Loading...
HomeMy WebLinkAboutReport - Mail Packet - 1/15/2019 - City Managers Monthly Update - January 2019Adaptive Recreation Opportunities - Holiday Ball The ARO program provides quality and equal opportunities for recreation and leisure programs to community members with disabilities. January 2019 JANUARY 10, 2019 Table of Contents ISSUES BEFORE COUNCIL ................................................................................................................. 4 JANUARY 15 COUNCIL MEETING ............................................................................................................................4 JANUARY 22 ADJOURNED MEETING ......................................................................................................................5 JANUARY 22 WORK SESSION ..................................................................................................................................5 JANUARY 29 STATE OF THE CITY .............................................................................................................................5 FEBRUARY 5 COUNCIL MEETING ............................................................................................................................5 FEBRUARY 12 WORK SESSION ................................................................................................................................6 PUBLIC ENGAGEMENT – UPCOMING EVENTS ........................................................................................................7 SALES AND USE TAX COLLECTION .................................................................................................. 8 MONTHLY & YEAR TO DATE ...................................................................................................................................8 CP- ENGINEERING .............................................................................................................................. 8 CITYWIDE PEDESTRIAN ACCESS PROJECT ...............................................................................................................8 SUNIGA ROAD IMPROVEMENTS – COLLEGE AVE. TO BLONDEL STREET ................................................................9 NORTH COLLEGE IMPROVEMENTS – CANAL TO STATE HIGHWAY 1 .....................................................................9 VINE AND LEMAY BNSF IMPROVEMENTS ..............................................................................................................9 SHARP POINT/NANCY GRAY CONNECTION ......................................................................................................... 10 RIVERSIDE BRIDGE REPLACEMENT ...................................................................................................................... 10 POWER TRAIL AND HARMONY ROAD GRADE SEPARATED CROSSING ................................................................ 11 TIMBERLINE ROAD CORRIDOR PROJECT ............................................................................................................. 11 JEFFERSON STREET IMPROVEMENTS PROJECT ................................................................................................... 12 LINDEN STREET RENOVATION PRPOJECT ............................................................................................................ 12 WILLOW STREET IMPROVEMENTS ...................................................................................................................... 12 CP - PARK PLANNING & DEVELOPMENT ....................................................................................... 13 POUDRE RIVER WHITEWATER PARK .................................................................................................................... 13 FOSSIL CREEK TRAIL – SHIELDS TO COLLEGE ....................................................................................................... 14 CP - OPERATION SERVICES ............................................................................................................ 15 GARDENS ON SPRING CREEK – VISITOR’S EXPANSION ........................................................................................ 15 FORT COLLINS/LOVELAND POLICE TRAINING CENTER ........................................................................................ 15 CP - UTILITIES.................................................................................................................................... 16 WATER TREATMENT FACILITY ............................................................................................................................. 16 HARMONY DUCT BANK – HARMONY SUBSTATION PROJECT ............................................................................. 16 LIGHT & POWER GENESIS64 SCADA UPGRADE PROJECT .................................................................................... 17 CIRCUIT 724 (NORTH COLLEGE) ........................................................................................................................... 17 NEW FEEDER CAPACITY (EAST DRAKE & LEMAY) ................................................................................................ 18 GIS/GWD & ADMS ............................................................................................................................................... 18 WATER TREATMENT FACILITY MICROHYDRO PROJECT ...................................................................................... 19 OXBOW LEVEE IMPROVEMENTS ......................................................................................................................... 19 MAIL CREEK IMPROVMENTS AT MEADOW PASSWAY ........................................................................................ 19 DWRF DEWATERING IMPROVEMENTS ................................................................................................................ 20 DWRF CO-GENERATION PROJECT........................................................................................................................ 20 DWRF SLUDGE STRAIN PRESS REDUNDANCY ...................................................................................................... 21 DWRF SIDESTREAM TREATMENT ........................................................................................................................ 21 CATHODIC PROTECTION FOR ANHEUSER-BUSCH WATER LINE .......................................................................... 21 SPRING CREEK IMPROVEMENTS AT EDORA PARK ............................................................................................... 22 CP-TRANSFORT AND PARKING SERVICES .................................................................................... 22 PARKING STRUCTURES AND ON-STREET PARKING ............................................................................................. 22 CITYWIDE BUS STOP IMPROVEMENT PROGRAM ................................................................................................ 23 PUBLIC SAFETY ................................................................................................................................ 23 POUDRE FIRE AUTHORITY ................................................................................................................................... 23 POLICE SERVICES .................................................................................................................................................. 24 PLANNING, DEVELOPMENT &TRANSPORTATION ......................................................................... 26 BUILDING SERVICES AND PLANNING ................................................................................................................... 26 NEIGHBORHOOD SERVICES ................................................................................................................................. 27 TRANSFORT AND PARKING SERVICES .................................................................................................................. 28 YEAR TO DATE COMPARISON .............................................................................................................................. 28 GRAFFITI UPDATE ............................................................................................................................ 28 SUSTAINABILITY SERVICES ............................................................................................................ 29 ENVIRONMENTAL SERVICES ................................................................................................................................ 29 SOCIAL SUSTAINABILITY ...................................................................................................................................... 29 ECONOMIC HEALTH ............................................................................................................................................. 29 UTILITIES ............................................................................................................................................ 30 CUSTOMER CONNECTIONS .................................................................................................................................. 30 COMMUNITY SERVICES .................................................................................................................... 30 RECREATION ........................................................................................................................................................ 30 PARKS ................................................................................................................................................................... 30 NATURAL AREAS YEAR-END UPDATE .................................................................................................................. 30 PUBLIC ENGAGEMENT ..................................................................................................................... 33 COMMUNITY DASHBOARD HIGHLIGHT .......................................................................................... 33 CITY MANAGER’S UPDATE 4 ISSUES BEFORE COUNCIL JANUARY 15 COUNCIL MEETING  Councilmember Vacancy Appointment o Councilmember Overbeck was elected to the office of Larimer County Assessor. Council will vote on an appointee to the District 2 Council seat.  Kechter Enclave Annexation (First reading-consent) o Annex and zone the Kechter Enclave Annexation. It is generally located at the southwest corner of East Trilby and Ziegler Roads. Neighborhood Livability & Social Health – 1.7 Guide development through community planning, historic preservation, and efficient and effective development review.  Trilby Substation Annexation (First reading-consent) o Annex and zone the Trilby Substation Annexation. It is generally located at the southeast corner of West Trilby Road and South Shields Street. Neighborhood Livability & Social Health – 1.7 Guide development through community planning, historic preservation, and efficient and effective development review.  Friendly Fire Annexation (First reading-consent) o Annex and zone the Friendly Fire Annexation. It is generally located north of Laporte Avenue between North Bryan Avenue and Grandview Avenue. Neighborhood Livability & Social Health – 1.7 Guide development through community planning, historic preservation, and efficient and effective development review.  Strauss Cabin-Kechter Annexation (First reading-consent) o Annex and zone the Strauss Cabin-Kechter Annexation. It is generally located immediately north of the intersection of Kechter and Strauss Cabin Roads. Neighborhood Livability & Social Health – 1.7 Guide development through community planning, historic preservation, and efficient and effective development review.  Meadow Springs Ranch Easement for the Roundhouse Renewable Energy Project o Consider an easement regarding the Meadow Springs Ranch for the Roundhouse Renewable Energy Project. Environmental Health – 4.1 Achieve Climate Action Plan (CAP) 2020 goals and continue progress toward the 2030 goals. 4.8 Project and enhance natural resources on City-owned properties and throughout the community.  Resolution to Support the Larimer County Solid Waste Infrastructure Master Plan o Formally support the Larimer County Master Plan for solid waste infrastructure. Environmental Health – 4.5 Achieve the 2020 Road to Zero Waste goals and work toward 2030 zero waste goals.  Respectful Workplace Policy (Consent) o Consider a Resolution Approving a Respectful Workplace Policy for the Council and Council Appointees High Performing Government – 7.2 Promote a values driven organizational culture that maintains the public trust through ethical behavior and transparency.  Staff Report: City Vendor Payment Automation o Share results of 2017-2018 Budget Offer 10.7, City Procurement and Payment Modernization Program High Performing Government – 7.6 Leverage data, technology, metrics and benchmarks to guide decisions, improve results and enhance service delivery. CITY MANAGER’S UPDATE 5 JANUARY 22 ADJOURNED MEETING  Oath of Office for District 1 Councilmember Appointee o Councilmember Overbeck was elected to the office of Larimer County Assessor. Council will vote on an appointee to the District 1 Council seat.  Salary Ordinances for the City Manager, City Attorney and Chief Municipal Judge (First Reading Tentative) o Consideration of Ordinances amending the compensation for the City Manager, City Attorney and Municipal Judge. High Performing Government – 7.1 Provide world-class services that meet the needs of the community. JANUARY 22 WORK SESSION  Occupancy Study (U+2) o Review initial findings and draft report of Occupancy Study Neighborhood Livability & Social Health – 1.7 Maintain and enhance attractive neighborhoods through City services, innovative enforcement techniques and voluntary compliance with City codes and regulations.  Keep Fort Collins Great (KFCG) 2020 Sunset-Funding Considerations o Consider and finalize ballot options to address the sunset of the Keep Fort Collins Great Tax. High Performing Government – 1.7 Provide world-class services that meet the needs of the community.  Outdoor Residential Wood Burning o Provide Council with regulatory options to address negative impacts from outdoor recreational wood fires in residential neighborhoods. Neighborhood Livability and Social Health – 1.6 Protect and preserve the quality of life in neighborhoods. Environmental Health – 4.2 Improve indoor and outdoor air quality. JANUARY 29 STATE OF THE CITY  5:30 p.m. – doors open  6:00 p.m. – 7:00 p.m. State of the City Program  The Lyric, 1209 North College Ave.  Register online at https://lyriccinema.com/movie/fort-collins-state-of-the-city-address FEBRUARY 5 COUNCIL MEETING  Keep Fort Collins Great (KFCG) 2020 Sunset-Funding Considerations o Consider and finalize ballot options to address the sunset of the Keep Fort Collins Great Tax. High Performing Government – 1.7 Provide world-class services that meet the needs of the community.  Kechter Enclave Annexation (Second reading-consent) o Annex and zone the Kechter Enclave Annexation. It is generally located at the southwest corner of East Trilby and Ziegler Roads. Neighborhood Livability & Social Health – 1.7 Guide development through community planning, historic preservation, and efficient and effective development review.  Trilby Substation Annexation (Second reading-consent) o Annex and zone the Trilby Substation Annexation. It is generally located at the southeast corner of West Trilby Road and South Shields Street. Neighborhood Livability & Social Health – 1.7 Guide development through community planning, historic preservation, and efficient and effective development review. CITY MANAGER’S UPDATE 6  Friendly Fire Annexation (Second reading-consent) o Annex and zone the Friendly Fire Annexation. It is generally located north of Laporte Avenue between North Bryan Avenue and Grandview Avenue. Neighborhood Livability & Social Health – 1.7 Guide development through community planning, historic preservation, and efficient and effective development review.  Strauss Cabin-Kechter Annexation (Second reading-consent) o Annex and zone the Strauss Cabin-Kechter Annexation. It is generally located immediately north of the intersection of Kechter and Strauss Cabin Roads. Neighborhood Livability & Social Health – 1.7 Guide development through community planning, historic preservation, and efficient and effective development review.  Land Use Code Amendments (Consent) o Make clarifications and revisions to the LUC to keep the Code current. Neighborhood Livability & Social Health – 1.7 Guide development compatible with community expectations through community planning, historic preservation, and efficient and effective development review.  Police Training Facility LEED Standards o Review and discuss LEED certification requirements for this training facility. Environmental Health – 4.3 Achieve 2020 Energy Policy goals and work towards Climate Action goals for carbon neutrality.  Items in connection with lease financing the Prospect / I-25 Interchange and joint venture Police Training Facility projects o Authorize the financing and appropriation of the Prospect / I-25 Interchange and joint venture Police Training Facility projects. The City Manager’s Recommended Budget includes estimate lease payments for 2019-2020 in connection with this anticipated financing. Transportation – 6.4 Support, enhance and accelerate I-25 improvements according to the multi-modal environmental impact statement. Safe Community – 5.2 Meet the expected level of core and specialized police services as the community grows  Staff Report: Municipal Greenhouse Gas Emissions Reduction Progress o Share how the City of Fort Collins, as an organization, leads by example, lowering its carbon emissions by 21% from 2005 levels. Environmental Health – 4.1 Achieve Climate Action Plan (CAP) 2020 goals and continued progress toward 2030 goals.  Staff Report: Monthly Community Dashboard Metric-Electric System Average Interruption Duration Index (SAIDI) o Share with Council and the community current status and factors influencing a Community Dashboard Metric that the City organization has a high level of influence over. High Performing Government – 7.6 Leverage data, technology, metrics and benchmarks to guide decisions, improve results and enhance service delivery. FEBRUARY 12 WORK SESSION  Pilot Program Allowing E-Bikes on Paved Trails o Discuss a possible pilot program to allow e-bikes on Fort Collins paved trails, provide a summary of related input from Boards and Commissions, and seek Council direction on next steps. Transportation – 6.2 Manage traffic congestion and improve high-priority intersections. Culture and Recreation – 2.2 Plan, design, implement and maintain the City’s parks and trails systems. CITY MANAGER’S UPDATE 7  Regional Wasteshed Project o Discuss a draft intergovernmental agreement formalizing solid waste infrastructure and policy commitments between members of the North Front Range Wasteshed Coalition, outlined in a 2018 Larimer County master plan for waste material management. Environmental Health – 4.5 Achieve the 2020 Road to Zero Waste goals and work toward 2030 zero waste goals.  City Plan Update – Principles & Policies o Review City Plan Principles and Policies, highlighting new or revised policies since the prior City Plan update in 2011. Neighborhood Livability and Social Health – 1.5 Guide development compatible with community expectations through appropriate planning. High Performing Government – 7.5 Broaden methods of public engagement to reach all segments of the community by giving additional consideration to diverse backgrounds, languages and needs. PUBLIC ENGAGEMENT – UPCOMING EVENTS  State of the City – Tuesday, Jan. 29, 6 - 8 p.m. at The Lyric. RSVP by Friday, January 25. The annual event will feature a short film followed by live Q&A with the Mayor and City Manager and a closing reception. RSVP at fcgov.com/stateofthecity/rsvp  Sharp Point and Nancy Gray Connection Project Open House – Thursday, Jan. 24, 5 - 7 p.m. at Liberty Common, 1725 Sharp Point Dr. to learn more about the Sharp Point Dr. and Nancy Gray Ave. connection project. The project calls for a vehicle, bicycle and pedestrian connection between Sharp Point Dr. and Nancy Gray Ave. across the Great Western Railroad tracks. See more at fcgov.com/engineering/sharppoint  Public Forum on Keep Fort Collins Great Tax – Thursday, Jan. 10, 6 - 7 p.m. at the Fort Collins Senior Center. The forum will review and gather input on two potential options for renewal of the voter-approved tax in advance of its sunset on December 31, 2020. o Option A – Base Rate Increase: A one-time vote putting the 0.85 percent into the base sales tax. o Option B – Base Rate Increase & Dedicated Tax: Includes a 0.6 percent base sales tax increase to cover the current KFCG contributions for core services such as police, streets, fire, parks and recreation, and a 0.25 percent renewable tax to support other existing services. This renewable 0.25 percent could be dedicated to services such as modes of transportation (sidewalks, bicycling, transit and infrastructure) and sustainability (economic, environmental and social health), or it could be a general revenue stream devoted to highest priority needs based on the City's biennial budget process.  Sustainable Neighborhoods Open House and Work Session – Thursday, Jan. 24, the event will include two sessions each including a short talk from a community member, a general program overview presentation, and a 45-minute workshop. o Session 1: 5:00 - 6:30 p.m. o Session 2: 6:30 - 8:00 p.m.  Feedback on District 1 Vacancy Feedback o Residents can respond through the online form at https://www.surveygizmo.com/s3/4766396/District-1-Council-Vacancy-Applicant-Feedback, or email Council, bring a letter/note, or attend the January 15 meeting and participate during public participation. CITY MANAGER’S UPDATE 8 SALES AND USE TAX COLLECTION MONTHLY & YEAR TO DATE NOVEMBER SUMMARY OVER PRIOR YEAR Month Year to Date Net Sales Tax Collected: 2.6% 3.7% Net Use Tax Collected: 1.4% -10.4% Net Sales and Use Tax Collected: 2.4% 1.2% Year to date, sales and use tax collections excluding rebates are up 1.2% and total $126.1M. NOVEMBER SUMMARY OVER BUDGET Month Year to Date Net Sales Tax Collected: 0.6% 1.3% Net Use Tax Collected: -8.5% -3.0% Net Sales and Use Tax Collected: -0.9% 0.6% Year to date, the City has collected 0.6% more sales and use tax revenue, totaling $713K over budget. Capital Projects (CP) – Updates are indicated in bold CP- ENGINEERING CITYWIDE PEDESTRIAN ACCESS PROJECT Funding Source: Community Capital Improvement Program (CCIP) Estimated Project Budget: 2018 - $1.1M Estimated Completion Date: Ongoing Phase: Construction Project Details: This project maintains a complete City sidewalk inventory, identifies sidewalk inadequacies, and develops a prioritized work program to achieve goals of promoting walking for transportation and recreation. Project Status:  Upcoming project locations: Minor sidewalk repairs and reviewing 2019 project locations.  Current projects: No Projects at this time More information is available at http://www.fcgov.com/engineering/pedneeds.php CITY MANAGER’S UPDATE 9 SUNIGA ROAD IMPROVEMENTS – COLLEGE AVE. TO BLONDEL STREET Funding Source: 2017 / 2018 BFO, COFC Utilities, Transportation Capital Expansion Fee (TCEF), Developer Contributions Estimated Project Budget: $3.7M Estimated Completion Date: Spring 2019 Phase: Final Design/Advertise for Bid Project Details: Design and construction of a new arterial roadway that connects existing Suniga Road, from Blondel St. to College Avenue. Project Status:  No updates this month More information is available at https://www.fcgov.com/engineering/suniga-to-college-improvements NORTH COLLEGE IMPROVEMENTS – CANAL TO STATE HIGHWAY 1 Funding Source: Federal Grants, URA Contribution, Pedestrian Program Funds, County Funds, Transportation Capital Expansion Fee (TCEF), Developer Contributions Estimated Project Budget: $2.35M Estimated Completion Date: Spring 2019 Phase: CDOT Construction Project Details: This project will construct pedestrian improvements along North College between the Larimer & Weld Canal (City limits) and State Highway 1, including pedestrian bridges crossing the canal. Project Status:  CDOT has started this phase of roadway work.  City staff is coordinating with CDOT to advertise the City’s project in early 2019. More information is available at fcgov.com/engineering/ncollege.php VINE AND LEMAY BNSF IMPROVEMENTS Funding Source: Keep Fort Collins Great (KFCG), Transportation Capital Expansion Fee (TCEF), 2017 / 2018 BFO Estimated Project Budget: $22M ($12M currently allocated) Estimated Completion Date: Spring 2021 Phase: In Design Project Details: The existing Vine and Lemay intersection, which includes the Burlington Northern Santa Fe (BNSF) Railway crossing, is severely congested with limited options to expand through or turn lane capacity due to land use constraints. Project Status:  No updates this month CITY MANAGER’S UPDATE 10 More information is available at fcgov.com/engineering/vine-lemay SHARP POINT/NANCY GRAY CONNECTION Funding Source: Transportation Capital Expansion Fee (TCEF), 2015/2016 BFO, Developer Contributions Estimated Project Budget: $1.2M Estimated Completion Date: Spring 2019 Phase: Railroad Coordination Project Details: The City Master Street Plan identifies Sharp Point Drive and Nancy Gray Avenue as connected across the Great Western Railroad tracks. This project will construct the roadway and pedestrian connection, and railroad crossing. Project Status:  City staff are working with the Federal Railroad Administration, Public Utilities Commission, and Great Western Railroad to pursue establishing a quiet zone at the crossing.  City staff will host a public open house January 24 for those interested in learning more about the project. More information is available at fcgov.com/engineering/sharppoint RIVERSIDE BRIDGE REPLACEMENT Funding Source: Federal Grants and Bridge Program Funds Estimated Project Budget: $4.3M Estimated Completion Date: March 2019 Phase: Under Construction Project Details: The project will replace the structurally deficient bridge over Spring Creek, and raise Riverside Avenue out of the 100 years flood level at the bridge location. This project is coordinated with Utility’s Spring Creek Restoration Project. CITY MANAGER’S UPDATE 11 Project Status:  During December, the contractor installed art panels, bridge corner monuments and bridge girders.  During January, the contractor will install the bridge walls, roadway embankment, and storm sewer pipe. City Utilities will begin the Spring Creek Rehab project which will realign Spring Creek from Edora Pond to the Union Pacific railroad trestle.  The Contractor is behind schedule with the full closure phase. Staff is evaluating the schedule changes with the Contractor and City staff has notified nearby stakeholders about the delay. POWER TRAIL AND HARMONY ROAD GRADE SEPARATED CROSSING Funding Source: Federal Grant, Community Capital Improvement Program (CCIP - Bike / Pedestrian Grade Separated Crossings) Estimated Project Budget: $5M - $8M Estimated Completion Date: 2020-2021 Phase: Alternatives Analysis – Conceptual Design Project Details: The Power Trail provides connectivity between the Spring Creek Trail to the north and the Fossil Creek Trail to the south. The Trail currently has a gap approximately three-quarters of a mile long north and south of Harmony Road. The detour route requires users to cross Harmony Road at grade at McMurry. This project will design, acquire property interests, and construct a trail grade separated crossing at Harmony Road as well as the trail connections on either side. Project Status:  No updates this month. More information is available at https://www.fcgov.com/engineering/powertrailcrossing TIMBERLINE ROAD CORRIDOR PROJECT Funding Source: Transportation Capital Expansion Fee (TCEF), Developer Contribution, Federal Grant Estimated Project Budget: $6.5M Estimated Completion Date: 2020 - 2021 Phase: Request for Proposal (RFP) Project Details: This project will reconstruct South Timberline Road from Stetson Creek Drive to Trilby Road to the City’s four lane arterial roadway standards. Planned improvements include; intersection improvements at Kechter Road, Zephyr Road, and Trilby Road, multi-modal accommodations, raised medians, access control, landscaping improvements, and roadway improvements. This project serves to build upon the development improvements that have been completed along the corridor. This project will improve safety, reduce congestion, and provide improved accommodations for alternate travel modes. CITY MANAGER’S UPDATE 12 Project Status:  No updates this month. JEFFERSON STREET IMPROVEMENTS PROJECT Funding Source: Federal Congestion Mitigation and Air Quality (CMAQ) Funds, Building on Basics (BOB) 1.0 funds Estimated Project Budget: $1.4M Estimated Completion Date: 2019 Phase: Right-of-way acquisition Project Details: The goals of this project are to develop preliminary engineering design plans and to acquire rights-of-way and easements for planned improvements along Jefferson Street between College Avenue and the Mountain/Lincoln Intersection. Project Status:  Staff looks to acquire property interests from five parcels to bring the existing walk into the public space. Existing buildings will not be impacted as part of the acquisition.  Staff received Council authorization to use eminent domain, if necessary, to acquire property interests. LINDEN STREET RENOVATION PRPOJECT Funding Source: Community Capital Improvement Program (CCIP) Estimated Project Budget: $3.5M Estimated Completion Date: 2020 Phase: Project Kick-off Project Details: The goals of this project are to renovate Linden Street between Walnut Avenue and Jefferson Street. Initial concepts include the converting this section of Linden Street to a “convertible” street; one that can function primarily as a roadway but can also be closed to vehicles and converted to a pedestrian plaza during specialty events. Project Status:  No updates this month. WILLOW STREET IMPROVEMENTS Funding Source: Federal Grants, Community Capital Improvement Program (CCIP), Developer Contributions, DDA Funds CITY MANAGER’S UPDATE 13 Estimated Project Budget: $3.8M Estimated Completion Date: 2019 Phase: Final Design Project Details: This project will design roadway and urban design improvements along Willow Street between College Avenue and Linden Street; including a pedestrian plaza at the northern corner of Willow Street and Linden Street. Project Status:  No updates this month. CP - PARK PLANNING & DEVELOPMENT POUDRE RIVER WHITEWATER PARK Funding Source: CCIP, BOB 2, General Fund, Private/Public Donations, Natural Areas, Stormwater, URA, Park Planning & Development Total Project Cost: $11.5M Phase: Under Construction Estimated Completion: Summer 2019 Project Details: The Poudre River Whitewater Park project has been a collaborative effort between multiple City departments, local advocates, and the philanthropic community. The project will provide natural systems, stormwater, and recreation benefits. Project elements include whitewater boating features, a pedestrian bridge, a naturalistic park space, overlook plaza, trail & walk connections, and parking. CITY MANAGER’S UPDATE 14 Project Status:  Construction of the two whitewater boating features is progressing  Footings for the south bank wall are being constructed  The historic infiltration gallery was successfully removed FOSSIL CREEK TRAIL – SHIELDS TO COLLEGE Funding Sources: Great Outdoors Colorado Grant (GOCO), Conservation Trust Fund Total Project Cost: $4.5M Phase: Opened in December Project Details: The final leg of the Fossil Creek Trail has been completed. The project included 1.7 miles of trail between Shields Street and College Avenue, and a pedestrian tunnel under the BNSF railroad. A grand opening celebration was held Dec.10, and was well attended. CITY MANAGER’S UPDATE 15 CP - OPERATION SERVICES GARDENS ON SPRING CREEK – VISITOR’S EXPANSION Funding Sources: Building on Basic (BOB) II - $2.2M Op Services (Maintenance): $300K Privately Raised Funds: $700K Total Project Cost: $3,200,000 Phase: Permitting Estimated Completion Date: Late Fall 2019 Project Details: The Gardens on Spring Creek Visitor Center Expansion is adding approximately 4500 SF. This includes a conservatory which will incorporate a butterfly pavilion, extra meeting rooms, additional office spaces, and Solar PV to offset the additional energy usage. Project Status:  Submitted building permit application early December, anticipate permit release late- January.  Operation Services is replacing some end-of-life mechanical and electrical equipment during construction.  We will be establishing the contract Guaranteed Maximum Price (GMP) this month with plans of starting construction early 2019. FORT COLLINS/LOVELAND POLICE TRAINING CENTER Funding Sources: $9.25M generated from bonds for the City of Fort Collins $9.25M from City of Loveland Total Project Cost: $18.5M Phase: Design Development Estimated Completion Date: Late 2020 Project Details: The City of Fort Collins is partnering with The City of Loveland to construct a new Police training facility which will be located on the west side of the Loveland Airport. This new site will offer a 50-yard pistol range, a 1.4-mile driving track, concrete skills pad, and some classrooms for special training. Project Status:  The project design has been on hold recently as we discuss LEED Certification. We presented this project to the Energy board on January 10 and then plan to take it back to City Council on February 5.  We received nine proposals for Construction-Manager-at-Risk (CMaR).  The top five construction firms will be interviewed by mid-January.  Project funding is scheduled to go to City Council on February 5 for approval.  Working to finalize the Construction and Operation & Maintenance IGA. Plan to present to Rendering of Expansion Current SD Site Plan (Red) is future phases Current SD Site Plan (Red) is future phases CITY MANAGER’S UPDATE 16 City Council in February for approval.  Loveland has postponed their grant application to April because the IGA needs to be in place before it can be reviewed. CP - UTILITIES WATER TREATMENT FACILITY Funding Source: Capital Project Budget Estimated Project Budget: $1,300,000 Phase: In Design Project Details: Approximately 7,300 feet of three-phase from Overland Trail to the Treatment Facility in an existing easement on Colorado State University Property Project Status:  Trenching and vault installation is complete.  The primary metering cabinet has arrived at the Water Treatment facility. Water Treatment Facility received the ordered the basement to accompany the cabinet in mid- December  Cable installation is pending while staff investigates using remaining funding to further enhance reliability at the facility. HARMONY DUCT BANK – HARMONY SUBSTATION PROJECT Funding Source: Development Fees Estimated Project Budget: $214,590.00 Phase: Preliminary Construction Project Details: 5 new duct banks for additional capacity at the Harmony substation Project Status: Project Completed  Final grading completed.  (3) 8 x 16 vaults have been set and tied into the Harmony duct banks  Construction of all duct banks completed from substation to new 8 x 16 vaults.  True grid, irrigation system installed. New tree planting completed.  Hydro seeding was completed the week of October 8, 2018.  Drive has been completed. Water Treatment Facility Duct Bank CITY MANAGER’S UPDATE 17 LIGHT & POWER GENESIS64 SCADA UPGRADE PROJECT Funding Source: New Capital Estimated Project Budget: $200,000 Phase: In Design Project Details: Convert the existing Iconics Genesis32 hardware, software, and screens to Genesis64 Project Status: No Updates  All Iconics Genesis64 software has been installed on the new SCADA servers  The ESCADA team and IT are working together on creating secure user accounts and domains for the new ESCADA system  The ESCADA team is currently working on configuring the new OPC server (Kepserver)  All ESCADA network switches have been upgraded  New ESCADA firewalls are scheduled to be installed in January 2019 CIRCUIT 724 (NORTH COLLEGE) Funding Source: New Capital Estimated Project Budget: $950,000.00 Phase: Capacity Planning Project Details: Install 14,300 feet of 3 phase 750 Al cable, and two switches to provide load relief and improved reliability to North College. Project Status: • Capacity Planning is currently in progress. • Design in Project Management with a project start date of February 1, 2019. • Construction has a projected start date of April 1, 2019. SCADA System Map of Planned Installation CITY MANAGER’S UPDATE 18 NEW FEEDER CAPACITY (EAST DRAKE & LEMAY) Funding Source: New Capital Estimated Project Budget: $500,000.00 Phase: Capacity Planning Project Details: Install 7000 feet of three phase 750 Al and one switch to serve new load at Drake and Lemay. Project Status: • Capacity Planning is currently in progress. • Design in Project Management with a project start date of February 1, 2019. • Construction has a projected start date of April 1, 2019. GIS/GWD & ADMS Funding Source: Offer 5.23 Operational Technology Estimated Project Budget: $2,762,384 Phase: Software & Hardware Procurement, Data Migration Project Details: 1. Replacement and upgrade of the existing L&P mapping systems to a fully capable Geographic Information System (GIS) platform compatible with the City's enterprise GIS. 2. Implementation of a GIS-based Graphic Work Design (GWD) system enabling streamlined electric distribution design and development and integration with GIS as well as other key systems 3. Replacement of existing electric distribution operational tools with a new Advanced Distribution Management System (ADMS) that enables L&P’s Supervisory Control & Operations (SCO) staff to performs a wide range of real-time analysis in the management of the City’s electric distribution system. Project Status:  Current goal to have GIS, GWD and ADMS up and running by the end of 2019.  The GIS/GWD selection team has chosen a vendor and are in the later stages of getting to a signed contract. There coordinating for the project kickoff meeting is estimated to take place the week January 7th or 14th of 2019.  The ADMS selection team chose a vendor and are in the beginning stages of contract review. A small, representative team will work with the vendor on a scope of work starting the week of January 7, 2019.  The landbase sub-team is in the final stages of testing prior to migrating CAD-based landbase layers to GIS format.  To aid the broadband effort, conduit information will be migrated from CAD into GIS and Conduit Manager, ahead of the conversion of electric distribution data. The configuration of the software is complete and conduit inventory is being built out, closely aligning with the design and installation areas laid out by the Broadband team. Map of Planned Installation CITY MANAGER’S UPDATE 19  Conversion work of EDAR and CAD data into GIS data will need to take place January and April of 2019 in order to be ready for further system development and configuration. WATER TREATMENT FACILITY MICROHYDRO PROJECT Funding Source: Water Estimated Project Budget: $715,000 Status: In design Estimated Completion Date: 1st Quarter 2019 Project Details: The City of Fort Collins receives its raw water from the Poudre River and Horsetooth Reservoir. Due to the elevation differences between the plant and the sources, pressure dissipating valves on site reduce the energy of the water. The micro hydropower project will develop the hydroelectric potential from the raw water supply from Horsetooth Reservoir. Project Updates:  Building delivered and installed  Excavated duct bank from microhydro building to transformer  Install turbine and piping OXBOW LEVEE IMPROVEMENTS Funding Source: Stormwater Estimated Project Budget: $1,095,955 Status: In design Estimated Completion Date: April 1, 2019 Project Details: The project components include excavation of a flow conveyance channel in the left Poudre River overbank, additional fill placement, and trail reconstruction along the Oxbow Levee, coordination with the U.S. Army Corps of Engineers, and permitting for FEMA Conditional/Letters of Map Revision to document the post-construction effective 100-year water elevations and floodplain boundary. Project Updates:  Approval from US Army Corps of Engineers completed  Pending floodplain use permit from City of Fort Collins  Construction cost verification (independent cost estimate) MAIL CREEK IMPROVMENTS AT MEADOW PASSWAY Funding Source: Stormwater Estimated Project Budget: $1,400,00 Status: In design Estimated Completion Date: April 1, 2020 Project Details: The Mail Creek stream reach is within an urbanized corridor and is Turbine unit delivered Site map CITY MANAGER’S UPDATE 20 experiencing severe bed and bank erosion. Improvements will include stabilizing the creek bed and banks through a combination of bio- engineered designs, re-grading and re-vegetation. The Mail Creek reach will require dedication of easements from property owners to construct and maintain the improvements. Project Updates:  Received direction from City Manager’s Office for plan advancement  Floodplain modeling  Construction means and methods DWRF DEWATERING IMPROVEMENTS Funding Source: Wastewater Estimated Project Budget: $4,270,000 Status: Almost complete Estimated Completion Date: End of January 2019 Project Details: The project provides two new centrifuges for the sludge dewatering process at the Drake Water Reclamation Facility. The dewatering process is a critical process during which water is removed from the sludge so that it can be transported and applied as biosolids at Meadow Springs Ranch. Project Updates:  HVAC installation  Final pipe coating  Centrifuge start-up DWRF CO-GENERATION PROJECT Funding Source: Wastewater Estimated Project Budget: $3,900,000 Status: In design Estimated Completion Date: 1st quarter 2020 Project Details: This project includes the installation of two 440kW biogas-fueled generator sets, a gas conditioning system, and electrical and mechanical modifications to incorporate these combined heat and power (CHP) generator sets into the digester sludge heating loop and the plant power grid. Electrical power generated by these improvements will be utilized onsite to offset plant power requirements. Project Updates:  Completed procurement work order for gas conditioning  Held preliminary meetings with Woodward to discuss their continued interest  Coordinate with Light and Power on connection coordination Severe bank erosion Installation of tags on electrical equipment in the control room Revised layout of gensets to accommodate future backup generators CITY MANAGER’S UPDATE 21 DWRF SLUDGE STRAIN PRESS REDUNDANCY Funding Source: Wastewater Estimated Project Budget: $1,520,000 Status: Punch list Estimated Completion Date: December 2018 Project Details: This project will install two strain presses that will screen inorganic Matter from the sludge going to the anaerobic digesters. Removing the inorganics prior to digestion improves digestion efficiency, generates increased biogas quantity and quality, and reduces operation and maintenance costs for the anaerobic digesters. Project Updates:  Punch list  Project is substantially complete DWRF SIDESTREAM TREATMENT Funding Source: Wastewater Estimated Project Budget: $4,300,000 Status: In design Estimated Completion Date: December 2019 Project Details: This project is the design and installation of a wastewater sidestream treatment system to meet future nutrient (nitrogen and phosphorous) regulations. The recycle stream from biosolids dewatering carries high nutrient concentrations back to the main stream treatment system. Sidestream treatment will remove nutrients from the recycle stream, which can potentially be turned into fertilizer and reused. Project Updates:  Prepare 60% estimate for review  Engineer to update model and plans CATHODIC PROTECTION FOR ANHEUSER-BUSCH WATER LINE Funding Source: Water Estimated Project Budget: $2,280,000 Status: In design Estimated Completion Date: 3rd Quarter 2019 Project Details: The Anheuser Busch water line cathodic protection project is part of the Utilities Cathodic Protection Program. This AB water line project entails Strain press motor and air-line installation Ortho view of reactor from 60% plans CITY MANAGER’S UPDATE 22 design and installation of a cathodic protection rectification system. This CP system will mitigate and prevent further corrosion on the bar-wrapped concrete cylinder pipe which supplies finished water from the Water Treatment Facility to Anheuser Busch. Project Updates:  Met with Light and Power on power supply to rectifiers  90% drawings submitted  Contractor repairing test stations along AB line first quarter of 2019 SPRING CREEK IMPROVEMENTS AT EDORA PARK Funding Source: Stormwater Estimated Project Budget: $1,000,000 Status: Pre-construction Estimated Completion Date: June 2019 Project Details: The Spring Creek stream reach is within an urbanized corridor and is experiencing severe bed and bank erosion. Improvements will include stabilizing the creek bed and banks through a combination of bio-engineered designs, re-grading, and re-vegetation. Project Updates:  Utilities Phase I construction completed  Joint project coordination with City Engineering  Spring Creek channel improvements CP-TRANSFORT AND PARKING SERVICES PARKING STRUCTURES AND ON-STREET PARKING Funding Source: General Fund and Parking Reserves Estimated Project Budget: $1.2M Estimated Completion Date: January 2019 Phase: Implementation Project Details: Parking sensors will provide real time parking availability information to the parking public via the FC Parking App and will provide valuable occupancy and turnover data to assist with parking management. Project Status:  2018 sensor installation complete. 2,663 sensors installed, 200 more to be installed after planned street maintenance projects.  Gateways receiving sensor data are installed and calibration is presently taking place. We expect to be receiving accurate data by the end of the year (2018). Repaired joint bond discontinuities 42” Dewatering pipe installation CITY MANAGER’S UPDATE 23  Passport, the developer of the FC Parking App, is working to add parking availability data. This feature is expected in Q2 2019.  New pre-pay technology (same as Firehouse Alley) and sensors have been installed in Old Town and Civic Center Parking Structures. The tentative “go-live” date is January 2, 2019. CITYWIDE BUS STOP IMPROVEMENT PROGRAM Funding Source: Keep Fort Collins Great (KFCG) and Building on Basics (BOB) Estimated Project Budget for 2018: $375K Estimated Completion Date: Ongoing Phase: Planning and Construction Project Details: The purpose of the Bus Stop Improvements Program is to bring Transfort bus stops into Americans with Disabilities Act (ADA) compliance to make transit accessible and comfortable to people of all abilities and ages. The goal is to achieve full ADA compliance by 2026. The process includes prioritizing and selecting non-ADA stops under Transfort’s purview through a scoring process and constructing as many stops per year that the budget and resources allow. Project Status:  Since the inception of the ADA upgrade program in 2016, about 100 stops have been upgraded. As of December 2018, 292 of 438 (67%) Transfort stops are ADA compliant.  28 stops were upgraded in 2018.  Transfort has been awarded a $1.5M grant to replace and expand bus stops throughout the bus system. The project will improve accessibility and service for bus riders in Fort Collins and the surrounding areas. More information about the program including project locations is available at: http://www.ridetransfort.com/abouttransfort/plans-and-projects/adabusstops PUBLIC SAFETY POUDRE FIRE AUTHORITY 2019 Budget Approval The PFA Board of Directors approved its 2019 Budget on December 11, 2018. Highlights of the 2019 Budget include maintaining current service levels, additional firefighter positions (five; three coverage and two Roving Alternative Medical Unit positions), an Employee and Labor Relations Manager position, a fire inspector/plan reviewer position, and a one-time contribution to the capital budget of $915,734. December 17, 2018 PFA crews responded to a fire at 1907 Pecan Street in a multi-family apartment complex. The fire was brought under control within 14 minutes and was contained to a garden level unit. The PFA Customer Assistance Response Team (CART) secured lodging for displaced residents, and other assisting agencies included UCHealth medics, Fort Collins Light and Power, and the Red Cross. CITY MANAGER’S UPDATE 24 December 18, 2018 PFA is proud to introduce its newest Captain, Tony Falbo. Thank you for your dedication, service and commitment to PFA and to the community. Tony has been with PFA for 12 years and is part of the Hazardous Materials team. December 18, 2018 PFA was dispatched to an ammonia leak at the Anheuser Busch Brewery. The leak occurred from a refrigerator system in the beer packaging and shipping building and caused six people to be transported to UCHealth. At no time during the incident was there any danger to people outside the plant. PFA Hiring Process Poudre Fire Authority is hiring firefighters and will be accepting test scores from the National Testing Network (NTN) from October 1, 2018 to January 31, 2019. Interviews will be conducted in April and May of 2019. POLICE SERVICES Agency News On December 10, Fort Collins Police recruits graduated from Police Academy at Front Range Community College. They will begin the FCPS in-house training program in January, followed by Field Training. On December 21, our agency welcomed two new leaders and promoted five employees at a ceremony held in City Hall. New Assistant Chiefs John Feyen and Tim Doran were sworn in, and formal promotions were held for Rena Martinez (Director of Information Services division), Adam McCambridge (Lieutenant), Mike Avrech (Sergeant), Allen Heaton (Sergeant), and Morgan D’Avis (Records Supervisor). We look forward to continuing our excellence journey under their leadership. Notable Cases Massage Therapist Arrested for Unlawful Sexual Contact – Massage therapist Mark Struckmeyer was arrested on four counts of Unlawful Sexual Contact, a class 4 felony, after reportedly touching the intimate parts of several clients. Struckmeyer was employed as a massage therapist at Spavia (215 E. Foothills Parkway) in Fort Collins and also ran an independent massage therapy business out of his home. He worked at Spavia from September 3, 2018 until October 10, 2018 when he was terminated following the sexual misconduct allegations. Salvation Army Kettle Thief Arrested – On November 30, 2018 Fort Collins Police Dispatch received a report that the Salvation Army bell ringer stole the kettle donation money from the King Soopers located at 2602 S. Timberline Rd. in Fort Collins. The theft gained significant community and media attention. Through the investigation, officers were able to identify Nicholas Rosselis-Freeman as the suspect. On CITY MANAGER’S UPDATE 25 December 6, 2018 officers located Rosselis-Freeman and arrested him for theft, a class 2 misdemeanor. Suspect Arrested for Burglary, Harassment – On the evening of December 18, 2018, Fort Collins Police Dispatch received a call that an unknown man tried to attack two women working in an office building located at 2900 S. College Ave. Officers arrived on scene and safely took suspect Seth Arthur into custody. Through the course of the investigation, officers determined that Arthur had been hiding in the building after hours and grabbed a female member of the cleaning staff. She was able to get away and hid in a safe location in the building with the other staff member until officers arrived. Community Engagement 100th Birthday Surprise – Chuck Kavalec is a long-time Fort Collins resident, local volunteer, and military veteran. His 100th birthday was last month, and we wanted to let him know how much we appreciate his service. Chief Swoboda, patrol officers, detectives, and civilian employees from around the agency stopped by his house to wish him a happy birthday. Chief made him an honorary member of our SWAT team and shared a few gifts to mark the occasion. The video is online at https://www.facebook.com/fortcollinspoliceservices/videos/2074099065989695/ Chief Chat – On December 18, FCPS hosted a Chief Chat at the Old Town Library. Community members and police discussed a variety of topics, including issues in parks, needles, found property, behavioral health, and neighborhood safety. We appreciate the candid dialogue and community partnerships. Special thanks to representatives from Sustainability Services, Homeward 20/20, The Murphy Center, and Outreach Fort Collins who participated in the discussion. We look forward to continuing the conversation in the coming year! Santa Cops – After months of fundraising, toy collections, application days, and gift wrapping, Santa Cops of Larimer County delivered toys to children in need. Deliveries began on December 15 as local law enforcement employees and their families joined Santa in bringing gifts to area homes. This annual program helps families in difficult situations and gives kids a chance to have positive interactions with law enforcement. Shop with a Cop – This year, local law enforcement agencies partnered with Target to help more than 50 kids and their families who are facing challenges. First, the kids paired up with officers to shop for family gifts and got them wrapped and ready for giving. Afterwards, our holiday shoppers and their families enjoyed a meal together. This annual event is funded through grants and donations. CITY MANAGER’S UPDATE 26 Social Media Highlight Rudolph the Red-Nosed Burglar – After a local business was burglarized by a suspect wearing a plush reindeer head, FCPS posted the video and asked the community to help I.D. the Rudolph impersonator (whose disguise briefly falls off in the video, revealing the suspect’s face). Police included some unique lyrics adapted to the famed reindeer’s song, which caught media attention. 9News did a feature story, which was picked up by national news. FCPS received numerous requests for a video of an officer singing the burglary-themed lyrics, and Officer Sarah Klich supplied vocals for a musical rendition of the song. This prompted further media coverage and reached international audiences. Not only has the post generated leads to help identify the suspect, it also provides a positive image of law enforcement. To view the video, visit https://youtu.be/1zW2PCGgMz0. PLANNING, DEVELOPMENT &TRANSPORTATION BUILDING SERVICES AND PLANNING Historic Preservation Code Review The Historic Preservation Division is finalizing the review of its codes and processes. The City has worked closely with Clarion Associates and a sixteen-member advisory committee to examine all aspects of the code and recommend changes, including to the landmark designation process, the standards for the review of development near historic properties, and to consider eliminating the review of non-designated single-family residential dwellings. Council will consider proposed changes at its February 19th and March 5, 2019 hearings. City Plan Initial City Plan policy development will be shared with City Council at its February 12, 2019 Work Session. Adoption of the City Plan Update is scheduled for the March 19th City Council hearing. Enclave Annexations The Planning and Zoning Board recommended approval of four enclave annexations at its December 20th hearing: Kechter Enclave, Trilby Substation, Friendly Fire and Strauss Cabin-Kechter. First reading for all four annexations is scheduled for the January 15th City Council meeting. Downtown and Transition Standards Adoption of Land Use Code Amendments that ensure compatibility of new development and redevelopment within the Downtown and surrounding interface areas, along with a corresponding expansion of the Downtown zone district, has been scheduled for the February 19, 2019 City Council hearing. This change in schedule coincides with parallel standards for historic preservation which will be considered for adoption on the same date. Harmony Corridor Plan Update A community engagement process will begin in January 2019 to consider potential updates to the Harmony Corridor Plan that will further define the gateway at I-25 and incorporate recommendations from the draft City Plan Update. Potential Harmony Corridor Updates could be considered by City Council as early as Spring of 2019. Sign Code Amendments A memo to Council in regard to electronic billboard regulations will be sent in January answering the questions from the last work session. Feedback from the memo will determine if another work session is needed or if staff should proceed with an ordinance with proposed changes. CITY MANAGER’S UPDATE 27 Montava Development Project The second round of review of the Montava PUD Master Plan was completed on December 28th. A second neighborhood meeting was held on December 19th. It has not yet been scheduled for Planning & Zoning Board or City Council review. NEIGHBORHOOD SERVICES CSU Key Civics-CityWorksEDU Class 18 first-year CSU students completed the Key Civics-CityWorksEDU Fall class co-taught by Community Liaison, Jenn Rieskamp, and Neighborhood Services Senior City Planner, JC Ward. The course explored the roles and functions of local government, integrating field trips and in-class presentations with City staff from various departments and community leaders, encouraging students to engage with their local government and influence their communities. Students met with City Councilmembers to informally discuss issues of concern for the students and the community. Every student also completed a civic engagement experience of their choice with the City of Fort Collins, ranging from preparation for Hogwarts Halloween to in-depth exploration of Historic Preservation and the Development Review process. Students participating in the Key Civics community were selected based on interest and risk factors for not completing college in four years. Students live in the same dormitory and attend core classes together, building a sense of community and providing a support system as they progress in their college experiences. As Jenn and JC are new to their positions this year, it was the first time either taught the curriculum or a full semester course at CSU. We are so proud of the students’ work this semester and look forward to continuing the partnership with CSU’s Key Civics community next year. Neighborhood Meeting Presentation Sylvia Tatman-Burruss presented research findings related to neighborhood meeting facilitation to the management team of Planning, Development and Transportation (PDT). The purpose of this presentation was to understand peer city staff involvement in the neighborhood meeting and engagement process in order to inform such future strategies here in Fort Collins. This presentation included information from three peer cities, Greeley, Longmont and Boulder. The presentation also included findings from best-practice cities, Portland, Oregon and Madison, Wisconsin. Peer cities in Colorado have generally chosen not to formally facilitate neighborhood meetings and instead lean heavily on the applicant team to do so. In Portland and Madison, Neighborhood Associations are heavily involved in the neighborhood meeting process and then offer their comments and feedback at the time of hearing. More discussion and consideration to follow at the direction of Laurie Kadrich. Mediation and Restorative Justice Services has a new temporary location The Mediation and Restorative Justice offices moved this month from long-time location at 112 N. Howes St. to the west side of 117 N. Mason St. Staff and volunteers will work out of this temporary location until about March 1, 2019, the scheduled date for moving back into 112 N. Howes. The space for Mediation and Restorative Justice Services will be renovated and expanded during this time. The location at 112 North Howes will be expanded into existing and empty space at 110 North Howes. To accommodate the move, the office has been closed Dec. 17 – Jan. 2. 2018 Vibrant Neighborhood Grants (VNG) A total of eight (8) Vibrant Neighborhood Grant contracts have been signed to support neighborhood- driven projects in 2019. One additional VNG is being executed through Art in Public Places. The total funding awarded is $184,141.15. The projects focus on revitalization, environmental sustainability, as well as, enhancing spaces and opportunities for neighbors to connect. All projects aim for completion dates of September 30, 2019. CITY MANAGER’S UPDATE 28 TRANSFORT AND PARKING SERVICES Game Day Operations Transfort’s Game Day operations provided enhanced service during CSU football games hosted at Canvas Stadium. Service during the 2018/2019 football season was extremely successful. Transfort service was flexible, efficient and innovative. Highlights include: • 0 Injuries, 0 Accidents, 0 Complaints, 0 Service Failures • Streamlined plan decreased the need for non-driver personnel, thereby decreasing cost. • Improved post-game accounting process. • Transfort provided all services without assistance from outside agencies; Greeley Evans Transit participated last year. • During the 2018 CSU Football season operations, Transfort accommodated a total of 57,876 boardings. Boardings for each game have been consistent throughout most of the the season, averaging over 7,100 boardings on MAX, 1,100 on the ADA Shuttle, and 927 on west campus routes. YEAR TO DATE COMPARISON 2017 YTD 2018 YTD % Change Development Project Submittals Received 344 365 6.10% Conceptual/Preliminary Design/Staff Reviews 277 252 -9.03% Building Permits Issued 8,493 10,685 25.81% Building Permit Valuations ($M) $511.29 $504.75 -1.28% Building Inspections Performed 33,921 33,736 -0.55% Zoning Inspections Performed 869 2,598 198.96% Overall Development Review revenues are $(231,713) under projection for 2018 as of December 31st with Development Review under by $(239,253) and Engineering Development Review over budget by $7,540. GRAFFITI UPDATE During the month of December 2018, staff abated 93 issues which was a slight increase over the same time period last year. The response time was 1.25 day(s) and there was only one significant call. On Christmas Eve, around 5:00 p.m., staff received an urgent request from a citizen regarding racist and hate graffiti that had just been applied to the Mason Trail south of Horsetooth. Still in the area, staff immediately addressed the issue so that the vulgar vandalism would not be visible to citizens over the Christmas Holiday. The citizen was very appreciative of the timely response. CITY MANAGER’S UPDATE 29 SUSTAINABILITY SERVICES ENVIRONMENTAL SERVICES Tree Recycling: The City is offering its annual Christmas tree recycling program through January 21. This program is free to residents; however, all decorations must be completely removed from trees prior to drop-off. This includes lights, ornaments, tinsel, wire, hooks, nails, plastic bags, and fake snow. Recycled trees will be repurposed and used for landscaping application in the spring, so wood mulch produced from these trees must be contamination-free. https://www.fcgov.com/recycling. Climate Action Committee: Are you interested in joining the Climate Action Plan (CAP) Community Advisory Committee (CAC)? The CAP CAC meets quarterly and is a group of community members advising city staff on the planning and implementation of climate action initiatives. For 2019, staff is recruiting an additional 3-4 members to ensure a continued cross-section of residents, businesses, and other community stakeholders are engaged. If you are interested in serving on this committee, please complete and submit an application at https://www.surveymonkey.com/r/BSWVNBN by January 18. If you have any questions, contact Lindsay Ex at 970.224.6143 or lex@fcgov.com. Radon Action Month: January is Radon Action Month, which means the City encourages residents to test the radon levels in their homes while homes are closed up for the winter. Radon is a colorless, odorless, and naturally-occurring gas that is the second leading cause of lung cancer. https://www.fcgov.com/radon. Municipal Climate Goals: Did you know the municipal organization has already exceeded its goal of a 20 percent reduction in greenhouse gas emissions by 2020? City employees helped reduce emissions of municipal operations by 21 percent in 2017. Full report at https://www.fcgov.com/climateaction/files/2017-municipal-carbon-inventory-report.pdf. SOCIAL SUSTAINABILITY Emergency Weather Plans: Forecasted winter temperatures below 0 degrees activated the City's Emergency Weather Shelter Plan for the first time this season in late December and early January. During emergency weather activation, additional options for overnight shelters are secured and community resources maximized to support those seeking shelter. During an activation, details are shared on https://www.fcgov.com and on official City social media accounts. ECONOMIC HEALTH Construction Toolkit: How can the City help businesses prepare for impacts of major construction projects? The Economic Health Office is collaborating with other City staff and businesses to develop a series of resources and tools that businesses can use to communicate with the City organization and with their business customers before, during and after City construction projects. Want to learn more? Contact Shannon Hein at shein@fcgov.com or 970.416.2294. Targeted Industry Clusters: The Economic Health Office is re-evaluating the competitive funding process for targeted industry clusters to assess the program and, as a result, pausing funding for 2019. City staff continue to evaluate and invest in clusters and hope to grow it into a regional program with CITY MANAGER’S UPDATE 30 sector partnerships that benefit the entire region. Watch for future opportunities to share your thoughts and insights to help build a revamped targeted industry cluster program in 2020! Midtown Plan Area: The Midtown Plan Area proposal, originally scheduled to go to City Council in January, has been moved to the March 19 regular Council meeting. The plan area is generally defined as the area west of the intersection of Drake and College avenues to the railroad tracks, from the northern edge of the former Kmart building south to West Thunderbird Drive. Proposed redevelopment within the plan area could include 192 residential units, 160,700 square feet of retail and a 100-room hotel. UTILITIES CUSTOMER CONNECTIONS Community Engagement has reached 23,107 participants in 371 outreach events and programs since January 2018. For the past several months, CE’s main focus has been on the Utilities Affordability Portfolio and Income Qualified Assistance Program. COMMUNITY SERVICES RECREATION CAPRA Accreditation Submitted The Parks Planning, Parks and Recreation Department turned in the final report for the Commission for Accreditation of Parks and Recreation Agencies (CAPRA). Next steps are for the visitation team to review the report and make a personal visit to Fort Collins in March for staff interviews. Pickleball Survey Deployed Recreation seeks feedback from community members who participate in pickleball. A short survey was deployed in January via email lists and social media. The goal is to gain knowledge regarding our pickleball programming and to better understand pickleball participants. PARKS Golf Pros Awarded Contracts Two new golf pros have been awarded contracts at Collindale Golf Course and City Park Nine. Matt Magley will be the head pro at City Park Nine and Vince Buelk will be the head pro at Collindale Golf Course. Fossil Creek Trail Open The Fossil Creek Trail officially opened on December 10. The Fossil Creek Trail extension is a 1.7-mile stretch of paved recreational trail that connects the east and west sides of Fort Collins and expands the multimodal trail system to include more than 36 miles of paved trail. NATURAL AREAS YEAR-END UPDATE Nix Farm- Natural Areas Shop Expansion Complete The Natural Areas Department’s shop and equipment yard were expanded to meet up to the next several decades of anticipated growth. The larger equipment yard securely stores equipment and vehicles. The new vehicle storage building CITY MANAGER’S UPDATE 31 provides indoor shelter for water trucks and other equipment that need to be protected from weather or freezing. The breakroom, locker room, restrooms, tool room, wood working, and metal working areas were all enlarged in the shop building. Prairie Dog Meadows Natural Area Expansion In May, Prairie Dog Meadows Natural Area was expanded by 3.5 acres. The land was purchased for $200,000 and was occupied by the Larimer Humane Society since 1974. All the structures were removed prior to the sale. The Humane Society parcel was nearly surrounded by Prairie Dog Meadows, so it was a priority for conservation. After acquisition, the new land was regraded and seeded with native grasses to blend in with the natural area. Rimrock Conservation Easement A conservation easement on 319.7 acres immediately adjacent to the Blue Sky Trail and Rimrock Open Space was acquired in January. Natural Areas partnered with Larimer County and Great Outdoors Colorado (GOCO) to acquire the property from the White family who have owned the ranch since 1964. The Natural Areas Department contributed funding to Larimer County’s fee purchase and the City will hold the GOCO-required conservation easement. The ranch is primarily agricultural and supports dryland wheat and alfalfa crops and livestock grazing. Rimrock Conservation Easement is within the Foothills/ Buckhorn/ Redstone conservation focus area designated in the Land Conservation and Stewardship Master Plan. Maxwell Natural Area Addition Just over 53 acres of grasslands and shrublands adjacent to the Foothills Trail and Maxwell Natural Area were acquired in April (pictured above). The State Board of Agriculture (CSU’s predecessor) acquired the property in 1940 and used it for livestock grazing. The property falls within the Foothills/ Buckhorn/ Redstone conservation focus area designated in the Land Conservation and Stewardship Master Plan. A variety of wildlife frequents the newly conserved land including mule deer and mountain lions. CITY MANAGER’S UPDATE 32 Poudre River Conservation Easement A 72-acre site that has been on Natural Areas potential conservation list for more than a decade was protected from development in September. The ranch is used for agriculture and livestock grazing. A bargain sale meant that the City contributed $200,000 towards the total $950,000 conservation easement value and the landowner will pursue state tax credits for the remaining $750,000 of the donation. The property is within the Poudre River Corridor conservation focus area designated in the Land Conservation and Stewardship Master Plan. Land Conservation Summary 2018 Land Conservation Summary - To Date Acreage Cost Acres of Land Purchased 37,082 Acres of Land Leased 897 Acres of Land in Conservation Easements 6,725 Total Conserved - To Date 44,705 $ 93,219,394 Land Conservation Summary Year to Date Acreage Cost Land Conserved - Jan - Mar 159.84 $ 370,498 Land Conserved - Apr - Jun 57.22 $ 665,832 Land Conserved - Jul - Sept 71.99 $ 200,851 Land Conserved - Oct - Dec 0 $ - Total Land Conserved - Year to Date 289.05 $ 1,237,181 Acquisitions To Date - 2018 Acreage Cost Rimrock CE 320 acres acquired in 50/50 partnership with Larimer County. 159.84 $ 370,498 Prairie Dog Meadows Addition ($20,000 earnest money paid in 2017). 3.35 $ 180,093 Maxwell Natural Area Addition 53.87 $ 485,739 Poudre River Conservation Easement 71.99 $ 200,851 Total Conserved - Year To Date 289.05 $ 1,237,181 Yearly Leases to Date Acreage Cost Fossil Creek Reservoir $ 74,558 Dixon - Pineridge NA $ 3,244 Total Leases $ 77,802 Earnest Money Paid Acreage Cost Fee Acquisition - Regional Foothills - Adjacent to Natural Areas owned property. 545 $ 20,000 Total Earnest Money $ 20,000 Land Conservation Funds Budgeted for 2018 $2,500,00 + Re- appropriation $7,905,019 $ 10,405,019 Land Conservation Funds 2018 Expenditure $ 1,334,983 Net Land Conservation Funds Remaining from 2018 $ 9,070,036 Property Under Contract Acreage Cost Fee Acquisition - S. Shields - Adjacent to Cathy Fromme Prairie 33 $ 1,155,000 Total Under Contract 33 $ 1,155,000 Properties with Accepted Offers (not yet under contract) Acreage Cost CITY MANAGER’S UPDATE 33 Fee Acquisition - Regional Foothills - Adjacent to Natural Areas owned property. 545 $ 1,600,000 Fee Acquisition - Adjacent to Coyote Ridge NA 40 $ 250,000 Fee Acquisition - Wellington Community Separator 295 $ 2,660,000 Total Accepted Offers 880 $ 4,510,000 Total Underway to Complete in 2019 913 $ 5,665,000 PUBLIC ENGAGEMENT OurCity 2018 Overview & Highlights Total Visits: 35.9K Max Visitors Per Day: 593 Most Popular Projects 1. Fort Collins Connexion 2. City Plan 3. Outdoor Residential Burning Most Popular Tools 1. Interactive Map Pinning – 3K pins drops 2. Surveys – 594 submissions 3. Share a Big Idea -1.76 new ideas shared Utilities Community Engagement interacted with 238 people in the month of December to assist those in need and offer financial support for unpaid Utility bills based on our Utilities Affordability Portfolio and Income Qualified Assistance Program. Utilities Customer Satisfaction Survey was administered in October and the data was received from the vendor in December. Utilities staff is analyzing the data to determine how the results guide programs and services that includes Broadband customer service. More details to come. COMMUNITY DASHBOARD HIGHLIGHT The Community Dashboard features performance data and information that highlights how the City is doing in achieving its seven Outcome areas: Neighborhood Livability and Social Health, Cultural and Recreation, Economic Health, Environmental Health, Safe Community, Transportation, and High Performing Government. The Dashboard is made up of 38 total metrics that are published quarterly and demonstrate where the City is doing well and where there are opportunities to improve. The color status of performance for each metric is determined based on the actual result for the quarter compared with the target. The color status of performance for the Outcome is determined based on the average calculation of the performance of each metric within that Outcome. Each month the City Manager’s Update will highlight a metric from the Community Dashboard. This month’s feature is from the Safe Community Outcome Area. CITY MANAGER’S UPDATE 34 Analysis: The 90th percentile time in third quarter of 2018 in the urban area (City of Fort Collins) was 7:12 seconds with an increase in calls from the third quarter 2017 (2018-5,805 and 2017-5,611). The overall benchmark goal for the PFA Standards of Cover is to respond to emergent calls within the urban area is 6:20 minutes 90 percent of the time. This is a very lofty goal that is designed to be difficult to achieve. Response times have improved overall since being accredited in August of 2015 but are starting to flatten out. This measure remains at the 77 to 78 percent achievement. Continue to monitor call volume and the three (3) components that make up response time (call processing, turn-out and travel). Definition: Fire response time measures the time elapsed from when the citizen/customer dials 911to when the first PFA personnel arrives on-scene. This data includes calls for emergencies in the urban response area of PFA. PFA's target is to respond within 6 minutes, 20 seconds at least 90% of the time. This is aligned with PFA's baseline performance goals under fire service accreditation. Why is this metric important? Quick response times mean that fire-rescue staff reduce the potential for fire loss and respond to medical/rescue calls within critical time frames for delivering patients to definitive care. Rapid response has the potential to limit costs to residents, the community, the health care system and other responding agencies. City’s impact on this metric: High – Response times for emergency calls are influenced by fire companies through efficient turn-out times, firefighter training, effective station location, and the use of technology for efficient dispatch and call mapping. Benchmarks: Benchmarking in progress To view the entire Dashboard, please visit: http://fortcollins.clearpointstrategy.com/