Loading...
HomeMy WebLinkAboutReport - Mail Packet - 11/19/2019 - City Manager Monthly Update - November 2019. Poudre River Whitewater Park Grand Opening - October 12, 2019 November 2019 NOVEMBER 14, 2019 Table of Contents ISSUES BEFORE COUNCIL ................................................................................................................. 4 NOVEMBER 19 COUNCIL MEETING ........................................................................................................................4 NOVEMBER 19 ELECTRIC UTILITY ENTERPRISE .......................................................................................................4 NOVEMBER 26 ADJOURNED MEETING ..................................................................................................................4 NOVEMBER 26 WORK SESSION ..............................................................................................................................4 DECEMBER 3 COUNCIL MEETING ...........................................................................................................................5 DECEMBER 3 ELECTRIC UTILITY ENTERPRISE MEETING .........................................................................................5 DECEMBER 4 URBAN RENEWAL AUTHORITY BOARD MEETING.............................................................................5 DECEMBER 10 WORK SESSION ...............................................................................................................................5 PUBLIC ENGAGEMENT – UPCOMING EVENTS ........................................................................................................6 SALES TAX - MONTHLY & YEAR TO DATE ....................................................................................... 7 CP- ENGINEERING .............................................................................................................................. 7 CITYWIDE PEDESTRIAN ACCESS PROJECT ...............................................................................................................7 TRANSFORT BUS PAD UPGRADE PROJECT..............................................................................................................8 SUNIGA ROAD IMPROVEMENTS – COLLEGE AVE. TO BLONDEL STREET ................................................................9 NORTH COLLEGE IMPROVEMENTS – CANAL TO STATE HIGHWAY 1 .....................................................................9 VINE AND LEMAY BNSF IMPROVEMENTS ........................................................................................................... 10 SHARP POINT/NANCY GRAY CONNECTION ......................................................................................................... 10 POWER TRAIL AND HARMONY ROAD GRADE SEPARATED CROSSING ................................................................ 11 TIMBERLINE ROAD CORRIDOR PROJECT ............................................................................................................. 11 JEFFERSON STREET IMPROVEMENTS PROJECT ................................................................................................... 12 LINDEN STREET RENOVATION PROJECT .............................................................................................................. 12 WILLOW STREET IMPROVEMENTS ...................................................................................................................... 13 TIMBERLINE WIDENING AT GREAT WESTERN CROSSING ................................................................................... 14 NORTH MASON DESIGN – ALPINE TO HICKORY .................................................................................................. 15 LAPORTE AVENUE ROADWAY AND BRIDGE IMPROVEMENTS ............................................................................ 15 CP - PARK PLANNING & DEVELOPMENT ....................................................................................... 15 BUCKING HORSE PARK/EAST COMMUNITY PARK MAINTENANCE FACILITY ....................................................... 15 CITY PARK REFRESH ............................................................................................................................................. 17 CYCLO-CROSS SKILLS TRAINING COURSE PILOT PROGRAM AT ROSSBOROUGH PARK ...................................... 17 EASTSIDE PARK IMPROVEMENTS ........................................................................................................................ 18 POUDRE RIVER WHITEWATER PARK .................................................................................................................... 19 POUDRE TRAIL AT LANCER DRIVE ........................................................................................................................ 19 CP - OPERATION SERVICES ............................................................................................................ 20 GARDENS ON SPRING CREEK – VISITOR’S EXPANSION ........................................................................................ 20 FORT COLLINS/LOVELAND POLICE TRAINING CENTER ........................................................................................ 21 CP - UTILITIES.................................................................................................................................... 21 WATER TREATMENT FACILITY ............................................................................................................................. 21 LIGHT & POWER GENESIS64 SCADA UPGRADE PROJECT .................................................................................... 22 NEW FEEDER CAPACITY (E. DRAKE & LEMAY) ..................................................................................................... 22 GIS/GWD & ADMS ............................................................................................................................................... 23 SYSTEM CABLE REPLACEMENT PRIORITY 1-WOODWEST.................................................................................... 24 SYSTEM CABLE REPLACEMENT PRIORITY 2-FOX MEADOWS............................................................................... 24 DWRF DIGESTER 612 LID REPLACEMENT ............................................................................................................ 24 MAIL CREEK IMPROVEMENTS AT MEADOW PASSWAY ...................................................................................... 25 HICKORY STREET WATERLINE RAILROAD BORE .................................................................................................. 25 PUBLIC SAFETY ................................................................................................................................ 26 POUDRE FIRE AUTHORITY ................................................................................................................................... 26 POLICE SERVICES .................................................................................................................................................. 27 PLANNING, DEVELOPMENT &TRANSPORTATION ......................................................................... 29 BUILDING, PLANNING AND DEVELOPMENT REVIEW .......................................................................................... 29 FC Moves ............................................................................................................................................................. 31 NEIGHBORHOOD SERVICES ................................................................................................................................. 31 YEAR TO DATE COMPARISON .............................................................................................................................. 31 GRAFFITI UPDATE ............................................................................................................................ 32 SUSTAINABILITY SERVICES ............................................................................................................ 32 ENVIRONMENTAL SERVICES ................................................................................................................................ 32 SOCIAL SUSTAINABILITY ...................................................................................................................................... 33 ECONOMIC HEALTH ............................................................................................................................................. 33 UTILITIES ............................................................................................................................................ 33 CUSTOMER CONNECTIONS .................................................................................................................................. 33 COMMUNITY SERVICES .................................................................................................................... 35 RECREATION ........................................................................................................................................................ 35 PARKS ................................................................................................................................................................... 35 CULTURAL SERVICES ............................................................................................................................................ 35 NATURAL AREAS .................................................................................................................................................. 36 PUBLIC ENGAGEMENT ..................................................................................................................... 37 BROADBAND – FORT COLLINS CONNEXION ................................................................................. 38 COMMUNITY DASHBOARD HIGHLIGHT .......................................................................................... 39 CITY MANAGER’S UPDATE 4 ISSUES BEFORE COUNCIL NOVEMBER 19 COUNCIL MEETING  Possible Executive Session o Discuss compensation for City Manager, City Attorney and Chief Judge  Staff Report: Community Dashboard Metric: Transfort Fixed Route Passengers per Revenue Hour o Share with Council and the community current status and factors influencing a Community Dashboard metric over which the City organization has a high level of influence. High Performing Government – 7.6 Leverage data, technology, metrics and benchmarks to guide decisions, to improve results, and enhance service delivery.  Staff Report: Update on Halligan Water Supply Project - Release of Draft Environmental Impact Statement o Update Council on the Halligan Water Supply Project. The Project has been in the federal permitting process since 2006 and is approaching a significant project milestone. The draft Environmental Impact Statement will be released for public review and comment in November. Environmental Health 4.3 Provide a reliable, high-quality water supply. NOVEMBER 19 ELECTRIC UTILITY ENTERPRISE  Updated Clause to Loan Agreement with U.S. Bank National Association to Provide Funding for the Epic Loan Program o Consideration of an ordinance that authorizes the Enterprise to borrow up to $2.5 million under a line of credit as additional funding for the On-Bill Utility Financing Program. Environmental Health 4.3 Achieve 2020 Energy Policy goals and work towards Climate Action goals for carbon neutrality. NOVEMBER 26 ADJOURNED MEETING  Possible Executive Session o Discussion of legal issues related to open meetings. NOVEMBER 26 WORK SESSION  Downtown Stormwater Project o Provide Council with an introduction to the Downtown Stormwater Project including the Magnolia Street Outfall. Safe Community - 5.5 Address water, wastewater and stormwater infrastructure needs for the protection of people, property and the environment.  Climate Economy Update o Share findings regarding the Climate Economy, an update on recent activities, and discuss integration of these findings into the City’s economic resilience strategy. Environmental Health -4.1 Achieve Climate Action Plan (CAP) 2020 goals and continue progress toward the 2030 goals Environmental Health - 4.3 Achieve 2020 Energy Policy goals and work toward Climate Action goals for carbon neutrality. Please note that this list is subject to frequent change. Please call the City Clerk’s Office for up-to-date information. 970-416-2774. CITY MANAGER’S UPDATE 5  Fort Collins Mobility and Transportation o Overview of the current state and future opportunities for transportation and mobility in Fort Collins and the surrounding region. Overviews of the major transportation plans will be discussed (Transportation Plan, Transit Master Plan, Pedestrian Plan, and the Bicycle Master Plan). Discussion of highest infrastructure and operational needs including options to expand the transit system and improvements to I-25. Seek direction on the Council priorities related to mobility and removing barriers to transit. Transportation - 6.2 Manage traffic congestion and improve high-priority intersections Transportation - 6.3 Improve transit availability and grow ridership Transportation - 6.4 Support, enhance and accelerate I-25 improvements to the multi- modal environmental impact statement Transportation - 6.5 Improve aging and/or missing transportation infrastructure that serves Fort Collins DECEMBER 3 COUNCIL MEETING  Salary Ordinances for City Manager, City Attorney and Chief Judge o Consideration of ordinances amending the compensation for the City Manager, City Attorney and Chief Judge. High Performing Government – 7.1 Provide world-class services that meet the needs of the community.  2020 Legislative Policy Agenda (consent) o Consider adoption of the 2020 Council Legislative Policy Agenda which will serve as a guiding document through the 2020 legislative session. High Performing Government – 7.9 Proactively influence policy and legislative development at all levels.  Staff Report: Lincoln Middle School Safe Routes to School o Share with Council on the multi-departmental work surrounding infrastructure and Safe Routes to School programming at Lincoln Middle School. Transportation - 6.1 Improve safety for all modes of travel. DECEMBER 3 ELECTRIC UTILITY ENTERPRISE MEETING  Updated Clause to Loan Agreement with U.S. Bank National Association to Provide Funding for the Epic Loan Program (Second Reading) o Consideration of an ordinance that authorizes the Enterprise to borrow up to $2.5 million under a line of credit as additional funding for the On-Bill Utility Financing Program. Environmental Health - 4.3 Achieve 2020 Energy Policy goals and work towards Climate Action goals for carbon neutrality. DECEMBER 4 URBAN RENEWAL AUTHORITY BOARD MEETING  2:00-4:00 p.m., Council Information Center, City Hall, 300 Laporte Ave., Building A o Agenda materials online https://www.renewfortcollins.com/meeting-agendas near the meeting date. DECEMBER 10 WORK SESSION  Reimagining Boards and Commissions o Discuss options related to restructuring existing boards and commissions to increase efficiency, create more meaningful ways to engage with the community, and increase opportunities for added diversity in board and commission membership. CITY MANAGER’S UPDATE 6 High Performing Government - 7.3 Broaden methods of community engagement with additional consideration to diverse backgrounds, languages and needs.  Destination Master Plan Update o Present an update on the Destination Master Plan. Economic Health - 3.1 Facilitate government and local partners to form an effective regional economic health group.  Mobile Home Park Redevelopment Moratorium o Review various regulatory options to prevent displacement and mitigate impacts of displacement of mobile home park residents consistent with principles and policies contained within City Plan and House Bill 1309 (Mobile Home Park Act). Staff will seek guidance in order to adopt an ordinance containing regulations that address the identified issues and concerns in a timely manner or prior to the expiration of the moratorium (August 30, 2020) upon the City’s acceptance of any application for development of any kind that, if granted, could result in the partial or total closing or reduction in capacity of any mobile home park. Neighborhood Livability and Social Health - 1.1 Improve access to quality housing that is affordable to a broad range of income levels. Neighborhood Livability and Social Health - 1.6 Protect and preserve the quality of life in neighborhoods. PUBLIC ENGAGEMENT – UPCOMING EVENTS  Xeriscape Incentive Program: November: Residential water customers will have one last opportunity to attend “Basics Training” to learn about the various ways they can receive a rebate for switching out a thirsty landscape with one that is water-wise. Training date is Nov. 16.  Our Climate Future Pop-Up Engagement: November – December: The pop-up events for Our Climate Future will continue in November and December. Upcoming locations include the Climate Action Plan Anniversary event on November 14 and The Lyric on November 21. The events consist of City staff asking community members two basic questions regarding sustainability. Community members are then given the opportunity to write down one of their answers in a chalkboard, and then have their picture taken for social media. They also receive a raffle ticket for a chance to win a tent. The tent is currently used during the events as a prop to get participants interested.  Strategic Plan Update: November The Communications and Public Involvement Department has started the public engagement process for the 2020 Strategic Plan update. The public engagement activities consist of presentations and information sharing with community partners as well as pop-up events at different partner locations. Upcoming presentations will take place at the Fort Collins Chamber of Commerce on November 15 and The Family Center on November 25.  Housing Our Future: Connecting Housing Affordability and Health: November 18 The first stakeholder event for the CDPHE Housing Affordability and Health Equity Grant will take place on November 18 at the Lincoln Center. Community members and community partners will participate in a panel of community members and local health and policy professions will discuss the local connections between housing and health and their impact in our community. Table discussions to share ideas, opportunities, and experiences will follow.  Children in Need November 16: Utilities will host a table at the event for affordability programs as well as the Discover Goodwill Mobile LEAP enrollment van will be in attendance to help folks sign up for LEAP. In the afternoon, the Mobile LEAP van will be at the Senior Center along with Utilities promoting LEAP enrollment as well as sharing Utilities affordability program information. Children in Need is a family resource fair hosted quarterly by Homeward Alliance. This event distributes CITY MANAGER’S UPDATE 7 supplies for families experiencing homelessness or are near homeless. Many agencies offer a variety of services.  Solinator Garden Ribbon Cutting November 15: Solaris Energy, and Namaste Solar have co- developed Fort Collins’ first one-megawatt solar array that incorporates five acres of flowering grasses and plants that support local pollinator populations. The project is part of the Utilities Solar Power Purchase Program (SP3) that purchases solar electricity on a 20-year contract for use by Fort Collins businesses and residents. SALES TAX - MONTHLY & YEAR TO DATE SEPTEMBER SUMMARY OVER PRIOR YEAR Month Year to Date Net Sales Tax Collected: 3.7% 2.3% Net Use Tax Collected: 30.5% 7.5% Net Sales and Use Tax Collected: 7.2% 3.0% Year to date, sales and use tax collections excluding rebates are up 3.0% and total $105.6M. SEPTEMBER SUMMARY OVER BUDGET Month Year to Date Net Sales Tax Collected: 2.0% 0.6% Net Use Tax Collected: 13.4% 5.4% Net Sales and Use Tax Collected: 3.6% 1.4% Year to date, the City has collected 1.4% more sales and use tax revenue, totaling $1.4M over budget. CP- ENGINEERING CITYWIDE PEDESTRIAN ACCESS PROJECT Funding Source: Community Capital Improvement Program (CCIP) Capital Project (CP) Updates are indicated in bold CITY MANAGER’S UPDATE 8 Estimated Project Budget: 2019 - $1.1M Estimated Completion Date: Ongoing Phase: Construction Project Details: This project maintains a complete City sidewalk inventory, identifies sidewalk inadequacies, and access needs under the Americans with Disabilities Act (ADA), and develops a prioritized work program to achieve goals of providing unobstructed access for transportation and recreation. Project Status:  Current project location: new sidewalk at Mulberry and Riverside.  Recently completed project: new sidewalk installed, replacing old inadequate sidewalk, at Remington Street near Olive Street (see before and after pictures above). More information is available at http://www.fcgov.com/engineering/pedneeds.php TRANSFORT BUS PAD UPGRADE PROJECT Funding Source: Federal Transit Administration (FTA) Estimated Project Budget: 2019 - $915K Estimated Completion Date: Spring/Summer 2021 Phase: Contract Award Project Details: Construction and upgrade of City-wide bus pads at Transfort stops to conform with Americans with Disabilities Act (ADA) requirements. A total of 66 bus pads have been identified under this contract for construction and/or upgrade. Project Status:  Project at Raintree near the Senior Center completed; currently working project at Harmony. CITY MANAGER’S UPDATE 9 SUNIGA ROAD IMPROVEMENTS – COLLEGE AVE. TO BLONDEL STREET Funding Source: 2017/2018 BFO, COFC Utilities, Transportation Capital Expansion Fee (TCEF), Developer Contributions Estimated Project Budget: $3.7M Estimated Completion Date: Spring 2020 Phase: Roadway Completed, Landscape Phase Project Details: Design and construction of a new arterial roadway that connects existing Suniga Road, from Blondel St. to College Avenue. Project Status:  Roadway is open to the public.  Landscape is expected to commence this fall and complete in Spring 2020. More information is available at https://www.fcgov.com/engineering/suniga-to-college-improvements NORTH COLLEGE IMPROVEMENTS – CANAL TO STATE HIGHWAY 1 Funding Source: Federal Grants, URA Contribution, Pedestrian Program Funds, County Funds, Transportation Capital Expansion Fee (TCEF), Developer Contributions Estimated Project Budget: $2.35M Completion Date: Summer 2019 Phase: Complete Project Details: This project will construct pedestrian improvements along North College between the Larimer & Weld Canal (City limits) and State Highway 1, including pedestrian bridges crossing the canal. Project Status:  The project is complete.  Pedestrian railings were installed in mid-October. CITY MANAGER’S UPDATE 10 More information is available at fcgov.com/engineering/ncollege.php VINE AND LEMAY BNSF IMPROVEMENTS Funding Source: Keep Fort Collins Great (KFCG), Transportation Capital Expansion Fee (TCEF), 2017 / 2018 BFO Estimated Project Budget: $22M ($12M currently allocated) Estimated Completion Date: 2021 (Pending funding) Phase: In Design Project Details: The existing Vine and Lemay intersection, which includes the Burlington Northern Santa Fe (BNSF) Railway crossing, is severely congested with limited options to expand through or turn lane capacity due to land use constraints. Project Status:  Staff is moving forward with right of way acquisition.  The contractor will be secured in the fall to begin construction next spring with the current $9M of funding.  Staff has submitted for railroad approval, and is beginning this process with BNSF and the Public Utilities Commission. More information is available at fcgov.com/engineering/vine-lemay SHARP POINT/NANCY GRAY CONNECTION Funding Source: Transportation Capital Expansion Fee (TCEF), 2015/2016 BFO, Developer Contributions Final Project Budget: $1.25M Final Completion Date: October 2019 Phase: Project Complete Project Details: The City Master Street Plan identifies Sharp Point Drive and Nancy Gray Avenue as connected across the Great Western Railroad tracks. This project will construct the roadway and pedestrian connection, and railroad crossing. Project Status:  The City has installed an additional speed bump west of the new connection on Nancy Gray, as well as supplementary signage at the Nancy Gray and Miles House intersection, both as requested by neighborhood residents from the outreach efforts of the City prior to construction. The City will continue to monitor vehicle speeds in the area.  The project is complete. More information is available at fcgov.com/engineering/sharppoint CITY MANAGER’S UPDATE 11 POWER TRAIL AND HARMONY ROAD GRADE SEPARATED CROSSING Funding Source: Federal Grant, Community Capital Improvement Program (CCIP - Bike / Pedestrian Grade Separated Crossings) Estimated Project Budget: $5M - $8M Estimated Completion Date: Pending funding Phase: Alternatives Analysis – Conceptual Design Project Details: The Power Trail provides connectivity between the Spring Creek Trail to the north and the Fossil Creek Trail to the south. The Trail currently has a gap approximately three-quarters of a mile long north and south of Harmony Road. The detour route requires users to cross Harmony Road at grade at McMurry. This project will design, acquire property interests, and construct a trail grade separated crossing at Harmony Road as well as the trail connections on either side. Project Status:  No project updates. More information is available at https://www.fcgov.com/engineering/powertrailcrossing TIMBERLINE ROAD CORRIDOR PROJECT Funding Source: Transportation Capital Expansion Fee (TCEF), Developer Contribution, Federal Grant Estimated Project Budget: $5M Estimated Completion Date: 2021 Phase: Request for Proposal (RFP) Project Details: This project will reconstruct South Timberline Road from Stetson Creek Drive to Trilby Road to the City’s four lane arterial roadway standards. Planned improvements include; intersection improvements at Kechter Road, Zephyr Road, and Trilby Road, multi-modal accommodations, raised medians, access control, landscaping improvements, and roadway improvements. This project serves to build upon the development improvements that have been completed along the corridor. This project will improve safety, reduce congestion, and provide improved accommodations for alternate travel modes. Project Status:  A Design Request for Proposals has been released, and the team expects to have a design consultant on board by December 2019. CITY MANAGER’S UPDATE 12 JEFFERSON STREET IMPROVEMENTS PROJECT Funding Source: Federal Congestion Mitigation and Air Quality (CMAQ) Funds, Building on Basics (BOB) 1.0 funds Estimated Project Budget: $1.4M Estimated Completion Date: Summer 2020 Phase: Construction Project Details: The goals of this project are to develop preliminary engineering design plans, to acquire rights-of-way and easements for planned improvements, and to construct short-term improvements along Jefferson Street between College Avenue and the Mountain/Lincoln Intersection. Project Status:  Staff has begun coordination with the Colorado Department of Transportation (CDOT) to design and construct short-term improvements along Jefferson Street which would enable pedestrian improvements at the Linden Street and Jefferson Street Intersection. LINDEN STREET RENOVATION PROJECT Funding Source: Community Capital Improvement Program (CCIP) Estimated Project Budget: $3.8M Estimated Completion Date: 2020 Phase: Conceptual Design Verification Project Details: The goals of this project are to renovate Linden Street between Walnut Street and Jefferson Street. Initial concepts include converting this section of Linden Street to a “convertible” street; one that can function primarily as a roadway but can also be closed to vehicles and converted to a pedestrian plaza during specialty events. CITY MANAGER’S UPDATE 13 Project Status:  Staff has developed several strategies to mitigate the loss of 30 on-street parking spaces associated with the preferred alternative. These include the addition of 36 on-street parking spaces within a two block radius of the project, wayfinding, fee adjustments to the Old Town Parking Structure during construction, and a planned marketing campaign focused on Old Town parking. WILLOW STREET IMPROVEMENTS Funding Source: Federal Grants, Community Capital Improvement Program (CCIP), Developer Contributions, DDA Funds Estimated Project Budget: $3.8M Estimated Completion Date: Fall 2019 Phase: Construction Project Details: This project will design roadway and urban design improvements along Willow Street between College Avenue and Linden Street; including a pedestrian plaza at the northern corner of Willow Street and Linden Street. Project Status: • During the month of October, crews continued to complete sidewalk and urban design improvements along Willow Street. • Landscaping has been installed. • The Willow Street Residencies completed their utility connections into the City infrastructure, marking the last milestone ahead of top mat paving. • Top mat paving and reopening of Willow Street was completed November 4, and the road was reopened that day. • Plaza construction has begun and will run through December 2019. CITY MANAGER’S UPDATE 14 • Plaza art installation is scheduled for Spring of 2020. • Staff continues to meet with, and coordinate with, residents and businesses on a daily basis. TIMBERLINE WIDENING AT GREAT WESTERN CROSSING Funding Source: Transportation Capital Expansion Fee (TCEF), Developer Contributions, Building on Basics (BOB) 1.0, Arterial Intersection Funding Estimated Project Budget: $0.6M – Phase Two Estimated Completion Date: December 2019 Phase: Construction Project Details: In 2016, Phase One intersection improvements were completed at Prospect and Timberline; along with Timberline widening and multi-modal improvements south of Prospect. Phase Two improvements will consist of widening the Great Western Railway crossing, completion of multi-modal connections at the crossing, a new railroad signal system, and completion of the “free-right” turn from eastbound Prospect to southbound Timberline. Project Status:  The Great Western Railroad signal installation is completed.  The City is contracting the road widening at the crossing to Mountain Constructors. The contractor is waiting for ROW permits from the GWRR to begin construction. Construction will begin in November and is anticipated to take 3-4 weeks to complete. Work will include new sidewalk, curb, and asphalt pavement to allow three thru lanes thru the railroad crossing.  Great Western has updated their schedule to reflect an October 2019 completion. The City will accommodate the updated schedule and finish the additional sidewalk and roadway widening by December 2019. CITY MANAGER’S UPDATE 15 NORTH MASON DESIGN – ALPINE TO HICKORY Funding Source: Transportation Capital Expansion Fee (TCEF), Storm Water Utility, Urban Renewal Authority (URA) funding Estimated Project Budget: $1.0M Estimated Completion Date: Fall 2020 Phase: Conceptual Design Project Details: A collaborative effort between City departments and the North College URA to find solutions to existing drainage issues along the west side of College Avenue, north of the Poudre River. The project was approved through the 2019/2020 Budgeting for Outcomes (BFO) process and will focus on roadway and storm sewer alignments for North Mason. Construction of the storm sewer backbone is expected to occur in 2021/2022. No funding has currently been identified for the roadway construction. Project Status:  No project updates. LAPORTE AVENUE ROADWAY AND BRIDGE IMPROVEMENTS Funding Source: CCIP, Pedestrian Program, Capital Bridge Program Estimated Project Budget: $3.2M Estimated Completion Date: Spring 2021 – Pending final funding for roadway Phase: Conceptual Design Project Details: This project will replace two bridges over the New Mercer Canal just east of Taft Hill Road along Laporte Avenue north of the cemetery. One bridge is structurally deficient while the other is functionally obsolete. This project is also design pedestrian, bicycle and other roadway improvements from Fishback to Sunset to provide a safer connection to amenities including Poudre High School and PSD offices. The project is currently only funded to provide 30% design for improvements along the entire corridor, however the final design and construction of both bridges is fully funded through the City’s Capital Bridge Program. The City intends to construct the bridges over next winter 2020/2021. Project Status:  The City has begun conceptual designs for pedestrian and bicycle improvements along the corridor.  City Staff held a public open house on October 7 to gather feedback from interested residents and stakeholders.  Staff plan to move the concept design forward this fall and have 30% project plans by first quarter of 2020. CP - PARK PLANNING & DEVELOPMENT BUCKING HORSE PARK/EAST COMMUNITY PARK MAINTENANCE FACILITY CITY MANAGER’S UPDATE 16 East Park District Maintenance Facility Funding Source: Parkland Funds Total Project Cost: Estimated $2.5 – $5 million Phase: Development Review Estimated Completion: Tentative – Fall 2021 Bucking Horse Park Funding Source: Parkland Funds Total Project Cost: $2.5 - $3 million Phase: Design Estimated Completion: Fall 2020 Project Details: Planning for East Park District Maintenance Facility and Bucking Horse Neighborhood Park is underway. East District Park Maintenance Facility will provide a maintenance hub for parks located on the east side of the city. Bucking Horse Park is a new neighborhood park planned in the Bucking Horse neighborhood. Project Status: • A neighborhood meeting is currently being organized in coordination with the Planning Department. • The meeting agenda will include kick-off/programming for Bucking Horse Park and rezoning of property recently acquired for the East District maintenance facility. • A date or location for the meeting has not yet been determined. CITY MANAGER’S UPDATE 17 CITY PARK REFRESH Funding Source: Building on Basics Total Project Cost: TBD Phase: Phase I project identified Estimated Completion: 2021 for Phase I project Project Details: Several concepts, master plans, and improvement ideas have been generated and shared with the community for feedback in 2016, 2018, and 2019 to address important refresh needs of City Park. Project Status: • Two master plans and three phase one project options were shared at the October 22 Council Work Session. • City staff is evaluating the feedback received to determine next steps. CYCLO-CROSS SKILLS TRAINING COURSE PILOT PROGRAM AT ROSSBOROUGH PARK Funding Source: Cyclo-cross community donations Phase: Pilot project in progress Estimated Completion: December 2019 CITY MANAGER’S UPDATE 18 Project Details: The city has been working with the cyclo-cross community for several years to evaluate several park sites for suitability to pilot a cyclo-cross skills training course. Rossborough Park was selected as the best fit due to existing physical features needed for the training course, available space for the use, and ability to mitigate potential conflicts with other park users. Staff from Park Planning, Parks, and Forestry have collaborated with the cyclo-cross community on the best course layout in order to protect park resources and other park uses while providing several skills features for cyclo-cross riders. Project Status: • The cyclo-cross pilot is in progress and will run from September 20 through December 10, 2019. • After one season of use, a thorough evaluation will be conducted. • The evaluation process will include another neighborhood meeting in early 2020. Feedback will then be used to inform decisions regarding the future of the course. EASTSIDE PARK IMPROVEMENTS Funding Source: First United Methodist Church Total Project Cost: Based on fundraising efforts Phase: Fundraising Estimated Completion: TBD Project Details: Through the generosity of First United Methodist Church, improvements to the current Eastside Park, located near the southwest corner of Riverside and Lemay, are being considered. Project Status: • Fundraising efforts by the First United Methodist Church are anticipated to continue through the end of this year. These funds will help create an enhanced greenway through the park. CITY MANAGER’S UPDATE 19 • The church hosted a neighborhood event in the park on Saturday, October 19, 2019 to help bring attention to the park, and provide volunteer clean-up efforts. POUDRE RIVER WHITEWATER PARK Funding Source: Park Planning & Development, CCIP, General Fund, Public and Private Fundraising, Stormwater, and Natural Areas Total Project Cost: $11.5M Phase: Completed – October 2019 Project Details: The Poudre River Whitewater Park project has been a collaborative effort between multiple City departments, local advocates, and the philanthropic community. The project provided natural systems, stormwater, and recreation benefits. Project elements include whitewater boating features, a pedestrian bridge, a naturalistic park space, overlook plaza, trail & walk connections, and parking. Project Status: • A grand opening celebration was held October 12, to recognize the official opening of the Poudre River Whitewater Park. • The event was well attended, with multiple kayakers/recreationalists enjoying the park and the river. The celebration included live music, fun activity for kids, and a ribbon cutting ceremony. POUDRE TRAIL AT LANCER DRIVE Funding Source: Conservation Trust Fund CITY MANAGER’S UPDATE 20 Total Project Cost: $750,000 Phase: Under construction Estimated Completion: Winter 2019 Project Detail: The Poudre Trail spur at Lancer Drive will be located east of Lincoln Middle School, and provide a safe, off-street pedestrian route from West Vine Drive to the Poudre Trail. In addition to the trail, Natural Areas and FC Bikes are proposing improvements in the area, to create a safer environment and enhanced connectivity for pedestrians and cyclists. Project Status • Trail construction is underway. Due to a delay in pedestrian bridge fabrication, construction of the trail is scheduled for completion in fall/winter, 2019. CP - OPERATION SERVICES GARDENS ON SPRING CREEK – VISITOR’S EXPANSION Funding Sources: Building on Basic (BOB) II - $2.2M Op Services (Maintenance): $410K Privately Raised Funds: $740K Total Project Cost: $3,350,000 Phase: Construction Estimated Completion Date: November 10, 2019 Project Details: The Gardens on Spring Creek Visitor Center Expansion is adding approximately 4500 SF. This includes a conservatory which will incorporate a butterfly pavilion, extra meeting rooms, additional office spaces, and Solar PV to offset the additional energy usage. Project Status: • Building finishes and exterior landscaping are finishing up. • USDA inspection for Butterfly Pavilion completed. • Installation of the Living Wall is finishing up. • Office furniture is being installed. • 64-kw solar PV system has been installed on the roof. • Art in Public Places (APP) piece has been installed in front of the Conservatory. • Building envelope test passed for entire building. • On track for LEED Gold; currently tracking at 63 credits. Final Exterior Finishes Being Installed Solar PV System is Installed CITY MANAGER’S UPDATE 21 FORT COLLINS/LOVELAND POLICE TRAINING CENTER Funding Sources: $9.25M generated from bonds for the City of Fort Collins $9.25M from City of Loveland $1M from DOLA Grant Total Project Cost: $19.5M Phase: Phase I Site Work Phase II Building Design Estimated Completion Date: Late 2020 Project Details: The City of Fort Collins is partnering with The City of Loveland to construct a new Police training facility which will be located on the west side of the Loveland Airport. This new site will offer a 50-yard pistol range, a 1.4-mile driving track, concrete skills pad, and some classrooms for special training. Project Status: • Phase I site work is underway for construction of the Track and Skills Pad. • Scheduled to start concrete paving mid-November, weather permitting. • Design team is working to finish up construction drawings for the building and we are planning to bid this out late-November. • We have selected Spire as the Firing Range Equipment Contractor. We will be working with them to finalize details for the Firing Range. • We are working with property owners to get easements for the utilities for the project. CP - UTILITIES WATER TREATMENT FACILITY Funding Source: Capital Project Budget Estimated Project Budget: $1,300,000 Phase: In Construction Project Details: Approximately 7,300 feet of three-phase from Overland Trail to the Treatment Facility in an existing easement on Colorado State University Property Project Status: No Update • The ATO order has been placed, however, we will not receive an estimated delivery date until engineering drawings have been provided and shared with the manufacturer. • Phase 2 has started. The station 400 vault has been set for the second switch • Completion is estimated for the first quarter of 2020. Track Construction Underway Water Treatment Facility CITY MANAGER’S UPDATE 22 LIGHT & POWER GENESIS64 SCADA UPGRADE PROJECT Funding Source: New Capital Estimated Project Budget: $200,000 Phase: In Design Project Details: Convert the existing Iconics Genesis32 hardware, software, and screens to Genesis64 Project Status: • Kepware has provided the BETA test program that should resolve the digital output command issues. The ESCADA team is testing the BETA program. • The ESCADA team is working on linking Kepware tags on the new GEN64 screens. NEW FEEDER CAPACITY (E. DRAKE & LEMAY) Funding Source: New Capital Estimated Project Budget: $500,000 Phase: Construction Project Details: Install 7000 feet of three phase 750 Al and one switch to serve new load at Drake and Lemay. Project Status: • The new circuit 234B has been extended to the customer site. • Customer pad and switch is in place. Customer is delaying the final installation of our last segment of 750 Al until their 200amp switch gear arrives. • 750 Al has been installed, terminations installed, and x- ray procedure is completed. Awaiting customer outage for final connection. Crossing Drake SCADA Software CITY MANAGER’S UPDATE 23 GIS/GWD & ADMS Funding Source: Offer 5.23 Operational Technology Estimated Project Budget: $2,762,384 Phase: System Design, Hardware Procurement, Database Configuration Project Details: 1. Replacement and upgrade of the existing L&P mapping systems to a fully capable Geographic Information System (GIS) platform compatible with the City's enterprise GIS. 2. Implementation of a GIS-based Graphic Work Design (GWD) system enabling streamlined electric distribution design and development and integration with GIS as well as other key systems 3. Replacement of existing electric distribution operational tools with a new Advanced Distribution Management System (ADMS) that enables L&P’s Supervisory Control & Operations (SCO) staff to performs a wide range of real-time analysis in the management of the City’s electric distribution system. Project Status: No Update • The project team has received the first GIS data report from the ADMS vendor, giving the team critical feedback on what is needed to continue to prepare our geodatabase for use in outage management and operations in the new software. • A series of map symbology workshops are underway, gathering feedback from future system users. • Heavy geodatabase configuration continues, informed by the editing process and workshop. • Work is underway with the GIS/GWD vendor to carry out an early implementation of key components in order to provide tools and resources to the project team in preparation for go live. This includes the mobile GIS application with redlining functionality. • The GIS/GWD software vendor has begun development of a custom software component to replace an existing system. We have completed two reviews with the vendor of the work in progress. • The ADMS project team and ACS have agreed on the system architecture and IT has placed the order for servers and storage. • The ADMS project team has completed system interface design documents and has supplied them to the vendor for development of the ADMS system. • The last two workshops for GIS/GWD are scheduled for later October and early November. • The project team is currently preparing a complete test and development environment for GIS/GWD. System Design Visual CITY MANAGER’S UPDATE 24 SYSTEM CABLE REPLACEMENT PRIORITY 1-WOODWEST Funding Source: Offer 8.9 Economic Health Estimated Project Budget: $158,000 Phase: In Construction Project Details: This project will replace 11,500 lineal feet of cable in the Woodwest Subdivision. This area was identified as a top priority. Project Status: No Update • Replacement includes 30 sections of cable. • Project completion is expected by year end in Quarter 4. SYSTEM CABLE REPLACEMENT PRIORITY 2-FOX MEADOWS Funding Source: Offer 8.9 Economic Health Estimated Project Budget: $ 32,000 Phase: Complete Project Details: This project replaced 2,500 lineal feet of cable in the Fox Meadows Subdivision. This area was identified as a top priority. Project Status: • This project is complete. • Replacement included four sections of cable. DWRF DIGESTER 612 LID REPLACEMENT Funding Source: Wastewater Estimated Project Budget: $2,100,000 Status: In construction Estimated Completion Date: 4th Quarter, 2019 Project Details: Anaerobic digesters treat organic solids from the wastewater treatment process by reducing the organic matter to a relatively odor-free dewaterable substance which can be reused as biosolids. Biogas produced by this process can be reused as heat and power. Digester 612’s lid was originally installed in the 1960s and has reached the end of its useful life. A new lid is necessary to continue to comply with wastewater and biosolids regulations, to ensure safety of staff and the public, and to improve anaerobic digestion efficiency and biogas storage Application progress of the insulation coating on the Digester Lid Cable that was replaced for the Fox Meadows Project. Cable to be replaced for the Woodwest Project. CITY MANAGER’S UPDATE 25 capacity. Project Status: • Insulation and top coating are underway. • Site cleanup is underway • Finalizing coating application on Digester 612. MAIL CREEK IMPROVEMENTS AT MEADOW PASSWAY Funding Source: Stormwater Estimated Project Budget: $2,808,900 Status: In design Estimated Completion Date: April 1, 2020 Project Details: The Mail Creek stream reach is within an urbanized corridor and is experiencing severe bed erosion. Improvements will include stabilizing the creek bed and banks through a combination of bio-engineered designs, re-grading, re-vegetation, and easements from property owners to construct and maintain the improvements. Project Status: • Construction contract is underway. • 404 permit is approved. • Independent cost estimate is completed. HICKORY STREET WATERLINE RAILROAD BORE Funding Source: Water Estimated Project Budget: $627,000 Status: In construction Estimated Completion Date: 4th Quarter, 2019 Project Details: The Hickory Street waterline project includes the installation of a new 8” waterline across the Union Pacific Railroad right-of-way and tracks to complete a long-needed connection for water distribution system reliability in this area. This project will connect an existing 8” waterline on the east side of the tracks to an existing 12” waterline running parallel and to the west of the tracks. This work will be done using an auger bore, installing a 24” diameter steel casing around the 8” PVC waterline across the railroad. Project Status: • Construction - BT to perform railroad bore is complete. • Construction BT to install 8” waterline and perform BacT and pressure testing is underway. Sandbags placed for erosion protection. Installing 8” PVC waterline through casing CITY MANAGER’S UPDATE 26 PUBLIC SAFETY POUDRE FIRE AUTHORITY Oct. 21 | Fire Ops 101 PFA Firefighters with the Local 1945 put on the first Fire Ops 101 course in over 12 years. Elected officials and partners of PFA spent an afternoon at the PFA Training Center. Firefighters created a safe and controlled environment for participants to run through training exercises and scenarios. Participants experienced a glimpse in to what it takes to be a career firefighter, including wearing nearly 50 lbs. of bunker gear while practicing lifesaving skills. They also discussed the critical issues facing the modern fire service. Oct. 16 | Elk Fire near Ben Delatour Scout Ranch PFA crews supported the attack of the Elk Fire near Ben Delatour Scout Ranch. A battalion chief and brush crew stayed on the scene through the first night. The brush crew was assigned to ‘structure protection’, which included defending homes and later a road. Roads can provide helpful barriers in wildfires and the PFA crew defended the road to prevent the fire from spreading to a new area. Company Performance Tasks Twice a year PFA performs Company Performance Tasks. These are evaluative drills in which crews practice basic skills such as pulling hose in through a burn building, throwing ladders and doing searches. The crews are timed as they run through scenarios to evaluate efficiencies and effectiveness. One scenario included dragging a 400 ft. hose down a long alley to a house fire that they couldn’t park an apparatus next to and another included vertical ventilation. Oct.6 – Oct. 12 | Fire Prevention Week The 2019 Fire Prevention Week them was “Not every hero wears a cape. Plan and practice your escape.” The National Fire Protection Association determines the theme based on trends and needs from the previous year. They create a slogan and marketing materials to create a collaborative effort between fire agencies and home safety organizations across the nation. PFA built off the materials and shared public education throughout the entire week on all channels. Messaging focused on planning an escape route, having a meeting place, calling for help and modern fire behavior. PFA and PSD also completed their annual surprise fire drills in the schools. CITY MANAGER’S UPDATE 27 Oct. 10 | House Fire on Sheely Dr. Firefighters responded to a house fire on the 1900 block of Sheely Dr. Occupants were able to safely evacuate the home and no other structures were threatened. Firefighters were able to rescue a pet hamster from the home. Upon arrival, firefighters discovered that the fire had spread from the east side of the home to the attic. A device called a fognail was deployed on the roof to quickly extinguish the fire in the attic. A fognail is a sprinkler like device that can be punched through surfaces such as walls and roofs. The fognail makes cooling of smoke and hot surfaces possible without adding oxygen to the fire. POLICE SERVICES Community Engagement Drug Takeback Day – Safe disposal of medication keeps harmful substances out of the environment, away from children and pets, and out of the hands of those who intend to misuse them. Twice a year, Fort Collins Police Services participates in National Drug Takeback Day. During this year’s event, 408 vehicles came through the event drive-thru. Residents dropped off 664 pounds of medication for safe disposal – the highest one-day drop off FCPS has seen in years! In addition to these events, FCPS also has a drug drop-off kiosk in the front lobby of the agency headquarters where people can drop off medications year-round during open hours. Coffee with a Cop – National Coffee with a Cop Day fell during the first week of October. FCPS partnered with Lamar’s Donuts to host a community engagement event and spent a few hours sharing donuts, coffee, and great conversation. School Resource Officers decided to go mobile since many working parents and students have difficulty attending daytime events. They set up tables near Traut Elementary, Preston Middle, and Fort Collins high school to share warm drinks on chilly days, much to the gratitude of students, staff, and parents. Case Highlights Robbery Suspects Arrested – Two suspects were arrested on October 19 following a series of robberies at 7-Eleven stores in Fort Collins and Loveland. While officers were investigating several of the incidents, a Larimer County Sheriff’s Office deputy contacted a vehicle that matched the description of a vehicle associated with the incidents. The two male occupants of the vehicle, Walter Herrera, 21, CITY MANAGER’S UPDATE 28 and Oscar Espinosa, 19, were identified as the suspects. Both men were arrested on four counts each of Aggravated Robbery (class 3 felony) and four counts each of Menacing (class 5 felony). The regional partnership between law enforcement agencies was an instrumental element in making these arrests and keeping Northern Colorado communities safe. Offender receives 128 year prison sentence - A sexually violent predator will spend the rest of his life in jail after being convicted of multiple felonies. In August 2013, a woman was kidnapped, severely beaten, sexually assaulted, bound, and left in a Fort Collins park by an unknown man. Despite an intensive investigation, police were unable to identify a suspect at that time. In 2017, there was a pivotal break in the case: through DNA evidence, the woman's attacker had been identified as Stefan Moon. Following this discovery, police learned that Moon had actually befriended and placed himself the victim's life several years *after* he perpetrated the assault. Moon was arrested in 2017, and in August 2019, a jury convicted him of sexual assault, second-degree kidnapping, and first-degree assault. In October 2019, he was sentenced to 128 years in prison. Thank you to everyone who worked diligently to bring this case to a conclusion. We also want to recognize the strength, courage, and resilience of this incredible survivor. She has been and continues to be an inspiration to everyone who's walked alongside her during this difficult journey. Safety Campaign During the month of October, Fort Collins Police partnered with BNSF Railway to conduct an education and enforcement campaign around railroad safety. FCPS shared a variety of educational materials across social media platforms to highlight laws, risks, and general safety tips. On October 16, FCPS officers and BNSF Railroad police conducted a join enforcement operation to impact dangerous behaviors around railroad crossings. A total of 55 educational contacts/warnings and 19 citations were issued. FCPS will continue to share information with the community about traffic safety related to trains and other high-violation areas. Crime Prevention This month, the Crime Prevention Specialist had 17 telephone calls to include a senior who wanted to know what he should say to scammers when they call him and to set up a class for a Girl Scout troop on what to do to prepare for a career in law enforcement. Presentations included having a table at the Family Emergency Preparedness Expo at The Ranch and the Prescription Drug Take Back event (1572 pounds were collected, including 908 pounds from the P.D. Lobby kiosk). Here’s the breakdown on activities in October: RESTORE, 36 attended Robbery Prevention, Great Western Bank, 13 attended Emergency Preparedness Family Expo, 230 attended Senior Scams & Frauds, 1st Christian Church, 48 attended Crime Prevention, Compass School 5 & 6 grades, 8 attended Personal Safety for Seniors, The Worthington, 38 attended Drug Take Back, 408 vehicles came through CITY MANAGER’S UPDATE 29 PLANNING, DEVELOPMENT &TRANSPORTATION BUILDING, PLANNING AND DEVELOPMENT REVIEW Monthly Reporting Monthly construction reporting and mapping of development review proposals and construction can be found by visiting: http://citydocs.fcgov.com/?dt=MONTHLY+REPORT&dn=NEIGHBORHOOD+%26+BUILDING+SERVIC ES%2FZONING&vid=2&cmd=showdt For a detailed listing of development Proposals under review, please visit: https://www.fcgov.com/developmentreview/proposals/ CDPHE Housing Affordability and Health Equity Grant Completion of the marketing/messaging design and strategy has been slightly delayed from the first grant quarter, to be completed before the first stakeholder convening in November 2019. Activities for the second grant quarter include finalizing the marketing strategy, a workshop with key stakeholders (November 18), an educational session for City staff/leadership, targeted engagement via resident panel discussions/focus groups, and initial data collection/research. A public kickoff event is anticipated in early 2020. All grant activities are being closely coordinated to integrate with and support parallel City efforts including; manufactured home park preservation, Land Use Code Audit, Social Sustainability Gaps Analysis, Affordable Housing Strategic Plan update, and updates to HUD plans. City Plan Implementation – Land Use Code Audit Staff recently completed a series of stakeholder meetings and an on-line survey to better understand potential Land Use Code changes that will implement new City Plan policies. There will be additional stakeholder conversations in November and December to review initial findings and recommendations. The final code audit report and findings are slated for the December/January timeframe. Harmony Corridor Plan Gateway Area Update An I-25 Gateways Workshop was held on October 21st where community members evaluated four land use alternatives for the Harmony Gateway Area. City Council further discussed the project status at a Work Session on October 22nd. Public hearings have been scheduled with P&Z, NRAB, LCSB, Water Board and the EAC during November. Council consideration of plan and code amendments has been scheduled for December 17th. Hughes Rezoning City Council approved an ordinance at 1st reading on November 5th that rezones the Hughes property from Transition (T) to a combination of Low-Density Mixed-Use Neighborhood (LMN) and Residential Foothills (RF) with the requirement that the RF-zoned area be designed as a cluster plan. Second reading is scheduled for November 19th. Oil and Gas Operations A City Council Work Session was held on October 8th, during which City Council directed staff to begin developing local regulations on oil and gas development. Stakeholder outreach will begin in November and include work sessions with boards and commissions, a City interdepartmental workshop, public outreach, website updates, and conversations with the operator and Larimer County. A City Council Work Session is scheduled in April to discuss alternative regulatory frameworks for consideration. Montava  Development Project CITY MANAGER’S UPDATE 30 The Planning & Zoning Board held a hearing for the Montava Planned Unit Development (PUD) project on August 15 and recommended approval of the project to City Council. City Council is the final decision-maker on the Montava PUD, and Council hearings have been rescheduled for the following dates: · December 17 – City Council Meeting (1st reading and public hearing) · January 7 – City Council Meeting (2nd reading and public hearing) All meetings will start at 6 p.m. at City Hall, 300 Laporte. New Development Applications  –October 2019 More information on development proposal under review:  https://www.fcgov.com/developmentreview/proposals/ Project Name Project Type Location Johnson Drive Apartments Final Plan, FDP190021 Mixed-use development 255 Johnson Dr Soldier Canyon Pump Station Annexation, ANX190002 Annexation Laporte west of Overland Trail Poudre School District Prospect School Site, SPA190002 New middle school, high school, and stadium Northwest corner of Prospect Rd & County Road 5 Solarium Addition of Permitted Use, PDP190016 Addition of Permitted Use (APU) requests for a lodging establishment and small-scale reception center 706 E Stuart St Old Town North Fifth Filing – Replat of Tract F, BDR190016 & MA190074 Replat; single-family attached dwelling units and one mixed use building Southeast corner of Suniga Rd & Jerome St FTC Lady Moon WTE, BDR190015 Wireless telecommunications equipment 3528 Precision Dr Fort Collins Montessori School, SPA190003 Charter school 1109 W Harmony Rd Summitview Church WTF Final Plan, FDP190022 Wireless Telecommunication Facility 1601 W Drake Rd Fox Grove Phase 2 Final Plan, FDP190023 Single-family detached residential East of I-25 & south of E Mulberry St Haven Apartments, PDP190017 Multi-family residential 730 W Prospect Rd Garcia House Final Plan, FDP190024 Long-term care facility E Elizabeth & Patton St Bonnetain Minor Subdivision, BDR190018 Subdivision to create one additional lot 3021 S Taft Hill Rd Development Project Decisions – October 2019 More information on development project decisions:  https://www.fcgov.com/developmentreview/agendas.php Project Name Decision Maker Location Decision Date Decision CITY MANAGER’S UPDATE 31 614 Lesser Drive Carriage House, FDP190013 Administrative Hearing Officer 614 Lesser Dr 10/25/19 Approved FC Moves Electric Scooter Share Program • Staff completed the applicant selection and contract negotiation process and entered into a 12- month e-scooter share pilot program partnership with Bird. • Following contract execution, a 2-week education and outreach period was initiated, which included extensive outreach to key stakeholder community groups and to relevant City staff. • E-scooters were deployed in the community on Wednesday, October 23. • Ongoing evaluation and management of the program is underway including addressing operational issues as they arise and responding to community communications regarding the program. NEIGHBORHOOD SERVICES Fall Clean-up 2019 CSU’s Off-Campus Life and The City of Fort Collins Neighborhood Services department held the 26th annual Fall Clean-up event on October 26th. Over 2,000 CSU volunteers spent the day raking leaves, trimming bushes and cleaning gutters to help elderly neighbors prepare their yards for winter. CSU volunteers helped over 330 neighbors, raked up over 5,000 bags of leaves and contributed over 8,100 service hours on a single day! Following the event, 8 staff members from Neighborhood Services and 3 Off-Campus Life professional staff and student employees teamed up with Farmhouse Fraternity, Kappa Sigma Fraternity, and CSU CREW student organization to deliver the majority of the collected leaves to The Growing Project, Mulberry Community Gardens and Hoffman Mill for composting. Pizza with Police Pizza with Police took place on Friday, October 25th from 5:30-7:00 p.m. at Campus West Connections. Fort Collins Police Services and the Community Liaison met with about 40 community members to eat pizza and talk about community issues. Campus West Connections Campus West Connections had approximately 107 people using the space during various meetings that took place, including: Student Resource Officers Team Meeting, CWC Management Team, CWC Collaboration Team, Cookies & Conflict, Community Violation, Party Partners and Pizza with Police. As well, staff members from Code Compliance, Off-Campus Life, Student Resolution Center and Police Services worked out of the space for a total of 87 hours. YEAR TO DATE COMPARISON 2018 2019 YTD % Change Development Project Submittals Received 295 356 20.68% Conceptual/Preliminary Design/Staff Reviews 210 187 -10.95% Building Permits Issued 9,165 14,577 59.05% Building Permit Valuations ($M) $386.39 $317.42 -17.85% Building Inspections Performed 28,716 22,973 -20.00% Zoning Inspections Performed 2,537 368 -85.49% Zoning Plan Reviews Performed 2,851 2,392 -16.10% CITY MANAGER’S UPDATE 32 Overall Development Review revenues are $(1,023,756) under projection for 2019 as of October 31st with Development Review under by $(929,969) and Engineering Development Review under by ($93,787). GRAFFITI UPDATE During the month of October 2019, the Graffiti Abatement Team abated 45 issues consisting of 109 tags measuring 2000 square feet of graffiti-covered surfaces. SUSTAINABILITY SERVICES ENVIRONMENTAL SERVICES Climate Action Plan 20th Anniversary Celebration! This November 14, the City of Fort Collins is partnering with CSU’s School of Global Environmental Sustainability to celebrate 20 years of climate action! The event will be a free, fun, family-friendly, open- house style program with community groups (business, non-profit, educational, and municipal) each running an activity station or interactive table to help connect event attendees with their group’s mission, teach them about the many ways to work to improve our environment, and, most importantly, to have fun! RSVP Here: https://cap20.app.rsvpify.com/ Our Climate Future Community Engagement: Do you want to co-create equitable solutions to achieve the community's energy, zero waste, and climate goals? Join us at one of our upcoming interactive “Community Conversations” or listening sessions. Events details as follows: November 17 - For Residents 222 Laporte - Colorado River Room 7:00 - 8:30 p.m. November 20 - For Businesses and Organizations Innosphere 11:15 – 1:00 p.m. December 4 - For Residents Wolverine Farm Letterpress & Publick House 6:00 – 7:30 p.m. Month Access FC Hotline Pro-Active Total January 5 0 29 34 February 10 9 38 57 March 12 5 76 93 April 19 3 40 62 May 13 3 53 69 June 16 7 42 65 July 7 11 51 69 August 16 7 71 94 September 14 5 46 65 October 4 4 37 45 Total 116 54 483 653 CITY MANAGER’S UPDATE 33 December 10 - For Businesses and Organizations Utilities Administration Building Community Room 9:00 – 10:30 a.m. SOCIAL SUSTAINABILITY City Seeking Feedback on How Federal Funding Can Support Community Development and Affordable Housing The City of Fort Collins is conducting a survey to determine how to invest federal funds in the community. The 2020–2024 Consolidated Plan decides how the City allocates CDBG and HOME funds from the Department of Housing and Urban Development (HUD). These funds can be used for affordable housing, homeless and supportive services, and economic and community development. Over the next several years, HUD is expected to invest nearly $9 million dollars into Fort Collins through the CDBG and HOME programs. The survey will run through mid-December and can be found here: English version: https://www.surveygizmo.com/s3/5246538/2019-Consolidated-Plan. Spanish version: https://www.surveygizmo.com/s3/5301345/22597191321c For more information, visit: https://www.fcgov.com/socialsustainability/consolidated-plan ECONOMIC HEALTH City of Fort Collins and Colorado Lending Source Partner on Small Business Loan Program The City of Fort Collins and Colorado Lending Source have partnered to help make access to capital more attainable for small businesses by creating the Fort Collins Main Street Loan Program. This loan program is a friendly and affordable option for Fort Collins-based businesses seeking capital from $5,000-$50,000 and are unable to secure traditional financing sources. In order for businesses to be eligible, they must have less than 100 employees and be located in the City of Fort Collins. This loan program places special emphasis on helping underserved businesses (women-owned, minority-owned, etc.); however, any type of business is encouraged to apply. Loan proceeds can be used for a variety of business purposes associated with helping to start, establish, strengthen, or grow a small business with the intention of creating meaningful living-wage jobs within the City of Fort Collins. Find out more at fcgov.com/business. UTILITIES CUSTOMER CONNECTIONS Community Engagement has reached 13,052 participants through 208 outreach events and programs covering hot topics such as Time-of-Day rates, Income Qualified Assistance Program, and resource conservation. In the next month Utilities Community Engagement will reach underserved populations, high schoolers, Colorado State University (CSU) students, real estate professionals and other community members through 14 programs and events. Utilities participated in the 13th annual Veterans Stand Down focused on the homeless and near- homeless veteran population and their families in the Fort Collins and Loveland areas. Utilities also interacted with over 40 individuals at the booth promoting the Income Qualified Assistance Program. The Income-Qualified Assistance Program (IQAP) currently has 835 participants enrolled since opening on November 1. CITY MANAGER’S UPDATE 34 Customer Accounts hosted a meeting for medium to industrial commercial customers in the business community to learn more about Our Climate Future, water supply updates and demand response, outage preparedness, and 2020 rates. There were 18 types of businesses with over 35 customers in attendance. Utilities partnered with Poudre School District’s Futures Lab and business incubator students to brainstorm, create, and deliver a creative pitch to address the City’s Climate Action Plan. Students crafted a “Shark Tank” style presentation, based off the popular television show, to deliver to a panel of professionals, with the winner receiving a special bundle of prizes. Utilities partnered with the Poudre School District and real estate professionals for STEM Night Epic Homes and the Epic Certificate to learn how they can join the Epic Homes Real Estate Ally Network to help homeowners sell their homes with efficiency upgrades. Multifamily Luncheon was attended by 64 multifamily property managers and owners in our community to learn about Utility programs, rate increases, rebates, and Connexion. Utilities sponsored a booth at Recreation’s Hogwarts Halloween. Staff played ‘Toilet Toss’ with the young, dressed up wizards and witches to learn what’s safe to flush and what goes in the trash. This event reached over 400 people. The 2019 residential Xeriscape Incentive Program just wrapped up with 65 households completing beautiful, waterwise landscape transformations for a total of over 80,000 square feet converted. This significantly exceeds the 50 projects goal, and the XIP 2018 result of 47 completed projects. Initial estimates suggest that these proactive community members will save over 1 million gallons each year. The 2020 program is open! One more class available on November 16th, with additional classes available in the spring. Interested Fort Collins Utilities water customers can sign up and learn more at Utilities website. Utilities Customer Care and Technology is successfully billing Connexion services via the new billing system, Open SmartFlex, completing two cycles of bills and payments. Fort Collins Utilities received the Smart Energy Provider (SEP) award at the 2019 American Public Power Association conference in New Orleans. The SEP program is a best practices designation for utilities that show commitment to and proficiency in energy efficiency, distributed generation, renewable energy, and environmental initiatives. The purpose of the SEP program is to provide national recognition of utility efforts and help public power utilities benchmark and evaluate their work on these topics against a set of industry best practices. Fort Collins staff were part of the technical committee which established the program structure, scoring and evaluation for the pilot program. CITY MANAGER’S UPDATE 35 COMMUNITY SERVICES RECREATION • Aaron Harris has been promoted to Recreation Manager and will now oversee the Senior Center, Club Tico, Pottery Studio and future Southeast Community Center. • To provide professional growth opportunities, current recreation managers will rotate their positions. Jason Chadock will now oversee Northside Aztlan Community Center, Foothills Activity Center, The Farm and sports division, while Marc Rademacher will take his vast knowledge and experience to EPIC and oversee ice and aquatics programming for the Recreation Department. • The National Parks and Recreation November publication highlights the Parks and Recreation Department’s recent Commission for Accreditation of Park and Recreation Agencies (CAPRA) award. The article can be found online at: https://ezine.nrpa.org/html5/reader/production/default.aspx?pubname=&pubid=af405065-f846- 4788-b6d6-e3a9d8f1a7b3 PARKS • Bird E-Scooters have been released throughout town and the team is working through the initial phases of the deployment. • Homeless impacts around Mawson Lumber remain a challenge. • Poudre River Whitewater Park Grand Opening took place on October 12, 2019 and included the re-opening of the Poudre Trail. • Eastside Park Improvement project kicked off with the First United Methodist Church. • Poudre Fire Authority Ossuary Dedication took place in Grandview Cemetery. • The City Forester was invited to join the Connexion Strategic Operation Team to provide guidance on working around the living infrastructure of the Urban Forest. • City Park Nine hosted a disc golf tournament in support of the Raptors of the Rockies. CULTURAL SERVICES CITY MANAGER’S UPDATE 36 The Gardens on Spring Creek’s Grand Opening is set for Saturday, November 16 from 9 a.m. to 5 p.m. Dignitary remarks and a ribbon cutting ceremony will mark the occasion at 9 a.m. This fall, The Lincoln Center launched two brand new series. The National Geographic Live! speaker series opened with Steve Winter’s On the Trail of Big Cats to a crowd of over 900 and the Laugh Riot series featured comedian Tig Notaro with a sold out performance. The Fort Collins Museum of Discovery welcomed over 800 trick-or-treaters on Halloween! It was the first time the Museum offered the program which included Halloween-themed activities spread throughout the Museum. As part of the opening of the Poudre River Whitewater Park, the Art in Public Places program celebrated the dedication of the artwork “Whitewater” by John Davis. The wave shelter was inspired by river rapids and the bubbles that are created as water crashes against the boulders in the river. NATURAL AREAS Final Foothills Natural Areas Management Plan Released The management plan that applies to Coyote Ridge, Pineridge, Maxwell and Reservoir Ridge natural areas and the Foothills Trail has been updated and finalized. The plan includes: • Foothills Natural Areas Management Plan Update (online storymap) • Executive Summary of the Foothills Natural Areas Management Plan Update • Action Plan for the Foothills Natural Areas Management Plan Update • Supporting documents, public feedback summaries and Visitor Use Impact and Decision Framework summaries. All the documents are available at https://www.fcgov.com/naturalareas/foothills-plan McMurry Natural Area Bridge The lower portion of the bridge at McMurry Natural Area was repainted in a brilliant cobalt blue adding to its unique character. The bridge railing depicting fish and waves is an Art in Public Places project. CITY MANAGER’S UPDATE 37 PUBLIC ENGAGEMENT 2019 Community Survey The 2019 Community Survey wrapped up on October 14. Two waves of post card notifications were sent to randomly selected households. Community members also had the opportunity to complete the opt-in survey online. Survey response are currently being analyzed. Strategic Plan The public engagement activities for the Strategic Plan began on October 9 at the Larimer County Farmer’s market. City staff set up a table at the event and asked community members for their feedback regarding the City’s Key Outcome Areas. Community members also participated in an activity that consisted of voting for their preferred outcome areas using small colored balls and placing them in clear plastic containers. Pop-up events took place at several other partner locations including, Larimer County Food Bank, Foothills Activity Center, Treatsylvania, and the Interfaith Council meeting. Presentations were also conducted at Summitstone Health Centers and Fort Collins High School. CITY MANAGER’S UPDATE 38 Our Climate Future Pop-up Engagement: City staff conducted more pop-up events as part of the public engagement plan for the Our Climate Future. Events were held in Old Town as well as at the Downtown Transit Center. The events will continue until the end of the year. BROADBAND – FORT COLLINS CONNEXION Connexion New Service Notification Once Connexion service is available in your neighborhood, we will notify you directly! 1. Door hanger – we will post a sales door hanger on your front door (unless there is a no soliciting sign present) 2. Email – we will send an email out if we have an existing one on file. To ensure you receive an email – visit fcconnexion.com/residential and fill out the form at the bottom of the page! 3. Direct mail – we will also mail out a post card to your home address. How do I sign up? Once you have been notified by the Connexion team that service is available for your home, you can either call Customer Service at 970-212-2900 or go online at fcconnexion.com to sign up for service. Currently residential internet and phone service is available – we will be rolling out TV around the beginning of December 2019. CITY MANAGER’S UPDATE 39 Connexion Technical Support 24/7 Our Technical Support Specialists are ready to assist customers calling in with technical support questions or issues—no matter what time of day, or night it is. Our 100% local support team is available Monday-Sunday, 24 hours a day! Social Media Follow Fort Collins Connexion on Facebook and Twitter! Get the latest updates on Connexion, stay informed and have fun! Join our growing online community of Connexion fans! Facebook: @FCConnexion Twitter: @ConnexionFC COMMUNITY DASHBOARD HIGHLIGHT The Community Dashboard features performance data and information that highlights how the City is doing in achieving its seven Outcome areas: Neighborhood Livability and Social Health, Culture and Recreation, Economic Health, Environmental Health, Safe Community, Transportation, and High Performing Government. The Dashboard is made up of 37 total metrics that are published quarterly and demonstrate where the City is doing well and where there are opportunities to improve. The color status of performance for each metric is determined based on the actual result for the quarter compared with the target. The color status of performance for the Outcome is determined based on the average calculation of the performance of each metric within that Outcome. Each month the City Manager’s Update will highlight a metric from the Community Dashboard. This month’s feature is from the Transportation Outcome Area. Analysis: Ridership has improved this quarter after two quarters of slight decline. Staff will continue to monitor for trends. Definition: CITY MANAGER’S UPDATE 40 The average number of passengers who board a transit vehicle for every revenue hour of service that a vehicle is operating. Why is this metric important? This metric allows Transfort to gauge the productivity and effectiveness of its service, and to compare against peer transit agencies. City’s impact on this metric: High – Transfort influences fixed route ridership through its choice of routes, stops, schedules and frequency of service, as well as marketing and outreach.. Benchmarks: Benchmarking in progress To view the entire Dashboard, please visit: http://fortcollins.clearpointstrategy.com/ Penny Flats 2nd, BDR190009 Development Review Manager 209 Cherry St 10/1/19 Approved FTC Rams Crossing WTE, BDR180027 Development Review Manager 808 W Prospect Rd 10/1/19 Approved Intrawest, BDR180035 Development Review Manager 3500 John F Kennedy Pkwy 10/9/19 Approved Garcia House, PDP190009 Planning & Zoning Board E Elizabeth & Patton St 10/17/19 Approved