Loading...
HomeMy WebLinkAboutReport - Mail Packet - 6/18/2019 - City Managers Monthly Update - June 2019Kids in the Park – Twin Silo Park – May 19, 2019 June 2019 JUNE 13, 2019 Table of Contents ISSUES BEFORE COUNCIL ................................................................................................................. 4 JUNE 18 COUNCIL MEETING - CANCELED ...............................................................................................................4 JUNE 25 WORK SESSION - CANCELED .....................................................................................................................4 JULY 2 COUNCIL MEETING ......................................................................................................................................4 JULY 9 WORK SESSION ............................................................................................................................................4 PUBLIC ENGAGEMENT – UPCOMING EVENTS ........................................................................................................4 SALES TAX - MONTHLY & YEAR TO DATE ....................................................................................... 5 CP- ENGINEERING ............................................................................................................................. 6 CITYWIDE PEDESTRIAN ACCESS PROJECT ...............................................................................................................6 SUNIGA ROAD IMPROVEMENTS – COLLEGE AVE. TO BLONDEL STREET ................................................................7 NORTH COLLEGE IMPROVEMENTS – CANAL TO STATE HIGHWAY 1 .....................................................................7 VINE AND LEMAY BNSF IMPROVEMENTS ..............................................................................................................8 SHARP POINT/NANCY GRAY CONNECTION ............................................................................................................8 POWER TRAIL AND HARMONY ROAD GRADE SEPARATED CROSSING ...................................................................9 TIMBERLINE ROAD CORRIDOR PROJECT ................................................................................................................9 JEFFERSON STREET IMPROVEMENTS PROJECT ................................................................................................... 10 LINDEN STREET RENOVATION PROJECT .............................................................................................................. 10 WILLOW STREET IMPROVEMENTS ...................................................................................................................... 11 TIMBERLINE WIDENING AT GREAT WESTERN CROSSING ................................................................................... 11 NORTH MASON DESIGN – ALPINE TO HICKORY .................................................................................................. 12 CP - PARK PLANNING & DEVELOPMENT ....................................................................................... 13 POUDRE RIVER WHITEWATER PARK .................................................................................................................... 13 SUGAR BEET PARK ............................................................................................................................................... 14 TRAIL HEAD PARK ................................................................................................................................................ 15 POWER TRAIL CONNECTION TO SPRING CREEK TRAIL ........................................................................................ 15 EASTSIDE PARK IMPROVEMENTS ........................................................................................................................ 16 LINCOLN MIDDLE SCHOOL TRAIL ......................................................................................................................... 17 CP - OPERATION SERVICES ............................................................................................................ 17 GARDENS ON SPRING CREEK – VISITOR’S EXPANSION ........................................................................................ 17 FORT COLLINS/LOVELAND POLICE TRAINING CENTER ........................................................................................ 18 308 VINE WATER LAB / INNOSPHERE PHASE II ................................................................................................... 18 CP - UTILITIES.................................................................................................................................... 19 WATER TREATMENT FACILITY ............................................................................................................................. 19 LIGHT & POWER GENESIS64 SCADA UPGRADE PROJECT .................................................................................... 20 CIRCUIT 724 (NORTH COLLEGE) ........................................................................................................................... 20 NEW FEEDER CAPACITY (E. DRAKE & LEMAY) ..................................................................................................... 21 GIS/GWD & ADMS ............................................................................................................................................... 21 SHERWOOD STREET WATERLINE REPLACEMENT ................................................................................................ 22 SPRING CREEK IMPROVEMENTS AT EDORA PARK ............................................................................................... 22 REMINGTON STREET STORM SEWER .................................................................................................................. 23 PUBLIC SAFETY ................................................................................................................................ 23 POUDRE FIRE AUTHORITY ................................................................................................................................... 23 POLICE SERVICES .................................................................................................................................................. 24 PLANNING, DEVELOPMENT &TRANSPORTATION ......................................................................... 26 BUILDING SERVICES AND PLANNING ................................................................................................................... 26 HISTORIC PRESERVATION SERVICES .................................................................................................................... 26 NEIGHBORHOOD SERVICES ................................................................................................................................. 26 FCMOVES ............................................................................................................................................................. 28 YEAR TO DATE COMPARISON .............................................................................................................................. 28 GRAFFITI UPDATE ............................................................................................................................ 28 SUSTAINABILITY SERVICES ............................................................................................................ 29 ENVIRONMENTAL SERVICES ................................................................................................................................ 29 SOCIAL SUSTAINABILITY ...................................................................................................................................... 29 ECONOMIC HEALTH ............................................................................................................................................. 29 UTILITIES ............................................................................................................................................ 29 CUSTOMER CONNECTIONS .................................................................................................................................. 29 WATER RESOURCES AND TREATMENT OPERATIONS .......................................................................................... 30 COMMUNITY SERVICES .................................................................................................................... 31 RECREATION ........................................................................................................................................................ 31 PARKS ................................................................................................................................................................... 31 CULTURAL SERVICES ............................................................................................................................................ 31 NATURAL AREAS .................................................................................................................................................. 32 PUBLIC ENGAGEMENT ..................................................................................................................... 33 BROADBAND – FORT COLLINS CONNEXION ................................................................................. 34 COMMUNITY DASHBOARD HIGHLIGHT .......................................................................................... 34 CITY MANAGER’S UPDATE 4 ISSUES BEFORE COUNCIL JUNE 18 COUNCIL MEETING - CANCELED  Meeting canceled for Colorado Municipal League Conference, Breckenridge, CO, June 18-21 JUNE 25 WORK SESSION - CANCELED  Work Session canceled. JULY 2 COUNCIL MEETING  Sunshine House Appeal o Consideration of an appeal of the Planning and Zoning Board decision regarding the Sunshine House at Bucking Horse Major Amendment. The project is located on the east side of Miles House Avenue, south of Nancy Gray Avenue, north of Drake Road and southwest of the Great Western Railway.  Council Priorities Consider adoption of a resolution setting Council priorities which will be used to guide the City organization for the next two years.  City Code Changes Related to Telecommunication Facilities and Services (Connexion) o Amend City Code to further implement the authority granted in City Charter Section 7 to begin offering telecommunications facilities and services to customers. Economic Health – 3.7 Deploy reliable, high-speed internet services throughout the community.  Staff Report: Business Trespass and College Avenue Traffic Safety JULY 9 WORK SESSION  Council Priorities regarding Affordable Housing and Mobile Home Park Preservation o Provide a review of existing City affordable housing policy contained in plans, strategies and studies to provide a foundation for a discussion defining current City Council priorities regarding affordable and achievable housing strategies including mobile home park preservation. Neighborhood Livability and Social Health – 1.1 Improve access to a broad range of quality housing that is safe, accessible and affordable.  City Financial Overview and Planning Overview o Provide an overview of the City’s revenue, expenditure and balance sheet and an overview of the City Strategic and Budgeting Process. High Performing Government – 7.1 Provide world-class municipal services to residents and businesses. PUBLIC ENGAGEMENT – UPCOMING EVENTS  Summer in the City - June 10 –13: The City’s Communication & Public Involvement Office (CPIO), in partnership with Poudre School District, hosted over 20 high school students for the Summer in the City program. Now in its third year, Summer in the City gives local teens a behind-the-scenes look at City operations and potential career paths through a variety of tours and presentations https://www.fcgov.com/cityworks/summerinthecity. CITY MANAGER’S UPDATE 5  Lagoon Concert Series - June 19 – August 7: The City will host a booth at the Lagoon Concert Series. Each week, different departments will be onsite to interact with concert goers and share information about upcoming projects and programs such as West Nile Virus, Recreation, FC Volunteer and more. For the complete concert schedule, visit: https://lagoonseries.com.  Open Streets - June 16: Come Ride the Route on Sunday, June 16 from 10:00 a.m. to 3:00 p.m. along Maple St. from Putnam Elementary to Lee Martinez Park via N. Sherwood St. Open Streets events are free for everyone! By closing public streets to through traffic, we create a comfortable and fun environment to ride, walk, run, scoot, roll, and play in the street https://www.fcgov.com/openstreets/.  Bring Your Child to Work - June 13: Utilities is celebrating Bring Your Child to Work Day. The Utility supports and encourages employees to show their children what they do at work. Activities include fun, child-friendly offerings and lunch, while creating an opportunity for employees to share their work with their families and inspire the next generation.  Xeriscape Garden Party - June 15: Utilities is hosting the annual Xeriscape Garden Party. This event creates an opportunity for the community to learn from experts about improving their sprinkler system, selecting low water-use plants, composting, recycling, using rain barrels, and more. Attendees can explore the Xeriscape Demonstration Garden and get advice from Master Gardeners. More information at https://www.fcgov.com/utilities/residential/conserve/water- efficiency/xeriscape/xeriscape-garden-party/.  Power Trip Bus Tour - June 27: The bus tour provides participants with a behind-the-scenes look at reliable electricity and its path into residents’ homes. More information at https://www.fcgov.com/utilities/community-education/adults/bus-tours. SALES TAX - MONTHLY & YEAR TO DATE APRIL SUMMARY OVER PRIOR YEAR Month Year to Date Net Sales Tax Collected: 0.2% 1.3% Net Use Tax Collected: 34.6% 11.6% Net Sales and Use Tax Collected: 4.8% 2.9% Year to date, sales and use tax collections excluding rebates are up 2.9% and total $46.5M. APRIL SUMMARY OVER BUDGET Month Year to Date Net Sales Tax Collected: -2.9% -0.9% Net Use Tax Collected: 13.1% 11.4% Net Sales and Use Tax Collected: -0.5% 1.0% Year to date, the City has collected 1.0% more sales and use tax revenue, totaling $464K over budget. CITY MANAGER’S UPDATE 6 CP- ENGINEERING CITYWIDE PEDESTRIAN ACCESS PROJECT Funding Source: Community Capital Improvement Program (CCIP) Estimated Project Budget: 2019 - $1.1M Estimated Completion Date: Ongoing Phase: Construction Project Details: This project maintains a complete City sidewalk inventory, identifies sidewalk inadequacies, and access needs under the Americans with Disabilities Act (ADA), and develops a prioritized work program to achieve goals of providing unobstructed access for transportation and recreation. Project Status:  Upcoming project locations: Minor sidewalk repairs and reviewing 2019 project locations. Mountain Ave. to Grandview (south side to cemetery entrance near trolley barn) began construction May 15, and was completed by Memorial Day weekend. Next project will be sidewalk connection at Lee Martinez Park.  Current projects: Opera Galleria sidewalk replacement, completed March 23 (see pictures above). More information is available at http://www.fcgov.com/engineering/pedneeds.php Capital Project (CP) Updates are indicated in bold Capital Project Updates are indicated in bold CITY MANAGER’S UPDATE 7 SUNIGA ROAD IMPROVEMENTS – COLLEGE AVE. TO BLONDEL STREET Funding Source: 2017 / 2018 BFO, COFC Utilities, Transportation Capital Expansion Fee (TCEF), Developer Contributions Estimated Project Budget: $3.7M Estimated Completion Date: Spring 2019 Phase: Construction Project Details: Design and construction of a new arterial roadway that connects existing Suniga Road, from Blondel St. to College Avenue. Project Status:  Project construction has commenced May 13 with a duration of approximately 90 days. Traffic impacts are expected to be minimal.  Landscape installation will follow in the fall of 2019. More information is available at https://www.fcgov.com/engineering/suniga-to-college-improvements NORTH COLLEGE IMPROVEMENTS – CANAL TO STATE HIGHWAY 1 Funding Source: Federal Grants, URA Contribution, Pedestrian Program Funds, County Funds, Transportation Capital Expansion Fee (TCEF), Developer Contributions Estimated Project Budget: $2.35M Estimated Completion Date: Summer 2019 Phase: Construction Project Details: This project will construct pedestrian improvements along North College between the Larimer & Weld Canal (City limits) and State Highway 1, including pedestrian bridges crossing the canal. Project Status:  During May, work focused on installing sidewalks and driveways on the west side of HWY 287.  CDOT roadway work south of Hwy 1 was completed in May. CITY MANAGER’S UPDATE 8 More information is available at fcgov.com/engineering/ncollege.php VINE AND LEMAY BNSF IMPROVEMENTS Funding Source: Keep Fort Collins Great (KFCG), Transportation Capital Expansion Fee (TCEF), 2017 / 2018 BFO Estimated Project Budget: $22M ($12M currently allocated) Estimated Completion Date: 2021 (Pending funding) Phase: In Design Project Details: The existing Vine and Lemay intersection, which includes the Burlington Northern Santa Fe (BNSF) Railway crossing, is severely congested with limited options to expand through or turn lane capacity due to land use constraints. Project Status:  $9.1M was passed through on first reading at Council on May 21. Second reading June 4 to appropriate Transportation Capital Expansion Fee reserves into the project budget and continue work. More information is available at fcgov.com/engineering/vine-lemay SHARP POINT/NANCY GRAY CONNECTION Funding Source: Transportation Capital Expansion Fee (TCEF), 2015/2016 BFO, Developer Contributions Estimated Project Budget: $1.4M Estimated Completion Date: Summer 2019 Phase: Construction, Railroad and FRA Coordination Project Details: The City Master Street Plan identifies Sharp Point Drive and Nancy Gray Avenue as connected across the Great Western Railroad tracks. This project will construct the roadway and pedestrian connection, and railroad crossing. Project Status:  No project updates. More information is available at fcgov.com/engineering/sharppoint CITY MANAGER’S UPDATE 9 POWER TRAIL AND HARMONY ROAD GRADE SEPARATED CROSSING Funding Source: Federal Grant, Community Capital Improvement Program (CCIP - Bike / Pedestrian Grade Separated Crossings) Estimated Project Budget: $5M - $8M Estimated Completion Date: 2021 (Pending funding) Phase: Alternatives Analysis – Conceptual Design Project Details: The Power Trail provides connectivity between the Spring Creek Trail to the north and the Fossil Creek Trail to the south. The Trail currently has a gap approximately three-quarters of a mile long north and south of Harmony Road. The detour route requires users to cross Harmony Road at grade at McMurry. This project will design, acquire property interests, and construct a trail grade separated crossing at Harmony Road as well as the trail connections on either side. Project Status:  No project updates. More information is available at https://www.fcgov.com/engineering/powertrailcrossing TIMBERLINE ROAD CORRIDOR PROJECT Funding Source: Transportation Capital Expansion Fee (TCEF), Developer Contribution, Federal Grant Estimated Project Budget: $5M Estimated Completion Date: 2021 Phase: Request for Proposal (RFP) Project Details: This project will reconstruct South Timberline Road from Stetson Creek Drive to Trilby Road to the City’s four lane arterial roadway standards. Planned improvements include; intersection improvements at Kechter Road, Zephyr Road, and Trilby Road, multi-modal accommodations, raised medians, access control, landscaping improvements, and roadway improvements. This project serves to build upon the development improvements that have been completed along the corridor. This project will improve safety, reduce congestion, and provide improved accommodations for alternate travel modes. Project Status:  No project updates. CITY MANAGER’S UPDATE 10 JEFFERSON STREET IMPROVEMENTS PROJECT Funding Source: Federal Congestion Mitigation and Air Quality (CMAQ) Funds, Building on Basics (BOB) 1.0 funds Estimated Project Budget: $1.4M Estimated Completion Date: Fall 2019 Phase: Right-of-way acquisition Project Details: The goals of this project are to develop preliminary engineering design plans and to acquire rights-of-way and easements for planned improvements along Jefferson Street between College Avenue and the Mountain/Lincoln Intersection. Project Status:  Staff has presented first offers to property owners and will continue negotiations through the second quarter of 2019. LINDEN STREET RENOVATION PROJECT Funding Source: Community Capital Improvement Program (CCIP) Estimated Project Budget: $3.5M Estimated Completion Date: 2020 Phase: Conceptual Design Verification Project Details: The goals of this project are to renovate Linden Street between Walnut Avenue and Jefferson Street. Initial concepts include converting this section of Linden Street to a “convertible” street; one that can function primarily as a roadway but can also be closed to vehicles and converted to a pedestrian plaza during specialty events. Project Status:  Staff has initiated a review of the 2014 Conceptual Design with the Downtown Development Authority, the Downtown Business Association, and other interested business and property owners along Linden Street.  Upcoming work includes additional stakeholder outreach to gather feedback on the 2014 Conceptual Design and the transition to the preliminary engineering design phase. CITY MANAGER’S UPDATE 11 WILLOW STREET IMPROVEMENTS Funding Source: Federal Grants, Community Capital Improvement Program (CCIP), Developer Contributions, DDA Funds Estimated Project Budget: $3.8M Estimated Completion Date: Fall 2019 Phase: Construction Project Details: This project will design roadway and urban design improvements along Willow Street between College Avenue and Linden Street; including a pedestrian plaza at the northern corner of Willow Street and Linden Street. Project Status: • Project Construction began May 20. TIMBERLINE WIDENING AT GREAT WESTERN CROSSING Funding Source: Transportation Capital Expansion Fee (TCEF), Developer Contributions, Building on Basics (BOB) 1.0, Arterial Intersection Funding Estimated Project Budget: $0.6M – Phase Two CITY MANAGER’S UPDATE 12 Estimated Completion Date: Summer 2019 Phase: Construction Project Details: In 2016, Phase One intersection improvements were completed at Prospect and Timberline; along with Timberline widening and multi-modal improvements south of Prospect. Phase Two improvements will consist of widening the Great Western Railway crossing, completion of multi-modal connections at the crossing, a new railroad signal system, and completion of the “free-right” turn from eastbound Prospect to southbound Timberline. Project Status:  The Great Western Railroad has shifted their construction schedule to complete this crossing in August 2019. The City will accommodate the new schedule and is scheduled to finish the additional sidewalk and roadway in September. NORTH MASON DESIGN – ALPINE TO HICKORY Funding Source: Transportation Capital Expansion Fee (TCEF), Storm Water Utility, Urban Renewal Authority (URA) funding Estimated Project Budget: $1.0M Estimated Completion Date: Fall 2020 Phase: Conceptual Design Project Details: A collaborative effort between City departments and the North College URA to find solutions to existing drainage issues along the west side of College Avenue, north of the Poudre River. The project was approved through the 2019/2020 Budgeting for Outcomes (BFO) process and will focus on roadway and storm sewer alignments for North Mason. Construction of the storm sewer backbone is expected to occur in 2021/2022. No funding has currently been identified for the roadway construction. Project Status:  Staff has hired a consultant team for conceptual and preliminary level design, topographic survey, and title work analysis.  Staff has met multiple times with the URA Citizens Advisory Group (CAG) to discuss the project and design approach.  Staff will continue to meet with property owners. CITY MANAGER’S UPDATE 13 CP - PARK PLANNING & DEVELOPMENT POUDRE RIVER WHITEWATER PARK Funding Source: Park Planning & Development, CCIP, Public and Private Fundraising, Stormwater, and Natural Areas Total Project Cost: $11.5M Phase: Under Construction Estimated Completion: Summer/Fall 2019 Project Details: The Poudre River Whitewater Park project has been a collaborative effort between multiple City departments, local advocates, and the philanthropic community. The project will provide natural systems, stormwater, and recreation benefits. Project elements include whitewater boating features, a pedestrian bridge, a naturalistic park space, overlook plaza, trail & walk connections, and parking. Project Status: • Road work on East Vine Drive is complete. An on-street bike path and additional on- street parking have been added. • The pedestrian bridge decking and south bank plaza will be poured mid-June. • The wave shelter art piece is on schedule for a September installation. • Construction is on track for a fall grand opening. CITY MANAGER’S UPDATE 14 SUGAR BEET PARK Funding Source: Parkland Funds, Lincoln Corridor Funds, & Nature in the City Total Project Cost: $2.4M Phase: Under Construction Estimated Completion: Fall 2019 Project Details: Sugar Beet Park is a neighborhood park planned near the intersection of East Vine Drive and Lemay Avenue, in front of the Streets Facility. The design of the park is inspired by the sugar beet industry and the Great Western Sugar Company that once stood nearby. This project is a collaborative effort between Park Planning & Development and Nature in the City. The park will feature a multi-use turf field, pollinator garden and themed playground – including a wooden beet structure. Project Status: • Construction is underway. • The beet play structure is being relocated from the Museum of Discovery, to the park site at the beginning of June. • Construction is on track for a mid to late summer grand opening. • A live stream video of construction can be found on the project’s webpage. CITY MANAGER’S UPDATE 15 TRAIL HEAD PARK Funding Source: Parkland funds Total Project Cost: $2.9M Phase: Design Estimated Completion: 2020 Project Details: Trail Head Park will be a 5.6-acre neighborhood park located in the northwest corner of East Vine Drive and I-25, in the Trail Head neighborhood subdivision. A second neighborhood meeting was recently held at the Budweiser Welcome Center. Construction is anticipated to start in 2020. Project Status: • Using comments and feedback collected from neighborhood meetings, a park design is being developed. • The design will be presented at a third neighborhood meeting mid-summer. POWER TRAIL CONNECTION TO SPRING CREEK TRAIL Funding Source: Conservation Trust Total Project Cost: $240K Phase: Under Construction Estimated Completion: Spring 2019 CITY MANAGER’S UPDATE 16 Project Detail: An extension of the Power Trail to Spring Creek Trail was recently completed and is now open. The new trail is located northeast of EPIC. The project was completed as a partnership with Park Planning & Development and Utilities. Utilities work included the rehabilitation and re-alignment of Spring Creek. This successful partnership resulted in saved time and cost. Project Status • Project is complete. EASTSIDE PARK IMPROVEMENTS Funding Source: First United Methodist Church Total Project Cost: TBD Phase: Design Estimated Completion: TBD Project Detail: The First United Methodist Church has generously offered to gift the City an improvement to Eastside Neighborhood Park. Residents surrounding the park were offered the opportunity to provide feedback on the extent of the improvement(s) based on potential costs. Park Planning & Development is working with CityGive to collect donations and will begin construction when funded. Project Status • The first neighborhood meeting was held in February and presented potential enhancements, and costs associated. • Of the 4 enhancement options presented, option 2 – Greenway was most well received. • The Greenway concept will focus on landscape improvements, lighting and seating. • The First United Methodist Church has begun fundraising. • Construction is dependent on the amount of time needed to raise funds. CITY MANAGER’S UPDATE 17 LINCOLN MIDDLE SCHOOL TRAIL Funding Source: Conservation Trust Fund Total Project Cost: $750,000 Phase: No phasing anticipated Estimated Completion: Fall 2019 Project Detail: A trail spur extending from the Poudre Trail to Lincoln Middle School. The trail is approximately ¾ mile long and will provide a much-needed connection to the Poudre River Trail from the school and surrounding neighborhoods. Project Status • Construction anticipated to begin August 2019. • The City is in final negotiations with Poudre School District to secure easement for the trail. • A master plan with additional pedestrian and bike crossing improvements has been prepared. CP - OPERATION SERVICES GARDENS ON SPRING CREEK – VISITOR’S EXPANSION Funding Sources: Building on Basic (BOB) II - $2.2M Op Services (Maintenance): $380K Privately Raised Funds: $700K Total Project Cost: $3,280,000 Phase: Construction Estimated Completion Date: Late Fall 2019 Project Details: The Gardens on Spring Creek Visitor Center Expansion is adding approximately 4500 SF. This includes a conservatory which will incorporate a butterfly pavilion, extra meeting rooms, additional office spaces, and Solar PV to offset the additional energy usage. Project Status: Foundations are Installed CITY MANAGER’S UPDATE 18 • Footings and foundations are in, backfilling and underground work will begin soon. • New conservatory structure to arrive mid-June and installation will follow. • Operation Services is working on a contract to replace existing roof in conjunction with this project and adding a 66-kw solar PV system. • Project staff is working with Parks to coordinate relocating the Living Wall from 222 Laporte to inside the new conservatory. • On track for LEED Gold currently tracking at 63 credits. • Garden staff had plant sale at the new stage area, and it was a big success. FORT COLLINS/LOVELAND POLICE TRAINING CENTER Funding Sources: $9.25M generated from bonds for the City of Fort Collins $9.25M from City of Loveland Total Project Cost: $18.5M Phase: Design Development Estimated Completion Date: Late 2020 Project Details: The City of Fort Collins is partnering with The City of Loveland to construct a new Police training facility which will be located on the west side of the Loveland Airport. This new site will offer a 50-yard pistol range, a 1.4- mile driving track, concrete skills pad, and some classrooms for special training. Project Status: • Continue working with Bryan Construction, our Construction Manager, to determine some critical cost to confirm our project budget. 1. Firing Range Equipment – working to confirm needed equipment and cost. 2. Site soil conditions – Received site Design Development (DD) drawings and working with Bryan Construction to confirm estimated cost of work. 3. Utility Easements – Working with City of Fort Collins Real Estate team to determine utility easements water, sewer, and railroad. • We have submitted permit applications with UPSF Railroad for two locations associated with water and sewer crossings. • Energy Model update shows we are on target for Admin building with an energy use index (EUI) of 30. Firing Range is challenging with the air exchanges required. We are planning to design the Firing Range for future heat exchanger plates but will hold off on installing them due to cost and budget. We need roughly $800K to add this and the current budget does not provide funding. • The project team is looking at the option of putting together an early-sitework package with hope of being able to begin work in late July. • There was a groundbreaking ceremony on Wednesday May 8. 308 VINE WATER LAB / INNOSPHERE PHASE II Funding Sources: City of Fort Collins Cost: 2/3 of Total $1M Currently Appropriated Rocky Mountain Innosphere Cost: 1/3 of Total Total Project Cost: Approximately $20M Current SD Site Plan CITY MANAGER’S UPDATE 19 Phase: Conceptual Estimated Completion Date: Fall 2020 Project Details: The 308 Vine Water Lab is a joint ownership project with the City of Fort Collins and Rocky Mountain Innosphere (RMI). The project is approximately 26,000 SF. The three-story building includes lab and office space on levels 1 and 2 for Water Quality, Pollution Control, and Water Shed which currently reside in separate facilities. Building is to be LEED Gold and has budgeted to incorporate Solar PV and infrastructure for future building Net Zero goals. RMI is to own and occupy level three. The City will have the option to buy out RMI after eight years. Project Status: • Innosphere is currently working to secure expanded parking. This is necessary to fulfill parking requirements outlined in the City of Fort Collins/Innosphere agreement. RMI is asking for a 30-day extension to complete their parking agreements. This extension will delay the project schedule. • City of Fort Collins Utilities is working with HDR Engineering, Inc. to help design and plan City laboratory and office space in the building. The first of three workshops have been completed. HDR is now working with the information received to produce a first draft of conceptual lab and office design documents. CP - UTILITIES WATER TREATMENT FACILITY Funding Source: Capital Project Budget Estimated Project Budget: $1,300,000 Phase: In Construction Project Details: Approximately 7,300 feet of three-phase from Overland Trail to the Treatment Facility in an existing easement on Colorado State University Property Project Status: No Updates • Switch over to receiving electricity from Light &Power has been completed. • Engineering is working with WTF staff to order an ATO switch. The switch has about a six-month lead time. • Project savings allowed for a second circuit, which has been pulled in. Conceptual Rendering Water Treatment Facility CITY MANAGER’S UPDATE 20 LIGHT & POWER GENESIS64 SCADA UPGRADE PROJECT Funding Source: New Capital Estimated Project Budget: $200,000 Phase: In Design Project Details: Convert the existing Iconics Genesis32 hardware, software, and screens to Genesis64 Project Status: • Alarm points have been successfully loaded into the Iconics alarm server software and status and analog points were test loaded into the Kepware OPC server the week of June 3, 2019. CIRCUIT 724 (NORTH COLLEGE) Funding Source: New Capital Estimated Project Budget: $950,000.00 Phase: Completion Project Details: Install 14,300 feet of 3 phase 750 Al cable, and two switches to provide load relief and improved reliability to North College. Project Status: • Circuit design was completed March 21, 2019. • A custom vault lid was installed May 6, 2019-May 8, 2019. • All 750 Al cable has been installed, including one 600- amp switch. • Circuit 724 was energized on May 3, 2019. • An addition switch was installed with vault lid during the week of May 6, 2019. • Project was completed on June 3, 2019. Map of Installation CITY MANAGER’S UPDATE 21 NEW FEEDER CAPACITY (E. DRAKE & LEMAY) Funding Source: New Capital Estimated Project Budget: $500,000.00 Phase: Construction Project Details: Install 7000 feet of three phase 750 Al and one switch to serve new load at Drake and Lemay. Project Status: • Construction is on track to meet the completion date during the week of July 4, 2019. • Duct crossing at Drake was installed the week of April 29, 2019. • To date, 95% of the 750 cable is in and a new vault and switch has been installed. • The circuit was energized the week of June 3, 2019. GIS/GWD & ADMS Funding Source: Offer 5.23 Operational Technology Estimated Project Budget: $2,762,384 Phase: Software & Hardware Procurement, Data Migration Project Details: 1. Replacement and upgrade of the existing L&P mapping systems to a fully capable Geographic Information System (GIS) platform compatible with the City's enterprise GIS. 2. Implementation of a GIS-based Graphic Work Design (GWD) system enabling streamlined electric distribution design and development and integration with GIS as well as other key systems 3. Replacement of existing electric distribution operational tools with a new Advanced Distribution Management System (ADMS) that enables L&P’s Supervisory Control & Operations (SCO) staff to performs a wide range of real-time analysis in the management of the City’s electric distribution system. Project Status: No Updates • A project sub-team has been assembled to carry out data migration programming and data alignment for the conversion work of EDAR and CAD data into GIS. The team has achieved an 86% successful conversion and will continue to improve the data before final migration takes place. • Current production mapping systems are being updated prior to data migration to GIS. • The GIS/GWD team has participated in a series of workshops: data modeling, functional requirements, business and workflow process. Project core team training just completed. • The City has signed a contract with Advanced Control Systems (ACS) to provide ADMS software and implementation services. • The ADMS team and IT are working with ACS to develop the system architecture plans to enable us to procure hardware. Map of Planned Installation CITY MANAGER’S UPDATE 22 SHERWOOD STREET WATERLINE REPLACEMENT Funding Source: Water Estimated Project Budget: $559,000 Status: In design Estimated Completion Date: August 1, 2019 Project Details: The existing water main located along the 600 block of Sherwood Street is a very old waterline, constructed in the 1880’s, and is slated for replacement this summer. The existing 6” cast iron main will be replaced with a new 8” PVC waterline. All of the existing residential water services and fire services will be served using a temporary waterline during construction so disruption to water service to this area should be minimal. Parking and drivable access to homes along this block will be limited during construction. Neighborhood meetings and outreach efforts for this project will be ongoing with the neighborhood. Project Status: • Final design complete • Public outreach, door-to-door notifications • Independent cost estimates complete SPRING CREEK IMPROVEMENTS AT EDORA PARK Funding Source: Stormwater Estimated Project Budget: $1,801,000 Status: In construction Estimated Completion Date: June 2019 Project Details: The Spring Creek stream reach is within an urbanized corridor and is experiencing severe bed and bank erosion. Improvements will include stabilizing the creek bed and banks through a combination of bio-engineered designs, re-grading, and re-vegetation. Project Status: • Installation of new Spring Creek Trail - completed • Irrigation, landscape, and seeding - upcoming • Restoration fencing – upcoming Sherwood Street May 2019 New Spring Creek channel – east of Riverside CITY MANAGER’S UPDATE 23 REMINGTON STREET STORM SEWER Funding Source: Stormwater and Wastewater Estimated Project Budget: $3,551,750 Status: In design Estimated Completion Date: 3rd Quarter 2019 Project Details: The Remington Street Outfall is a storm sewer and sanitary sewer replacement project along Remington Street from Spring Park Drive to Lake Street. The storm sewer will be upsized to alleviate flooding along Remington and the surrounding areas. This project is currently in the final design phase and construction is anticipated to begin in early 2020. Project Status: • Cost estimating - underway • Public outreach • Construction scheduling and phasing PUBLIC SAFETY POUDRE FIRE AUTHORITY May 15| Aircraft Craft near Larimer County Humane Society and Loveland Airport PFA assisted in a response to an inflight emergency that resulted in an aircraft crash about 1/4 mile northwest of the Humane Society. The incident was in the Loveland Fire Rescue Authority jurisdiction and PFA assisted in the initial fire attack and communications. May 16| Hiker Rescued from Arthur’s Rock PFA carried a hiker 2 miles down Arthur's Rock Trail after they suffered an ankle injury. The responders hiked about two miles up the trail, loaded the patient onto the litter and carried them to the base of the trail where they were transported to the hospital by private vehicle. May 22| PFA at 28th Annual Children’s Water Festival PFA provided a hands-on educational event that taught attendees about how and why firefighters use water to put out fires. Nearly 100 kids learned about the fire triangle (heat, fuel and oxygen) then practiced using a small fire house. May 29| Low Pressure Gas Leak Engine 2 was dispatched to the scene of a low pressure gas leak. They arrived on scene at 2:40. The crew found that the line had a check valve which greatly minimized the leak. The crew went to the nearby houses to inform residents and monitored the air. While Xcel Energy worked to fix the leak, PFA monitored the environment and has equipment at the ready to keep their workers and the area safe. Swift Water Trainings Preliminary design at Parker and Remington CITY MANAGER’S UPDATE 24 PFA spent some cold hours in the water working through swift water trainings and honing the skills needed for swift water rescues. This coincided with the beginning of a communications campaign about river safety. Fireworks are Illegal Campaign Communications are a group effort that includes the City of Fort Collins Neighborhood Services, Fort Collins Police Services, and Larimer County Humane Society. Residents can pick up signs for their own yard at any of these locations as well as the Poudre Fire Authority Administrative Offices at 102 Remington St. Upcoming Event: Car Seat Check Event; Saturday, June 14 at Station 4, 1945 W. Drake Appointments are available that afternoon at 3:00, 3:30, and 4:00 p.m. Call (970)-416-2892 or email education@poudre-fire.org. POLICE SERVICES Crime and Safety International Fugitive Extradited for 2002 Case - In 2002, Fort Collins Police detectives filed multiple charges against James Bachmann for sexual assault on a child, sexual exploitation of a child, and possession of a controlled substance. However, prior to prosecution, Bachmann failed to appear for court and disappeared from the area. In August 2018, detectives received a tip about his whereabouts. Through extensive investigation and collaboration with federal and international authorities, FCPS and the US Marshals flew to the Middle East in April 2019 to assist with Bachmann’s extradition. He was booked into the Larimer County Jail on April 25, 2019 where he was held on a $2 million cash bond. Excellent work by the Criminal Impact Unit! Police Arrest 10 for Impaired Driving - On Saturday evening, May 4, 2019, Fort Collins Police, in conjunction with the Northern Colorado Traffic Safety Task Force, hosted a DUI Sobriety Checkpoint. Members of Fort Collins Police Services, Colorado State Patrol, Larimer County Sheriff’s Office, Loveland Police Department, Colorado State University Police Department, Mothers Against Drunk Driving, and UC Health participated in the event. The DUI Sobriety Checkpoint was in operation from 9:49pm Saturday May 4 until 2:30am on May 5. During this time, 1,231 vehicles were contacted, resulting in 10 arrests for Driving Under the Influence (DUI) and Driving While Ability Impaired (DWAI). Man Arrested for Multiple Counts of Indecent Exposure - Over a period of several weeks, Fort Collins Police and Colorado State University Police received several reports regarding an unknown male in a red car, later identified as Wyatt Johnson. Johnson reportedly drove up to victims and asked for help. When the victims approached the vehicle, they saw that Johnson was exposing his genitals. Through the course of the investigation, Fort Collins officers identified the suspect and arrested him on May 20, 2019. Agency News FCPS Awarded National Accreditation – On May 4, 2019, Fort Collins Police Services was officially awarded national accreditation by the Commission on Accreditation for Law Enforcement Agencies, Inc. (CALEA®). The purpose of the Commission is to develop standards based on international best practices in public safety, and to establish and administer the accreditation process. The accreditation process is how a public safety agency voluntarily demonstrates the ways it meets professionally recognized criteria for excellence in management and service delivery. CITY MANAGER’S UPDATE 25 National Police Week – During the week of May 12, Fort Collins Police joined agencies around the country celebrating National Police Week. They honored fallen officers in several ways, including a Wreath-Laying Ceremony in the FCPS Lobby. Several people from the agency also rode in the Police Unity Tour, a 300-mile bike ride honoring fallen heroes. The ride culminates at the National Law Enforcement Memorial in Washington, D.C. Thank you to all who serve! Dancing with a First Responder – On May 18, FCPS Chief Swoboda and other police employees joined first responders from the region in a friendly competition that raised money for the Fraternal Order of Police Benevolent Fund, which supports police officers and their families in times of need. The event grossed $23,000 and netted over $11,000. To watch videos of the event, which featured police, deputies, dispatchers, firefighters, EMS personnel, and District Attorney staff, visit the FOP Benevolent Fund Facebook page at https://www.facebook.com/FOP3benevolentfund/ CITY MANAGER’S UPDATE 26 PLANNING, DEVELOPMENT &TRANSPORTATION BUILDING SERVICES AND PLANNING City Plan A searchable, electronic version of the adopted City Plan Update is expected to come on-line by late July. Harmony Corridor Plan Gateway Area Update At its May 14th Work Session, City Council gave direction for staff to explore alternative development intensities within the Harmony ‘Gateway Area’ and continue engagement with the community through additional outreach. Once alternatives have been evaluated, DRAFT revisions to the Harmony Gateway Chapter of the Harmony Corridor Plan and corresponding Standards and Guidelines will be brought to the P&Z, NRAB, LCSB and EAC for recommendations prior to City Council consideration in late Summer. Montava Development Project The Planning & Zoning Board and City Council hearings for the Montava project, have been tentatively rescheduled for the following dates: • August 1 – Planning and Zoning Board Hearing • October 15 – City Council Meeting (1st reading) • November 5 – City Council Meeting (2nd reading) Hughes Redevelopment Conceptual development plans have been submitted and reviewed through the pre-application process known as Preliminary Design Review (PDR). A tour was held on May 6th for interested community members to visit the development site and an additional focus group/neighborhood meeting was held on May 22nd. Both a City-sponsored forum on land use concerns and a neighborhood meeting will be held prior to the application of a formal rezone/development plan submittal, none of which have been scheduled. No formal development submittal has been received. HISTORIC PRESERVATION SERVICES Fort Collins Historic Building Survey Sherry Albertson-Clark has been hired to fill the new City Planner-Historic Survey contractual position. With years of experience in both historic preservation and planning, Ms. Albertson-Clark has extensive knowledge of Fort Collins’ history and architecture and comprehensive experience in evaluating and documenting historic resources. This two-year contractual position will add significantly to the community’s knowledge of Fort Collins’ important older buildings and structures. Historic Preservation Grants Historic Preservation Services has been awarded two State Historical Fund grants from History Colorado: $25,000 for additional property survey along College Avenue between Laporte Avenue and Mulberry Street; and $22,835 for a historic structural assessment of the Water Treatment Plant No. 1, at Gateway Park. NEIGHBORHOOD SERVICES Hughes Stadium Development Review Engagement Community engagement for the redevelopment proposal for the former Hughes Stadium site has been a major focus over the past two months. Engagement strategies have included the Our City online platform that serves as the hub for information and comment gathering, community site tours and a CITY MANAGER’S UPDATE 27 focus group gathering. Because of the level of community interest in the project, additional staff from Neighborhood Services have been brought onto the project engagement team to assist with the community engagement effort and to help create the most effective strategy for serving the needs of residents. Outreach will continue to focus on education regarding decisions to be made, how those decisions are informed by overarching City goals and how community input will be organized and presented throughout the Development Review process. Sustainable Neighborhoods Fort Collins Leadership training for 25 residents in the four Sustainable Neighborhoods pilot participants featured sessions on grassroots organizing, inclusion, and project management. Just one month into the program, all pilot neighborhoods have completed their first projects. The smallest neighborhood, Moore, has completed three projects and are now working with a neighborhood church to create a public, outdoor space for community connection. The Sustainable Neighborhoods Team from Environmental Services and Neighborhood Services are serving as liaisons for pilot neighborhoods and expect our first neighborhoods to be certified by September, eight months ahead of schedule. Library Park Neighborhood Tree Festival Neighborhood Services is partnering with Social Sustainability, Poudre River Public Library District, and Library Park neighbors to bring a community-building Tree Festival to Library Park. In an effort to reframe the neighborhood narrative by focusing on beloved shared resources and positive interactions among groups with frequently competing interests, the Tree Festival will activate Library Park in a new way, celebrate the neighborhood, and avoid traditional issues-based town hall meetings. The Tree Festival will feature the Neighborhood Services free Lemonade Stand and Block Party Trailer, NET Officer engagement, library story time, “forest bathing” meditation, and guided historical tree tours. Mini-Grant Projects & Programs Neighborhood Services mini-grant application evaluation criteria have been aligned with the Sustainable Neighborhoods Target Goal Areas (Water, Land, Energy, Air, and People) to promote outcome-driven “parties with a purpose”. This approach is generating more diverse and first-time neighborhood-based events. Program Assistant, Julie Wenzel, reached 120 residents this month by setting up the City Lemonade Stand at all public libraries in Fort Collins to promote the mini-grant program and assist community members without computer or internet access in submitting online applications. Mini-grant projects are also reaching historically underserved communities such as the Latinx, lower income residents, and African American youth. Julie also continues to work with the PSD School Board to build relationships with their leadership and promote integration of schools into neighborhood events funded through mini-grants. Neighborhood Night Out Neighborhood Night Out is getting an early start with registration and improvements this year. NNO registration has averaged 94 events per year since 2006. If the number of registered events kept pace with the population growth rate, Fort Collins should have registered at least 132 NNO events last year. Neighborhood Services held internal and external Neighborhood Night Out meetings in Q1 to identify barriers to program growth. At the creative suggestion of Ginny Sawyer, timely registration was given an incentive boost. The first 100 registered events in 2019 will receive a $25 gift card to an area grocery store in lieu of the traditional “goodie bags”, which met the needs of a more limited audience. The addition of a drawing for use of the Block Party Trailer and inflatable movie screen/projector is also providing a new incentive for registration. For the first time, NNO opened registration in May with 37 events already planned in Fort Collins. Early registration is also allowing Neighborhood Services staff to match up neighborhoods with nearby event organizers to combine efforts or host “progressive parties” so groups get to meet more neighbors and explore more of their neighborhood. This decreases the CITY MANAGER’S UPDATE 28 number of separate small events for Council Member, Mayor, Poudre Fire Authority, Police Services, and staff visits, allowing more community contact. Mediation and Restorative Justice Grant Award Restorative Justice Services received a $67,612 grant award from the Colorado Department of Public Safety, Division of Criminal Justice. The award helps fund restorative justice services for youth referred from the 8th Judicial District Attorney’s Office. The grant fund cycle is July 1, 2019 – June 30, 2020. FCMOVES E-Scooter Share Pilot Program The Shared Mobility Device (Including E-Scooter) Program Request for Proposal was released on April 29. Legislation at the State level was adopted granting cities flexibility in the placement of e-scooters within right of way. RFP submittal evaluation, interviews and Operator selection will continue through July. Program launch is expected to occur mid-late July. In light of the State legislation adoption, proposed Code updates related to where e-scooters can operate went before Council for first reading on June 4 and are expected to go before Council for second reading on July 2. E-Bike Paved Trail Pilot Program A pilot program allowing Class 1 and Class 2 e-bikes on paved trails was approved by City Council on April 16. The one-year pilot program began May 1, 2019 and will include extensive data collection and public outreach. City staff and volunteers conducted preliminary data collection in April, which included trail intercept surveys, bicycle speed snapshots, bicycle behavior observations, and e-bike demo surveys. Comprehensive trail education and outreach is planned for this summer. YEAR TO DATE COMPARISON 2018 2019 YTD % Change Development Project Submittals Received 136 186 36.76% Conceptual/Preliminary Design/Staff Reviews 95 90 -5.26% Building Permits Issued 3,676 3,709 .90% Building Permit Valuations ($M) $164.43 $144.78 -11.95% Building Inspections Performed 14,464 10,869 -24.85% Zoning Inspections Performed 2229 188 -91.57% Zoning Plan Reviews Performed 1,377 1,135 -174% Overall Development Review revenues are $(750,246) under projection for 2019 as of May 31st with Development Review under by $(726,929) and Engineering Development Review under by ($23,317). GRAFFITI UPDATE During the month of May 2019, the Graffiti Abatement Team abated 69 issues consisting of 223 tags measuring 1,404 square feet of graffiti-covered surfaces. Month Access FC Hotline Pro-Active Total January 5 0 29 34 February 10 9 38 57 CITY MANAGER’S UPDATE 29 SUSTAINABILITY SERVICES ENVIRONMENTAL SERVICES Healthy Homes Month June is National Healthy Homes Month! Do you have a healthy home? Not sure? Sign-up for a Healthy Homes assessment today to learn more about how you can improve the indoor air quality and safety of your home. The City of Fort Collins Healthy Homes program wants to help you connect the dots between your health and your home by offering a free assessment to identify the presence of air pollutants and safety hazards. Sign up for an assessment at: fcgov.com/healthy homes. SOCIAL SUSTAINABILITY Community Dialogue: June 19th Fort Collins is on many top 10 lists and is a great place to live. What's it like for people of color on a daily basis? Join Safety, Security & Risk Management Director Kendra Radford and community member Phil Donaldson (www.PhilDonaldson.com) on Juneteenth to hear their stories and experiences (both the good and the challenging) of living in Fort Collins as people of color. You’ll have the opportunity to ask questions and engage in a community dialogue. City employees: Register in FC Career Connect Community members: RSVP to Janet Freeman at jfreeman@fcgov.com. ECONOMIC HEALTH Upcoming Women Owned Business Listening Session Economic Health is hosting a Women Owned Business Listening Session in July. More details coming soon. UTILITIES CUSTOMER CONNECTIONS Community Engagement (CE) Community Engagement has reached 5,624 participants through 90 outreach events and programs, including 56 school programs to 3,276 students in the Poudre School District (PSD) this spring. Students ranged from kindergarten to high school students. March 12 5 76 93 April 19 3 40 62 May 13 3 53 69 Total 59 20 236 315 CITY MANAGER’S UPDATE 30 CE hosted the 28th annual Children’s Water Festival at Front Range Community College on May 22 for 1,671 third grade PSD students. Thirty-three presenters and 20 exhibitors from across the Fort Collins community provided hands-on learning opportunities to help students explore the multiple facets of water. This collaborative event was made possible by 45 City/Utilities staff to help ensure the event ran smoothly. Water Conservation sprinkler audit season is underway! Free, residential sprinkler audits promote water savings by helping customers use their sprinkler system more effectively. Audits are available June-September to eligible Fort Collins Utilities, ELCO, and Fort Collins-Loveland water district customers. 177 customers are currently on the waitlist to schedule an audit in 2019. See https://www.fcgov.com/utilities/residential/conserve/water-efficiency/water-efficient-sprinkler- systems/free-sprinkler-system-audits for more information. Energy Services and Water Conservation successfully completed the Larimer County Conservation Corps 2018/2019 audit season. Corps members completed 365 home audits, including installation of energy and water conservation fixtures (i.e. air filters, low-flow toilets, LED light bulbs, faucet, and sink aerators) in Fort Collins, including more than 60 audits for low-income households. These audits help residents improve comfort and air quality and reduce utility bills. WATER RESOURCES AND TREATMENT OPERATIONS Environmental Regulatory Affairs (ERA) Division • Bacteriological Study: ERA will kick off the bacteriological study this month, coordinating efforts with Wright Water Engineers and an internal stakeholder team. • Household Hazardous Waste: Event was held on May 18, where community members in 1,288 vehicles disposed of over 89,000 pounds of hazardous waste and 55 mattresses/box springs. Thanks to the 40 staff members who helped unload vehicles, break down cardboard, greet, survey, and assist with traffic flow. CITY MANAGER’S UPDATE 31 Water Treatment Facility Transition to Light and Power Customer - On June 4, the Water Treatment Facility hosted an event celebrating the installation of a micro-hydro generator and the transition of electric service to Utilities Light & Power from Xcel Energy. This project, in the works for 20+ years, uses water from Horsetooth Reservoir for hydroelectric power and will power up to 20-25% of the Water Treatment Facility. COMMUNITY SERVICES RECREATION  Registration for Summer Recreator programs took place on Thursday, May 9. o Total enrollments: 6,492; Revenue: $257,951. (Last summer’s revenue: $240,358). o 76% of registration took place online. o The Reduced Fee Program total enrollments of 1,298 youths and adults. o The top 5 enrollment areas were: Child Development, Fitness, Aquatics, The Farm, Youth Sports  Kids in the Park took place at Twin Silo Park on Sunday, May 19. The weather was not ideal, but an estimated 2,200 attendees made an appearance and participated in interactive games, enjoyed music, and flew kites.  Camp FunQuest is Recreation’s Summer Day Camp series which started last year. Currently based out of Northside Aztlan Community Center, the program is at 93.48% capacity with 1,151 registrations. This is a 50% increase of participation in comparison to 2018. PARKS  Event season is in full swing with Food Truck Rallies every week, the Colorado Marathon, and Realities Ride over Memorial Day weekend.  Thousands of annuals have been planted (and protected from freezing) in the downtown core area.  Memorial Day events were held at Spring Canyon and Edora Parks along with Grandview and Roselawn Cemeteries.  Twelve new pickleball courts were striped at Spring Canyon Community park. The total number of outdoor pickleball courts is now 41.  Two public mulch give away days were held this spring. Approximately 1,500 cubic yards of mulch were dispersed. CULTURAL SERVICES  The FoCo Creates Arts and Culture Master Plan was adopted by the City Council on May 21st.  Fort Collins Museum of Discovery achieved accreditation by the American Alliance of Museums, the highest national recognition afforded the nation’s museums.  The Gardens at Spring Creek had the most successful Spring Plant Sale ever, with over 1,800 transactions and raising over $100,000 to support programming. CITY MANAGER’S UPDATE 32  The Lincoln Center announced the 2019 – 2020 Season, highlights include the play The Color Purple, Ballet Folclórico Nacional de México, celebrated violinist Joshua Bell and the new National Geographic Live speaker series.  The popular Pianos About Town program announced the 2019 commissioned artists. Painting of the new pianos will take place May through October. NATURAL AREAS Watershed Forum (Internal) On May 28th, the Natural Areas Department hosted a half-day internal Watershed Forum meeting. With a resource like the Poudre River, almost every water-related project touches another water-related project, department or jurisdiction. This forum serves to enhance integration and communication across City departments on river and water-related initiatives. Forty-five participants listened to 32 presentations from Natural Areas, Parks, Parks Planning and Utilities (including water resources, stormwater, capitol projects, and the watershed program). The list of topics was vast, inspiring and impressive ranging from modeling and preparations for the community’s future water needs to large-scale urban stormwater planning, emergency response planning, river health and water quality assessments, research and restoration, to the opening of the whitewater park. By keeping our colleagues informed, this forum aims to increase efficiencies and project success by catalyzing new connections and fostering the formation of new creative or essential collaborations. CITY MANAGER’S UPDATE 33 PUBLIC ENGAGEMENT CityWorks 101 (March 20 – May 15) – The Communications and Public Involvement Office (CPIO), in partnership with City staff from various departments, hosted our annual 8-week course where residents get a behind-the-scenes look at their local government. From getting a first-hand look at the Museum’s coveted archives to operating FCPS’ SWAT robot, residents learned how City services and staff work for and with them to build their community through thoughtful decision-making, customer service and stewardship. Our class of 30 students, ranging from twenty- somethings to seniors, were eager to learn about the innerworkings of their City, and weren’t afraid to ask the tough questions. This was the fourteenth CityWorks 101 class, and this year's graduates join an alumni network of more than 400 residents. CityWorks 101 graduates have later become Boards and Commissions members and Councilmembers, have served on BFO teams and have also joined the ranks of City volunteers. MAX 5 Year Anniversary - On Saturday, May 11, the City celebrated MAX’s five-year anniversary at five MAX stations across town. An estimated 50 people attended the South Transit Center kickoff where an official cake cutting and speeches by City officials took place. Hundreds turned out to check out various party stations along the Mason Corridor ending at the Downtown Transit Center. Several attendees joined FC Bikes to ride the route in celebration of the event. Solar and Litium Ion Kit Car Competition - Fort Collins Utilities and Platte River Power Authority, and the Natural Renewable Energy Laboratory partnered on a state-wide solar and lithium ion kit-car competition. The Utilities-sponsored team from Webber Middle School took home the Spirit Award at the state-wide competition. They also earned first place in the regional competition held last month and placed highly in the battery car category. CITY MANAGER’S UPDATE 34 BROADBAND – FORT COLLINS CONNEXION Upcoming community events! Open Streets: Connexion will be at the upcoming Open Streets (June 16). Look for us there! Social Media: Fort Collins Connexion is on Facebook and Twitter! Follow us for the latest updates on your community owned broadband network! Facebook: @FCConnexion Twitter: @ConnexionFC COMMUNITY DASHBOARD HIGHLIGHT The Community Dashboard features performance data and information that highlights how the City is doing in achieving its seven Outcome areas: Neighborhood Livability and Social Health, Cultural and Recreation, Economic Health, Environmental Health, Safe Community, Transportation, and High Performing Government. The Dashboard is made up of 38 total metrics that are published quarterly and demonstrate where the City is doing well and where there are opportunities to improve. The color status of performance for each metric is determined based on the actual result for the quarter CITY MANAGER’S UPDATE 35 compared with the target. The color status of performance for the Outcome is determined based on the average calculation of the performance of each metric within that Outcome. Each month the City Manager’s Update will highlight a metric from the Community Dashboard. This month’s feature is from the Neighborhood Livability and Social Health Outcome Area. Analysis: With a staff reduction of 1 FTE taking place between Q4 2018 and Q1 2019, we remain very similar from year-to-year quarterly historical compliance rates, narrowly missing our target of 95% voluntary compliance. Seasonality also plays a role in our Q1 and Q4 compliance rates as snow historically reduces voluntary compliance. Continue efforts to educate the public on a private basis and utilize social media outlets prior to seasonal nuisance issues occurring. For example: NextDoor posts prior to and throughout the active snow season. Definition: This metric tracks the percentage of voluntary compliance with nuisance code violations issued by the City of Fort Collins. Voluntary compliance is defined as violations corrected by the property owner or tenant. Why is this metric important? Code compliance contributes to the preservation, maintenance, and enhancement of neighborhoods. Voluntary compliance of nuisance codes is an indicator of the City's attractiveness and feeling of safety in neighborhoods. It is also an indication of whether a neighborhood is deteriorating and may need additional services. City’s impact on this metric: High – The City affects the metric in the following ways: 1) violation notices sent to property owner and tenant explaining the violation and giving a deadline to correct the problem; 2) final notice – this is a posting on the door explaining that the deadline has come, what the violation is, and that they need to correct the violation by the next day in order to avoid abatement or citation; 3) encouragement of residents to call if they need an extension – our violation notices state that they should call us if they CITY MANAGER’S UPDATE 36 have a need for a little more time to correct the violation; 4) Adopt-a-Neighbor program – volunteer program to help elderly or disabled residents with shoveling their sidewalks; and 5) door hangers – for codes that do not require notice be given (i.e. sidewalk snow removal) – we provide a courtesy door hanger on the first offense explaining the code requirement and give them until the following day to correct the violation. Benchmarks: This metric contains benchmark data for cities with code enforcement programs that are similar to that in Fort Collins. These benchmarks were identified based on a combination of similar populations, caseloads, enforcement methodologies, and voluntary compliance rates. To view the entire Dashboard, please visit: http://fortcollins.clearpointstrategy.com/