Loading...
HomeMy WebLinkAboutReport - Mail Packet - 3/13/2018 - City Manager Monthly Update - March 2018MARCH 2018 MARCH 8, 2018 Table of Contents ISSUES BEFORE COUNCIL ................................................................................................................. 4 March 13 WORK SESSION - CANCELED ...................................................................................................................4 MARCH 20 COUNCIL MEETING ...............................................................................................................................4 MARCH 20 ELECTRIC ENTERPRISE MEETING ..........................................................................................................4 MARCH 20 URBAN RENEWAL AUTHORITY MEETING .............................................................................................4 MARCH 27 WORK SESSION .....................................................................................................................................4 APRIL 3 COUNCIL MEETING ....................................................................................................................................5 APRIL 3 ELECTRIC ENTERPRISE MEETING ...............................................................................................................5 APRIL 10 WORK SESSION - CANCELED ....................................................................................................................6 SALES AND USE TAX COLLECTION .................................................................................................. 6 MONTHLY & YEAR TO DATE ...................................................................................................................................6 CAPITAL PROJECTS- ENGINEERING ................................................................................................ 6 CITYWIDE PEDESTRIAN ACCESS PROJECT ...............................................................................................................6 SUNIGA ROAD IMPROVEMENTS – COLLEGE AVE. TO BLONDEL STREET ................................................................7 DOWNTOWN RIVER DISTRICT IMPROVEMENTS ....................................................................................................7 NORTH COLLEGE IMPROVEMENTS – CANAL TO STATE HIGHWAY 1 .....................................................................8 HORSETOOTH AND COLLEGE INTERSECTION IMPROVEMENTS .............................................................................8 VINE AND LEMAY BNSF IMPROVEMENTS ..............................................................................................................9 DRAKE AND LEMAY TURN LANE IMPROVEMENTS .................................................................................................9 BICYCLE AND PEDESTRIAN GRADE SEPARATION STUDY ........................................................................................9 SHARP POINT/NANCY GRAY CONNECTION ......................................................................................................... 10 RIVERSIDE BRIDGE REPLACEMENT ...................................................................................................................... 10 LEMAY CULVERT EMERGENCY REPLACEMENT .................................................................................................... 11 HARMONY AND STRAUSS CABIN SIGNALIZATION ............................................................................................... 11 CAPITAL PROJECTS – PARK PLANNING & DEVELOPMENT ........................................................ 12 LONG VIEW TRAIL ................................................................................................................................................ 12 CRESCENT PARK ................................................................................................................................................... 12 CAPITAL PROJECTS – OPERATION SERVICES ............................................................................. 13 GARDENS ON SPRING CREEK -GARDEN EXPANSION ........................................................................................... 13 GARDENS ON SPRING CREEK – VISITOR’S EXPANSION ........................................................................................ 13 FORT COLLINS/LOVELAND POLICE TRAINING CENTER ........................................................................................ 13 CAPITAL PROJECTS – UTILITIES .................................................................................................... 14 EAST HARMONY DUCT BANK ............................................................................................................................... 14 COLORADO STATE UNIVERSITY CIRCUITS AND DUCT BANK PROJECT ................................................................ 14 HP BROADCOM CIRCUITS .................................................................................................................................... 15 WATER TREATMENT FACILITY ............................................................................................................................. 15 HARMONY DUCT BANK – HARMONY SUBSTATION PROJECT ............................................................................. 16 LIGHT & POWER GENESIS64 SCADA UPGRADE PROJECT .................................................................................... 16 WALNUT STREET WATER MAIN REPLACEMENT .................................................................................................. 17 DRAKE WATER RECLAMATION DEWATERING IMPROVEMENTS ......................................................................... 17 NECCO PONDS AND BACKBONE-PHASE II ........................................................................................................... 18 UTILITIES ............................................................................................................................................ 18 WATER RESOURCES AND TREATMENT ................................................................................................................ 18 WATER ENGINEERING AND FIELD SERVICES ....................................................................................................... 18 CUSTOMER CONNECTIONS .................................................................................................................................. 19 PUBLIC SAFETY ................................................................................................................................ 19 POUDRE FIRE AUTHORITY ................................................................................................................................... 19 POLICE SERVICES .................................................................................................................................................. 21 PLANNING, DEVELOPMENT &TRANSPORTATION ......................................................................... 23 BUILDING SERVICES AND PLANNING ................................................................................................................... 23 NEIGHBORHOOD SERVICES ................................................................................................................................. 23 SPECIAL PROJECTS ............................................................................................................................................... 24 YEAR TO DATE COMPARISONS ............................................................................................................................ 24 SUSTAINABILITY SERVICES ............................................................................................................ 24 ENVIRONMENTAL SERVICES ................................................................................................................................ 24 SOCIAL SUSTAINABILITY ...................................................................................................................................... 24 ECONOMIC HEALTH ............................................................................................................................................. 25 COMMUNITY SERVICES .................................................................................................................... 25 RECREATION ........................................................................................................................................................ 25 PARKS ................................................................................................................................................................... 25 PUBLIC ENGAGEMENT ..................................................................................................................... 26 COMMUNITY DASHBOARD HIGHLIGHT .......................................................................................... 27 CITY MANAGER’S UPDATE 4 ISSUES BEFORE COUNCIL MARCH 13 WORK SESSION - CANCELED  National League of Cities Congressional City Conference -March 11-14, 2018 (Washington, DC) MARCH 20 COUNCIL MEETING  Appropriate Debt Proceeds for Use in Light & Power / Broadband Fund o Appropriate funds in connection with the issuance of revenue bonds from the Light & Power/Broadband Fund to finance the design, construction, marketing, and initial operations of a municipal broadband service High Performing Government-7.1 Provide world-class services that meet the needs of the community. MARCH 20 ELECTRIC ENTERPRISE MEETING  Authorize New Debt for Light & Power / Broadband o Authorize staff to execute agreements in connection with the issuance of $132 million in revenue bonds from the Light & Power/Broadband Fund to finance the design, construction, marketing, and initial operations of a municipal broadband service High Performing Government-7.1 Provide world-class services that meet the needs of the community. MARCH 20 URBAN RENEWAL AUTHORITY MEETING  Whitewater Park o Consider Urban Renewal Authority Funding for the Whitewater Park project. Economic Health- 3.5 Foster sustainable infill and redevelopment. MARCH 27 WORK SESSION  West Nile Virus (WNV) Management Policy Review o Discuss new understandings of impacts of WNV, review input provided by the WNV Technical Advisory Committee, and seek direction from Council regarding potential policy changes requiring a new resolution Environmental Health - EH 4.3 Engage citizens in ways to educate and encourage behaviors toward more sustainable living practices.  Sign Code Update, Phase 2 o Review with Council potential Land Use Code changes concerning the sign code Community & Neighborhood Livability-1.5 Guide development compatible with community expectations through appropriate planning, annexation, land use, historical preservation and development review processes. CITY MANAGER’S UPDATE 5  Significant BFO Considerations for 2019/2020 o Inform Council on several areas that will impact or influence the upcoming BFO process. Proposed areas for discussion include: (1) Police staffing, (2) Compensation and benefits, (3) Improvements related to capital project estimates, and (4) Potential infrastructure financing. High Performing Government- 7.1 Provide world-class services that meet the needs of the community. APRIL 3 COUNCIL MEETING  2018 Reappropriation Ordinance (consent) o Appropriate expenses related to the previous fiscal year's appropriations that lapsed at year end, but for which the expenses were not completed High Performing Government-7.1 Provide world-class services that meet the needs of the community  Appropriate debt proceeds for use in Light & Power/Broadband Fund. (Second Reading) o Appropriate funds in connection with the issuance of revenue bonds from the Light & Power/Broadband Fund to finance the design, construction, marketing, and initial operations of a municipal broadband service. High Performing Government-7.1 Provide world-class services that meet the needs of the community  Oil and Gas Land Use Code Updates (consent) o Update Land Use Code to increase the setback between new residential development and existing oil and gas operations from 350 feet to 500 feet. The proposed requirements would allow for a reduced setback around permanently plugged wells if the developer completes additional soil, groundwater and air quality testing. Staff will present the results of community outreach and proposed code changes for consideration. Neighborhood Livability & Social Health-1.5 Guide development compatible with community expectations through appropriate planning, annexation, land use, historical preservation and development review processes.  East Gateway Annexation Initiation o Consider initiating annexation proceedings for the East Gateway Annexation, located approximately ¼ mile northeast of the I-25 and East Mulberry Interchange  Staff Report: Horsetooth Foothills Land Conservation Project o Celebrate the conservation of 2,500 acres of land in an area south and west of Horsetooth Reservoir. This effort, was accomplished through a partnership between Larimer County, Great Outdoors Colorado and Natural Areas  Staff Report: Energy Efficiency Portfolio Evaluation and Continuous Improvement o Utilities completed an independent third-party evaluation project in 2017 for the energy efficiency portfolio. The review included verification of reported energy savings and cost effectiveness, and made recommendations regarding results and ease of participation. In alignment with our mission, vision and values, staff is utilizing the project results and recommendations for continuous improvement and to further optimize goals for savings, customer service and financial performance. APRIL 3 ELECTRIC ENTERPRISE MEETING  Authorize new debt for Light & Power/Broadband (Second Reading) o Authorize staff to execute agreements in connection with the issuance of $132 million in revenue bonds from the Light & Power/Broadband Fund to finance the design, construction, marketing, and initial operations of a municipal broadband service. High Performing Government-7.1 Provide world-class services that meet the needs of the community CITY MANAGER’S UPDATE 6 APRIL 10 WORK SESSION - CANCELED  Quest for Excellence Conference -April 8-11, 2018 (Baltimore, MD) SALES AND USE TAX COLLECTION MONTHLY & YEAR TO DATE JANUARY SUMMARY OVER PRIOR YEAR Month Year to Date Net Sales Tax Collected: 5.1% 5.1% Net Use Tax Collected: -28.6% -28.6% Net Sales and Use Tax Collected: -1.4% -1.4% Year to date, sales and use tax collections excluding rebates are down 1.4% and total $14.0M. JANUARY SUMMARY OVER BUDGET Month Year to Date Net Sales Tax Collected: 2.3% 2.3% Net Use Tax Collected: 6.7% 6.7% Net Sales and Use Tax Collected: 2.9% 2.9% Year to date, the City has collected 2.9% more sales and use tax revenue, totaling $393K over budget CAPITAL PROJECTS- ENGINEERING CITYWIDE PEDESTRIAN ACCESS PROJECT Funding Source: Community Capital Improvement Program Estimated Project Budget: 2018 - $1.1M Estimated Completion Date: Ongoing Phase: In Design Project Details: This project maintains a complete City sidewalk inventory, identifies sidewalk inadequacies, and develops a prioritized work program to achieve goals of promoting walking for transportation and recreation. Project Status:  Upcoming project locations: The 2018 season has begun, and work is underway along Timberline south of Vine for sidewalk and bus stop improvements.  Current projects: 2018 Pedestrian Improvement Program is finalizing bid results. Staff is reviewing a five-year pedestrian program and how to best coordinate efforts with other departments. More information is available at http://www.fcgov.com/engineering/pedneeds.php CITY MANAGER’S UPDATE 7 SUNIGA ROAD IMPROVEMENTS – COLLEGE AVE. TO BLONDEL STREET Funding Source: Building on Basics (BOB), COFC Utilities, Capital TCEF, Development Repay Estimated Project Budget: $3.8M Estimated Completion Date: Fall 2018 Phase: In Design Project Details: Design of a new arterial roadway that connects existing Suniga Road, from Blondel St. to College Avenue. Project Status:  Project team has completed preliminary design.  Currently working towards rights of way acquisitions, holding adjacent property owner meetings, and reviewing previous associated designs. Staff is also in the process of finalizing needed utilities.  60% design plans are completed and being reviewed for cost and constructability. DOWNTOWN RIVER DISTRICT IMPROVEMENTS Funding Source: Federal Grants/Local Funds/DDA Funds Estimated Project Budget: $1.4M for Jefferson Street, $3.5M for Willow Street Estimated Completion Date: 2021 Phase: In Design Project Details: The goals of this project are to provide various design and construction improvements within the Downtown River District. The project is focused on obtaining environmental clearances for planned improvements along Jefferson Street between College Avenue and the Mountain/Lincoln Intersection. The project will also design roadway and urban design improvements along Willow Street between the Great Western railroad tracks and Linden Street; including a pedestrian plaza at the northern corner of Willow Street and Linden Street. Project Status:  Staff finalized ROW plans for the Jefferson Street Improvements Project. Once the project has obtained all environmental clearances, Staff plans to initiate property acquisition. Property acquisition is anticipated to begin in late Spring 2018.  Staff continues coordination with planned development located along Willow Street. Staff’s goals are to coordinate planned Willow Street improvements with development improvements.  Staff has initiated the final engineering phase for the Willow Street Improvements Project between Linden Street and the Great Western Railroad. The project is funded through Community Capital Improvement Program funds. CITY MANAGER’S UPDATE 8 NORTH COLLEGE IMPROVEMENTS – CANAL TO STATE HIGHWAY 1 Funding Source: CMAQ Grant, URA Contribution, Pedestrian Program Funds, TAP Grant, County Funds, Transportation Capital Expansion Fee Funds Estimated Project Budget: $2.1M Estimated Completion Date: 2018 Phase: In Design, Right of Way Acquisition Project Details: This project will construct pedestrian improvements along North College between the Larimer & Weld Canal (City limits) and State Highway 1, including pedestrian bridges crossing the canal. Project Status:  City and Consultant Staff are working to acquire necessary right-of-way.  Consultant is finalizing design based on final review comments. HORSETOOTH AND COLLEGE INTERSECTION IMPROVEMENTS Funding Sources: Funding Appropriated Through the 2017/2018 BFO Process, Surface Transportation Program Grant, Highway Safety Improvement Program Grant, Bridge Funds, Transportation Capital Expansion Fee Funds, Arterial Intersection Improvement Funds Estimated Project Budget: $7.25M Estimated Completion Date: December 2018 Phase: In Design Project Details: This project will construct intersection improvements to address safety and congestion problems. Issues were identified in the Arterial Intersection Prioritization Study, completed in 2011. Project Status:  Project is complete with 60% design.  A contractor has been procured, and the City has begun working with the contractor on project phasing and construction impacts.  ROW discussions with affected property owners have begun and acquisition is in process. More information is available at fcgov.com/horsetoothandcollege/ CITY MANAGER’S UPDATE 9 VINE AND LEMAY BNSF IMPROVEMENTS Funding Source: Keep Fort Collins Great (KFCG), Transportation Capital Expansion Fee (TCEF) Estimated Project Budget: $22M Estimated Completion Date: Spring 2021 Phase: In Design Project Details: The existing Vine and Lemay intersection, which includes the Burlington Northern Santa Fe (BNSF) Railway crossing, is severely congested with limited options to expand through or turn lane capacity due to land use constraints. Project Status:  Embankment construction has begun on realigned Lemay north of Vine Drive in partnership with the NECCO Utilities project. Box culvert work across Dry Creek has also started. The embankment construction is anticipated to be complete in late March.  The City is in the process of right-of-way negotiations for the parcel containing the proposed realigned Lemay and Suniga intersection.  Staff is currently working on traffic studies and funding alternatives which will be presented at the March Council Finance Committee meeting. More information is available at fcgov.com/engineering/vine-lemay DRAKE AND LEMAY TURN LANE IMPROVEMENTS Funding Source: Community Capital Improvement Program (Arterial Intersections) Estimated Project Budget: $600k Estimated Completion Date: Fall 2018 Phase: In Design Project Details: Design and construction of a southbound Lemay to westbound Drake dedicated right turn lane, in conjunction with safety and site access improvements at the northwest corner of the intersection. Sidewalk, ADA, and bus stop improvements will be evaluated and integrated into the project. Project Status:  The project team is working through preliminary design options, and meeting with adjacent property owners  The construction start date will be dependent upon right-of-way acquisition at the northwest corner of the intersection  Final design and public outreach will occur in early 2018, with construction of the improvements in the fall of 2018 BICYCLE AND PEDESTRIAN GRADE SEPARATION STUDY Funding Source: Community Capital Improvement Program (Bike / Pedestrian Grade Separated Crossing Fund) Estimated Project Budget: $80k CITY MANAGER’S UPDATE 10 Estimated Completion Date: Summer 2018 Phase: In Design Project Details: This Study is a multi-departmental effort to catalogue existing bike/pedestrian grade separations throughout the City, and to create a data-driven list of potential, future crossing locations. The study will identify the top 20 locations for high level screening and will conduct a detailed analysis of the top 3 to 5 preferred locations. Project Status:  The project team is currently updating maps of existing grade separated structures, gathering projects costs for recently constructed structures, and identifying potential locations for new crossings. SHARP POINT/NANCY GRAY CONNECTION Funding Source: Street Oversizing Funds, Funds Appropriated through 2015/2016 BFO Process Estimated Project Budget: $1.2M Estimated Completion Date: Fall 2018 Phase: Railroad Negotiation Project Details: The City Master Street Plan identifies Sharp Point Drive and Nancy Gray Avenue as connected across the Great Western Railroad tracks. This project will construct the roadway and pedestrian connection, and railroad crossing. Project Status:  The project team has submitted an application with the PUC and is awaiting approval.  There are challenges with gaining Great Western and PUC approval and support for this project.  The PUC hearing for September was postponed as the City and Great Western are actively negotiating for Great Western support of the project. The project team and design consultant have finalized design in order to make the project “shovel ready” to coordinate with railroad timing. More information is available at fcgov.com/engineering/sharppoint RIVERSIDE BRIDGE REPLACEMENT Funding Source: Federal Grants and Bridge Funds Estimated Project Budget: $4.0M Estimated Completion Date: December 2018 Phase: In Design Project Details: The project will replace the structurally deficient bridge over Spring Creek, and raise Riverside Avenue out of the 100 years CITY MANAGER’S UPDATE 11 flood level at the bridge location. This project is coordinated with Utility’s Spring Creek Restoration Project. Project Status: 90% plans set completed.  CLMOR review is in progress.  Public meeting to be held on March 22 at EPIC. LEMAY CULVERT EMERGENCY REPLACEMENT Funding Source: Bridge Funds Estimated Project Budget: $800K Estimated Completion Date: End of March 2018 Phase: In Construction Project Details: The Warren Lake Outfall culvert failed late August 2017. The structure needs to be replaced by spring 2018 before the start of irrigation season. Project Status: Construction began on February 5. Lemay Ave closed from February 26 thru March 19, with a financial incentive for the contractor to finish up to 5 days early. HARMONY AND STRAUSS CABIN SIGNALIZATION Funding Source: Transportation Capital Expansion Fee Fund, developer contribution Estimated Project Cost: $800K Estimated Completion Date: Summer 2018 Phase: In design Project Details: A signal at Harmony and Strauss Cabin road is warranted with the implementation of the Harmony 23 development. Design and construction of north bound auxiliary turn lanes on Strauss Cabin will be completed by the developer in conjunction with this signal project Project Status:  The project team is working through preliminary design options  The construction start date will be dependent upon right-of-way acquisition and utility relocation on the north portion of the intersection  Final design and public outreach will occur in early 2018, with construction of the improvements summer of 2018 CITY MANAGER’S UPDATE 12 CAPITAL PROJECTS – PARK PLANNING & DEVELOPMENT LONG VIEW TRAIL Funding Source: ConTrust Fund, Federal TAP grant, GOCO grant Total Project Cost: $3.5M Estimated Fort Collins Construction Cost: $2.2M Phase: In Construction Project Details: Park Planning and Development is working in collaboration with the City of Loveland and Larimer County on construction of this trail. The Long View Trail will offer another paved trail connection between the City of Loveland and the City of Fort Collins. Construction has begun and is on schedule for a summer, 2018 completion. Project Status:  Bridge abutments for the 2 bridges on Fort Collins portion of trail are near completion  Boulder walls are being constructed between Scenic Drive and Fossil Creek Drive  Installation of concrete trail anticipated early April, weather permitting CRESCENT PARK Funding Source: Neighborhood Parkland Fund Total Project Cost: $2.5M Phase: Under Construction Estimated Completion: Spring 2018 Project Details: Park Crescent Park is a 7-acre neighborhood park located in the heart of the Maple Hill neighborhood. Construction of the park began in fall, 2017, and is anticipated to be completed later this season. The core area of the park, which includes the playground and shelter, will open to residents once complete. The remaining area of the park will be gated to allow turf and shrubs to take root. Project Status:  Finalizing installation of playground equipment  Finishing shelter CITY MANAGER’S UPDATE 13 CAPITAL PROJECTS – OPERATION SERVICES GARDENS ON SPRING CREEK -GARDEN EXPANSION Funding Sources: $2M Privately Raised Funds $800K General Funds Estimated Project Budget: $2.8M Phase: Under Construction Project Details: Expanding the Gardens to add 5 acres which includes an amphitheater and great-lawn for outdoor performances. Project Status:  Construction is in-progress through winter  Stage and sound walls are going up  Rock walls are being installed  Trees are being relocated from Hughes Stadium  Expected completion is June 2018 GARDENS ON SPRING CREEK – VISITOR’S EXPANSION Funding Sources: Community Capital Improvement Tax - $2.2M Privately Raised Funds: $700K Estimated Project Budget: $2,900,000 Phase: Design-Build Selection Project Details: Add a conservatory, meeting rooms, restrooms and additional office space FORT COLLINS/LOVELAND POLICE TRAINING CENTER Funding Source: Bonds Estimated Project Budget: $9,250,0000 Phase: In Design Project Details: The new training facility site is to offer a 50-yard pistol range, a 1.4 mile driving track along with classrooms. Project Status:  Design team is working on site layout  Working to update budget for revised layout Early Conceptual Site Layout CITY MANAGER’S UPDATE 14 CAPITAL PROJECTS – UTILITIES EAST HARMONY DUCT BANK Funding Source: Development Fees Estimated Project Budget: $4,000,000 Phase: Estimated Completion Date: End of 2018 Project Details: Three Phase Project: Phase 1 is in design, Phase 2 is complete, and Phase 3 will be completed in conjunction with Engineering’s improvements at Strauss Cabin & Harmony. Project Status:  Route identification is 100% complete on Phases 1, 2 and 3. Design is in progress for Phase 1.  Construction of Phase 3 began April 10, 2017, 95% complete.  Installation of two vaults and tie in conduit delayed until Engineering’s final design of intersection improvements.  Phase 2 is complete. COLORADO STATE UNIVERSITY CIRCUITS AND DUCT BANK PROJECT Funding Source: Development Fees Estimated Project Budget: $2,804,340 Phase: Under Construction Project Details: 2.2 miles of duct bank and two new circuits from the Linden Substation to Colorado State University. Project Status:  Drake to Lake Duct Bank is complete.  Cherry Street duct bank from College to Howes is under construction; however, 10 underground gas tanks were discovered and will need to be removed by property owner. Project on hold for 3-6 months.  Howes/Laurel duct bank is complete.  The Vine Drive duct bank is complete.  Circuits are 90% complete; once Cherry St Duct Bank is complete, final circuit section will be pulled in. Vault Installation Vault Installation CITY MANAGER’S UPDATE 15 HP BROADCOM CIRCUITS Funding Source: Development Fees Estimated Project Budget: $500,000 Phase: In Design Project Details: Installation of approximately 1,200 feet of duct bank on Broadcom property. Project Status: Pending an easement from Broadcom. WATER TREATMENT FACILITY Funding Source: Water Treatment Facility Capital Project Budget Estimated Project Budget: $850,000 Phase: In Design Project Details: Approximately 4,000 feet of three-phase from Overland Trail to the Treatment Facility in an existing easement on Colorado State University Property Project Status: Pending an easement from Western Area Power Administration Hewlett-Packard Campus Water Treatment Facility CITY MANAGER’S UPDATE 16 HARMONY DUCT BANK – HARMONY SUBSTATION PROJECT Funding Source: Development Fees Estimated Project Budget: $214,590.00 Phase: Preliminary Construction Project Details: 5 new duct banks for additional capacity at the Harmony substation Project Status:  Tree and stump removal completed  Berm removal  Final grading  Setting of (3) 8 x 16 vaults  Construction of 5 duct banks and tie in to harmony duct banks  Final landscaping of 5 new trees, sprinkler system and sod construction area LIGHT & POWER GENESIS64 SCADA UPGRADE PROJECT Funding Source: New Capital Estimated Project Budget: $200,000 Phase: In Design Project Details: Convert the existing Iconics Genesis32 hardware, software, and screens to Genesis64 Project Status:  Servers have been purchased  Software has been purchased  A consultant to assist with some aspects  the upgrade has been retained  Currently in the process of having I.T. configure two workstations for use with the project Tree Removal CITY MANAGER’S UPDATE 17 WALNUT STREET WATER MAIN REPLACEMENT Funding Source: Water Estimated Project Budget: $613,000 Status: In Construction Project Details: This project replaces two 100-year-old undersized water mains in Walnut Street between College Avenue and Linden Street. The new water main that will be constructed will be 8” in diameter and 480’ long. Additional work includes 12 new water service connections, 2 new 6” fire services, and 2 new fire hydrants. Walnut Street will be resurfaced in the spring when temperatures rise. Project Updates:  Water main and services connections are complete  Full depth asphalt street paving is being done as part of the project and will be completed the first 5 days of March DRAKE WATER RECLAMATION DEWATERING IMPROVEMENTS Funding Source: Wastewater Estimated Project Budget: $4,270,000 Status: In Construction Project Details: Addition of 2 new centrifuges at the Drake Water Reclamation Facility. This project will provide redundancy for the dewatering process at the Drake Water Reclamation Facility. Construction will be complete at the end of 2018. Project Updates:  Demolition of concrete slabs and curbs in the centrifuge room  Removal of mechanical piping in the centrifuge room is underway Installing water main on Walnut Street Demolition of existing belt press conveyor in the centrifuge room CITY MANAGER’S UPDATE 18 NECCO PONDS AND BACKBONE-PHASE II Funding Source: Stormwater Estimated Project Budget: $8,300,000 Status: In Construction Project Details: The Northeast College Corridor Outfall Project (NECCO) is a storm drainage improvement, that includes the Necco Regional Detention Pond at Redwood and Suniga that outfalls into a storm sewer box culvert located north of Vine Drive from Redwood Street east to the Lindenmeir Outfall. Additionally, a 12” waterline was constructed along the future Suniga Drive ROW from Redwood Street to Lemay Avenue. Project Updates:  32,500 cubic yards of material excavated and placed  Outfall channel complete UTILITIES WATER RESOURCES AND TREATMENT Environmental Regulatory Affairs Division ERA Stormwater staff awarded $30,000 through the City’s Waste Innovation Fund to conduct a pilot study focused on reduction of phosphorus in local streams through the use of water treatment residuals in Low Impact Development bio-media mixtures. Water Quality Services Division Congratulations to the Water Quality Lab, which passed the 2018 NSI Laboratory Proficiency Testing audit with 100% accuracy. Successful completion of this audit is a critical component of maintaining the lab’s U.S. Environmental Protection Agency/Colorado Department of Public Health and Environment certification for Drinking Water Analysis and requires correct analysis of 102 different “unknown” parameters. It takes considerable time and careful attention from the chemists as well as hard work from everyone who supports lab operations. WATER ENGINEERING AND FIELD SERVICES Water Engineering and Field Services hit a very important milestone in the wastewater section this month. The Maximo (Computer Maintenance Management System) went live on Monday morning 2/26. Wastewater field crews now have a modern and mobile software solution to aid with planning, scheduling, GIS and overall work execution within their area of responsibility. Furthermore, Utilities management will be able to analyze asset data in a more clear and concise form compared to past practices. This type of analysis will ultimately become a part of the decision-making process as it pertains to repairing and replacing wastewater assets. 66” Outfall into NECCO Pond CITY MANAGER’S UPDATE 19 CUSTOMER CONNECTIONS Energy Efficiency Portfolio Evaluation and Continuous Improvement Utilities completed an independent 3rd party evaluation project in 2017 for the energy efficiency portfolio. The review included verification of reported energy savings and cost effectiveness, and made recommendations regarding results and ease of participation. The study was coordinated with Platte River Power Authority for programs common to all four cities. The results concluded portfolio results are on track for savings and cost effectiveness and are available here: https://www.fcgov.com/utilities/what- we-do. A staff report to Council is scheduled for April 3 summarizing next steps from this study. Compact of Colorado Communities Award Fort Collins Utilities received an award for the “Driving Fort Collins Clean Energy Economy” initiative at the Compact of Colorado Communities Symposium. The award recognizes innovative, leading edge programs and initiatives in the public and private sectors that demonstrate a bold vision for a clean, resilient and prosperous Colorado. Bloomberg Champion Cities Award Fort Collins is one of 35 Champion Cities selected as part of the 2018 U.S. Mayor’s Challenge from Bloomberg Philanthropies, which provides grants and technical assistance to city leaders who are solving urgent problems in their communities, announced today. The award includes a $100,000 grant in support of the project, which will include on-bill financing for improving the energy efficiency of low- to moderate-income rental households. Platte River 20 MW Solar with Battery Storage RFP Platte River Power Authority has issued a request for proposals for at least 20 megawatts of new solar energy capacity that could be added to its system, and also calls for up to 5 megawatt-hours of energy storage capacity. The energy produced from the solar installation is anticipated to be used as part of a community solar program, making the energy available to residential and business customers. The timeline calls for bid evaluations to be completed in May. PUBLIC SAFETY POUDRE FIRE AUTHORITY February awards | Recognizing the amazing people who make our community better Throughout February, Poudre Fire Authority recognized individuals, businesses and organizations for their contributions to our community, whether it be through donation of critical training props or the saving of a life. Among those recognized are: Fort Collins Towing, for its annual donation to PFA of about 80 cars used for extrication training; Fort Collins Police Services Officers Matthew Brede and Dexter Rowe; Fort Collins 911 Dispatcher Dana Carlvaho; UCHealth EMS EMT Elizabeth Baggett; and Thompson Valley EMS Paramedic Jason Lucas for their collective work saving the life of Axel Siverts in April 2017; Leslie Coblantz, Dr. Malcolm Scott and Colorado State University, for their partnership in exploring the intersections between social services and the fire service; Fort Collins 911 Dispatcher Ethan Lack, for saving the lives of a family impacted by a fire at their house; and Terrill Mussleman, Barry Kroemer, Keegan Barricklow and Michael Parish for saving the life of CITY MANAGER’S UPDATE 20 their colleague through quick and effective use of cardio pulmonary resuscitation (CPR) and an automated external defibrillator, or AED. Feb. 12 | PFA welcomes four new firefighter recruits Please welcome Poudre Fire Authority's four newest firefighter recruits. They will take part in the Front Range Fire Consortium Academy in order to be considered for future employment. As is tradition, Chief Tom DeMint handed them their helmets, saying, "This helmet will take care of you if you take care of it. ... Protect what's in your helmet." Good luck, recruit Class 18-1. Feb. 24 | Firefighters extinguished a fire Saturday morning at a Fort Collins home that injured two of the home’s occupants. Crews were dispatched to a single-family ranch home at 2409 Mathews St. at 6:10 a.m. PFA’s Engine 3 arrived first on scene 3 minutes later and quickly got to work fighting the fire. It was brought under control at 6:25 a.m. Fortunately, two adults and one child were outside the home when firefighters arrived on scene. The two adults suffered burns and were transported to hospitals for treatment. The garage, laundry room and a bedroom sustained damage in the fire, which is under investigation. There is no additional information at this time. Any time there is a fire, it serves as an important reminder of safety tips:  Make sure you have working smoke alarms in your home. Test them regularly so you know they’ll work if there is an emergency.  Know two ways out of any room.  Make an emergency plan with your family or roommates. Talk through it, and practice it often.  Sleep with your door closed. Hard as it is to believe, a door can stop the spread of fire and protect you. Feb. 28 | Significant carbon monoxide call serves as reminder of detectors’ importance Talk to your family, friends and roommates about carbon monoxide, or “the invisible killer.” That conversation can mean the difference between life and death. Poudre Fire Authority firefighters responded early Wednesday morning to a serious carbon monoxide-related call on Eastwood Drive in Fort Collins. An adult and two adolescents were taken to the hospital for treatment of conditions likely associated with their exposure to carbon monoxide. Four dogs in the home also needed veterinary care. There were no carbon monoxide detectors in the home. One of the adolescents woke up with a headache, prompting a 911 call. PFA firefighters conducted testing at the home and reported carbon monoxide levels at more than 400 ppm, or parts per million. This environment is life-threatening to a person after three hours. If the adolescent hadn’t awoken, it’s possible this event could have ended in tragedy. Read more at: bit.ly/PFACOcall0228. Public Affairs and Communication Manager Madeline Noblett uses cases like this to educate the greater community about critical life-safety information across myriad in-person and digital platforms. Feb. 28 | Emergency Management Award The Colorado Emergency Management Association bestowed upon Fort Collins Office of Emergency Management Battalion Chief Mike Gavin its President’s Award for his contributions to the profession. Congratulations, Chief Gavin! CITY MANAGER’S UPDATE 21 POLICE SERVICES Crime Prevention This month, the Crime Prevention Specialist had 23 telephone calls ranging from working with Associates in Family Medicine and their chronic false alarms to helping a victim of domestic violence get connected with victim’s services. Presentations ranged from a Neighborhood Watch/Safety for the Woodlands Apartments (a homicide had occurred there in previous weeks), to interacting and providing information to CSU freshmen who would be coming out into the community after a year in the dorms. Here’s the breakdown on activities in February:  CSU Housing Fair (2518 at the fair)  Neighborhood Watch, Woodlands Apts, 33 attended  RESTORE, 50 attended  Scotch Pines Neighborhood Watch, 27 attended  Presentations to 2628 people, 23 incoming telephone calls Citywide Teamwork Results in Wheelchair Theft Recovery Officers responded to a motorized wheelchair theft. The victim, Mr. Cook, was an elderly veteran who relies heavily on his wheelchair for mobility around town. When the call came in, a Dispatcher remembered seeing a man on the Downtown Transit Center public safety cameras who a) was not Mr. Cook and b) was riding around on Mr. Cook's wheelchair. Several Dispatchers followed up with Transfort and located the suspect and stolen wheelchair on a bus. When the suspect realized we were onto him, he abandoned the wheelchair and left the bus. Transfort staff recovered the stolen property and returned it to the Downtown Transit Center. An officer picked it up and brought it back to a very grateful Mr. Cook. Outstanding service and teamwork between FCPS divisions and City service areas! Traffic Safety Officers continue to dedicate Community Impact Days to traffic enforcement and education in areas of concern. To guide these efforts, FCPS has partnered with the Traffic Operations department to identify common collision spots and the behaviors that cause them. Officers also used resident reports from the Traffic Hotline to pinpoint areas of concern. Spring Forecasting As Spring approaches, patrol supervisors have started discussing strategies for preventing and addressing warm-weather issues such as “cruisers” on College Avenue and other busy streets, disruptive and criminal transient activity, parties, and window peepers. FCPS will share tips and information relative to these topics on social media in the coming months. CITY MANAGER’S UPDATE 22 Community Trust Initiative City staff and representatives from FCPS continue to work with a stakeholder advisory group to identify concerns within documented and undocumented communities here in Fort Collins. The group will conduct listening sessions throughout the Spring with different community members to answer questions, better understand perceptions, and develop actionable ideas for improving trust and engagement between the City and our residents. Cat Cop Hopefuls Flock to Fort Collins, Cause a Stir on Social Media Following last year’s internationally-popular April Fool’s “Feline Unit” video, FCPS has noticed a few furry visitors around the Police Services building. FCPS posted about two of these visitors on social media and saw an extremely positive response from followers and local media. On FCPS’ Facebook page alone, the two posts combined reached more than 37,000 people, earned over 1,400 reactions, and were shared 221 times. While these types of posts may seem trivial, numerous people expressed their appreciation for the lighthearted content. One person commented, “Just so you know, you have a fan base in Italy. I send these gems over. I love your humor and your hard work. You make me feel safe. Thank you for all you do.” Another person commented, “A good laugh is like sunshine…We can all use more of that. Thanks for all you do.” Police Regional Training Center Update The Design Team met on 2/7/18 to address issues around the footprint for the facility. The decision was made to allow design firm to identify which footprint would work best in the general area previously designated with the condition the footprint will not exceed 44.608 acres. The design team should have a series of conceptual drawings by next week to review and agree upon final footprint. Once the footprint is designated, an amendment to the FAA will be submitted. As soon as the concept is approved by all parties, geotechnical vendors will provide real data regarding soils and capacities to reduce our design risks. Both cities met on February 22 to discuss project delivery method, and City of Loveland is reviewing a CMGC model as proposed by City of Fort Collins in order to satisfy both cities’ concerns related to delivery method. There was an identified need to start an IGA on usage agreement soon since the last IGA took over 100 days to complete. It appears the process slowed down as a result of the legal reviews by both city attorney offices. A deadline for the end of August 2018 for design to prepare for council approvals and allocation of funds was established with both cities. Construction costs continue to rise at an estimated .5% per month and with time this could affect the allowable scope. The scope has been affected by rising costs since 2015, however the budget will still provide for a facility which meets the initial needs of both cities. Construction still anticipated to begin in early 2019 and be completed by November/December 2019. CITY MANAGER’S UPDATE 23 PLANNING, DEVELOPMENT &TRANSPORTATION BUILDING SERVICES AND PLANNING City Plan  The City Plan Update public kickoff event on February 12th was a rousing success, with 500 citizens in attendance. Staff is preparing for the upcoming Visioning phase of the project and has selected more than 50 Plan Ambassadors and multiple Working Group members who will assist in the Plan’s creation this next year Downtown and Transitions Code  The public open house providing initial DRAFT updates to the Downtown and the NCB zone district development codes was held on February 28th. A Council Work Session is scheduled for April 24th to review progress to date. Historic Preservation Code Review  The Historic Preservation Division is examining existing historic preservation-related codes and processes to ensure that they best support Council’s policies and are best practices nationally. The City has contracted with Clarion, Associates to produce a series of reports on the major areas of review: Landmark Designation; Review of Changes to Landmark Properties; Development Review and Historic Resources; and Demolition/Alteration Review of Older Buildings, Demolition by Neglect, and Dangerous Buildings. Following community outreach and discussion in Spring 2018, recommendations for change will be presented to Council at its April 24, 2018 work session, and for adoption at the June 5, 2018 regular meeting. At the April 24, 2018 Council work session, staff will provide a comparison of recent development projects reviewed with the current historic preservation codes and with the proposed codes. NEIGHBORHOOD SERVICES Lincoln Corridor Plan – Neighborhood Project Implementation Of the ten funded neighborhood projects, seven are complete and three are ongoing. The neighborhood artwork and Streets Facility park enhancements are being managed by City staff in various departments. PDT and APP staff are working on a re-appropriation for the remaining lasing funds to complete the final three art projects (wayfinding, art at the new Streets park, and the light/street post art). We are excited to see Art in Public Places take the lead for the final projects. This has been very beneficial to neighbors and we have witnessed stronger connections being made and some healing between neighbors. In the Buckingham neighborhood, two neighbors that traditional were at odds came together around the transformer mural painting. Neighborhood Connections Expanded outreach underway for 2018 with childcare and interpretation being offered for core education classes. The Winter session had a strong turn-out for its two Saturday classes. As we continue to expand our reach, we will be offering classes on different days of the week and at different times of the day. The Spring session starts in April and is scheduled for the Tuesday lunch hour. We anticipate that our numbers will grow as we have continued to modify the curriculum to meet the needs of neighbors and are meeting in places and at times that are more convenient for neighbors. Vibrant Neighborhoods Grant The grant has launched and applications are being accepted for 2018 funding to date we have received four (4) initial applications. The grant team has been meeting bi-weekly with students from the Center for Public Deliberation at CSU to help facilitate neighborhood brainstorming sessions. Outreach continues and recent articles have been published through CityNews and the Coloradoan. Support continues for projects awarded in 2017. One of the many successes came from the grassroots efforts CITY MANAGER’S UPDATE 24 of one neighbor to engage her neighborhood in a series of events that offered an opportunity to build relationships and foster connections. Several people in this neighborhood had lived there for 15 plus years and did not have connections to their neighbors. Mediation and Restorative Justice Services Nine community volunteers have been trained to be Restorative Justice Facilitators in a two and a half day training this month. These volunteers can now plan, schedule and facilitate restorative justice sessions for the programs. Restorative Justice conferences bring young people who commit offenses in our community together with those they have harmed and together find ways to repair that harm. SPECIAL PROJECTS North I-25 Express Lanes Project Colorado Department of Transportation (CDOT) has selected a contractor for the North I-25 Express Lanes Project, and will begin construction of the $300+ million project in summer 2018. Construction will commence on the south side of the Corridor (SH-402 in Loveland) and work its way north to Fort Collins (up to SH-14/Mulberry). Construction to be completed in 2021. The Project will include improvements to the Prospect/I-25 interchange. The City of Fort Collins is partnering with property owners adjacent to the interchange and Town of Timnath to help share costs with CDOT for the $31 million improvement project. YEAR TO DATE COMPARISONS 2017 YTD 2018 YTD % Change Development Project Submittals Rec’d 61 45 -26.23% Conceptual/Preliminary Design Reviews/Staff Reviews Performed 45 28 -37.78% Building Permits Issued 1,042 1,240 +19.00% Building Permit Valuations ($M) $71.72 $60.01 -16.34% Building Inspections Performed 4,635 5,059 +9.15% Overall development review revenues are $64,033 over projection for 2018 as of February 28th with Development Review over by $97,158 and Engineering Development Review under by $(33,126). SUSTAINABILITY SERVICES ENVIRONMENTAL SERVICES  Residents or businesses with large loads of cardboard can now drop them for free inside the hard- to-recycle yard at the City’s Timberline Recycling Center. This option will be faster and less cumbersome for customers, who can now deposit entire loads of flattened cardboard directly into an open-topped container. Go to https://www.fcgov.com/recycling for more information and to take a brief questionnaire about the recycling center. SOCIAL SUSTAINABILITY  City Council on first reading on February 20 approved updates to the Land Bank Program, one of the City’s incentives to increase affordable housing intended for people making no more than 80 CITY MANAGER’S UPDATE 25 percent of the Area Median Income. The new ordinance includes raising the income target for affordable homeownership because the current housing market is experiencing price escalation. Second reading was March 6.  The department will host a public hearing March 8 to educate and gather input on funds that are distributed to human service (nonprofits) and affordable housing providers through the annual Competitive Process. Read more at https://www.fcgov.com/socialsustainability/ ECONOMIC HEALTH  The Economic Health Office co-sponsored Fort Collins Startup Week and hosted or participated in multiple sessions including “Connections to Capital” and “Ask Me Anything” on Thursday, March 1.  The deadline to apply to the Fort Collins Urban Renewal Authority board has been extended to March 9. Apply online at https://www.fcgov.com/cityclerk/bcapplication-link3.php.  Fort Collins is one of 35 Champion Cities selected from 320 applications as part of the 2018 U.S. Mayor’s Challenge, which provides grants and technical assistance to city leaders who are solving urgent problems in their communities, Bloomberg Philanthropies announced in February. https://www.fcgov.com/news/index.php?id=7084 COMMUNITY SERVICES RECREATION Record Spring Registration The Recreation Department reported a record spring registration in February. Over 4,175 thousand people registered for Recreation programs from February 2-8. This represents a 17% increase from Spring 2017 registration. Recreation also reported that over $231,600 in revenue was received during this time, a 20% increase from 2017. The updated reduced fee program received 372 youth and adult enrollments and 40% of reduced fee participants registered online; program participants were previously unable to register online. Parks and Recreation Summer Job Fair The Parks and Recreation Departments are partnering on a Summer Job Fair in March. The program began last year and received positive results. The job fair allows Parks and Recreation to provide the community more information on hiring opportunities with the City. The summer represents a critical time for both departments and help is needed to maintain and staff busy Parks and Recreation facilities. The Summer Job Fair will be held at EPIC on Saturday, March 24 from 9:00 a.m. – 1:00 p.m. PARKS City Forester Retires Tim Buchanan retired as the City Forester after a 41-year career with the City of Fort Collins Forestry Department. Tim was the first full time City Forester employed by the City. Tim leaves behind a strong legacy and his service to the community has been exceptional. Ralph Zentz will serve as the interim City Forester. The Parks Department has initiated the hiring process and plans to find a replacement for Mr. Buchanan within the next few months. Holiday Lights Removed The Parks Department has removed the holiday lights from Old Town. The holiday lights project is a partnership between the DBA, DDA and the City of Fort Collins. Several corporate sponsors also CITY MANAGER’S UPDATE 26 contribute to the project. The holiday lights are highly anticipated and remain a popular feature of Old Town during the holiday season. The holiday lights plan to return to Old Town in November of 2018. PUBLIC ENGAGEMENT Feature: City Plan Kickoff Event  Over 500 in attendance  6 educational and information stations around the room  748 comments received  Childcare room offered with childcare providers and activities  Kickoff Video, Summary and Draft Trends and Forces available on OurCity: https://ourcity.fcgov.com/cityplan  Quotes – Q: What does a Creative Fort Collins mean to you? Resident Answer: “Multi-cultural art – celebrate and embrace strong Mexican culture especially”  Q: What was the most successful aspect of the evening? Staff Answer: “Seeing the enthusiasm from the community to discuss and think about opportunities/challenges for the future.” Public Engagement Recap  Historic Preservation Open House – Feb. 28; 30 attendees; Draft Code updates for the Downtown, Draft Code Changes, Transitions, and Historic Preservation  Mulberry Improvements Open House – March 1; 85 attendees; discussed upcoming improvements for West Mulberry Street between Overland Trail and Jackson Avenue  Police Chief Meet & Greet – March 1, recorded with both Spanish and English audio for sharing, streamed live for additional access options, feedback form and Police Chief Recruitment information in English and Spanish shared with community partners  Inclusion Discussion – March 6, listening and idea session with members of the Fort Collins Jewish community to discuss partnership and outreach opportunities regarding religious and cultural inclusivity  Community Trust Initiative Stakeholder Advisory Committee – March 5; Meeting #2; Focus: Police interactions, policies and responses; agenda and presentations created with help from Police Services Upcoming  CityWorks 101 2018 – Class schedule March 28 – May 16; Participants chosen and scheduling in progress  Neighborhood Connections Open House – March 19 from 6 to 8 p.m. at Beattie Elementary Gym; evening will feature grant application opportunities, discount and rebate programs and the BFO Process  Riverside Bridge Replacement Open House – March 22; from 5 to 7 p.m. at Epic; replacing bridge over Spring Creek and creek restoration  Budgeting for Outcomes – Internal teams chosen, community member positions being selected this week; community outreach for events and presentations are beginning CITY MANAGER’S UPDATE 27 COMMUNITY DASHBOARD HIGHLIGHT The Community Dashboard features performance data and information that highlights how the City is doing in achieving its seven Outcome areas: Neighborhood Livability and Social Health, Cultural and Recreation, Economic Health, Environmental Health, Safe Community, Transportation, and High Performing Government. The Dashboard is made up of 38 total metrics that are published quarterly and demonstrate where the City is doing well and where there are opportunities to improve. The color status of performance for each metric is determined based on the actual result for the quarter compared with the target. The color status of performance for the Outcome is determined based on the average calculation of the performance of each metric within that Outcome. Each month the City Manager’s Update will highlight a metric from the Community Dashboard. This month’s feature is from the Neighborhood Livability and Social Health Outcome Area. Analysis: Voluntary compliance for this quarter was very strong. We were able to surpass our target of 95% by reaching a 98.1% voluntary compliance rate during 4th quarter. This result was positively impacted with the mild winter weather during that time frame. Due to consistent performance over the past 7 quarters the targets for 2018 have been increased to 95% for every quarter. Definition: This metric tracks the percentage of voluntary compliance with nuisance code violations issued by the City of Fort Collins. Voluntary compliance is defined as violations corrected by the property owner or tenant. Why is this metric important? Code compliance contributes to the preservation, maintenance, and enhancement of neighborhoods. Voluntary compliance of nuisance codes is an indicator of the City's attractiveness and feeling of safety in neighborhoods. It is also an indication of whether a neighborhood is deteriorating and may need additional services. CITY MANAGER’S UPDATE 28 City’s impact on this metric: High – The City affects the metric in the following ways: 1) violation notices sent to property owner and tenant explaining the violation and giving a deadline to correct the problem; 2) final notice – this is a posting on the door explaining that the deadline has come, what the violation is, and that they need to correct the violation by the next day in order to avoid abatement or citation; 3) encouragement of residents to call if they need an extension – our violation notices state that they should call us if they have a need for a little more time to correct the violation; 4) Adopt-a-Neighbor program – volunteer program to help elderly or disabled residents with shoveling their sidewalks; and 5) door hangers – for codes that do not require notice be given (i.e. sidewalk snow removal) – we provide a courtesy door hanger on the first offense explaining the code requirement and give them until the following day to correct the violation. Benchmarks: This metric contains benchmark data for cities with code enforcement programs that are similar to that in Fort Collins. These benchmarks were identified based on a combination of similar populations, caseloads, enforcement methodologies, and voluntary compliance rates. To view the entire Dashboard, please visit: http://fortcollins.clearpointstrategy.com/