MEMORANDUM
DATE: December 5, 2018
TO: Mayor Troxell and Councilmembers
THROUGH: Darin Atteberry, City Manager
Jeff Mihelich, Deputy City Manager
Kevin Gertig, Utilities Executive Director
Theresa Connor, Deputy Director - Water Engineering and Field Operations
FROM: Matt Fater, Civil Engineer III - Special Projects Manager
RE: Magnolia Street Outfall Update
Bottom Line
The downtown area of Fort Collins faces significant flood risk. The Magnolia Street Outfall
Project was identified in the 2003 Master Plan as a large diameter outfall to address a portion of
the flooding. Staff has been working on alternative analysis, feasibility and cost estimating for
the project. The project warrants a thorough process for public consensus and City Council
direction given the significant magnitude of the project. Staff has developed a timeline for
working towards City Council direction for the project in late 2020.
Background
Downtown Fort Collins was built prior to design standards for stormwater management and
flood hazards. As a result, significant flood hazards due to intense rainfall exist in the downtown
area including risk to homes, businesses, and roadways. The area has a history of repeated
flooding including the storm event on May 22
nd
of this year. Figure 1 identifies the 100-year
floodplain for the Old Town Basin as well as the three major stormwater outfall projects and the
Udall Water Quality Area.
In 2003, the Stormwater Master Plan recommended a system of improvements in the Old Town
Basin to address the flood risk including the Magnolia Street Outfall project. The system of
recommended improvements is shown on Figure 1. The projects were originally conceptualized
as large diameter storm sewer projects including extensions of the existing outfalls and an
entirely new outfall along Magnolia Street. These master plan projects were conceptual
approaches to address the flood hazard based on limited feasibility and alternative analysis.
DocuSign Envelope ID: A75DB359-4BE1-4F6B-A7A5-71336E288538
Page 2 of 4
The 2017/2018 City budget included $1.5 Million in funding to begin design of the Magnolia
Street Outfall project (Safe Community Offer 8.19). To date, approximately $400,000 has been
spent conducting alternatives analysis, feasibility and cost estimating for the project.
Project Goals
The goal of the Magnolia Street Outfall project and the remaining downtown stormwater projects
is to provide flood mitigation and treatment of stormwater runoff. These goals help reduce the
social, environmental, and economic impacts associated with urban flooding such as public
safety, property protection and water quality. In addition, the project seeks collaboration
opportunities to enhance downtown and achieve additional City objectives.
Feasibility Study
A feasibility study was completed in 2017 & 2018 to confirm the viability of constructing the
Magnolia Street Outfall project identified in the master plan. The technical work completed
included: hydrologic modeling, pipe sizing, geotechnical investigations, and constructability
analyses. The conceptual project includes storm sewers up to 120-inch diameter, extending from
the Poudre River to Shields Street primarily within Magnolia Street. In addition, stormwater
would be diverted to the Udall Water Quality area for treatment. The feasibility study estimated
the project cost at $80 Million with a construction duration of over 3 years. A significant portion
of the flood hazard in the downtown area would be addressed. However, flood hazards would
remain until all remaining projects identified in Figure 1 are constructed. The feasibility analysis
revealed the need to evaluate the Magnolia Street project and the remaining downtown projects
as a system. This analysis, planned for early 2019, will determine if more cost-effective
solutions exist for the entire downtown area.
Alternative Analysis
An alternative analysis was also conducted to determine if more cost-effective solutions could be
identified and to evaluate the potential for multi-objective opportunities. While opportunities to
reduce the overall cost were not identified, the analysis did identify potential approaches that
could provide additional benefits to downtown such as: park space, access to nature and
additional stormwater filtration. These approaches included regional and underground detention
as well as repurposing portion of the public right of way for stormwater management. It was
also identified that opportunities for streetscape enhancements exists with the conventional storm
sewer option due to excavation and reconstruction of the street. While these approaches could
provide additional benefits to the area, they also have significant challenges in terms of
availability of vacant land and public concerns over reduction in street widths and potential loss
of parking. For these reasons, these approaches would require significant public outreach and
design work to further evaluate feasibility and community acceptance.
DocuSign Envelope ID: A75DB359-4BE1-4F6B-A7A5-71336E288538
Page 3 of 4
Financial Analysis
Rate stability is a key goal of the Utilities Financial Strategic Plan. Analysis was completed to
determine the financial feasibility of the Stormwater Utility to fund a project of this magnitude
along with other capital projects in the Financial Strategic Plan. Bonding will be required to
generate enough capital to construct the project within a reasonable timeframe. Preliminary
analysis indicates this debt could be incurred with periodic rate increases of less than 3% given
the Utility’s high debt capacity. The Stormwater Utility has significant, annual operating margin
intended for capital improvements such as this. Additional analysis will be needed to further
confirm the financial feasibility of the project.
Next Steps
A project of this magnitude and expense requires significant analysis and community discussion.
Staff will ultimately be seeking direction from Council on the project. The project team has
developed a schedule to provide enough time for both additional technical analyses and
community outreach. A critical milestone in the schedule is seeking direction from Council on
the project by the end of 2020. If Council directs staff to move forward with the project, design
and permitting would begin in 2021 with an estimated construction start of mid-2024.
Activity 2019 2020 2021 2022 2023 2024
Additional Alternative Evaluation
Community Outreach - Consensus
Community Outreach - Construction
Council Decision
Design and Permitting
Estimated Construction Start
Staff will be scheduling Council work sessions in 2019 and 2020 to provide information on the
project and seek Council guidance. The first of these work sessions is scheduled for March 26,
2019.