Loading...
HomeMy WebLinkAboutReport - Mail Packet - 9/18/2018 - City Manager Monthly Update - September 2018September 2018 SEPTEMBER 13, 2018 Table of Contents ISSUES BEFORE COUNCIL ................................................................................................................. 4 SEPTEMBER 18 COUNCIL MEETING ........................................................................................................................4 SEPTEMBER 25 ADJOURNED MEETING ..................................................................................................................5 OCTOBER 2 COUNCIL MEETING ..............................................................................................................................5 OCTOBER 9 WORK SESSION ....................................................................................................................................6 PUBLIC ENGAGEMENT – UPCOMING EVENTS ........................................................................................................6 EQUITY AND INCLUSION EFFORTS ..........................................................................................................................6 SALES AND USE TAX COLLECTION .................................................................................................. 7 MONTHLY & YEAR TO DATE ...................................................................................................................................7 CAPITAL PROJECTS- ENGINEERING ................................................................................................ 7 CITYWIDE PEDESTRIAN ACCESS PROJECT ...............................................................................................................7 SUNIGA ROAD IMPROVEMENTS – COLLEGE AVE. TO BLONDEL STREET ................................................................8 DOWNTOWN RIVER DISTRICT IMPROVEMENTS ....................................................................................................8 NORTH COLLEGE IMPROVEMENTS – CANAL TO STATE HIGHWAY 1 .....................................................................9 HORSETOOTH AND COLLEGE INTERSECTION IMPROVEMENTS .............................................................................9 VINE AND LEMAY BNSF IMPROVEMENTS ........................................................................................................... 10 SHARP POINT/NANCY GRAY CONNECTION ......................................................................................................... 10 RIVERSIDE BRIDGE REPLACEMENT ...................................................................................................................... 11 HARMONY AND STRAUSS CABIN SIGNALIZATION ............................................................................................... 11 POWER TRAIL AND HARMONY ROAD GRADE SEPARATED CROSSING ................................................................ 12 TIMBERLINE ROAD CORRIDOR PROJECT ............................................................................................................. 12 MULBERRY CORRIDOR PROJECT .......................................................................................................................... 13 DRAKE BRIDGE REPLACEMENT ............................................................................................................................ 13 CAPITAL PROJECTS – PARK PLANNING & DEVELOPMENT ........................................................ 14 FOSSIL CREEK TRAIL – SHIELDS TO COLLEGE ....................................................................................................... 14 CRESCENT PARK ................................................................................................................................................... 14 POUDRE RIVER WHITEWATER PARK .................................................................................................................... 15 CAPITAL PROJECTS – OPERATION SERVICES ............................................................................. 15 GARDENS ON SPRING CREEK – GARDEN EXPANSION ......................................................................................... 15 GARDENS ON SPRING CREEK – VISITOR’S EXPANSION ........................................................................................ 16 FORT COLLINS/LOVELAND POLICE TRAINING CENTER ........................................................................................ 16 CITY HALL BUILDING ACCESS IMPROVEMENTS ................................................................................................... 17 CAPITAL PROJECTS – UTILITIES .................................................................................................... 17 EAST HARMONY DUCT BANK ............................................................................................................................... 17 COLORADO STATE UNIVERSITY CIRCUITS AND DUCT BANK PROJECT ................................................................ 17 HP BROADCOM CIRCUITS .................................................................................................................................... 18 WATER TREATMENT FACILITY ............................................................................................................................. 18 HARMONY DUCT BANK – HARMONY SUBSTATION PROJECT ............................................................................. 19 LIGHT & POWER GENESIS64 SCADA UPGRADE PROJECT .................................................................................... 19 WATER TREATMENT FACILITY MICROHYDRO PROJECT ...................................................................................... 20 SPRING CREEK IMPROVEMENTS AT EDORA PARK ............................................................................................... 20 MAGNOLIA STREET OUTFALL .............................................................................................................................. 21 TRANSFORT AND PARKING SERVICES .......................................................................................... 21 PUBLIC SAFETY ................................................................................................................................ 22 POUDRE FIRE AUTHORITY ................................................................................................................................... 22 POLICE SERVICES .................................................................................................................................................. 24 PLANNING, DEVELOPMENT &TRANSPORTATION ......................................................................... 26 BUILDING SERVICES AND PLANNING ................................................................................................................... 26 NEIGHBORHOOD SERVICES ................................................................................................................................. 26 GRAFFITI UPDATE ................................................................................................................................................ 28 YEAR TO DATE COMPARISON .............................................................................................................................. 28 SUSTAINABILITY SERVICES ............................................................................................................ 28 ENVIRONMENTAL SERVICES ................................................................................................................................ 28 SOCIAL SUSTAINABILITY ...................................................................................................................................... 29 ECONOMIC HEALTH ............................................................................................................................................. 29 UTILITIES ............................................................................................................................................ 29 CUSTOMER CONNECTIONS .................................................................................................................................. 29 COMMUNITY SERVICES .................................................................................................................... 30 RECREATION ........................................................................................................................................................ 30 PARKS ................................................................................................................................................................... 30 PUBLIC ENGAGEMENT ..................................................................................................................... 31 COMMUNITY DASHBOARD HIGHLIGHT .......................................................................................... 31 CITY MANAGER’S UPDATE 4 ISSUES BEFORE COUNCIL SEPTEMBER 18 COUNCIL MEETING  2019-20 Budget Public Hearing o Public hearing to gather citizen input on 2019-2020 proposed City Budget.  Phase II Poudre River Flows Plan IGA and Agreement for the use of certain City Water Rights in the Poudre River Flows Plan o Review and ask for approval of a Phase II IGA with the Poudre River Instream Flow Plan partners; and, to review and approve the proposed use of certain City water rights in the Plan. A coalition, including the City, has been developing a Plan to protect and provide instream flows on the Poudre River. Phase I of the Plan is drawing to a close. Phase II will entail a water court application by the State of Colorado on behalf of the partners. Three partners have offered water to include in the Plan, Fort Collins, Greeley, and Thornton. Environmental Health – 4.9 – Sustain and improve the health of the Cache la Poudre River and its watershed. 4.8 Protect and enhance natural resources on City-owned properties and throughout the community  Larimer County Behavioral Health Plan o Consider a Resolution regarding the Larimer County Behavioral Health Plan Neighborhood Livability & Social Health – 1.2 – Leverage and improve collaboration with other agencies to address homelessness, poverty issues and other high priority human service needs  Waterfield Metropolitan Districts Consolidated Service Plan (continued from September 4) o Consider approving the Metro District Service Plan for the Waterfield Project. Waterfield is a 71- acre proposed residential development located in the northeast portion of the community. The project will deliver a number of stated extraordinary public benefits, including enhanced environmental sustainability, critical public infrastructure, smart growth development, and affordable housing. Neighborhood Livability and Social Health – 1.5 Guide development compatible with community expectations through appropriate planning, annexation, land use, historical preservation and development review processes.  Water’s Edge Metropolitan Districts Consolidated Service Plan (continued from September 4) o Consider approving the Metro District Service Plan for the Water’s Edge Project. Water’s Edge is a proposed 235-acre mostly residential development located in the northeast portion of the community. The project will be an age targeted development that is geared around an aging in place philosophy. The project features a non-potable water system, open space enhancements, and other services and support targeted for the 55-years and older age demographic. Neighborhood Livability and Social Health – 1.5 Guide development compatible with community expectations through appropriate planning, annexation, land use, historical preservation and development review processes.  Larimer County Community Report o Commissioner Steve Johnson will highlight the work done by the City of Fort Collins and Larimer County, working together to serve the citizens.  Staff Report: 2018 Bike to Work Day o Highlight the City’s annual Bike to Work Day events and discuss the linkage to the Climate Action Plan “Take Two” initiative. CITY MANAGER’S UPDATE 5 SEPTEMBER 25 ADJOURNED MEETING  H25 Pre-Application Hearing o Allow a prospective developer to receive preliminary feedback from Council about a land use proposal located at the southwest quadrant of the I-25/Harmony Road interchange. Neighborhood Livability & Social Health – 1.5 – Guide development compatible with community expectations through appropriate planning, annexation, land use, historical preservation and development review processes  Montava Pre-Application PUD Overlay o Provide an opportunity for applicants of the potential Montava development to present conceptual information regarding the proposed development including how site constraints will be addressed and issues of controversy or opportunities related to the development Neighborhood Livability & Social Health – 1.5 – Guide development compatible with community expectations through appropriate planning, annexation, land use, historical preservation and development review processes  Montava Metropolitan Districts Consolidated Service Plan (Continued from September 4) o Consider approving the Metro District Service Plan for the Montava project. Montava is a 900 acre proposed mixed-use development located in the northeast portion of the community. The project will deliver a number of stated extraordinary public benefits, including enhanced environmental sustainability, critical public infrastructure, smart growth development, and affordable housing. Neighborhood Livability & Social Health – 1.5 – Guide development compatible with community expectations through appropriate planning, annexation, land use, historical preservation and development review processes OCTOBER 2 COUNCIL MEETING  2019-20 Budget Public Hearing o Public hearing to gather citizen input on 2019-2020 proposed City Budget.  2018 Annual Adjustment Ordinance o Appropriate expenses related to unanticipated revenue, grants and unforeseen costs that had not been previously budgeted  Design Compatibility and Character Land Use Code Amendments o Amend the Land Use Code to address the compatibility of new construction with existing built environment. Those efforts include improved Historic Adjacency Standards and design standards for Downtown and within transition areas as the interface between Downtown and the Old Town Neighborhoods. Neighborhood Livability & Social Health – 1.5 – Guide development compatible with community expectations through appropriate planning, annexation, land use, historical preservation and development review processes  100% Renewable Electricity Resolution o The purpose of this item is to consider a resolution to establish a community-wide 100% renewable electricity goal by 2030 in addition to the community’s climate action goals Environmental Health – 4.3 Achieve 2020 Energy Policy goals and work toward long- term net zero energy  Hughes Stadium Annexation and Zoning (first reading, consent) o Annex and zone the Hughes Stadium Annexation, located at South Overland Trail and County Road 42C (2011 N. County Road 21) Neighborhood Livability & Social Health – 1.7 – Guide development through community planning, historic preservation and efficient and effective development review  Northern Integrated Supply Project (NISP) - Comments o Consider a Resolution directing the City Manager to submit comments on NISP CITY MANAGER’S UPDATE 6 Environmental Health – 4.9 Sustain and improve the health of the Cache la Poudre River and its watershed  Collective Bargaining Agreement o Approve a collective bargaining agreement between the City and the Northern Colorado Lodge #3, Colorado Fraternal Order of Police (FOP) and authorize execution of such agreement. Safe community – 5.2 Enhance our Police Services capability to foster public trust and create a safer community  Amending the Yearly Evaluation Process for the City Manager, City Attorney, and Chief Municipal Judge o Consider a resolution to amend the evaluation process for the City Manager, City Attorney and Chief Judge to be held early in the year. OCTOBER 9 WORK SESSION  Lockers at Mennonite Church Appeal o Consideration of an appeal of the Planning and Zoning Board’s decision regarding External Storage Lockers at the Fort Collins Mennonite Fellowship, 300 East Oak Street.  2019-20 Budget #2 O Review the budget offers included in the City Manager’s Recommended Budget and answer questions of Councilmembers:  Environmental Health  Transportation  High Performing Government PUBLIC ENGAGEMENT – UPCOMING EVENTS  Community Issues Forum – Wednesday, Oct. 10; Senior Center; 6 p.m. to 8:30 p.m. in the Prairie Sage Room; topics will include: FoCo Creates Arts and Culture Master Plan; Water Scarcity Education and Scenario discussion; and KFCG.  City Plan Scenario Workshops- Saturday, September 22, 10am-12pm at Front Range Community College; Wednesday, September 26, 6-8pm at Northside Aztlan Center; Thursday, September 27 from 6-8pm at the Senior Center. EQUITY AND INCLUSION EFFORTS  Spanish Community Outreach: Police Services has been hosting “Cafecitos” in partnership with The Family Center La Familia. These gatherings are focused on discussing issues of concern to our Hispanic/Latino community. In August, Spanish-speaking officers and civilians from FCPS met with residents to discuss mental health resources, substance use in our community, and chronic issues impacting their neighborhoods. The ongoing Cafecito series has been a positive way to connect with Hispanic/Latino members of our Fort Collins community.  FoCo Creates Arts and Culture Master Plan - launching next phase of public engagement; partnering with CreatesPlaces who will be organizing three focused outreach events specifically around inclusivity, diversity and accessibility to the arts and culture. The first took place on Thursday, Aug. 23 and the next will be Thurs., Sept. 20 from 5:30 p.m. to 7:30 p.m. in the Community Room at the Old Town Library.  Community Trust Initiative – Stakeholder meeting Sept. 19  Air Park Mobile Home Park Resource Fair – Sept. 17, working with City Plan ambassador, featuring rebate program and annexation/City Plan information  PSD Parent Academy for parents that speak English as a second language – featuring rebates, Natural Areas, Recreation, and language resources  Recreator Workshop at La Familia - Sept. 20 featuring volunteer opportunities, language resources and step-by-step Recreator sign up workshop CITY MANAGER’S UPDATE 7  Racial Equity Workshop – City Council, leadership and managers will attend a workshop on racial equity given by the National League of Cities. The training covers the history of racism in America and the role of government in advancing equity within their local communities.  Healthy Homes Program: Healthy Homes is a free, indoor air quality program for residents of the City of Fort Collins aimed at improving the air quality of their homes by reducing chemical and biological pollutants, and promoting safety. Assessments are offered in English, Spanish, and Chinese year-round. SALES AND USE TAX COLLECTION MONTHLY & YEAR TO DATE JULY SUMMARY OVER PRIOR YEAR Month Year to Date Net Sales Tax Collected: 4.7% 4.3% Net Use Tax Collected: -11.1% -16.8% Net Sales and Use Tax Collected: 2.1% 0.4% Year to date, sales and use tax collections excluding rebates are up 0.4% and total $79.4M. JULY SUMMARY OVER BUDGET Month Year to Date Net Sales Tax Collected: 2.1% 1.8% Net Use Tax Collected: -7.9% -4.9% Net Sales and Use Tax Collected: 0.6% 0.7% Year to date, the City has collected 0.7% more sales and use tax revenue, totaling $580K over budget. CAPITAL PROJECTS- ENGINEERING CITYWIDE PEDESTRIAN ACCESS PROJECT Funding Source: Community Capital Improvement Program (CCIP) Estimated Project Budget: 2018 - $1.1M Estimated Completion Date: Ongoing Phase: Construction Project Details: This project maintains a complete City sidewalk inventory, identifies sidewalk inadequacies, and develops a prioritized work program to achieve goals of promoting walking for transportation and recreation. Project Status:  Upcoming project locations: Staff is reviewing the current budget and will be identifying any additional projects.  Current projects: Laporte Avenue project was complete in August. Whedbee and Buckingham projects mentioned in previous report are complete. Capital Project Updates are indicated in bold CITY MANAGER’S UPDATE 8 More information is available at http://www.fcgov.com/engineering/pedneeds.php SUNIGA ROAD IMPROVEMENTS – COLLEGE AVE. TO BLONDEL STREET Funding Source: 2017 / 2018 BFO, COFC Utilities, Transportation Capital Expansion Fee (TCEF), Developer Contributions Estimated Project Budget: $3.7M Estimated Completion Date: Spring 2019 Phase: Right-of-Way Negotiations Project Details: Design and construction of a new arterial roadway that connects existing Suniga Road, from Blondel St. to College Avenue. Project Status:  Final design is complete and the project is ready to bid, pending final right-of-way acquisition. More information is available at https://www.fcgov.com/engineering/suniga-to-college-improvements DOWNTOWN RIVER DISTRICT IMPROVEMENTS Funding Source: Federal Grants, Community Capital Improvement Program (CCIP), Developer Contributions, DDA Funds Estimated Project Budget: $1.4M for Jefferson Street (Design and right-of-way), $3.8M for Willow Street Estimated Completion Date: Jefferson 2023, Willow 2019 Phase: Jefferson – Right-of-way acquisition Willow – Final Design Project Details: The goals of this project are to provide various design and construction improvements within the Downtown River District. The project’s current focus is acquiring right of way and easements for planned improvements along Jefferson Street between College Avenue and the Mountain/Lincoln Intersection. The project is also designing roadway and urban design improvements along Willow Street between College Avenue and Linden Street; including a pedestrian plaza at the northern corner of Willow Street and Linden Street. Project Status:  Staff met with the River District Business Association in late August to discuss the project scope, schedule, and proposed construction phasing.  A public open house occurred on September 6 at Wolverine Coffee House.  Current Jefferson funding is $1.4M. Staff will finalize the construction estimate in 2019, which is currently in the range of $10M - $12M. CITY MANAGER’S UPDATE 9 NORTH COLLEGE IMPROVEMENTS – CANAL TO STATE HIGHWAY 1 Funding Source: Federal Grants, URA Contribution, Pedestrian Program Funds, County Funds, Transportation Capital Expansion Fee (TCEF), Developer Contributions Estimated Project Budget: $2.35M Estimated Completion Date: Winter 2018/Spring 2019 Phase: Utility Relocations Project Details: This project will construct pedestrian improvements along North College between the Larimer & Weld Canal (City limits) and State Highway 1, including pedestrian bridges crossing the canal. Project Status:  Utility relocations are occurring, in preparation for the CDOT roadway reconstruction work.  Final design is complete, and the project is ready to bid for construction. City staff is meeting with CDOT staff in September to finalize the construction schedules for both agencies’ projects. More information is available at fcgov.com/engineering/ncollege.php HORSETOOTH AND COLLEGE INTERSECTION IMPROVEMENTS Funding Sources: 2017/2018 BFO, Federal Grants, Bridge Program Funds, Transportation Capital Expansion Fee (TCEF), Community Capital Improvement Program (CCIP – Arterial Intersection) Estimated Project Budget: $7.5 M Estimated Completion Date: November 11, 2018 Phase: Construction Project Details: This project will construct intersection improvements to address safety and congestion problems. Issues were identified in the Arterial Intersection Prioritization Study, completed in 2011. Project Status:  The second major closure, Horsetooth Road west of College Avenue, will re-open on September 10 with full turning movements available at the intersection. CITY MANAGER’S UPDATE 10  The Horsetooth Bridge deck was recently completed, along with concrete paving at the intersection.  Construction will continue after September 10 with daily lane closures and night work for final paving operations. More information is available at fcgov.com/horsetoothandcollege/ VINE AND LEMAY BNSF IMPROVEMENTS Funding Source: Keep Fort Collins Great (KFCG), Transportation Capital Expansion Fee (TCEF), 2017 / 2018 BFO Estimated Project Budget: $22M ($12M currently allocated) Estimated Completion Date: Spring 2021 Phase: In Design Project Details: The existing Vine and Lemay intersection, which includes the Burlington Northern Santa Fe (BNSF) Railway crossing, is severely congested with limited options to expand through or turn lane capacity due to land use constraints. Project Status:  Embankment construction is complete with all of the material from the NECCO project. Box culvert work across Dry Creek has been completed.  The City completed the right-of-way acquisition for the parcel containing the proposed realigned Lemay and Suniga intersection.  Current funding is $12M. Staff has submitted a BFO offer to request the unfunded portion of $10M. More information is available at fcgov.com/engineering/vine-lemay SHARP POINT/NANCY GRAY CONNECTION Funding Source: Transportation Capital Expansion Fee (TCEF), 2015/2016 BFO, Developer Contributions Estimated Project Budget: $1.2M Estimated Completion Date: Spring 2019 Phase: Railroad Negotiation Project Details: The City Master Street Plan identifies Sharp Point Drive and Nancy Gray Avenue as connected across the Great Western Railroad tracks. This project will construct the roadway and pedestrian connection, and railroad crossing. Project Status:  The City and Great Western are in the process of signing the settlement agreement for the proposed at-grade crossing. The settlement agreement states that Great Western will begin the railroad crossing construction in 2018 and complete their work in early 2019.  The roadway construction is expected to be complete in the second quarter of 2019. More information is available at fcgov.com/engineering/sharppoint CITY MANAGER’S UPDATE 11 RIVERSIDE BRIDGE REPLACEMENT Funding Source: Federal Grants and Bridge Program Funds Estimated Project Budget: $4.3M Estimated Completion Date: December 2018 Phase: Construction begins in mid-September Project Details: The project will replace the structurally deficient bridge over Spring Creek, and raise Riverside Avenue out of the 100 years flood level at the bridge location. This project is coordinated with Utility’s Spring Creek Restoration Project. Project Status:  Project was awarded to the contractor in late-August.  Construction begins on September 17 with a 6-week full closure of Riverside Ave. anticipated in mid-October thru mid-November.  Public meetings were held on March 22 and May 3 at EPIC. Additional outreach will be ongoing throughout construction HARMONY AND STRAUSS CABIN SIGNALIZATION Funding Source: Transportation Capital Expansion Fee Fund, developer contribution Estimated Project Budget: $800K Estimated Completion Date: September 2018 Phase: Construction of Landscaping Project Details: A signal at Harmony and Strauss Cabin road is warranted with the implementation of the Harmony 23 development. Design and construction of north bound auxiliary turn lanes on Strauss Cabin will be completed by the developer in conjunction with this signal project Project Status:  The roadway portion of the project was substantially complete in early June.  Final landscape and irrigation work will be completed in September. CITY MANAGER’S UPDATE 12 POWER TRAIL AND HARMONY ROAD GRADE SEPARATED CROSSING Funding Source: Federal Grant, Community Capital Improvement Program (CCIP - Bike / Pedestrian Grade Separated Crossings) Estimated Project Budget: $5M - $8M Estimated Completion Date: 2020-2021 Phase: Alternatives Analysis – Conceptual Design Project Details: The Power Trail provides connectivity between the Spring Creek Trail to the north and the Fossil Creek Trail to the south. The Trail currently has a gap approximately three-quarters of a mile long north and south of Harmony Road. The detour route requires users to cross Harmony Road at grade at McMurry. This project will design, acquire property interests, and construct a trail grade separated crossing at Harmony Road as well as the trail connections on either side. Project Status:  Staff will begin subsurface explorations and utility potholing in September. This work will require a few days of lane closures on Harmony Road.  The initial phase of the design contract will be a feasibility study and alternatives analysis for different project alternatives.  Current funding is $1.9M. Staff has submitted a BFO offer to request additional funding. More information is available at https://www.fcgov.com/engineering/powertrailcrossing TIMBERLINE ROAD CORRIDOR PROJECT Funding Source: Transportation Capital Expansion Fee (TCEF), Developer Contribution, Federal Grant Estimated Project Budget: $6.5M Estimated Completion Date: 2020 - 2021 Phase: Drafting the Request for Proposal (RFP) Project Details: This project will reconstruct South Timberline Road from Stetson Creek Drive to Trilby Road to the City’s four lane arterial roadway standards. Planned improvements include; intersection improvements at Kechter Road, Zephyr Road, and Trilby Road, multi-modal accommodations, raised medians, access control, landscaping improvements, and roadway improvements. This project serves to build upon the development improvements that have been completed along the corridor. This project will improve safety, reduce congestion, and provide improved accommodations for alternate travel modes. Project Status:  The project contains a $2.2 M grant which becomes available in 2020.  Staff will release an RFP in the fall of 2018 for design services.  Current funding is $5M. Staff has submitted a BFO offer to request the unfunded portion of $1.5M. CITY MANAGER’S UPDATE 13 MULBERRY CORRIDOR PROJECT Funding Source: FC Bikes, Street Maintenance Program Estimated Project Budget: $600k Estimated Completion Date: Summer 2018 Phase: Construction Project Details: Building on the recommendations adopted in the 2017 Old Town Neighborhoods Plan and 2014 Bicycle Master Plan, the City will be improving W. Mulberry Street between Jackson Ave. and Overland Trail in 2018. This project will restripe Mulberry to add a center turn lane while also piloting protected bicycle lanes. Bicycle and pedestrian crossing improvements are also planned at the following locations along the corridor: Mulberry at Impala/Ponderosa, Mulberry at City Park, and N. Shields at Magnolia. Project Status:  The project team has completed multiple phases of public outreach.  The surface treatment and re-striping were completed in July and the corridor was re-opened to traffic.  The raised bike protection elements are complete (concrete curbs, steel rails, and delineators).  Protected intersection at Mulberry and Bryan is scheduled for the first week in September.  Shields and Magnolia Toucan signal is scheduled for implementation in early October. DRAKE BRIDGE REPLACEMENT Funding Source: Bridge Program Funds, COFC Utilities Estimated Project Budget: $2.8M Estimated Completion Date: May 2019 Phase: In Design Project Details: The project will replace the structurally deficient bridge over the Larimer Canal No. 2, adjacent to the Colorado State University (CSU) Veterinary Teaching Hospital (between Research Boulevard and the MAX CITY MANAGER’S UPDATE 14 line). This project is in partnership with the City’s Utility Department, which will upgrade aging storm sewer infrastructure adjacent to the bridge replacement. Project Status:  The project is in final design and will be advertised for construction in late 2018, pending Bridge Program funding from the 2019 BFO process.  Construction is expected to occur from late January 2019 thru May 2019. An 8-week full closure is proposed for the months of February and March 2019. The full closure will be incentivized/disincentivized through the construction contract.  A communication and public outreach plan will be developed in September. CAPITAL PROJECTS – PARK PLANNING & DEVELOPMENT FOSSIL CREEK TRAIL – SHIELDS TO COLLEGE Funding Source: ConTrust Fund, GOCO grant Total Project Cost: $5M Phase: Under Construction Estimated Completion Date: Fall 2018 Project Details: Construction has begun on the Fossil Creek Trail - Shields to College, and is anticipated to be complete fall, 2018. This trail will provide an important east/west connection between College Avenue and Shields Street under the BNSF railroad. The trail will also connect with the Long View Trail, which will opened August 18th. Project Status:  Design of the artwork is under way and a location for installation is being assessed  Trail construction through Red Tail Grove Natural Area is nearing completion. The next portion of trail to be constructed will be along Fossil Creek Drive CRESCENT PARK Funding Source: Neighborhood Parkland Funds Total Project Cost: $2.7M Phase: Under Construction Estimated Completion: 2018 Project Details: Crescent Park is a 7-acre neighborhood park located in the heart of the Maple Hill neighborhood. Project elements include an in- earthed restroom, shelter, playground, irrigation pond and concrete walks. Project Status:  Artwork by Carolyn Braaksma has been installed CITY MANAGER’S UPDATE 15  Turf grass and native seeding are near completion  The restroom and drinking fountain have opened for use POUDRE RIVER WHITEWATER PARK Funding Source: CCIP, BOB 2, General Fund, Private/Public Donations, Natural Areas, Stormwater, URA, Park Planning & Development Total Project Cost: $11.5M Phase: Under Construction Estimated Completion: 2019 Project Details: The Poudre River Whitewater Park project has been a collaborative effort between multiple City departments, local advocates, and the philanthropic community. A Groundbreaking ceremony was held August 23rd. The project is estimated to be complete in summer, 2019. Project Status:  Contractor staging is underway  Construction in the river can begin October 1 CAPITAL PROJECTS – OPERATION SERVICES GARDENS ON SPRING CREEK – GARDEN EXPANSION Funding Sources: $2.1M Privately Raised Funds $900K General Funds Total Project Cost: $3.0 M Phase: Under Construction Estimated Completion Date: Summer 2018 Project Details: Garden on Spring Creek Garden Expansion is expanding the Gardens to add five acres to the north. This will include an amphitheater with a great-lawn for outdoor performances, several arbors and many added garden areas for the public to explore and enjoy. Project Status:  Contractor is working to finish up punch-list items.  Gardens staff has started to install their landscaping and plantings.  Working through a resolution for cracks in sound-absorbing walls. Great Lawn at The Gardens CITY MANAGER’S UPDATE 16 GARDENS ON SPRING CREEK – VISITOR’S EXPANSION Funding Sources: Building on Basic (BOB) II - $2.2M Privately Raised Funds: $700K Total Project Cost: $2,900,000 Phase: Design Development Estimated Completion Date: Late Fall 2019 Project Details: The Gardens on Spring Creek Visitor Center Expansion is adding approximately 4500 SF. This includes a conservatory which will incorporate a butterfly pavilion, extra meeting rooms, additional office spaces, and Solar PV to offset the additional energy usage. Project Status:  Re-designing existing mechanical and electrical systems with new building.  Facilities staff working to improve existing building envelope for better performance.  Design to be completed by end of 2018.  Construction is scheduled to start in early 2019. FORT COLLINS/LOVELAND POLICE TRAINING CENTER Funding Sources: $9.25M generated from bonds for the City of Fort Collins $9.25M from City of Loveland Total Project Cost: $18.5M Phase: Design Development Estimated Completion Date: Early 2020 Project Details: The City of Fort Collins is partnering with The City of Loveland to construct a new Police training facility which will be located on the west side of the Loveland Airport. This new site will offer a 50- yard pistol range, a 1.4 mile driving track along with some classrooms for special training. Project Status:  Project team modified the office/classroom space to be wood frame construction to reduce the cost and get the project close to budget.  Loveland has applied for a grant that could include up to $1M to help with project funding. The grant will be awarded early 2019.  Loveland and Fort Collins Art in Public Places (APP) teams are working to bring an artist to the project team to create the art piece for the project. Floor Plan for Expanded Visitor Center Current SD Site Plan (Red) is future phases Current SD Site Plan (Red) is future phases CITY MANAGER’S UPDATE 17 CITY HALL BUILDING ACCESS IMPROVEMENTS Funding Source: Operation Services 2017 Funds Estimated Project Cost: $820,000 Phase: Complete Completion Date: August 2018 Project Details: Demolition of existing elevator and north entrance. Installation of new ADA accessible elevator and restroom on main lobby. Project Status:  Contractor completed punch-list items. Project is complete. CAPITAL PROJECTS – UTILITIES EAST HARMONY DUCT BANK Funding Source: Development Fees Estimated Project Budget: $4,000,000 Phase: Estimated Completion Date: End of 2018 Project Details: Three Phase Project: Phase 1, the Substation Phase, is detailed below. Phase 2, installation of the duct bank between the substation and Ziegler Rd is complete. Phase 3, installation of the duct bank between Ziegler Rd and Strauss Cabin Rd is complete. Project Status: No updates this month  Phase 1 in construction  Phases 2 and 3 are complete COLORADO STATE UNIVERSITY CIRCUITS AND DUCT BANK PROJECT Funding Source: Development Fees Estimated Project Budget: $2,804,340 Phase: Complete Project Details: 2.2 miles of duct bank and two new circuits from the Linden Substation to Colorado State University. Project Status:  Drake to Lake duct bank is complete  Cherry Street duct bank is complete  Howes/Laurel duct bank is complete  The Vine Drive duct bank is complete  Circuits work is complete Vault Installation Vault Installation CITY MANAGER’S UPDATE 18 HP BROADCOM CIRCUITS Funding Source: Development Fees Estimated Project Budget: $500,000 Phase: In Design Project Details: Installation of approximately 1,200 feet of duct bank on Broadcom property to add capacity and facilitate separately metering several buildings on the site. Project Status: No updates this month  Project has been divided into two phases  Phase 1 will include the installation of conduit and cable north of the Ziegler entrance to Hewlett Packard Enterprise metering equipment and is pending an easement from Broadcom  Phase 2 will include installation of conduit and cable south of the Ziegler entrance to Harmony Rd. and is pending an easement from Broadcom WATER TREATMENT FACILITY Funding Source: Water Treatment Facility Capital Project Budget Estimated Project Budget: $850,000 Phase: In Design Project Details: Approximately 7,300 feet of three-phase from Overland Trail to the Treatment Facility in an existing easement on Colorado State University Property Project Status:  Project design is being reviewed by CSU staff  L&P staff met with all stake holders on August 30th as a final step prior to construction  Construction began on September 4th, and it will last 4 to 6 weeks. Hewlett-Packard Campus Water Treatment Facility CITY MANAGER’S UPDATE 19 HARMONY DUCT BANK – HARMONY SUBSTATION PROJECT Funding Source: Development Fees Estimated Project Budget: $214,590 Phase: Preliminary Construction Project Details: 5 new duct banks for additional capacity at the Harmony substation Project Status:  Tree and stump removal completed  Berm removal completed to rough grade  Final grading will be completed once all duct banks and vaults have been installed.  (3) 8 x 16 vaults have been set and tied into the harmony duct banks  Construction of the first duct bank completed from substation to new 8 x 16 vault completed.  Landscape plan finalized with Elite Industries, appropriate City departments and HOA.  Final grading, irrigation, and all landscaping to be completed in September. LIGHT & POWER GENESIS64 SCADA UPGRADE PROJECT Funding Source: New Capital Estimated Project Budget: $200,000 Phase: In Design Project Details: Convert the existing Iconics Genesis32 hardware, software, and screens to Genesis64 Project Status:  All Iconics Genesis64 software has been installed on the new SCADA servers  The ESCADA team and IT are working together on creating secure user accounts and domains for the new ESCADA system  The ESCADA team is currently working on configuring the new OPC server (Kepserver) and attempting to communicate with field devices SCADA System Duct Bank CITY MANAGER’S UPDATE 20 WATER TREATMENT FACILITY MICROHYDRO PROJECT Funding Source: Water Estimated Project Budget: $715,000 Status: In design Estimated Completion Date: 1st Quarter 2019 Project Details: The City of Fort Collins receives its raw water from the Poudre River and Horsetooth Reservoir. Due to the elevation differences between the plant and the sources, pressure dissipating valves on site reduce the energy of the water. The micro hydropower project will develop the hydroelectric potential from the raw water supply from Horsetooth Reservoir. Project Updates:  Preparing final design drawings of turbine unit  Review and comment on final design drawings of the unit SPRING CREEK IMPROVEMENTS AT EDORA PARK Funding Source: Stormwater Estimated Project Budget: $1,000,000 Status: Phase I construction September - November 2018 Estimated Completion Date: November 2018 Project Details: This project will include utility infrastructure modifications to facilitate the bridge replacement work. This work includes installation of a buried water quality vault, raising a sanitary sewer manhole and constructing a protective concrete cap over the sanitary sewer line. Project Updates:  Integration of project design with the Riverside bridge  Joint CLOMR approval from FEMA - completed  CDOT final approval of the bridge plans - completed Final design plan set of turbine unit Flooding at Spring Creek and Riverside Bridge CITY MANAGER’S UPDATE 21 MAGNOLIA STREET OUTFALL Funding Source: Stormwater Estimated Project Budget: $480,000 Status: In design, construction 2020 Estimated Completion Date: 2023 Project Details: The Magnolia Street Outfall Project is a large diameter storm sewer outfall into the Poudre River. The current alignment runs west along Magnolia Street to Shields Street. Pipe diameters range from 60” up to 132”. Construction methods include open cut with the potential for tunneling under Riverside Avenue, College Avenue, Mason Street, and Mulberry Street. Project Updates:  LID analysis - completed  Comparison of alternatives - completed  Seek input from other departments - completed TRANSFORT AND PARKING SERVICES Citywide Bus Stop Improvement Program Funding Source: Keep Fort Collins Great (KFCG) and Building on Basics (BOB) Estimated Project Budget: 2018 - $375k Estimated Completion Date: Ongoing Phase: Planning and Construction Project Details: The purpose of the Bus Stop Improvements Program is to bring Transfort bus stops into Americans with Disabilities Act (ADA) compliance to make transit accessible and comfortable to people of all abilities and ages. The goal is to achieve full ADA compliance by 2026. The process includes prioritizing and selecting non-ADA stops under Transfort’s purview through a scoring process and constructing as many stops per year that the budget and resources allow. Project Status: • Since the inception of the ADA upgrade program in 2016, over 90 stops have been upgraded. As of July 2018, 285 of 441 (65%) Transfort stops are ADA compliant. • 23 stops have been upgraded this year. An additional 18 stops are either planned for construction or staff is determining the feasibility of upgrades in 2018. More information about the program including project locations is available at: http://www.ridetransfort.com/abouttransfort/plans-and-projects/adabusstops Parking Structures and On-Street Parking Sensors Funding Source: General Fund and Parking Reserves Estimated Project Budget: $1.2 M Estimated Completion Date: November 2018 Flooding at the Lincoln Center May 22, 2018 CITY MANAGER’S UPDATE 22 Phase: Planning and Construction Project Details: Parking sensors will provide real time parking availability information to the parking public via the FC Parking App and will provide valuable occupancy and turnover data to assist with parking management. Project Status: • Between September 10 and October 31, sensors will be installed in over 3,000 on-street parking spaces in Downtown (see map). • Staff is working closely with CPIO, Utilities, Streets, Traffic, DDA, and DBA to coordinate and communicate the 24-hour rolling closures occurring during installation. • New pre-pay technology (same as Firehouse Alley) and sensors are being installed in Old Town and Civic Center Parking Structures. • Notable impacts to parking: Civic Center: 75 – 100 spaces rolling closure for 2-3 weeks beginning in Fall 2018; Old Town: full closure August 20 – August 31. According to average occupancy of these facilities, there should be plenty of parking for everyone. Timing ensures the project is completed with the least disruption to businesses and visitors. PUBLIC SAFETY POUDRE FIRE AUTHORITY 2019 PFA Budget-Planning Process Underway PFA staff members have begun to develop the proposed 2019 PFA budget. Various divisions and programs have conducted annual planning processes to evaluate future funding issues, have reviewed and reallocated existing line items to focus on current and future needs, and reviewed existing replacement and capital plans. The Senior Leadership Team (SLT) conducted a preliminary budget retreat on Aug. 2, to review revenue projections and approximately 50 budget requests. Follow-up budget meetings among key staff will continue over the next several weeks prior to the Sept. 28 presentation of the Preliminary Budget to the Poudre Fire Authority Board of Directors. Poudre Valley Fire Protection District Board Votes to Approve November Ballot Question On Sept. 5, 2018, members of the PVFPD Board met during a special meeting to approve language for a ballot question that will go before voters this November. It asks District residents and property owners to annually adjust the District’s assessed mill levy so the PVFPD may maintain its current level of funding (a zero-dollar increase to PVFPD funding) and continue providing fire protection, rescue, and emergency medical services to the community. The PVFPD encompasses the Town of Timnath, the communities of Laporte, Bellvue, Horsetooth Reservoir, Redstone Canyon, and areas of unincorporated Larimer and Weld counties. Poudre Fire Authority was established in 1981 through an Intergovernmental Agreement between the PVFPD and the City of Fort Collins. Simply put, PFA’s firefighters provide services to people within Fort Collins and the PVFPD. Because of a collision between the Gallagher Amendment and the Taxpayer Bill of Rights, or TABOR, the PVFPD stands to lose at least $600,000 to $900,000 per year, on an ongoing basis starting in 2020. At this time, the PVFPD can’t specify how this would impact the District; that’s ultimately up to the Poudre Fire Authority Board to decide. However, Board Members would likely have to consider a range of options that could include closing a fire station or eliminating positions. CITY MANAGER’S UPDATE 23 PFA Recognizes Amazing Community Partners with Awards On June 25, 2018, Poudre Fire Authority firefighters were dispatched to a medical call involving an adult female. Though no medical attention was necessary, upon evaluation, the woman desperately needed a place to stay for the night. The crew from Engine 3 exhausted all resources, attempting to find accommodations for the woman. They eventually went to The Hilton Fort Collins, where they met Brandon Dorrance, a front office supervisor. The Hilton had no available rooms because of a sports event, so he called around to other hotels in close proximity to check their availability; they were all full, as well. With open arms, Mr. Dorrance allowed the woman to rest in the lobby in a safe and quiet place while securing her belongings. He also gave her vouchers for dinner and breakfast the following morning. Not knowing the Hilton was going to provide her with dinner, Engine 3’s crew walked across West Prospect Road to Paninos Fort Collins Restaurant to buy the woman dinner. Unfortunately, the restaurant was closed. Noticing it was firefighters outside the business, the employees asked if we needed anything. When we told them of the situation, they went out of their way to re-open the kitchen and make the woman a fresh hot dinner at no charge. It is people like Mr. Dorrance, Ms. Ali Jones, Ms. Halie York, and the Panino’s staff that make our community an incredible place and, it is for this reason, PFA was proud to bestow upon them its prestigious Professional Partnership Award on Aug. 27, 2018. Front Range Fire Consortium Fire Academy – Day One, Aug. 27 Members of the Front Range Fire Consortium Academy Class 18-2 are ready to become future firefighters. We have a classroom and drill grounds full of energy, excitement and anticipation. This group of 20 men and women will be serving their communities in 2019. Please look for updates on Class 18-2 by following PFA on Facebook and Twitter. RAM1 HITS THE STREETS FOR SECOND PILOT PHASE PFA's Roving Alternative Medical, or RAM, unit is an alternative-response vehicle that will be on the streets from now until Dec. 31, 2018. This is the second time the RAM program will be piloted at PFA, with the first pilot running from January to June 2017. For decades, medically trained firefighters have responded to medical calls, along with our partner agencies. As PFA's call volume continues to tick upward -- our agency tallied just more than 22,000 calls for service --, we know that sending a fire engine to every call isn't the most efficient use of resources. Enter RAM1, a two-person SUV that can more nimbly and dynamically respond to medical calls throughout PFA's 235-square-mile service area. The idea of right-sized response is identifying a problem and determining what types of resources -- people and apparatus -- are required to solve a problem. Watch the video at https://vimeo.com/286615416 GOV. HICKENLOOPER AGAIN PROCLAIMS SEPTEMBER ‘CAMPUS FIRE SAFETY MONTH’ Thank you, John W. Hickenlooper, for once again proclaiming September Campus Fire Safety Month (PDF). Those of us at PFA are also thankful for our relationship with Colorado State University, specifically the amazing people in CSU's Office of Fire & Life Safety. Together, we educate hundreds of students each year about various fire-safety topics, including proper evacuation techniques during annual residence hall fire drills, proper use of a fire extinguisher, and more. CITY MANAGER’S UPDATE 24 INVITATION: SEPT. 15 GUNS & HOSES BENEFIT Attend the Second Annual Guns vs Hoses Boxing Tournament, a fundraising event benefiting the FOP Benevolent Fund and Poudre Fire Authority’s Local 1945 Foundation, both focused on financially supporting injured or ill emergency responders and their families. Men and women police and firefighters will battle head-to-head in this exciting, community event at 6 p.m. at Colorado State University’s B.W. Pickett Equine Center. More info: www.facebook.com/events/573879776363922/ PFA LAUNCHES WEBSITE REDESIGN As of Aug. 9, PFA’s website, at www.poudre-fire.org, has a new look and feel. This redesign project gave PFA the opportunity to not only update the design, but take a look at content, update photos, eliminate redundant or confusing pages, and improve site navigation. The main goal was to make the site easier for people to use, and to update the information to reflect who we are today. Here is a comparison of the new homepage vs. the old. H2O FOR HEROES THANK YOU On Aug. 4, 2018, Firehouse Subs stores across the nation hosted H2O for Heroes, a campaign that encourages people to donate water to first responders. PFA donations totaled just over 180 cases of water, which in water math equates to more than 4,300 bottles! A big thank you, to our local Firehouse Subs partners and all those people who donated to the campaign. REGIONAL AGENCIES PARTNERING TO HOST FULL-SCALE EXERCISE Larimer and Fort Collins Offices of Emergency Management are partnering with a multitude of regional emergency service agencies, and municipal and county departments to plan and host a full-scale disaster exercise in 2019. The intent is to create a scenario(s) that bring agencies together to test their current capacities, and to identify areas for improvement so they are as prepared as possible to serve the community in times of natural and man-made disasters. POLICE SERVICES Notable Criminal Cases The Fort Collins Police Criminal Impact Unit arrested three men and three women for months of criminal activity. Detectives connected these suspects to 15 separate incidents that occurred between December 2017 and May 2018. The incidents occurred in Fort Collins and Larimer County and impacted more than 20 victims. In total, the suspects face 107 charges. CITY MANAGER’S UPDATE 25 On August 29, police responded to a report of possible animal cruelty in a home. When they arrived, they contacted resident Bryan Hackleman. Through the course of the investigation, officers located a deceased cat with injuries consistent with abuse. Hackleman was arrested for animal cruelty and booked into the Larimer County Jail. Follow up investigation resulted in a total of three charges being filed with the District Attorney. Detectives are continuing to investigate reports of missing cats in the area near the suspect’s home. Community Connections FCPS officers and civilian employees constantly find positive ways to connect with residents. From chance encounters on the street to educational presentations, we truly enjoy building relationships with our community. A few examples from the last month include: • The annual Citizen’s Police Academy kicked off in August. Citizens participating in this program will have a chance to learn about FCPS’ day-to-day operations, special units, training, and issues facing law enforcement today. • Sworn and civilian staff from FCPS visited neighborhood parties across the City during National Night Out. We had a great time connecting with residents and building relationships. • FCPS employees joined others from the City and CSU to welcome students back to school and educate residents old and new about how to be good neighbors. • The Boys and Girls Club of Larimer County challenged FCPS to a kickball game, and the kids really brought their best. After an exciting six innings, the Boys and Girls Club team prevailed with a one-point win over police! We look forward to a rematch in the future with our young friends. • Community members and officers gathered at Genoa Coffee for the August Coffee with a Cop event. Kids almost outnumbered adults at this well-attended gathering. FCPS has started holding a monthly Coffee with a Cop at different locations around town. The next event is scheduled for October 3 at Lamar’s Donuts on Drake Rd from 7-9 a.m. Crime Prevention This month, the Crime Prevention Specialist had 30 telephone calls ranging from networking with Lowe’s Regional Loss Prevention Manager to helping a resident with a faulty alarm system. CITY MANAGER’S UPDATE 26 Presentations ranged from a talk to the Northern Colorado Property Manager’s Assn. Annual meeting to attending a Neighborhood’s National Night Out event. Here’s the breakdown on activities in August: • Neighborhood Night Out, THOUSANDS attended • RESTORE, 33 attended • Property Managers Association, Personal Safety, 35 attended PLANNING, DEVELOPMENT &TRANSPORTATION BUILDING SERVICES AND PLANNING City Plan Public events sharing three alternative future community scenarios will be held on Sept 25-26 along with multiple small group meetings held by local Plan Ambassadors. A recap of the City Plan scenarios phase and initial policy development will be shared with City Council at its November 13th Work Session. Downtown and Transitions Code Final refinements are being prepared to draft code changes based on recent community comments. Review by the Planning and Zoning Board has been scheduled for October 18th. Formal recommendations will also be received from the Downtown Development Authority and Landmark Preservation Commission. City Council review will likely occur in November or December of this year. Planned Unit Development (PUD) Code City Council adopted a new, optional Planned Unit Development (PUD) process. The PUD process would allow for greater creativity and flexibility for parcels larger than 50 acres and being developed in multiple phases. Sign Code Amendments Sign Code amendments were discussed at the August 14th City Council Work Session. Based on Council direction the majority of amendments will be brought to Council for consideration within the next two months. Changes related to electronic billboards will follow a separate timeline, with additional research and outreach conducted before that portion of the code is considered by Council. NEIGHBORHOOD SERVICES Neighborhood Night Out The 2018 Neighborhood Night Out was held August 7th and provided opportunities for neighborhoods across Fort Collins to celebrate community and connect with neighbors. 86 events were registered this year, hosting approximately 5,000 participants and ranged from small potlucks gathering a few neighbors to large concerts with hundreds of participants. City Council, City Staff, Poudre Fire Authority, Police Services, and neighborhood businesses visited Neighborhood Night Out events to greet neighbors and connect citizens to safety and community resources. Initial feedback from neighbors and City visitors indicate overwhelmingly strong support for the program, value of City sponsorship, and appreciation for the opportunity for meaningful dialogue among neighbors, elected officials, and City Staff. Neighborhood Services Program Staff is currently analyzing historical Neighborhood Night Out data to identify registration and neighborhood trends. Meetings with partner organizations are planned for 2018 Q4 to create a program purpose statement and address gaps in articulated focus and measurable objectives for Neighborhood Night Out. Additionally, Neighborhood Services Staff is drafting an engagement plan for an ad hoc neighborhood stakeholder outreach group to create opportunities for public participation in the creation and management of Neighborhood Services programming to assure alignment with community needs. CITY MANAGER’S UPDATE 27 Neighboring Basics for Pet Owners Neighborhood Services Program Staff are designing a learning and engagement module focused on positive neighboring for pet owners. Approximately 40% of households in Fort Collins have at least one dog. Larimer Humane Society indicates that barking dog reports from neighbors are one of their biggest complaints. A recent incident in the Fossil Lake neighborhood that escalated from frustration over barking dogs began a conversation among Neighborhood Services Staff, Larimer Humane Society Animal Protection Staff, and Neighborhood Enforcement Team Officers on best practices for proactive education and community-building for dog owners. The engagement strategy will be piloted in the Fossil Lake neighborhood for potential scaling throughout the City. Dog owners will participate in formal “dog walker watch” safety and communication training, informal walking club meet-ups to create a visible neighborhood presence, and activity-based meet-ups to educate dog owners about their role in neighborhood and community livability. Get the Scoop This collaborative program brings together Neighborhood Services Code Enforcement Staff, Off- Campus Life at Colorado State University, and a local ice cream truck to build community among long- term residents and students living together in the neighborhoods that surround the Colorado State University Campus. This year we connected with 153 individuals during the first weekend of August and helped to foster connections among neighbors and shared a “scoop of ice cream and scoop of information” regarding city codes and ordinances. Community Welcome Every year, just prior to the fall semester, the City of Fort Collins and Colorado State University collaborate to foster positive community relations between new students and long-term residents of Fort Collins during the Community Welcome event. This event is meant to help students and long-term residents of Fort Collins connect and find a sense of community early in the fall semester. Dr. Tony Frank President of CSU and Mayor Wade Troxell welcomed just under 200 volunteers from the City of Fort Collins, City Council, Fort Collins Police, CSU Police, CSU faculty and staff, CSU athletes, CSU students, and community members before they connected with 1,400 households surrounding the CSU Campus. CSU Game Day- Game 1 Nine (9) staff from NBS/CC served as neighborhood ambassadors in the neighborhoods around CSU campus two (2) hours prior to kick-off to assist residents & game attendees navigate issues such as; party noise/behavior, RP3 parking questions, stadium clear-bag policy, parking on yard ordinance and enforcement, and any other resident concerns/questions. A total of sixty-four (64) contacts were made in the neighborhoods. • Code staff continued with parking on yard enforcement efforts at start of game, following education/opportunity to correct observed municipal code violation. Ultimately, eight (8) violations were corrected and two (2) citations were issued. • Code staff conducted noise readings at five (5) identified neighborhood locations through the first quarter of play to confirm prior season data. The highest impact remains at the northern part of the Sheely Addition neighborhood. Equity and Inclusion Capacity Building Restorative Justice Services was awarded a $10,326 grant for Equity and Inclusion Capacity Building. The grant will pay to have all RJ forms and documents translated and/or updated from English to Spanish. It will also provide for two rounds of Equity and Inclusion training for Mediation and RJ staff and volunteers. Grant time period is 9/1/2018-6/30/2019. The trainings will take place this Fall and next Spring. The grant is awarded from the Colorado Council on Restorative Justice. CITY MANAGER’S UPDATE 28 GRAFFITI UPDATE In August 2018, the total number of abatements was 172. Last year in August, there were 122. One of the main reasons for this increase was due in part to two separate weekend graffiti sprees that took place in the Rigden Farm neighborhood. A quarter of all the reported graffiti for the month of August occurred during these attacks. A second incident that consisted of numerous reported tags (25+) came over the Bohemian Nights NewWestFest event. Lastly, a transient camp located under the Railroad Bridge in the Gustav Natural Area required a site clean-up and the removal of 20+ graffiti tags. The number of individuals supervised for community service was 2, and 25 community service hours were completed by each person. YEAR TO DATE COMPARISON Development Project Submittals Rec’d Conceptual/Preliminary Design Reviews/Staff reviews Performed Building Permits Issued Building Permit Valuations ($M) Building Inspections Performed 2017 YTD 219 184 4,938 $383.28 22,467 2018 YTD 219 161 7,151 $294.13 23,104 % Change 0% -12.50% 44.82% -23.26% 4.84% Overall Development Review revenues are $(137,339) under projection for 2018 as of August 31st with Development Review under by $(137,055) and Engineering Development Review under by $(283) SUSTAINABILITY SERVICES ENVIRONMENTAL SERVICES Buckets, Beds and Shreds: The City will host a special recycling collection event for mattresses, papers for shredding and hard plastics on Saturday, October 6 from 9 a.m. to 3 p.m. at the Timberline Recycling Center, 1903 S. Timberline Road. There will be no additional fee after the $5 gate fee for acceptable bulky plastics during the collection event. Mattresses and box springs are $10 each. Documents for shredding are $5 per banker's box. Innovate Fort Collins Challenge: About 130 people witnessed six finalists presenting funding proposals on the August 30 public Pitch Night as part of the City’s Innovate Fort Collins Challenge. The teams, including nonprofit organizations, industry and educational institutions, were selected from 19 proposals totaling $788,000 in requested funding. Sixteen community volunteers largely from City boards and commissions participated in hosting CITY MANAGER’S UPDATE 29 the event and judging the competition. Winners are expected to be selected and announced by the middle of September. SOCIAL SUSTAINABILITY Affordable housing: The City seeks a development team to design and construct affordable for-sale homes on a five-acre parcel in south Fort Collins. The parcel is part of the City’s Land Bank Program, through which the City acquires, holds and sells real property to help housing providers build affordable rental and homeownership housing. The “bank” currently consists of four properties. The City sold a fifth parcel in 2017 to Housing Catalyst for the 96-unit Village on Horsetooth. The deadline to apply is September 16. Multicultural retreat: The community Multicultural Retreat – an effort to help increase knowledge, mindfulness and effective behaviors across cultural differences in the community – will be from 8 a.m. to 5 p.m. Saturday, October 6 at 222 Laporte Ave., in the Colorado River Room. Cost is $50. Registration deadline is Monday, October 1. For more information, contact Alma Vigo-Morales at avm- bak@comcast.net, Barb Kistler at bak-avm@comcast.net or Janet Freeman at jfreeman@fcgov.com. City of Opportunity: The National League of Cities has named Fort Collins one of 12 Cities of Opportunity to develop a comprehensive approach to improving community health and wellbeing through economic opportunity, affordable housing and planning. The pilot program is part of a national effort to develop multi-sector, holistic, sustainable and equitable policy around health. ECONOMIC HEALTH Small business survey: Wanted: Cool stories about doing business in Fort Collins. What are some highlights as a business owner? As a resident? Share a story about your relationship with the business community and supporting the business culture in Fort Collins. Share feedback and discussion at https://ourcity.fcgov.com/FoCo-Business-and-You. Efficiency Loans: Fort Collins Utilities has launched a new loan program called EPIC Loans to help residential property owners make their homes more efficient through a financial partnership with the Colorado Energy Office and Bloomberg Philanthropies. The state has contributed a $200,000 grant and $1 million in loans. UTILITIES CUSTOMER CONNECTIONS Community Engagement recently completed a successful peak season and is excited to re-engage with Poudre School District, Colorado State University and all Utility customers this Fall with relevant Utility programs, events and rate changes. Key stats to date since January 2018: reached over 6,545 participants (youth through adults) through 156 education outreach programs. Community Engagement has managed or participated in 77 events that have reached 5,300 community members. September currently has approximately 35 education programs and events scheduled. CITY MANAGER’S UPDATE 30 Time of Day (TOD) communications has been a phased launch in providing customers both awareness and education on the upcoming rate structure change. Two media stories have been pitched and selected by the Coloradoan. The stories by the Coloradoan are being picked up by other media, such as Energy Central, and Channel 7 news. The campaign will be ongoing for the next year, that includes details on the Income Qualified Assistance Program, and low income support. To date there has been 263 customer calls and 12 Access Fort Collins inquiries. As customers spoke with staff they understood key information that eased concerns greatly. Staff also launched a TOD Estimator to alleviate concerns regarding on-peak hours that customers can input with their electric utility usage. COMMUNITY SERVICES RECREATION Fall Registration Fall Recreation registration began on August 9. Registration increased by 22% from Fall of 2017. Over 4,600 participants registered for programs in a 24-hour period. Over 60% registered online and 645 people registered for reduced fee programs. Fitness, Child Development and Aquatics programs were the top three program area enrollments. 3CMA Savvy Award for Social Media The Parks and Recreation communications team won the top prize at this year’s 3CMA (County and City Communications and Marketing Association) Conference. The communications team won the Savvy for “Best Use of Social Media.” There department utilizes Facebook, Instagram and Twitter to inform, entertain and engage followers. Pooch Plunge Success On August 26, Recreation hosted the always popular "Pooch Plunge" event at the pool. Over 475 dogs and 780 humans attended the event which signifies the closure of City park Pool for the season. PARKS Parks Supports Large Summer Events The Parks Department supported many community events that took place within the Park’s system. Large events such as NewWest Fest and Tour de Fat required support from the Parks Department at various levels of maintenance and operations. These events were successful and well attended. Downtown Tree Replacement Completed The Forestry Department completed the downtown tree replacement program. Ten trees were replaced with minimal disruption to businesses and traffic. This project the removal, grinding and replacement in downtown tree grates. Crescent Park CITY MANAGER’S UPDATE 31 The Parks Department assumed maintenance responsibility for Crescent Park. The new park located in north Fort Collins is 7 acres and features an “in-earthed” restroom, basketball court, play area, pond and gathering spaces. PUBLIC ENGAGEMENT Feature: Summer in the City Alumni – Pizza Party with City Leader The City partners with PSD to put on an annual, short-term, civic engagement summer camp for high school students. Members of the 2018 class, along with the family members, were invited to join City leaders for a pizza party celebration to receive graduation certificates and discuss their experience. Our PSD partner also attended the event and is excited to continue and expand the program. Public Engagement Recap  West Nile Virus – two series of adulticide applications were done which included extensive communication to the neighborhoods including: Nextdoor, LETA, social channels, media, doorhangers and web updates. Staff responded to residents’ questions through emails and phone calls.  Rebate Program – the first month of the application period concluded with about 500 completed applications which is on par with this time last year.  BFO – the City’s Budget page was updated to include the City Manager’s Recommended Budget, information around next steps and Council review, options for public engagement and the budget review simulation tool. Review at fcgov.com/budget COMMUNITY DASHBOARD HIGHLIGHT The Community Dashboard features performance data and information that highlights how the City is doing in achieving its seven Outcome areas: Neighborhood Livability and Social Health, Cultural and Recreation, Economic Health, Environmental Health, Safe Community, Transportation, and High Performing Government. The Dashboard is made up of 38 total metrics that are published quarterly and demonstrate where the City is doing well and where there are opportunities to improve. The color status of performance for each metric is determined based on the actual result for the quarter compared with the target. The color status of performance for the Outcome is determined based on the average calculation of the performance of each metric within that Outcome. Each month the City Manager’s Update will highlight a metric from the Community Dashboard. This month’s feature is from the Culture and Recreation Outcome Area. CITY MANAGER’S UPDATE 32 Analysis: Trail counts exceed the quarterly target for the second quarter of 2018. The increase is attributed to increased use on the Stanton Creek Trail created by opening the new Front Ranger Trail connecting Fort Collins to the Boyd Lake Trail in Loveland. Additionally, the Colorado Marathon, Horsetooth Half Marathon and Bike to Work Day all increased trail counts. Definition: The total number of people accessing and utilizing the City's paved trails system. Why is this metric important? This metric provides an indication of the popularity of trails which, in turn, indicates how well the trail system is meeting the needs of the community. City’s impact on this metric: High – Park Planning and Development influences this metric by providing an accessible, well-planned paved trail system that serves the community's trail commuters and recreational users. Benchmarks: This metric contains no benchmark data due to the lack of comparable data. There is no accepted standard for what qualifies as a trail; for example some communities includes paved surfaces within neighborhood parks. There is also no standard method for the calculations used to determine the number of visits. To view the entire Dashboard, please visit: http://fortcollins.clearpointstrategy.com/