Loading...
HomeMy WebLinkAboutReport - Mail Packet - 12/18/2018 - City Managers Monthly Update - December 2018Ross Proving Up House Ribbon Cutting – November 15, 2018 December 2018 DECEMBER 13, 2018 Table of Contents ISSUES BEFORE COUNCIL ................................................................................................................. 4 DECEMBER 18 COUNCIL MEETING .........................................................................................................................4 DECEMBER 20 URBAN RENEWAL AUTHORITY BOARD ...........................................................................................4 DECEMBER 25 WORK SESSION – CANCELED ..........................................................................................................4 JANUARY 1, 2019 COUNCIL MEETING-CANCELED ..................................................................................................4 WEDNESDAY, JANUARY 2, 2019 COUNCIL MEETING .............................................................................................4 WEDNESDAY, JANUARY 2, 2019 WORK SESSION ...................................................................................................4 JANUARY 8 ADJOURNED MEETING.........................................................................................................................5 JANUARY 8 WORK SESSION - CANCELED ................................................................................................................5 PUBLIC ENGAGEMENT – UPCOMING EVENTS ........................................................................................................5 SALES AND USE TAX COLLECTION .................................................................................................. 5 MONTHLY & YEAR TO DATE ...................................................................................................................................5 CP- ENGINEERING .............................................................................................................................. 6 CITYWIDE PEDESTRIAN ACCESS PROJECT ...............................................................................................................6 SUNIGA ROAD IMPROVEMENTS – COLLEGE AVE. TO BLONDEL STREET ................................................................6 NORTH COLLEGE IMPROVEMENTS – CANAL TO STATE HIGHWAY 1 .....................................................................7 HORSETOOTH AND COLLEGE INTERSECTION IMPROVEMENTS .............................................................................7 VINE AND LEMAY BNSF IMPROVEMENTS ..............................................................................................................8 SHARP POINT/NANCY GRAY CONNECTION ............................................................................................................8 RIVERSIDE BRIDGE REPLACEMENT .........................................................................................................................8 POWER TRAIL AND HARMONY ROAD GRADE SEPARATED CROSSING ...................................................................9 TIMBERLINE ROAD CORRIDOR PROJECT ............................................................................................................. 10 JEFFERSON STREET IMPROVEMENTS PROJECT ................................................................................................... 10 LINDEN STREET RENOVATION PRPOJECT ............................................................................................................ 11 WILLOW STREET IMPROVEMENTS ...................................................................................................................... 11 CP - PARK PLANNING & DEVELOPMENT ....................................................................................... 12 POUDRE RIVER WHITEWATER PARK .................................................................................................................... 12 CP - OPERATION SERVICES ............................................................................................................ 12 GARDENS ON SPRING CREEK – GARDEN EXPANSION ......................................................................................... 12 GARDENS ON SPRING CREEK – VISITOR’S EXPANSION ........................................................................................ 13 FORT COLLINS/LOVELAND POLICE TRAINING CENTER ........................................................................................ 13 CP– UTILITIES .................................................................................................................................... 14 EAST HARMONY DUCT BANK ............................................................................................................................... 14 HP BROADCOM CIRCUITS .................................................................................................................................... 14 WATER TREATMENT FACILITY ............................................................................................................................. 15 HARMONY DUCT BANK – HARMONY SUBSTATION PROJECT ............................................................................. 15 LIGHT & POWER GENESIS64 SCADA UPGRADE PROJECT .................................................................................... 16 WATER TREATMENT FACILITY MICROHYDRO PROJECT ...................................................................................... 16 OXBOW LEVEE IMPROVEMENTS ......................................................................................................................... 16 MAGNOLIA STREET OUTFALL .............................................................................................................................. 17 DWRF DEWATERING IMPROVEMENTS ................................................................................................................ 17 DWRF CO-GENERATION PROJECT........................................................................................................................ 18 DWRF SLUDGE STRAIN PRESS REDUNDANCY ...................................................................................................... 18 DWRF SIDESTREAM TREATMENT ........................................................................................................................ 18 CATHODIC PROTECTION FOR ANHEUSER-BUSCH WATER LINE .......................................................................... 19 WATER DISTRIBUTION AND WASTEWATER COLLECTION MASTER PLAN ........................................................... 19 SPRING CREEK IMPROVEMENTS AT EDORA PARK ............................................................................................... 20 CP-TRANSFORT AND PARKING SERVICES .................................................................................... 20 PARKING STRUCTURES AND ON-STREET PARKING ............................................................................................. 20 PUBLIC SAFETY ................................................................................................................................ 21 POUDRE FIRE AUTHORITY ................................................................................................................................... 21 POLICE SERVICES .................................................................................................................................................. 22 PLANNING, DEVELOPMENT &TRANSPORTATION ......................................................................... 23 BUILDING SERVICES AND PLANNING ................................................................................................................... 23 NEIGHBORHOOD SERVICES ................................................................................................................................. 24 YEAR TO DATE COMPARISON .............................................................................................................................. 25 GRAFFITI UPDATE ............................................................................................................................ 26 SUSTAINABILITY SERVICES ............................................................................................................ 26 ENVIRONMENTAL SERVICES ................................................................................................................................ 26 SOCIAL SUSTAINABILITY ...................................................................................................................................... 27 ECONOMIC HEALTH ............................................................................................................................................. 27 UTILITIES ............................................................................................................................................ 28 CUSTOMER CONNECTIONS .................................................................................................................................. 28 LIGHT & POWER OPERATIONS ............................................................................................................................. 28 COMMUNITY SERVICES .................................................................................................................... 29 RECREATION ........................................................................................................................................................ 29 PARKS ................................................................................................................................................................... 29 NATURAL AREAS .................................................................................................................................................. 29 PUBLIC ENGAGEMENT ..................................................................................................................... 30 COMMUNITY DASHBOARD HIGHLIGHT .......................................................................................... 30 CITY MANAGER’S UPDATE 4 ISSUES BEFORE COUNCIL DECEMBER 18 COUNCIL MEETING  2019 Fee Update (2nd Reading) o Consider ordinances associated with Wet Utility fees, Development Review fees, and Step II of Capital Expansion Fees. High Performing Government - 7.1 Provide world-class services that meet the needs of the community.  Connexion and Art in Public Places o Consider an Ordinance addressing the Connexion contribution to Art in Public Places. Culture and Recreation – 2.3 Provide enhanced opportunities for arts and culture throughout the City of Fort Collins.  Police Training Facility LEED Standards o Review and discuss LEED certification requirements for this training facility. Environmental Health – 4.3 Achieve 2020 Energy Policy goals and work towards Climate Action goals for carbon neutrality.  Staff Report: Coalition for the Poudre River Watershed Update o Update City Council on the activities of the Coalition of the Poudre River Watershed and highlight the community benefits associated with investing in this organization.  Staff Report: 20 Year Anniversary Sprinkler Audit Program Review results and accomplishments of a program that engages customers towards water savings while sustaining landscapes.  Ordinance placing citizen-initiated Councilmember salary petition ordinance on April 2, 2019 Ballot If the citizen-initiated petition is deemed sufficient, it is necessary to consider First Reading by January 2, with Second Reading on January 15, so that the notice of Charter Amendment can be published before the deadline of February 1, 2019 DECEMBER 20 URBAN RENEWAL AUTHORITY BOARD  December 20 from 9:00-11:00 a.m., Council Information Center, City Hall, 300 Laporte Ave. o Agenda materials at https://www.renewfortcollins.com/meeting-agendas DECEMBER 25 WORK SESSION – CANCELED JANUARY 1, 2019 COUNCIL MEETING-CANCELED WEDNESDAY, JANUARY 2, 2019 COUNCIL MEETING  Councilmember Vacancy Interviews o Councilmember Overbeck was elected to the office of Larimer County Assessor and has resigned. Council will hear presntations by and about candidates for the District 1 Council seat. WEDNESDAY, JANUARY 2, 2019 WORK SESSION  Keep Fort Collins Great (KFCG) 2020 Sunset-Funding Considerations o Continue discussion regarding the sunset of Keep Fort Collins Great tax, desired level of service, and funding options. CITY MANAGER’S UPDATE 5 High Performing Government – 1.7 Provide world-class services that meet the needs of the community. JANUARY 8 ADJOURNED MEETING  Annual Evaluations of the City Manager, City Attorney and Chief Judge JANUARY 8 WORK SESSION - CANCELED PUBLIC ENGAGEMENT – UPCOMING EVENTS  State of the City – Tuesday, Jan. 29, 6 – 8 p.m. at The Lyric. More details and RSVP info coming soon!  Montava Development Neighborhood Meeting #2 - Dec. 19 – Northside Aztlan Community Center from 6 PM - 8 PM in Eagle Rooms 1 and 2. Planning staff will convene a second neighborhood meeting to discuss what has changed since the neighborhood meeting on October 11.  Montava Staff Review Meeting – Dec. 28 – Staff will meet with the developer to discuss their revised submittal documents. SALES AND USE TAX COLLECTION MONTHLY & YEAR TO DATE OCTOBER SUMMARY OVER PRIOR YEAR Month Year to Date Net Sales Tax Collected: 1.2% 3.8% Net Use Tax Collected: 33.1% -11.3% Net Sales and Use Tax Collected: 6.1% 1.1% Year to date, sales and use tax collections excluding rebates are up 1.1% and total $115.0M. OCTOBER SUMMARY OVER BUDGET Month Year to Date Net Sales Tax Collected: -1.7% 1.3% Net Use Tax Collected: 32.9% -2.5% Net Sales and Use Tax Collected: 3.5% 0.7% Year to date, the City has collected 0.7% more sales and use tax revenue, totaling $811K over budget. CITY MANAGER’S UPDATE 6 Capital Projects (CP) – Updates are indicated in bold CP- ENGINEERING CITYWIDE PEDESTRIAN ACCESS PROJECT Funding Source: Community Capital Improvement Program (CCIP) Estimated Project Budget: 2018 - $1.1M Estimated Completion Date: Ongoing Phase: Construction Project Details: This project maintains a complete City sidewalk inventory, identifies sidewalk inadequacies, and develops a prioritized work program to achieve goals of promoting walking for transportation and recreation. Project Status:  Upcoming project locations: Minor sidewalk repairs and reviewing 2019 project locations.  Current projects: No Projects at this time More information is available at http://www.fcgov.com/engineering/pedneeds.php SUNIGA ROAD IMPROVEMENTS – COLLEGE AVE. TO BLONDEL STREET Funding Source: 2017 / 2018 BFO, COFC Utilities, Transportation Capital Expansion Fee (TCEF), Developer Contributions Estimated Project Budget: $3.7M Estimated Completion Date: Spring 2019 Phase: Final Design/Advertise for Bid Project Details: Design and construction of a new arterial roadway that connects existing Suniga Road, from Blondel St. to College Avenue. Project Status:  Final design is complete and the project is ready to bid; all parcels have been secured for construction. More information is available at https://www.fcgov.com/engineering/suniga-to-college-improvements CITY MANAGER’S UPDATE 7 NORTH COLLEGE IMPROVEMENTS – CANAL TO STATE HIGHWAY 1 Funding Source: Federal Grants, URA Contribution, Pedestrian Program Funds, County Funds, Transportation Capital Expansion Fee (TCEF), Developer Contributions Estimated Project Budget: $2.35M Estimated Completion Date: Spring 2019 Phase: CDOT Construction Project Details: This project will construct pedestrian improvements along North College between the Larimer & Weld Canal (City limits) and State Highway 1, including pedestrian bridges crossing the canal. Project Status:  CDOT has started this phase of roadway work. City staff is coordinating with CDOT to advertise the City’s project in December 2018. More information is available at fcgov.com/engineering/ncollege.php HORSETOOTH AND COLLEGE INTERSECTION IMPROVEMENTS Funding Sources: 2017/2018 BFO, Federal Grants, Bridge Program Funds, Transportation Capital Expansion Fee (TCEF), Community Capital Improvement Program (CCIP – Arterial Intersection) Estimated Project Budget: $7.5 M Phase: Project is complete Project Details: This project will construct intersection improvements to address safety and congestion problems. Issues were identified in the Arterial Intersection Prioritization Study, completed in 2011. Project Status:  Roadway project is complete with final landscaping and improvements. Minor coordination with private landscaping and sign resets on private property until early December. More information is available at fcgov.com/horsetoothandcollege/ CITY MANAGER’S UPDATE 8 VINE AND LEMAY BNSF IMPROVEMENTS Funding Source: Keep Fort Collins Great (KFCG), Transportation Capital Expansion Fee (TCEF), 2017 / 2018 BFO Estimated Project Budget: $22M ($12M currently allocated) Estimated Completion Date: Spring 2021 Phase: In Design Project Details: The existing Vine and Lemay intersection, which includes the Burlington Northern Santa Fe (BNSF) Railway crossing, is severely congested with limited options to expand through or turn lane capacity due to land use constraints. Project Status:  Final slope grading and riprap work on the north side of the tracks along Dry Creek to finalize floodplain and embankment work. This will complete the final work associated with Dry Creek box culvert placement. Work will resume in December and last approximately 3 weeks.  Engineering has partnered with City Utilities to haul and place approximately 14,000 yards of additional roadway embankment on the south side of the railroad tracks. Once completed, 90,000 yards will have been placed, out of 200,000 yards needed. Work will begin in mid- January to place material, from the Oxbow Levy project, south of the tracks to the east of Andersonville neighborhood. It is expected this work will take 2-3 weeks. More information is available at fcgov.com/engineering/vine-lemay SHARP POINT/NANCY GRAY CONNECTION Funding Source: Transportation Capital Expansion Fee (TCEF), 2015/2016 BFO, Developer Contributions Estimated Project Budget: $1.2M Estimated Completion Date: Spring 2019 Phase: Railroad Coordination Project Details: The City Master Street Plan identifies Sharp Point Drive and Nancy Gray Avenue as connected across the Great Western Railroad tracks. This project will construct the roadway and pedestrian connection, and railroad crossing. Project Status:  No updates this month. More information is available at fcgov.com/engineering/sharppoint RIVERSIDE BRIDGE REPLACEMENT Funding Source: Federal Grants and Bridge Program Funds Estimated Project Budget: $4.3M Estimated Completion Date: March 2019 Phase: Under Construction CITY MANAGER’S UPDATE 9 Project Details: The project will replace the structurally deficient bridge over Spring Creek, and raise Riverside Avenue out of the 100 years flood level at the bridge location. This project is coordinated with Utility’s Spring Creek Restoration Project. Project Status:  During November, the old Riverside bridge was removed, steel H-pile substructure was installed, and precast concrete abutments were installed.  The Contractor is behind schedule with the full closure phase. Staff is evaluating the schedule changes with the Contractor and has notified stakeholders about the delay. Staff has messaged to stakeholders that the City will provide an updated schedule once finalized with the Contractor. POWER TRAIL AND HARMONY ROAD GRADE SEPARATED CROSSING Funding Source: Federal Grant, Community Capital Improvement Program (CCIP - Bike / Pedestrian Grade Separated Crossings) Estimated Project Budget: $5M - $8M Estimated Completion Date: 2020-2021 Phase: Alternatives Analysis – Conceptual Design Project Details: The Power Trail provides connectivity between the Spring Creek Trail to the north and the Fossil Creek Trail to the south. The Trail currently has a gap approximately three-quarters of a mile long north and south of Harmony Road. The detour route requires users to cross Harmony Road at grade at McMurry. This project will design, acquire property interests, and construct a trail grade separated crossing at Harmony Road as well as the trail connections on either side. CITY MANAGER’S UPDATE 10 Project Status:  The initial phase of the design contract is a feasibility study and alternatives analysis for different project alternatives.  Design team is developing conceptual level alternatives for the alternatives analysis phase and beginning evaluation of alternatives.  City staff are presenting project status and alternatives to various City boards and committees.  Funding identified up to $4.3M. More information is available at https://www.fcgov.com/engineering/powertrailcrossing TIMBERLINE ROAD CORRIDOR PROJECT Funding Source: Transportation Capital Expansion Fee (TCEF), Developer Contribution, Federal Grant Estimated Project Budget: $6.5M Estimated Completion Date: 2020 - 2021 Phase: Request for Proposal (RFP) Project Details: This project will reconstruct South Timberline Road from Stetson Creek Drive to Trilby Road to the City’s four lane arterial roadway standards. Planned improvements include; intersection improvements at Kechter Road, Zephyr Road, and Trilby Road, multi-modal accommodations, raised medians, access control, landscaping improvements, and roadway improvements. This project serves to build upon the development improvements that have been completed along the corridor. This project will improve safety, reduce congestion, and provide improved accommodations for alternate travel modes. Project Status:  No updates this month. JEFFERSON STREET IMPROVEMENTS PROJECT Funding Source: Federal Congestion Mitigation and Air Quality (CMAQ) Funds, Building on Basics (BOB) 1.0 funds Estimated Project Budget: $1.4M Estimated Completion Date: 2019 Phase: Right-of-way acquisition Project Details: The goals of this project are to develop preliminary engineering design plans and to acquire rights-of-way and easements for planned improvements along Jefferson Street between College Avenue and the Mountain/Lincoln Intersection. CITY MANAGER’S UPDATE 11 Project Status:  Staff has prioritized property acquisition along Jefferson Street which can be acquired with the remaining project funds.  Staff plans to begin the acquisition phase in December 2018. Staff will be requesting Council authorization to use eminent domain, if necessary, to acquire property interests.  Current Jefferson funding is $1.4M. Staff will continue to refine the construction estimate as the project moves forward. The current overall project estimate is currently in the range of $10M - $12M. LINDEN STREET RENOVATION PRPOJECT Funding Source: Community Capital Improvement Program (CCIP) Estimated Project Budget: $3.0M Estimated Completion Date: 2020 Phase: Project Kick-off Project Details: The goals of this project are to renovate Linden Street between Walnut Avenue and Jefferson Street. Initial concepts include the converting this section of Linden Street to a “convertible” street; one that can function primarily as a roadway but can also be closed to vehicles and converted to a pedestrian plaza during specialty events. Project Status:  The project is scheduled to receive design funds in 2019 and construction funds in 2020.  Staff anticipates releasing a Request for Proposals (RFP) for the design of the Linden Street Renovation Project in December and expects to be contracted with a design team in January 2019. WILLOW STREET IMPROVEMENTS Funding Source: Federal Grants, Community Capital Improvement Program (CCIP), Developer Contributions, DDA Funds Estimated Project Budget: $3.8M Estimated Completion Date: 2019 Phase: Final Design Project Details: This project will design roadway and urban design improvements along Willow Street between College Avenue and Linden Street; including a pedestrian plaza at the northern corner of Willow Street and Linden Street. Project Status:  The project team held a second public hearing related to the planned Willow Street Improvement Project. The feedback from this meeting was positive. CITY MANAGER’S UPDATE 12  Staff is coordinating construction with the ongoing developments planned along Willow Street.  Staff is meeting with businesses along Willow and Linden (with support from our Economic Development team), to begin discussions about construction impacts during the summer.  Final design plans will be submitted in early 2019.  Construction is planned to begin in June of 2019. CP - PARK PLANNING & DEVELOPMENT POUDRE RIVER WHITEWATER PARK Funding Source: CCIP, BOB 2, General Fund, Private/Public Donations, Natural Areas, Stormwater, URA, Park Planning & Development Total Project Cost: $11.5M Phase: Under Construction Estimated Completion: 2019 Project Details: The Poudre River Whitewater Park project has been a collaborative effort between multiple City departments, local advocates, and the philanthropic community. The project is estimated to be complete in summer, 2019. Project Status:  A historic infiltration gallery was found during construction.  The infiltration gallery was used to transfer water between the power plan cooling system and the river during the 1930’s  Documents were submitted to the USACE and the Historic Preservation Office to determine the appropriate level of documentation  The level of documentation required was completed the week of December 7, and the infiltration gallery was removed CP - OPERATION SERVICES GARDENS ON SPRING CREEK – GARDEN EXPANSION Funding Sources: $2.1M Privately Raised Funds $900K General Funds Total Project Cost: $3.0 M Phase: Project Close-out Estimated Completion Date: Fall 2018 Project Details: Garden on Spring Creek Garden Expansion is expanding the Gardens to add five acres to the north. This will include an amphitheater with a great-lawn for Great Lawn at The Gardens CITY MANAGER’S UPDATE 13 outdoor performances, several arbors and many added garden areas for the public to explore and enjoy. Project Status:  Gardens staff installing their landscaping and plantings  Contractor is finishing up repair of cracks in sound-absorbing walls  Processing final change order, and retainage payment GARDENS ON SPRING CREEK – VISITOR’S EXPANSION Funding Sources: Building on Basic (BOB) II - $2.2M Privately Raised Funds: $700K Total Project Cost: $2,900,000 Phase: Construction Documents Estimated Completion Date: Late Fall 2019 Project Details: The Gardens on Spring Creek Visitor Center Expansion is adding approximately 4500 SF. This includes a conservatory which will incorporate a butterfly pavilion, extra meeting rooms, additional office spaces, and Solar PV to offset the additional energy usage. Project Status:  Design is finishing up and we will apply for the building permit before the end of the year.  Contracted for 53 KW Solar PV system to offset much of the buildings energy use.  Establishing the contract Guaranteed Maximum Price (GMP) in January with plans of starting construction in 1st Quarter 2019. FORT COLLINS/LOVELAND POLICE TRAINING CENTER Funding Sources: $9.25M generated from bonds for the City of Fort Collins $9.25M from City of Loveland Total Project Cost: $18.5M Phase: Design Development Estimated Completion Date: Early 2020 Project Details: The City of Fort Collins is partnering with The City of Loveland to construct a new Police training facility which will be located on the west side of the Loveland Airport. This new site will offer a 50- yard pistol range, a 1.4-mile driving track, concrete skid pad, and some classrooms for special training. Project Status:  The project design has been on hold recently as we discuss LEED Certification.  We are bringing on a contractor using a Construction-Manager-at-Risk (CMaR) contract to help with cost estimating during design and then later manage the construction phase.  Working to finalize the Construction and Operation & Maintenance IGA.  Loveland has postponed their grant application because the IGA needs to be in place before it Rendering of Expansion Current SD Site Plan (Red) is future phases Current SD Site Plan (Red) is future phases CITY MANAGER’S UPDATE 14 can be reviewed.  Plan is to take the project to Fort Collins City Council in January for approval of funds for construction. CP– UTILITIES EAST HARMONY DUCT BANK Funding Source: Development Fees Estimated Project Budget: $4,000,000 Phase: Complete Project Details: Three Phase Project: Phase 1, the Substation Phase. Phase 2, installation of the duct bank between the substation and Ziegler Rd. is complete. Phase 3, installation of the duct bank between Ziegler Rd. and Strauss Cabin Rd. is complete. Project Status: Complete HP BROADCOM CIRCUITS Funding Source: Development Fees Estimated Project Budget: $500,000 Phase: Complete Project Details: Installation of approximately 1,200 feet of duct bank on Broadcom property to add capacity and facilitate separately metering several buildings on the site. Project Status: Complete Hewlett-Packard Campus Vault Installation CITY MANAGER’S UPDATE 15 WATER TREATMENT FACILITY Funding Source: Water Treatment Facility Capital Project Budget Estimated Project Budget: $1,300,000 Phase: In Design Project Details: Approximately 7,300 feet of three-phase from Overland Trail to the Treatment Facility in an existing easement on Colorado State University Property Project Status:  Trenching and vault installation is complete.  The primary metering cabinet has arrived at the Water Treatment facility. Water Treatment Facility staff have ordered the basement to accompany the cabinet. We are expecting delivery by mid-December  Cable installation is pending while staff investigates using remaining funding to further enhance reliability at the facility. HARMONY DUCT BANK – HARMONY SUBSTATION PROJECT Funding Source: Development Fees Estimated Project Budget: $214,590.00 Phase: Preliminary Construction Project Details: 5 new duct banks for additional capacity at the Harmony substation Project Status: No Updates  Final grading completed.  (3) 8 x 16 vaults have been set and tied into the Harmony duct banks  Construction of all duct banks completed from substation to new 8 x 16 vaults.  True grid, irrigation system installed. New tree planting completed.  Hydro seeding was completed the week of October 8, 2018.  Drive to be resurfaced with reclaimed asphalt mix. Water Treatment Facility Duct Bank CITY MANAGER’S UPDATE 16 LIGHT & POWER GENESIS64 SCADA UPGRADE PROJECT Funding Source: New Capital Estimated Project Budget: $200,000 Phase: In Design Project Details: Convert the existing Iconics Genesis32 hardware, software, and screens to Genesis64 Project Status:  All Iconics Genesis64 software has been installed on the new SCADA servers  The ESCADA team and IT are working together on creating secure user accounts and domains for the new ESCADA system  The ESCADA team is currently working on configuring the new OPC server (Kepserver)  All ESCADA network switches have been upgraded  New ESCADA firewalls are scheduled to be installed by the end of 2018. WATER TREATMENT FACILITY MICROHYDRO PROJECT Funding Source: Water Estimated Project Budget: $715,000 Status: In design Estimated Completion Date: 1st Quarter 2019 Project Details: The City of Fort Collins receives its raw water from the Poudre River and Horsetooth Reservoir. Due to the elevation differences between the plant and the sources, pressure dissipating valves on site reduce the energy of the water. The micro hydropower project will develop the hydroelectric potential from the raw water supply from Horsetooth Reservoir. Project Updates:  Tied new feeder wires from Horsetooth dissipator to inside utility transformer  Delivery of turbine unit and building from manufacturers OXBOW LEVEE IMPROVEMENTS Funding Source: Stormwater Estimated Project Budget: $1,095,955 Status: In design Estimated Completion Date: April 1, 2019 Project Details: SCADA System IT and ICE design of electrical and communication systems CITY MANAGER’S UPDATE 17 The project components include excavation of a flow conveyance channel in the left Poudre River overbank, additional fill placement, and trail reconstruction along the Oxbow Levee, coordination with the U.S. Army Corps of Engineers, and permitting for FEMA Conditional/Letters of Map Revision to document the post-construction effective 100-year water elevations and floodplain boundary. Project Updates:  Pre-construction activities  Joint project coordination with City engineering  Prepare construction contracts for 1st quarter of 2019 project start MAGNOLIA STREET OUTFALL Funding Source: Stormwater Estimated Project Budget: $480,000 Status: In design, construction 2024 Estimated Completion Date: TBD Project Details: The Magnolia Street Outfall Project is a large diameter storm sewer outfall into the Poudre River. The current alignment runs west along Magnolia Street to Shields Street. Pipe diameters range from 60” up to 132”. Construction methods include open cut with the potential for tunneling under Riverside Avenue, College Avenue, Mason Street, and Mulberry Street. Project Updates:  Water Board Steering Committee in January 2019 DWRF DEWATERING IMPROVEMENTS Funding Source: Wastewater Estimated Project Budget: $4,270,000 Status: Almost complete Estimated Completion Date: End of January 2019 Project Details: The project provides two new centrifuges for the sludge dewatering process at the Drake Water Reclamation Facility. The dewatering process is a critical process during which water is removed from the sludge so that it can be transported and applied as biosolids at Meadow Springs Ranch. Project Updates:  Odor control ductwork installation  Landscaping Soil type study area map Flooding at College Avenue May 22, 2018 Installation of a new polymer pump CITY MANAGER’S UPDATE 18  Final pipe coating DWRF CO-GENERATION PROJECT Funding Source: Wastewater Estimated Project Budget: $3,900,000 Status: In design Estimated Completion Date: Unknown Project Details: This project includes the installation of two 440kW biogas-fueled generator sets, a gas conditioning system, and electrical and mechanical modifications to incorporate these combined heat and power (CHP) generator sets into the digester sludge heating loop and the plant power grid. Electrical power generated by these improvements will be utilized onsite to offset plant power requirements. Project Updates:  City Council approved additional funding for project  Held preliminary meetings with Woodward to discuss their continued interest  Reestablish design team to begin redesign of project DWRF SLUDGE STRAIN PRESS REDUNDANCY Funding Source: Wastewater Estimated Project Budget: $1,520,000 Status: Punch list Estimated Completion Date: November 2018 Project Details: This project will install two strain presses that will screen inorganic Matter from the sludge going to the anaerobic digesters. Removing the inorganics prior to digestion improves digestion efficiency, generates increased biogas quantity and quality, and reduces operation and maintenance costs for the anaerobic digesters. Project Updates:  Punch list DWRF SIDESTREAM TREATMENT Funding Source: Wastewater Estimated Project Budget: $4,300,000 Status: In design Estimated Completion Date: December 2019 Project Details: This project is the design and installation of a wastewater sidestream Revised site plan with 2 genset locations and programmed backup genset location Strain press motor CITY MANAGER’S UPDATE 19 treatment system to meet future nutrient (nitrogen and phosphorous) regulations. The recycle stream from biosolids dewatering carries high nutrient concentrations back to the main stream treatment system. Sidestream treatment will remove nutrients from the recycle stream, which can potentially be turned into fertilizer and reused. Project Updates:  Process design report submitted for City review  Negotiated procurement work order  Review process design report and submit to State CATHODIC PROTECTION FOR ANHEUSER-BUSCH WATER LINE Funding Source: Water Estimated Project Budget: $2,280,000 Status: In design Estimated Completion Date: 3rd Quarter 2019 Project Details: The Anheuser Busch water line cathodic protection project is part of the Utilities Cathodic Protection Program. This AB water line project entails design and installation of a cathodic protection rectification system. This CP system will mitigate and prevent further corrosion on the bar-wrapped concrete cylinder pipe which supplies finished water from the Water Treatment Facility to Anheuser Busch. Project Updates:  Met with Light and Power on power supply and communication connection  Working with Real Estate Services on easements WATER DISTRIBUTION AND WASTEWATER COLLECTION MASTER PLAN Funding Source: Water and Wastewater Estimated Project Budget: $1,274,000 Status: Complete Estimated Completion Date: November 2018 Project Details: The Master Plan assessed the condition and performance of the water distribution and wastewater collection systems. A set of capital improvement recommendations were identified to maintain service quality. This information will be used to support the water and wastewater utility capital improvement programs. Project Updates:  Final draft submittal  Project debrief Pipe joint cathodic protection test wires Profile view of latest proposal of Sidestream process Master plan branding CITY MANAGER’S UPDATE 20 SPRING CREEK IMPROVEMENTS AT EDORA PARK Funding Source: Stormwater Estimated Project Budget: $1,000,000 Status: Pre-construction Estimated Completion Date: June 2019 Project Details: The Spring Creek stream reach is within an urbanized corridor and is experiencing severe bed and bank erosion. Improvements will include stabilizing the creek bed and banks through a combination of bio-engineered designs, re-grading, and re-vegetation. Project Updates:  Utilities Phase I construction underway  Raise sanitary manhole underway  Spring Creek Channel improvements CP-TRANSFORT AND PARKING SERVICES PARKING STRUCTURES AND ON-STREET PARKING Funding Source: General Fund and Parking Reserves Estimated Project Budget: $1.2M Estimated Completion Date: November 2018 Phase: Planning and Construction Project Details: Parking sensors will provide real time parking availability information to the parking public via the FC Parking App and will provide valuable occupancy and turnover data to assist with parking management. Project Status:  2018 sensor installation complete. 2,663 sensors installed, 200 more to be installed after planned street maintenance projects.  Gateways receiving sensor data are installed and calibration is presently taking place. We expect to be receiving accurate data by the end of the year (2018).  Passport, the developer of the FC Parking App, is working to add parking availability data. This feature is expected in Q2 2019.  New pre-pay technology (same as Firehouse Alley) and sensors have been installed in Old Town and Civic Center Parking Structures. The tentative “go-live” date is January 2, 2019. Water quality tank installation CITY MANAGER’S UPDATE 21 PUBLIC SAFETY POUDRE FIRE AUTHORITY Automatic Sprinkler System Fire Saves Firefighters responded to two separate fires on December 5, 2018 that were both extinguished due to automatic sprinkler systems. The first of those fires was in a senior living facility located at 2201 S. Lemay. The exact cause of the fire is still unknown but fire crews discovered that a fire had started and two sprinkler heads had extinguished the fire prior to PFA arrival. PFA crews disabled the sprinkler system and began clean-up and overhaul to ensure that there was no hidden fire. This building houses many mobility impaired senior citizens so this fire would have been far worse without the early suppression of the sprinkler system. The second fire was in a religious facility located at 630 South Meldrum. A man called dispatch and stated that he had started the fire. He was later arrested by Police Services. The fire started in an upholstered chair and was extinguished by a single sprinkler head. Damage was minimal. There were no injuries. Firefighters Donate Car to Woman Battling Cancer Firefighters from Station 5 (4615 Hogan Drive) and Karen Johnson, a cashier at King Soopers near Harmony Road, have become friends through shopping at the grocery store. When firefighters found out Karen had been diagnosed with cancer, they wanted to do something nice as a token of their gratitude for her smiles and friendly demeanor. The firefighters provided Karen with a 1998 Honda Accord, a year’s worth of insurance, and a GoFundMe to help defray medical expenses. For more information: https://www.coloradoan.com/story/news/2018/11/20/firefighters-donate-car-fort-collins- woman-cancer-diagnosis/2004403002/ November 27, 2018 A huge thanks goes out to OtterBox for their support of the volunteers that staff Stations 9 and 11 above Horsetooth Reservoir. The volunteers that work from these two stations respond to emergencies as volunteer firefighters/EMTs and deeply appreciate the support of our local community. BizWest 40 Under Forty Honoree PFA is proud of our own Michael Durkin; one of the BizWest 40 Under Forty honorees. Michael works to educate our residents on fire safety, and help the citizens who live within PFA's area live a healthy, safe life. PFA Hiring Process Poudre Fire Authority is hiring firefighters and will be accepting test scores from the National Testing Network (NTN) from October 1, 2018 to January 31, 2019. Interviews will be conducted in April and May of 2019. CITY MANAGER’S UPDATE 22 POLICE SERVICES Agency News New Assistant Chief and Info Services Director – Following national searches, FCPS welcomed two new employees and promoted an existing employee to fill open executive staff positions. Rena Martinez was promoted from her role as Interim Communications Manager to the role of Information Services Division Director. She began serving in this position effective November 5. John Feyen, a lieutenant at Larimer County Sheriff’s Office, and Tim Doran, a retired FBI agent and Director of Service Operations at Advanced Energy Industries, will begin serving as Assistant Chiefs starting in January 2019. Notable Cases Suspect Arrested for Burglary, Fatal Thanksgiving Day Collision – Suspect Marcus Orozco was arrested on Thanksgiving after burglarizing a pawn shop in the early morning and causing a collision that killed two people. Officers attempted to contact Orozco after a resident reported a suspicious vehicle with one occupant and visible firearms. The suspect fled the scene and crashed several miles away, killing Fort Collins resident Nicole Nees and her father, John. Our hearts continue to be with the Nees family and all affected by this tragedy. Man Arrest for Stabbing Outside of Bowling Alley – Kirk Wynn was arrested on November 15 for assaulting another man with a knife outside of Chipper’s Lanes on North College Ave. The suspect fled the scene but was apprehended a short time later. K9 Ivo located the knife used in the incident. Vehicle Break-Ins – Since early September, FCPS and the Larimer County Sheriff’s Office have taken more than 30 reports of vehicle break-ins that occurred in park and natural area parking lots. The suspect/s are using forced entry to access the interior compartments of vehicles, often breaking windows or door locks. The most commonly stolen items include purses, wallets, and bags. Some stolen items were left in plain sight, while others were hidden or not highly visible. Residents were advised to report any suspicious activity, and officers continue to investigate. Community Engagement Spanish Tour – The FCPS Spanish team welcomed members of our Spanish-speaking community to the Police Building for the second of two recent facility tours held in Spanish. FCPS partnered with The Family Center/La Familia and showed families the building, introduced them to K9 Trigger, partnered with the SWAT team for a demo, answered questions and discussed any issues of concern. This is part of an ongoing outreach to remove barriers and build trust with our Latinx community. Crime Prevention - This month, the Crime Prevention Specialist had 32 telephone calls ranging from setting up a class on Scams and Frauds for the resident seniors at MacKenzie Place, to a property manager with concerns of homeless people camping out on her properties. Presentations ranged from several Neighborhood Watch meetings (one neighborhood in particular was having increased problems with homeless camping out in their enclosed dumpster area) to two classes on Dealing With Difficult People. Here’s the breakdown on activities in November: Landlord Safety, 21 attended Difficult People, Bath Landscape, 28 attended RESTORE, 38 attended Neighborhood Watch (partner with LCOS), RFL, 45 attended Difficult People, City’s Environmental Services Employees, 25 attended CITY MANAGER’S UPDATE 23 United Covenant Church, CPTED, 5 attended Neighborhood Watch, Rigden Farms (The Flats), 20 attended Social Media Highlight Thanksgiving Turkey Drive – FCPS partnered with the Larimer Food Bank to promote a holiday turkey drive. We found a feathered friend to help our cause and filmed a light-hearted video to encourage the community to help our residents in need. To view the video, visit https://www.facebook.com/fortcollinspoliceservices/videos/325638954903171/ PLANNING, DEVELOPMENT &TRANSPORTATION BUILDING SERVICES AND PLANNING Historic Preservation Code Review The Historic Preservation Division is finalizing the review of its codes and processes. The City has worked closely with Clarion Associates and a sixteen-member advisory committee to examine all aspects of the code and recommend changes, including to the landmark designation process, the standards for the review of development near historic properties, and to consider eliminating the review of non-designated single-family residential dwellings. Council will consider proposed changes at its February 5 and February 19, 2019 hearings. City Plan The major policy concepts being brought forward to City Council at a Work Session on December 11th, with a review of initial policy development be shared with City Council at its February 12, 2019 Work Session. Adoption of the City Plan Update is scheduled for the April 16th City Council hearing. Enclave Annexations The City initiated annexation and zoning proceedings for four enclave annexations on November 20th: The Kechter Enclave Annexation, Trilby Substation Annexation, Friendly Fire Annexation and Strauss CITY MANAGER’S UPDATE 24 Cabin-Kechter Annexation. First reading for all four annexations is scheduled for the January 15th City Council meeting. Downtown and Transition Standards Adoption of Land Use Code Amendments that ensure compatibility of new development and redevelopment within the Downtown and surrounding interface areas has been scheduled for February 4, 2019 City Council hearing. This change in schedule coincides with parallel standards for historic preservation which will be considered for adoption on the same date. Sign Code Amendments Council approved Land Use Code amendments related to the sign code on First Reading November 20th. Second reading is scheduled for December 4th. This ordinance does not include the electronic billboard regulations. Changes related to electronic billboards will follow a separate timeline, with additional research and outreach conducted before that portion of the code is considered by Council. Montava Development Project The first round of review of the Montava PUD Master Plan was completed on November 16th. There is a second neighborhood meeting scheduled for Wednesday, December 19th from 6-8 pm at the Northside Aztlan Community Center. NEIGHBORHOOD SERVICES CSU Game Day Neighborhood Services and Code Compliance staff serve as neighborhood ambassadors in the neighborhoods around CSU campus 2 hours prior to kick-off at all home games to assist residents & game attendees navigate issues such as; party noise/behavior, RP3 parking questions, stadium clear- bag policy, parking on yard ordinance and enforcement and any other resident concerns/questions. Season contact totals: • A total of 265 contacts have been made. • Twenty-nine (29) parking violations were corrected, and six (6) citations issued. Dangerous Tree Code Compliance partnered with the Forestry Department to address fifteen (15) dangerous tress located on private property that needed to be removed to preserve public safety. Both groups worked together to successfully work with the property owners in education, information, and resources in the management of removing these condemned trees. City Planning Academy The second annual City Planning Academy wrapped up recently. This year, sixteen community members participated in the 4-week course, which covered topics such as the Development Review process, Land Use Code, transportation planning, affordable housing and sub-area planning. This CITY MANAGER’S UPDATE 25 course is designed to increase awareness of our City processes, increase engagement in the creation and implementation of those processes and cultivate a group of participants across a wide variety of neighborhoods in Fort Collins. We expect to maintain engagement with this group by making them aware of outreach opportunities related to community development and planning efforts in the future. Mediation and Restorative Justice Services Renovation Project and Move The space for Mediation and Restorative Justice Services will be renovated in the coming months. The location at 112 North Howes will be expanded into existing and empty space at 110 North Howes. This will give the Mediation and Restorative Justice team consisting of 4 to 5 staff and 60+ volunteers more space to work and conduct mediations and Restorative Justice conferences. In order to accommodate this project, the Mediation and Restorative Justice team will move temporarily into empty space at 117 North Mason. The office and staff will move the week of Dec. 17th and the office will be closed Dec. 17th through Jan. 2nd. The renovation project is scheduled to be completed at the end of February 2019 and the staff and volunteers will move back into the renovated space at 110-112 North Howes at that time. Mediation and Restorative Justice Inclusion and Equity Training The first round of Inclusion and Equity training for mediation and restorative justice staff and volunteers was completed in November. Another round of training will be offered to staff and volunteers in Spring 2019. All training was provided through grant funds received from Colorado Restorative Justice Council. YEAR TO DATE COMPARISON 2017 YTD 2018 YTD % Change Development Project Submittals Received 313 330 5.43% Conceptual/Preliminary Design/Staff Reviews 254 229 -9.84 Building Permits Issued 7,786 10,017 28.65% Building Permit Valuations ($M) $477.60 $412.56 -13.62% Building Inspections Performed 31,242 31,266 -0.59% Zoning Inspections Performed 753 2,577 242.23% Overall Development Review revenues are $(322,052) under projection for 2018 as of November 30th with Development Review under by $(330,358) and Engineering Development Review over budget by $8,306. CITY MANAGER’S UPDATE 26 GRAFFITI UPDATE During the month of November 2018, there was a 50% decrease in abated graffiti as compared to the same time period last year. Forty issues were addressed which included all calls for service. This time of year consistently sees less graffiti due mainly to the colder temperatures. Staff responded to one large tag off the Mason Trail near the Spring Creek Overpass on a stormwater headwall that required major abatement (see photo). Police assistance was needed while staff was working on the Mason Trail behind the South Transit Center, as a large group (12- 13) transients became verbally abusive. The transients fled the area quickly as two patrol units arrived. This is the first time Police presence has been needed in these situations. SUSTAINABILITY SERVICES ENVIRONMENTAL SERVICES Holiday Recycling: Between Thanksgiving and New Year’s Day, household waste increases by more than 25%! The Holiday Recycling Guide at fcgov.com/recycling/pdf/Holiday_Recycling_Guide.pdf includes helpful tips to use less and recycle more. Managing Our Waste: The Larimer County Landfill is going to be full by 2024. Regional governments are proposing new resource recovery facilities and a convenient trash drop-off site to replace it. How would this affect Fort Collins? City Council discussed this on December 11 at a work session. Read more about the project at www.fcgov.com/recycling/wasteshed.php. Electric Vehicle Roadmap: In 2018, the City of Fort Collins developed an Electric Vehicle (EV) Readiness Roadmap to support current and future EV adoption in our community. The Roadmap establishes a vision, goals, and clearly defined roles for City of Fort Collins Departments, the private sector, and the Fort Collins community. This work will be incorporated into the Transportation Master Plan and City Plan efforts moving forward. CITY MANAGER’S UPDATE 27 SOCIAL SUSTAINABILITY Prescription Discounts: The City of Fort Collins, through the National League of Cities, now offers savings on prescription drugs to all residents, whether they are without health insurance, have a traditional benefits plan, or have prescriptions that are not covered by insurance. By showing a My Healthy Hometown Prescription Discount Card at a participating retail pharmacy, a resident can receive an average discount of 24 percent off the retail price of pharmaceuticals. Savings may vary by drug and pharmacy. Residents can download a free My Healthy Hometown Prescription Discount Card at any time at https://www.rxprintacard.biz/nlc/web-cards/nlc.aspx?pid=EE48C30B-6FF6-4230-B515- F6245ED0E91E or obtain one by calling toll-free 1-888-620-1749. Want to learn more? Contact Brittany Depew in the City's Social Sustainability department at bdepew@fcgov.com or 970.221.6595. Supporting Nonprofits: Every year, the City of Fort Collins conducts a competitive process to award City and federal dollars to local affordable housing providers and nonprofit human service organizations. In fiscal year 2017 (Oct 1, 2017–Sept 30, 2018), the City allocated $1.28 million of City funds and $3.1 million in federal dollars to local projects. Thirty nonprofits provided food, shelter, childcare, adult daycare, physical and behavioral health services, case management, employment services, and other critical support to more than 19,000 low-income community members. Affordable housing providers are using funds to rehabilitate 179 apartments and construct 104 new housing units for low income residents. ECONOMIC HEALTH Small Business Saturday: City leaders helped celebrate the holidays on November 20 before Thanksgiving to promote Small Business Saturday on November 24. Mayor Wade Troxell and City Councilmember Ray Martinez toured the Scott Pine Village shopping area in Midtown with SBA Region VIII Administrator Dan Nordberg and Colorado District Director Frances Padilla. Sparrow House of Design, The Fox and the Crow and Friendly Nick’s Butcher were among the businesses visited. Innovation Partner: The National League of Cities has highlighted Fort Collins as one of 50 communities forging bold local partnerships to expand America’s innovation economy. See press release at https://www.fcgov.com/news/index.php?id=7306. Fort Collins is being recognized for its unique public-private partnership to “find, finance and fix” thousands of energy inefficient rental homes in Fort Collins through its EPIC Program. Free Parking Saturdays During Holidays: The City is offering free Saturday parking in all three downtown structures through December 29: • Old Town Parking Structure • Civic Center Parking Structure • Firehouse Alley Parking Structure CITY MANAGER’S UPDATE 28 UTILITIES CUSTOMER CONNECTIONS Community Engagement since January 2018 has reached 22,291 participants in 355 outreach events and programs, with a primary focus on Time-of-Day rates education and awareness, and Utilities Affordability Portfolio, that includes Income Qualified Assistance Program (IQAP). Key outreach: • Hickory Village Mobile Home Park - Staff initiated a project funded through an internal grant program which brought energy efficiency and sustainability items to 150 families. The event consisted of direct installs with these products and a community celebration with educational information, food, and fun! • Pleasant Valley Lake Canal project - Outreach and engagement began and received several media highlights over the past month including a public meeting on November 15th reaching several members of the impacted community to seek feedback on the project. Time of Day (TOD) communications has been a phased launch since May 2018 providing customers both awareness and education. To date eleven media stories have been completed. Customer feedback stats are: 668 customer calls, 31 Access Fort Collins requests, 7,226 customers reached through social media, and completed 680 customer specific estimator tool analysis. LIGHT & POWER OPERATIONS Substation Specialists are working on installing animal guard protection at substations. Over the past few years, there have been three incidents of racoons or squirrels contacting energized substation bushings, located on the switchgear building or substation transformers, causing large scale service interruptions, extensive damage and costly repairs. The typical cost to replace transformer bushings is approximately $55,000, and the cost to replace switchgear roof bushings is approximately $8,000. One of the process improvement initiatives in 2018 was to find a solution to eliminate this kind of event. The substation group reviewed possible solutions and chose to use a self-bonding insulating tape along with insulating tubing to cover the overhead conductors. Rigid type animal guards were ruled out after a review revealed manufacturers’ limited ability to accommodate the varied overhead bus fittings and bushing installations. The insulating tape has proved adaptable to each installation. The approximate cost to insulate each substation facility is $3,000. Work is underway to install the insulating protection on all the substation facilities by the end of the year. Typical Tape Installation on Transformer Bushings and Conductor. CITY MANAGER’S UPDATE 29 COMMUNITY SERVICES RECREATION Winter Registration Success Over 4,375 people registered for winter Recreation programs on registration opening day, November 15. The 2018 winter registration was an increase of 46% compared to 2017 winter registration. Fitness, Aquatics and Child Development programs received the most enrollments. Over 60% registered online and 1,616 programs are currently offered for the winter 2018/2019 season. Junior Rams CSU/Recreation Partnership Begins The Junior Rams program (a partnership between CSU and Recreation) began in November. 715 children are participating in the youth basketball program. Games are played at Northside Aztlan Community Center and Foothills Activity Center. Sports Economic & Feasibility Study: Kickoff Key Stakeholder meetings will be taking place the first week of January. A full report is expected within 12 – 16 weeks. The report will be presented to the Executive Team and Council at this time. PARKS Major Tree Pruning Project on Remington Street Forestry worked with two contractors on a major tree pruning project the week of November 26. The project used a “rolling” street closure approach to minimize traffic disturbances. During the pruning project Forestry staff identified an ash tree that was severely damaged and a threat to public and private property. The tree was removed and a replacement tree will be planted next year. Holiday Lights, Rink and Santa House Installed in Old Town The holiday season kicked off in Old Town with the holiday lighting on November 2. Shortly after, the installation of the Old Town Square Skating Rink and Santa’s House were completed. These projects are a result of partnership with DDA and expected to help draw people to Old Town. NATURAL AREAS Foothills Natural Areas Management Plan Process Underway The management plan is being updated for Coyote Ridge, Pineridge, Maxwell, and Reservoir Ridge natural areas and the Foothills Trail. An initial public outreach phase will begin this winter followed by an open house and online feedback opportunity in the spring of 2019. The Foothills Natural Areas are some of the most well-loved natural areas in the City and they feature important conservation values. The management planning processes will utilize new planning methods and a decision framework to explore and integrate the visitor experience with ecological objectives and conditions. CITY MANAGER’S UPDATE 30 Gateway Natural Area Management Plan Nearly Complete The Gateway Management Plan is in the final stages of editing and is almost complete. The Plan addresses important conservation goals for the area and challenges such as crowding during busy months and financial sustainability. Outreach included meetings with key stakeholders, 3 days of on-site outreach spread out over the busy season, and an online feedback opportunity. PUBLIC ENGAGEMENT New Mapping Tool Launched for KFCG Engagement Staff continues to update the KFCG project page on OurCity including rotating graphics, responding to community input and the new mapping tool which pins locations throughout the community that are funded by KFCG. Pins include information and pictures. People can drop their own pins to share their favorite locations and tell us why. 2018 Community Survey – The City has received and is reviewing draft reports from the statistically valid and opt-in options of the 2018 Community Survey. The City is discussing more ways to share the results, report back to participants and help departments use the data. More details will come. Future of Transit Discussion Panel - A panel of transportation professionals discussed new trends in transit such as on-demand service, micro-transit, autonomous vehicles, and how these concepts could serve Fort Collins. Attendees expressed interest in more high frequency transit and opportunities for public-private partnerships. There were 125 attendees. COMMUNITY DASHBOARD HIGHLIGHT The Community Dashboard features performance data and information that highlights how the City is doing in achieving its seven Outcome areas: Neighborhood Livability and Social Health, Cultural and Recreation, Economic Health, Environmental Health, Safe Community, Transportation, and High Performing Government. The Dashboard is made up of 38 total metrics that are published quarterly and demonstrate where the City is doing well and where there are opportunities to improve. The color status of performance for each metric is determined based on the actual result for the quarter compared with the target. The color status of performance for the Outcome is determined based on the average calculation of the performance of each metric within that Outcome. CITY MANAGER’S UPDATE 31 Each month the City Manager’s Update will highlight a metric from the Community Dashboard. This month’s feature is from the Transportation Outcome Area. Analysis: • Quarter 3 2018 results have shown a slight increase in productivity over the same period in 2017, while narrowly missing the goal. This can be attributed to the fact that overall ridership was slightly below the target. • Passengers per hour is a standard industry measurement of how well a transit system is performing, calculated by dividing passenger trips by hours of service. Definition: The average number of passengers who board a transit vehicle for every revenue hour of service that a vehicle is operating. Why is this metric important? This metric allows Transfort to gauge the productivity and effectiveness of its service, and to compare against peer transit agencies. City’s impact on this metric: High – Transfort influences fixed route ridership through its choice of routes, stops, schedules and frequency of service, as well as marketing and outreach. Benchmarks: Benchmarking in progress To view the entire Dashboard, please visit: http://fortcollins.clearpointstrategy.com/