Loading...
HomeMy WebLinkAboutReport - Mail Packet - 9/17/2019 - City Managers Monthly Update - September 12, 2019Neighborhood Night Out – August 6, 2019 September 2019 SEPTEMBER 12, 2019 Table of Contents ISSUES BEFORE COUNCIL ................................................................................................................. 4 SEPTEMBER 17 COUNCIL MEETING ........................................................................................................................4 SEPTEMBER 17 ELECTRIC UTILITY ENTERPRISE ......................................................................................................4 SEPTEMBER 17 WORK SESSION ..............................................................................................................................4 SEPTEMBER 24 ADJOURNED MEETING ..................................................................................................................4 SEPTEMBER 24 WORK SESSION ..............................................................................................................................5 SEPTEMBER 26 URBAN RENEWAL AUTHORITY BOARD MEETING - CANCELED .....................................................5 OCTOBER 1 COUNCIL MEETING ..............................................................................................................................5 OCTOBER 8 WORK SESSION ....................................................................................................................................5 PUBLIC ENGAGEMENT – UPCOMING EVENTS ........................................................................................................6 SALES TAX - MONTHLY & YEAR TO DATE ....................................................................................... 7 CP- ENGINEERING .............................................................................................................................. 7 CITYWIDE PEDESTRIAN ACCESS PROJECT ...............................................................................................................7 TRANSFORT BUS PAD UPGRADE PROJECT..............................................................................................................8 SUNIGA ROAD IMPROVEMENTS – COLLEGE AVE. TO BLONDEL STREET ................................................................9 NORTH COLLEGE IMPROVEMENTS – CANAL TO STATE HIGHWAY 1 .....................................................................9 VINE AND LEMAY BNSF IMPROVEMENTS ........................................................................................................... 10 SHARP POINT/NANCY GRAY CONNECTION ......................................................................................................... 10 POWER TRAIL AND HARMONY ROAD GRADE SEPARATED CROSSING ................................................................ 11 TIMBERLINE ROAD CORRIDOR PROJECT ............................................................................................................. 11 JEFFERSON STREET IMPROVEMENTS PROJECT ................................................................................................... 12 LINDEN STREET RENOVATION PROJECT .............................................................................................................. 12 WILLOW STREET IMPROVEMENTS ...................................................................................................................... 13 TIMBERLINE WIDENING AT GREAT WESTERN CROSSING ................................................................................... 14 NORTH MASON DESIGN – ALPINE TO HICKORY .................................................................................................. 15 CP - PARK PLANNING & DEVELOPMENT ....................................................................................... 15 CYCLO-CROSS SKILLS TRAINING COURSE PILOT PROGRAM AT ROSSBOROUGH PARK ...................................... 15 TRAIL HEAD PARK ................................................................................................................................................ 16 SUGAR BEET PARK ............................................................................................................................................... 17 POUDRE TRAIL AT LANCER DRIVE ........................................................................................................................ 17 POUDRE RIVER WHITEWATER PARK .................................................................................................................... 18 EAST PARK DISTRICT MAINTENANCE FACILITY .................................................................................................... 19 CP - OPERATION SERVICES ............................................................................................................ 19 GARDENS ON SPRING CREEK – VISITOR’S EXPANSION ........................................................................................ 19 FORT COLLINS/LOVELAND POLICE TRAINING CENTER ........................................................................................ 20 308 VINE WATER LAB / INNOSPHERE PHASE II ................................................................................................... 20 CP - UTILITIES.................................................................................................................................... 21 WATER TREATMENT FACILITY ............................................................................................................................. 21 LIGHT & POWER GENESIS64 SCADA UPGRADE PROJECT .................................................................................... 22 NEW FEEDER CAPACITY (E. DRAKE & LEMAY) ..................................................................................................... 22 GIS/GWD & ADMS ............................................................................................................................................... 22 DWRF SIDESTREAM TREATMENT ........................................................................................................................ 23 MAIL CREEK IMPROVEMENTS AT MEADOW PASSWAY ...................................................................................... 24 CATHODIC PROTECTION FOR NORTHEAST LOOP WATER LINE ........................................................................... 24 HICKORY STREET WATERLINE RAILROAD BORE .................................................................................................. 25 PUBLIC SAFETY ................................................................................................................................ 25 POUDRE FIRE AUTHORITY ................................................................................................................................... 25 POLICE SERVICES .................................................................................................................................................. 26 PLANNING, DEVELOPMENT &TRANSPORTATION ......................................................................... 28 BUILDING, PLANNING AND DEVELOPMENT REVIEW .......................................................................................... 28 NEIGHBORHOOD SERVICES ................................................................................................................................. 29 Historic Preservation Services ............................................................................................................................. 31 YEAR TO DATE COMPARISON .............................................................................................................................. 32 GRAFFITI UPDATE ............................................................................................................................ 32 SUSTAINABILITY SERVICES ............................................................................................................ 32 ENVIRONMENTAL SERVICES ................................................................................................................................ 32 SOCIAL SUSTAINABILITY ...................................................................................................................................... 32 ECONOMIC HEALTH ............................................................................................................................................. 33 UTILITIES ............................................................................................................................................ 33 CUSTOMER CONNECTIONS .................................................................................................................................. 33 COMMUNITY SERVICES .................................................................................................................... 34 RECREATION ........................................................................................................................................................ 34 PARKS ................................................................................................................................................................... 34 CULTURAL SERVICES ............................................................................................................................................ 35 NATURAL AREAS .................................................................................................................................................. 36 PUBLIC ENGAGEMENT ..................................................................................................................... 36 BROADBAND – FORT COLLINS CONNEXION ................................................................................. 37 COMMUNITY DASHBOARD HIGHLIGHT .......................................................................................... 38 CITY MANAGER’S UPDATE 4 ISSUES BEFORE COUNCIL SEPTEMBER 17 COUNCIL MEETING  Northfield Metropolitan District Nos. 1 through 3 Consolidated Service Plan o Consider approval of the Northfield Metropolitan District Nos. 1 through 3 Consolidated Service Plan. The developer of the proposed Northfield Development has submitted the Service Plan to support the proposed development of approximately 56 acres located north of Vine Street on the west side of Lindenmeier Road/Lemay Avenue (southeast of the Lake Canal and north of the to-be designated historic Alta Vista neighborhood). The development is anticipated to include 442 residential units and a mixed-use center that will offer light commercial use on the first floor, residential for-rent units on the second floor, and small amenities open to the public. The project has committed to provide approximately 15 percent for-sale affordable housing units. A Metro District with a Mill Levy Cap of 50.00 mills has been proposed to support the project the final report from Hunden Strategic Partners regarding the Sports Complex Economic and Feasibility Study. Economic Health -3.4 Foster infill and redevelopment that enhances the community.  Staff Report: Community Dashboard Metric: Housing First Initiative o Share with Council and the community current status and factors influencing a Community Dashboard metric over which the City organization has a high level of influence High Performing Government – 7.6 Leverage data, technology, metrics and benchmarks to guide decisions, to improve results, and enhance service delivery. SEPTEMBER 17 ELECTRIC UTILITY ENTERPRISE  Epic Program Capital Agreements (2nd Reading) o Approval of multiple agreements with third-party capital providers for the Epic Program on-bill financing. Environmental Health – 4.3 Achieve 2020 Energy Policy goals and work towards Climate Action goals for carbon neutrality. SEPTEMBER 17 WORK SESSION  Oil and Gas Operations – Overview and Options o Provide updates regarding oil and gas operations, and seek direction regarding potential regulatory options to consider in the context of new land use authority granted by the State (Senate Bill 19-181). Neighborhood Livability and Social Health – 1.7 Guide development through community planning, historic preservation and effective development review.  Downtown Stormwater Project o Provide Council with an introduction to the Downtown Stormwater Project including the Magnolia Street Outfall. Safe Community – 5.5 Address water, wastewater and stormwater infrastructure needs for the protection of people, property and the environment. SEPTEMBER 24 ADJOURNED MEETING  Possible Executive Session o Discuss legal issues related to landfill environmental issues. Please note that this list is subject to frequent change. Please call the City Clerk’s Office for up-to-date information. 970-416-2774. CITY MANAGER’S UPDATE 5 SEPTEMBER 24 WORK SESSION  2020 Budget Revisions o Review suggested budget modifications to the 2020 fiscal year. High Performing Government – 7.1 Provide world-class services that meet the needs of the community.  Northeast Fort Collins Planning Discussion o Discuss potential amendments to the Mountain Vista Subarea Plan, Master Street Plan and Parks and Recreation Master Plan, as well as utility service plans for the area and how utility services relate to other City objectives. Neighborhood Livability and Social Health – 1.7 Guide development through community planning, historic preservation, and efficient and effective development review.  Reimagining Boards and Commissions o Discuss options related to restructuring existing boards and commissions to increase efficiency, create more meaningful ways to engage with the community, and increase opportunities for added diversity in board and commission membership. High Performing Government – 7.3 Broaden methods of community engagement with additional consideration to diverse backgrounds, languages and needs. SEPTEMBER 26 URBAN RENEWAL AUTHORITY BOARD MEETING - CANCELED OCTOBER 1 COUNCIL MEETING  2019 Annual Adjustment Ordinance o Appropriate expenses related to unanticipated revenue, grants and unforeseen costs that had not previously been budgeted. High Performing Government – 7.1 Provide world-class services that meet the needs of the community.  Staff Report: Community Dashboard Metric o Share with Council and the community current status and factors influencing a Community Dashboard metric over which the City organization has a high level of influence. High Performing Government – 7.6 Leverage data, technology, metrics and benchmarks to guide decisions, to improve results, and enhance service delivery. OCTOBER 8 WORK SESSION  2019 Fee Update o Review 2019 fee updates associated with Development Review fees, Electric Capacity fees, Wet Utility fees, Raw Water fees, and Step III of Capital Expansion Fees. High Performing Government – 7.1 Provide world-class services that meet the needs of the community.  Homelessness Update o Provide City Council with the annual update regarding homelessness in Fort Collins including current, local data, programs and partnerships. It will be co-presented with Homeward 2020 and focus on actions taken to meet the goal of making homelessness rare, short-lived and nonrecurring. Neighborhood Livability and Social Health – 1.4 Co-create a more inclusive and equitable community that promotes unity and honors diversity. CITY MANAGER’S UPDATE 6  Equity and Inclusion Priority o Discuss he Council priority of an equity lens deployment, development of equity metrics/indicators, and an anti-discrimination resolution. Neighborhood Livability and Social Health – 1.4 Co-create a more inclusive and equitable community that promotes unity and honors diversity. PUBLIC ENGAGEMENT – UPCOMING EVENTS  Utilities NEW Self Service Portal – September – November: Fort Collins Utilities self-service portal and bill payment system is changing. A free, two-hour open-to-all drop-in session and discussion that starts with a brief educational presentation and then onto Q&A session, with demonstrations, will occur once per month over the next three months, conducted across prominent public venues to generate awareness for the new portal and customer self-service features.  2019 Community Survey – September – October: The Fort Collins Community Survey serves as a consumer report card for the City by providing residents the opportunity to rate the quality of life in the city and their satisfaction with community amenities and their local government. Residents also provide feedback to the City on what is working well and what is not, and identify priorities for community planning and resource allocation which are then used to update the City’s Strategic Plan. The 2019 survey will be based on past City surveys and will assess the objectives identified by the City Council and City management team. The five-page survey will be administered to a random selection of 3,000 Fort Collins residents. The first wave of post card notifications and invitations have been sent out, the second wave will be mailed in mid-September, followed by the open opt-in survey to all residents at the end of September. Comparisons to previous survey results and national and Front Range benchmark comparisons will be provided  Trail Head Park Neighborhood Meeting - September 19: The third and final neighborhood meeting will include the presentation of final park concepts and time for public feedback. The meeting will take place September 19, 2019 | 6:30 - 8 p.m. at the Budweiser Brewery.  Business Appreciation Breakfast – September 26: The Business Appreciation Breakfast honors businesses for their contributions to a healthy Fort Collins economy. This year’s breakfast will take place on Thursday, September 26th at the Fort Collins Hilton from 7 - 9 a.m. and will feature Betsy Craig of MenuTrinfo, LLC., as the keynote speaker. The event is sponsored by the City’s Economic Health Office.  Open Streets – September 29: During Open Streets events, the event route is closed to cars but programmed with various activities. In 2019, Fort Collins Open Streets events will feature tactical urbanism projects along the one- to two-mile route, as well as programming by local organizations and businesses. Participants are encouraged to Ride the Route and explore streets that are walkable and bikeable on a daily basis. The event will be on Sunday, September 29 from 10:00 a.m. to 3:00 p.m. Seneca St. from W. Horsetooth Rd. to W. Harmony Rd. CITY MANAGER’S UPDATE 7 SALES TAX - MONTHLY & YEAR TO DATE JULY SUMMARY OVER PRIOR YEAR Month Year to Date Net Sales Tax Collected: 2.5% 1.8% Net Use Tax Collected: -0.7% 5.1% Net Sales and Use Tax Collected: 2.1% 2.3% Year to date, sales and use tax collections excluding rebates are up 2.3% and total $81.3M. JULY SUMMARY OVER BUDGET Month Year to Date Net Sales Tax Collected: 2.2% 0.2% Net Use Tax Collected: -4.2% 4.7% Net Sales and Use Tax Collected: 1.3% 0.9% Year to date, the City has collected 0.9% more sales and use tax revenue, totaling $711K over budget. CP- ENGINEERING CITYWIDE PEDESTRIAN ACCESS PROJECT Funding Source: Community Capital Improvement Program (CCIP) Estimated Project Budget: 2019 - $1.1M Estimated Completion Date: Ongoing Phase: Construction Capital Project (CP) Updates are indicated in bold CITY MANAGER’S UPDATE 8 Project Details: This project maintains a complete City sidewalk inventory, identifies sidewalk inadequacies, and access needs under the Americans with Disabilities Act (ADA), and develops a prioritized work program to achieve goals of providing unobstructed access for transportation and recreation. Project Status:  Current project location: Remington Street crossing improvements to be completed by end of August.  Recently completed project: new sidewalk connection at Harmony and Hogan completed in August (see before and after pictures above). More information is available at http://www.fcgov.com/engineering/pedneeds.php TRANSFORT BUS PAD UPGRADE PROJECT Funding Source: Federal Transit Administration (FTA) Estimated Project Budget: 2019 - $915K Estimated Completion Date: Spring/Summer 2021 Phase: Contract Award Project Details: Construction and upgrade of City-wide bus pads at Transfort stops to conform with Americans with Disabilities Act (ADA) requirements. A total of 66 bus pads have been identified under this contract for construction and/or upgrade. Project Status:  Project awarded August 22nd; contractor currently mobilizing. CITY MANAGER’S UPDATE 9 SUNIGA ROAD IMPROVEMENTS – COLLEGE AVE. TO BLONDEL STREET Funding Source: 2017/2018 BFO, COFC Utilities, Transportation Capital Expansion Fee (TCEF), Developer Contributions Estimated Project Budget: $3.7M Estimated Completion Date: Fall 2019 Phase: Construction Project Details: Design and construction of a new arterial roadway that connects existing Suniga Road, from Blondel St. to College Avenue. Project Status:  Roadway work substantially complete. Finishing details being installed.  Landscape installation will follow in the fall of 2019. More information is available at https://www.fcgov.com/engineering/suniga-to-college-improvements NORTH COLLEGE IMPROVEMENTS – CANAL TO STATE HIGHWAY 1 Funding Source: Federal Grants, URA Contribution, Pedestrian Program Funds, County Funds, Transportation Capital Expansion Fee (TCEF), Developer Contributions Estimated Project Budget: $2.35M Estimated Completion Date: Summer 2019 Phase: Construction Project Details: This project will construct pedestrian improvements along North College between the Larimer & Weld Canal (City limits) and State Highway 1, including pedestrian bridges crossing the canal. Project Status:  In August, crews focused on installing the two pedestrian bridges and sidewalk connections. CITY MANAGER’S UPDATE 10  Remaining work to be completed in September will be to install pedestrian railings along the east side retaining walls.  The west sidewalk is currently open to pedestrians. More information is available at fcgov.com/engineering/ncollege.php VINE AND LEMAY BNSF IMPROVEMENTS Funding Source: Keep Fort Collins Great (KFCG), Transportation Capital Expansion Fee (TCEF), 2017 / 2018 BFO Estimated Project Budget: $22M ($12M currently allocated) Estimated Completion Date: 2021 (Pending funding) Phase: In Design Project Details: The existing Vine and Lemay intersection, which includes the Burlington Northern Santa Fe (BNSF) Railway crossing, is severely congested with limited options to expand through or turn lane capacity due to land use constraints. Project Status:  Second reading for right of way authorization is September 3. Staff will move forward with the acquisition process beginning in October, pending final Council approval.  The contractor will be secured in the fall to begin construction next spring with the current $9M of funding.  Staff is planning to submit for railroad approval by end of September. More information is available at fcgov.com/engineering/vine-lemay SHARP POINT/NANCY GRAY CONNECTION Funding Source: Transportation Capital Expansion Fee (TCEF), 2015/2016 BFO, Developer Contributions Estimated Project Budget: $1.4M Estimated Completion Date: September 2019 Phase: Construction, Railroad and FRA Coordination Project Details: The City Master Street Plan identifies Sharp Point Drive and Nancy Gray Avenue as connected across the Great Western Railroad tracks. This project will construct the roadway and pedestrian connection, and railroad crossing. Project Status:  City’s contractor has completed roadway construction and is now installing landscaping.  Railroad has installed the surface crossing material and is installing the railroad signals. CITY MANAGER’S UPDATE 11  Roadway will be open once signing and striping have been completed, and all signals have been installed and tested. More information is available at fcgov.com/engineering/sharppoint POWER TRAIL AND HARMONY ROAD GRADE SEPARATED CROSSING Funding Source: Federal Grant, Community Capital Improvement Program (CCIP - Bike / Pedestrian Grade Separated Crossings) Estimated Project Budget: $5M - $8M Estimated Completion Date: 2021 (Pending funding) Phase: Alternatives Analysis – Conceptual Design Project Details: The Power Trail provides connectivity between the Spring Creek Trail to the north and the Fossil Creek Trail to the south. The Trail currently has a gap approximately three-quarters of a mile long north and south of Harmony Road. The detour route requires users to cross Harmony Road at grade at McMurry. This project will design, acquire property interests, and construct a trail grade separated crossing at Harmony Road as well as the trail connections on either side. Project Status:  No project updates. More information is available at https://www.fcgov.com/engineering/powertrailcrossing TIMBERLINE ROAD CORRIDOR PROJECT Funding Source: Transportation Capital Expansion Fee (TCEF), Developer Contribution, Federal Grant Estimated Project Budget: $5M Estimated Completion Date: 2021 Phase: Request for Proposal (RFP) Project Details: This project will reconstruct South Timberline Road from Stetson Creek Drive to Trilby Road to the City’s four lane arterial roadway standards. Planned improvements include; intersection improvements at Kechter Road, Zephyr Road, and Trilby Road, multi-modal accommodations, raised medians, access control, landscaping improvements, and roadway improvements. This project serves to build upon the development improvements that have been completed along the corridor. This project will improve safety, reduce congestion, and provide improved accommodations for alternate travel modes. Project Status:  No project updates. CITY MANAGER’S UPDATE 12 JEFFERSON STREET IMPROVEMENTS PROJECT Funding Source: Federal Congestion Mitigation and Air Quality (CMAQ) Funds, Building on Basics (BOB) 1.0 funds Estimated Project Budget: $1.4M Estimated Completion Date: Fall 2019 Phase: Right-of-way acquisition Project Details: The goals of this project are to develop preliminary engineering design plans and to acquire rights-of-way and easements for planned improvements along Jefferson Street between College Avenue and the Mountain/Lincoln Intersection. Project Status:  Staff continues negotiations with property owners with the intent to finalize the acquisition phase by Mid-September 2019.  Staff is exploring possible improvements along Jefferson Street which would enable additional pedestrian improvements at the Linden Street and Jefferson Street Intersection. LINDEN STREET RENOVATION PROJECT Funding Source: Community Capital Improvement Program (CCIP) Estimated Project Budget: $3.8M Estimated Completion Date: 2020 Phase: Conceptual Design Verification Project Details: The goals of this project are to renovate Linden Street between Walnut Street and Jefferson Street. Initial concepts include converting this section of Linden Street to a “convertible” street; one that can function primarily as a roadway but can also be closed to vehicles and converted to a pedestrian plaza during specialty events. Project Status:  Based on stakeholder input, along with its ability to meet a majority of the defined project goals, staff’s preferred alternative is the alternative that implements parallel parking with an enhanced pedestrian space along Linden Street between Walnut Street and Jefferson Street. This change results in a net parking loss of 30 on-street spaces. CITY MANAGER’S UPDATE 13  Staff will continue to meet with concerned stakeholders to better understand their perspectives on the challenges associated with Old Town Parking, and if there are opportunities to mitigate these concerns as part of the project.  To meet the proposed 2020 construction schedule, the project alternative must be finalized by the beginning of October 2019. WILLOW STREET IMPROVEMENTS Funding Source: Federal Grants, Community Capital Improvement Program (CCIP), Developer Contributions, DDA Funds Estimated Project Budget: $3.8M Estimated Completion Date: Fall 2019 Phase: Construction Project Details: This project will design roadway and urban design improvements along Willow Street between College Avenue and Linden Street; including a pedestrian plaza at the northern corner of Willow Street and Linden Street. Project Status: • During the month of August, crews finished bottom mat paving on Willow Street. • Concrete curb, gutter and driveways, and sidewalks were installed along the north side of the project. • Staff continues to meet with, and coordinate with, residents and businesses on a daily basis. • Plaza construction is slated to begin in October 2019 as schedule allows, in coordination with the Confluence development. CITY MANAGER’S UPDATE 14 TIMBERLINE WIDENING AT GREAT WESTERN CROSSING Funding Source: Transportation Capital Expansion Fee (TCEF), Developer Contributions, Building on Basics (BOB) 1.0, Arterial Intersection Funding Estimated Project Budget: $0.6M – Phase Two Estimated Completion Date: Summer 2019 Phase: Construction Project Details: In 2016, Phase One intersection improvements were completed at Prospect and Timberline; along with Timberline widening and multi-modal improvements south of Prospect. Phase Two improvements will consist of widening the Great Western Railway crossing, completion of multi-modal connections at the crossing, a new railroad signal system, and completion of the “free-right” turn from eastbound Prospect to southbound Timberline. Project Status:  The Great Western Railroad has shifted their construction schedule to complete this crossing in August 2019.  Great Western has updated their schedule to reflect an October 2019 completion. The City will accommodate the updated schedule and finish the additional sidewalk and roadway widening by November 2019. CITY MANAGER’S UPDATE 15 NORTH MASON DESIGN – ALPINE TO HICKORY Funding Source: Transportation Capital Expansion Fee (TCEF), Storm Water Utility, Urban Renewal Authority (URA) funding Estimated Project Budget: $1.0M Estimated Completion Date: Fall 2020 Phase: Conceptual Design Project Details: A collaborative effort between City departments and the North College URA to find solutions to existing drainage issues along the west side of College Avenue, north of the Poudre River. The project was approved through the 2019/2020 Budgeting for Outcomes (BFO) process and will focus on roadway and storm sewer alignments for North Mason. Construction of the storm sewer backbone is expected to occur in 2021/2022. No funding has currently been identified for the roadway construction. Project Status:  The consultant team is currently working on conceptual and preliminary level design, topographic survey, and title work analysis. CP - PARK PLANNING & DEVELOPMENT CYCLO-CROSS SKILLS TRAINING COURSE PILOT PROGRAM AT ROSSBOROUGH PARK Funding Source: Cyclo-cross community donations Phase: Planning and design Estimated Completion: September 2019 Project Details: The city has been working with the cyclo-cross community for several years to evaluate several park sites for suitability to pilot a cyclo-cross skills training course. Rossborough Park was selected as the CITY MANAGER’S UPDATE 16 best fit due to existing physical features needed for the training course, available space for the use, and ability to mitigate potential conflicts with other park users. Staff from Park Planning, Parks, and Forestry have collaborated with the cyclo-cross community on the best course layout in order to protect park resources and other park uses while providing several skills features for cyclo-cross riders. Project Status: • A neighborhood meeting was held in early July for consideration of a cyclo-cross skills training course in Rossborough Park. • A broad spectrum of feedback was received from those who attended the meeting, as well as those who provided feedback online. By modifying the proposed course layout and incorporating better signage, many of the concerns expressed can be mitigated. • With City leadership support, staff will work with the cyclo-cross community to implement a pilot course for one season. The cyclo-cross season will run from September through mid-December. • After one season of use, a thorough evaluation will be conducted. The evaluation process will include another neighborhood meeting in early 2020. TRAIL HEAD PARK Project Detail: Funding Source: Parkland funds Total Project Cost: $2.2 - 2.9M Phase: Design Estimated Completion: 2020 Project Details: Trail Head Park will be a 5.6-acre neighborhood park located in the northwest corner of East Vine Drive and I-25, in the Trail Head neighborhood subdivision. A second neighborhood meeting was recently held at the Budweiser Welcome Center. Construction is anticipated to start in 2020. Project Status • The third and final neighborhood meeting is tentatively scheduled for Thursday, September 19th from 6 p.m. - 8 p.m., at the Budweiser Biergarten. CITY MANAGER’S UPDATE 17 • At this meeting, the preferred park concept will be presented, with opportunity for attendees to provide feedback. • Construction is anticipated to begin in early 2020. SUGAR BEET PARK Funding Source: Parkland Funds, Lincoln Corridor Funds, & Nature in the City Total Project Cost: $2.4M Phase: Under Construction Estimated Completion: Fall 2019 Project Details: Sugar Beet Park is a neighborhood park planned near the intersection of East Vine Drive and Lemay Avenue, in front of the Streets Facility. The design of the park is inspired by the sugar beet industry and the Great Western Sugar Company that once stood nearby. This project is a collaborative effort between Park Planning & Development and Nature in the City. The park will feature a multi-use turf field, pollinator garden and themed playground – including a wooden beet structure. Project Status: • Construction is on track and nearing completion. • A Grand Opening event is scheduled to be held September 28th, from 10am – noon. POUDRE TRAIL AT LANCER DRIVE Funding Source: Conservation Trust Fund Total Project Cost: $750,000 CITY MANAGER’S UPDATE 18 Phase: No phasing anticipated Estimated Completion: Fall 2019 Project Detail: The Poudre Trail spur at Lancer Drive will be located east of Lincoln Middle School, and provide a safe, off-street pedestrian route from West Vine Drive to the Poudre Trail. In addition to the trail, Natural Areas and FC Bikes are proposing improvements in the area, to create a safer environment and enhanced connectivity for pedestrians and cyclists. Project Status • Construction is scheduled to begin in September/October, with project completion anticipated in late fall, 2019. • A spring 2020 event will be organized through the Open Streets program. POUDRE RIVER WHITEWATER PARK Funding Source: Park Planning & Development, CCIP, General Fund, Public and Private Fundraising, Stormwater, and Natural Areas Total Project Cost: $11.5M Phase: Under Construction Estimated Completion: Summer/Fall 2019 Project Details: The Poudre River Whitewater Park project has been a collaborative effort between multiple City departments, local advocates, and the philanthropic community. The project will provide natural systems, stormwater, and recreation benefits. Project elements include whitewater boating features, a pedestrian bridge, a naturalistic park space, overlook plaza, trail & walk connections, and parking. Project Status: • Two testing sessions for the functionality and performance of the boating features at different flows occurred earlier this summer. CITY MANAGER’S UPDATE 19 • The testing sessions were well received; the City received constructive feedback on suggested improvements to the features. Any adjustments to the features will occur in fall/winter after flows have subsided. • Park construction is on-track for a mid-September opening, with different sections of the park opened in sequence as they are completed. • A grand opening celebration is planned for October 12. EAST PARK DISTRICT MAINTENANCE FACILITY Funding Source: TBD Total Project Cost: TBD Phase: Design Estimated Completion: TBD Project Detail: Planning efforts will soon be underway for a new maintenance facility located near the intersection of Drake & Ziegler. City staff recently acquired a 3.6-acre site for the facility. The maintenance facility will serve the East Park district, including the future East Community Park. A budget offer for full funding of the facility is anticipated to be submitted as part of the 2021-22 budget cycle. CP - OPERATION SERVICES GARDENS ON SPRING CREEK – VISITOR’S EXPANSION Funding Sources: Building on Basic (BOB) II - $2.2M Op Services (Maintenance): $380K Privately Raised Funds: $700K Total Project Cost: $3,280,000 Phase: Construction Estimated Completion Date: Late Fall 2019 Project Details: The Gardens on Spring Creek Visitor Center Expansion is adding approximately 4500 SF. This includes a conservatory which will incorporate a butterfly pavilion, extra meeting rooms, additional office spaces, and Solar PV to offset the additional energy usage. Project Status: • Completion of Conservatory is scheduled early September. • Exterior wall air membrane has been applied and ready for windows. • Storefront windows installation has begun. • Exterior stone installation is to begin early September. • Exterior stucco installation is to follow stonework. • Roofing is finishing up with new fall protection system installed. • Spray foam insulation has been applied to the interior walls. • Interior finishes are to begin the first week of September. • Project includes a 64-kw solar PV system to help offset power usage. • Relocating the Living Wall from 222 Laporte to inside the new Conservatory. • On track for LEED Gold; currently tracking at 63 credits. Conservatory Construction is Underway CITY MANAGER’S UPDATE 20 • Coordinating the Arts in Public Places (APP) design into the front entrance area. • Current completion is late October 2019. FORT COLLINS/LOVELAND POLICE TRAINING CENTER Funding Sources: $9.25M generated from bonds for the City of Fort Collins $9.25M from City of Loveland Total Project Cost: $18.5M Phase: Design Development Estimated Completion Date: Late 2020 Project Details: The City of Fort Collins is partnering with The City of Loveland to construct a new Police training facility which will be located on the west side of the Loveland Airport. This new site will offer a 50- yard pistol range, a 1.4-mile driving track, concrete skills pad, and some classrooms for special training. Project Status: • Site Construction documents have been issued. The contractor, Bryan Construction, has submitted pricing for Phase I site construction, and we are negotiating a contract. • Design team is working on construction drawings for the building and we are looking to bid this late October. • Toured four Police Department firing ranges last week in Arizona and will be selecting our vendor for the firing range soon. • We are working with property owners to get easements for the utilities for the project. • Fort Collins-Loveland Water District informed us they will not require the water line loop as part of this project. We will still need to create an easement so the water line can be installed at a later date if they need the water pressure increased in the future. • UPSF Railroad has granted us permits for two locations associated with water and sewer crossings. We are moving forward with the paperwork for the sewer line. • DOLA awarded the project a $1M grant which will allow the alternates shown with Magenta color in the photo above to be incorporated into this project. • Loveland presented the Phase I contract to their City Council on September 3. We will get signatures and start sitework in late September. • Project team is working with LEED consultant to find credits to see if we can achieve LEED Silver. 308 VINE WATER LAB / INNOSPHERE PHASE II Funding Sources: City of Fort Collins Cost: TBD (2/3) City Exclusive Cost: TBD $1M Currently Appropriated Rocky Mountain Innosphere Cost: TBD (1/3) Total Project Cost: Approximately TBD Phase: Conceptual Estimated Completion Date: TBD Construction Site Plan CITY MANAGER’S UPDATE 21 Project Details: The 308 Vine Water Lab is a joint ownership project with the City of Fort Collins and Rocky Mountain Innosphere (RMI). The project is approximately 26,000 SF. The three-story building includes lab and office space on levels 1 and 2 for Water Quality, Pollution Control, and Water Shed which currently reside in separate facilities. Building is to be LEED Gold and has budgeted to incorporate Solar PV and infrastructure for future building Net Zero goals. RMI is to own and occupy level three. The City will have the option to buy out RMI after eight years. Project Status: (No Change) • The General Contractor for the project produced a budget update that presented a $7M overall cost increase for the required heating and vent systems. • The City project team is taking steps understand and validate the conceptual estimate update. The team will also be collecting information for the City to discuss the value and overall benefit of the City/RMI partnership. • Due to the above items, project design is on hold. CP - UTILITIES WATER TREATMENT FACILITY Funding Source: Capital Project Budget Estimated Project Budget: $1,300,000 Phase: In Construction Project Details: Approximately 7,300 feet of three-phase from Overland Trail to the Treatment Facility in an existing easement on Colorado State University Property Project Status: No Updates • Engineering is working with Water Treatment Facility staff to order an ATO switch. • Phase 2 has started. The station 400 vault has been set for the second switch • Completion is estimated for the first quarter of 2020. Water Treatment Facility CITY MANAGER’S UPDATE 22 LIGHT & POWER GENESIS64 SCADA UPGRADE PROJECT Funding Source: New Capital Estimated Project Budget: $200,000 Phase: In Design Project Details: Convert the existing Iconics Genesis32 hardware, software, and screens to Genesis64 Project Status: • Kepware is expected to provide a solution for digital outputs by the end of September. • The ESCADA team is working on linking Kepware tags on the new GEN64 screens. NEW FEEDER CAPACITY (E. DRAKE & LEMAY) Funding Source: New Capital Estimated Project Budget: $500,000.00 Phase: Construction Project Details: Install 7000 feet of three phase 750 Al and one switch to serve new load at Drake and Lemay. Project Status: No Updates • The new circuit 234B has been extended to the customer site. • The project has been delayed due to redesign of the customer switch pad until August or September of 2019. GIS/GWD & ADMS Funding Source: Offer 5.23 Operational Technology Estimated Project Budget: $2,762,384 Phase: System Design, Hardware Procurement, Database Configuration Project Details: 1. Replacement and upgrade of the existing L&P mapping systems to a fully capable Geographic Information System (GIS) platform compatible with the City's enterprise GIS. 2. Implementation of a GIS-based Graphic Work Design (GWD) system enabling streamlined electric distribution design and development and integration with GIS as well as other key systems Crossing Drake to Woodward CITY MANAGER’S UPDATE 23 3. Replacement of existing electric distribution operational tools with a new Advanced Distribution Management System (ADMS) that enables L&P’s Supervisory Control & Operations (SCO) staff to performs a wide range of real-time analysis in the management of the City’s electric distribution system. Project Status: • A team of editors have begun preparing the new geodatabase for use in GWD and ADMS. This is expected to continue for several months in preparation for cutover. • A series of map symbology workshops are underway, gathering feedback from future system users. • Heavy geodatabase configuration continues, informed by the editing process and workshop. • The GIS/GWD project team is working with the software vendor to move implementation of key systems forward in the project in order to provide tools and resources to the project team in preparation for go live. • The GIS/GWD software vendor has begun development of a custom software component to replace an existing system. We will be periodically reviewing this progress using an agile development methodology to allow the project team better guide the development process. • The ADMS project team and ACS have agreed on the system architecture and IT has placed the order for servers and storage. • The ADMS project team is working on system interface design documents to supply to the vendor prior to development of the ADMS system. DWRF SIDESTREAM TREATMENT Funding Source: Wastewater Estimated Project Budget: $5,400,000 Status: Construction kick-off meeting held on September 3, 2019 Estimated Completion Date: 3rd Quarter, 2020 Project Details: This project is the design and installation of a wastewater side stream treatment system to meet future nutrient (nitrogen and phosphorous) regulations. The recycle stream from biosolids dewatering carries high nutrient concentrations back to the main stream treatment system. Side stream treatment will remove nutrients from the recycle stream, which can potentially be turned into fertilizer and reused. Project Status: • Completed and distributed 100% plans. • Completed independent cost estimate and reconciliation. • Construction work order prepared and in routing process. Tank profile from 60% plans CITY MANAGER’S UPDATE 24 MAIL CREEK IMPROVEMENTS AT MEADOW PASSWAY Funding Source: Stormwater Estimated Project Budget: $1,400,000 Status: In design Estimated Completion Date: April 1, 2020 Project Details: The Mail Creek stream reach is within an urbanized corridor and is experiencing severe bed erosion. Improvements will include stabilizing the creek bed and banks through a combination of bio-engineered designs, re-grading, re-vegetation, and easements from property owners to construct and maintain the improvements. Project Status: • Final design development is completed. • CLOMR submittal is under review. • Coordination with irrigation companies is underway. CATHODIC PROTECTION FOR NORTHEAST LOOP WATER LINE Funding Source: Water Estimated Project Budget: $2,280,000 Status: In construction Estimated Completion Date: 4th Quarter, 2019 Project Details: The Anheuser Busch (AB) water line Cathodic Protection (CP) Project is part of the Utilities Cathodic Protection Program. This AB water line project entails design and installation of a cathodic protection rectification system. This CP system will mitigate and prevent further corrosion on the bar-wrapped concrete cylinder pipe which supplies finished water from the Water Treatment Facility to AB. Project Status: • Drilled deep bed anode wells and installed anodes at all five sites. • Started installing concrete pads for rectifiers and anode boxes. • Pulled wires between anode and rectifier pads. Sandbags placed for erosion protection Contractor drilling deep bed anode well CITY MANAGER’S UPDATE 25 HICKORY STREET WATERLINE RAILROAD BORE Funding Source: Water Estimated Project Budget: $627,000 Status: In permitting Estimated Completion Date: 4th Quarter 2019 Project Details: The Hickory Street waterline project includes the installation of a new 8” waterline across the Union Pacific Railroad right-of-way and tracks to complete a long-needed connection for water distribution system reliability in this area. This project will connect an existing 8” waterline on the east side of the tracks to an existing 12” waterline running parallel and to the west of the tracks. This work will be done using an auger bore, installing a 24” diameter steel casing around the 8” PVC waterline across the railroad. Project Status: • Final construction contracts are complete. • Finalize agreement with UPRR is complete. • Additional outreach efforts to inform neighbors and businesses of the updated start of construction is underway. PUBLIC SAFETY POUDRE FIRE AUTHORITY Elevated Wildfire Risk Awareness PFA has responded to several grass/vegetation fires in the last two weeks and has been raising awareness throughout August. The largest and most recent fire was the Skyline Fire at the northeast end of Horsetooth Reservoir. The fire burned 16.2 acres along both sides of the ridge to the east of County Rd. 23. PFA arrived on scene at about 11:30 a.m. on Thursday, Sept. 5. The attack included a robust set of resources including around 20 members of PFA, multiple agencies, a helicopter which dropped water and a seat plane which dropped fire retardant. The area was monitored through the night and crews spent Friday “cold trailing” which means walking the entire perimeter feeling for and extinguishing hot spots. Aug. 30| Colorado Task Force 1 Deployed Seven PFA firefighters were deployed to Florida in preparations for Hurricane Dorian. The firefighters are part of Colorado Task Force 1 and a unique response resource known as a Mission Ready Package. This is a small team of specially trained responders designed to deploy quickly and for a specific purpose. In this case, all members of the team are swiftwater trained and could help with Geotechnical test pit, February 2019 CITY MANAGER’S UPDATE 26 rescues or searches in flooded areas as needed. The team left Fort Collins just hours after the deployment and has since moved from Florida to Georgia to North Carolina. Two Vehicle vs. Structure Incidents PFA firefighters responded to two vehicle vs. structure accidents in August. One involved Nuance Chocolate at 214 Pine St. after a vehicle collided with the structure and the second involved a private residence on the 1100 block of Wabash St. In both incidents, the firefighters put support structures in place to secure the scene and mitigate further damage. August 26| Academy 19-2 Began Twenty-one recruits from other fire agencies in the Front Range Fire Consortium joined seven PFA recruits for the beginning of Academy 19-2. PFA recruits spent two additional weeks together before the academy learning about PFA specifically. The recruits will spend the next weeks learning the skills required to be career firefighters. This will include team building, using a large variety of tools, rolling hose, learning about fire behavior, completing obstacle courses in full bunker gear and more. Muscular Dystrophy Campaign – Fill the Boot Fundraiser Goal Surpassed PFA crews helped gather funds to support local families affected by Muscular Dystrophy (MD). Funds will support research, help kids go to summer camps and more. Firefighters helped gather funds during the campaign, which ran from Aug. 29 to Sept. 3. Their goal was to raise $25,000 and the total raised was $33,325.78, more than double what was raised last year. Good News Item PFA has had more neurologically intact cardiac arrest saves so far this year than in all of 2018. We are happy to report that 14 people that have suffered cardiac arrests have been saved and are able to spend birthdays, weddings and holidays with their families. Statement of Findings for Accredited Status Every year PFA submits an Annual Compliance Report (ACR) to the Commission, which is reviewed by a peer. They recommend if an agency maintains accredited status for another year. PFA was awarded again and this was the last ACR for this cycle under the 8th edition of the Fire and Emergency Service Self-Assessment Manual. POLICE SERVICES Case Highlights Shooting Suspects Arrested – Three men were arrested in connection with a June shooting on Timberwood Drive during which two adults were assaulted and a juvenile was shot. Fortunately, all of the injured parties survived. Three suspects were identified and arrested with the assistance of the US Marshals in Maryland and the Laramie (WY) County Sheriff’s Office. Drugs are believed to be a factor in this case. Peeping suspect charged with sexual assault – FCPS detectives received new evidence linking James Morsbach to an unsolved 2018 sexual assault. He now faces additional charges of sexual assault and second degree burglary. Morsbach was arrested in May 2019 on a variety of charges related to stalking and window peeping. CITY MANAGER’S UPDATE 27 CRASH team investigates multiple serious collisions – The FCPS Collision Reconstruction and Scene Handling team investigated multiple serious crashes in August, three of which included fatalities. September public communications will highlight traffic law information, enforcement efforts, and reminders about how the community can work together to create safe roadways. Community Engagement & Outreach New West Fest – With anticipated attendance over 100,000 people, FCPS worked closely with the event planners and community partners to ensure a safe, positive atmosphere for everyone. Numerous officers provided security over the course of the weekend. While outfitted with the tools to handle any situation, they were also approachable and had fun with festival-goers, handing out stickers and smiling for selfie requests. Through three days of festivities, not a single arrest was necessary at the event. We sincerely appreciate the personal responsibility and shared partnership in making this a great weekend of community, memories, and music! Spanish – The FCPS Spanish team connected with La Familia’s new Family Support Services Director to plan ongoing engagement opportunities with our Spanish-speaking residents. FCPS also created a video in Spanish to provide community members with information about calling 911. The video can be viewed at https://www.facebook.com/fortcollinspoliceservices/videos/389816295010514/. Community Welcome – FCPS employees participated in the annual Community Welcome event, in partnership with Colorado State University and City staff. Groups walked door-to-door in the neighborhoods surrounding CSU to welcome new students and connect with permanent residents. We handed out info, talked about party registration and being a good neighbor, and had a lot of great conversations! Redtail Ponds Barbecue - Our Neighborhood Engagement Team spent time barbecuing and connecting with Redtail Ponds residents. Redtail Ponds provides housing for a mix of incomes with one- and two- bedroom apartments combined with onsite services to promote stability and independence. The community is designed to meet the special housing needs of formerly homeless individuals with disabilities and formerly homeless veterans. Officers really enjoyed hearing your stories and learning about how we can continue working together to create a supportive, successful community! Social Media Feature Mental Health Minute – This year, FCPS created a new video series called “Mental Health Minute,” which covers mental health resources, features community partners, and discusses different issues surrounding mental health and police interactions. Co-Responder Stephanie Booco has led this initiative provide helpful resources and insight about our agency’s philosophy when it comes to CITY MANAGER’S UPDATE 28 assisting people experiencing mental health challenges. The most recent episode featured Nick Verni- Lau, Executive Director of Outreach Fort Collins is located at https://www.facebook.com/fortcollinspoliceservices/videos/373334543352429/. PLANNING, DEVELOPMENT &TRANSPORTATION BUILDING, PLANNING AND DEVELOPMENT REVIEW Monthly Reporting Monthly construction reporting and mapping of development review proposals and construction can be found by visiting: http://citydocs.fcgov.com/?dt=MONTHLY+REPORT&dn=NEIGHBORHOOD+%26+BUILDING+SERVIC ES%2FZONING&vid=2&cmd=showdt For a detailed listing of development Proposals under review, please visit: https://www.fcgov.com/developmentreview/proposals/ City Plan Implementation – Land Use Code Audit Staff has begun an evaluation of the alignment between the Land Use Code and recently adopted City Plan principles and policies. This audit, that hopes to define specific code changes or areas of further investigation, will be completed by the end of the year. Harmony Corridor Plan Gateway Area Update Staff has prepared four land use alternatives for the Harmony Gateway Area based on recent City Council direction. Scenarios will be shared with the community at an I-25 Gateways workshop on October 2nd. Work sessions will also be held with P&Z, NRAB, LCSB, Water Board and the EAC during September prior to a City Council Work Session on October 22nd. City Council consideration will likely occur in December. Hughes Rezoning The Planning and Zoning Board will hold a public hearing on September 19th to make a recommendation on a City-initiated rezoning request on the former Hughes Stadium site. City Council will review the rezoning ordinance at 1st reading on November 5th. Oil and Gas Operations Work is underway to evaluate the City’s oil and gas regulatory options in response to new State legislation. A City Council Work Session has been scheduled on September 17th seeking direction and a strategy for next steps. Public Health and Environment Grant Staff and community partners have begun meeting every two weeks as a core team. Initial deliverables for the first grant quarter (July-September) include a stakeholder analysis, a training session on Health in All Policies, marketing and messaging design, a presentation to the Affordable Housing Executive Team, and a finalized public engagement plan and project charter. All deliverables for the first grant quarter are on track for completion. A workshop with key stakeholders is anticipated in the fall, and a public kickoff event is anticipated in early 2020. Montava  Development Project The Planning & Zoning Board held a hearing for the Montava Planned Unit Development (PUD) project on August 15 and recommended approval of the project to City Council. City Council is the final CITY MANAGER’S UPDATE 29 decision-maker on the Montava PUD, and Council hearings have been scheduled for the following dates: • October 15 – City Council Meeting (1st reading and public hearing) • November 5 – City Council Meeting (2nd reading and public hearing) All meetings will start at 6 p.m. at City Hall, 300 Laporte. New Development Applications  –  August 2019 More information on development proposal under review:  https://www.fcgov.com/developmentreview/proposals/ Project Name Project Type Location Overlook Stand-Alone Modification Request, MOD190001 Request for a Modification of Land Use Code Standards 3710 John F Kennedy Pkwy Waterglen Solar Array, PDP190010 Ground-Mounted Community Solar Project Near Vine Dr and I-25 (parcel #8704106001) Rennat Project Development Plan, PDP190011 Residential Subdivision 6015 S Timberline Rd Stodgy Brewing, PDP190012 Brewery and Taproom with Accessory Office Uses 1800, 1802 and 1804 Laporte Ave Hughes Site Rezone, REZ190001 Rezoning Northwest corner of S Overland Trail and County Rd 42C (former CSU Hughes Stadium Site) Dutch Bros Final Development Plan, FDP190017 Drive Thru Coffee Shop 121 Kensington Drive The Odell Wine Project, MJA190002 Microwinery 824 E Lincoln Ave CSU Lake and Prospect Parking Lot, FDP190018 Parking Lot 615 Lake St, and 634 & 626 Prospect Rd Development Project Decisions – August 2019 More information on development project decisions:  https://www.fcgov.com/developmentreview/agendas.php Project Name Decision Maker Location Decision Date Decision Summitview Church Wireless Telecommunication Facility, PDP180016 Administrative Hearing Officer 1601 W Drake Rd 8/6/19 Approved with Conditions Dutch Bros Drive Thru Coffee, PDP190008 Planning & Zoning CITY MANAGER’S UPDATE 30 recommendation of Scenario 1. Each board was staffed with a technical expert who was able to answer substantive questions from community members. Feedback was gathered at each scenario and at a station in the middle of the event hall. Staff trained in public participation techniques from the International Association for Public Participation (IAP2) help to orient and facilitate groups of community members through each station throughout the event. Approximately 265 community members were in attendance throughout the evening. Community member feedback has been compiled and analyzed and will be presented to the Planning and Zoning Board at the upcoming work session on September 13th. All of the materials presented at the event can be found by visiting the Our City engagement page here: https://ourcity.fcgov.com/hughes_stadium_redevelopment Odell Brewing-Microwinery Neighborhood Meeting On August 14th, 2019, City staff held a neighborhood meeting regarding the proposed expansion of the Odell Brewery to include a microwinery and outdoor wine tasting area. The meeting, held in the Community Room at the Odell Brewery, provided an opportunity to discuss the microwinery being proposed on the existing Odell Brewery site. Notification was sent to neighbors within 800 feet of the proposed development. Two neighbors attended the meeting including one local business owner and a local resident. Both neighbors were generally in favor of the development. Staff has not yet received other resident feedback regarding the proposal. The applicant intends to submit a full project application soon. A summary of the meeting will soon be emailed to attendees. Get the Scoop 2019 Neighborhood Services and Off-Campus Life at Colorado State University hosted Get the Scoop on August 3-4. Staff members from each area visited with neighborhoods surrounding campus and gave out education on city codes and ordinances, tips on good neighboring and ice cream to neighbors. Community Welcome 2019 On the evening of Wednesday, August 28th Neighborhood Services, Fort Collins Police Services, and Off-Campus Life at Colorado State University hosted the 19th annual Community Welcome event. Teams of volunteers made up of City of Fort Collins Staff, CSU faculty, staff and students as well as Fort Collins Police Services and Colorado State University Police visited neighborhoods surrounding campus to welcome residents, share information about city codes and ordinances and share tips on good neighboring. Neighborhood Night Out Neighborhood Night Out 2019 was held August 6th with a record number of registered events this year with 111 neighborhoods hosting parties throughout Fort Collins. Neighbors in Council Districts 1, 2, 3, and 4 held record numbers of events this year, largely due to the replacement of goodie bags from years past with a $25 gift card for event supplies as registration incentives. Initial event organizer surveys indicate that the $25 gift card was a factor in driving NNO registration for more than 95% of respondents. The Block Party Trailer and inflatable movie screen made appearances at two events selected through a “drawing” of interested NNO events and despite a brief sprinkler dousing of the movie night in Eastside Park, these new additions were a big hit. Decreases in annual NNO participation in Council District 5 correlate with the Canvas Stadium development outreach (2014/15) and increases in CSU neighborhood programming during the month of August (Community Welcome, Get the Scoop, Game Day outreach/Canvas Stadium event outreach, and Campus West Connections). CITY MANAGER’S UPDATE 31 CSU CityWorksEDU/Key Civics Course The Fall 2019 CityWorksEDU/Key Civics course for CSU freshmen in the Key Civics-Service Community began in August. Nineteen students were selected by CSU to participate in the Key Civics cluster through a competitive application process. Students participating in Key Communities are “at risk” of not graduating from college due to a number of factors including first-generation college student status, socio-economic background, high school graduation rate, or rate of college attendance for their home community. The course is co-taught by Neighborhood Services Senior City Planner for Programs, JC Ward, and CSU/City Community Liaison, Jenn Rieskamp, and is designed to give the students insight into the functions of city government, the innovative work of the City of Fort Collins, and the power of public participation in local government. Throughout the course, students take field trips to City facilities to meet subject matter experts, participate in civic engagement experiences, and gain skills in public speaking and participation models. Students enjoy engaging field trips such as visits to the Traffic Operations and Streets Facility, water quality sampling in the Poudre River with the Utilities Education Team, meetings with K-9 cops at Police Services, interactions with “co-creators” from the Downtown Business Association and local small business owners who work closely with the City to improve livability and economic health, and a discussion session with City Council. Historic Preservation Services Fort Collins Historic Building Survey In August, the Historic Preservation Survey Planner prepared and submitted a $40,000 grant application for funding from History Colorado for additional reconnaissance and intensive-level survey of the East Mulberry Corridor area, to include the enclave area expected to be annexed within the next five years. The project will begin with a reconnaissance survey of each property in the area and selective intensive of approximately 20 resources. Managing survey consultants as well as conducting surveys herself enables the Survey Planner to achieve the highest survey efficiencies with the resources available. A total of 141 properties have been surveyed and recoded to date. CITY MANAGER’S UPDATE 32 YEAR TO DATE COMPARISON 2018 2019 YTD % Change Development Project Submittals Received 219 292 33.33% Conceptual/Preliminary Design/Staff Reviews 161 151 -6.21% Building Permits Issued 7,151 9,014 26.05% Building Permit Valuations ($M) $294.13 $213.29 -27.48% Building Inspections Performed 23,104 18,258 -20.97% Zoning Inspections Performed 2,439 286 -88.27% Zoning Plan Reviews Performed 2,303 1,886 -18.11% Overall Development Review revenues are $(1,322,751) under projection for 2019 as of August 31st with Development Review under by $(1,013,466) and Engineering Development Review under by ($309,285). GRAFFITI UPDATE During the month of August 2019, the Graffiti Abatement Team abated 94 issues consisting of 238 tags measuring 2,252 square feet of graffiti-covered surfaces. SUSTAINABILITY SERVICES ENVIRONMENTAL SERVICES Timberline Recycling Center 3rd Birthday and Special Collection Event The TRC is celebrating it’s third year of operations on Sunday, October 6th with a special collection event from 11 a.m. - 2 p.m. The event is free and will include a Drop and Swap, Reuse Arts and Crafts station, Exhibitor tables, kid’s activities and cake and refreshments. For more information, visit: fcgov.com/TRC. SOCIAL SUSTAINABILITY Affordable Housing and Homeless Services Campus Engagement The City is currently taking a pause to reconvene around engagement and process for this effort. City staff is working on a formal project charter and steering committee with a variety of community Month Access FC Hotline Pro-Active Total January 5 0 29 34 February 10 9 38 57 March 12 5 76 93 April 19 3 40 62 May 13 3 53 69 June 16 7 42 65 July 7 11 51 69 August 16 7 71 94 Total 98 45 400 543 CITY MANAGER’S UPDATE 33 stakeholders that will help determine steps forward and solutions to address affordable housing and homeless service gaps in our community. ECONOMIC HEALTH Business Appreciation Breakfast Planning The Economic Health Office will host the 7th Annual Business Appreciation Breakfast on Thursday, September 26th at the Hilton in Fort Collins. The event will feature keynote speaker and local business owner, Betsy Craig. Craig is the founder and CEO of MenuTrinfo, LLC based in Fort Collins. The company assists over 100 major national brands with menu labeling, 450+ colleges and universities with food allergy/food safety training and recently added certification and auditing to the offerings. The event will be celebrating local businesses in our community; “start-ups, scale-ups and seasoned pros”. UTILITIES CUSTOMER CONNECTIONS Community Engagement (CE) has reached 8,627 participants through 131 outreach events and programs covering topics such as Time-of-Day, Income Qualified Assistance Program, and resource conservation and efficiency. Wade The River was a fun, annual, drop-in event where 128 participants used dipnets in the river, discovered the connection between natural organisms and water quality and learned about Fort Collins’ water resources and natural areas. Neighborhood Night Out, through Neighborhood Services, Utilities visited 4 neighborhoods to say “hello” to our customers, offer an opportunity to ask questions, and share information on programs and services. Connexion 101: Outreach for the new Connexion service began with 8 sessions, providing detailed information on the upcoming services of our newest utility to 124 participants. In addition, a brief version of this presentation was converted into a video for any employee who missed out on the offerings, and has over 70 views to date. Discover Your Work Life Balance Resource Fair: Capturing engagement with over 50 community members, our team was able to present information about the services and programs Utilities has to offer. (photo below: Lisa Schroers engages a customer on Utility Affordability programs) Watershed Bus Tour hosted our second Watershed Bus Tour 2019 on August 13 which gave 35 residents the opportunity to explore the behind- the-scenes work that goes into providing high-quality drinking water. The Residential Sprinkler Audit Program is a free service for all single-family residents, in partnership with Fort Collins-Loveland and ELCO water districts. 399 audits completed to date, far exceeding the goal of 350 audits, and there are another 40+ on the schedule! 100% of survey respondents said the audit met (14%) or exceeded (86%) expectations. The 2018 Water Conservation Annual Report is available online at fcgov.com/save-water. This report highlights how our community uses water and all the ways we took action to reduce use by 133 million gallons! The Residential Sprinkler Audit Program has received the Outstanding Public Engagement Award from the national (international - includes Canada) Irrigation Association. The award will be presented at the WaterSmart Innovations Conference in early October in Las Vegas. It recognizes work to engage CITY MANAGER’S UPDATE 34 and educate residential and commercial end users on smart and efficient technologies, best practices and programs related to outdoor water conservation. COMMUNITY SERVICES RECREATION • Mass Registration: o August 8; Total revenue from registrations = $207,763, last year’s Fall registration revenue was $193,235. o Total enrollments = 5,095 up 11% from last year with 69% registered using on- line. This includes a total of 792 Youth and Adult reduced fee enrollments. • Pooch Plunge: Event was held on Sunday, August 25 at City Park Pool. We had over 409 dogs and 656 humans attend the event. PARKS • Hosted the very popular New West Fest in Downtown Fort Collins. • The new Grandview Mausoleum Building B is now complete and open for business. • Working through tree issues associated with various HOA’s amending their landscape plans due to increased water charges. • The new Golf Manager, Scott Phelps, is now onboard and adjusting to his new position. CITY MANAGER’S UPDATE 35 CULTURAL SERVICES At the Gardens on Spring Creek, construction continues with the Butterfly House starting to take shape and the glass panels being installed. Fort Collins Museum of Discovery (FCMoD) is installing their next traveling exhibit “Game Changers” which will explore the evolution of gaming (10/12/19 – 1/12/20). The exhibit comes in English and French but FCMoD made the decision to also translate it into Spanish for our Spanish-speaking community – a first for a larger traveling exhibit. FCMoD is committed to making programs as accessible as possible to the Fort Collins community. Single tickets for The Lincoln Center’s 2019-2020 performing arts season went on sale on August 7th. With strong interest, first day revenue was over $115,000. Artist Andrew Dufford has begun installing his Art in Public Places artwork on Willow Street between the Northside Aztlan Community Center and Linden Street. The work includes four vertical sculptures in the Willow Street pedestrian plaza, which have illuminating features to provide nighttime interest, and a series of three sculptural seating elements along the street. CITY MANAGER’S UPDATE 36 NATURAL AREAS Black-Footed Ferret Update In 2014, the Natural Areas Department (NAD) became a partner in the effort to recover endangered black-footed ferrets. The U.S. Fish and Wildlife Service is the lead in the recovery effort. The Natural Areas Department (NAD) involvement is unique because we are the only municipality in the coalition (typical partners are federal and state wildlife agencies). The NAD monitors black-footed ferrets every August by counting the number of young. Reproduction is essential for a self-sustaining population at Soapstone Prairie Natural Area and Meadow Springs Ranch. This year, for the first time, NAD did not supplement the population with captive-bred ferrets to better understand the status of the ferret population on City lands. Three ferrets from three different prairie dog colonies were captured, tagged, and vaccinated for canine distemper and sylvatic plague. These data points are very exciting, encouraging, and support the decision to not release captive bred ferrets. Staff from all of the work groups within the NAD contributed to the success of the surveys. Twenty-six people monitored black-footed ferrets and most volunteered their time. In addition, monitoring participants included staff from U.S. Fish and Wildlife Service, Colorado Parks and Wildlife, City of Boulder, and Boulder County Parks and Open Space. PUBLIC ENGAGEMENT West Nile Virus Outreach & Education Mosquito season in Colorado starts in spring and ends in mid-September. This year, as part of the West Nile Virus Communication Plan, City staff created different communication tools to raise awareness about the virus and the risks associated with it. Some of the tools created included, digital tools such as monthly City News articles, frequent social media content and CityView news show segments; printed information like utility bill inserts, posters and flyers; and paid advertising such as radio spots, Coloradoan print/digital, Senior Voice, FYI Magazine, Recreator, bus benches and utility pole banners. These tools were shared by City staff by setting up booths at different Lagoon Concerts as well as by posting information and distributing mosquito wipes in Natural Areas and at trailheads. Black-footed ferret at Soapstone Prairie Natural Area CITY MANAGER’S UPDATE 37 2019 Community Welcome The City of Fort Collins and Colorado State University teamed up once again for the 19th annual Community Welcome event that took place on Wednesday, August 28nd, 2019. This year’s event was welcomed by Mayor, Wade Troxell, and CSU’s President, Joyce McConnell. The goal of the program is to help foster a sense of community and connection between students, new and long-term Fort Collins residents. Close to 200 volunteers, made up of CSU students and staff, city employees, and Fort Collins and CSU police went door-to-door visiting approximately 2,000 homes in neighborhoods surrounding the main campus. Volunteers welcomed community members, distributed information on being a good neighbor, informed neighbors about FORTitude Race road closures, and shared information about the City’s codes and ordinances. Hughes Stadium Site Rezoning Open House An Open House event was conducted on August 8 from 5:00pm to 8:00pm at the Drake Centre. Fort Collins staff displayed tentative zoning plans for the former Hughes Stadium. The event consisted of different sections set up around the room that explained the different aspects and phases of the rezoning process. Over 250 community members were in attendance and were given the opportunity to provide input and ask questions to subject matter experts. City staff will present their zoning recommendation and public feedback at a Planning and Zoning Board hearing tentatively scheduled for Sept. 19 BROADBAND – FORT COLLINS CONNEXION Connexion Service is Live! Fort Collins Connexion announced it’s official go-live on Thursday, August 29th at the Connexion Launch Party at the Lincoln Center. Over 300 people were in attendance as Mayor Wade Troxell, City Manager Darin Atteberry, Executive Director Colman Keane, Marketing Manager Erin Shanley and guest speaker Nick Armstrong discussed Connexion service in the city. Connexion has 7 active Beta testers and the first group of homes have been notified that service is available. Connexion will be notifying residents in areas where construction has been successfully completed as soon service becomes available. Residents will receive a sales door hanger (unless there is a no soliciting sign) and an email as the initial communication. CITY MANAGER’S UPDATE 38 Connexion Pricing Residential pricing for Internet and home phone is available. 1 Gb for $59.95/month with no contracts, no data caps and no installation fees. Additional pricing can be viewed at https://www.fcconnexion.com New Website The new Connexion website is now live! The site at https://www.fcconnexion.com incorporates the Connexion brand look and feel unveiled at last year’s brand launch, initial residential pricing (Small Business and Professional pricing is coming soon!) and a form for residents to be notified when service is available in their neighborhood. Once a resident or business has been contacted about service being available in their area, they can come to the site and sign up for service using the new online portal. Future customers also have the option to call and speak with a Customer Service Representative to order service. Social Media Follow Fort Collins Connexion on Facebook and Twitter! Get the latest updates on Connexion, stay informed and have fun! Join our growing online community of Connexion fans! Facebook: @FCConnexion Twitter: @ConnexionFC COMMUNITY DASHBOARD HIGHLIGHT The Community Dashboard features performance data and information that highlights how the City is doing in achieving its seven Outcome areas: Neighborhood Livability and Social Health, Culture and Recreation, Economic Health, Environmental Health, Safe Community, Transportation, and High Performing Government. The Dashboard is made up of 37 total metrics that are published quarterly and demonstrate where the City is doing well and where there are opportunities to improve. The color status of performance for each metric is determined based on the actual result for the quarter compared with the target. The color status of performance for the Outcome is determined based on the average calculation of the performance of each metric within that Outcome. Each month the City Manager’s Update will highlight a metric from the Community Dashboard. This month’s feature is from the High Performing Government Outcome Area. CITY MANAGER’S UPDATE 39 Analysis: Governmental Funds Community Services: Community Services overall positive balance is due to $659K, lifecycle projects in progress, not yet expensed; $505K, timing of filling vacancies; $425K, timing of supplies due to variable programming/business needs; $393K, vehicle repairs, snow removal and other maintenance contracts; and $174K, timing of invoices for the King Fisher Natural Area restoration. PDT: Street Maintenance program under $2.7M due weather impacts on project schedules. TCEF under budget $924k due to difference in original estimate of reimbursement for development vs. actual. Reimbursements are dependent upon developer requests and are not controllable by City staff. Under $749k due to vacancies across the organization and higher allocations out to capital/grant projects (which are budgeted conservatively).Transfort under $337k due to invoice timing for demand response services (para transit). Under $240k for vehicle purchases taking longer than originally planned. Expect to end year under budget. IES: IES underspend is comprised of YTD Medical and Dental claims performance $2.5M, timing of Ops services billing for various ongoing major projects and maintenance $1.2M, savings from YTD rentals, vehicle repair, and parts $863, YTD fuel and utilities savings $677. Hoffman Mill and Transfort CNG compressor projects in procurement process $627, and vehicle repairs claim from 2018 hail damage $510. Utilities Light & Power -System Addition & Replacement $1.0M (Supplies $657, these supplies are for new construction which may pick up this summer, Vehicles & Equipment $490, waiting for delivery of five vehicles, offset by Capital Labor ($204), allocation can change based on type of work, O&M, System Additions or Capital). Energy Services $530(Rebates & Incentives $338 along with Consulting $195 related to the Efficiency Works program which has had less assessments than last year and less than expected participation in residential programs, no change in the program annual forecast so far; this also includes the demand response program). L&P Operations $438(Supplies $255, use of utility supplies for O&M work which may pick up as the year goes on, Purchased Property Services $83, Vehicle Repairs, Other Repairs & Maintenance and Construction Services all are contributing to this under budget area, vehicles are typically budgeted aggressively, Purchased Professional & Technical CITY MANAGER’S UPDATE 40 Services $74, Consulting was all loaded early in the year, actual should catch up with budget, Education & Training services are also below budget. Purchase Power -Purchase Power-Tariff 1 $1.87M(weather and actual demand for the year are key factors on the spend in Tariff 1 from PRPA). Purchase Power-Renewables $107(this is a contracted amount and will be on budget at year end (YE)). CS&A -Support Services $361 (Building Maintenance $136 (charges for June not booked, yet, budgeted conservatively, YE spend TBD), Janitorial Services $89 and Security Services $27 (booked to wrong object -G/L cleanup needed, YE spend TBD) and Copier Rental $33 (savings due to reworked leases and POs carried forward, under budget at YE)), Minor Capital $171 (Vehicles $120 (2 Locates vehicles, 1 Grounds Maintenance vehicle -TBD, and 1 CCSU vehicle -in progress; expected to be under $60+ at YE) and Equipment $29 (Locates -unanticipated sole source process delayed purchase; likely under budget by YE), IT $168 (Software/Software Maint. & Support $82 (primarily payment timing of AMI-related invoice offset by more NextAxiom licensing needed and Maximo-related invoice paid earlier in the year; will be near budget at YE) and Other Professional & Technical $75 (Cybersecurity projects in planning stages -resources being identified, RFP to follow; possible underspend by YE)), Finance & Asset Management $117(Personnel $64 (vacancies and hourly not utilized, savings will persist) and Audit Services $32 (new vendor with slightly different timing, YE spend TBD)),Customer Service $113 (Personnel $71 (vacancies; savings should persist), Consulting $53 (delay in start of work, at budget by YE)) and Community Engagement $93(Personnel $45 (vacancies; savings should persist), Educational Programs $23 (calendarized based on historical, more variation due to vacancies and charging to correct objects), and Other Professional & Technical $16 (affordability programs launch in July , slightly under budget by YE)). Water -Minor Capital $528 (Construction Contracts $266 (projects on hold, will monitor underspend), Other Capital Outlay $191 ($140 for project at the Water Meter shop will be spent or encumbered by the end of the year, will monitor for other possible under spend); Transmission and Distribution $260(Personnel $97 (vacancies filled, possible savings of ~$160 for the year), Vehicle Repair $38 (spend occurs as needed, will monitor for underspend), Street & Bridge Maintenance $32 (spend occurs as bills are received -no anticipated savings for the year), Water Pipe & Accessories $26 (billing can be sporadic, no savings expected in 2019) as well as other minor underspends); Water Resources $154 (Consulting $57 (money encumbered for water vulnerability study) and Personnel $44 (current vacancy, underspend ~$80 for the year)); and Water Conservation $134 (Rebates $63 depends on demand - will monitor for possible savings), City Programs $34 (waiting on invoice - no savings), and Consulting $18 (used as needed), and other minor underspends). Definition: This metric covers the accuracy and precision of planned (budgeted) and actual expenditures. Expenditures include operating costs, such as personnel, insurance, consulting and supplies, as well as debt payments and capital equipment purchases. Not included are the costs of large capital projects that occur over several years and have a beginning and end. Expenditures are separated into Governmental and Enterprise. Governmental expenditures are for those activities that are primarily supported by taxes and grants and to a much lesser degree from fees. Examples are Police, Streets Maintenance, Parks, Museum, Fire, etc. Alternatively, Enterprise expenditures related to activities that are accounted for like a business and are entirely supported by fees charged to users. These include Light and Power, Water, Wastewater, Storm Drainage and Golf. CITY MANAGER’S UPDATE 41 Why is this metric important? Accuracy and precision in expense budgeting is very important to ensure the City can provide the full amount of programs and services citizens expect. Over estimating budgeting expenses takes money away from additional programs and services that could be provided to the community. The City strives to do a better job being accurate with our expense forecasts without going over the Council approved budget. The City is not allowed to go over budget according to statutory law. City’s impact on this metric: High – The City has direct control over the amounts it forecasts and how much it actually spends. Historical analysis of actual spending to budgeted spending should allow the City to improve the accuracy of its budgeting. Benchmarks: This metric contains no benchmark data because the target for this metric is not influenced by the performance of other cities. External reference points would add no value to the data because the City's goal is always to be as accurate as possible with its own budgeted expenses. The evaluation criteria for this metric was revised so that Green performance is between 96-100% of the target, Yellow performance is between 93-96% of the target and Red performance is below 93% of the target. To view the entire Dashboard, please visit: http://fortcollins.clearpointstrategy.com/ Board 121 Kensington Drive 8/15/19 Approved NEIGHBORHOOD SERVICES Hughes Stadium Site Rezoning Outreach A neighborhood meeting on the rezoning of the Hughes Stadium Site was held August 8th at the Drake Centre from 5:00 to 8:00 p.m. The meeting was an “Open House” format featuring informational boards and subject matter experts from the City stationed at each board to encourage the audience flow. The boards covered topics such as City Plan place types, zone districts in Fort Collins, “clustered” conditional zoning, Natural Areas goals and the different zone district configurations laid out by staff. These zone district configurations were presented as Scenarios 1 through 5, with a staff