to ensure that everyone has the supply they
need – plant to start bringing down the level in Horsetooth - we will shift to use more of our CBT water
and manage the supply in that way – there will be increases in the river flow as they bring that water down
Ross Cunniff; leftover water - if we use less water and water supply is high
Carol Webb; yes, there would be more water as they draw that down - best outcome - keep storage in Joe
Wright and maintain flows in the Poudre up high
Tri – they have gravel pit - some storage they get from some of the ditch companies
Carol Webb; Greeley has quite a bit - we are working with them so they can utilize ous
They have to position their water up high - usually they are switching over at that time
Ken Summers; how does Halligan factor in this?
Carol Webb; it doesn’t - the status of what is in Halligan now will make releases to main stem – doesn’t
physically get moved to our intake but gives us another tool
12
Mayor Troxell; diversion structure - at that time of year it will be basically dry
Carol Webb; this project allows us to exercise working together with our partners and this time we have the
time to plan - next time we may not but we will have the framework in place
Water storage for energy - work with property owner
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
Does the Committee support the appropriation of Water Fund reserves to construct an emergency backup
water supply system for the City and our partners, the Tri-Districts and Platte River Power Authority (PRPA)?
Does the Committee support implementation of water use reduction measures to lower water demands to
typical winter levels of 15 million gallons per day for the duration of the project?
Result;
Mayor Troxell, Ross Cunniff and Ken Summers; all yes and yes for questions above.
Meeting adjourned at 11:15 am
WORK SESSION
AGENDA ITEM SUMMARY TEMPLATE
Staff: Lance Smith, Utilities Strategic Financial Director
SUBJECT FOR DISCUSSION – Utilities 2019 Capital Improvement Plans and Strategic Financial Plan
Updates for the Light & Power and Stormwater Utilities
UEXECUTIVE SUMMARY
The purpose of this agenda item is to provide the Council Finance Committee with an overview of the
planning processes underway within Fort Collins Utilities. This agenda item will focus on the Light & Power
and Stormwater Enterprise Funds. The Water and Wastewater Enterprise Funds will be presented for
discussion in January. The 2019 Capital Improvement Plans (CIPs) and the 2019 Strategic Financial Plans
for each utility are outlined. The resulting investment projections set the basis for beginning the 2021-22
Budgeting For Outcomes (BFO) cycle. The overall 10 year rate projections for both utilities is also
presented here along with the forecasted debt issuance needs.
Through active management of O&M expenses, modest rate adjustments and the issuance of some debt,
the Light & Power Enterprise Fund is expected to be able to meet its operational objectives through targeted
capital investments over the coming decade.
The Stormwater Enterprise Fund has a significant amount of capital investment required to complete the
initial buildout of all the needed infrastructure. Given the high operating ratio (operating income / operating
revenue) and the amount of capital investment needed, this utility will require the issuance of significant
debt over the next 25 years as this initial infrastructure is built. Modest rate adjustments allow for some
increase in the debt capacity of this Fund but not enough to accelerate the build out. Timely debt issuances
will allow for rates to remain close to current rates while completing build out over the next 25 years.
UGENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
1. Does the Council Finance Committee support the Utilities Strategic Financial Plan assumptions
ahead of the 2021-22 BFO cycle? In particular, the projected rate increases necessary to meet
anticipated revenue requirements?
UBACKGROUND/DISCUSSION
The financial health of each utility Enterprise Fund depends on active management of ongoing operating
and maintenance expenses as well as planning for large capital expenditures. In some years it is
expected that the capital investment alone may exceed the annual operating revenues for an Enterprise
Fund even before considering operating expenses. Thus the capital investment required to maintain the
current levels of service provided by each of the four utility services to the community requires a long
planning horizon and consistent reevaluation and prioritization. Additionally the expected operating and
maintenance expenses must be forecasted and managed so that the financial sustainability of each utility
is ensured while continuing to provide the levels of service expected without large rate increases being
necessary in any given year.
U10 Year Capital Improvement Plans
The capital improvement planning process begins with periodically developing and updating Operational
Master Plans for each utility. These plans assess current infrastructure for needs and risks and review
expected growth and regulatory requirements. The Master Plans generate a list of recommended capital
projects over the planning horizon which are then included in the Capital Improvement Plans (CIP). The
Utility Asset Management program has implemented a standardized process to prioritize necessary
capital investments that has been in place since 2014. This prioritized list includes the associated annual
capital investment which becomes an input into the long term Strategic Financial Plan. This list is
updated ahead of the two year BFO process and prioritized using metrics intended to measure the levels
of service that each utility is targeting to provide to the community. The financial position of each utility is
also reviewed in this step with the output being a recommended path forward which may involve rate
adjustments and future debt issuances in order to achieve the operational objectives and needs of each
utility.
ULight & Power Enterprise Fund
The 10 year Capital Improvement Plan (CIP) for the Light & Power Fund consists of projects needed to
provide adequate substation and distribution capacity to developing areas of the City, anticipated
annexations including the Mulberry Corridor, operational technology improvements and system renewal
of existing substations and underground distribution assets.
Assess Operational
Needs / Risks
Determine Optimal
Solutions &
Mitigations
Identify Anticipated
Capital Projects Over
Planning Horizon
Establish Capital
Project Prioritization
Criteria
Determine Relative
Weighting of Criteria
Prioritize Projects with
Criteria
Review Financial
Position of Each Utility
Determine Capital
Investment
Capacities
Recommend
Financial Strategy to
Achieve Operational
Objectives
Master
Planning
Capital
Improvement
Planning
Strategic
Financial
Planning
$0
$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
$14,000,000
$16,000,000
$18,000,000
$20,000,000
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Annual Capital Investment
Light & Power Fund Capital Improvement Plan
Distribution System Improvements Substation Improvements Operational Technology
Ave Capital Investment 2020-30 Historical Ave Capital 2010-19 Previous CIP Estimated 2017-2026 Capital Investment
The 2019 CIP for Light & Power includes a significant decrease in identified capital work over the 2017
CIP. The 2017 CIP identified $165M as being needed to meet the capital investments needed over the
next decade. The 2019 CIP includes $99M of capital investments. This is due in part to new growth and
load projections which are not anticipated to require the addition of 2 new substations as had previously
been forecasted.
Light & Power Operations
Operating revenues have grown significantly over the past decade through rate increases while total
energy sales have remained flat. Based on the projected revenue requirements for O&M and capital
investment revenues are projected to grow at a rate slower than the past decade.
The colored area represents the 95% confidence band around the expected operating expense.
Light & Power O&M expenses have increased at an unsustainable rate over the past decade. This will
need to be addressed through active management. The rate and debt issuance forecasts in the plan
assume that O&M will increase at a rate close to the rate of inflation.
$0
$50,000,000
$100,000,000
$150,000,000
$200,000,000
$250,000,000
Annual Operating Revenue
Light & Power Fund Operating Revenues (2010 - 2030)
Operating Revenue
(2.8% per yr)
Assuming Historical Trend
(4.8% per yr)
The colored area represents the 95% confidence band around the expected operating expense.
By limiting O&M to a more modest rate of growth it is expected that the L&P Fund will generate positive
operating income which will be available for capital investments. This will limit the amount of debt
issuance that is necessary over the coming decade.
Light & Power Rate and Debt Forecasts
Rate increases above those necessary to cover wholesale purchased power increases are not
anticipated to be significant over the coming decade although any significant change in the necessary
$-
$50,000,000
$100,000,000
$150,000,000
$200,000,000
$250,000,000
$300,000,000
2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030
Annual Operating Expenses
Light & Power Fund Operating Expenses (2010 - 2030)
Operating Expenses
(2.2% per yr)
Assuming Historical Trend
(4.9% per yr)
($50,000,000)
$0
$50,000,000
$100,000,000
$150,000,000
$200,000,000
2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030
Light & Power Fund Operating Income (2010-2030)
OPERATING INCOME
Total Operating Revenue
Total Operating Expenses
capital investments may require modest adjustments to ensure adequate operating revenue is generated
to support the system renewal investments. Some debt is anticipated to be needed for capital
investments over the next decade.
UStormwater Enterprise Fund
Stormwater CIP
The Capital Improvement Plan for the Stormwater Fund includes new cost estimates for all anticipated
initial buildout projects. Updating the cost estimates, along with some preliminary design refinements to
some of the project requirements, increased the anticipated capital investment needed to build out the
stormwater infrastructure from $272M in the 2017 CIP to $374M. Cost adjustments for stream restoration
projects are also included in the model which now shows $70M in stream restoration projects separate
from the infrastructure projects. The CIP is now being proposed to be built over a 25 year period which
as the graph below shows will still require investing almost 4 times as much each year in capital
infrastructure than the previous decade’s level of investment. It is shown below as being a levelized
investment subject to inflation because the prioritization is not completed yet and the investments will
require significant debt issuances to fund the major outfall projects that are still needed to complete the
buildout.
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Rate Increase 5.0% 2% 2% 1-3% 1-3% 1-3% 1-3% 1-3% 1-3% 1-3% 1-3%
Debt Issuance $M - - - $10-15M - - $10-15M - - - -
$100M of capital work is expected to be needed between 2020 and 2030 in addition to the current capital appropriations.
Stormwater Operations
Operating revenues have grown modestly over the past decade primarily through annexations and infill
development along with some modest rate adjustments.
The colored area represents the 95% confidence band around the expected operating expense.
Stormwater O&M has increased as more infrastructure is built requiring O&M. The financial forecast
recognizes this but assumes that the growth can be managed to increase at the rate of inflation. The
largest increases were seen in engineering and administrative charges.
The colored area represents the 95% confidence band around the expected operating expense.
The combination of operating revenues increasing very modestly and O&M increasing at a faster rate will
over time reduce the operating income being generated for this utility. However, operating income is
expected to remain strong over the coming decade as shown in the graph below.
Stormwater Rate and Debt Forecasts
With the strong operating income being generated every year in this utility only providing a fourth of the
anticipated capital investment required to fully build out the infrastructure for the community over the next
25 years it will be necessary to issue significant debt to complete the remaining flood mitigation
infrastructure. Significant rate increases could be implemented rather than, or in conjunction with, issuing
debt, however, the capital needs are not ongoing capital needs. Rates are usually adjusted to fund
ongoing operational and capital needs. There is significant debt capacity in this fund that operates with
an operating margin of 40%. Increasing rates would increase the operating margin but not necessarily
allow for the initial infrastructure to be built on an accelerated schedule because of the relative scale of
the capital investment compared to the operating revenues. The anticipated levelized annual capital
investment required to complete the initial build out over the next 25 years along with minor capital
investments required on existing infrastructure is $24M per year or 150% of the 2019 operating revenue.
Infrastructure that is expected to last for at least 50 years into the future could be financed over that time
period with those customers benefiting from the new investment paying for its cost rather than increasing
rates substantially. The table below shows the amount of debt that would need to be issued over the next
decade to establish this 25 year build out schedule while adhering the financial boundary conditions of
gradual, modest rate adjustments, positive operating income and a debt coverage ratio of at least 2.0.
As the table below shows, there will be the need to issue debt for several capital investments over the
next decade. The first such issuance should be done in 2022 so that the funds are available for the 2023-
24 BFO cycle.
UConclusion and Next Steps
Updating the ten year Capital Improvement Plans ahead of the budget cycle allows for an assessment of
potential rate adjustments and debt issuances that may be necessary in the near future. The Strategic
Financial Plan provides a financial path forward to meet the operational needs of each utility.
Through active management of O&M expenses, modest rate adjustments and the issuance of some debt,
the Light & Power Enterprise Fund is expected to be able to meet its operational objectives through targeted
capital investments over the coming decade.
The Stormwater Enterprise Fund has a significant amount of capital investment required to complete the
initial buildout of all the needed infrastructure. Given the high operating ratio (operating income / operating
revenue) and the amount of capital investment needed, this utility will require the issuance of significant
debt over the next 25 years as this initial infrastructure is built. Modest rate adjustments allow for some
increase in the debt capacity of this Fund but not enough to accelerate the build out. Timely debt issuances
will allow for rates to remain close to current rates while completing build out over the next 25 years.
UAttachments
Attachment 1 - Powerpoint presentation
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Rate Increase 2.0% 0.0% 0.0% 0-2% 0-2% 0-2% 0-2% 0-2% 0-2% 0-2% 0-2%
Debt Issuance $35-40M $35-40M $20-25M
*$374M of capital work is expected to be needed between 2021 and 2045.
1
Utilities Strategic Financial Plan & Recommendations
Lance Smith, Utilities Strategic Finance Director
12-16-2019
Purpose and Direction Sought
Objective:
• Provide an update on the Capital Improvement Plans and Strategic Financial
Plan for the Light & Power and Stormwater Enterprise Funds
• Recommend strategic path forward to meet 10 year operational and financial
objectives ahead of the 2021-22 Budget cycle
Direction Sought:
• Does the Council Finance Committee support the Utilities Strategic Financial
Plan assumptions ahead of the 2021-22 BFO cycle? In particular, the projected
rate increases necessary to meet anticipated revenue requirements?
2
Utilities Planning Process
3
Assess Operational
Needs / Risks
Determine Optimal
Solutions &
Mitigations
Identify Anticipated
Capital Projects
Over Planning
Horizon
Establish Capital
Project Prioritization
Criteria
Determine Relative
Weighting of Criteria
Prioritize Projects
with Criteria
Review Financial
Position of Each
Utility
Determine Capital
Investment
Capacities
Recommend
Financial Strategy to
Achieve
Operational
Objectives
Master
Planning
Capital
Improvement
Planning (CIP)
Strategic
Financial
Planning
2 years 2 years 5-7 years
Objectives
Utilities Strategic Financial Plan
Financial Objectives
• Maintain adequate reserve balances such that:
• Meet Minimum Reserves Policy
• Reserves and revenues adequate to cover near term capital requirements
• Maintain current credit ratings for each Enterprise Fund and the City
• Avoid rate spikes by limiting rate increases to no more than 5% annually
Operational Objectives
• Provide adequate funds for anticipated capital investments
• Maintain adequate reserves to meet unanticipated capital investments and any debt
service expense
4
5
Light & Power Enterprise Fund
Light & Power Fund CIP
6
2018 Operating Revenue not used for Purchased Power expense was $38M
$0
$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
$14,000,000
$16,000,000
$18,000,000
$20,000,000
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Annual Capital Investment
Light & Power Fund Capital Improvement Plan
Distribution System Improvements Substation Improvements Operational Technology
Ave Capital Investment 2020-30 Historical Ave Capital 2010-19 Previous CIP Estimated 2017-2026 Capital Investment
Light & Power OperatingRevenue
7
• Expect
revenue
growth < 3%
on average
• 5% over the last
decade 2010 -
2019
$0
$50,000,000
$100,000,000
$150,000,000
$200,000,000
$250,000,000
Annual Operating Revenue
Light & Power Fund Operating Revenues (2009 - 2028)
Operating Revenue
(2.8% per yr)
Assuming Historical Trend
(4.8% per yr)
Light & Power Rate Pressures
8
• Limit O&M
inflation to
2%:
• Assumes PRPA
increase of
2.0%
• Increased
efficiencies
$- • CIP
$50,000,000
$100,000,000
$150,000,000
$200,000,000
$250,000,000
$300,000,000
2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030
Annual Operating Expenses
Light & Power Fund Operating Expenses (2010 - 2030)
Operating Expenses
(2.2% per yr)
Assuming Historical Trend
(4.9% per yr)
Light & Power Operating Income
9
($50,000,000)
$0
$50,000,000
$100,000,000
$150,000,000
$200,000,000
2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030
Light & Power Fund Operating Income (2010-2030)
OPERATING INCOME
Total Operating Revenue
Total Operating Expenses
Light & Power Financial Health Forecast
10
0.0%
1.0%
2.0%
3.0%
4.0%
5.0%
6.0%
7.0%
8.0%
9.0%
10.0% Rate Increase
($5,000,000)
$0
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000 Operating Income
$0
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
$35,000,000
$40,000,000
$45,000,000
$50,000,000
2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030
Available Fund Balance
$0
$10,000,000
$20,000,000
$30,000,000
2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030
Outstanding Debt
Assumptions:
1. AnnualRate increases limited to 5%.
2. Debt issued no more often than once every 3 years.
Light & Power Rate & Debt Forecasts
11
• Modest rate adjustments will be necessary over the coming decade
• Operating Income becomes positive and Available Reserves increase
• Some debt issuances are expected to be necessary for electric infrastructure over
the coming decade
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Rate Increase 5.0% 2% 2% 1-3% 1-3% 1-3% 1-3% 1-3% 1-3% 1-3% 1-3%
Debt Issuance $M - - - $10-15M - - $10-15M - - - -
$100M of capital work is expected to be needed between 2020 and 2030 in addition to the current capital appropriations.
12
Stormwater Enterprise Fund
Stormwater Fund CIP
13
2018 Operating Revenue was $17.0M
Stormwater Operating Revenue
14
Stormwater Operating Expenses
15
Stormwater Fund Operating Income
16
Stormwater Fund Financial Health Forecast
17
Stormwater Rate & Debt Forecasts
18
• Near term capital needs are met with debt issuance in 2022 for the
2023-24 BFO cycle
• Initial buildout of infrastructure to be completed by 2045
• 2030 rates are projected to be 7% higher than 2019
• Total debt issued between 2020 and 2030 is $90-105M
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Rate Increase 2.0% 0.0% 0.0% 0-2% 0-2% 0-2% 0-2% 0-2% 0-2% 0-2% 0-2%
Debt Issuance $35-40M $35-40M $20-25M
*$374M of capital work is expected to be needed between 2021 and 2045.
Stormwater Rate & Debt Forecasts
Alternative Rate Strategy
19
• Near term capital needs are met with debt issuance in 2022 for the 2023-24
BFO cycle
• Initial buildout of infrastructure to be completed by 2045
• 2030 rates would be 28% higher than 2019 (vs. 7%)
• Total debt issued between 2020 and 2030 would be $65-80M (vs. $90-105M)
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Rate Increase 2.0% 3.0% 2.0% 2.5% 2.0% 2.0% 2.0% 2.1% 2.4% 2.4% 2.2%
Debt Issuance $30-35M $20-25M $15-20M
*$374M of capital work is expected to be needed between 2021 and 2045.
Next Steps
• January 2020 – Council Finance Committee update on Water and Wastewater
Enterprise Fund CIPs and Strategic Financial Plans
• January 2020 - Finalize the prioritization of the CIPs for all Utility Enteprise Funds
• March 2020 – Enter 2021 and 2022 revenue projections into BART as the first step
in BFO 2021-22
20
Purpose and Direction Sought
Objective:
• Provide an update on the Capital Improvement Plans and Strategic Financial
Plan for the Light & Power and Stormwater Enterprise Funds
• Recommend strategic path forward to meet 10 year operational and financial
objectives ahead of the 2021-22 Budget cycle
Direction Sought:
• Does the Council Finance Committee support the Utilities Strategic Financial
Plan assumptions ahead of the 2021-22 BFO cycle? In particular, the projected
rate increases necessary to meet anticipated revenue requirements?
21
22
COUNCIL FINANCE COMMITTEE
AGENDA ITEM SUMMARY
Staff: Gerry Paul, Purchasing Director
Date: December 16, 2019
SUBJECT FOR DISCUSSION
Recommended revisions to the Municipal Code, Article IV, Purchasing and Contracting
EXECUTIVE SUMMARY
Purchasing staff in collaboration with the City Attorney’s Office has revised the Municipal Code,
Article IV, Purchasing and Contracting to reflect current business needs including:
• Updated language, definitions, descriptions, and processes
• Updated timing of public disclosures
• Update thresholds of authority – minor purchases
• Excluded select contract types for the five (5) year term limit
The recommended revisions to the Municipal Code also expand on the appropriate use of
alternative delivery methods for delivery of capital projects.
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
1. Does the Council Finance Committee support bringing the recommended revisions to the
Municipal Code, Article IV to the full council for adoption?
BACKGROUND/DISCUSSION
Staff periodically reviews and updates Article IV, Purchasing and Contracting to the Municipal
Code, based on changing needs and conditions. The impetus for the update to the procurement
code resulted from a cross-functional team evaluation of the Alternative Project Delivery System
(APDS) utilized by Utilities. Based on this work, the opportunity was identified to update the
procurement code to expand upon the appropriate use of all alternative delivery methods utilized
City-wide to delivery capital construction projects.
The revisions to the procurement code also address current business needs consistent with public
procurement best practices.
ATTACHMENTS
1. Presentation to Council Finance Committee
2. Redline changes to Municipal Code, Article IV, Purchasing and Contracting
3. Revised Municipal Code, Article IV, Purchasing and Contracting
FINANCIAL SERVICES
December 5, 2019
Procurement Code Updates
Code Update Objectives
• Periodic update to code to reflect current business needs
• Updated language, definitions, descriptions, processes
• Update timing of public disclosure of notice of award
• Update thresholds of authority – minor purchase
• Exclude select contracts from the term limit of 5 years – i.e. software
• Provide better definition of various procurement delivery methods
for capital projects
2
Code Update Summary
3
Sec 8-110 - Procurement Application – Expanded Exemptions
• Real property, grants awarded by the City, Museum exhibits
• Benefits – Eliminated ambiguity
Sec 8-158 – Competitive Sealed Proposals
• Public disclosure of offerors after submittal deadline
• Name of firm awarded disclosed after the notice of award vs. after contract signing
• Benefits – Transparency & enhanced timeliness of communications
Sec 8-186 – Multi-year Contracts
• Exclude select types of agreements from the 5-year term limit
• Software licensing & maintenance agreements
• Select financial services – credit card processing, retirement record keeping
• Content for City-delivered video programming
• Benefits – Enhanced alignment of contract term and service type
Code Update Summary
4
Sec 8- 161 – Minor Purchases
• Increase department threshold from $5k to $7.5k and $10k to $15k for pricing agreements
• Benefits - Efficiency
Sec 8- 161 – Construction Change Orders
• Exempt capital projects using APDS from the 15% cumulative change order limit
• Benefits – Enhanced alignment of code with APDS (Cost Plus)
Defined Alternative Delivery Methods & Expanded on Appropriate Use
• APDS use will be limited to Utility capital projects on a project-by-project basis
• Increase opportunities for competition and document material & subcontractor quotes
Capital Construction Delivery Methods
• CMGC – Construction Manager General Contractor/Construction Manager At-Risk
• The design and construction of a project is contracted for separately
• Both are largely qualification-based selection with consideration to cost
• General Contractor typically joins the project at about 30% design
• Reach a guaranteed maximum price at 90% design
• Design Build
• A single contract with a single contractor to provide both design and build services
• Reach a guaranteed maximum price at 90% design
• APDS – Alternative Procurement Delivery System
• Qualification based selection of both design and construction for each project
• City and contractors jointly develop solutions and designs on each project
• Costs verified via contractor quotes and Independent Cost Estimates
• No guaranteed maximum price – cost plus
• Design / Bid / Build
• Qualification based selection of the design firm
• Contractor selection is based on lowest cost bid
5
Construction Methodology Matrix
6
APDS CM/GC & CMAR Design/Build Design/Bid/Build Service Agreement
Michigan Ditch Tunnel Poudre White Water Park Connexion Outside Plant Fossil Creek Trail Operations & Maintenance
Halligan Reservoir Horsetooth & Prospect/College Intersections North College Pedestrian Gap Minor Water line replacement
DWRF Headworks Sugar Beet Park Riverside Bridge Replacement Hydrants
Magnolia Outfall Police Training Center Sharp Point/Nancy Gray Connection Pipe replacement
Stormwater Levees Transfort Bus Pad Construction Electrical
Water & Sewer Line Replacement Paving Replacement & Rehabilitation Pumps
Utility APDS Implications
7
• Within Utilities, process engineering and project management
resources have been supported by long term APDS contractors
• Less work completed using APDS will require additional Utility internal resources
to support process engineering and project management
• Key – should be cost neutral, these costs have historically been in the contractor
project costs.
• More work will be competitively bid – adding workload to Purchasing
Conclusion / Summary
8
• Refreshed Procurement Code
• Reduced ambiguity with exemptions
• Enhance alignment of contract term with service type
• Increased transparency with timing of public disclosures
• Increase minor purchase threshold from $5K to $7.5K
• Aligned APDS with Code and Public Procurement Principles
• Contract-by-contract basis
• Enhanced competition – expanded contractor base
• Increased quoting for materials and subcontractors
• Increased transparency
ARTICLE IV. - PURCHASING AND CONTRACTING[3]
Footnotes:
--- (3) ---
Editor's note— Ord. No. 84, 1990, adopted Aug. 7, 1990, repealed former Art. IV, "Purchasing," §§ 8-
110-8-132, derived from Code 1972, §§ 2-56-2-69, and Ord. No. 97, 1987, §§ 1, 2, adopted July 21,
1987, and added a new Art. IV, §§ 8-110-8-206..
Charter reference— Purchasing, Art. V, Pt. IV.
Cross reference— The Director of Administrative Services shall be responsible for the function and
duties of the Financial Administration Unit and the Purchasing Division, § 2-500.
Division 1 - Generally
Sec. 8-110. - Procurement application.
This Article shall apply to the procurement of all materials, services and, professional services, and
construction required or used by all departments and agencies of the City, including businesses and
enterprises operated by the City, whether used in the construction of City improvements or otherwise,
irrespective of the source of the funds, excepting only donations, real property, the procurement of legal
and litigation services, City grants, museum exhibits, musical, dramatic and other fine arts performances,
power purchases for resale, and services or activities subject to contracts between the City and other
governmental bodies. When any procurement involves the expenditure of federal or state funds, the
procurement shall be conducted in accordance with any mandatory applicable federal or state laws or
regulations. This Article does not create or confer any right or entitlement upon any person to bid on or
receive an award of any City contract.
(Ord. No. 84, 1990, 8-7-90)
Sec. 8-111. - Purpose.
The purposes of this Article are to provide for the fair and equitable treatment of all persons involved in
public purchasing by the City, to maximize the purchasing value of public funds, to codify and standardize
the City's purchasing procedures for the orderly and efficient administration thereof, to provide safeguards
for maintaining a procurement system of quality and integrity and to foster effective, broad-based
competition within the free enterprise system.
(Ord. No. 84, 1990, 8-7-90)
Sec. 8-112. - Definitions.
The following words, terms and phrases, when used in this Article, shall have the meanings ascribed to
them in this Section:
Alternative delivery method process –shall mean a process of construction using either the Alternative
Project Delivery System (APDS), Construction Manager/General Contractor (CM/GC), Construction
Manager At-Risk (CMAR) or Design/Build approaches.
Alternative Project Delivery System (APDS) shall mean a process of managing a construction manager
process,project in which the design/build process or and construction of the project are contracted for
separately, typically during the preliminary design/select/ build process phase of the project. Firms are
selected utilizing a qualification based competitive sealed proposal with consideration to cost. The
designer and construction contractor teams work with the City as part of an integrated team focused on
risk reduction, value engineering and best value.
Brand name shall mean a specification limited to one (1) or more items by manufacturers' names or
catalog numbers.
Change order shall mean any written modification to an existing contract authorizing changes within the
scope of work, additions or deletions to the work or an adjustment to any other provision of the contract.
City Grants shall mean direct monetary assistance to an organization or individual to undertake a specific
project or program. Grants fund solutions to identified problems and/or opportunities within the City.
Confidential information shall mean any information which is available to an employee only because of
the employee's status as an employee of the City and which is not a matter of public knowledge or
available to the public on request.
Construction shall mean the process of building, improving, altering or demolishing improvements.
Construction shall not include the operation, repair or maintenance of improvements.
Construction manager process shall mean the process of entering into a contract for the design and
construction of a project together with a contract with a business organization having the expertise and
resources to help manage the design and construction of the project and establish a guaranteed
maximum price for the project.
Contract shall mean any agreement enforceable by law between the City and one (1) or more outside
parties, regardless of form or title, for the procurement of materials, services or construction.
Contract Manager/General Contractor (CM/GC) or Construction Manager At-Risk (CMAR) shall mean a
process of managing a construction project in which the design and construction of the project are
contracted for separately with the construction contractor typically joining the project at about 30% design
completion to provide constructability input, cost estimating, risk reduction, value engineering and best
value. Firms are selected utilizing a qualification based competitive sealed proposal with consideration to
cost.
Cost data shall mean factual information concerning the cost of labor, material, overhead and other cost
elements which are expected to be incurred or which have been actually incurred by the contractor in
performing the contract.
Design/build process shall mean a process for managingexecuting a construction project in which a
primary or mainone contractor submits a combined proposal , the design-build team, works under a single
contract with the City to provide the design and construction services for the entire constructionfrom initial
design through project. completion. Firms are selected utilizing a qualification based competitive sealed
proposal with consideration to cost.
Design/selectbid/build process shall mean a process for managing a construction project delivery method
in which the City contracts with separate entities for the design and construction of thea project are
contracted for separately but the designer . The design firm is a qualification-based selection process
and the construction contractor work with the City as part of an integrated team foris selected based on
the design lowest responsive and responsible bid.
Guaranteed Maximum Price (GMP) shall mean the sum of money agreed upon between the City and the
construction contractor to complete a construction project. This is a not-to-exceed total cost of the
services and materials provided during the construction of the project.phase of work including direct
costs, overhead, any contingency, and fees. The GMP is typically established at approximately 90%
design completion.
Independent Cost Estimate (ICE) shall mean a tool utilized to assist in determining the reasonableness of
the project cost. The ICE is developed by a qualified independent third-party not associated with the
project.
Improvements shall mean any structure, building, street, utility or other valuable addition to real property
amounting to more than mere repairs or partial replacement and intended to enhance its value or utility or
to adapt it for new or further purposes.
Invitation for bids shall mean all documents, whether attached or incorporated by reference, utilized for
soliciting bids.
Legal services shall mean the advice, representation, document preparation or related services of an
attorney as special counsel provided to the City upon the request of the City Attorney.
Litigation services shall mean professional or other services procured by the City Attorney for the purpose
of evaluating, preparing, providing or presenting evidence at the trial of any lawsuit to which the City is a
party. Litigation services shall not include legal services.
Maintenance shall mean acts of repair, replacement or other acts necessary to keep any improvements
or personal property in proper condition and good working order, to prevent decline in, failure or cessation
of the existing condition of the improvement or personal property or to restore any improvement to its
original condition after partial failure or destruction. This term shall not include improvements.
Master Agreement shall mean an agreement established for the completion of a project or provision of
services or materials on an as-required basis establishing the terms, conditions and general scope of
services. The Master Agreement works in conjunction with a Work Order, which supplements the Master
Agreement.
Materials shall mean all personal property, including, but not limited to, supplies, equipment, parts,
printing and insurance; excluding, however, leases of a permanent interest in real property, securities and
financial paper and water and water rights whether represented by shares of stock in ditch and irrigation
companies, units of the Northern Colorado Water Conservancy District or otherwise.
Price data shall mean factual information concerning prices for items substantially similar to those being
procured. Prices as used in this definition shall refer to offered or proposed selling prices, historical selling
prices and current selling prices.
Pricing agreement shall mean an agreement by which procurements are conducted by or on behalf of
more than one (1) governmental body.
Procurement shall mean the purchasing, renting, leasing or other acquisition of any materials, services,
professional services or construction. It shall also include all functions that pertain to obtaining any
material, service or construction, including the description of requirements, the selection and solicitation
of sources and the preparation and award of contract. Procurement shall not include the buying,
purchasing, renting or leasing of real property.
Professional services shall mean the furnishing of labor, time, effort or expertise by a contractor with
specialized knowledge in a field, including, but not limited to, architecture, engineering, medicine, finance,
accounting, appraisal and land surveying.
Public notice shall mean any publication reasonably calculated to inform responsible bidders or offerors.
Public notice shall occur for a reasonable time and may be disseminated through any means of mass
communication, including, but not limited to, e-procurement systems, internet, newspapers, other written
publications, posting, television, radio, other broadcasting media and electronic billboards.
Real property shall mean lands, lands under water, buildings, permanent structures and any and all
easements, incorporeal hereditaments and every estate and right herein, legal and equitable, including
terms for years and liens by way of judgment, mortgage or otherwise.
Request for proposals shall mean all documents, whether attached or incorporated by reference, utilized
for soliciting proposals.
Responsible bidder or offeror shall mean a person who meets the criteria specified in § 8-160 of this
Article and who has the capability in all respects to perform fully the contract requirements and the
experience, integrity, reliability, capacity, facilities, equipment, insurance and credit which will ensure
good-faith performance.
Responsive bidder or offeror shall mean a person whose bid or offer conforms in all material respects to
the requirements set forth in the invitation for bids or request for proposals.
Services shall mean the performance of maintenance or the furnishing of labor, time or effort which does
not involve the delivery of a specific end product other than a report or other item which is merely
incidental to the performance of the service. Services shall not include services rendered under an
employment agreement nor shall it include professional services as that term is defined in this Section.
Specification shall mean any description of the physical or functional characteristics of or the nature of the
material, service or construction item. It may include a description of any requirement for inspecting,
testing or preparing a material, service or construction item for delivery or a procedure for determining
whether the requirements are satisfied.
Using agency shall mean any service area, department, board or commission of the City requiring
supplies, professional services, services or construction procured pursuant to this Article.
Work order shall mean a written order defining a discrete service and/or material with a definite project,
price and time of completion which is used in conjunction with a work order contract to create an
enforceable contract.
Work order contract shall mean a master contract for completion of a project or provision of services or
materials on an as-needed basis establishing all terms and conditions requested by the City except those
contained in the work orders to be issued pursuant to the work order contract.
(Ord. No. 84, 1990, 8-7-90; Ord. No. 130, 2002, § 18, 9-17-02; Ord. No. 026, 2008, § 1, 3-18-
08)
Sec. 8-113. - Authority and duties of purchasing agent.
(a) The Purchasing Agent shall serve as the public purchasing official for the City, and shall be
responsible for the procurement of all materials, services, professional services and construction for
the City which are governed by the terms of this Article.
(b) The Purchasing Agent may formulate and promulgate rules and regulations for the administration of
this Article, not inconsistent with the provisions of this Article, with respect to purchasing procedures.
Any rules and regulations promulgated by the Purchasing Agent hereunder shall be effective upon the
Purchasing Agent's filing of the same withapproval by the City ClerkManager.
(Ord. No. 84, 1990, 8-7-90; Ord. No. 026, 2008, § 2, 3-18-08)
Charter reference— Powers and duties of Purchasing Agent, Art. V, § 27.
Sec. 8-114. - Procurement contrary to this article.
Except as may be otherwise provided by law, it shall be unlawful for any City officer or employee to order
a procurement contrary to the provisions of this Article. Any procurement or contract so made shall be
void and wholly without effect and shall not be binding upon the City in any manner.
(Ord. No. 84, 1990, 8-7-90)
Secs. 8-115—8-135. - Reserved.
Division 2 - Specifications
Sec. 8-136. - Intent.
All specifications, including, but not limited to, design, performance and brand name specifications, shall
be drafted so as to provide a clear and concise description of the material, service or construction
desired.
(Ord. No. 84, 1990, 8-7-90)
Sec. 8-137. - Preparation.
Before any procurement, the Purchasing Agent shall cause to be prepared written specifications detailing
the City's requirements for the materials, service or construction. The Purchasing Agent may request
other departments or agencies of the City to prepare specifications for procurements to be made primarily
for such department or agency.
(Ord. No. 84, 1990, 8-7-90)
Sec. 8-138. - Approval.
(a) Specifications prepared primarily for a procurement for a specific department or agency of the City
shall be approved by both the Purchasing Agent and the head of the using department, agency or
designee thereof before being submitted for bid.
(b) If the Purchasing Agent and head of the using department or agency cannot agree, the matter shall
be referred to the City Manager.
(Ord. No. 84, 1990, 8-7-90)
Sec. 8-139. - Brand name specification.
(a) A brand name specification may be used to maintain standardization, interchangeability, or
compatibility within a critical system or process or when the Purchasing Agent has determined that
sufficient sources for competition exist for the procurement of the material and that the use of the brand
name specification is not intended to limit or restrict competition.
(b) A brand name specification may also be used to describe the standard of quality, performance and
other salient characteristics of a material in lieu of a description of its physical or functional
characteristics. In such cases, the solicitation shall contain explanatory language that the use of a
brand name is for the purpose of describing the standard desired and that the substitution of equivalent
materials is permitted.
(Ord. No. 84, 1990, 8-7-90)
Secs. 8-140—8-155. - Reserved.
Division 3 - Contract Formation and Award[4]
Footnotes:
--- (4) ---
Charter reference— Competitive bidding, Art. V, § 27; contracts for services, Art. V, § 30.
Sec. 8-156. - Methods of source selection.
All procurements subject to the terms of this Article shall be awarded by competitive sealed bidding
pursuant to § 8-157, except as provided in:
(1) Section 8-158 concerning awards by competitive sealed proposals; and
(2) Section 8-161 concerning exemptions to the use of competitive bids or proposals.
(Ord. No. 84, 1990, 8-7-90; Ord. No. 83, 1991, § 1, 7-16-91)
Sec. 8-157. - Competitive sealed bidding.
(a) Procurements accomplished pursuant to this Section shall be awarded to the lowest responsive and
responsible bidder after competitive sealed bidding.
(b) An invitation for bids shall be issued and shall include specifications and all contractual terms and
conditions applicable to the procurement.
(c) Public notice shall be given and shall include the bid title, place, date and time of bid opening.
(d) All bids shall be opened in public at the time and place stated in the invitation for bids. The amount of
each bid and such other relevant information as the Purchasing Agent deems appropriate, together
with the name of each bidder, shall be recorded. Thereafter, the record of bids and each bid shall be
available for public inspection in the office of the Purchasing Agent in the same manner as are other
public records. In the event of good cause as determined by the Purchasing Agent, bid openings may
be postponed.
(e) Bids shall be unconditionally accepted without alteration or correction, except as authorized in
Subsection (g) of this Section. Bids shall be evaluated based on the requirements set forth in the
invitation for bids, which may include criteria and/or processes for determining acceptability, such as
inspection, provision of sample materials, testing, quality, workmanship, delivery and suitability for a
particular purpose. Those criteria that will affect the bid price shall be objectively measurable, such as
discounts, transportation costs and total or life cycle costs. The invitation for bids shall set forth all
evaluation criteria to be used. No criteria may be used in bid evaluation that are not set forth in the
invitation for bids.
(f) Correction or withdrawal of inadvertently erroneous bids before or after bid opening, or cancellation of
awards or contracts based on such bid mistakes, may be authorized when deemed appropriate by the
Purchasing Agent.
(1) (1) Bids may be withdrawn by the offeror for any reason prior to bid opening. Any such
notice of withdrawal must be received in the office designated in the invitation for bids prior to
the time set for bid opening.
(2) Mistakes discovered before bid opening may be corrected or withdrawn in writing by the bidder.
Any such corrections or notices of withdrawal must be received in the office designated in the
invitation for bids prior to the time set for bid opening.
(2) 3) After bid opening, the following provisions shall apply:
a. A low bidder alleging a material mistake of fact may be permitted by the Purchasing Agent
to correct its bid if the mistake is clearly evident on the face of the bid document and the
intended correct bid is similarly evident.
b. A low bidder alleging a material mistake of fact may be permitted by the Purchasing Agent
to withdraw its bid: (i) if the mistake is clearly evident on the face of the bid but the intended
correct bid is not similarly evident or (ii) if the mistake is not clearly evident on the face of the
bid but the bidder submits evidence to the Purchasing Agent which clearly and convincingly
demonstrates that a mistake was made, in which case the bidder must show the nature of
the mistake and the bid price actually intended.
(3) 4) No changes in bid prices or other provisions of bids prejudicial to the interests of the City or
fair competition shall be permitted.
(4) 5) All decisions to permit the correction or withdrawal of bids or to cancel awards or contracts
based on bid mistakes will be supported by a written determination made by the Purchasing
Agent.
(g) The contract shall be awarded with reasonable promptness by written notice to the lowest responsive
and responsible bidder whose bid meets the requirements and criteria set forth in the invitation for
bids. If the lowest responsive and responsible bid exceeds budgeted funds and either time constraints
or economic considerations preclude resolicitation of work of a reduced scope, the Purchasing Agent
is authorized to negotiate an adjustment of the bid price with the lowest responsive and responsible
bidder or to modify the scope of work, so as to bring the bid within the amount of available funds. The
Purchasing Agent is also authorized to negotiate other terms and conditions.
(Ord. No. 84, 1990, 8-7-90)
Sec. 8-158. - Competitive sealed proposals.
(a) Procurements for the following are eligible for award by competitive sealed proposals:
(1) Materials and services when the Purchasing Agent determines in writing that the use of
competitive sealed bidding is either not practicable or not advantageous to the City;
(2) Professional services; and
(3) City improvements when the Purchasing Agent determines that the use of alternative delivery
methods will provide substantial benefit to the City while retaining sufficientassurance of
competitive pricing and/or performance.
(b) Procurements accomplished pursuant to this Section shall be solicited through a request for
proposals.
(c) Public notice shall be given and shall include the proposal title, place, date and time of proposal
opening. the proposal must be received at the place stated in the request for proposal. In the event of
good cause as determined by the Purchasing Agent, the time set for submittal of the proposals may
be extended when determined to be in the City’s best interest.
(d) Except as provided in paragraphparagraphs (e) and (m) of this Section, proposals shall be opened
so as to avoid disclosure of contents to competing offerors during the process of negotiation.
(e) A registerlist of the offerors submitting proposals shall be maintained containing the name of each
offeror and shall be open for public inspection or disclosure after the awardtime set for submittal of the
contract in the office of the Purchasing Agent in the same manner as are other public recordsproposals.
(f) The request for proposals shall state evaluation factors and their relative importance.
(g) After proposal opening, interviews may be conducted with the highest ranked responsible offeror or
offerors for the purpose of clarification and to assure full understanding of, and responsiveness to,
solicitation requirements. Offerors selected for interview shall be accorded fair and equal treatment
with respect to any opportunity for discussion and revision of proposals. Revisions may be permitted
after submissions and prior to award in order to reflect clarifications in the proposal's scope of work or
contract amount.
(h) Except as provided in paragraphparagraphs (e) and (m) of this Section, in conducting interviews,
there shall be no disclosure by the City or any officer, employee or committee thereof, of any
information derived from proposals submitted by competing offerors, nor shall there be any disclosure
of information discussed by the evaluation committee in selecting the highest ranked offeror(s).
(i) After the contract has been awarded and a written contract executed with the selected offeror(s), the
total points of the evaluation committee will be retained by the Purchasing Agent for a period of time
consistent with the City's record retention policy. The total points or ranking of the offerors shall not be
made available for public inspection or disclosure.
(j) Except as provided in paragraph (m) of this Section, individual rating sheets, notes, emails and
notesother documents prepared or utilized by members of the evaluation committee shall not be made
available for public inspection. or disclosure.
(k) The contract shall be awarded with reasonable promptness by written notice to the responsible offeror
whose proposal is determined in writing to be the most advantageous to the City, taking into
consideration the evaluation factors set forth in the request for proposals. No other factors or criteria
shall be used in the evaluation.
(l) The Purchasing Agent is authorized to negotiate contract terms, including but not limited to the final
price and precise scope of work, with the selected offeror.
(m) If the proposals are for the services of a public accounting firm to conduct the annual independent
audit of the City's books and accounts as required in Section 17 of Charter Article II, those proposals
shall be reviewed and the interviews conducted by the City Council or a committee of the Council in a
public meeting and the selection by Council shall be conducted in a public meeting. In conducting such
review, interviews and selection, the City Council and committees of the Council shall not be subject
to the provisions in paragraphs (d), (h), (i) and (j) of this Section.
(n) No public accounting firm selected to conduct the City's annual independent audit shall be eligible to
be selected under this Section to conduct that audit for more than two (2) consecutive five (5) year
terms. In addition, any firm conducting the audit for five (5) consecutive years shall not be eligible to
participate in a new competitive sealed proposal and be selected unless the firm assigns a new lead
partner to conduct the audit under the new contract with a term of one (1) to five (5) years.
(o) The construction of City improvements utilizing an alternative delivery method will ensure competitive
pricing and value by requiring the contractor to obtain quotes from at least three (3) suppliers and/or
subcontractors for all materials and services exceeding a cost of $60,000 subject to the discretion of
the Purchasing Agent. Subcontractors selected as part of the construction contractor team
competitive process for the alternative delivery method are exempt from this requirement, subject to
the discretion of the Purchasing Agent.
(Ord. No. 84, 1990, 8-7-90; Ord. No. 83, 1991, § 2, 7-16-91; Ord. No. 144, 1996, 12-3-96; Ord.
No. 026, 2008, § 3, 3-18-08; Ord. No. 101, 2018 , § 2, 8-21-18)
Sec. 8-159. - Competitive negotiated procurement.
(a) Procurement for goods, services, professional services, products for resale or redistribution,
distribution services usage and competitive business arrangements that are related to the
establishment of strategic business plans or relationships of any City utility in a competitive market
environment shall be eligible for award by competitive negotiation under this Section, provided that the
following conditions are met:
(1) The Purchasing Agent determines in writing, with the approval of the City Manager, that the use
of competitive sealed bidding or competitive sealed proposal processes are either not practicable
or not advantageous to the City; and
(2) There is a minimum of two (2) vendors/businesses willing and able to provide the basic goods,
services or products to be procured through competitive negotiation.
(b) In order to initiate a competitive negotiated procurement under this Section, the procuring utility shall,
in a manner acceptable to the Purchasing Agent as sufficient to identify potential appropriate and
qualified vendors of the goods or, services, or professional services to be procured, investigate and
research the market for such goods, services, or professional services, and identify those vendors
determined to be appropriate and qualified candidates in light of the competitive and other interests of
the procuring utility.
(c) The procuring utility may contact selected vendors, or may consider appropriate and qualified vendors
that have initiated contact with the City, provided that a rational basis for identifying and selecting
candidate vendors in view of the interests of the procuring utility is applied consistently to all vendors
reasonably known to the procuring utility.
(d) The Purchasing Agent shall, with the approval of the City Manager, be responsible for accepting and
soliciting all offers made on behalf of the procuring utility under the provisions of this Section.
(e) Each vendor participating in competitive negotiations under this Section shall be accorded a fair and
reasonable opportunity to present and explain the goods or, services, or professional services to be
provided by such vendor.
(f) The basis for final selection of a vendor under a competitive negotiation process, and the final terms
of the contract under which goods or, services, or professional services shall be procured under this
Section, shall each be subject to the review and approval of the Purchasing Agent and City Manager.
(g) Prior to the renewal or extension of any contract for goods or, services, or professional services under
this Section beyond the original potential term of such contract, the City Manager or procuring utility
shall require that an assessment of the subject vendor's performance and the benefits to the City of
the terms of such contract be conducted by a qualified third party, to be selected by the Purchasing
Agent.
(Ord. 179, 1997, 11-18-97)
Sec. 8-160. - Responsibility of bidders and offerors.
(a) In determining whether a bidder or offeror is responsible, the following shall be considered:
(1) The ability, capacity and skill of the bidder or offeror to perform the contract or provide the
services required;
(2) Whether the bidder or offeror can perform the contract or provide the service promptly and within
the time specified without delay or interference;
(3) The character, integrity, reputation, judgment, experience and efficiency of the bidder or offeror;
(4) The quality of the bidder's or offeror's performance of previous contracts or services;
(5) The previous and existing compliance by the bidder or offeror with laws and ordinances relating
to the contract or service;
(6) The sufficiency of the financial resources and ability of the bidder or offeror to perform the
contract or provide the service;
(7) The quality, availability and adaptability of the materials and services to the particular use
required;
(8) The ability of the bidder or offeror to provide future maintenance and service for the use of the
subject of the contract;
(9) Any other circumstances which will affect the bidder's or offeror's performance of the contract.
(b) In addition to the authority for rejection found in §§ 8-157, 8-158, 8-160, 8-163, 8-164 and 8-166 of
this Article, the Purchasing Agent shall have the authority to reject all bids or proposals or any portions
thereof when the interests of the City and the public will be served thereby. All such decisions will be
supported by a written determination made by the Purchasing Agent.
(c) No bidder or offeror shall be in default on the performance of any other contract with the City or in the
payment of any taxes, licenses or other monies due to the City.
(Ord. No. 84, 1990, 8-7-90; Ord. 179, 1997, 11-18-97)
Sec. 8-161. - Exemptions to use of competitive bid or proposal.
(a) Minor purchases .
(1) The Purchasing Agent shall have the powerauthority to negotiate without formal competition for
the purchase of any materials, professional services, services or construction not exceeding a
cost of sixty thousand dollars ($60,000.)) per year of contract or purchase order. Where a project
has been previously bid, project managers may approve, pursuant to administrative guidelines
approved by the Purchasing Agent, change orders up to the minor purchase limit established in
this Subsection; provided, however, that no such change order shall authorize any expenditure
of funds in excess of the amounts budgeted and appropriated for the project.
(2) Such negotiated purchases shall be made in the open market, but wherever practical or
advantageous, the Purchasing Agent, department or agency shall obtain quotes from at least
three (3) suppliers. Negotiated purchases of materials, professional services, services or
construction shall be awarded to the person supplying the lowest responsible and responsive
quote. Critical attributes, such as quality, experience and delivery, may be considered in the
award, but such attributes must be stated in the invitation for quote.
(3) The purchasing procedures adopted pursuant to § 8-113 of this Article may authorize the
purchase of materials, services or professional services in the open market by other departments
or agencies of the City, provided that no such purchase shall exceed fiveseven thousand five
hundred dollars ($,5000.)($7,500) except that the Purchasing Agent may authorize the
procurement of materials and services in an amount not to exceed tenfifteen thousand dollars
($1015,000.)) per procurement when purchased pursuant to a pricing agreement approved by
the Purchasing Agent and purchased by an employee of the City authorized by the Purchasing
Agent to make such purchases.
(4) No procurement willshall be divided so as to constitute a minor purchase under this Subsection.
(b) Emergency purchases .
(1) In the case of an apparent emergency requiring the immediate purchase of materials,
professional services, services or construction, the City Manager shall have the power to
authorize the Purchasing Agent to secure necessary items in the open market regardless of the
amount of the expenditure.
(2) In no event shall the contract price exceed commercially reasonable prices.
(3) A full written report of the circumstances of all emergency purchases over two hundred thousand
dollars ($200,000.)) shall be made by the City Manager to the City Council. The report shall be
received by the City Council in an open meeting, and such report shall be open to public
inspection.
(c) Construction change orders .
(1) Notwithstanding the provisions of Paragraph (a)(1) of this Section and Subsection (2) below, one
(1) or more change orders to an existing construction contract may be executed without
competition unless the cumulative amount of such change orders exceeds the greater of:
a. Fifteen (15) percent of the original contract amount; or
b. Fifteen (15) percent of the Guaranteed Maximum Price (GMP); or
b. Sixty thousand dollars ($10060,000.).).
(2
(2) Construction contracts utilizing an alternative delivery method shall not be subject to the limits
of subsection (c)(1) of this Section 8-161, except in the event a Guaranteed Maximum Price
(GMP) is established. In such event, subsection (c)(1) above shall apply.
(3) Any construction change order which authorizes a new improvement under a construction
contract may be executed without competition when the Purchasing Agent makes an
administrative finding that it would be in the City’s best interest to negotiate with the on-site
contractor for the construction of the new improvement because:
a. The new improvement is required for the completion of an improvement which is currently
under construction pursuant to a competitive bidding or competitive proposal process; or
b. The new improvement results from the discovery of differing or unforeseen physical
conditions at the site of the improvement under construction and is required for the
completion of the improvement under construction; and.
c. An administrative finding has been made by the Purchasing Agent that it would be in the City's best
interest to negotiate with the on-site contractor for the construction of the new improvement. Any
change order executed under this subsection (3) is not subject to the cost limitations of subsection
(c)(1) of this Section 8-161.
(d) Miscellaneous exemptions .
(1) A contract for materials, professional services or services may be awarded without competition
if the Purchasing Agent determines in writing that one (1) or more of the following conditions
exists:
a. There exists only one (1) responsible source;
b. Although there exists more than one (1) responsible source, a competitive process cannot
reasonably be used or, if used, will result in a substantially higher cost to the City, will
otherwise injure the City's financial interests or will substantially impede the City's
administrative functions or the delivery of services to the public;
c. A particular material or service is required to maintain interchangeability or compatibility as
a part of an existing integrated system;
d. A particular material, professional service or service is required in order to standardize or
maintain standardization for the purpose of reducing financial investment or simplifying
administration;
e. The material is perishable;
f. The material qualifies as an object of fine art;
g. A particular material is required to match materials in use, so as to produce visual harmony;
h. A particular material is required to enable use by a specific individual;
i. A particular material is prescribed by a professional advisor;
j. The material, professional service or service is the subject of a change order.
(2) The Purchasing Agent shall submit each determination made under this Subsection (d) to the
City Manager, who shall approve or reject the procurement.
(3) The City Manager shall submit all procurements under this Subsection (d) which exceed a cost
of two hundred thousand dollars ($200,000.) to the City Council in an open meeting for final
approval.
(4) Any procurement approved under this Section 8-161 by the City Manager or the City Council
may be used as the basis for a negotiated purchase of additional quantities of the same materials
or services at any time within a period of five (5) years from the date of approval; provided,
however, that subsequent procurements may be expressly limited to a specific number of
purchases or a period of less than five (5) years.
(e) Purchase of utility services .
(f) Materials, certainservices, professional services and construction competitively bid within twenty-four
(24) months . In any case where the City has, within the preceding twenty-four (24) months, pursuant
to an invitation for bids or request for proposals, awarded a contract for the procurement of any
materials or for the procurement of services, professional services or construction bid on a unit price
basis and/or hourly rate schedule, the Purchasing Agent may negotiate with the successful bidder for
the purchase of additional quantities of the materials or units of services or construction. under a new
agreement subject to the limitations of Section 8-186. The Purchasing Agent may, based upon a
reasonably prudent investigation of market conditions at the time, make procurements at a price
warranted by such conditions, even if the resulting cost to the City is greater than the amount of the
previous award.
(gf) Purchase of content for City-delivered video programming and streaming services . The Purchasing
Agent shall have the authority to negotiate without formal competition the purchase of video content
licensing rights for the City's delivery of cable or other subscriber video content, programming, and
streaming services. The Purchasing Agent is authorized to procure such licensing from local channels,
individual channels and channel families, and video content aggregation companies when he or she
determines i) viable market demand supports obtaining rights to deliver the specific content, and ii) the
anticipated cost to acquire such rights is reasonable based on the uniqueness of the content, region,
and market. The Purchasing Agent shall submit a summary of such transactions and determinations
to the City Manager's Office for each purchase under this Subsection. The Purchasing Agent and the
City Manager designee with direct responsibility to manage City telecommunication facilities and
services, as defined in Section 7(f) of Charter Article XII, shall jointly advise City Council regarding any
purchase under this Subsection that exceeds an annual cost of one million dollars ($1,000,000).
(Ord. No. 84, 1990, 8-7-90; Ord. No. 83, 1991, § 3, 7-16-91; Ord. No. 144, 1996, 12-3-96; Ord.
179, 1997, 11-18-97; Ord. No. 026, 2008, § 4, 3-18-08; Ord. No. 051, 2019 , § 2, 4-16-19)
Sec. 8-162. - Bid and performance bonds.
(a) When deemed necessary by the Purchasing Agent, bid bonds or other equivalent security shall be
required and the invitation for bids or request for proposals shall describe the requirements.
Unsuccessful bidders or offerors shall be entitled to the return of any cash deposit. Unless a specific
extension is granted in writing, a successful bidder or offeror shall forfeit any bid bond or equivalent
security required by the Purchasing Agent upon its failure to enter into a contract within fifteen (15)
days after the award.
(b) All contracts for construction the cost of which exceed the sum of one hundred thousand dollars
($100,000.) shall require a performance bond or other equivalent security.
(c) Nothing in this Section shall be construed to limit the authority of the City to require additional bonds
or security.
(Ord. No. 84, 1990, 8-7-90; Ord. 179, 1997, 11-18-97; Ord. No. 026, 2008, § 5, 3-18-08)
Sec. 8-163. - Other procedural prerequisites for award of contracts.
(a) In the case of a contract for procurement primarily for the use of a specific department or agency of
the City, the head of such using department or agency or designee thereof shall also approve an award
before written notice of the award is sent.
(b) In any case where competitive sealed bids or proposals are required by this Article and less than
three (3) are received, the Purchasing Agent shall document the rationale for rejecting or awarding the
bid or proposal.
(c) The Purchasing Agent shall not award any contract or finalize any procurement until the funds
necessary to defray the cost of such procurement are appropriated and available, excepting only:
(1) Cases cases of emergency under Subsection 8-161(b); and
(2) Cases where revenue to pay the bidder or offeror will be raised through the performance of the
contract.).
(d) No contract for the acquisition of property or the construction of improvements or other expenditures
which is to be financed by bonds or other obligations shall be effective until the proceeds of the bonds
or obligations have been received by the Financial Officer. Improvements to be paid for by special
assessments are excepted from this requirement.
(e) In any case where two (2) or more bids are received for the same total amount of unit price and are
otherwise eligible for award, the low bidder shall be determined by any method which will, in the
judgment of the Purchasing Agent, discourage the submission of tied bids.
(Ord. No. 84, 1990, 8-7-90; Ord. No. 144, 1996, 12-3-96; Ord. 179, 1997, 11-18-97)
Sec. 8-164. - Prequalification of bidders and offerors.
Any person desiring to receive invitations for bids or requests for proposals from the City may submit to
the Purchasing Agent such information as the Purchasing Agent may require to determine that person's
acceptability as a bidder or offeror. The Purchasing Agent may maintain one (1) or more lists compiled
from such submittals and may utilize the same The Purchasing Agent may authorize the establishment of
a prequalified list of vendors utilizing a competitive prequalification process. This list of vendors may be
utilized in lieu of public notice for soliciting competitive sealed bids or competitive sealed proposals;
provided, however, that the Purchasing Agent may use such list in lieu of public notice only if public notice
of the prequalification procedure and intended use of the list has been given within the preceding twenty-
four (24) months.
(Ord. No. 84, 1990, 8-7-90; Ord. 179, 1997, 11-18-97)
Sec. 8-165. - Cooperative procurement plans.
The Purchasing Agent shall have the authority to join with other units of government in cooperative
procurement plansprocurements , including, but not limited to, the State and the Multiple Assembly of
Procurement Officials, when the best interests of the City would be served thereby. Upon written approval
by the Purchasing Agent, competitive sealed bids, competitive sealed proposals or pricing agreements
received by any other governmental agency shall be the equivalent of bids or proposals received by the
City and may be the basis for any procurement by the City.
(Ord. No. 84, 1990, 8-7-90; Ord. 179, 1997, 11-18-97; Ord. No. 026, 2008, § 6, 3-18-08)
Sec. 8-166. - Solicitations or awards in violation of law.
(a) If, prior to the bid opening or the closing date for receipt of proposals, the Purchasing Agent
determines that a solicitation is in violation of federal, state or municipal law, then the solicitation shall
be canceled or revised to comply with applicable law.
(b) If, after the bid opening or the closing date for receipt of proposals, the Purchasing Agent determines
that a solicitation or a proposed award of a contract is in violation of federal, state or municipal law,
then the solicitation or proposed award shall be canceled.
(c) If, after an award, the Purchasing Agent, after consultation with the City Attorney, determines that a
solicitation or award of a contract was in violation of applicable law:
(1) If the person awarded the contract has not acted in violation of Article IV, Section 9 of the Charter,
the contract may be ratified and affirmed if it is determined by the Purchasing Agent that doing so
is in the best interests of the City, or the contract may be terminated and the person awarded the
contract shall be compensated for the actual costs reasonably incurred under the contract, prior
to the termination;
(2) If the person awarded the contract has acted in violation of Article IV, Section 9 of the Charter,
the contract may be declared null and void, if such action is in the best interest of the City.
(Ord. No. 84, 1990, 8-7-90; Ord. 179, 1997, 11-18-97)
Secs. 8-167—8-184. - Reserved.
Division 4 - Contract Administration
Sec. 8-185. - City attorney review.
All written contracts shall be on forms previously approved by the City Attorney and any changes or
additions shall be approved by the City Attorney.
(Ord. No. 026, 2008, § 7, 3-18-08)
Sec. 8-186. - Multi-year contracts.
(a) No contract for materials, services or professional services, including all renewals, shall be made by
the City for a period longer than five (5) years, unless authorized by ordinance, which ordinance shall
not be passed as an emergency ordinance. Notwithstanding the foregoing, the following shall not be
subject to the five (5) year term limitation but in any event shall not have a term in excess of ten (10)
years:
(1) Software licensing and/or maintenance agreements; or
(2) Select financial services including procurement credit cards, credit card processing, and
retirement record keeping; or
(3) Purchase of content for City-delivered video programming and streaming services; or
(4) Master Agreements with Work Order(s) in-process may be renewed for up to a maximum of one
(1) additional year if required to complete an in-process Work Order.
(b) Multi-year contracts shall be expressly contingent upon the annual budgeting and appropriation of
sufficient funds on an annual basis or by nonlapsing appropriation.
(c) When funds are not appropriated or otherwise made available to support the continuation of the City's
performance in a subsequent fiscal period, the contract shall be canceled.
(Ord. No. 84, 1990, 8-7-90)
Sec. 8-187. - Multiple source award.
A multiple source award may be made when an award to two (2) or more bidders or offerors for similar
supplies or, services, or professional services is necessary for adequate delivery, service or product
compatibility.
(Ord. No. 84, 1990, 8-7-90; Ord. No. 82, 1991, § 1, 7-16-91)
Sec. 8-188. - Right to inspect plant.
The City may inspect the plant, place of business or work site of any contractor or subcontractor which is
pertinent to the performance of any contract awarded or to be awarded by the City.
(Ord. No. 84, 1990, 8-7-90)
Sec. 8-189. - Right to audit records.
(a) The City may, at reasonable times and places, audit the books and records of any contractor who has
submitted cost or pricing data to the extent such books, documents, papers and records are pertinent
to cost or pricing data.
(b) The City shall be entitled to audit the books and records of any contractor or subcontractor when a
negotiated contract is not a firm, fixed-price contract.
(Ord. No. 84, 1990, 8-7-90)
Secs. 8-190—8-205. - Reserved.
Division 5 - Resolution of Controversies
Sec. 8-206. - Resolution of controversies.
(a) The Purchasing Agent is authorized, after consultation with the City Attorney, to settle and resolve
any questions regarding:
(1) Any protest concerning the solicitation or award of a contract;
(2) Debarment or suspension from consideration for award of contracts; and
(3) Any controversy arising between the City and a contractor by virtue of a contract between them,
including, without limitation, controversies based upon breach of contract, mistake,
misrepresentation or any other cause for contract modification or rescission.
(b) This authority shall be exercised pursuant to procedures established pursuant to § 8-113 which shall
provide for an expeditious resolution of the controversy.
(Ord. No. 84, 1990, 8-7-90; Ord. No. 144, 1996, 12-3-96)
ARTICLE IV. - PURCHASING AND CONTRACTING[3]
Footnotes:
--- (3) ---
Editor's note— Ord. No. 84, 1990, adopted Aug. 7, 1990, repealed former Art. IV, "Purchasing," §§ 8-
110-8-132, derived from Code 1972, §§ 2-56-2-69, and Ord. No. 97, 1987, §§ 1, 2, adopted July 21,
1987, and added a new Art. IV, §§ 8-110-8-206..
Charter reference— Purchasing, Art. V, Pt. IV.
Cross reference— The Director of Administrative Services shall be responsible for the function and
duties of the Financial Administration Unit and the Purchasing Division, § 2-500.
Division 1 - Generally
Sec. 8-110. - Procurement application.
This Article shall apply to the procurement of all materials, services, professional services, and
construction required or used by all departments and agencies of the City, including businesses and
enterprises operated by the City, whether used in the construction of City improvements or otherwise,
irrespective of the source of the funds, excepting only donations, real property, the procurement of legal
and litigation services, City grants, museum exhibits, musical, dramatic and other fine arts performances,
power purchases for resale, and services or activities subject to contracts between the City and other
governmental bodies. When any procurement involves the expenditure of federal or state funds, the
procurement shall be conducted in accordance with any mandatory applicable federal or state laws or
regulations. This Article does not create or confer any right or entitlement upon any person to bid on or
receive an award of any City contract.
(Ord. No. 84, 1990, 8-7-90)
Sec. 8-111. - Purpose.
The purposes of this Article are to provide for the fair and equitable treatment of all persons involved in
public purchasing by the City, to maximize the purchasing value of public funds, to codify and standardize
the City's purchasing procedures for the orderly and efficient administration thereof, to provide safeguards
for maintaining a procurement system of quality and integrity and to foster effective, broad-based
competition within the free enterprise system.
(Ord. No. 84, 1990, 8-7-90)
Sec. 8-112. - Definitions.
The following words, terms and phrases, when used in this Article, shall have the meanings ascribed to
them in this Section:
Alternative delivery method –shall mean a process of construction using either the Alternative Project
Delivery System (APDS), Construction Manager/General Contractor (CM/GC), Construction Manager At-
Risk (CMAR) or Design/Build approaches.
Alternative Project Delivery System (APDS) shall mean a process of managing a construction project in
which the design and construction of the project are contracted for separately, typically during the
preliminary design phase of the project. Firms are selected utilizing a qualification based competitive
sealed proposal with consideration to cost. The designer and construction contractor teams work with the
City as part of an integrated team focused on risk reduction, value engineering and best value.
Brand name shall mean a specification limited to one (1) or more items by manufacturers' names or
catalog numbers.
Change order shall mean any written modification to an existing contract authorizing changes within the
scope of work, additions or deletions to the work or an adjustment to any other provision of the contract.
City Grants shall mean direct monetary assistance to an organization or individual to undertake a specific
project or program. Grants fund solutions to identified problems and/or opportunities within the City.
Confidential information shall mean any information which is available to an employee only because of
the employee's status as an employee of the City and which is not a matter of public knowledge or
available to the public on request.
Construction shall mean the process of building, improving, altering or demolishing improvements.
Construction shall not include the operation, repair or maintenance of improvements.
Contract shall mean any agreement enforceable by law between the City and one (1) or more outside
parties, regardless of form or title, for the procurement of materials, services or construction.
Contract Manager/General Contractor (CM/GC) or Construction Manager At-Risk (CMAR) shall mean a
process of managing a construction project in which the design and construction of the project are
contracted for separately with the construction contractor typically joining the project at about 30% design
completion to provide constructability input, cost estimating, risk reduction, value engineering and best
value. Firms are selected utilizing a qualification based competitive sealed proposal with consideration to
cost.
Cost data shall mean factual information concerning the cost of labor, material, overhead and other cost
elements which are expected to be incurred or which have been actually incurred by the contractor in
performing the contract.
Design/build shall mean a process for executing a construction project in which one contractor, the
design-build team, works under a single contract with the City to provide the design and construction
services from initial design through project completion. Firms are selected utilizing a qualification based
competitive sealed proposal with consideration to cost.
Design/bid/build shall mean a project delivery method in which the City contracts with separate entities for
the design and construction of a project. The design firm is a qualification-based selection process and
the construction contractor is selected based on the lowest responsive and responsible bid.
Guaranteed Maximum Price (GMP) shall mean the sum of money agreed upon between the City and the
construction contractor to complete a construction project. This is a not-to-exceed total cost of the
services and materials provided during the construction phase of work including direct costs, overhead,
any contingency, and fees. The GMP is typically established at approximately 90% design completion.
Independent Cost Estimate (ICE) shall mean a tool utilized to assist in determining the reasonableness of
the project cost. The ICE is developed by a qualified independent third-party not associated with the
project.
Improvements shall mean any structure, building, street, utility or other valuable addition to real property
amounting to more than mere repairs or partial replacement and intended to enhance its value or utility or
to adapt it for new or further purposes.
Invitation for bids shall mean all documents, whether attached or incorporated by reference, utilized for
soliciting bids.
Legal services shall mean the advice, representation, document preparation or related services of an
attorney as special counsel provided to the City upon the request of the City Attorney.
Litigation services shall mean professional or other services procured by the City Attorney for the purpose
of evaluating, preparing, providing or presenting evidence at the trial of any lawsuit to which the City is a
party. Litigation services shall not include legal services.
Maintenance shall mean acts of repair, replacement or other acts necessary to keep any improvements
or personal property in proper condition and good working order, to prevent decline in, failure or cessation
of the existing condition of the improvement or personal property or to restore any improvement to its
original condition after partial failure or destruction. This term shall not include improvements.
Master Agreement shall mean an agreement established for the completion of a project or provision of
services or materials on an as-required basis establishing the terms, conditions and general scope of
services. The Master Agreement works in conjunction with a Work Order, which supplements the Master
Agreement.
Materials shall mean all personal property, including, but not limited to, supplies, equipment, parts,
printing and insurance; excluding, however, leases of a permanent interest in real property, securities and
financial paper and water and water rights whether represented by shares of stock in ditch and irrigation
companies, units of the Northern Colorado Water Conservancy District or otherwise.
Price data shall mean factual information concerning prices for items substantially similar to those being
procured. Prices as used in this definition shall refer to offered or proposed selling prices, historical selling
prices and current selling prices.
Pricing agreement shall mean an agreement by which procurements are conducted by or on behalf of
more than one (1) governmental body.
Procurement shall mean the purchasing, renting, leasing or other acquisition of any materials, services,
professional services or construction. It shall also include all functions that pertain to obtaining any
material, service or construction, including the description of requirements, the selection and solicitation
of sources and the preparation and award of contract. Procurement shall not include the buying,
purchasing, renting or leasing of real property.
Professional services shall mean the furnishing of labor, time, effort or expertise by a contractor with
specialized knowledge in a field, including, but not limited to, architecture, engineering, medicine, finance,
accounting, appraisal and land surveying.
Public notice shall mean any publication reasonably calculated to inform responsible bidders or offerors.
Public notice shall occur for a reasonable time and may be disseminated through any means of mass
communication, including, but not limited to, e-procurement systems, internet, newspapers, other written
publications, posting, television, radio, other broadcasting media and electronic billboards.
Real property shall mean lands, lands under water, buildings, permanent structures and any and all
easements, incorporeal hereditaments and every estate and right herein, legal and equitable, including
terms for years and liens by way of judgment, mortgage or otherwise.
Request for proposals shall mean all documents, whether attached or incorporated by reference, utilized
for soliciting proposals.
Responsible bidder or offeror shall mean a person who meets the criteria specified in § 8-160 of this
Article and who has the capability in all respects to perform fully the contract requirements and the
experience, integrity, reliability, capacity, facilities, equipment, insurance and credit which will ensure
good-faith performance.
Responsive bidder or offeror shall mean a person whose bid or offer conforms in all material respects to
the requirements set forth in the invitation for bids or request for proposals.
Services shall mean the performance of maintenance or the furnishing of labor, time or effort which does
not involve the delivery of a specific end product other than a report or other item which is merely
incidental to the performance of the service. Services shall not include services rendered under an
employment agreement nor shall it include professional services as that term is defined in this Section.
Specification shall mean any description of the physical or functional characteristics of or the nature of the
material, service or construction item. It may include a description of any requirement for inspecting,
testing or preparing a material, service or construction item for delivery or a procedure for determining
whether the requirements are satisfied.
Using agency shall mean any service area, department, board or commission of the City requiring
supplies, professional services, services or construction procured pursuant to this Article.
Work order shall mean a written order defining a discrete service and/or material with a definite project,
price and time of completion which is used in conjunction with a work order contract to create an
enforceable contract.
(Ord. No. 84, 1990, 8-7-90; Ord. No. 130, 2002, § 18, 9-17-02; Ord. No. 026, 2008, § 1, 3-18-
08)
Sec. 8-113. - Authority and duties of purchasing agent.
(a) The Purchasing Agent shall serve as the public purchasing official for the City and shall be responsible
for the procurement of all materials, services, professional services and construction for the City which
are governed by the terms of this Article.
(b) The Purchasing Agent may formulate and promulgate rules and regulations for the administration of
this Article, not inconsistent with the provisions of this Article, with respect to purchasing procedures.
Any rules and regulations promulgated by the Purchasing Agent hereunder shall be effective upon
approval by the City Manager.
(Ord. No. 84, 1990, 8-7-90; Ord. No. 026, 2008, § 2, 3-18-08)
Charter reference— Powers and duties of Purchasing Agent, Art. V, § 27.
Sec. 8-114. - Procurement contrary to this article.
Except as may be otherwise provided by law, it shall be unlawful for any City officer or employee to order
a procurement contrary to the provisions of this Article. Any procurement or contract so made shall be
void and wholly without effect and shall not be binding upon the City in any manner.
(Ord. No. 84, 1990, 8-7-90)
Secs. 8-115—8-135. - Reserved.
Division 2 - Specifications
Sec. 8-136. - Intent.
All specifications, including, but not limited to, design, performance and brand name specifications, shall
be drafted so as to provide a clear and concise description of the material, service or construction
desired.
(Ord. No. 84, 1990, 8-7-90)
Sec. 8-137. - Preparation.
Before any procurement, the Purchasing Agent shall cause to be prepared written specifications detailing
the City's requirements for the materials, service or construction. The Purchasing Agent may request
other departments or agencies of the City to prepare specifications for procurements to be made primarily
for such department or agency.
(Ord. No. 84, 1990, 8-7-90)
Sec. 8-138. - Approval.
(a) Specifications prepared primarily for a procurement for a specific department or agency of the City
shall be approved by both the Purchasing Agent and the head of the using department, agency or
designee thereof before being submitted for bid.
(b) If the Purchasing Agent and head of the using department or agency cannot agree, the matter shall
be referred to the City Manager.
(Ord. No. 84, 1990, 8-7-90)
Sec. 8-139. - Brand name specification.
(a) A brand name specification may be used to maintain standardization, interchangeability, or
compatibility within a critical system or process or when the Purchasing Agent has determined that
sufficient sources for competition exist for the procurement of the material and that the use of the brand
name specification is not intended to limit or restrict competition.
(b) A brand name specification may also be used to describe the standard of quality, performance and
other salient characteristics of a material in lieu of a description of its physical or functional
characteristics. In such cases, the solicitation shall contain explanatory language that the use of a
brand name is for the purpose of describing the standard desired and that the substitution of equivalent
materials is permitted.
(Ord. No. 84, 1990, 8-7-90)
Secs. 8-140—8-155. - Reserved.
Division 3 - Contract Formation and Award[4]
Footnotes:
--- (4) ---
Charter reference— Competitive bidding, Art. V, § 27; contracts for services, Art. V, § 30.
Sec. 8-156. - Methods of source selection.
All procurements subject to the terms of this Article shall be awarded by competitive sealed bidding
pursuant to § 8-157, except as provided in:
(1) Section 8-158 concerning awards by competitive sealed proposals; and
(2) Section 8-161 concerning exemptions to the use of competitive bids or proposals.
(Ord. No. 84, 1990, 8-7-90; Ord. No. 83, 1991, § 1, 7-16-91)
Sec. 8-157. - Competitive sealed bidding.
(a) Procurements accomplished pursuant to this Section shall be awarded to the lowest responsive and
responsible bidder after competitive sealed bidding.
(b) An invitation for bids shall be issued and shall include specifications and all contractual terms and
conditions applicable to the procurement.
(c) Public notice shall be given and shall include the bid title, place, date and time of bid opening.
(d) All bids shall be opened in public at the time and place stated in the invitation for bids. The amount of
each bid and such other relevant information as the Purchasing Agent deems appropriate, together
with the name of each bidder, shall be recorded. Thereafter, the record of bids and each bid shall be
available for public inspection in the office of the Purchasing Agent in the same manner as are other
public records. In the event of good cause as determined by the Purchasing Agent, bid openings may
be postponed.
(e) Bids shall be unconditionally accepted without alteration or correction, except as authorized in
Subsection (g) of this Section. Bids shall be evaluated based on the requirements set forth in the
invitation for bids, which may include criteria and/or processes for determining acceptability, such as
inspection, provision of sample materials, testing, quality, workmanship, delivery and suitability for a
particular purpose. Those criteria that will affect the bid price shall be objectively measurable, such as
discounts, transportation costs and total or life cycle costs. The invitation for bids shall set forth all
evaluation criteria to be used. No criteria may be used in bid evaluation that are not set forth in the
invitation for bids.
(f) Correction or withdrawal of inadvertently erroneous bids before or after bid opening, or cancellation of
awards or contracts based on such bid mistakes, may be authorized when deemed appropriate by the
Purchasing Agent.
(1) Bids may be withdrawn by the offeror for any reason prior to bid opening. Any such notice of
withdrawal must be received in the office designated in the invitation for bids prior to the time
set for bid opening.
(2) Mistakes discovered before bid opening may be corrected or withdrawn in writing by the bidder.
Any such corrections or notices of withdrawal must be received in the office designated in the
invitation for bids prior to the time set for bid opening.
(3) After bid opening, the following provisions shall apply:
a. A low bidder alleging a material mistake of fact may be permitted by the Purchasing Agent
to correct its bid if the mistake is clearly evident on the face of the bid document and the
intended correct bid is similarly evident.
b. A low bidder alleging a material mistake of fact may be permitted by the Purchasing Agent
to withdraw its bid: (i) if the mistake is clearly evident on the face of the bid but the intended
correct bid is not similarly evident or (ii) if the mistake is not clearly evident on the face of the
bid but the bidder submits evidence to the Purchasing Agent which clearly and convincingly
demonstrates that a mistake was made, in which case the bidder must show the nature of
the mistake and the bid price actually intended.
(4) No changes in bid prices or other provisions of bids prejudicial to the interests of the City or fair
competition shall be permitted.
(5) All decisions to permit the correction or withdrawal of bids or to cancel awards or contracts based
on bid mistakes will be supported by a written determination made by the Purchasing Agent.
(g) The contract shall be awarded with reasonable promptness by written notice to the lowest responsive
and responsible bidder whose bid meets the requirements and criteria set forth in the invitation for
bids. If the lowest responsive and responsible bid exceeds budgeted funds and either time constraints
or economic considerations preclude resolicitation of work of a reduced scope, the Purchasing Agent
is authorized to negotiate an adjustment of the bid price with the lowest responsive and responsible
bidder or to modify the scope of work, so as to bring the bid within the amount of available funds. The
Purchasing Agent is also authorized to negotiate other terms and conditions.
(Ord. No. 84, 1990, 8-7-90)
Sec. 8-158. - Competitive sealed proposals.
(a) Procurements for the following are eligible for award by competitive sealed proposals:
(1) Materials and services when the Purchasing Agent determines that the use of competitive sealed
bidding is either not practicable or not advantageous to the City;
(2) Professional services; and
(3) City improvements when the Purchasing Agent determines that the use of alternative delivery
methods will benefit the City while retaining assurance of competitive pricing.
(b) Procurements accomplished pursuant to this Section shall be solicited through a request for proposals.
(c) Public notice shall be given and shall include the proposal title, place, date and time the proposal must
be received at the place stated in the request for proposal. In the event of good cause as determined
by the Purchasing Agent, the time set for submittal of the proposals may be extended when determined
to be in the City’s best interest.
(d) Except as provided in paragraphs (e) and (m) of this Section, proposals shall be opened so as to
avoid disclosure of contents to competing offerors during the process of negotiation.
(e) A list of the offerors submitting proposals shall be maintained containing the name of each offeror and
shall be open for public inspection or disclosure after the time set for submittal of the proposals.
(f) The request for proposals shall state evaluation factors and their relative importance.
(g) After proposal opening, interviews may be conducted with the highest ranked responsible offeror or
offerors for the purpose of clarification and to assure full understanding of, and responsiveness to,
solicitation requirements. Offerors selected for interview shall be accorded fair and equal treatment
with respect to any opportunity for discussion and revision of proposals. Revisions may be permitted
after submissions and prior to award in order to reflect clarifications in the proposal's scope of work or
contract amount.
(h) Except as provided in paragraphs (e) and (m) of this Section, in conducting interviews, there shall be
no disclosure by the City or any officer, employee or committee thereof, of any information derived
from proposals submitted by competing offerors, nor shall there be any disclosure of information
discussed by the evaluation committee in selecting the highest ranked offeror(s).
(i) After the contract has been awarded and a written contract executed with the selected offeror(s), the
total points of the evaluation committee will be retained by the Purchasing Agent for a period of time
consistent with the City's record retention policy. The total points or ranking of the offerors shall not be
made available for public inspection or disclosure.
(j) Except as provided in paragraph (m) of this Section, individual rating sheets, notes, emails and other
documents prepared or utilized by members of the evaluation committee shall not be made available
for public inspection or disclosure.
(k) The contract shall be awarded with reasonable promptness by written notice to the responsible offeror
whose proposal is determined in writing to be the most advantageous to the City, taking into
consideration the evaluation factors set forth in the request for proposals. No other factors or criteria
shall be used in the evaluation.
(l) The Purchasing Agent is authorized to negotiate contract terms, including but not limited to the final
price and precise scope of work, with the selected offeror.
(m) If the proposals are for the services of a public accounting firm to conduct the annual independent
audit of the City's books and accounts as required in Section 17 of Charter Article II, those proposals
shall be reviewed and the interviews conducted by the City Council or a committee of the Council in a
public meeting and the selection by Council shall be conducted in a public meeting. In conducting such
review, interviews and selection, the City Council and committees of the Council shall not be subject
to the provisions in paragraphs (d), (h), (i) and (j) of this Section.
(n) No public accounting firm selected to conduct the City's annual independent audit shall be eligible to
be selected under this Section to conduct that audit for more than two (2) consecutive five (5) year
terms. In addition, any firm conducting the audit for five (5) consecutive years shall not be eligible to
participate in a new competitive sealed proposal and be selected unless the firm assigns a new lead
partner to conduct the audit under the new contract with a term of one (1) to five (5) years.
(o) The construction of City improvements utilizing an alternative delivery method will ensure competitive
pricing and value by requiring the contractor to obtain quotes from at least three (3) suppliers and/or
subcontractors for all materials and services exceeding a cost of $60,000 subject to the discretion of
the Purchasing Agent. Subcontractors selected as part of the construction contractor team
competitive process for the alternative delivery method are exempt from this requirement, subject to
the discretion of the Purchasing Agent.
(Ord. No. 84, 1990, 8-7-90; Ord. No. 83, 1991, § 2, 7-16-91; Ord. No. 144, 1996, 12-3-96; Ord.
No. 026, 2008, § 3, 3-18-08; Ord. No. 101, 2018 , § 2, 8-21-18)
Sec. 8-159. - Competitive negotiated procurement.
(a) Procurement for goods, services, professional services, products for resale or redistribution,
distribution services usage and competitive business arrangements that are related to the
establishment of strategic business plans or relationships of any City utility in a competitive market
environment shall be eligible for award by competitive negotiation under this Section, provided that the
following conditions are met:
(1) The Purchasing Agent determines in writing, with the approval of the City Manager, that the use
of competitive sealed bidding or competitive sealed proposal processes are either not practicable
or not advantageous to the City; and
(2) There is a minimum of two (2) vendors/businesses willing and able to provide the basic goods,
services or products to be procured through competitive negotiation.
(b) In order to initiate a competitive negotiated procurement under this Section, the procuring utility shall,
in a manner acceptable to the Purchasing Agent as sufficient to identify potential appropriate and
qualified vendors of the goods, services, or professional services to be procured, investigate and
research the market for such goods, services, or professional services and identify those vendors
determined to be appropriate and qualified candidates in light of the competitive and other interests of
the procuring utility.
(c) The procuring utility may contact selected vendors, or may consider appropriate and qualified vendors
that have initiated contact with the City, provided that a rational basis for identifying and selecting
candidate vendors in view of the interests of the procuring utility is applied consistently to all vendors
reasonably known to the procuring utility.
(d) The Purchasing Agent shall, with the approval of the City Manager, be responsible for accepting and
soliciting all offers made on behalf of the procuring utility under the provisions of this Section.
(e) Each vendor participating in competitive negotiations under this Section shall be accorded a fair and
reasonable opportunity to present and explain the goods, services, or professional services to be
provided by such vendor.
(f) The basis for final selection of a vendor under a competitive negotiation process, and the final terms
of the contract under which goods, services, or professional services shall be procured under this
Section, shall each be subject to the review and approval of the Purchasing Agent and City Manager.
(g) Prior to the renewal or extension of any contract for goods, services, or professional services under
this Section beyond the original potential term of such contract, the City Manager or procuring utility
shall require that an assessment of the subject vendor's performance and the benefits to the City of
the terms of such contract be conducted by a qualified third party, to be selected by the Purchasing
Agent.
(Ord. 179, 1997, 11-18-97)
Sec. 8-160. - Responsibility of bidders and offerors.
(a) In determining whether a bidder or offeror is responsible, the following shall be considered:
(1) The ability, capacity and skill of the bidder or offeror to perform the contract or provide the
services required;
(2) Whether the bidder or offeror can perform the contract or provide the service promptly and within
the time specified without delay or interference;
(3) The character, integrity, reputation, judgment, experience and efficiency of the bidder or offeror;
(4) The quality of the bidder's or offeror's performance of previous contracts or services;
(5) The previous and existing compliance by the bidder or offeror with laws and ordinances relating
to the contract or service;
(6) The sufficiency of the financial resources and ability of the bidder or offeror to perform the
contract or provide the service;
(7) The quality, availability and adaptability of the materials and services to the particular use
required;
(8) The ability of the bidder or offeror to provide future maintenance and service for the use of the
subject of the contract;
(9) Any other circumstances which will affect the bidder's or offeror's performance of the contract.
(b) In addition to the authority for rejection found in §§ 8-157, 8-158, 8-160, 8-163, 8-164 and 8-166 of
this Article, the Purchasing Agent shall have the authority to reject all bids or proposals or any portions
thereof when the interests of the City and the public will be served thereby. All such decisions will be
supported by a written determination made by the Purchasing Agent.
(c) No bidder or offeror shall be in default on the performance of any other contract with the City or in the
payment of any taxes, licenses or other monies due to the City.
(Ord. No. 84, 1990, 8-7-90; Ord. 179, 1997, 11-18-97)
Sec. 8-161. - Exemptions to use of competitive bid or proposal.
(a) Minor purchases .
(1) The Purchasing Agent shall have the authority to negotiate without formal competition for the
purchase of any materials, professional services, services or construction not exceeding a cost
of sixty thousand dollars ($60,000) per contract or purchase order. Where a project has been
previously bid, project managers may approve, pursuant to administrative guidelines approved
by the Purchasing Agent, change orders up to the minor purchase limit established in this
Subsection; provided, however, that no such change order shall authorize any expenditure of
funds in excess of the amounts budgeted and appropriated for the project.
(2) Such negotiated purchases shall be made in the open market, but wherever practical or
advantageous, the Purchasing Agent, department or agency shall obtain quotes from at least
three (3) suppliers. Negotiated purchases of materials, professional services, services or
construction shall be awarded to the person supplying the lowest responsible and responsive
quote. Critical attributes, such as quality, experience and delivery, may be considered in the
award, but such attributes must be stated in the invitation for quote.
(3) The purchasing procedures adopted pursuant to § 8-113 of this Article may authorize the
purchase of materials, services or professional services in the open market by other departments
of the City, provided that no such purchase shall exceed seven thousand five hundred dollars
($7,500) except that the Purchasing Agent may authorize the procurement of materials and
services in an amount not to exceed fifteen thousand dollars ($15,000) per procurement when
purchased pursuant to a pricing agreement approved by the Purchasing Agent and purchased by
an employee of the City authorized by the Purchasing Agent to make such purchases.
(4) No procurement shall be divided so as to constitute a minor purchase under this Subsection.
(b) Emergency purchases .
(1) In the case of an apparent emergency requiring the immediate purchase of materials,
professional services, services or construction, the City Manager shall have the power to
authorize the Purchasing Agent to secure necessary items in the open market regardless of the
amount of the expenditure.
(2) In no event shall the contract price exceed commercially reasonable prices.
(3) A full written report of the circumstances of all emergency purchases over two hundred thousand
dollars ($200,000) shall be made by the City Manager to the City Council. The report shall be
received by the City Council in an open meeting, and such report shall be open to public
inspection.
(c) Construction change orders .
(1) Notwithstanding the provisions of Paragraph (a)(1) of this Section and Subsection (2) below, one
(1) or more change orders to an existing construction contract may be executed without
competition unless the cumulative amount of such change orders exceeds the greater of:
a. Fifteen (15) percent of the original contract amount; or
b. Fifteen (15) percent of the Guaranteed Maximum Price (GMP); or
b. Sixty thousand dollars ($60,000).
(2) Construction contracts utilizing an alternative delivery method shall not be subject to the limits
of subsection (c)(1) of this Section 8-161, except in the event a Guaranteed Maximum Price
(GMP) is established. In such event, subsection (c)(1) above shall apply.
(3) Any construction change order which authorizes a new improvement under a construction
contract may be executed without competition when the Purchasing Agent makes an
administrative finding that it would be in the City’s best interest to negotiate with the on-site
contractor for the construction of the new improvement because:
a. The new improvement is required for the completion of an improvement which is currently
under construction pursuant to a competitive bidding or competitive proposal process; or
b. The new improvement results from the discovery of differing or unforeseen physical
conditions at the site of the improvement under construction and is required for the
completion of the improvement under construction.
Any change order executed under this subsection (3) is not subject to the cost limitations of subsection
(c)(1) of this Section 8-161.
(d) Miscellaneous exemptions .
(1) A contract for materials, professional services or services may be awarded without competition
if the Purchasing Agent determines in writing that one (1) or more of the following conditions
exists:
a. There exists only one (1) responsible source;
b. Although there exists more than one (1) responsible source, a competitive process cannot
reasonably be used or, if used, will result in a substantially higher cost to the City, will
otherwise injure the City's financial interests or will substantially impede the City's
administrative functions or the delivery of services to the public;
c. A particular material or service is required to maintain interchangeability or compatibility as
a part of an existing integrated system;
d. A particular material, professional service or service is required in order to standardize or
maintain standardization for the purpose of reducing financial investment or simplifying
administration;
e. The material is perishable;
f. The material qualifies as an object of fine art;
g. A particular material is required to match materials in use, so as to produce visual harmony;
h. A particular material is required to enable use by a specific individual;
i. A particular material is prescribed by a professional advisor;
j. The material, professional service or service is the subject of a change order.
(2) The Purchasing Agent shall submit each determination made under this Subsection (d) to the
City Manager, who shall approve or reject the procurement.
(3) The City Manager shall submit all procurements under this Subsection (d) which exceed a cost
of two hundred thousand dollars ($200,000.) to the City Council in an open meeting for final
approval.
(4) Any procurement approved under this Section 8-161 by the City Manager or the City Council
may be used as the basis for a negotiated purchase of additional quantities of the same materials
or services at any time within a period of five (5) years from the date of approval; provided,
however, that subsequent procurements may be expressly limited to a specific number of
purchases or a period of less than five (5) years.
(e) Materials, services, professional services and construction competitively bid within twenty-four (24)
months . In any case where the City has, within the preceding twenty-four (24) months, pursuant to an
invitation for bids or request for proposals, awarded a contract for the procurement of any materials or
for the procurement of services, professional services or construction bid on a unit price basis and/or
hourly rate schedule, the Purchasing Agent may negotiate with the successful bidder for the purchase
of additional quantities of the materials or units of services or construction under a new agreement
subject to the limitations of Section 8-186. The Purchasing Agent may, based upon a reasonably
prudent investigation of market conditions at the time, make procurements at a price warranted by
such conditions, even if the resulting cost to the City is greater than the amount of the previous award.
(f) Purchase of content for City-delivered video programming and streaming services . The Purchasing
Agent shall have the authority to negotiate without formal competition the purchase of video content
licensing rights for the City's delivery of cable or other subscriber video content, programming, and
streaming services. The Purchasing Agent is authorized to procure such licensing from local channels,
individual channels and channel families, and video content aggregation companies when he or she
determines i) viable market demand supports obtaining rights to deliver the specific content, and ii) the
anticipated cost to acquire such rights is reasonable based on the uniqueness of the content, region,
and market. The Purchasing Agent shall submit a summary of such transactions and determinations
to the City Manager's Office for each purchase under this Subsection. The Purchasing Agent and the
City Manager designee with direct responsibility to manage City telecommunication facilities and
services, as defined in Section 7(f) of Charter Article XII, shall jointly advise City Council regarding any
purchase under this Subsection that exceeds an annual cost of one million dollars ($1,000,000).
(Ord. No. 84, 1990, 8-7-90; Ord. No. 83, 1991, § 3, 7-16-91; Ord. No. 144, 1996, 12-3-96; Ord.
179, 1997, 11-18-97; Ord. No. 026, 2008, § 4, 3-18-08; Ord. No. 051, 2019 , § 2, 4-16-19)
Sec. 8-162. - Bid and performance bonds.
(a) When deemed necessary by the Purchasing Agent, bid bonds or other equivalent security shall be
required and the invitation for bids or request for proposals shall describe the requirements.
Unsuccessful bidders or offerors shall be entitled to the return of any cash deposit. Unless a specific
extension is granted in writing, a successful bidder or offeror shall forfeit any bid bond or equivalent
security required by the Purchasing Agent upon its failure to enter into a contract within fifteen (15)
days after the award.
(b) All contracts for construction the cost of which exceed the sum of one hundred thousand dollars
($100,000.) shall require a performance bond or other equivalent security.
(c) Nothing in this Section shall be construed to limit the authority of the City to require additional bonds
or security.
(Ord. No. 84, 1990, 8-7-90; Ord. 179, 1997, 11-18-97; Ord. No. 026, 2008, § 5, 3-18-08)
Sec. 8-163. - Other procedural prerequisites for award of contracts.
(a) In the case of a contract for procurement primarily for the use of a specific department or agency of
the City, the head of such using department or agency or designee thereof shall also approve an award
before written notice of the award is sent.
(b) In any case where competitive sealed bids or proposals are required by this Article and less than
three (3) are received, the Purchasing Agent shall document the rationale for rejecting or awarding the
bid or proposal.
(c) The Purchasing Agent shall not award any contract or finalize any procurement until the funds
necessary to defray the cost of such procurement are appropriated and available, excepting only cases
of emergency under Subsection 8-161(b).
(d) No contract for the acquisition of property or the construction of improvements or other expenditures
which is to be financed by bonds or other obligations shall be effective until the proceeds of the bonds
or obligations have been received by the Financial Officer. Improvements to be paid for by special
assessments are excepted from this requirement.
(e) In any case where two (2) or more bids are received for the same total amount of unit price and are
otherwise eligible for award, the low bidder shall be determined by any method which will, in the
judgment of the Purchasing Agent, discourage the submission of tied bids.
(Ord. No. 84, 1990, 8-7-90; Ord. No. 144, 1996, 12-3-96; Ord. 179, 1997, 11-18-97)
Sec. 8-164. - Prequalification of bidders and offerors.
The Purchasing Agent may authorize the establishment of a prequalified list of vendors utilizing a
competitive prequalification process. This list of vendors may be utilized in lieu of public notice for
soliciting competitive sealed bids or competitive sealed proposals; provided, however, that the Purchasing
Agent may use such list in lieu of public notice only if public notice of the prequalification procedure and
intended use of the list has been given within the preceding twenty-four (24) months.
(Ord. No. 84, 1990, 8-7-90; Ord. 179, 1997, 11-18-97)
Sec. 8-165. - Cooperative procurement plans.
The Purchasing Agent shall have the authority to join with other units of government in cooperative
procurements , including, but not limited to, the State and the Multiple Assembly of Procurement Officials,
when the best interests of the City would be served thereby. Upon written approval by the Purchasing
Agent, competitive sealed bids, competitive sealed proposals or pricing agreements received by any
other governmental agency shall be the equivalent of bids or proposals received by the City and may be
the basis for any procurement by the City.
(Ord. No. 84, 1990, 8-7-90; Ord. 179, 1997, 11-18-97; Ord. No. 026, 2008, § 6, 3-18-08)
Sec. 8-166. - Solicitations or awards in violation of law.
(a) If, prior to the bid opening or the closing date for receipt of proposals, the Purchasing Agent
determines that a solicitation is in violation of federal, state or municipal law, then the solicitation shall
be canceled or revised to comply with applicable law.
(b) If, after the bid opening or the closing date for receipt of proposals, the Purchasing Agent determines
that a solicitation or a proposed award of a contract is in violation of federal, state or municipal law,
then the solicitation or proposed award shall be canceled.
(c) If, after an award, the Purchasing Agent, after consultation with the City Attorney, determines that a
solicitation or award of a contract was in violation of applicable law:
(1) If the person awarded the contract has not acted in violation of Article IV, Section 9 of the Charter,
the contract may be ratified and affirmed if it is determined by the Purchasing Agent that doing so
is in the best interests of the City, or the contract may be terminated and the person awarded the
contract shall be compensated for the actual costs reasonably incurred under the contract, prior
to the termination;
(2) If the person awarded the contract has acted in violation of Article IV, Section 9 of the Charter,
the contract may be declared null and void, if such action is in the best interest of the City.
(Ord. No. 84, 1990, 8-7-90; Ord. 179, 1997, 11-18-97)
Secs. 8-167—8-184. - Reserved.
Division 4 - Contract Administration
Sec. 8-185. - City attorney review.
All written contracts shall be on forms previously approved by the City Attorney and any changes or
additions shall be approved by the City Attorney.
(Ord. No. 026, 2008, § 7, 3-18-08)
Sec. 8-186. - Multi-year contracts.
(a) No contract for materials, services or professional services, including all renewals, shall be made by
the City for a period longer than five (5) years, unless authorized by ordinance, which ordinance shall
not be passed as an emergency ordinance. Notwithstanding the foregoing, the following shall not be
subject to the five (5) year term limitation but in any event shall not have a term in excess of ten (10)
years:
(1) Software licensing and/or maintenance agreements; or
(2) Select financial services including procurement credit cards, credit card processing, and
retirement record keeping; or
(3) Purchase of content for City-delivered video programming and streaming services; or
(4) Master Agreements with Work Order(s) in-process may be renewed for up to a maximum of one
(1) additional year if required to complete an in-process Work Order.
(b) Multi-year contracts shall be expressly contingent upon the annual budgeting and appropriation of
sufficient funds on an annual basis or by nonlapsing appropriation.
(c) When funds are not appropriated or otherwise made available to support the continuation of the City's
performance in a subsequent fiscal period, the contract shall be canceled.
(Ord. No. 84, 1990, 8-7-90)
Sec. 8-187. - Multiple source award.
A multiple source award may be made when an award to two (2) or more bidders or offerors for similar
supplies, services, or professional services is necessary for adequate delivery, service or product
compatibility.
(Ord. No. 84, 1990, 8-7-90; Ord. No. 82, 1991, § 1, 7-16-91)
Sec. 8-188. - Right to inspect plant.
The City may inspect the plant, place of business or work site of any contractor or subcontractor which is
pertinent to the performance of any contract awarded or to be awarded by the City.
(Ord. No. 84, 1990, 8-7-90)
Sec. 8-189. - Right to audit records.
(a) The City may, at reasonable times and places, audit the books and records of any contractor who has
submitted cost or pricing data to the extent such books, documents, papers and records are pertinent
to cost or pricing data.
(b) The City shall be entitled to audit the books and records of any contractor or subcontractor when a
negotiated contract is not a firm, fixed-price contract.
(Ord. No. 84, 1990, 8-7-90)
Secs. 8-190—8-205. - Reserved.
Division 5 - Resolution of Controversies
Sec. 8-206. - Resolution of controversies.
(a) The Purchasing Agent is authorized, after consultation with the City Attorney, to settle and resolve
any questions regarding:
(1) Any protest concerning the solicitation or award of a contract;
(2) Debarment or suspension from consideration for award of contracts; and
(3) Any controversy arising between the City and a contractor by virtue of a contract between them,
including, without limitation, controversies based upon breach of contract, mistake,
misrepresentation or any other cause for contract modification or rescission.
(b) This authority shall be exercised pursuant to procedures established pursuant to § 8-113 which shall
provide for an expeditious resolution of the controversy.
(Ord. No. 84, 1990, 8-7-90; Ord. No. 144, 1996, 12-3-96)
COUNCIL FINANCE COMMITTEE
AGENDA ITEM SUMMARY
Staff: Jennifer Poznanovic, Sr. Revenue & Project Manager
Date: December 16, 2019
SUBJECT FOR DISCUSSION
Sales Tax on Mobile Homes
EXECUTIVE SUMMARY
The purpose of this item is to discuss sales tax exemption options for mobile/manufactured home
sales in the City of Fort Collins. Estimated sales tax collections have been roughly $88k per year
over the past two years.
The City of Fort Collins currently applies sales tax on all mobile/manufactured home sales,
whereas the State of Colorado and Larimer County exempt all mobile/manufactured home sales
from sales tax. Conventional (site-built) homes pay sales tax on materials used in construction
and there is no sales tax for subsequent sales. All mobile/manufactured homes and site-built
homes pay property tax based on the assessed value.
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
Does Council Finance Committee support option 2?
• Apply sales tax on initial purchase of new mobile/manufactured home and exempt
all subsequent sales from sales tax
• 50% exempt on initial sale
• Update City code
BACKGROUND/DISCUSSION
Earlier this year City Council asked for sales tax data on mobile homes. The City does not
exempt sales tax on mobile/manufactured homes sales. According to data from the Larimer
County Assessor’s Office, in 2017 and 2018 there were 181 mobile home sales in Fort Collins,
an average of 90 per year. Sales tax over the two-year period was $176k or roughly $88k per
year.
As of July 1, 2019, the State of Colorado and state collected jurisdictions (such as Larimer
County) exempt all manufactured homes sales from sales tax (House Bill 18-1315).
City Code does not differentiate between mobile and manufactured homes (per Safety Standards
Act of 1974) but are considered the same in practice regarding taxation. There are 1,400
mobile/manufacture homes in Fort Collins and 2,100 in the Growth Management Area (GMA).
Tax treatment (sales tax and property tax) varies for mobile/manufactured homes and site-built
homes. A summary is provided below:
• The State and the County exempt mobile/manufactured homes from all sales tax (new
and used)
• The City applies sales tax to the full purchase price on all mobile/manufactured home
sales (new and used)
• Site-built homes pay sales tax on the materials used in new construction; there is no sales
tax on subsequent sales
• All types of dwelling units pay property tax based on the assessed value
Peer City Review
In a review of eleven self-collected home rule cities, each one includes mobile homes in their
definition of automotive vehicle, which suggests mobile homes be treated as automotive vehicles
for tax purposes. This definition of automotive vehicle is a product of the Colorado Municipal
League’s (CML) organized effort engaging municipalities to adopt standard sales tax definitions,
which the City participated in. However, in other cities’ codes, there are various terms and
definitions for these types of structures, such as manufactured home, factory-built housing, or
factory built residential structures.
Five cities, including Fort Collins, do not have exemptions on mobile/manufactured homes.
Those with exemptions:
• Either exempt after having been taxed once or;
• 48% exempt for first sale and subsequent sales are exempt
Proposed Exemption Options:
1. Exempt all mobile/manufactured home sales from sales tax
2. Apply sales tax on initial purchase of new mobile/manufactured home and exempt all
subsequent sales (100% or a percentage)
Staff recommends Option 2 with a 50% exemption on the initial new purchase. The intention is
for mobile/manufactured and site-built homes to be taxed similarly. Site-built homes require a
50% deposit of total estimated construction valuation. When the project is complete, the
remaining tax liability is calculated using a project cost report available from the City.
Both options would require Code updates. The definition of “automotive vehicle” would likely
need to be amended to exclude mobile homes, so that a new definition of mobile homes and/or
manufactured housing could be created so that these structures can be treated uniquely in the
sales tax ordinances. Amending the “automotive vehicle” definition would stray from CML
standard definitions, which is within Council’s authority and discretion. The Code could be
updated to include a definition for mobile or manufactured homes. The City currently treats
mobile and manufactured homes the same in practice regarding taxation.
Using the term “mobile home” and defining it separately would likely be the least Code changes
to address the issue of sales tax on mobile/manufactured housing. Another approach would be to
add a definition for the new term “manufactured home.” Doing so may necessitate updating for
consistency other parts of Municipal, Land Use and Traffic Codes, which also use the terms
“mobile home” and “manufactured housing.” This process would include additional legal review
and coordination with other City departments. Regardless of the term used, any amendment
would include the addition of an exemption from sales tax for mobile homes/manufactured
homes.
Below is draft Code language for consideration, using the first approach discussed above.
Depending on Council direction, this Code language would be subject to change:
34TSec. 25-71. Definitions.16T34T
34T. . .16T 34T
34TAutomotive vehicle shall mean any vehicle or device in, upon or by which any person or property is or
may be transported or drawn upon a public highway, or any device used or designed for aviation or
flight in the air. Automotive vehicle includes, but is not limited to, motor vehicles, trailers, or semi-
trailersS or mobile homesS. Automotive vehicle shall not include devices moved by human power or used
exclusively upon stationary rails or tracks.16T34T
34TMobile home means any preconstructed building unit or combination of preconstructed building units,
without motive power, where such unit or units are manufactured in a factory or a location other than
the residential site of the completed home, which is designed and commonly used for occupancy by
persons for residential purposes, in either temporary or permanent locations, and which unit or units
are not licensed as a vehicle. It does not include travel trailers, campers, camper buses or motor
homes.16T34T
34T. . .16T 34T
34TUNew Exemption from Sales/Use Tax in Sales Tax CodeU16T34T
34TSec. 25-73. Imposition of the sales tax and exemptions.16T34T
34T. . .16T 34T
34T(c)Transactions and items exempt from the sales tax. The following shall be exempt from the sales tax:16T34T
34T. . .16T 34T
34T(25) 34TFifty percent (50%) of the purchase price on the first sale of a new mobile home for
installation, use or storage in the City shall be exempt from taxation under this Code. For any
subsequent sales of the mobile home, the entire purchase price is exempt from taxation under this
Code.
ATTACHMENTS (numbered Attachment 1, 2, 3,…)
1. CFC Sales Tax on Mobile Homes PPT
Agenda
• Mobile Home Sales Tax Exemption Overview
• Proposed Options
• Council Finance Committee Direction
1
Mobile Home Sales Tax Exemption
Overview
2
*According to data from the Larimer County Assessor’s Office
The City does not exempt sales tax on mobile/manufactured homes sales
• 181 mobile home sales in Fort Collins in 2017 & 2018*
• Sales tax estimate over the two-year period of $176k or roughly $88k per year*
• 1,400 mobile/manufactured homes & 2,100 in the GMA
• City Code does not differentiate between mobile and manufactured homes (per Safety
Standards Act of 1974) but are considered the same in practice regarding taxation
State and state collected jurisdictions (Larimer County) exempt all mobile/manufactured
homes sales from sales tax
• House Bill 18-1315
• Effective July 1, 2019
Mobile/Manufacture Homes
and Site-Built Homes
3
Tax treatment (sales tax and property tax) varies for mobile/manufactured homes and a site-built homes
• The State and the County exempt mobile/manufactured homes from all sales tax (new and used)
• The City applies sales tax to the full purchase price on all mobile/manufactured home sale (new and used)
• Site-built homes pay sales tax on the materials used in new construction; there is no sales tax on subsequent sales
• All types of dwelling units pay property tax based on the assessed value
Sale Type State Sales Tax County Sales Tax City Sales Tax Property Tax
New manufactured home
purchase Exempt Exempt
100% of purchase
price
Per assessed
value
New site-built home
100% of construction
material
100% of construction
material
100% of construction
material
Per assessed
value
Subsequent sales of
mobile/manufactured homes Exempt Exempt
100% of purchase
price
Per assessed
value
Subsequent site-built home
sales No No No
Per assessed
value
Peer Cities
Tax on Mobile Homes
• All peer cities reviewed include
mobile homes in their definition of
automotive vehicle
• Various terms and definitions for
mobile/manufactured home
exemptions
• Those with exemptions:
• Either exempt after having
been taxed once or;
• 48% exempt for first sale and
subsequent sales are exempt
4
CITY Exemption Comments
Arvada No Tax applied on new and used sales
Denver No Tax applied on new and used sales
Fort Collins No Tax applied on new and used sales
Littleton No Tax applied on new and used sales
Westminster No Tax applied on new and used sales
Aurora Yes
48% exempt for first sale, subsequent sales are
exempt if state tax was paid on sale of new housing
Boulder Yes Exempt after having been taxed once
Brighton Yes
48% exempt for first sale, subsequent sales are
exempt
Colorado Springs Yes Exempt after having been taxed once
Lakewood Yes
48% exempt for first sale, subsequent sales are
exempt
Parker Yes
48% exempt for first sale, subsequent sales are
exempt
Thornton Yes
48% exempt for first sale, subsequent sales are
exempt
Proposed Exemption Options
1. Exempt all mobile/manufactured home sales from sales tax
2. Apply sales tax on initial purchase of new mobile/manufactured home
and exempt all subsequent sales
(100% or a percentage)
5
Staff Recommendation
Option 2
Apply sales tax on initial purchase of new mobile/manufactured
home and exempt all subsequent sales
(50% exempt on initial sale)
• Intention for mobile/manufactured & site-built homes to be
taxed similarly
• Site-built homes require 50% deposit of total estimated
construction valuation*
6
*When the project is complete, the remaining tax liability is calculated using a project cost report
Proposed Code Updates
Both options would require Code updates:
• Update “automotive vehicle” definition to exclude mobile homes
• Add a definition of mobile homes/manufactured homes
• Mobile and manufactured homes are currently considered the same in practice regarding taxation
• Definition of manufactured home may need updating in other parts of Municipal, Land Use & Traffic Codes
• Adding & updating manufactured home definition would require legal review with other City departments
• Add an exemption for sales tax on used mobile homes or manufactured homes
7
Updating ‘automotive vehicle’ definition would stray from CML uniform definitions, which is within Council’s authority and discretion
Direction Sought
8
Does Council Finance Committee support option 2?
• Apply sales tax on initial purchase of new mobile/manufactured home
and exempt all subsequent sales
• 50% exempt on initial sale
• Update City Code
COUNCIL FINANCE COMMITTEE
AGENDA ITEM SUMMARY
Staff: Lance Smith, Director Financial Planning and Analysis
Tim McCollough, Deputy Director
Kraig Bader, Director, Electrical Engineering
John Phelan, Energy Services Senior Manager
Date: 16 December 2019
SUBJECT FOR DISCUSSION
2020 Climate Action Plan Mitigation and Resilience Off-Cycle Appropriation for Light & Power
EXECUTIVE SUMMARY
Staff recommends bringing forward an off-cycle appropriation package to City Council in early
2020 to address existing and emerging infrastructure demands and refocused investments in
energy services programs.
This package supports resilience by improving electric system reliability and grid flexibility with
additional Distributed Energy Resource (DER) program elements and also carbon mitigation
with additional support for commercial-scale solar. The Energy Services elements are a
realignment of existing budget while the L&P distribution system elements can be funded from
reserves based on 2019 underspend. The proposed package focuses on “no regrets” acceleration
of planned activities of the L&P Capital Improvement Plan and 2030 climate and energy
objectives.
The reliability scope also supports broadband services (3.7 Deploy reliable, high-speed internet)
because the work is aligned with Connexion deployment as it creates new markets via
annexations or pathways via spare conduits to deploy fiber in the electric system. Accelerating
this investment is aligned with the recently published 2019 Capital Improvement Plan for Light
& Power and the Connexion deployment schedule.
GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED
• Does Council Finance support this off-cycle budget package for Council consideration in
January 2020?
BACKGROUND/DISCUSSION
36TCoordinated Planning and Implementation
36TThe electric industry is facing rapid change. Market disruption is happening at a pace we have
not experienced before. Solar photovoltaics (PV) are commonplace and growing at increasing
rates each year, battery storage is no longer a thought experiment, and the fastest production car
on earth is fully electric and has the capability to drive itself. We can no longer plan in the
traditional way we have done for decades, because our former load growth models no longer
hold true.
36TFort Collins Utilities Light & Power and Energy Services teams are collaborating closer than
ever before on planning, implementation and operations in support of the community’s goals of
100% renewable electricity (100RE) in just ten years while maintaining our historic reliability
and affordability.
16TThis off-cycle budget proposal is a concrete example of this coordination. By bringing forward
both customer program and distribution system investment funding proposals together, Utilities
is presenting an optimal short-term mix of investment which supports electric system resilience
and carbon mitigation. 16TThe proposed package focuses on “no regrets” acceleration of planned
activities of the L&P Capital Improvement Plan and 2030 climate and energy objectives as
described below.
16T
Light & Power Proposed 2020 Scope
During the Budgeting for Outcomes process for the FY2019/20 budget, there were revisions
made in the City Manager’s recommended budget to enable the Climate Action Plan (CAP)
opportunity package. One area of budget reduction was in the distribution transformer BFO
offer (offer 8.70) in the amount of $318,000. As a result, the ability to purchase transformers
necessary to support system improvements was inhibited by the end of the second quarter of
2019. As part of this appropriation, the request is to first restore the funding to support
distribution transformer purchases in 2020, which will also help to support system replacement
projects and proactive outage mitigation activities. Capital projects in the following categories
will also directly benefit from the appropriation of funds from the parent accounts.
• UHigh priority electric distribution cable system replacement areas to aimed at improving
distribution system reliability: UAs the electric distribution system ages, cable and cable
accessory failure rates have been increasing. Specific areas have been identified for
replacement based on probability of future failures, risk, and several other factors. Some
of the identified replacement areas that do not have a spare conduit for fiber optic cables
offer a synergistic benefit between Light & Power and Connexion if fiber is pulled in
with the replacement power cables.
• UCable diagnostic testing equipment purchase:U Thus far, our cable system prioritization
efforts have been making use of statistical analysis drawn from past reliability and failure
information. With the support from this off-cycle appropriation, we can purchase a cable
diagnostic system that has the proven ability to assess the health of an existing circuit.
Installed in a proper vehicle that allows access and effective application of the equipment,
we can focus our cable system replacement investment based on forward-looking leading
predictive maintenance indicators to supplement our statistical predictive failure models.
• UElectric distribution system connection for annexation areas:U Connecting the electric
distribution system to annexed areas also provides an opportunity for Connexion to serve
those customers via cooperative installation of conduit pathways that must be installed
for electric service. These areas include Mail Creek Crossing, Strauss Cabin, Fox Hills,
and Blehm Annexations.
• UConversion of overhead electric distribution system areas to underground:U Consistent
with Fort Collins’ legacy and with the City Council’s current priority to convert overhead
electric lines to underground electric lines, there are nine projects that will replace the
remaining overhead distribution lines in Light & Power’s service territory with
underground infrastructure. Work to convert overhead electric distribution areas not only
improves electric reliability, but also allows cooperative installation of conduit pathways
for future Connexion customers.
Following the completion of capital projects in the 2019 Light & Power fund, underspend in the
associated capital accounts has been identified which can be returned to the electric fund and be
appropriated to support additional projects in 2020. Similarly, underspend in system additions
and operations and maintenance (O&M) accounts that would otherwise be returned to the
electric fund reserves can also be appropriated to support electric system reliability and
resiliency. The projects detailed above total $6.22 million, with currently budgeted and
appropriated funds providing for all but a gap of about $3.10 million.
Appropriating funds for the identified capital projects will allow for better definition of the offers
that will be put into the 2021 / 2022 BFO process. If funds returned to reserves are not
appropriated, we must prioritize the projects, putting the higher priority replacement projects
completed under funds already appropriated for 2020 and the remaining projects identified for
funding in the 2021/2022 BFO cycle. As the underspend in L&P and Energy Services accounts
represents enough to support all projects described here, this truly does represent a “no regrets”
opportunity to support system reliability and resilience.
Energy Services 2020 Funding Summary
During the Budgeting for Outcomes process for the FY2019/20 budget, there were revisions
made in the City Manager’s recommended budget to enable a scaled-down Climate Action Plan
(CAP) opportunity package. In this package, commercial solar rebates (Offer 9.92) was funded
at $125,000 annually (25% of the original offer amount). As part of this appropriation, the 2020
commercial solar funding would be 73% of the original offer amount.
The following summarizes the external factors which driving the opportunity for maximizing
benefit in 2020 with changes in Energy Services programs.
• UIncrease in energy efficiency funding from Platte River ($390k):U Platte River’s proposed
2020 budget for efficiency and demand side management is increasing to reflect their
commitment to reach higher levels of savings. Fort Collins Utilities will continue to
receive our load ratio share of these funds. The proposed budget will result in an increase
of approximately $390k for Fort Collins common efficiency programs. This increase in
Platte River 2020 funding will “offset” an equivalent amount of funds from the approved
2020 budget (offers 9.80 and 9.90).
• ULarge-scale solar projects not moving forward ($240k):U Several incentives for large scale
commercial solar projects were committed in 2018 and carried over into 2019 via
purchase order. Customers have recently notified Utilities that these projects will not
move forward due to various issues. The total incentive amount is $240k. At the same
time, staff has committed all of the 2019 funding and is tracking pending applications
which will exceed current 2020 funding.
• USolar Power Purchase Program (SP3) ($150k):U 2019 funding for the SP3 included a mid-
year anticipated start date of a new large system. Due to solar module federal tariffs and
related delivery issues, the system was commissioned in mid-November. As a result,
approximately $150k of scheduled expenditures will not occur in 2019.
• UOverall efficiency programs ($1.5M):U 2019 efficiency programs are on track for
achieving savings targets but are currently forecast to meet the annual goals with a
financial balance of approximately $1.5M. This is primarily due to lower participation in
business efficiency and shifts in 2019 funding under Efficiency Works with Platte River.
Energy Services 2020 Proposed Scope
Priorities for Energy Services with regards to 2020 are to leverage customer interest in
distributed solar to meet the 2020 Energy Policy local renewable energy target and to lay the
groundwork for 2030 energy and climate goals with customer offers related to grid flexibility
and beneficial electrification.
The following projects are proposed for implementation in 2020.
• Appropriation of commercial solar 2019 funds for 2020 commercial solar projects,
$240k. This would bring the 2020 commercial solar incentive budget up to $365k. The
2019 commercial solar incentives budget ($125k) is fully committed to customer
projects. Staff has project intent affidavits from multiple customers for 2020 for a total of
$180k of incentives and active inquiries from an additional eight customers which could
total over $360k in incentives.
These solar projects will add approximately one megawatt of solar capacity, directly
reduce carbon emissions by up to approximately 800 metric tons starting in 2021 and
support reaching the Energy Policy 2020 renewable energy target of 20 megawatts of
local solar.
• Realignment of 2020 activities under existing Offers 9.80 and 9.90. Approved offers 9.80
and 9.90 include incentives which will receive additional support from Platte River in
2020. The new funding from Platte River allows for the realignment of 2020 resources
without changing Utilities funding levels. Staff proposes the following for 2020 and that
any ongoing costs associated with these projects will be incorporated into existing
funding levels for 2021/2022:
o Addition of Ecobee thermostats to the Bring Your Own Thermostat (BYOT) offer
under the Peak Partners program. This will add the third most popular installed
thermostat brand to the BYOT program (complementing Nest and Honeywell).
150 units would be added with a first-year cost of $65,000 through the existing
vendor Itron. Ongoing costs will be incorporated into the 2021/2022 demand
energy resources management offer.
o Demonstration of Grid Interactive Water Heaters (GIWH). Up to 20 GIWH would
be installed in low income customer premises at no cost to the customer. The
units will prioritize heat pump water heater technology wherever possible but may
include some resistance units based on customer premises. This project will test
options for transitioning 3G cellular communications, streamline the business
processes needed for the field deployment of future units, provide a storage
platform for storing excess renewable electricity and demonstration of optimal
control strategies. This project will be delivered in partnership with Itron for a
cost of $130k.
o Residential Battery Storage Demonstration. This project will engage existing
battery customers with incentives for allowing utility monitoring and potentially
control of behind the meter battery asset, install several residential behind the
meter batteries for management by utilities and pilot an incentive for combining
batteries with solar. This project will be delivered by existing Energy Services
staff with a budget in 2020 of $100k.
o Development of Carbon-Based Incentive Structure. This project will provide
funding for a collaborative effort with Sacramento Municipal Utilities District
(SMUD) to customize a framework for carbon based incentives for efficiency,
distributed generation and electrification. This framework will support the
transition of incentives for reducing loads, increasing loads and shaping loads to a
common carbon metric. A preliminary cost estimate for this project is $25k.
o Expansion and coordination of Beneficial Electrification Incentives. This project
will provide initial funding to expand and coordinate beneficial electrification
incentives, specifically targeting customer and trade ally requirements to advance
installation of heat pumps for space and water heating to reduce both natural gas
and electric resistance use. This project will be delivered by existing Energy
Services staff with a budget in 2020 of $70k.
Realignment of approved 2020 Energy Services funds and appropriation of commercial solar
funds allows for improved definition of offers for the 2021 / 2022 BFO process. Without this
realignment, it is likely that existing efficiency funds will not be fully utilized in 2020 and that
priority changes towards grid flexibility and beneficial electrification requests will be considered
for starting in 2021.
Off-cycle Budget Package
The proposed funding described above will result in the following specific actions to be included
in the Council ordinance (see attachment 1):
• Increase in System Improvements and Replacements (parent account 501012) by
$1,921,249.
• Increase in Annexations (parent account 501004) by $268,585.
• Increase in System Conversions (parent account 501601) by $909,925.
• Net reduction in Energy Services efficiency funding (business unit 13000000) by
$295,000. This will be offset by increased funding from Platte River
• Increase in Community Renewables funding for commercial solar incentives and for
battery storage demonstration (business unit 11110000) by $340,000. This will be funded
from expiring purchase orders for past solar projects and from associated reductions in
Energy Services.
• Increase in Demand Response funding for thermostats and grid interactive water heaters
(business unit 135000000) by $195,000. This will be funded from associated reductions
in Energy Services.
ATTACHMENTS
1) Funding Summary
2) GIS map with Details of L&P projects can be viewed at this link: 32TUhttps://arcg.is/SS9maU32T
Budget 2019 2020 Total
Offer 8.7 ‐ Distribution Transformers (Original recommended budget) FY1920 $ 800,000 $ 827,500 $ 1,627,500
Offer 8.7 ‐ Distribution Transformers (Reduced funding, CAP opportunity) FY1920 $ 577,000 $ 732,500 $ 1,309,500
Total to replace L&P funding that was reduced in CAP opportunity package $ 318,000
501012 System Improvements & Replacements Year Budget Project Cost Funding Gap
5010120000 Distribution System Improvements Capital Parent Account Balance 2019 $ 507,191
5010122781 2019 Cable Rpl Non‐Work Ord 2019 $ 141,500
5010120000 Funding from Offer 8.9 ‐ System Cable Replacement 2020 $ 500,000
FY1920 Offer 8.7 ‐ Distribution Transformer Replacements (supplemental) 2020 $ 318,000
501012F022 Distribution Transformer Purchases for Off‐Cycle Projects 2020 $ 1,002,000
Circuit 732 Feeder Cable Replacement (Identified by 4 Dec diagnostic test) 2020 $ 247,940
Cable System Diagnostic Test Equipment with Vehicle 2020 $ 142,000
501012C003 CAPITAL ‐ Replacement Area 3 ‐ Skyway South 2020 $ 213,000
501012C004 CAPITAL ‐ Replacement Area 4 ‐ Stonehenge PUD 2020 $ 297,000
501012C005 CAPITAL ‐ Replacement Area 5 ‐ Cottonwood 2020 $ 331,000
501012C006 CAPITAL ‐ Replacement Area 6 ‐ Kreger Plaza 2020 $ 124,000
501012C007 CAPITAL ‐ Replacement Area 7 ‐ Village East 2020 $ 242,000
501012C008 CAPITAL ‐ Replacement Area 8 ‐ Brown Farm 3rd 2020 $ 153,000
Subtotal $ 1,148,691 $ 3,069,940 $ 1,921,249
501004 Annexations
5010040000 Annexations Capital Parent Account Balance 2019 $ 993,415
501004C001 Mail Creek Crossing 2nd Filing 2020 $ 392,000
501004C002 Strauss Cabin Enclave 2020 $ 173,000
501004C003 Fox Hills Annexation 2020 $ 127,000
501004C004 Blehm_(REA) Annexation 2020 $ 514,000
501004C004 Blehm_(Xcel) Annexation 2020 $ 56,000
Subtotal $ 993,415 $ 1,262,000 $ 268,585
501601 System Conversions
5016010000 System Conversions Capital Parent Account Balance 2019 $ 974,075
501601O001 Taft and Drake Overhead Conversion (Milfred) 2020 $ 336,000
501601O002 Taft and Drake Overhead Conversion (Craws) 2020 $ 228,000
501601O003 Taft and Drake Overhead Conversion (Tefft) 2020 $ 480,000
501601O004 Taft and Drake Overhead Conversion (Drake) 2020 $ 24,000
501601O005 College and Trilby Overhead Conversion 2020 $ 732,000
501601O006 Overland Trail and Mulberry Overhead Conversion 2020 $ 36,000
501601O007 North College and Willox Overhead Conversion 2020 $ 24,000
501601O008 West Vine and Shields Overhead Conversion 2020 $ 24,000
Subtotal $ 974,075 $ 1,884,000 $ 909,925
Energy Services
2020 Commercial Solar Rebate Appropriation of 2019 Funds 2020 $ 240,000
Bring Your Own Thermostat Expansion 2020 $ 65,000
Grid Interactive Water Heater pilot 2020 $ 130,000
Residential Battery Demonstration 2020 $ 100,000
Carbon Based Incentive Development 2020 $ 25,000
Beneficial Electrification Incentive Development 2020 $ 70,000
SubTotal $ ‐ $ 630,000 $ 630,000
Grand Total for Off‐Cycle Appropriation $ 3,116,181 $ 6,845,940 $ 3,729,759
Funding Sources (amounts will +return to 501 Fund Balance at the end of 2019) Year Budget
5010052724 Dixon Creek Substation Circuit 828 + 2019 $ 105,018
5010052743 2019 Circuit 724 ‐ Linden to Willox + 2019 $ 619,529
5010082755 Hewlitt Packard Campus Ductbank + 2019 $ 217,873
5010052785 2019 CKT 234B‐Woodward Governor + 2019 $ 299,456
12300000 Light & Power Operations 2019 Underspend + 2019 $ 708,000
(15100000 ‐ 19730000) System Addition/Replacement Underspend + 2019 $ 456,000
2019 Commercial Solar Projects Cancelled + 2019 $ 240,000
2019 Projected Underspend in Energy Services Operations + 2019 $ 1,506,000
Total Underspend Returning to Fund $ 4,151,875
Net Funding Impact $ (422,116)
1
2020 CAP Mitigation and Resilience Off Cycle Appropriation
Kraig Bader & John Phelan
Council Finance Committee – December 16, 2019
CAP Mitigation & Resiliency Package
• Restores funds removed from 2019/20 BFO for CAP
opportunity package
• Addresses existing & emerging infrastructure needs
through data informed investments
• Supports resiliency through grid flexibility programs
with DERs
• Supports Connexion by opening new conduit pathways
and new markets.
• Completes funding for undergrounding efforts
• Neutral fund impact by redeploying 2019 underspend
2
Strategic Alignment
• Economic Health
• 3.5 Maintain utility systems, services, infrastructure
• 3.6 Invest in utility infrastructure
• 3.7 Deploy reliable, high-speed internet services
• Environmental Health
• 4.1 Achieve CAP 2020 goals and continue progress towards 2030
• 4.3 Achieve 2020 Energy Policy goals and work towards carbon neutrality
• 4.5 Develop strategies to improve climate resilience
• Council Priority
• Undergrounding of electric infrastructure (transmission and distribution)
3
Question for Council
• Does Council Finance support this off-cycle budget package for
Council consideration in January 2020?
4
Proposed Projects – Energy Services
5
• Commercial solar incentives
• 2020 funding - $125k
• Off-cycle supplemental funding - $240k
• Grid flexibility – Redeploy $390k
• Bring your own thermostat expansion, $65k
• Grid interactive water heater demonstration, $130k
• Residential battery demonstration, $100k
• Carbon-based incentives framework development, $25k
• Beneficial electrification incentive development, $70k
• Net neutral funding, offset by increased funding from Platte River in
2020
Proposed Projects – Energy Services
6
• Commercial solar incentives
• Expect 8 to 12 projects, one megawatt capacity,
800 metric tons CO2
• Bring your own thermostat expansion
• Add Ecobee thermostats to Peak Partners
program
• Grid interactive water heater demonstration
• Up to 20 GIWH installed in LMI households to
reduce costs, demonstrate interactive storage and
deployment processes
Proposed Projects – Energy Services
7
• Residential battery demonstration
• Engage existing battery customers, test residential scale
batteries with solar
• Carbon-based incentives framework
• Common carbon framework for efficiency, solar and
electrification
• Beneficial electrification incentives
• Trade ally and customer requirements for heat pump
transition
Proposed Projects – Light & Power
8
Project Project
Costs
2020
Funding
Supplemental
Funding
System Improvements &
Replacements
• Cable replacements
• Diagnostic equipment
• Transformer replacements
$3.07M $1.15M $1.92M
Annexations
• Extends electric to annexed areas
$1.26M $0.99M $0.27M
System Conversions
• Completes undergrounding funding
$1.88M $0.97M $0.91M
Total $6.22M $3.12M $3.10M
System Improvements & Replacements
Cable System Replacement – Data Driven Investment
9
Outage Heat Map
Areas prioritized based
on failures within
boundaries and high-risk
cables
Top 10 Worst
Performing Vintages
Replacement Area
Boundaries Developed
Refine and Focus Replacement
Efforts with Cable Diagnostic Testing
Annexations & Overhead Conversions
• Annexations
• Fox Hills
• Mail Creek Crossing 2nd
• Blehm
• Strauss Cabin
• Overhead Conversions (0.3%)
• College & Trilby
• Drake & Taft
10
Light & Power Reserves
• Budget forecast of L&P reserves at end of 2019
• $5.5M
• Actual anticipated L&P reserves at end of 2019
• $10.5M
• Total off-cycle funding request from reserves
• $3.73M
11
Question for Council
• Does Council Finance support this off-cycle budget package for
Council consideration in January 2020?
12
Questions
Kraig Bader
Director Electric Engineering
kbader@fcgov.com
John Phelan
Energy Services Senior Manager
jphelan@fcgov.com
13