Loading...
HomeMy WebLinkAboutMemo - Mail Packet - 10/15/2019 - City Managers Monthly Update - October 10, 2019Joe Buckner is the Founder and Visionary of Fort Collins’ only boutique boxing studio, Beautifully Savage: The Art of Pugilism. He was featured in the Business Appreciation Breakfast Video – September 26, 2019. October 2019 OCTOBER 10, 2019 Table of Contents ISSUES BEFORE COUNCIL ................................................................................................................. 4 OCTOBER 15 COUNCIL MEETING ............................................................................................................................4 OCTOBER 15 GID NO. 1 ...........................................................................................................................................4 OCTOBER 15 SKYVIEW GID NO. 15 .........................................................................................................................4 OCTOBER 22 WORK SESSION ..................................................................................................................................4 OCTOBER 24 URBAN RENEWAL AUTHORITY BOARD MEETING .............................................................................5 OCTOBER 29 5TH TUESDAY WORK SESSION - CANCELED ........................................................................................5 NOVEMBER 5 COUNCIL MEETING ..........................................................................................................................5 NOVEMBER 5 GID NO. 1 .........................................................................................................................................5 NOVEMBER 5 SKYVIEW GID NO. 15 ........................................................................................................................5 NOVEMBER 7 URBAN RENEWAL AUTHORITY BOARD MEETING ............................................................................6 NOVEMBER 12 ADJOURNED MEETING ..................................................................................................................6 NOVEMBER 12 WORK SESSION - CANCELED ..........................................................................................................6 PUBLIC ENGAGEMENT – UPCOMING EVENTS ........................................................................................................6 SALES TAX - MONTHLY & YEAR TO DATE ....................................................................................... 7 CP- ENGINEERING .............................................................................................................................. 8 CITYWIDE PEDESTRIAN ACCESS PROJECT ...............................................................................................................8 TRANSFORT BUS PAD UPGRADE PROJECT..............................................................................................................9 SUNIGA ROAD IMPROVEMENTS – COLLEGE AVE. TO BLONDEL STREET ................................................................9 NORTH COLLEGE IMPROVEMENTS – CANAL TO STATE HIGHWAY 1 .................................................................. 10 VINE AND LEMAY BNSF IMPROVEMENTS ........................................................................................................... 10 SHARP POINT/NANCY GRAY CONNECTION ......................................................................................................... 11 POWER TRAIL AND HARMONY ROAD GRADE SEPARATED CROSSING ................................................................ 11 TIMBERLINE ROAD CORRIDOR PROJECT ............................................................................................................. 12 JEFFERSON STREET IMPROVEMENTS PROJECT ................................................................................................... 12 LINDEN STREET RENOVATION PROJECT .............................................................................................................. 13 WILLOW STREET IMPROVEMENTS ...................................................................................................................... 14 TIMBERLINE WIDENING AT GREAT WESTERN CROSSING ................................................................................... 15 NORTH MASON DESIGN – ALPINE TO HICKORY .................................................................................................. 16 CP - PARK PLANNING & DEVELOPMENT ....................................................................................... 16 CYCLO-CROSS SKILLS TRAINING COURSE PILOT PROGRAM AT ROSSBOROUGH PARK ...................................... 16 SUGAR BEET PARK ............................................................................................................................................... 17 POUDRE TRAIL AT LANCER DRIVE ........................................................................................................................ 18 POUDRE RIVER WHITEWATER PARK .................................................................................................................... 18 FOSSIL CREEK TRAIL ............................................................................................................................................. 19 POUDRE TRAIL AT I-25 ......................................................................................................................................... 19 CITY PARK REFRESH ............................................................................................................................................. 20 PARKS AND RECREATION POLICY PLAN UPDATE ................................................................................................. 20 CP - OPERATION SERVICES ............................................................................................................ 21 GARDENS ON SPRING CREEK – VISITOR’S EXPANSION ........................................................................................ 21 FORT COLLINS/LOVELAND POLICE TRAINING CENTER ........................................................................................ 21 308 VINE WATER LAB / INNOSPHERE PHASE II ................................................................................................... 22 CP - UTILITIES.................................................................................................................................... 23 WATER TREATMENT FACILITY ............................................................................................................................. 23 LIGHT & POWER GENESIS64 SCADA UPGRADE PROJECT .................................................................................... 23 NEW FEEDER CAPACITY (E. DRAKE & LEMAY) ..................................................................................................... 24 GIS/GWD & ADMS ............................................................................................................................................... 24 SYSTEM CABLE REPLACEMENT PRIORITY 1-WOODWEST.................................................................................... 25 SYSTEM CABLE REPLACEMENT PRIORITY 2-FOX MEADOWS............................................................................... 25 DWRF NPT BLOWER HVAC REPLACEMENT ......................................................................................................... 26 MAIL CREEK IMPROVEMENTS AT MEADOW PASSWAY ...................................................................................... 26 REMINGTON STREET STORM SEWER .................................................................................................................. 26 HICKORY STREET WATERLINE RAILROAD BORE .................................................................................................. 27 PUBLIC SAFETY ................................................................................................................................ 27 POUDRE FIRE AUTHORITY ................................................................................................................................... 27 POLICE SERVICES .................................................................................................................................................. 28 PLANNING, DEVELOPMENT &TRANSPORTATION ......................................................................... 30 BUILDING, PLANNING AND DEVELOPMENT REVIEW .......................................................................................... 30 NEIGHBORHOOD SERVICES ................................................................................................................................. 32 YEAR TO DATE COMPARISON .............................................................................................................................. 33 GRAFFITI UPDATE ............................................................................................................................ 33 SUSTAINABILITY SERVICES ............................................................................................................ 34 ENVIRONMENTAL SERVICES ................................................................................................................................ 34 SOCIAL SUSTAINABILITY ...................................................................................................................................... 34 ECONOMIC HEALTH ............................................................................................................................................. 34 UTILITIES ............................................................................................................................................ 34 CUSTOMER CONNECTIONS .................................................................................................................................. 34 COMMUNITY SERVICES .................................................................................................................... 36 RECREATION ........................................................................................................................................................ 36 PARKS ................................................................................................................................................................... 36 CULTURAL SERVICES ............................................................................................................................................ 36 NATURAL AREAS .................................................................................................................................................. 37 PUBLIC ENGAGEMENT ..................................................................................................................... 39 BROADBAND – FORT COLLINS CONNEXION ................................................................................. 39 COMMUNITY DASHBOARD HIGHLIGHT .......................................................................................... 40 CITY MANAGER’S UPDATE 4 ISSUES BEFORE COUNCIL OCTOBER 15 COUNCIL MEETING  2020 City Budget Revisions and Annual Appropriation (First Reading) o Appropriate funds for the 2020 fiscal year based on the adopted 2019-2020 Biennial Budget and associated revisions to the 2020 Budget. High Performing Government – 7.1 Provide world-class services that meet the needs of the community.  2020 Downtown Development Authority Annual Appropriation (First Reading) o Appropriate the 2020 Budget for the Downtown Development Authority (DDA)  2020 Northern Colorado Regional Airport Appropriation (First Reading) o Appropriate the 2020 Budget for the Northern Colorado Regional Airport.  2020 Utility Rate Ordinances (First Reading) o Consider adjusting electric and stormwater monthly charges for 2020 in support of the revenue anticipated in the 2019-20 Budget. Economic Health – 3.5 Maintain utility systems, services, infrastructure and predictable rates.  Staff Report: Teaching Tree o Provide a progress update to Council on the redevelopment of a City-owned facility into expanded childcare services provided by Teaching Tree Early Childhood Learning Center Economic Health – 3.3 Enhance business engagement to address existing and emerging business needs. OCTOBER 15 GID NO. 1  2020 Annual Appropriation (First Reading) o Appropriate the 202 Budget for the General Improvement District No. 1 (GID) OCTOBER 15 SKYVIEW GID NO. 15  2020 Annual Appropriation (First Reading) o Appropriate the 2020 Budget for the Skyview South General Improvement District No. 15. OCTOBER 22 WORK SESSION  Update to Harmony Gateway Plan o Status report on the Harmony Corridor Plan and corresponding Harmony Corridor Standards and Guidelines that pertain to the “Gateway Area” at I-25 and Harmony Road. Neighborhood Livability and Social Health – 1.5 Guide development compatible with community expectations through appropriate planning. High Performing Government – 7.5 Broaden methods of public engagement to reach all segments of the community by giving additional consideration to diverse backgrounds, languages and needs.  City Park Improvements o Review City Park updated master plan and proposed phasing strategy. Culture and Recreation – 2.2 Plan, design, implement and maintain the City’s Parks and trails system.  Parks and Recreation Master Plan o Discuss planned and conducted outreach, timeline, scope, and any work to date on the 10-year update to the City’s Park and Recreation Policy Plan. Please note that this list is subject to frequent change. Please call the City Clerk’s Office for up-to-date information. 970-416-2774. CITY MANAGER’S UPDATE 5 Culture and Recreation – 2.2 Plan, design, implement and maintain the City’s Parks and trails system. OCTOBER 24 URBAN RENEWAL AUTHORITY BOARD MEETING  3:00-6:00 p.m. in the Council Information Center, 300 Laporte Ave., Building A. o Agenda materials posted at www.renewfortcollins.com OCTOBER 29 5TH TUESDAY WORK SESSION - CANCELED NOVEMBER 5 COUNCIL MEETING  2020 City Budget Revisions and Annual Appropriation (2nd Reading) o Appropriate funds for the 2020 fiscal year based on the adopted 2019-2020 Biennial Budget and associated revisions to the 2020 Budget. High Performing Government – 7.1 Provide world-class services that meet the needs of the community.  2020 Downtown Development Authority Annual Appropriation (Second Reading) o Appropriate the 2020 Budget for the Downtown Development Authority (DDA)  2020 Northern Colorado Regional Airport Appropriation (Second Reading) o Appropriate the 2020 Budget for the Northern Colorado Regional Airport.  2019 Fee Update o Amend City Code relating to 2019 fees associated with Development Review fees, Electric Capacity fees, Wet Utility fees, Raw Water fees, and Step III of Capital Expansion Fees. High Performing Government – 7.1 Provide world-class services that meet the needs of the community.  2019 Utility Rate Ordinances (Second Reading) o Consider adjusting electric and stormwater monthly charges for 2020 in support of the revenue anticipated in the 2019-20 Budget Economic Health – 3.5 Maintain utility systems, services, infrastructure and predictable rates.  Hughes Stadium Annexation Property Rezoning o Consider a rezoning of 164.56 acres that was the site of the former Hughes Stadium. The proposal amends the City of Fort Collins Zoning Map from the Transition (T) zone district. Neighborhood Livability & Social Health– 1.5 Guide development compatible with community expectations through appropriate planning, annexation, land use, historical preservation and development review processes. NOVEMBER 5 GID NO. 1  2020 Annual Appropriation (Second Reading) o Appropriate the 202 Budget for the General Improvement District No. 1 (GID) NOVEMBER 5 SKYVIEW GID NO. 15  2020 Annual Appropriation (Second Reading) o Appropriate the 2020 Budget for the Skyview South General Improvement District No. 15. CITY MANAGER’S UPDATE 6 NOVEMBER 7 URBAN RENEWAL AUTHORITY BOARD MEETING  3:00-5:00 p.m. in the Council Information Center, 300 Laporte Ave., Building A. o Agenda materials posted at www.renewfortcollins.com NOVEMBER 12 ADJOURNED MEETING  Yearly Evaluation of City Manager, City Attorney and Chief Judge NOVEMBER 12 WORK SESSION - CANCELED PUBLIC ENGAGEMENT – UPCOMING EVENTS  Xeriscape Incentive Program: October – November: Residential water customers will have three opportunities this fall to attend “Basics Training” to learn about the various ways they can receive a rebate for switching out a thirsty landscape with one that is water-wise. Training dates include Oct. 11 and Nov. 16.  Multi-Family Luncheon – October 11: Utilities hosts a Multi-family Luncheon to gather property managers to present and discuss WaterSmart tools, rates, Building Energy and Water Scoring, Connexion, and the partnership with Larimer County Conservation Corps for home efficiency assessments.  Downtown Stormwater Improvement Project – October 23: Join City staff and local experts at the Lincoln Center from 4-6 pm to learn why downtown Fort Collins is at risk for flooding, and how the Downtown Stormwater Infrastructure Plan will address the five major stormwater projects remaining in the area.  Our Climate Future and Platte River Power Authority Integrated Resource Plan – October 24: Join us for a conversation about Our Climate Future (Energy Policy, Climate Action Plan and Road- to-Zero-Waste) and Platte River’s Integrated Resource Plan (IRP). The IRP is a critical tool for establishing a near-term action plan and long-term trajectory that will ensure an adequate supply of reliable, financially sustainable and environmentally responsible electricity.  Utilities Key Account Meeting - November 5: Utilities will host the second biannual meeting for key account and large industrial customers at the Drake Centre to provide an opportunity for businesses to learn about upcoming rate changes, water allotments, and ask the experts any questions that they might have regarding Utilities services.  2019 Community Survey: September – October: The Fort Collins Community Survey serves as a consumer report card for the City by providing residents the opportunity to rate the quality of life in the city and their satisfaction with community amenities and their local government. The five-page survey will be administered to a random selection of 3,000 Fort Collins residents. The two waves of post card notifications and invitations have been sent out. The open opt-in survey for all community members will be open until October 14.  2019 Strategic Plan - October: The Strategic Plan is a document that serves as a five-year road map for the City that articulates community goals, ways to measure success and aligns work across projects and departments. It will directly affect the development of the 2021-2022 City of Fort CITY MANAGER’S UPDATE 7 Collins Budget. Throughout the month of October, City staff will conduct several public engagement activities across town to ensure the 2020 City of Fort Collins Strategic Plan reflects the input of residents, community and business partners, Mayor and Council Members, and City staff. The public engagement activities will consist of presentations to partners and community stakeholders; pop-up events in different locations; as well as online tools.  Our Climate Future Pop-Up Engagement: September – October – November – December: There will be several pop-up engagement events in the last quarter of the year in different locations across town, as part of the public engagement strategy for the Our Climate Future process. The events consist of City staff asking community members two basic questions regarding sustainability. Community members are then given the opportunity to write down one of their answers in a chalkboard, and then have their picture taken for social media. They also receive a raffle ticket for the chance to win a tent. The tent is currently used during the events as a prop to get participants interested. There have been two events already; the first one took place in front of the City Services Building (222 Laporte), and the second one was conducted in the Lory Student Center plaza at CSU. There will be eight more events scheduled for the remaining of the year.  Mobile Home Park and Residents Rights: October – November – December: In an effort to preserve Fort Collins' dwindling mobile home parks and protect its residents, City Council has implemented a moratorium on the redevelopment of those sites until August 2020. City staff will explore several mobile home park-related reforms to city code, including resident rights regulations, a new mobile home park-specific zoning district, increased time requirements for notices of redevelopment, and creating rights of first refusal. As part of the public engagement for the project, City staff from different departments (Neighborhood Services; Planning; Social Sustainability; Communications and Public Involvement) will be conducting public engagement activities during the last quarter of the year, in our mobile home park communities. These activities will be performed in coordination with community partners, to get firsthand account information from mobile home park residents regarding their needs and priorities SALES TAX - MONTHLY & YEAR TO DATE AUGUST SUMMARY OVER PRIOR YEAR Month Year to Date Net Sales Tax Collected: 3.6% 2.1% Net Use Tax Collected: 4.4% 5.0% Net Sales and Use Tax Collected: 3.7% 2.5% Year to date, sales and use tax collections excluding rebates are up 2.5% and total $93M. AUGUST SUMMARY OVER BUDGET Month Year to Date Net Sales Tax Collected: 2.3% 0.5% Net Use Tax Collected: 2.4% 4.4% Net Sales and Use Tax Collected: 2.3% 1.1% Year to date, the City has collected 1.1% more sales and use tax revenue, totaling $975K over budget. CITY MANAGER’S UPDATE 8 CP- ENGINEERING CITYWIDE PEDESTRIAN ACCESS PROJECT Funding Source: Community Capital Improvement Program (CCIP) Estimated Project Budget: 2019 - $1.1M Estimated Completion Date: Ongoing Phase: Construction Project Details: This project maintains a complete City sidewalk inventory, identifies sidewalk inadequacies, and access needs under the Americans with Disabilities Act (ADA), and develops a prioritized work program to achieve goals of providing unobstructed access for transportation and recreation. Project Status:  Current project location: installing concrete curbing to create protected lane at W. Vine near Lancer.  Recently completed project: new combined use path for bikes/peds at W. Vine near Lancer, asphalt surface (see before and after pictures above). More information is available at http://www.fcgov.com/engineering/pedneeds.php Capital Project (CP) Updates are indicated in bold CITY MANAGER’S UPDATE 9 TRANSFORT BUS PAD UPGRADE PROJECT Funding Source: Federal Transit Administration (FTA) Estimated Project Budget: 2019 - $915K Estimated Completion Date: Spring/Summer 2021 Phase: Contract Award Project Details: Construction and upgrade of City-wide bus pads at Transfort stops to conform with Americans with Disabilities Act (ADA) requirements. A total of 66 bus pads have been identified under this contract for construction and/or upgrade. Project Status:  Project awarded August 22nd; first project started September 30 at Raintree near the Senior Center. SUNIGA ROAD IMPROVEMENTS – COLLEGE AVE. TO BLONDEL STREET Funding Source: 2017/2018 BFO, COFC Utilities, Transportation Capital Expansion Fee (TCEF), Developer Contributions Estimated Project Budget: $3.7M Estimated Completion Date: Fall 2019 Phase: Construction CITY MANAGER’S UPDATE 10 Project Details: Design and construction of a new arterial roadway that connects existing Suniga Road, from Blondel St. to College Avenue. Project Status:  Roadway work substantially complete. Finishing details being installed. Roadway will open mid- October.  Landscape installation will follow in the fall of 2019. More information is available at https://www.fcgov.com/engineering/suniga-to-college-improvements NORTH COLLEGE IMPROVEMENTS – CANAL TO STATE HIGHWAY 1 Funding Source: Federal Grants, URA Contribution, Pedestrian Program Funds, County Funds, Transportation Capital Expansion Fee (TCEF), Developer Contributions Estimated Project Budget: $2.35M Estimated Completion Date: Summer 2019 Phase: Construction Project Details: This project will construct pedestrian improvements along North College between the Larimer & Weld Canal (City limits) and State Highway 1, including pedestrian bridges crossing the canal. Project Status:  Work was completed in early September. The project is waiting for delivery and installation of a pedestrian railing that will be installed in mid-October.  The west sidewalk is currently open to pedestrians. More information is available at fcgov.com/engineering/ncollege.php VINE AND LEMAY BNSF IMPROVEMENTS Funding Source: Keep Fort Collins Great (KFCG), Transportation Capital Expansion Fee (TCEF), 2017 / 2018 BFO Estimated Project Budget: $22M ($12M currently allocated) Estimated Completion Date: 2021 (Pending funding) Phase: In Design Project Details: The existing Vine and Lemay intersection, which includes the Burlington Northern Santa Fe (BNSF) Railway crossing, is severely congested with limited options to expand through or turn lane capacity due to land use constraints. Project Status:  Staff is moving forward with right of way acquisition. CITY MANAGER’S UPDATE 11  The contractor will be secured in the fall to begin construction next spring with the current $9M of funding.  Staff has submitted for railroad approval and is beginning this process with BNSF and the Public Utilities Commission. More information is available at fcgov.com/engineering/vine-lemay SHARP POINT/NANCY GRAY CONNECTION Funding Source: Transportation Capital Expansion Fee (TCEF), 2015/2016 BFO, Developer Contributions Estimated Project Budget: $1.4M Estimated Completion Date: September 2019 Phase: Construction, Railroad and FRA Coordination Project Details: The City Master Street Plan identifies Sharp Point Drive and Nancy Gray Avenue as connected across the Great Western Railroad tracks. This project will construct the roadway and pedestrian connection, and railroad crossing. Project Status:  City’s contractor has completed roadway construction and is now installing landscaping.  Roadway is open to the public.  City Staff, along with the Federal Railroad Administration and Great Western railroad have established a quiet zone at the crossing. Trains are no longer required by federal law to use their horns; however, they may use horns if safety concerns are present. More information is available at fcgov.com/engineering/sharppoint POWER TRAIL AND HARMONY ROAD GRADE SEPARATED CROSSING Funding Source: Federal Grant, Community Capital Improvement Program (CCIP - Bike / Pedestrian Grade Separated Crossings) Estimated Project Budget: $5M - $8M Estimated Completion Date: Pending funding Phase: Alternatives Analysis – Conceptual Design Project Details: The Power Trail provides connectivity between the Spring Creek Trail to the north and the Fossil Creek Trail to the south. The Trail currently has a gap approximately three-quarters of a mile long north and south of Harmony Road. The detour route requires users to cross Harmony Road at grade at McMurry. This project will design, acquire property interests, and construct a trail grade separated crossing at Harmony Road as well as the trail connections on either side. Project Status:  No project updates. CITY MANAGER’S UPDATE 12 More information is available at https://www.fcgov.com/engineering/powertrailcrossing TIMBERLINE ROAD CORRIDOR PROJECT Funding Source: Transportation Capital Expansion Fee (TCEF), Developer Contribution, Federal Grant Estimated Project Budget: $5M Estimated Completion Date: 2021 Phase: Request for Proposal (RFP) Project Details: This project will reconstruct South Timberline Road from Stetson Creek Drive to Trilby Road to the City’s four lane arterial roadway standards. Planned improvements include; intersection improvements at Kechter Road, Zephyr Road, and Trilby Road, multi-modal accommodations, raised medians, access control, landscaping improvements, and roadway improvements. This project serves to build upon the development improvements that have been completed along the corridor. This project will improve safety, reduce congestion, and provide improved accommodations for alternate travel modes. Project Status:  No project updates. JEFFERSON STREET IMPROVEMENTS PROJECT Funding Source: Federal Congestion Mitigation and Air Quality (CMAQ) Funds, Building on Basics (BOB) 1.0 funds Estimated Project Budget: $1.4M Estimated Completion Date: Fall 2019 Phase: Right-of-way acquisition Project Details: The goals of this project are to develop preliminary engineering design plans, to acquire rights-of-way and easements for planned improvements, and to construct partition improvements along Jefferson Street between College Avenue and the Mountain/Lincoln Intersection. Project Status:  Staff has finalized the acquisition phase for the project.  Staff is exploring possible improvements along Jefferson Street which would enable additional pedestrian improvements at the Linden Street and Jefferson Street Intersection. CITY MANAGER’S UPDATE 13 LINDEN STREET RENOVATION PROJECT Funding Source: Community Capital Improvement Program (CCIP) Estimated Project Budget: $3.8M Estimated Completion Date: 2020 Phase: Conceptual Design Verification Project Details: The goals of this project are to renovate Linden Street between Walnut Street and Jefferson Street. Initial concepts include converting this section of Linden Street to a “convertible” street; one that can function primarily as a roadway but can also be closed to vehicles and converted to a pedestrian plaza during specialty events. Project Status:  Staff’s preferred alternative is the alternative that implements parallel parking with an enhanced pedestrian space along Linden Street between Walnut Street and Jefferson Street. This change results in a net parking loss of 30 on-street spaces.  Staff has developed several strategies to mitigate the loss of on-street parking associated with the preferred alternative. These include the addition of on-street parking spaces within a four-block radius of the project, wayfinding, fee adjustments to the Old Town Parking Structure during construction, and a planned marketing campaign focused on Old Town parking.  To meet the proposed 2020 construction schedule, the project alternative must be finalized by the middle of October 2019. CITY MANAGER’S UPDATE 14 WILLOW STREET IMPROVEMENTS Funding Source: Federal Grants, Community Capital Improvement Program (CCIP), Developer Contributions, DDA Funds Estimated Project Budget: $3.8M Estimated Completion Date: Fall 2019 Phase: Construction Project Details: This project will design roadway and urban design improvements along Willow Street between College Avenue and Linden Street; including a pedestrian plaza at the northern corner of Willow Street and Linden Street. Project Status: • During the month of September, crews continued to complete sidewalk and urban design improvements along Willow Street. • Pine Street improvements were completed during September. • The Willow Street Residencies has begun to tie their utility connections into the City infrastructure, marking the last milestone ahead of top mat paving. • Top mat paving and reopening of Willow Street is scheduled for October. • Staff continues to meet with, and coordinate with, residents and businesses on a daily basis. • Plaza construction is slated to begin in October 2019 as schedule allows, in coordination with the Confluence development. CITY MANAGER’S UPDATE 15 TIMBERLINE WIDENING AT GREAT WESTERN CROSSING Funding Source: Transportation Capital Expansion Fee (TCEF), Developer Contributions, Building on Basics (BOB) 1.0, Arterial Intersection Funding Estimated Project Budget: $0.6M – Phase Two Estimated Completion Date: Summer 2019 Phase: Construction Project Details: In 2016, Phase One intersection improvements were completed at Prospect and Timberline; along with Timberline widening and multi-modal improvements south of Prospect. Phase Two improvements will consist of widening the Great Western Railway crossing, completion of multi-modal connections at the crossing, a new railroad signal system, and completion of the “free-right” turn from eastbound Prospect to southbound Timberline. Project Status:  The Great Western Railroad began installing the new crossing gates October 3. Their work is anticipated to be completed by October 10.  The City is contracting the road widening at the crossing to Mountain Constructors. Construction will begin in mid-October and is anticipated to take 3-4 weeks to complete. Work will include new sidewalk, curb, and asphalt pavement to allow three thru lanes thru the railroad crossing.  Great Western has updated their schedule to reflect an October 2019 completion. The City will accommodate the updated schedule and finish the additional sidewalk and roadway widening by November 2019. CITY MANAGER’S UPDATE 16 NORTH MASON DESIGN – ALPINE TO HICKORY Funding Source: Transportation Capital Expansion Fee (TCEF), Storm Water Utility, Urban Renewal Authority (URA) funding Estimated Project Budget: $1.0M Estimated Completion Date: Fall 2020 Phase: Conceptual Design Project Details: A collaborative effort between City departments and the North College URA to find solutions to existing drainage issues along the west side of College Avenue, north of the Poudre River. The project was approved through the 2019/2020 Budgeting for Outcomes (BFO) process and will focus on roadway and storm sewer alignments for North Mason. Construction of the storm sewer backbone is expected to occur in 2021/2022. No funding has currently been identified for the roadway construction. Project Status:  The consultant team is currently working on conceptual and preliminary level design, topographic survey, and title work analysis. CP - PARK PLANNING & DEVELOPMENT CYCLO-CROSS SKILLS TRAINING COURSE PILOT PROGRAM AT ROSSBOROUGH PARK Funding Source: Cyclo-cross community donations Phase: Pilot project underway Estimated Completion: December 2019 Project Details: The city has been working with the cyclo-cross community for several years to evaluate several park sites for suitability to pilot a cyclo-cross skills training course. Rossborough Park was selected as the best fit due to existing physical features needed for the training course, available space for the use, and ability to mitigate potential conflicts with other park users. CITY MANAGER’S UPDATE 17 Staff from Park Planning, Parks, and Forestry have collaborated with the cyclo-cross community on the best course layout in order to protect park resources and other park uses while providing several skills features for cyclo-cross riders. Project Status: • With City leadership support, staff has collaborated with the cyclo-cross community to implement a pilot course for one season. • The cyclo-cross season will run from September 20 through December 10, 2019. • After one season of use, a thorough evaluation will be conducted. • The evaluation process will include another neighborhood meeting in early 2020. Feedback will then be used to inform decisions regarding the future of the course. SUGAR BEET PARK Funding Source: Parkland Funds, Lincoln Corridor Funds, & Nature in the City Total Project Cost: $2.4M Phase: Completed Project Details: Sugar Beet Park is a neighborhood park planned near the intersection of East Vine Drive and Lemay Avenue, in front of the Streets Facility. The design of the park is inspired by the sugar beet industry and the Great Western Sugar Company that once stood nearby. This project is a collaborative effort between Park Planning & Development and Nature in the City. The park features a multi-use turf field, pollinator garden and themed playground – including a wooden beet structure. Project Status: • Park was completed in September 2019. • A successful Grand Opening event was held on September 28. The park is now open to the public. CITY MANAGER’S UPDATE 18 POUDRE TRAIL AT LANCER DRIVE Funding Source: Conservation Trust Fund Total Project Cost: $750,000 Phase: Under construction Estimated Completion: Winter 2019 Project Detail: The Poudre Trail spur at Lancer Drive will be located east of Lincoln Middle School, and provide a safe, off-street pedestrian route from West Vine Drive to the Poudre Trail. In addition to the trail, Natural Areas and FC Bikes are proposing improvements in the area, to create a safer environment and enhanced connectivity for pedestrians and cyclists. Project Status • Bids for the construction of the trail connection came in at $515,000. The cost is less than the anticipated estimates. • Construction of the trail began in September. POUDRE RIVER WHITEWATER PARK Funding Source: Park Planning & Development, CCIP, General Fund, Public and Private Fundraising, Stormwater, and Natural Areas Total Project Cost: $11.5M Phase: Nearing completion CITY MANAGER’S UPDATE 19 Estimated Completion: Fall 2019 Project Details: The Poudre River Whitewater Park project has been a collaborative effort between multiple City departments, local advocates, and the philanthropic community. The project will provide natural systems, stormwater, and recreation benefits. Project elements include whitewater boating features, a pedestrian bridge, a naturalistic park space, overlook plaza, trail & walk connections, and parking. Project Status: • Portions of the park have been opened as construction has been completed, including the pedestrian bridge and the north bank. • A grand opening celebration is planned for October 12, from 10 a.m. to noon. The celebratory ribbon cutting will take place at 10:30 a.m. • The entire park will be open to the public at the grand opening. FOSSIL CREEK TRAIL Project Detail: As part of new construction, a fence was installed along Shields Street, near the Fossil Creek Drive intersection. Project Status: • Fence was installed at the start of September. • The art piece for the Fossil Creek Trail is anticipated to be completed in October. POUDRE TRAIL AT I-25 CITY MANAGER’S UPDATE 20 Project Detail: The Poudre Trail at I-25 project is part of a collaborative effort to complete the entire Poudre Trail from Bellvue to Greeley. Participating entities include Larimer County, City of Fort Collins, the Towns of Windsor and Timnath, and Colorado Department of Transportation (CDOT). Thanks to a $2 million Great Outdoors Colorado (GOCO) 2019 Connect Initiative grant, the Colorado Front Range/Poudre River Trail Initiative project will fill three trail gaps of the Poudre River Trail between Fort Collins and Windsor. Project Status: • City of Fort Collins segments of the Poudre Trail connection at I-25 are under design. Construction is anticipated to begin in early 2021. CITY PARK REFRESH Project Detail: Several concepts, master plans, and improvement ideas have been generated and shared with the community for feedback in 2016, 2018, and 2019 to address important refresh needs of City Park. Project Status: • Design workshop participants were invited to a follow up meeting in late August to hear about the most current master plan and phase one project options. • Staff will present feedback from the design workshop as well the master plan and phase on project options at a Council work session on October 22. PARKS AND RECREATION POLICY PLAN UPDATE Project Status: • A consultant has been selected for the Parks and Recreation Plan update. • City Council will hear more about the scope of work and expected outcomes at the October 22 work session. CITY MANAGER’S UPDATE 21 CP - OPERATION SERVICES GARDENS ON SPRING CREEK – VISITOR’S EXPANSION Funding Sources: Building on Basic (BOB) II - $2.2M Op Services (Maintenance): $410K Privately Raised Funds: $740K Total Project Cost: $3,350,000 Phase: Construction Estimated Completion Date: November 1, 2019 Project Details: The Gardens on Spring Creek Visitor Center Expansion is adding approximately 4500 SF. This includes a conservatory which will incorporate a butterfly pavilion, extra meeting rooms, additional office spaces, and Solar PV to offset the additional energy usage. Project Status: • Conservatory section is complete. • Exterior stucco finish is complete. • Storefronts are in, stonework is going up. • Installation of landscape pavers began early October. • Interior drywall is finishing up and concrete floor polishing has taken place. • Tile is being installed at the restrooms • Painting began early October. • 64-kw solar PV system installation has begun. • Living Wall is getting modified and will re-install in the new Conservatory. • On track for LEED Gold; currently tracking at 63 credits. • Coordinating the Arts in Public Places (APP) design into the front entrance area. FORT COLLINS/LOVELAND POLICE TRAINING CENTER Funding Sources: $9.25M generated from bonds for the City of Fort Collins $9.25M from City of Loveland Total Project Cost: $18.5M Phase: Phase I Site Work Estimated Completion Date: Late 2020 Project Details: The City of Fort Collins is partnering with The City of Loveland to construct a new Police training facility which will be located on the west side of the Loveland Airport. This new site will offer a 50- yard pistol range, a 1.4-mile driving track, concrete skills pad, and some classrooms for special training. Project Status: • Phase I site work GMP (Guaranteed Maximum Price) contract is out for signatures and began early October. • Design team is working on construction drawings for the building and we are looking to bid this late October. Construction Site Plan Conservatory Construction is Underway CITY MANAGER’S UPDATE 22 • We have selected Spire as the Firing Range Equipment Contractor. We will be working with them to finalize details for the Firing Range. • We are working with property owners to get easements for the utilities for the project. 308 VINE WATER LAB / INNOSPHERE PHASE II Funding Sources: City of Fort Collins Cost: TBD (2/3) City Exclusive Cost: TBD $1M Currently Appropriated Rocky Mountain Innosphere Cost: TBD (1/3) Total Project Cost: Approximately TBD Phase: Conceptual Estimated Completion Date: TBD Project Details: The 308 Vine Water Lab is a joint ownership project with the City of Fort Collins and Rocky Mountain Innosphere (RMI). The project is approximately 26,000 SF. The three-story building includes lab and office space on levels 1 and 2 for Water Quality, Pollution Control, and Water Shed which currently reside in separate facilities. Building is to be LEED Gold and has budgeted to incorporate Solar PV and infrastructure for future building Net Zero goals. RMI is to own and occupy level three. The City will have the option to buy out RMI after eight years. Project Status: • The partnership was unable to collectively navigate the financial hurdles necessary for the project to move forward. • The City Manager signed termination letter for the City/RMI partnership which has been sent to RMI ending the partnership. Future Tasks: • Evaluation of all potential project sites available for a new City Water Laboratory. • Evaluation of all the selected sites and estimated cost for each location. • Presentation for the Budget for Outcomes in March 2020. CITY MANAGER’S UPDATE 23 CP - UTILITIES WATER TREATMENT FACILITY Funding Source: Capital Project Budget Estimated Project Budget: $1,300,000 Phase: In Construction Project Details: Approximately 7,300 feet of three-phase from Overland Trail to the Treatment Facility in an existing easement on Colorado State University Property Project Status: • The ATO order has been placed, however, we will not receive an estimated delivery date until engineering drawings have been provided and shared with the manufacturer. • Phase 2 has started. The station 400 vault has been set for the second switch • Completion is estimated for the first quarter of 2020. LIGHT & POWER GENESIS64 SCADA UPGRADE PROJECT Funding Source: New Capital Estimated Project Budget: $200,000 Phase: In Design Project Details: Convert the existing Iconics Genesis32 hardware, software, and screens to Genesis64 Project Status: • Kepware is expected to provide a solution for digital outputs within the next few weeks. • The ESCADA team is working on linking Kepware tags on the new GEN64 screens. Water Treatment Facility SCADA Software CITY MANAGER’S UPDATE 24 NEW FEEDER CAPACITY (E. DRAKE & LEMAY) Funding Source: New Capital Estimated Project Budget: $500,000 Phase: Construction Project Details: Install 7000 feet of three phase 750 Al and one switch to serve new load at Drake and Lemay. Project Status: • The new circuit 234B has been extended to the customer site. • Customer pad and switch is in place. Customer is delaying the final installation of our last segment of 750 Al until their 200amp switch gear arrives. GIS/GWD & ADMS Funding Source: Offer 5.23 Operational Technology Estimated Project Budget: $2,762,384 Phase: System Design, Hardware Procurement, Database Configuration Project Details: 1. Replacement and upgrade of the existing L&P mapping systems to a fully capable Geographic Information System (GIS) platform compatible with the City's enterprise GIS. 2. Implementation of a GIS-based Graphic Work Design (GWD) system enabling streamlined electric distribution design and development and integration with GIS as well as other key systems 3. Replacement of existing electric distribution operational tools with a new Advanced Distribution Management System (ADMS) that enables L&P’s Supervisory Control & Operations (SCO) staff to performs a wide range of real-time analysis in the management of the City’s electric distribution system. Project Status: • The project team has received the first GIS data report from the ADMS vendor, giving the team critical feedback on what is needed to continue to prepare our geodatabase for use in outage management and operations in the new software. • A series of map symbology workshops are underway, gathering feedback from future system users. • Heavy geodatabase configuration continues, informed by the editing process and workshop. • Work is underway with the GIS/GWD vendor to carry out an early implementation of key components in order to provide tools and resources to the project team in preparation for go live. This includes the mobile GIS application with redlining functionality. • The GIS/GWD software vendor has begun development of a custom software component to replace an existing system. We have completed two reviews with the vendor of the work in progress. Crossing Drake to Woodward System Design Visual CITY MANAGER’S UPDATE 25 • The ADMS project team and ACS have agreed on the system architecture and IT has placed the order for servers and storage. • The ADMS project team has completed system interface design documents and has supplied them to the vendor for development of the ADMS system. • The last two workshops for GIS/GWD are scheduled for later October and early November. • The project team is currently preparing a complete test and development environment for GIS/GWD. SYSTEM CABLE REPLACEMENT PRIORITY 1- WOODWEST Funding Source: Offer 8.9 Economic Health Estimated Project Budget: $158,000 Phase: In Construction Project details: • This project will replace 11,500 lineal feet of cable in the Woodwest Subdivision. This area was identified as a top priority. • Replacement includes 30 sections of cable. • Project completion is expected by year end in Quarter 4. SYSTEM CABLE REPLACEMENT PRIORITY 2-FOX MEADOWS Funding Source: Offer 8.9 Economic Health Estimated Project Budget: $ 32,000 Phase: In Construction Project details: • This project will replace 2,500 lineal feet of cable in the Fox Meadows Subdivision. This area was identified as a top priority. • Replacement includes four sections of cable. • Project completion is expected by year end in Quarter 4. Cable to be replaced for the Woodwest Project. Cable to be replaced for the Fox Meadows Project. CITY MANAGER’S UPDATE 26 DWRF NPT BLOWER HVAC REPLACEMENT Funding Source: Wastewater Estimated Project Budget: $370,000 Status: In construction Estimated Completion Date: 1st Quarter, 2020 Project Details: The aging evaporative swamp cooler at DWRF’s North Process Train Blower building can no longer keep up with the cooling demands of the four blower units, which provide the aeration required to treat wastewater and meet DWRF’s regulatory discharge permits. The swamp cooler will be replaced a Makeup Air Unit (MAU) customized to fit within the existing curb cut, provide more efficient cooling, withstand Colorado’s unique temperature swings during shoulder seasons and stand up to potential air quality issues. Project Status: • MAU on order • Coordinate programming with ICE Team MAIL CREEK IMPROVEMENTS AT MEADOW PASSWAY Funding Source: Stormwater Estimated Project Budget: $1,400,000 Status: In Design Estimated Completion Date: April 1, 2020 Project Details: The Mail Creek stream reach is within an urbanized corridor and is experiencing severe bed erosion. Improvements will include stabilizing the creek bed and banks through a combination of bio-engineered designs, re-grading, re-vegetation, and easements from property owners to construct and maintain the improvements. Project Status: • Easement and access agreements with HOA - completed • Floodplain modeling - completed • Independent cost estimate - underway REMINGTON STREET STORM SEWER Funding Source: Stormwater and Wastewater Estimated Project Budget: $3,551,750 Status: In Design Estimated Completion Date: 3rd Quarter, 2020 Project Details: Sandbags placed for erosion protection Existing evaporative cooler CITY MANAGER’S UPDATE 27 The Remington Street outfall is a storm sewer and sanitary sewer replacement project along Remington Street from Spring Park Drive to Prospect Road. The storm sewer will be upsized to alleviate flooding along Remington and the surrounding areas. This project is currently in the final design phase and construction is anticipated to begin in February 2020. Project Status: • Final design - underway • Cost estimating - underway • Public outreach HICKORY STREET WATERLINE RAILROAD BORE Funding Source: Water Estimated Project Budget: $627,000 Status: In Permitting Estimated Completion Date: 4th Quarter 2019 Project Details: The Hickory Street waterline project includes the installation of a new 8” waterline across the Union Pacific Railroad right-of-way and tracks to complete a long-needed connection for water distribution system reliability in this area. This project will connect an existing 8” waterline on the east side of the tracks to an existing 12” waterline running parallel and to the west of the tracks. This work will be done using an auger bore, installing a 24” diameter steel casing around the 8” PVC waterline across the railroad. Project Status: • Final construction contracts are complete. • Finalize agreement with UPRR is complete. • Additional outreach efforts to inform neighbors and businesses of the updated start of construction is underway. PUBLIC SAFETY POUDRE FIRE AUTHORITY Oct. 4 | Ossuary Dedication at Grandview Cemetery Several plots within Grandview Cemetery serve as final resting places for firefighters and their family members. Thanks to a collaborative effort between PFA and the City of Fort Collins, the six remaining sites Geotechnical test pit, February 2019 Utility investigation: potholing for Subsurface Utility Engineering (SUE) CITY MANAGER’S UPDATE 28 have been reserved for firefighters that make the ultimate sacrifice in the line of duty. An ossuary, a vessel or container dedicated to hold human remains, was added to the site. All firefighters, their family members and PFA civilian personnel can choose to have their ashes added to the ossuary. Fire Chief DeMint, Mayor Troxell, Chaplain Christopherson, Parks Crew Chief Mark Young and Parks Supervisor Kevin Williams all spoke at the dedication. The event gathered a crowd of around 50 people including family members of fallen firefighters, firefighters, and other community members. Sept. 26 | No Injuries in Early Morning Fire Firefighters responded to a house fire on the 2300 block of Antelope Rd. near the intersection of Horsetooth Rd. and Timberline Rd. Thankfully, no one was home and there was no risk to other structures. Smoke was coming from the roof when firefighters arrived. Crews remained on scene to clear debris and create a safe area for the fire investigator to conduct a thorough review of the scene. The family was notified and PFA’s Customer Assistance Response Team, or CART, was dispatched to assist them. CART team members help people displaced by fire to navigate tragic events such as these by providing support that can include finding temporary places to stay, starting insurance claims and more. The fire started in the garage and the cause was determined to be accidental. Sept. 24 | Board Members Learn CPR –Sept. 24 PFA Board Members engaged the community to learn CPR, understand AEDs and use the lifesaving app PulsePoint by learning it themselves at their last meeting. They helped to share the PFA message that it takes a community to save a life. Sept. 22 | Crew Reunites with Baby They Helped Deliver The C Shift Engine 1 Crew welcomed one of their tiniest visitors to Station 1. The crew, along with UCHealth 210, helped deliver the baby in Fort Collins late last July. The family and 2-month old Mason presented the crew with a framed photo as a token of their appreciation. The crew showed the family around the station and apparatus while everyone took turns holding the baby. “It made me think of the day my daughters were born and how happy I was,” said one firefighter of the experience. POLICE SERVICES Community Engagement On September 13, officers and members of the Neighborhood Services team gathered at Campus West Connections to share coffee, snacks, and great conversation. The CWC staff has planned a number of engagement events throughout the year to create opportunities to spend time with community members and showcase the space. FCPS staff continues to hold informal Walk & Talk events. In September, members of the Criminal Investigation Division spent an evening walking around the neighborhoods surrounding Kruse Elementary and chatted with residents about any issues or concerns on their minds. This initiative has been a great way to meet people where they’re at and create positive interactions within our community. CITY MANAGER’S UPDATE 29 Social Media Feature Traffic Stop Video – Members of the FCPS Spanish team developed a video explaining the traffic stop process. This video came as a result of a request from the community to shed light on a situation that makes many people uncomfortable, especially in our non-English speaking community. The video was well-received, and staff received positive feedback from community members. To view the video, visit https://www.facebook.com/fortcollinspoliceservices/videos/902800856747616/ Case Highlights Sexual Assault Suspect Arrested – In the early morning hours of September 7, a female victim contacted police to report that an unknown male entered her residence in the 600-block of Balsam Lane and sexually assaulted her. Responding officers quickly located and arrested the suspect, who was identified as 22-year-old Tanner Cook. Cook was arrested and booked into the Larimer County Jail. He faces charges of Burglary (class 3 felony) and Sexual Assault (class 3 felony). Serious Injury Assault Suspects Arrested – Two people were arrested in connection with an assault that left one man with serious injuries. On July 28, 2019 around 1:30 a.m., Fort Collins Police responded to a disturbance in the area of Oak Street and Remington Street. Investigators determined that the victim witnessed a verbal disturbance between a man and woman and tried to intervene. The male suspect punched the victim, knocking him to the ground and causing serious bodily injury. The suspect fled from the area before police arrived. Throughout the investigation, the woman repeatedly insisted that she and the suspect had just met on the night of the incident and that she had no information about his identity. However, after a thorough investigation, detectives determined that the two were actually in a relationship. Detectives identified the man as Noah DeWitt, 25, of Casper, Wyoming. A warrant was issued, and DeWitt was arrested in Casper on the charge of Second Degree Assault (class 4 felony). The woman, Kaytlyn Garner, 27, was also arrested in Casper on the charge of Attempt to Influence a Public Servant (class 4 felony). Crime Prevention This month, the Crime Prevention Specialist had 21 telephone calls to include a Property Management Company needing some advice on illegal dumping to setting up robbery prevention at a bank. Presentations included a repeat class on Scams & Frauds at the Legacy Apartments for seniors and teaching a child safety class to autistic children. Here’s the breakdown on activities in September: Dealing with Difficult People, Senior Center Managers, 15 attended RESTORE (Restorative Justice), 35 attended CITY MANAGER’S UPDATE 30 Scams & Frauds, Legacy Apartments, 16 attended Community Talk, Parkwood East, 50 attended Child Safety Fair, Christ Fellowship, 56 attended Child Safety, Autistic Children, 31 attended Child Safety, Children’s Workshop, 45 attended Senior Pedestrian Safety, The Worthington Apts, 11 attended Fall Prevention Safety Fair, Senior Center, 62 attended PLANNING, DEVELOPMENT &TRANSPORTATION BUILDING, PLANNING AND DEVELOPMENT REVIEW Monthly Reporting Monthly construction reporting and mapping of development review proposals and construction can be found by visiting: http://citydocs.fcgov.com/?dt=MONTHLY+REPORT&dn=NEIGHBORHOOD+%26+BUILDING+SERVIC ES%2FZONING&vid=2&cmd=showdt For a detailed listing of development Proposals under review, please visit: https://www.fcgov.com/developmentreview/proposals/ CDPHE Housing Affordability and Health Equity Grant Initial deliverables for the first grant quarter (July-September) have been substantially completed. Completion of the marketing/messaging design and strategy has been slightly delayed from the first grant quarter, to be completed before the first stakeholder convening in November 2019. Activities for the second grant quarter include finalizing the marketing strategy, a workshop with key stakeholders (November), an educational session for City staff/leadership, targeted engagement via resident panel discussions/focus groups, and initial data collection/research. A public kickoff event is anticipated in early 2020. All grant activities are being closely coordinated to integrate with and support parallel City efforts including; manufactured home park preservation, Land Use Code Audit, Social Sustainability Gaps Analysis, Affordable Housing Strategic Plan update, and updates to HUD plans. City Plan Implementation – Land Use Code Audit Staff recently completed a series of stakeholder meetings and an on-line survey to better understand potential Land Use Code changes that will implement new City Plan policies. In November, there will be initial community engagement meetings to review issues and possible code direction. Code audit findings and Land Use Code Amendment recommendations are slated for the December/January timeframe. Harmony Corridor Plan Gateway Area Update Staff has prepared four land use alternatives for the Harmony Gateway Area based on recent City Council direction. Scenarios will be shared with the community at an I-25 Gateways workshop on October 21st. Work sessions have been held with P&Z, NRAB, LCSB, Water Board and the EAC. City Council will discuss the project status at a Work Session on October 22nd. Council consideration of plan and code amendments has been scheduled for December 17th. Hughes Rezoning City Council will review the rezoning ordinance at 1st reading on November 5th. CITY MANAGER’S UPDATE 31 Oil and Gas Operations Work is underway to evaluate the City’s oil and gas regulatory options in response to new State legislation. A City Council Work Session was rescheduled to October 8th to seek direction and a strategy for next steps. Montava  Development Project The Planning & Zoning Board held a hearing for the Montava Planned Unit Development (PUD) project on August 15 and recommended approval of the project to City Council. City Council is the final decision-maker on the Montava PUD, and Council hearings have been rescheduled for the following dates: · December 3 – City Council Meeting (1st reading and public hearing) · December 17 – City Council Meeting (2nd reading and public hearing) All meetings will start at 6 p.m. at City Hall, 300 Laporte. New Development Applications  –  September 2019 More information on development proposal under review:  https://www.fcgov.com/developmentreview/proposals/ Project Name Project Type Location Mars Landing, PDP190013 Multi-family Residential Intersection of Mars Dr & W Skyway Dr Prospect and College Hotel, PDP190014 Hotel Intersection of Prospect Rd & College Ave Elm Ridge Ranch Replat, FDP190020 Replat for Residential Lots 1727 Ridgecrest Rd 405 Scott Ave Carriage House, FDP190019 Carriage House 405 Scott Ave Mulberry Connection, PDP190015 Industrial Buildings 3801-4099 Redman Dr Development Project Decisions – September 2019 More information on development project decisions:  https://www.fcgov.com/developmentreview/agendas.php Project Name Decision Maker Location Decision Date Decision Trail Head Filing Two – Replat & Minor Amendment, BDR190012 / MA190053 Development Review Manager Green Lake Dr 9/4/19 Approved The Overlook - Stand Alone Modification, MOD190001 Planning & Zoning Board 3710 John F Kennedy Pkwy 9/19/19 Approved Fox Grove Phase 2, PDP190002 Administrative Hearing Officer East of I-25, South of Mulberry St 9/21/19 Approved 644 Remington Street - Extra Occupancy, BDR190010 Development Review Manager 644 Remington St 9/24/19 Approved CITY MANAGER’S UPDATE 32 NEIGHBORHOOD SERVICES Sustainable Neighborhoods Fort Collins Sustainable Neighborhoods Fort Collins has two neighborhoods certified through the Sustainable Neighborhoods program! The first, Warren Lake, held neighborhood-wide sustainability events tied to a lake “regatta”, hosted workshops with City staff in Environmental Services, and kept Warren Lake clean with a successful lake clean-up. Parkwood East is the second neighborhood to qualify for certification as a Sustainable Neighborhood. This neighborhood reached the 60-credit milestone after a hugely successful block party, which has propelled them toward starting a “Sip and Stroll” club, planning a preparatory gardening workshop, and organizing a neighborhood Oktoberfest complete with cider, sausage, and pretzels. Both neighborhoods continue to work toward a 100-credit goal of being certified as an “Outstanding Sustainable Neighborhood” before the April 2020 pilot year deadline. The other two Sustainable Neighborhoods, Moore and Oakridge 8, are on track for certification and more than halfway to the credits needed. Neighborhood Services and Environmental Services will provide an update with this exciting news about Warren Lake and Parkwood East to the CAP Executive Team and City Council. Neighborhood Mini-Grants Neighborhood Services is also proud to share the story of the youngest mini-grant recipient ever. Lily Horst, a 14-year-old student in Fort Collins’ Meadowlark Heights Neighborhood, applied for a Neighborhood Services mini-grant along with her uncle to help bring neighbors together to repair the South Meadowlark Heights neighborhood sign. Sadly, soon after being awarded the funding, Lily’s uncle committed suicide. Lily and family have chosen to continue with the sign repair project, to honor her uncle’s life. While sharing flyers about fundraising for the sign, Lily and her Aunt Rachel met a writer for the Coloradoan in the neighborhood. Lily’s story was so inspirational, the Coloradoan ran two articles about her work and the project. The Go Fund Me set up for funds to repair the Meadowlark sign raised more than $4,000 (with only $3,000 needed for sign repair) from almost 100 individual donors. Lily and her neighbors are looking forward to repairing the sign, updating the landscaping, and hosting a celebration of neighborhood connections. https://www.coloradoan.com/story/news/2019/09/17/fort- collins-girl-wants-repair-sign-honor-late-uncle/2342890001/ https://www.gofundme.com/f/fix-the-meadowlark-heights-sign Vibrant Neighborhoods Grants We are closing out some of our Vibrant Neighborhood Grants from the projects awarded funding in the 2018 budget year. A 2018 Vibrant Neighborhood Grant was awarded to the Saddlebrook Neighborhood for to install Night-Sky-Friendly light posts throughout their neighborhood. In 2017, Saddlebrook received a VNG to swap out porch lights with night-sky friendly alternative and worked with Utilities Senior Energy Services Engineer, Gary Schroeder, to oversee the design and implementation of the project. The results of their efforts include reduced energy costs, better visibility of stars and planets, more friendly habitat for wildlife, and an increased sense of safety and visibility with less glaring lights. The neighborhood organized an astronomy night after the lighting was installed and enjoyed stargazing with the Northern Colorado Astronomical Society. A 2018 Vibrant Neighborhood Grant was awarded to the Village Park Neighborhood to turn a grassy area in the center of the cul-de-sac into a “community circle.” In addition to relocating mailboxes here, the circle became a destination with benches, a Free Little Library, and a message board. Now neighbors can sit and visit when they collect their mail, and children can play and read along the xeriscaped path. CITY MANAGER’S UPDATE 33 Avery Park Neighborhood Clean-Up Project On September 30th the Community Liaison between the City of Fort Collins and Colorado State University, Jenn Rieskamp, partnered with 7 CSU students from Engineering College Council on an Avery Park Neighborhood Clean-Up Project. Students walked around Avery Park and the surrounding neighborhood to pick-up trash and chat with residents. Students reported being thanked by several residents for their clean-up efforts. YEAR TO DATE COMPARISON 2018 2019 YTD % Change Development Project Submittals Received 249 321 28.57% Conceptual/Preliminary Design/Staff Reviews 183 167 -8.74% Building Permits Issued 8,079 12,033 48.97% Building Permit Valuations ($M) $316.33 $261.12 -17.45% Building Inspections Performed 25,788 20,496 -20.52% Zoning Inspections Performed 2,488 345 -86.13% Zoning Plan Reviews Performed 2,560 2,129 -16.84% Overall Development Review revenues are $(1,024,360) under projection for 2019 as of September 30th with Development Review under by $(930,573) and Engineering Development Review under by ($93,787). GRAFFITI UPDATE During the month of September 2019, the Graffiti Abatement Team abated 65 issues consisting of 100 tags measuring 805 square feet of graffiti-covered surfaces. Month Access FC Hotline Pro-Active Total January 5 0 29 34 February 10 9 38 57 March 12 5 76 93 April 19 3 40 62 May 13 3 53 69 June 16 7 42 65 July 7 11 51 69 August 16 7 71 94 September 14 5 46 65 Total 107 50 417 574 CITY MANAGER’S UPDATE 34 SUSTAINABILITY SERVICES ENVIRONMENTAL SERVICES October is Radon Action Month! With winter fast approaching it’s the perfect time to test your home for radon. Radon is a colorless, odorless, and naturally occurring gas that is the second leading cause of lung cancer. Radon gas enters homes and other buildings through cracks and openings in basements, crawl spaces, and slabs. Colorado homes are at a higher risk for radon. Testing the radon levels in your home is simple and inexpensive. Here are a few options: Purchase a radon test kit or sign us for a healthy homes assessment. Find out more at fcgov.com/radon. Our Climate Future Community Engagement: Do you want to co-create equitable solutions to achieve the community's energy, zero waste, and climate goals? If so, you have an opportunity to get involved in the Our Climate Future Planning effort! This project is an update to the City’s Climate Action Plan, Energy Policy and Road to Zero Waste initiative. The project is currently in the early stages of public engagement and will be hosting upcoming interactive listening sessions, including one October 24th at the Senior Center from 4:30 – 5:45 p.m. Find out more or at ourcity.fcgov.com. SOCIAL SUSTAINABILITY Emergency Weather Shelter Plan Forecasted winter temperatures below 0 degrees will activate the City's Emergency Weather Shelter Plan. During emergency weather activation, additional options for overnight shelters are secured and community resources maximized to support those seeking shelter. Find out more by visiting the newly updated Homeless Resource Guide: https://www.fcgov.com/sustainability/pdf/HomewardAlliance_ResourceGuide.pdf?1569947946 ECONOMIC HEALTH Business Appreciation Breakfast The Economic Health Office hosted the 7th Annual Business Appreciation Breakfast on Thursday, September 26th at the Hilton in Fort Collins. The event featured keynote speaker and local business owner, Betsy Craig. The event celebrated local businesses in our community; “start-ups, scale-ups and seasoned pros”. Event photos can be found here: https://www.flickr.com/photos/fortcollinsgov/albums/72157711151614431 UTILITIES CUSTOMER CONNECTIONS Community Engagement (CE) has reached 11,050 participants through 168 outreach events and programs covering hot topics such as Time-of-Day, Income Qualified Assistance Program, and resource conservation. CITY MANAGER’S UPDATE 35 The Power Trip Bus Tour offered a behind-the-scenes look at how electricity evolves from source to switch. This bus tour provided the opportunity for 30 members of the public to tour the Rawhide plant and hear from our local experts on everything electric. Following this final bus tour of the season, a participant even blogged about her experience! Open Streets is a biannual, family friendly event that encourages biking in the community. Utilities attended and shared with 159 participants about upcoming programs and campaigns such as Time-of-Day, Shift Campaign, Halligan, Water Shortage Response Plan, and the Income Qualified Assistance Program. The Income-Qualified Assistance Program (IQAP) currently has 753 participants enrolled, approximately 100 more compared to last year’s average enrollment. City Code updates for IQAP will be presented this fall to Council that will include access for more customers to participate who live in multi-family units. The Residential Sprinkler Audit Program is a free service for all single-family residents, in partnership with Fort Collins-Loveland and ELCO water districts. In 2019 Utilities completed 440 audits, far exceeding the goal of 350 audits. 84% of survey respondents said the audit exceeded their expectations. The Residential Sprinkler Audit Program has received the Outstanding Public Engagement Award from the national (international - includes Canada) Irrigation Association. The award will be presented at the WaterSmart Innovations Conference in early October in Las Vegas. It recognizes work to engage and educate residential and commercial end users on smart and efficient technologies, best practices and programs related to outdoor water conservation. Energy Services staff attended the Rocky Mountain Utility Exchange and presented on; Improved Health Outcomes from Residential Energy Efficiency Upgrades, Residential Solar and Battery Customer Response to Time-of-Day Rates, Energy Savings from Dark Sky Lighting in a Townhome Neighborhood, Program Design with Rapid Prototyping, and Promoting the Value of Residential Energy Efficiency in the Real Estate Market. The conference is attended by over 150 Utility and industry professionals across the west. The exchange provides an opportunity for utilities to share best practices in a changing utility environment. Fort Collins Utilities has historically led many of these discussions, detailing innovation in program administration. The theme for this year’s conference was “Practicing Customer Centricity.” Fort Collins Utilities won two 3CMA awards: • Silver Circle Award - Time-of-Day Residential Electric Pricing with comments from the panel stating, “This was such an impressive entry. Not only was it extremely well thought out, comments from the panel judges focused on the extremely well thought out, but its timeline was relevant and realistic considering such a massive change to the company and to its customers. What impressed me the most was their willingness for two-way communication, and allowing for multiple channels for feedback and communication.” • Award of Excellence #WeAreUtilities Campaign with comments from the panel stating, “This is well done and truly defines connectivity. It ensures your community of the importance of CITY MANAGER’S UPDATE 36 respecting one another and the importance of each vital role that each employee plays to continue to build a high functioning and safe environment.” COMMUNITY SERVICES RECREATION • National Senior Center Month: The Recreation Department celebrated National Senior Center Month in September with programs such as Grandparents Day that had over 150 participants. • Commission for Accreditation of Park and Recreation Agencies (CAPRA): The City of Fort Collins Parks, Recreation, and Park Planning and Development departments were awarded the national accreditation award from the Commission for Accreditation of Park and Recreation Agencies. This prestigious accreditation demonstrates our commitment to parks and recreation best practices and high-quality services and programs for the community. PARKS • Parks, Recreation, and Park Planning and Development earned the national accreditation award from the Commission for Accreditation of Park and Recreation Agencies (CAPRA) at the National Recreation and Park Association (NRPA) conference in Baltimore, MD. • Cyclo-cross pilot course at Rossborough Park is open and will be evaluated early next year. • Poured in place surfacing installed at Lee Martinez Park playground to enhance accessibility. • Emerald Ash Borer was detected in Larimer County for the first time. Appropriate communication strategies are being deployed. CULTURAL SERVICES “Ringfall” by Tim Upton and Todd Kundla The Arts in Public Places Program has two artworks that won a 2019 Fort Collins Urban Design Award. The first is “Ringfall” by Tim Upham and Todd Kundla located near East Prospect Road and South Timberline Road. The second is the integrate artworks on the exterior of Utilities Administration CITY MANAGER’S UPDATE 37 Building, 222 Laporte Ave. The artworks include “Power Grid” and “The Water We Share” by Andrew Dufford and Chevo Studios. At the Gardens on Spring Creek, construction of the Butterfly House and new Visitor’s Center are nearing completion! Look for announcements for the grand reopening later this fall. The OtterBox Digital Dome Theater at the Fort Collins Museum of Discovery continues to program a wide range of excellent offerings. On October 17th the Dome will premiere “Sound & Vision Cinema: Detour 360” an audio-visual portrait of the state of Colorado featuring internationally renowned sound artist and musician Bruce Odland. The Lincoln Center will be hosting the 19th Artwear Biennial: Where Fashion Meets Fine Art on Friday, October 18th. ArtWear's goal is to present innovative and wearable work of the highest quality and provide a forum to share enthusiasm for an exploration of techniques and materials. NATURAL AREAS Goat Grazing Goats' role in in improving wildlife habitat might not be obvious at first. But it makes more sense when you know that Fort Collins' high elevation grassland ecosystems can benefit from grazing to ensure plant diversity, nutrient cycling, and for overall health. While mechanical mowing can replicate some of the benefits of grazing, it’s not quite the same. That is why the Natural Areas Department periodically uses herds of goats to graze and breakdown weedy vegetation. They will be grazing along the Poudre River corridor this fall. The goats set the stage for future management actions such as planting native seeds, judicious herbicide applications, and controlled burns. Goat grazing is part of the long-term natural areas management strategy called Integrated Pest Management which maximizes habitat improvement and minimizes negative impacts to human and ecosystem health. Land Conservation Highlight: Coyote Ridge Natural Area Expansion Goats grazing at Salyer Natural Area CITY MANAGER’S UPDATE 38 On September 19th, Coyote Ridge Natural Area was expanded by 40 acres at the cost of $250,553. The property has a beautiful and diverse mixed grass prairie. The prairie is in good condition with very few non-native plants. Wildflowers are abundant and flower in the summer months. Many of the plants provide important habitat for native bees, butterflies and moths. Yucca found in rocky soils on the top of small rolling hills is critical for the yucca moth. Native grasses like blue grama, little bluestem and western wheat provide larval food sources for many of the foothill butterfly species. Rare plants can also be found on site. Bell’s twinpod, a globally imperiled plant, inhabits soils from the Niobrara outcrop that can be found in small patches throughout the area. Bell’s twinpod is a locally endemic plant and can only be found in Larimer and Boulder counties. These pristine habitats increase the potential for hosting a diversity of wildlife species. Breeding bird survey results of the adjacent property would suggest that grassland bird species that have experienced significant declines are likely to be present on this property as well. The conservation of this property will help create a more contiguous, less fragmented landscape, that will benefit wildlife of multiple scales. Quarterly Land Conservation Update Land Conservation Summary To Date Acreage Cost Acres of Land Purchased 37,259 Acres of Land Leased 897 Acres of Land in Conservation Easements 6,725 Total Conserved - To Date 44,881 $ 96,278,320 2019 Acquisitions To Date Acreage Cost Robbins Fee Acquisition - S. Shields - Adjacent to Cathy Fromme Prairie January 32 $ 1,122,851 Bishop Ranch - Antrim/Ring Fee Acquisition - Regional Foothills - Adjacent to Natural Areas owned property. March 540 $ 1,584,739 Hazelhurst Fee Acquisition - Addition to Coyote Ridge NA Sept. 40 $ 250,553 Total Conserved - Year To Date 612 $ 2,958,143 Property Under Contract Acreage Cost Fee Acquisition Addition to Kingfisher NA Closing 4th Quarter 5.4 $ 27,000 Fee Acquisition Northwest Fort Collins Closing 4th Quarter 35 $ 1,870,775 Total Under Contract 40.4 $ 1,897,775 CITY MANAGER’S UPDATE 39 Land Conservation Funds Budgeted for 2019 $3,500,000 + Re-appropriation $9,100,000 $ 12,600,000 Land Conservation Funds Expended to Date $ 2,958,143 Acquisitions Under Contract $ 1,897,775 Net Land Conservation Funds Remaining for 2019 $ 7,744,082 PUBLIC ENGAGEMENT 2019 Community Survey The two waves of post card notifications to complete the 2019 Community Survey have been sent out. The open opt-in survey is now underway and will be available until October 14. City staff is promoting participation in the survey with several community partners, through social media, as well as three radio stations. Survey responses will be analyzed through the first week of November. Our Climate Future Pop-up Engagement: As part of the Our Climate Future process, City staff has organized several pop-up engagement events. The events consist of City staff asking community members two basic questions regarding sustainability. Community members are then given the opportunity to write down one of their answers in a chalkboard, and then have their picture taken for social media. They also receive a raffle ticket for the chance to win a tent. The tent is currently used during the events as a prop to get participants interested. There have been two events already; the first one took place in front the City Services building (222 Laporte), and the second one was conducted in the Lory Student Center plaza. There will be eight more events scheduled for the remaining of the year. BROADBAND – FORT COLLINS CONNEXION Connexion Service in a Neighborhood Near You Fort Collins Connexion continues to turn on new streets every week. Homeowners are notified with a sales door hanger (unless a no soliciting sign is present), and email and a direct mail letter once service is available to order for their home! Residents can call Customer Service at 970-212-2900 or go online at fcconnexion.com to sign up for service. Connexion Technical Support 24/7 CITY MANAGER’S UPDATE 40 The Connexion Team just hired three new Technical Support Specialist who will assist customers calling in with technical support questions or issues—no matter what time of day, or night it is. Our 100% local support team is available Monday-Sunday 24 hours a day! Social Media Follow Fort Collins Connexion on Facebook and Twitter! Get the latest updates on Connexion, stay informed and have fun! Join our growing online community of Connexion fans! Facebook: @FCConnexion Twitter: @ConnexionFC COMMUNITY DASHBOARD HIGHLIGHT The Community Dashboard features performance data and information that highlights how the City is doing in achieving its seven Outcome areas: Neighborhood Livability and Social Health, Culture and Recreation, Economic Health, Environmental Health, Safe Community, Transportation, and High Performing Government. The Dashboard is made up of 37 total metrics that are published quarterly and demonstrate where the City is doing well and where there are opportunities to improve. The color status of performance for each metric is determined based on the actual result for the quarter compared with the target. The color status of performance for the Outcome is determined based on the average calculation of the performance of each metric within that Outcome. Each month the City Manager’s Update will highlight a metric from the Community Dashboard. This month’s feature is from the Safe Community Outcome Area. Analysis: In the second quarter of 2019 there were two (2) fires that reached flashover. There were seventy-five calls coded as Fires and of those twenty-five (25) incidents met the requirements of this measure. There were of a total of 5,235 calls for service from April 1, 2019 through June 31, 2019. Eight (8) of those were extinguished by crews on scene with proper deployment of hoselines and two (2) were CITY MANAGER’S UPDATE 41 extinguished by a fire sprinkler system in commercial buildings. One of the fires extinguished by the sprinkler system was ironically caused by the fire pump for the system and the other was at Fossil Ridge High School. This was a fire in the wood shop dust collection system. Two fires reached flashover in the second quarter of 2019, but before any crews arrived on scene. One of these fires was a chicken coop and one was a landscape business. There were no actions that response crews could have taken to stop the flashovers. Unfortunately, there was a fire related death in a structure fire that didn’t reach flashover. This was in the manufactured home park where Community Risk Reduction partnered with the Front Range Fire Consortium academy to install smoke detectors after this event. PFA strongly believes that the best service to the community is to prevent fires from occurring and limiting the loss to life and property if they do. Therefore, PFA will continue to inspect and require sprinklers in occupancies that the Fire Code dictates to prevent flashover from occurring. PFA Public education will continue to employ strategies in their programs to reduce the loss of life and property from fires like the one completed in the manufactured home park. Response times are monitored for Standard of Cover requirements and crews train monthly on tactics like Vent-Enter-Search and hose deployment to be ready when a fire does occur. Finally, PFA is working on “right sizing the response” to all incident types that the organization responds to. This includes the implementation of the RAM (Roving Alternative Medical) unit in high density areas in high volume periods to reduce response times in all risks, including fire. If engines are not on lower acuity calls, then they are able to respond quicker to higher acuity ones. Definition: This measure relates to the ability of on-scene firefighters and building sprinklers to prevent fire flashover and the spread of a structure fire. Why is this metric important? Flashover is the stage of a structure fire when it becomes extremely dangerous to occupants, structures and firefighters. During a flashover, temperatures and conditions are intense and an entire room can burst into flames, causing a fire to spread to other parts of the structure. By containing a fire to its room of origin and delaying flashover, firefighters can buy several minutes, which may be critical. Delaying flashover allows more time to complete a search and rescue of the burning room or allow a firefighter to go above a fire to rescue a trapped victim. Delaying flashover and fire spread can limit fire loss and injuries to occupants and firefighters. City’s impact on this metric: High – PFA's ability to influence the fire containment to the room of origin is rooted in effective firefighter training to attack fire upon arrival, efficient response times, education and outreach to the community on fire safety practices, and the mandatory use of fire sprinklers in some buildings to limit the spread of fire. Benchmarks: Benchmarking in progress To view the entire Dashboard, please visit: http://fortcollins.clearpointstrategy.com/