HomeMy WebLinkAboutReport - Mail Packet - 11/13/2018 - City Managers Monthly Update - November 2018Business Appreciation Breakfast 2018 November 2018 NOVEMBER 8, 2018 Table of Contents ISSUES BEFORE COUNCIL (AS OF 11/7/18) ...................................................................................... 4 NOVEMBER 13 WORK SESSION ..............................................................................................................................4 NOVEMBER 20 COUNCIL MEETING ........................................................................................................................4 NOVEMBER 20 GID NO. 1 .......................................................................................................................................5 NOVEMBER 20 SKYVIEW GID ..................................................................................................................................5 NOVEMBER 27 ADJOURNED MEETING ..................................................................................................................5 NOVEMBER 27 WORK SESSION ..............................................................................................................................6 DECEMBER 4 COUNCIL MEETING ...........................................................................................................................6 DECEMBER 11 WORK SESSION ...............................................................................................................................7 PUBLIC ENGAGEMENT – UPCOMING EVENTS ........................................................................................................8 MONTHLY & YEAR TO DATE ...................................................................................................................................8 CP- ENGINEERING .............................................................................................................................. 9 CITYWIDE PEDESTRIAN ACCESS PROJECT ...............................................................................................................9 SUNIGA ROAD IMPROVEMENTS – COLLEGE AVE. TO BLONDEL STREET ................................................................9 DOWNTOWN RIVER DISTRICT IMPROVEMENTS ................................................................................................. 10 NORTH COLLEGE IMPROVEMENTS – CANAL TO STATE HIGHWAY 1 .................................................................. 10 HORSETOOTH AND COLLEGE INTERSECTION IMPROVEMENTS .......................................................................... 11 VINE AND LEMAY BNSF IMPROVEMENTS ........................................................................................................... 11 SHARP POINT/NANCY GRAY CONNECTION ......................................................................................................... 12 RIVERSIDE BRIDGE REPLACEMENT ...................................................................................................................... 12 POWER TRAIL AND HARMONY ROAD GRADE SEPARATED CROSSING ................................................................ 13 TIMBERLINE ROAD CORRIDOR PROJECT ............................................................................................................. 13 DRAKE ROAD RAILROAD CROSSING REPLACEMENT ........................................................................................... 14 CP - PARK PLANNING & DEVELOPMENT ....................................................................................... 14 FOSSIL CREEK TRAIL – SHIELDS TO COLLEGE ....................................................................................................... 14 CRESCENT PARK ................................................................................................................................................... 15 POUDRE RIVER WHITEWATER PARK .................................................................................................................... 15 CP - OPERATION SERVICES ............................................................................................................ 16 GARDENS ON SPRING CREEK – GARDEN EXPANSION ......................................................................................... 16 GARDENS ON SPRING CREEK – VISITOR’S EXPANSION ........................................................................................ 16 FORT COLLINS/LOVELAND POLICE TRAINING CENTER ........................................................................................ 17 CP – UTILITIES ................................................................................................................................... 17 EAST HARMONY DUCT BANK ............................................................................................................................... 17 HP BROADCOM CIRCUITS .................................................................................................................................... 18 WATER TREATMENT FACILITY ............................................................................................................................. 18 HARMONY DUCT BANK – HARMONY SUBSTATION PROJECT ............................................................................. 19 LIGHT & POWER GENESIS64 SCADA UPGRADE PROJECT .................................................................................... 19 WATER TREATMENT FACILITY MICROHYDRO PROJECT ...................................................................................... 20 OXBOW LEVEE IMPROVMENTS ........................................................................................................................... 20 MAGNOLIA STREET OUTFALL .............................................................................................................................. 21 MAIL CREEK IMPROVEMENTS AT MEADOW PASSWAY ...................................................................................... 21 DWRF CO-GENERATION PROJECT........................................................................................................................ 22 MULBERRY/RIVERSIDE DRAINAGE IMPROVEMENTS .......................................................................................... 22 DWRF SIDESTREAM TREATMENT ........................................................................................................................ 23 CATHODIC PROTECTION FOR ANHEUSER-BUSCH WATER LINE .......................................................................... 23 CP-TRANSFORT AND PARKING SERVICES .................................................................................... 24 PARKING STRUCTURES AND ON-STREET PARKING ............................................................................................. 24 PUBLIC SAFETY ................................................................................................................................ 24 POUDRE FIRE AUTHORITY ................................................................................................................................... 24 POLICE SERVICES .................................................................................................................................................. 25 PLANNING, DEVELOPMENT &TRANSPORTATION ......................................................................... 27 BUILDING SERVICES AND PLANNING ................................................................................................................... 27 NEIGHBORHOOD SERVICES ................................................................................................................................. 28 YEAR TO DATE COMPARISON .............................................................................................................................. 29 TRANSFORT AND PARKING SERVICES .................................................................................................................. 29 SUSTAINABILITY SERVICES ............................................................................................................ 30 ENVIRONMENTAL SERVICES ................................................................................................................................ 30 SOCIAL SUSTAINABILITY ...................................................................................................................................... 30 ECONOMIC HEALTH ............................................................................................................................................. 31 UTILITIES ............................................................................................................................................ 31 CUSTOMER CONNECTIONS .................................................................................................................................. 31 LIGHT & POWER OPERATIONS ............................................................................................................................. 32 COMMUNITY SERVICES .................................................................................................................... 32 RECREATION ........................................................................................................................................................ 32 PARKS ................................................................................................................................................................... 32 NATURAL AREAS .................................................................................................................................................. 33 PUBLIC ENGAGEMENT ..................................................................................................................... 34 COMMUNITY DASHBOARD HIGHLIGHT .......................................................................................... 34 CITY MANAGER’S UPDATE 4 ISSUES BEFORE COUNCIL (AS OF 11/7/18) NOVEMBER 13 WORK SESSION  2019 Fee Update o Review the Fee Working Team report and fee updates associated with Wet Utility fees, Development Review fees, and Step II of Capital Expansion Fees. High Performing Government - 7.1 Provide world-class services that meet the needs of the community.  Developing an Electric Scooter Regulatory Framework o Discuss with Council various options to create a regulatory framework for a successful electric scooter program implementation, including possible land traffic amendments. Transportation – 6.1 Improve safety for all modes of travel including vehicular, pedestrian and bicycle.  City Plan Scenarios o Recap of the City Plan scenarios phase and initial policy direction based on community involvement. Neighborhood Livability and Social Health – 1.5 Guide development compatible with community expectations through appropriate planning. High Performing Government - 7.5 Broaden methods of public engagement to reach all segments of the community by giving additional consideration to diverse backgrounds, languages and needs. NOVEMBER 20 COUNCIL MEETING  2019-20 Budget and Annual Appropriation Ordinance (2nd Reading) o Consider the annual appropriation ordinance and setting the City budget for a two-year period (2019-2020) which becomes the City’s financial plan for the next two fiscal years. High Performing Government - 7.1 Provide world-class services that meet the needs of the community.  Building Energy Scoring o Consider an Ordinance that establishes a reporting requirement for benchmarking, and transparency of building energy scores for large commercial and multi-family building owners. Environmental Health - 4.5 Work towards long term net zero energy goals within the community and the City organization using a systems approach.  Sign Code Update Phase 2 (consent) o Consider amendments to the Land Use Code specifically the sign section; to improve the overall legibility, address common requests, implement action items from the adopted Downtown Plan, and provide standards for new technology. These changes have been presented to Council work sessions as Phase 2 of the side code update. Community and Neighborhood Livability – 1.5 Guide development compatible with community expectations through appropriate planning, annexation, land use, historical preservation and development review processes.  Adopt the 2019 Legislative Policy Agenda o Consider and adopt the 2019 City of Fort Collins Legislative Policy Agenda. High Performing Government – 7.9 Proactively influence policy and legislative development on all levels.  Appropriate unanticipated revenues in the Light and Power Enterprise Fund o Appropriate unanticipated revenues in the Light and Power Enterprise Fund due to higher than anticipated energy sales to offset the higher than budgeted Purchase Power expense in 2018. Economic Health - 3.5 Maintain utility systems, services, infrastructure and predictable rates. CITY MANAGER’S UPDATE 5  Kechter Enclave Annexation Initiation o Initiate annexation and zoning proceedings for the Kechter Enclave Annexation. It is generally located at the southwest corner of East Trilby and Ziegler Roads. Neighborhood Livability & Social Health – 1.7 – Guide development through community planning, historic preservation, and efficient and effective development review.  Trilby Substation Annexation Initiation o Initiate annexation and zoning proceedings for the Trilby Substation Annexation. It is generally located at the southeast corner of West Trilby Road and South Shields Street. Neighborhood Livability & Social Health – 1.7 – Guide development through community planning, historic preservation, and efficient and effective development review.  Friendly Fire Annexation Initiation o Initiate annexation and zoning proceedings for the Friendly Fire Enclave Annexation. It is generally located north of Laporte Avenue between North Bryan Avenue and Grandview Avenue. Neighborhood Livability & Social Health – 1.7 – Guide development through community planning, historic preservation, and efficient and effective development review.  Strauss Cabin-Kechter Annexation Initiation o Initiate annexation and zoning proceedings for the Strauss Cabin-Kechter Annexation. It is generally located at the immediately north of the intersection of Kechter and Strauss Cabin Roads. Neighborhood Livability & Social Health – 1.7 – Guide development through community planning, historic preservation, and efficient and effective development review.  Staff Report: Income Qualified Assistance Program (IQAP) Review the success of the City’s Lean process for the IQAP application that resulted in a user-friendly and convenient enrollment for low-income customers.  Staff Report: 20 Year Anniversary Sprinkler Audit Program Review results and accomplishments of a program that engages customers towards water savings while sustaining landscapes. NOVEMBER 20 GID NO. 1  2019 Annual Appropriation Ordinance o Appropriate the 2019 budget for the General Improvement District No. 1. NOVEMBER 20 SKYVIEW GID  2019 Annual Appropriation Ordinance o Appropriate the 2019 budget for the Skyview General Improvement District No. 15. NOVEMBER 27 ADJOURNED MEETING  Brinkman Construction and Lamar Advertising Appeal o Consider an appeal of the Zoning Board of Appeals decision regarding Lamar’s sign at 216 N. College.. CITY MANAGER’S UPDATE 6 NOVEMBER 27 WORK SESSION  Meadow Springs Ranch Easement for the Roundhouse Renewable Energy Project o Provide Council with an opportunity to learn about the project team, process to select the proposed and alternative alignments, progress to date, next steps and ask any questions regarding the project. Environmental Health – 4.1 Achieve Climate Action Plan (CAP) 2020 goals and continue progress toward the 2030 goals. 4.8 – Project and enhance natural resources on City-owned properties and throughout the community. DECEMBER 4 COUNCIL MEETING  Design Compatibility and Character Land Use Code Amendments o Consider amendments to the Land Use Code to address the compatibility of new construction with existing built environment. Those efforts include improved design standards for downtown and within transition areas at the interface between downtown and the Old Town Neighborhoods. Community & Neighborhood High Performing Government – 1.5 Guide development compatible with community expectations through appropriate planning, annexation, land use, historical preservation and development review processes.  Historic Preservation Code Changes o Consider amendments to the Municipal and Land Use Codes pertaining to the preservation and management of designated and older historic properties and addressing compatible new construction. These amendments are the result of a comprehensive study undertaken in 2017- 2018. Neighborhood Livability & Social Health – 1.5 Guide development compatible with community expectations through appropriate planning, annexation, land use, historical preservation and development review processes.  Consideration of a proposed long term land lease agreement at the Northern Colorado Regional Airport o Approve land lease at the Northern Colorado Regional Airport. This is outside of the authority for the Airport Commission and requires formal approval by the City Councils of Fort Collins and Loveland. Economic Health – 3.1 Facilitate government and local partners to form an effective regional economic health group.  Marijuana Code Changes o Consider additional and amendments to the medical and retail marijuana code based on recent state legislative action. Safe Community – 5.2 Enhance our Police Services capability to foster public trust and create a safer community.  2019 Fee Update o Consider ordinance associated with Wet Utility fees, Development Review fees and Step II of Capital Expansion Fees. High Performing Government – 7.1 Provide world-class services that meet the needs of the community.  2019 City Classified Employee Pay Plan o Recommend the 2019 City Classified Employee Pay Plan. High Performing Government - 7.4 Provide world-class services that meet the needs of the community. CITY MANAGER’S UPDATE 7  New Fort Collins Stormwater Criteria Manual and Low Impact Development (LID) Implementation Manual o Replace previously adopted “Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual” with an updated format to a stand-alone manual that incorporates all key design requirements and will more effectively communicate the criteria specific for Fort Collins and its GMA. The LID manual will aid in improving current LID practices in Fort Collins and help streamline compliance with City regulations. This LID Implementation Manual will become a technical addendum to the Storm water Criteria Manual. Safe Community – 5.5 Protect life and property with natural and attractive flood mitigation facilities.  Items in connection with lease financing the Prospect/I-25 Interchange and joint venture Police Training Facility projects o Authorize the financing and appropriation of the Prospect/I-25 Interchange and joint venture Police Training Facility projects. The City Manager’s Recommended Budget includes estimated lease payments for 2019-2020 in connection with this anticipated financing. Transportation – 6.4 Support, enhance and accelerate I-25 improvements according to the multi-modal environmental impact statement. Safe Community – 5.2 Meet the expected level of core and specialized police services as the community grows.  Adoption of the 2018 International Building Code, International Residential Code, International Mechanical Code, International Fuel Gas Code, International Energy Conservation Code, International Existing Building Code, International Pool and Spa Code, International Property Maintenance Code o Establish the minimum construction requirements to safeguard the public health, safety and general welfare by regulating structural strength and stability, sanitation, light and ventilation, energy conservation, and property protection from hazards attributed to the built environment within the City of Fort Collins. Neighborhood Livability & Social Health – 1.7 – Guide development through community planning, historic preservation, and efficient and effective development review.  Set Public Hearing for Adoption of an Urban Renewal Plan Area in the Vicinity of Drake and College o Set the date of the Public Hearing and provide notice to consider adoption of a proposed Urban Renewal Plan Area. Economic Health – 3.4 Foster infill and redevelopment that enhances the community.  Staff Report: Open Streets o Provide a summary of the past five years of Open Streets events in Fort Collins and update City Council on the next steps regarding this initiative. Transportation 6.2 Manage traffic congestion and improve high-priority intersections Transportation 6.1 Improve safety for all modes of travel. DECEMBER 11 WORK SESSION  Regional Wasteshed Project Update o Review draft intergovernmental agreement outlining solid waste infrastructure and policy commitments between Larimer County and Fort Collins, which would formalize recommendations of the North Front Range Wasteshed Coalition for increasing diversion of construction debris and organic material. Economic Health –4.5 Achieve the 2020 Road to Zero Waste goals and work toward 2030 zero waste goals.  Keep Fort Collins Great (KFCG) Sunset-Funding Consideration o Continue discussion regarding the sunset of Keep Fort Collins Great tax, desired level of service, and funding options. CITY MANAGER’S UPDATE 8 High Performing Government – 1.7 Provide world-class services that meet the needs of the community.  Natural Areas Acquisition Policy and potential cost sharing principles and/or guidelines o Review the City’s Natural Areas Acquisition Policy, compare it to other communities, and discuss possible process improvements. Also to be discussed is possible cost-sharing principles and/or guidelines with respect to collaborative transactions with Larimer County Open Lands. Environmental Health – 4.10 Expand the Natural Areas land portfolio while simultaneously maintaining existing lands and access to nature. PUBLIC ENGAGEMENT – UPCOMING EVENTS  FoCoCreates Public Engagement Closes Nov. 9 – All public feedback will be compiled and reviewed by the consultant and project leads to create a next draft of the plan. See the updated project and put art on the map at https://ourcity.fcgov.com/fococreates  Montava Development Staff Review on Nov. 14 – The project was added to OurCity and staff will deliver comments to the applicant based on their first-round submittal and community feedback.  CityGives United Way Campaign Closes Nov. 9 – 14 ambassadors have helped staff from their department and across the City participate in events, learn more about United Way and volunteer for Make a Difference Day. Staff also arranged a Burrito Bar Fiesta, a Silent Auction and several other events to help raise funds.  Community Survey Opt-in Version Closes Nov. 11 – The statistical valid survey conducted through the National Research Center is accompanied by an online, opt-in version for the first time. This helped create more robust outreach for the survey, education about how it is used and offer everyone the chance to participate. The opt-in version is available in English and Spanish at https://www.surveygizmo.com/s3/4585676/2018-Fort-Collins-CO-Community-Survey-Opt-in MONTHLY & YEAR TO DATE SEPTEMBER SUMMARY OVER PRIOR YEAR Month Year to Date Net Sales Tax Collected: 2.5% 4.1% Net Use Tax Collected: -7.0% -15.8% Net Sales and Use Tax Collected: 1.2% 0.6% Year to date, sales and use tax collections excluding rebates are up 0.6% and total $102.5M. SEPTEMBER SUMMARY OVER BUDGET Month Year to Date Net Sales Tax Collected: 0.3% 1.7% Net Use Tax Collected: -17.0% -6.4% Net Sales and Use Tax Collected: -2.4% 0.4% Year to date, the City has collected 0.4% more sales and use tax revenue, totaling $385K over budget. CITY MANAGER’S UPDATE 9 Capital Projects (CP) – Updates are indicated in bold CP- ENGINEERING CITYWIDE PEDESTRIAN ACCESS PROJECT Funding Source: Community Capital Improvement Program (CCIP) Estimated Project Budget: 2018 - $1.1M Estimated Completion Date: Ongoing Phase: Construction Project Details: This project maintains a complete City sidewalk inventory, identifies sidewalk inadequacies, and develops a prioritized work program to achieve goals of promoting walking for transportation and recreation. Project Status:  Upcoming project locations: Minor sidewalk repairs and reviewing 2019 project locations.  Current projects: No Projects at this time More information is available at http://www.fcgov.com/engineering/pedneeds.php SUNIGA ROAD IMPROVEMENTS – COLLEGE AVE. TO BLONDEL STREET Funding Source: 2017 / 2018 BFO, COFC Utilities, Transportation Capital Expansion Fee (TCEF), Developer Contributions Estimated Project Budget: $3.7M Estimated Completion Date: Spring 2019 Phase: Right-of-Way Negotiations Project Details: Design and construction of a new arterial roadway that connects existing Suniga Road, from Blondel St. to College Avenue. Project Status:  Final design is complete, and the project is ready to bid; remaining parcel has been petitioned through the courts for acquisition. More information is available at https://www.fcgov.com/engineering/suniga-to-college-improvements CITY MANAGER’S UPDATE 10 DOWNTOWN RIVER DISTRICT IMPROVEMENTS Funding Source: Federal Grants, Community Capital Improvement Program (CCIP), Developer Contributions, DDA Funds Estimated Project Budget: $1.4M for Jefferson Street (Design and right-of- way), $3.8M for Willow Street Estimated Completion Date: Jefferson 2023, Willow 2019 Phase: Jefferson – Right-of-way acquisition Willow – Final Design Project Details: The goals of this project are to provide various design and construction improvements within the Downtown River District. The project’s current focus is acquiring right of way and easements for planned improvements along Jefferson Street between College Avenue and the Mountain/Lincoln Intersection. The project is also designing roadway and urban design improvements along Willow Street between College Avenue and Linden Street; including a pedestrian plaza at the northern corner of Willow Street and Linden Street. Project Status:  Staff received and reviewed a preliminary level planset and cost estimate for the Willow Street Improvements Project in October. Final plans are anticipated in early 2019.  Current Jefferson funding is $1.4M. Staff will continue to refine the construction estimate as the project moves forward. The current overall project estimate is currently in the range of $10M - $12M.  Staff has prioritized property acquisition along Jefferson Street which matches the project’s available federal funding. Staff plans to begin the acquisition phase in December 2018. NORTH COLLEGE IMPROVEMENTS – CANAL TO STATE HIGHWAY 1 Funding Source: Federal Grants, URA Contribution, Pedestrian Program Funds, County Funds, Transportation Capital Expansion Fee (TCEF), Developer Contributions Estimated Project Budget: $2.35M Estimated Completion Date: Winter 2018/Spring 2019 Phase: Utility Relocations Project Details: This project will construct pedestrian improvements along North College between the Larimer & Weld Canal (City limits) and State Highway 1, including pedestrian bridges crossing the canal. Project Status:  Utility relocations are occurring, and CDOT started this phase of roadway work.  Final design is complete, and the project is ready to bid for construction. City staff is coordinating with CDOT to advertise the City’s project at the optimal time. More information is available at fcgov.com/engineering/ncollege.php CITY MANAGER’S UPDATE 11 HORSETOOTH AND COLLEGE INTERSECTION IMPROVEMENTS Funding Sources: 2017/2018 BFO, Federal Grants, Bridge Program Funds, Transportation Capital Expansion Fee (TCEF), Community Capital Improvement Program (CCIP – Arterial Intersection) Estimated Project Budget: $7.5 M Estimated Completion Date: November 16, 2018 Phase: Construction Project Details: This project will construct intersection improvements to address safety and congestion problems. Issues were identified in the Arterial Intersection Prioritization Study, completed in 2011. Project Status:  The intersection is fully open to all traffic, with major intersection reconstruction work and bridge work complete.  Construction will continue through early November with daily lane closures and night work for final paving and median work in College Avenue.  Final landscaping and urban design elements have begun to be installed. More information is available at fcgov.com/horsetoothandcollege/ VINE AND LEMAY BNSF IMPROVEMENTS Funding Source: Keep Fort Collins Great (KFCG), Transportation Capital Expansion Fee (TCEF), 2017 / 2018 BFO Estimated Project Budget: $22M ($12M currently allocated) Estimated Completion Date: Spring 2021 Phase: In Design Project Details: The existing Vine and Lemay intersection, which includes the Burlington Northern Santa Fe (BNSF) Railway crossing, is severely congested with limited options to expand through or turn lane capacity due to land use constraints. Project Status:  No updates this month More information is available at fcgov.com/engineering/vine-lemay CITY MANAGER’S UPDATE 12 SHARP POINT/NANCY GRAY CONNECTION Funding Source: Transportation Capital Expansion Fee (TCEF), 2015/2016 BFO, Developer Contributions Estimated Project Budget: $1.2M Estimated Completion Date: Spring 2019 Phase: Railroad Coordination Project Details: The City Master Street Plan identifies Sharp Point Drive and Nancy Gray Avenue as connected across the Great Western Railroad tracks. This project will construct the roadway and pedestrian connection, and railroad crossing. Project Status:  The City and Great Western have executed a settlement agreement for the proposed at-grade crossing. The Colorado Public Utilities Commission has approved the new crossing. The settlement agreement states that Great Western will begin the railroad crossing construction in 2018 and complete their work in early 2019.  City Staff are exploring the possibility of getting a quiet zone designation for this crossing.  The roadway construction is expected to be complete in the second quarter of 2019. More information is available at fcgov.com/engineering/sharppoint RIVERSIDE BRIDGE REPLACEMENT Funding Source: Federal Grants and Bridge Program Funds Estimated Project Budget: $4.3M Estimated Completion Date: December 2018 Phase: Under Construction Project Details: The project will replace the structurally deficient bridge over Spring Creek and raise Riverside Avenue out of the 100 years flood level at the bridge location. This project is coordinated with Utility’s Spring Creek Restoration Project. Project Status:  Construction began on September 17 with a 6-week full closure of Riverside Avenue beginning on October 13.  Additional outreach will be ongoing throughout construction CITY MANAGER’S UPDATE 13 POWER TRAIL AND HARMONY ROAD GRADE SEPARATED CROSSING Funding Source: Federal Grant, Community Capital Improvement Program (CCIP - Bike / Pedestrian Grade Separated Crossings) Estimated Project Budget: $5M - $8M Estimated Completion Date: 2020-2021 Phase: Alternatives Analysis – Conceptual Design Project Details: The Power Trail provides connectivity between the Spring Creek Trail to the north and the Fossil Creek Trail to the south. The Trail currently has a gap approximately three-quarters of a mile long north and south of Harmony Road. The detour route requires users to cross Harmony Road at grade at McMurry. This project will design, acquire property interests, and construct a trail grade separated crossing at Harmony Road as well as the trail connections on either side. Project Status:  The initial phase of the design contract is a feasibility study and alternatives analysis for different project alternatives.  Design team is developing conceptual level alternatives for the alternatives analysis phase.  Current funding is $1.9M. Staff has submitted a BFO offer to request additional funding. More information is available at https://www.fcgov.com/engineering/powertrailcrossing TIMBERLINE ROAD CORRIDOR PROJECT Funding Source: Transportation Capital Expansion Fee (TCEF), Developer Contribution, Federal Grant Estimated Project Budget: $6.5M Estimated Completion Date: 2020 - 2021 Phase: Drafting the Request for Proposal (RFP) Project Details: This project will reconstruct South Timberline Road from Stetson Creek Drive to Trilby Road to the City’s four lane arterial roadway standards. Planned improvements include; intersection improvements at Kechter Road, Zephyr Road, and Trilby Road, multi-modal accommodations, raised medians, access control, landscaping improvements, and roadway improvements. This project serves to build upon the development improvements that have been completed along the corridor. This project will improve safety, reduce congestion, and provide improved accommodations for alternate travel modes. Project Status:  No updates this month CITY MANAGER’S UPDATE 14 DRAKE ROAD RAILROAD CROSSING REPLACEMENT Funding Source: Railroad Crossing Replacement and Maintenance (BNSF railroad) Estimated Project Budget: $96K (City’s share) Estimated Completion Date: November 28, 2018 Phase: Pre-construction Project Details: The Burlington Northern Santa Fe (BNSF) railroad crossing on Drake Road is deteriorated and the tracks needs imminent replacement, creating an unsafe condition for vehicles and trains. Project Update:  BNSF is working with City staff on a closure during the last week of November to replace the railroad crossing.  The Drake Road crossing is planned to be closed for three days, beginning Monday, November 26.  A detour route will be advertised in advance of the closure via press release and social media, which will include S. College Ave., Horsetooth Rd, Shields St, and Prospect Rd. Additionally, City traffic crews will make use of Variable Message Boards to alert traffic in advance of the closure. There are no anticipated impacts to Horsetooth Road as the Horsetooth and College intersection project will be completed by the time we begin this project. CP - PARK PLANNING & DEVELOPMENT FOSSIL CREEK TRAIL – SHIELDS TO COLLEGE Funding Source: ConTrust Fund, GOCO grant Total Project Cost: $5M Phase: Under Construction Estimated Completion Date: Fall 2018 Project Details: Construction is underway on the Fossil Creek Trail between Shields Street and College Avenue, and is anticipated to be complete fall, 2018. This trail will provide an important east/west connection between College Avenue and Shields Street under the BNSF railroad. The trail will also connect with the Long View Trail, which opened in August. Project Status:  3 bridges over Fossil Creek have been installed  Construction is underway for section of trail along Fossil Creek Drive CITY MANAGER’S UPDATE 15 CRESCENT PARK Funding Source: Neighborhood Parkland Fund Total Project Cost: $2.5M Phase: Under Construction Estimated Completion Date: Fall 2018 Project Details: Crescent Park is a 7-acre neighborhood park located in the heart of the Maple Hill neighborhood. Construction of the park began in fall, 2017, and is anticipated to be completed later this season. The core area of the park, which includes the playground and shelter, opened to residents at the beginning of March, and will remain open year-round. Project Status:  The restroom for the park has been closed for the season  Construction for the Park’s operation and maintenance facility will begin when final permit is approved  Construction for maintenance facility is anticipated to be complete by the end of the year. POUDRE RIVER WHITEWATER PARK Funding Source: CCIP, BOB 2, General Fund, Private/Public Donations, Natural Areas, Stormwater, URA, Park Planning & Development Total Project Cost: $11.5M Phase: Under Construction Estimated Completion: 2019 Project Details: The Poudre River Whitewater Park project has been a collaborative effort between multiple City departments, local advocates, and the philanthropic community. The project is estimated to be complete in summer, 2019. Project Status:  Removal of old concrete building pads from the future park site  Tree removal and pruning along the river  Dewatering of a section of the river using sheet pile has begun CITY MANAGER’S UPDATE 16 CP - OPERATION SERVICES GARDENS ON SPRING CREEK – GARDEN EXPANSION Funding Sources: $2.1M Privately Raised Funds $900K General Funds Total Project Cost: $3.0 M Phase: Project Close-out Estimated Completion Date: Fall 2018 Project Details: Garden on Spring Creek Garden Expansion is expanding the Gardens to add five acres to the north. This will include an amphitheater with a great-lawn for outdoor performances, several arbors and many added garden areas for the public to explore and enjoy. Project Status:  Gardens staff installing their landscaping and plantings  Continue to work through resolution for cracks in sound-absorbing walls  Will be processing final change order and then final payment in coming months GARDENS ON SPRING CREEK – VISITOR’S EXPANSION Funding Sources: Building on Basic (BOB) II - $2.2M Privately Raised Funds: $700K Total Project Cost: $2,900,000 Phase: Construction Documents Estimated Completion Date: Late Fall 2019 Project Details: The Gardens on Spring Creek Visitor Center Expansion is adding approximately 4500 SF. This includes a conservatory which will incorporate a butterfly pavilion, extra meeting rooms, additional office spaces, and Solar PV to offset the additional energy usage. Project Status:  Design is to finish up in November and will follow up with submitting for a permit  Contracted for 53 KW Solar PV system to offset much of the buildings energy use  Establishing the contract Guaranteed Maximum Price (GMP) in January with plans of starting construction in 1st Quarter 2019 Rendering of Expansion Great Lawn at The Gardens CITY MANAGER’S UPDATE 17 FORT COLLINS/LOVELAND POLICE TRAINING CENTER Funding Sources: $9.25M generated from bonds for the City of Fort Collins $9.25M from City of Loveland Total Project Cost: $18.5M Phase: Design Development Estimated Completion Date: Early 2020 Project Details: The City of Fort Collins is partnering with The City of Loveland to construct a new Police training facility which will be located on the west side of the Loveland Airport. This new site will offer a 50- yard pistol range, a 1.4-mile driving track, concrete skid pad, and some classrooms for special training. Project Status:  The project design has been on hold recently with LEED Certification discussions  The project team is discussing bringing on a contractor using a Construction-Manager-at-Risk (CMaR) contract to help with cost estimating during design and then later manage the construction phase  Loveland has postponed their grant application because the IGA needs to be in place before it can be reviewed  Plan is to take the project to Fort Collins City Council in December for approval of funds for construction CP – UTILITIES EAST HARMONY DUCT BANK Funding Source: Development Fees Estimated Project Budget: $4,000,000 Phase: Estimated Completion Date: End of 2018 Project Details: Three Phase Project: Phase 1, the Substation Phase. Phase 2, installation of the duct bank between the substation and Ziegler Rd. is complete. Phase 3, installation of the duct bank between Ziegler Rd. and Strauss Cabin Rd. is complete. Project Status: No updates this month  Phase 1 in construction  Phases 2 and 3 are complete Current SD Site Plan (Red) is future phases Current SD Site Plan (Red) is future phases Vault Installation CITY MANAGER’S UPDATE 18 HP BROADCOM CIRCUITS Funding Source: Development Fees Estimated Project Budget: $500,000 Phase: In Design Project Details: Installation of approximately 1,200 feet of duct bank on Broadcom property to add capacity and facilitate separately metering several buildings on the site. Project Status:  All conduit, cable and vaults have been installed  An outage was scheduled for Friday, Nov 2nd to complete the transfer separating Building 5 from the HPE campus. WATER TREATMENT FACILITY Funding Source: Water Treatment Facility Capital Project Budget Estimated Project Budget: $850,000 Phase: In Design Project Details: Approximately 7,300 feet of three-phase from Overland Trail to the Treatment Facility in an existing easement on Colorado State University property Project Status:  Work on the north part of the project including boring beneath the driveway to the National Wildlife Research Center, crossing LaPorte Avenue and completing conduit installation along Laporte Avenue to the Water Treatment Facility metering equipment has been completed.  L&P crews shifted to the south side of the project and began conduit and vault installation along Overland Trail and Rampart Rd the week of October 8, 2018. Trenching and vault installation along Rampart Rd is 95% complete.  The bison herd has been moved. Trenching along the service road, including a small portion through the bison pen, is scheduled for the week of November 5, 2018.  The primary metering cabinet has arrived at the Treatment Facility. Facility staff will order the basement to accompany the cabinet.  Cable installation is scheduled beginning the week of November 11, 2018, with a targeted completion date of November 30, 2018. Hewlett-Packard Campus Water Treatment Facility CITY MANAGER’S UPDATE 19 HARMONY DUCT BANK – HARMONY SUBSTATION PROJECT Funding Source: Development Fees Estimated Project Budget: $214,590.00 Phase: Preliminary Construction Project Details: Five new duct banks for additional capacity at the Harmony substation Project Status:  Final grading completed.  (3) 8 x 16 vaults have been set and tied into the Harmony duct banks  Construction of all duct banks completed from substation to new 8 x 16 vaults.  True grid, irrigation system installed. New tree planting completed.  Hydro seeding was completed the week of October 8, 2018.  Drive to be resurfaced with reclaimed asphalt mix. LIGHT & POWER GENESIS64 SCADA UPGRADE PROJECT Funding Source: New Capital Estimated Project Budget: $200,000 Phase: In Design Project Details: Convert the existing Iconics Genesis32 hardware, software and screens to Genesis64 Project Status: No updates this month  All Iconics Genesis64 software has been installed on the new SCADA servers  The ESCADA team and IT are working together on creating secure user accounts and domains for the new ESCADA system  The ESCADA team is currently working on configuring the new OPC server (Kepserver) and attempting to communicate with field devices Duct Bank SCADA System CITY MANAGER’S UPDATE 20 WATER TREATMENT FACILITY MICROHYDRO PROJECT Funding Source: Water Estimated Project Budget: $715,000 Status: In Design Estimated Completion Date: 1st Quarter 2019 Project Details: The City of Fort Collins receives its raw water from the Poudre River and Horsetooth Reservoir. Due to the elevation differences between the plant and the sources, pressure dissipating valves on site reduce the energy of the water. The micro hydropower project will develop the hydroelectric potential from the raw water supply from Horsetooth Reservoir. Project Status:  Fiber pre-work installation  Cored pipe penetrations in Horsetooth dissipator vault ceiling OXBOW LEVEE IMPROVMENTS Funding Source: Stormwater Estimated Project Budget: $1,095,955 Status: In Design Estimated Completion Date: April 1, 2019 Project Details: The project components include excavation of a flow conveyance channel in the left Poudre River overbank, additional fill placement, and trail reconstruction along the Oxbow Levee, coordination with the U.S. Army Corps of Engineers, and permitting for FEMA Conditional/Letters of Map Revision to document the post-construction effective 100-year water elevations and floodplain boundary. Project Status:  CLOMR approval received from FEMA - completed  Approval from U.S. Army Corps of Engineers - completed  Project is under indefinite delay waiting for additional funding from BFO 2019-2020 IT and ICE design of electrical and communication systems Oxbow Levee certification mapping CITY MANAGER’S UPDATE 21 MAGNOLIA STREET OUTFALL Funding Source: Stormwater Estimated Project Budget: $480,000 Status: In Design, construction 2024 Estimated Completion Date: TBD Project Details: The Magnolia Street Outfall Project is a large diameter storm sewer outfall into the Poudre River. The current alignment runs west along Magnolia Street to Shields Street. Pipe diameters range from 60” up to 132”. Construction methods include open cut with the potential for tunneling under Riverside Avenue, College Avenue, Mason Street, and Mulberry Street. Project Status:  Memo to City Council - December/January  City Council work session - February/March MAIL CREEK IMPROVEMENTS AT MEADOW PASSWAY Funding Source: Stormwater Estimated Project Budget: $1,400,000 Status: In Design Estimated Completion Date: April 1, 2020 Project Details: The Mail Creek stream reach is within an urbanized corridor and is experiencing severe bed and bank erosion. Improvements will include stabilizing the creek bed and banks through a combination of bio-engineered designs, re-grading and re-vegetation. The Mail Creek reach will require dedication of easements from property owners to construct and maintain the improvements. Project Status:  Floodplain modeling  Easement and access discussions with HOA  Construction means and methods Flooding at the Lincoln Center May 22, 2018 Severe bank erosion CITY MANAGER’S UPDATE 22 DWRF CO-GENERATION PROJECT Funding Source: Wastewater Estimated Project Budget: $3,900,000 Status: In Design Estimated Completion Date: Unknown Project Details: This project includes the installation of two 440kW biogas-fueled generator sets, a gas conditioning system, and electrical and mechanical modifications to incorporate these combined heat and power (CHP) generator sets into the digester sludge heating loop and the plant power grid. Electrical power generated by these improvements will be utilized onsite to offset plant power requirements. Project Status:  Held project team meeting to discuss work necessary to revise design if BFO offer is approved  Once BFO offer is approved, begin work on procurement of gas conditioning and switchgear MULBERRY/RIVERSIDE DRAINAGE IMPROVEMENTS Funding Source: Stormwater Estimated Project Budget: $2,362,156 Status: In Construction Estimated Completion Date: December 2018 Project Details: The purpose of this drainage improvement project is to provide a new storm sewer and inlets to address localized drainage problems and reduce the effects of flood potential in the area during major storms. It is funded by the City of Fort Collins, State of Colorado and the Federal Emergency Management Agency (FEMA) as part of the federal Hazard Mitigation Grant Program (HMGP). Drainage improvement work will be coordinated with a water line replacement project along Cowan and Myrtle Streets. City crews will install a new 6-inch waterline to replace the existing 4-inch line in Cowan and East Myrtle Streets. Pipeline construction will begin in March and continue through spring 2018. Project Status:  Asphalt paving on Cowan/Myrtle - complete  Landscape restoration on Cowan/Myrtle - complete  Outfall improvements at the Springer Natural Area - on-going Revised site plan with 2 genset locations and programmed backup genset location Final paving at Cowan/Myrtle intersection CITY MANAGER’S UPDATE 23 DWRF SIDESTREAM TREATMENT Funding Source: Wastewater Estimated Project Budget: $4,300,000 Status: In Design Estimated Completion Date: 2019 Project Details: This project is the design and installation of a wastewater sidestream treatment system to meet future nutrient (nitrogen and phosphorous) regulations. The recycle stream from biosolids dewatering carries high nutrient concentrations back to the main stream treatment system. Sidestream treatment will remove nutrients from the recycle stream, which can potentially be turned into fertilizer and reused. Project Status:  Completed sludge feed pump system design  Continue site work layouts and additional potholing  Continue work on building structural and layout design CATHODIC PROTECTION FOR ANHEUSER-BUSCH WATER LINE Funding Source: Water Estimated Project Budget: $2,280,000 Status: In Design Estimated Completion Date: 3rd Quarter 2019 Project Details: The Anheuser Busch water line cathodic protection project is part of the Utilities Cathodic Protection Program. This AB water line project entails design and installation of a cathodic protection rectification system. This CP system will mitigate and prevent further corrosion on the bar-wrapped concrete cylinder pipe which supplies finished water from the Water Treatment Facility to Anheuser Busch. Project Status:  Met with Light and Power on power supply and communication connection  60% drawings submittal late November 2018  Determine remote monitoring units, radio – communication Plan view of latest proposal of Sidestream process Pipe joint cathodic protection test wires CITY MANAGER’S UPDATE 24 CP-TRANSFORT AND PARKING SERVICES PARKING STRUCTURES AND ON-STREET PARKING Funding Source: General Fund and Parking Reserves Estimated Project Budget: $1.2M Estimated Completion Date: November 2018 Phase: Planning and Construction Project Details: Parking sensors will provide real time parking availability information to the parking public via the FC Parking App and will provide valuable occupancy and turnover data to assist with parking management. Project Status:  Between September 10 and early November, sensors will be installed in over 3,000 on-street parking spaces in Downtown. As of November 1, Phase 1 - 5 are complete (see map).  Staff is working closely with CPIO, Utilities, Streets, Traffic, DDA, and DBA to coordinate and communicate the 24-hour rolling closures occurring during sensor installation and 100+ parking spaces in Civic Center Parking Structure. According to average occupancy, there should be plenty of parking for everyone. Timing ensures the project is completed with the least disruption to businesses and visitors.  New pre-pay technology (same as Firehouse Alley) and sensors are being installed in Old Town and Civic Center Parking Structures. Work is expected to be complete in mid-November with a tentative “go-live” date of January 2. PUBLIC SAFETY POUDRE FIRE AUTHORITY 218 Whedbee Fire On October 28, 2018 PFA rescued three people from the roof and two people inside of a house on fire at 218 Whedbee Street. A working smoke detector alerted occupants of the residence, and thankfully no one was injured. The cause of the fire has been determined to be improperly discarded cigarettes. October 24, 2018 Fatal Fire Poudre Fire Authority and Fort Collins Police officers responded to a structure fire at 3219 Sumac Street, west of Overland Trail. Two parties were reported as injured, and a third person was found deceased in the home. One firefighter sustained a leg injury during the initial response to the fire. Firefighters rescued a dog and two turtles. PFA’s Customer Assistance Response Team responded to help displaced residents; approximately 30 people were displaced due to the fire. PFA and Fort Collins police are working in close partnership to conduct a joint investigation. CITY MANAGER’S UPDATE 25 PFA Hiring Process Poudre Fire Authority is hiring firefighters and will be accepting test scores from the National Testing Network (NTN) from October 1, 2018 to January 31, 2019. Interviews will be conducted in April and May of 2019. Community Lifesaving Award On September 9, 2018, PFA’s Engine 1 was dispatched to New Belgium Brewing Company on a report that an adult man was in cardiac arrest. Firefighters arrived on scene to find New Belgium employees waving them into the physical location; this protocol was outstanding and noteworthy. According to witnesses, a group of people immediately initiated Cardio Pulmonary Resuscitation (CPR) and called 9- 1-1. The group performed CPR and shocked the patient one time when prompted by the Automatic External Defibrillator (AED). By performing effective CPR with a proper rotation of volunteers, the patient regained consciousness. Poudre Fire Authority firefighters were proud to bestow upon Christine Glor, David Glor, Nick Ampe, Brian Callahan, Marc Leblond, Bryan Febel, Kristen Coley, and Tracey Callahan its prestigious Community Lifesaving Award on October 2, 2018. PulsePoint Update The life-saving app, PulsePoint, will soon be available to the communities served by not only PFA, but also five additional agencies in Larimer County, thanks to strong partnerships among the agencies and with the Larimer Emergency Telephone Authority (LETA). This free app is available for download on Apple and Android devices at https://www.pulsepoint.org/download. Not only does the app give people access to see, in real-time, the calls to which selected agency’s units are dispatched, but most importantly, it sends app users notifications when CPR is needed in a public place near their location. 38th Metro Fire Planners Conference Poudre Fire Authority hosted the 38th Metro Fire Planners Conference at the Elizabeth Hotel in Fort Collins from October 1 to October 3, 2018. This annual forum for fire and EMS professionals from the U.S. and Canada provides opportunities to share best practices, seek ideas on challenges, offer innovative ideas, solutions, and methodologies. POLICE SERVICES Drug Take-Back Day On October 27 from 10 a.m. to noon, Fort Collins Police held a drive-through drug takeback event at the police department. Residents stopped by to safely dispose of unwanted prescription and over-the- counter drugs. Over 130 vehicles came through, dropping off what amounted to 10 bags or 208 pounds of medication. Residents can always stop by the FCPS main lobby to drop off medications during business hours. Community Engagement Coffee with a Cop – On October 3, officers gathered at Lamar’s Donuts to celebrate National Coffee with a Cop Day with residents. Community Barbecue - FCPS and La Familia co-hosted a community barbecue in Soft Gold Park. FCPS has been working with La Familia to better connect with immigrant families, hear their stories, and gain a better understanding of their concerns and fears about law enforcement. Our agency is here to serve everyone in this community, and if someone needs help, we want them to feel comfortable contacting us. Spanish Tour – In October, members of the Spanish team conducted a tour of the police department for families. The event was led completely in Spanish and included a guided walk through the FCPS CITY MANAGER’S UPDATE 26 building, demos by K9 and SWAT officers, a Q&A with Dispatchers. Our visitors also got a chance to speak with Chief Swoboda and happened to cross paths with City Manager Atteberry along the way! Families gave very positive feedback, and a second tour is planned for November. Incidents of Note Blue Leaf Court Homicide - On October 2, 2018 at 12:42 a.m., Dispatch received a report of a shooting in the 3000 block of Blue Leaf Court. Officers responded to the residence and located a deceased adult male, identified by the Larimer County Coroner as Greg Baker, 60, of Fort Collins. Police arrested Nancy Baker, 63, of Fort Collins, at the scene without incident. She was arrested on charges of First Degree Murder and Domestic Violence and booked into the Larimer County Jail. College/Mason Fatal Collision - On October 6, police were notified of an injury collision at the intersection of South College Avenue and Mason Street involving a motorcycle and SUV. The 68-year- old driver of the Escape sustained minor injuries from the collision. The 42-year-old driver of the motorcycle was transported to Medical Center of the Rockies for treatment of serious injuries. A 37- year-old female passenger on the motorcycle was also transported to Medical Center of the Rockies where she died from her injuries. Mason/Magnolia Injury Collision - On October 15, police responded to collision involving a car and a Transfort bus at the intersection of Mason and Magnolia Streets. A Nissan Altima sedan was traveling west on Magnolia Street and stopped for a stop sign at Mason Street. As the sedan crossed the intersection westbound, the passenger side was broadsided by a City of Fort Collins Transfort bus traveling south on Mason Street. The bus did not have a stop sign. The driver of the bus and his four passengers were not injured. The driver of the sedan suffered minor injuries. The front seat passenger of the sedan was extricated from the vehicle and transported to Medical Center of the Rockies for treatment of moderate injuries. Police do not believe speed, alcohol or distraction contributed to the collision. The investigation is continuing, and charges are pending. Social Media FCPS has started sharing farewell posts when agency employees retire. The community response has been extremely positive, as evidenced by the high number of post engagements and multitude of comments from residents wishing the outgoing officers well. Halloween activities can pose safety risks, so in order to ensure a safe, fun holiday for our residents, the agency shared several light-hearted posts reminding people to celebrate responsibly. These posts CITY MANAGER’S UPDATE 27 were met with a very positive response, high reach, and a significant number of shares. PLANNING, DEVELOPMENT &TRANSPORTATION BUILDING SERVICES AND PLANNING City Plan Multiple small group meetings have been and continue to be held by local Plan Ambassadors and Community Partners. A video providing an overview of the Scenario phase has been released. A recap of the City Plan scenarios phase and initial policy development will be shared with City Council at its November 13th Work Session. Sign Code Amendments First Reading of the adoption ordinance is scheduled for Nov 20th. This ordinance does not include the electronic billboard regulations. Changes related to electronic billboards will follow a separate timeline, with additional research and outreach conducted before that portion of the code is considered by Council. PUD Master Plan Applications One Planned Unit Development (PUD) Master Plan application was submitted during the month of October (Montava development project). This is the first development application to be reviewed under the recently adopted PUD ordinance. Montava Development Project The Montava PUD Master Plan was submitted to the City on October 24 for City staff review. CITY MANAGER’S UPDATE 28 NEIGHBORHOOD SERVICES CSU Game Day Neighborhood Services and Code Compliance staff serve as neighborhood ambassadors in the neighborhoods around CSU campus 2 hours prior to kick-off at all home games to assist residents & game attendees navigate issues such as; party noise/behavior, RP3 parking questions, stadium clear- bag policy, parking on yard ordinance and enforcement and any other resident concerns/questions. To date: • A total of 257 contacts have been made. • Twenty-five parking violations were corrected, and 4 citations issued. Short-term Rental Code Compliance is actively reviewing 4 properties that will potentially receive enforcement action for operating without an approved license. One property came into compliance prior to a citation being issued. Shovel Showdown Event at CSU On October 3rd Neighborhood Services Code Compliance team and Off-Campus Life staff at Colorado State University hosted an educational event called Shovel Snowdown and gave away 417 free snow shovels on the Lory Student Center Plaza. CSU Students were provided with a free snow shovel as well as education about the City’s snow ordinance. Education focused on the 24-hour timeline, being a good neighbor and the Adopt-a-Neighbor Program. Alta Vista Neighborhood Outreach During the month of October, Neighborhood Services staff partnered with Utilities Light & Power staff to make door-to-door visits throughout the Alta Vista neighborhood. Neighborhood Services staff provided an informational flyer on City resources, services, and upcoming projects in the neighborhood. Recent feedback from the neighbors reflected concerns about the number of neighborhood meetings hosted by the City over the summer and confusion about direct sources for City-related information. The informational flyers were created through collaboration among 10 City departments to address these concerns. This effort to distribute the flyers coincided with Utilities Light & Power timeline to assess potential need and location of new street lights. Partnering with Utilities to distribute flyers and engage neighbors through discussions at their homes provided opportunities to gather feedback on several projects, address neighborhood safety, and build direct relationships with Alta Vista residents. Neighborhood Services continues to work with CPIO to integrate all City-related community engagement needs into strategic contact opportunities with the Alta Vista neighbors to maximize each interaction. Citizen Planning Academy The second annual City Planning Academy is currently accepting applications. The four-week academy is an opportunity for community members to learn more about the management of development in the City of Fort Collins, including its history and the evolution of policies that helped shape the community over time. Participants take a close look at the development review process and opportunities for public participation in decision making. The 2018 City Planning Academy is expected to have 25 participants. Home Makeover: Neighborhood CAP Edition Home Makeover – Neighborhood CAP Edition project was awarded $9,775 in Innovate Fort Collins Challenge funds to create one-day event in early November to connect neighbors with each other and City departments through sustainability measures and social activities. The “Home Makeovers” will take place throughout Hickory Village Mobile Home Park with residents sweeping through their neighborhood installing LED lightbulbs, door sweeps, and porchlight timers, as well as providing household recycling bins and guides to their neighbors. CITY MANAGER’S UPDATE 29 Neighbors and City staff will also construct and install either four in-ground vermicomposting units or 50 in-home vermicomposting bins (depending on neighborhood preference). The project day will wrap-up with an educational booth showcase, sustainability-related activities, and food truck celebration of the neighborhood’s contribution to City climate goals. The event is being co-created with neighbors, who will be supported by numerous City department staff and community partners and will serve as a model neighborhood-wide project for the Sustainable Neighborhoods Network neighborhood activities. Neighborhood Mini-Grants & Vibrant Neighborhoods Grants The final round of Neighborhood Mini-Grants in 2018 to improve neighborhood livability and connections were awarded in September. This year, the Neighborhood Mini-Grants supported 88 events and projects with funding of $11,855 awarded to neighborhood organizers. Mini-Grants helped to unite more than 6,000 neighbors through clean-ups, ice cream socials, astronomy nights, and Neighborhood Night Out events. For example, in the Andersonville neighborhood, a Mini-Grant helped provide food, games, music, and prizes during their backpack giveaway for more than 200 participants. Neighborhoods are also utilizing the Mini-Grants to highlight projects in their neighborhoods. Saddlebrook Neighborhood, a 2017 Vibrant Neighborhoods Grant (VNG) recipient, used VNG funds to change lighting in their neighborhood to be Dark-Sky compliant, then used a Mini-Grant for an astronomy night activity. While 2018 VNG funds are just being awarded to applicants, 15 collaborative brainstorming sessions were held between City staff and neighborhoods, resulting in submission of 14 Letters of Intent, and 9 final applications for neighborhood improvement projects. YEAR TO DATE COMPARISON Development Project Submittals Rec’d Conceptual/Preliminary Design Reviews/Staff reviews Performed Building Permits Issued Building Permit Valuations ($M) Building Inspections Performed 2017 YTD 283 236 6,968 $439.24 28,654 2018 YTD 295 210 9,165 $386.39 28,716 % Change 4.24% -11.02% 31.53% -12.03% 0.22% Overall Development Review revenues are $(254,616) under projection for 2018 as of October 31st with Development Review under by $(263,480) and Engineering Development Review over by $8,864. TRANSFORT AND PARKING SERVICES Game Day Operations Transfort’s Game Day operations continue to provide enhanced service during CSU football games. During the first four games in 2018, Transfort accommodated a total of 39,359 boardings. Boardings for each game have been consistent throughout the season, averaging over 7,600 on MAX, 1,200 on the ADA Shuttle, and 1,000 on west campus routes. CITY MANAGER’S UPDATE 30 SUSTAINABILITY SERVICES ENVIRONMENTAL SERVICES Leaf Exchange: Got leaves? Keep them out of the trash and out of the street. Fort Collins residents and businesses have many options for handling fallen leaves this time of year. Leaves are excellent for composting. Local residents and farmers also use them for animal bedding and to insulate plants and gardens over the winter. Leaves can even support diversity by providing habitat in your yard when left on the ground. Innovate Fort Collins Challenge: The City of Fort Collins has named five projects winners of the 2018 Innovate Fort Collins Challenge. The projects were selected from an original list of 19 submissions from businesses and organizations proposing solutions to challenges related to waste materials, transportation, energy and behavior change. Final award dollar amounts are pending approval. Finalists participated in a public pitch night on August 30. See https://www.fcgov.com/environmentalservices/innovate-fort-collins.php for more details. 100% Renewable Goal: City Council on October 2 approved a 100% Renewable Electricity goal to reduce our climate impact while continuing to provide reliable and affordable electricity for customers, who continue to express their support for integrated resources and energy efficiency. The goal aligns with the City's planning efforts and climate economy work, and will help to shape the long-term energy mix of the City's power provider, Platte River Power Authority. Solar at TRC: Thanks to a recently installed solar photovoltaic (PV) system at the facility, the Timberline Recycling Center is now producing more energy than it uses! Construction of the 20 kilowatt (kW) system began in May 2018 on previously undeveloped land adjacent to the TRC. The system consists of 58 high-efficiency PV panels on ground-mounted racks and is connected to the City’s electrical grid. In July, the system began generating clean, renewable energy back to the community. Based on one month’s worth of energy usage data so far, the system is currently generating about double the energy needed to power the TRC. SOCIAL SUSTAINABILITY Housing Rehabilitation: The Social Sustainability department helped complete rehabilitation of 47 units of affordable senior housing in the Northern Hotel - with $675,000 from the City’s affordable housing fund - and 124 units of low-income senior housing in the DMA Plaza rehabilitation. Improvements in the Northern Hotel included installation of air conditioning, screens on all windows and updated flooring, cabinetry and appliances. In the DMA Plaza project, the City/HUD contribution of $2.5 million assisted with energy efficiency upgrades of all appliances, replacement of all major systems, asbestos removal and updated flooring, cabinetry, lighting, windows and appliances. Cold Weather Shelter: Winter and emergency weather shelter information has been updated for the 2018 season, which begins November 1. View document at https://www.fcgov.com/sustainability/pdf/WinterEmergencyWeatherShelterSheet_Oct18.pdf. Severe winter storm warnings, wind chill been updated advisories and below zero temps activate the City’s Emergency Weather Shelter Plan. Community partners should encourage all those needing assistance to go to year-round shelters. CITY MANAGER’S UPDATE 31 ECONOMIC HEALTH $1 Million Winner: Fort Collins has been selected as a $1 million winner of the Bloomberg Philanthropies U.S. Mayors Challenge for its innovative approach to providing health and equity benefits for low- and moderate-income renters by improving the energy efficiency of rental homes. Residential property owners can take advantage of the EPIC Program’s (see https://www.fcgov.com/utilities/residential/conserve/financing/easy) streamlined steps to make their homes more comfortable, healthy and efficient. In addition, the new EPIC Loan offers attractive financing for these projects, repaid on the owner’s portion of the utility bill, with capital delivered via private sector partners. Business Appreciation Breakfast: About 380 people attended the sixth annual Business Appreciation Breakfast on November 1 at the Hilton. The theme of the event was “Fort Collins is My Business,” which speaks to honoring the role of business in making Fort Collins a great place to live, work and play. See photos of the event at https://www.flickr.com/photos/fortcollinsgov/page1. Business Survey Due Nov. 16: The National Business Survey has been mailed randomly to Fort Collins businesses for the second year in a row so the City can better understand business customer needs and how to improve engagement. The survey asks businesses to rate performance of the City organization on everything from street repair and storm drainage to economic development and overall customer service. This year, we’re adding questions about business use of the Timberline Recycling Center. Survey responses are due November 16. UTILITIES CUSTOMER CONNECTIONS Community Engagement since January 2018 has reached 21,219 participants in 310 outreach events and programs, with a primary focus on Time-of-Day rates education and awareness. Key outreach: • XIP Open House: Hosted a public meeting on October 11 reaching 90 members of the community to educate and seek feedback and educate on the Xeriscape Incentive Program. • Multifamily Luncheon: Hosted a public luncheon on October 12 that focused on current topics such as Time-of- Day, transportation, recycling, and Utilities Affordability Portfolio. • Make a Difference Day (picture attached): Greg Over (Education) and Katie Collins (Water Conservation) worked with Doug Groves and Basil Hamden in Stormwater to host a United Way project along the Spring Creek Trail. Pete Iengo (Community Engagement) and Joni Crist (Finance) coordinated 19 volunteers for a total of 76 hours. CITY MANAGER’S UPDATE 32 LIGHT & POWER OPERATIONS Substation Specialists are working on installing animal guard protection at substations. Over the past few years, there have been three incidents of racoons or squirrels contacting energized substation bushings, located on the switchgear building or substation transformers, causing large scale service interruptions, extensive damage and costly repairs. The typical cost to replace transformer bushings is approximately $55,000, and the cost to replace switchgear roof bushings is approximately $8,000. One of the process improvement initiatives in 2018 was to find a solution to eliminate this kind of event. The substation group reviewed possible solutions and chose to use a self-bonding insulating tape along with insulating tubing to cover the overhead conductors. Rigid type animal guards were ruled out after a review revealed manufacturers’ limited ability to accommodate the varied overhead bus fittings and bushing installations. The insulating tape has proved adaptable to each installation. The approximate cost to insulate each substation facility is $3,000. Work is underway to install the insulating protection on all the substation facilities by the end of the year. COMMUNITY SERVICES RECREATION Proving House The restoration and installation of the Ross Proving-Up House is complete. The structure was installed at The Farm at Lee Martinez Park. The restoration of this historical building would not have been possible without the generosity and support of Cache la Poudre River National Heritage Area. A grand opening event of The Ross Proving-Up House will occur on November 15 at 4:00 p.m. Fall Events Success Over 10,000 people attended Recreation community events in October. Treatsylvania at The Farm and Hogwarts Halloween at Northside Aztlan Center provided community members an opportunity to gather and have fun in a safe environment. Old Town Square Skate Rink The Old Town Square Skate Rink will open to the public on November 17. The rink is a partnership between the DDA and Recreation. Admission to the rink is $2 and skate rental is $1. The rink will be open until February 2. PARKS Collindale and City Park Nine Recertified as Audubon Cooperative Sanctuaries Collindale Golf Course and City Park Nine Golf Course were recertified as "Certified Audubon Cooperative Sanctuaries" through the Audubon Cooperative Sanctuary Program for Golf Courses. Both courses were recognized for Environmental Stewardship by Audubon International. Only 47 golf courses in Colorado and 910 in the world to hold the title of Audubon Cooperative Sanctuary. Typical Tape Installation on Transformer Bushings and Conductor. CITY MANAGER’S UPDATE 33 NATURAL AREAS NEW INSIGHTS INTO TRAIL USE To make data-driven decisions to protect natural areas’ conservation values, staff and volunteers surveyed visitors at four foothills natural areas (Coyote Ridge, Pineridge, Maxwell, and Reservoir Ridge) from 2016 – 2018 using a scientifically-valid methodology developed in collaboration with Colorado State University. This baseline data on trail use is an important tool to help understand visitor impacts on natural resources, assess the visitor experience and inform trail management decisions. Initial survey results indicate a high level of visitor satisfaction with the quality of foothills natural areas; users did not feel overcrowded, and most were behaving with courtesy. Full results and an executive summary are forthcoming and will be used in the 2019 update to the Foothills Natural Areas Management Plan. RESTORATION AT KINGFISHER POINT IS UNDERWAY Restoration projects are one example of how residents and the Natural Areas Department conserve and care for natural areas now and for future generations. The restoration project at Kingfisher Point Natural Area started with creating 2.5 acres of wetlands. Highlights include funding from City Development Review wetland mitigation, the use of NAD-sourced plant material for local genetics, and the involvement by 25 volunteers who planted almost 100 native, fruit-bearing shrubs. FOSSIL CREEK RESERVOIR NATURAL AREA CHANGE IN MANAGEMENT In early 2019, Natural Areas will be taking on the management of Fossil Creek Reservoir Natural Area in accordance with the IGA with Larimer County. LEARNING GARDENS AT ALL HIGH NEEDS SCHOOLS Nature in the City partnered with Big Green (formerly the Kitchen Community) to be the first in the nation to install learning gardens at all high-needs schools. These gardens allow students in Poudre School District to connect daily to their food and nature. Nature in the City partnered on six of the gardens and doubled the funding by securing matching dollars. CITY MANAGER’S UPDATE 34 PUBLIC ENGAGEMENT Community Issues Forum Approximately 40 residents provided feedback on the Keep Fort Collins Great tax, water shortage scenarios, and the FoCo Creates Arts and Culture Master Plan through group discussion, scenario creation, and dot exercises. A report of feedback from the event will be provided by the Center for Public Deliberation in the coming weeks. CSU Recreation Marketing Team Workshop and Presentation City Recreation and the Communications and Public Involvement Office partnered with CSU Recreation Marketing Students to offer a presentation about City communications, engagement, internships and recreation opportunities. KFCG Community Outreach Over 200 people attended listening sessions over the last month. Staff continues to update the OurCity page including updated graphics and an educational quiz that helps people learn about what is funded by KFCG and how they can give feedback. CityWorks Alumni Forum for Utilities Time of Day Rates CPIO and Utilities partnered to offer a customized presentation about the TOD as well as an opportunity for participants to bring in their bills and receive estimates about rate changes. COMMUNITY DASHBOARD HIGHLIGHT The Community Dashboard features performance data and information that highlights how the City is doing in achieving its seven Outcome areas: Neighborhood Livability and Social Health, Cultural and Recreation, Economic Health, Environmental Health, Safe Community, Transportation, and High Performing Government. The Dashboard is made up of 38 total metrics that are published quarterly and demonstrate where the City is doing well and where there are opportunities to improve. The color status of performance for each metric is determined based on the actual result for the quarter compared with the target. The color status of performance for the Outcome is determined based on the average calculation of the performance of each metric within that Outcome. Each month the City Manager’s Update will highlight a metric from the Community Dashboard. This month’s feature is from the Culture and Recreation Outcome Area. CITY MANAGER’S UPDATE 35 Analysis: • The goal is to reach 12,688 to 15,860 people annually, which was 8-10 percent of Fort Collins' population (when it was 158,600). We provided 38 programs and volunteer opportunities for 1,627 people which is 627 people more than the quarterly target of 1,000. • This metric will be revised this year. Definition: The participants per capita attending Natural Areas programs. Why is this metric important? This metric provides an indication of the diversity and popularity of Natural Areas programs. Offering a wide range of popular programs is a hallmark of successful operation. City’s impact on this metric: Medium – Natural Areas influences this metric by providing a wide range of quality programs to community members. Participation numbers are also influenced by marketing and outreach. Benchmarks: This metric contains benchmark data for Colorado open space agencies that have similar educational programs, voter approved tax funding, land conservation missions, and community demographics. Fort Collins compares itself to county-wide programs because municipal open space programs are very rare. To view the entire Dashboard, please visit: http://fortcollins.clearpointstrategy.com/