Loading...
HomeMy WebLinkAboutReport - Mail Packet - 4/18/2017 - City Manager Monthly Report - April 13, 2017April 13, 2017 CONTENTS ISSUES BEFORE COUNCIL ................................................................................................................. 3 APRIL 18 COUNCIL MEETING ..................................................................................................................................3 April 25 WORK SESSION ..........................................................................................................................................3 MAY 2 COUNCIL MEETING ......................................................................................................................................4 MAY 9 WORK SESSION ............................................................................................................................................4 MAY 12/13 CITY COUNCIL RETREAT .......................................................................................................................4 SALES AND USE TAX COLLECTION .................................................................................................. 5 MONTHLY & YEAR TO DATE ...................................................................................................................................5 CAPITAL PROJECTS ........................................................................................................................... 5 CITYWIDE PEDESTRIAN ACCESS PROJECT ...............................................................................................................5 TIMBERLINE IMPROVEMENTS – PROSPECT TO BLACKBIRD ...................................................................................5 PITKIN BIKEWAY PROJECT ......................................................................................................................................6 DOWNTOWN RIVER DISTRICT IMPROVEMENTS ....................................................................................................6 NORTH COLLEGE MULTI-USE PATH PROJECT .........................................................................................................7 LINCOLN CORRIDOR PROJECT – 1ST STREET TO LEMAY AVENUE ...........................................................................8 LINCOLN CORRIDOR PROJECT – POUDRE RIVER BRIDGE TO 1ST STREET ................................................................8 COLLEGE AND PROSPECT INTERSECTION IMPROVEMENTS ...................................................................................9 VINE AND LEMAY BNSF IMPROVEMENTS ..............................................................................................................9 SHARP POINT/NANCY GRAY CONNECTION ......................................................................................................... 10 COLORADO STATE PROJECT COORDINATION...................................................................................................... 10 ELIZABETH AND SHIELDS UNDERPASS ................................................................................................................. 11 CAPITAL PROJECTS – UTILITIES .................................................................................................... 12 DWRF CO-GENERATION ....................................................................................................................................... 12 WATER TREATMENT FACILITY CHLORINE CONTACT BASIN ................................................................................ 12 DWRF UV DISINFECTION...................................................................................................................................... 13 SPRING EAST HARMONY DUCT BANK – TIMBERLINE TO ZIEGLER – PHASE 1 ..................................................... 13 COLORADO STATE UNIVERSITY CIRCUITS AND DUCT BANK PROJECT ................................................................ 14 CARPENTER ROAD DUCT BANK PROJECT ............................................................................................................ 14 CAPITAL PROJECTS – PARK PLANNING & DEVELOPMENT ........................................................ 15 TWIN SILO PARK .................................................................................................................................................. 15 AVERY PARK ......................................................................................................................................................... 15 FOSSIL CREEK TRAIL / BNSF UNDERPASS ............................................................................................................. 15 PUBLIC SAFETY UPDATE ................................................................................................................. 16 POLICE SERVICES .................................................................................................................................................. 16 POUDRE FIRE AUTHORITY ................................................................................................................................... 16 BUILDING AND PLANNING ACTIVITY .............................................................................................. 17 YEAR TO DATE COMPARISONS ............................................................................................................................ 17 PROJECTS OF NOTE-STATUS AND UPDATES ........................................................................................................ 18 PROJECTS UNDER APPEAL ................................................................................................................................... 21 SUSTAINABILITY SERVICES ............................................................................................................ 21 ENVIRONMENTAL SERVICES ................................................................................................................................ 21 SOCIAL SUSTAINABILITY ...................................................................................................................................... 21 ECONOMIC HEALTH ............................................................................................................................................. 22 PUBLIC ENGAGEMENT UPDATE ..................................................................................................... 22 LAND CONSERVATION 1ST QUARTER 2017 .................................................................................... 23 Page 3 CITY MANAGER’S UPDATE ISSUES BEFORE COUNCIL APRIL 18 COUNCIL MEETING  Land Use Code Update o Bring forward an annual package of various revisions to the Land Use Code in order to clarify, revise, add, or otherwise amend the Code as part of a continuous improvement effort.  Neighborhood Livability and Social Health-1.5 Guide development compatible with community expectations through appropriate planning, annexation, land use, historical preservation and development review process.  Chapter 25 Sales Tax Code Amendments o Amend Chapters 25 and 26 of City Code to update definitions, align the sales tax, use tax and lodging tax portions of the Code for consistency and allow for more flexibility for contractors in reporting their taxable amounts during reconciliation of building permits.  Economic Health Strategic objective: 3.4 Provide transparent, predictable and efficient processes for citizens and businesses interacting with the City.  Boxelder Board Appointment o Appoint a Director to the Boxelder Basin Regional Stormwater Authority Board of Directors that will jointly represent the City of Fort Collins and Larimer County. The BBRSA Intergovernmental Agreement (IGA) specifies that its Board of Directors shall consist of five (5) Directors – one each appointed by the City of Fort Collins, the Town of Wellington and Larimer County and then one jointly-appointed by the City of Fort Collins and Larimer County and the other jointly-appointed by the Town of Wellington and Larimer County. Directors are appointed for a 3 year term.  High Performing Government 7.11. Proactively influence policy at other levels of government regulation  2015 International Fire Code Adoption (First Reading-consent) o Consider local amendments to the 2015 International Fire Code as approved by the Poudre Fire Authority Board. The 2015 edition will replace the currently adopted 2012 edition.  Neighborhood Livability and Social Health-1.5 Guide development compatible with community expectations through appropriate planning, annexation, land use, historical preservation and development review process.  Water and Wastewater Criteria Manual Adoption (consent) o Adopt a Criteria Manual in order to establish the governing criteria and provide additional guidance for the public water distribution and wastewater collection improvements that are designed and installed in conjunction with the City’s Development Review Process and are within areas wherein Fort Collins Utilities owns and operates such systems. The criteria, with all future amendments, establish minimum design standards for providing and maintaining the public water distribution and wastewater collection systems.  Environmental Health-4.9 Meet all regulatory requirements while supporting programs that go beyond compliance  Capital Expansion Fee Updates –Motion to Postpone to May 16 o Consider a motion to postpone adoption of new fees related to Capital Expansion to May 16.  High Performing Government-7.1 Provide world class services that meet the needs of the community. April 25 WORK SESSION Page 4 CITY MANAGER’S UPDATE  365 Transfort Service o Provide an update to City Council of status to fund 365 day bus service.  Transportation-6.2. Improve transit availability and grow ridership through extended hours, improved headways, and Sunday service in appropriate activity centers  Capital Expansion Fees, Transportation Capital Expansion Fees and Electric Capacity Fees o Update Council on methodologies, calculations, phasing and revenue implications of Capital Expansion Fees (with an emphasis on Parks Fees), Transportation Capital Expansion fees and Electric Capacity Fees as well as additional outreach that has been completed on the fees to date.  High Performing Government-7.1 Provide world class services that meet the needs of the community.  Upper Poudre Watershed Collaborative Water Quality Monitoring Program o Provide a brief overview of the City's Source Watershed Program with an emphasis on the Upper Cache La Poudre Watershed Collaborative Water Quality Monitoring Program.  Environmental Health 4.2: Protect and provide a high quality water supply and implement appropriate conservation efforts and long term water storage capability MAY 2 COUNCIL MEETING  Water’s Edge Appeal o Consideration of an appeal of the Waters’ Edge PDP, located west of Turnberry Road and north of Richard’s Lake Subdivision.  staff report: Safety, Security & Risk Management Update o Provide a status update as to the work accomplished since establishing the mission and vision around the commitment to occupational safety at the City. MAY 9 WORK SESSION  Broadband Update o Update on incumbent discussions, third party due diligence and retail model business plan.  Economic Health-3.11 Encourage the development of reliable, ultra-high speed internet services throughout the community.  Community Behavioral Health-where do we go from here? o Update and discuss with City Council information about the Larimer County Behavioral Health Center Initiative, including where we are now, where we are headed, and how the City can work with Larimer County on this issue.  Laurie Stolen, Behavioral Health Project Director with Larimer County, will lead the discussion along with City staff.  City Plan Outreach Options & Strategies o Provide information and discuss with City Council ideas, tools, and strategies for involvement throughout the City Plan, Transportation Master Plan, and Transit Master Plan updates.  High Performing Government-7.5 Broaden methods of public engagement to reach all segments of the community by giving additional consideration to diverse backgrounds, languages and needs. MAY 12/13 CITY COUNCIL RETREAT  Friday evening 5:00-9:00 p.m. and Saturday 9:00 a.m. - 4:00 p.m. Page 5 CITY MANAGER’S UPDATE  Location: Rocky Mountain Innosphere, 320 E. Vine Drive SALES AND USE TAX COLLECTION MONTHLY & YEAR TO DATE FEBRUARY 2017 SUMMARY OVER PRIOR YEAR Month Year to Date Sales Tax Collected: -7.4% -1.2% Use Tax Collected Excluding Rebates: -20.9% -1.9% Sales and Use Tax Collected Excluding Rebates: -10.5% -1.3% Year to date, sales and use tax collections excluding rebates are down 1.3% and total $24.5M. CAPITAL PROJECTS CITYWIDE PEDESTRIAN ACCESS PROJECT Funding Source: Community Capital Improvement Program Estimated Project Budget: $1m Status: On Budget, On Schedule Project Details:  This project provides a complete City sidewalk inventory, identifies sidewalk inadequacies, and identifies inadequate handicap accessibilities according to Americans with Disabilities Act (ADA) requirements.  37,741 accessible ramps have been identified as acceptable, substandard, or missing in accordance with the ADA requirements. Project Updates: o Upcoming project locations: Work on Access to Schools will begin at the end of May. Eight locations have been determined and reviewed with PSD. Public outreach efforts are continuing for the 2017 Pedestrian Improvement Program. o Current projects: Work is occurring on the General Program and Missing Segments. These various locations will be complete at the end of May. More information is available at http://www.fcgov.com/engineering/pedneeds.php TIMBERLINE IMPROVEMENTS – PROSPECT TO BLACKBIRD Funding Source: Building on Basics (BOB) Estimated Project Budget: $5.0m Status: On Budget, On Schedule Project Details:  The goals of this project are to improve air quality, reduce vehicle wait time and reduce the accident rate by constructing a free-right turn and acceleration lane from Page 6 CITY MANAGER’S UPDATE eastbound Prospect to southbound Timberline; as identified in our Arterial Intersection Prioritization Study.  The 2005 ballot language stated this project will expand Timberline Road to four (4) lane arterial standards including:  Travel lanes, sidewalks, bike lanes and landscaped medians.  Improvements to the Prospect and Timberline intersection and all its approaches to add additional turn lanes.  The project will add a sidewalk connection for southbound Timberline from Prospect to Blackbird.  The project is likely a Two Phase project (Phase One – Roadway work 2016, Phase Two – Great Western Maintenance and Signal Improvements).  Construction is expected to begin in the spring of 2016. Project Updates:  Work was suspended for March, with work resuming on April 1 for landscape installation.  April will have periodic single lane closures on Timberline Road. More information is available at http://www.fcgov.com/engineering/prospect-timberline.php PITKIN BIKEWAY PROJECT Funding Source: Federal Grants/Local Funds Estimated Project Budget: $900,000 Status: On Budget, On Schedule Project Details:  The goals of this project are to improve the bicycle low stress network by providing a continuous east-west bicycle corridor on the local street network from Overland Trail Rd. to Riverside Ave.  Major improvements include significant bicycle and pedestrian enhancements at Taft Hill Road, Shields Street, and Lemay Avenue along the Pitkin corridor. The project will install pedestrian and bicycle “toucan” style traffic signals and bicycle refuge islands to improve bike/pedestrian safety at these intersections. Project Updates:  Staff is in the process of awarding the contract to the apparent low bid contractor, Lightfield Enterprises.  The 50 calendar day construction schedule is expected to begin on May 1, 2017.  Work will mostly be on local streets but some single lane closures at Taft Hill Road, Shields Street, and Lemay Avenue will be necessary. More information is available at http://www.fcgov.com/bicycling/pitkinbikeway.php DOWNTOWN RIVER DISTRICT IMPROVEMENTS Funding Source: Federal Grants/Local Funds/DDA Funds Estimated Project Budget: $1.4M Status: On Budget, On Schedule Page 7 CITY MANAGER’S UPDATE Project Details:  The goals of this project are to provide various design and construction improvements within the Downtown River District.  The project has completed two design projects to date. The project is now focused on developing a preliminary engineering design for improvements along Jefferson Street between College Avenue and the Mountain/Lincoln Intersection. Project Updates:  Staff has initiated the preliminary engineering design phase for improvements along Jefferson Street from North College Avenue to the Lincoln/Mountain intersection. The design is based on improvements outlined in the Jefferson Street Intergovernmental Agreement (IGA) with the Colorado Department of Transportation (CDOT).  Improvements include converting a section of Jefferson Street from four lanes to three lanes, a raised, landscaped median, urban design elements, and drainage improvements. On-street bike lanes will not be included as part of the project.  Staff continues coordination with planned development located along Willow Street. Staff’s goals are to coordinate planned Willow Street improvements with development improvements. The Willow Street Improvements Project between Linden Street and North College Avenue is scheduled to receive Community Capital Improvements Funds in 2018/2019.  Upcoming months will see continued utility coordination, public engagement, environmental investigations, and the development of roughly 60% plans for the Jefferson Street Project. Staff will also continue design coordination with property owners along Willow Street. NORTH COLLEGE MULTI-USE PATH PROJECT Funding Source: CMAQ Grant/URA Contribution/Pedestrian Program Funds, TAP Grant, County Funds Estimated Project Budget: $1.7 Status: On Budget, On Schedule Project Details:  The primary goal of this project is to complete a gap in pedestrian infrastructure from Highway 1 to the south side of the Larimer & Weld Canal.  This project will construct a pedestrian connection crossing the Larimer & Weld Canal extending north to SH 1 (Terry Lake Rd). The project impacts a federal highway, and is located outside the City limits but within the Growth Management Area. Project Updates:  Larimer County and the City applied for, and were awarded, an additional $810,000 in federal grant funding for the project. The additional funding enables multimodal improvements on both sides of the road.  Staff is meeting regularly with Larimer County and the Colorado Department of Transportation in order to coordinate roadway improvements as well as pedestrian improvements along the project corridor.  The City will serve as the lead agency for environmental clearances and property acquisition. Staff is working toward obtaining environmental clearances in order to start the property acquisition phase. Page 8 CITY MANAGER’S UPDATE  City, County, and CDOT Staff continue to investigate ways to accelerate the project schedule.  At this time, planned improvements do not include reconstruction of the existing roadway bridge; raised and landscaped medians; or landscaped parkways. Improvements will be aesthetically similar to current improvements under construction to the north. LINCOLN CORRIDOR PROJECT – 1ST STREET TO LEMAY AVENUE Funding Source: General Fund Reserves, Street Oversizing Fund, previously committed developer local street obligations, savings from Woodward interim improvements Estimated Project Budget: $6.5m Status: On Budget, On Schedule Project Details:  This phase of the overall Lincoln corridor plan includes improvements along Lincoln Avenue between 1st Street and Lemay Avenue.  Subsequent phases include improvements to the Poudre River Bridge and improvements along Lincoln Avenue to Jefferson Street.  Project intent is to create a multi-modal design along Lincoln Avenue that will include creating a street with a unique identity, improving the mobility, safety, and experience for bicyclists, pedestrians, transit users, and vehicles, and creating an environment where local businesses can thrive. Project Updates:  Placement of concrete curb and gutter, sidewalk, driveways, and pavement construction along south side of Lincoln ongoing, as well as electrical and irrigation lines.  North side of Lincoln construction has begun; new utility installation and utility relocations ongoing to prep for new pavement, curb, gutter, and sidewalk.  Underground detention system on north side of Lincoln is now in place.  Rain garden and silva cells are partially in place.  400’ of RCP storm sewer on north side of Lincoln and west of underground detention has been installed and backfilled. LINCOLN CORRIDOR PROJECT – POUDRE RIVER BRIDGE TO 1ST STREET Funding Source: BOB 2.0 Estimated Project Budget: $5.4m Status: On Budget, On Schedule Project Details:  This phase of the overall Lincoln corridor plan includes replacement of the Poudre River bridge and road between the bridge and 1st Street.  Project intent is to add to the ongoing Lincoln Corridor project creating a street with a unique identity, improving the mobility, safety, and experience for bicyclists, pedestrians, transit users, and vehicles, to include an enhanced bridge that will meet the intent of the overall project. Project Updates:  Bridge construction ongoing; caissons for abutments and center pier has been poured, currently forming new abutments.  East and west abutments are in place, along with center piers/columns.  West abutment has been backfilled; pier cap and center floodwall are in place.  Footings for south floodwall have been poured. Page 9 CITY MANAGER’S UPDATE  Riprap on west and east banks of the Poudre River is now in place.  120’ girders have been set from center piers to west abutment. COLLEGE AND PROSPECT INTERSECTION IMPROVEMENTS Funding Source: Mid-Budget Approval of 2016 Capital Projects Fund Estimated Project Budget: $2.7 M Status: On Budget, On Schedule Project Details:  The Colorado State University (CSU) Medical Center project at the northwest corner of this intersection, presented an opportunity for the City to address other existing deficiencies which were identified in the 2011 Arterial Intersection Prioritization Study.  The goals of the project are to address safety, operational, and congestion issues primarily focused on Prospect Road by: o Adding turn lane capacity to existing turn lanes o Constructing new turn lanes and medians on Prospect Road o Improving bicycle and pedestrian facilities  The City and Colorado State will work collaboratively on the intersection improvements, with each entity funding their own design and construction obligations. Project Updates:  Construction is on-going. Eastbound Prospect is open, westbound Prospect is on schedule to open between Remington and College on April 17. Crews installed major storm sewer improvements across College Avenue with night and weekend work.  Staff is coordinating construction with CSU Medical Center schedule. Roadwork associated with the Medical Center is on-going with a closure of westbound Prospect Road. This closure is scheduled to be complete by late April and open from College to the RR tracks.  The overall construction timeline is on schedule. More information available at: http://www.fcgov.com/engineering/college-prospect.php VINE AND LEMAY BNSF IMPROVEMENTS Funding Source: Keep Fort Collins Great (KFCG) Estimated Project Budget: $1.0 M Status: On Budget, On Schedule Project Details:  The existing Vine and Lemay intersection, which includes the Burlington Northern Santa Fe (BNSF) Railway crossing, is severely congested with limited options to expand through or turn lane capacity due to land use constraints. Page 10 CITY MANAGER’S UPDATE  Lemay Avenue realignment and intersection improvements have been prioritized as the City’s #1 Transportation Capital Improvement Project  The realignment has been on the City’s Master Street Plan since the mid-1980’s  The project area is included within the City’s Mountain Vista Subarea Plan which was created as a long-term planning vision for the northeast section of Fort Collins  The improvements will construct a new roadway and intersection slightly northeast of the existing Vine and Lemay intersection. The new intersection will be realigned Lemay and Suniga Road.  The City is investigating a number of interim and ultimate solutions that include new at-grade intersections or overpass/underpass of the BNSF Railway and existing Vine Drive Project Updates:  Staff is developing a matrix of options for the existing and relocated crossings, with input from BNSF and the Public Utilities Commission (PUC). More information is available at http://www.fcgov.com/engineering/vine-lemay.php SHARP POINT/NANCY GRAY CONNECTION Funding Source: Street Oversizing Estimated Project Budget: $1 M Status: On Schedule for Late 2017 Construction Project Details:  The City Master Street Plan identifies Sharp Point Drive and Nancy Gray Avenue connected across the Great Western Railroad tracks.  City Staff has identified the connection as a priority due to recent developments to the south.  City Staff is in the process of preparing an application for a new at-grade crossing of the Great Western tracks to the Public Utilities Commission (PUC). Once approved by the PUC, Staff will continue coordination with Great Western in order to facilitate design, crossing agreements and construction.  Construction dates are tentative as timeline depends on PUC approval and railroad coordination. Project Updates:  There are significant challenges with gaining Great Western and PUC approval for this project to keep it on track for a fall 2017 construction.  The project team is currently inventorying all Great Western crossings within the area to summarize traffic volumes and analyze safety measures. COLORADO STATE PROJECT COORDINATION Funding Source: Colorado State Estimated Project Budget: None Status: On Schedule Page 11 CITY MANAGER’S UPDATE Project Details:  Prospect and Center bicycle and pedestrian underpass, along with Center Avenue improvements between Bay Farm and Lake  Elizabeth and Shields bicycle and pedestrian underpass, and at-grade intersection improvements  Laurel / Washington and Laurel / Sherwood pedestrian enhancements  Whitcomb sidewalk improvements (east side) Prospect to Lake  Whitcomb sanitary sewer line (stadium flow)  College and Lake (northbound left turn lane improvements)  Lake and Center intersection improvements  Lake Street bicycle and pedestrian improvements  Game Day Operations Plan Project Updates:  Prospect and Center underpass – Complete and open to the public  Elizabeth and Shields underpass o Right-of-way negotiations are complete o The voluntary SPAR process received a unanimous approval on November 10, 2016 at the Planning and Zoning Board hearing. o Construction began December 2016  Laurel Street pedestrian improvements – Washington completed August 2016; Sherwood was completed September 2016  Lake and Center intersection – requires further study of vehicle, bike, and pedestrian counts with the opening of Aggie Village North and the Center underpass  Lake Street bike and pedestrian improvements o Substantially complete – street overlay and restriping scheduled for summer 2017  Game Day Operations Plan – Public open house events were held in January and February. Based upon public feedback, another open house is scheduled for May 4. More information available at http://source.colostate.edu/construction-and-parking/ ELIZABETH AND SHIELDS UNDERPASS Funding Source: Colorado State University Estimated Project Budget: $10.0 M Status: On Budget, On Schedule Project Details:  The City and Colorado State University (CSU) have been working in partnership for years to improve bicycle and pedestrian safety amid continued and projected population growth along the West Elizabeth corridor. CSU is making a series of improvements as a commitment by the University to improve safety and make the campus more accessible.  The project aligns with multiple CSU and City planning efforts, such as: West Central Area Plan (2015), CSU Parking and Transportation Master Plan (2014), City Bicycle Master Plan (2014), City Student Housing Action Plan (2013), City Arterial Intersection Prioritization Study (2012), and the City Transportation Master Plan (2011). All of these planning efforts identified the need for improvements at the Elizabeth and Shields intersection with recurring themes of: enhanced safety, separation of travel modes, and reducing the number of conflict points and crashes.  The Elizabeth and Shields intersection has 50,000 vehicles per day, an increase of 20% in traffic volumes since 2009. Peak hour volumes (morning, midday, and afternoon) generate 170 Page 12 CITY MANAGER’S UPDATE bicyclists and 140 pedestrians per hour. More than 2,000 bicyclists per day are crossing Shields at Elizabeth, an increase of 40% since 2009. This intersection has a “higher than expected” crash rate. The grade separated crossing for bicyclists and pedestrians will reduce the number of conflict points and intersection crash rating Project Updates:  Construction began in December with utility relocations in Shields Street. The project will be completed in August 2017.  The full closure of Shields was extended by two weeks due to an unforeseen utility conflict. This conflict has been addressed in the short term, keeping the underpass project on schedule. The long term solution to resolving this utility conflict is under investigation and will likely require a larger, future relocation along Shields Street. More detailed information will be coming in the next few months. More information is available at http://source.colostate.edu/construction-and-parking/shields- underpass-proposal/ and http://www.fcgov.com/engineering/elizabeth-shields.php CAPITAL PROJECTS – UTILITIES DWRF CO-GENERATION Funding Source: Wastewater Estimated Project Budget: $3,900,000 Status: On Budget, On Schedule Project Details:  Switchgear specifications completed  Received first engine for calibration and testing  Heat exchanger design underway Upcoming Work:  Work with Woodward and Stateline on container purchases  Continue to work on site design, gas design, and hot water design  Preparing gas conditioning procurement work order WATER TREATMENT FACILITY CHLORINE CONTACT BASIN Funding Source: Water Estimated Project Budget: $10,720,000 Status: On Budget, On Schedule Project Details:  CCB online and in hands of WTF staff as of March 7, 2017  WTF staff disinfected CCB Complete 42” pipe connection between west reservoir and CCB First Weichai engine arrives from China Page 13 CITY MANAGER’S UPDATE Vault Installation  Installing perimeter drain and backfilling around CCB Upcoming Work:  Upsize existing 36” into west reservoir with 42” pipe  Complete install of perimeter drain and surface drainage  Complete access road and area grading DWRF UV DISINFECTION Funding Source: Wastewater Estimated Project Budget: $5,900,000 Status: On Budget, On Schedule Project Details:  Forming and placing the electrical room slab  Parshall flume installation and associated bypass operations  Formed and placed walls for the weir and effluent channels Upcoming Work:  Form and place the UV building slab  Masonry construction for the UV building  Finger weir installation SPRING EAST HARMONY DUCT BANK – TIMBERLINE TO ZIEGLER – PHASE 1 Funding Source: Development Fees Estimated Project Budget: $4,000,000 Status: On Budget, On Schedule Project Details:  Three Phase Project  Phase One: Install new vaults adjacent to Harmony Substation  Phase Two: 1.1 miles of duct bank installation from Timberline Substation to Ziegler  Phase Three: 1.1Miles of duct bank from Ziegler to Strauss Cabin  Design, route identification, and project coordination permits.  Locates, pot holing, excavation and construction  Duct bank, vault, conduit, and cable installation Project Updates: Flying the Parshall flume into the final effluent channel Page 14 CITY MANAGER’S UPDATE Vault Installation Easement Required with Natural Areas  Design, route identification is 100% complete on Phases 1, 2 and 3  Construction of Phase 3 begins April 10, will last five weeks o Installation will include a one mile lane closure along Harmony Rd.  Phase 2 is 90% complete, pending railroad permit which has been submitted o 12 of 12 vaults are installed COLORADO STATE UNIVERSITY CIRCUITS AND DUCT BANK PROJECT Funding Source: Development Fees Estimated Project Budget: $2,804,340 Status: On Budget, On Schedule Project Details:  2.2 miles of duct bank and two new circuits  Design, easements, and project coordination  Locates and pot holing, excavation, and construction  Duct bank, vault and conduit installation, and cable pulling  Electric termination and energizing Project Updates:  Drake to Lake Duct Bank is complete o The circuit and terminations in this duct bank are 100% complete  Cherry Street duct bank from College to Howes is progressing well; railroad permit has been submitted o Museum of Discovery has accepted and completed compensation number o Real Estate has submitted compensation number to the Car Lot for consideration  Howes/Laurel duct bank is complete  The railroad permit for Vine Drive duct bank from Linden Substation has been submitted CARPENTER ROAD DUCT BANK PROJECT Funding Source: 2016 Duct Bank Budget Estimated Project Budget: 2,700,000 Status: Delayed until 2017 Project Details:  2.6 miles of duct bank  Boring  Complete Excavation  Potholing and locates Project Updates:  No change this month  Work continues around easements and/or temporary construction easements. Page 15 CITY MANAGER’S UPDATE  Completing due diligence in order to ask for an alignment from Natural Areas  This project will be delayed until 2017 pending the alignment CAPITAL PROJECTS – PARK PLANNING & DEVELOPMENT TWIN SILO PARK Funding Source: Community Parkland Fund Estimated Project Budget: $16M Status: On budget, on schedule Project Details:  Creek Play area near completion  Pickleball courts near completion  Restrooms near completion Upcoming Work:  Seeding to begin soon AVERY PARK Funding Source: Parks Life Cycle, Social Sustainability, Neighborhood Parkland Fund Estimated Project Budget: $425,000 Status: On budget, on schedule Project Details:  Phase II construction has begun Upcoming Work:  Restroom remodel & shelter construction FOSSIL CREEK TRAIL / BNSF UNDERPASS Funding Source: ConTrust Fund & GOCO grant Estimated Project Budget: $3M Status: On budget, on schedule Project Details:  Tunnel work on track for early May completion Upcoming Work: Page 16 CITY MANAGER’S UPDATE  Trail construction to follow. Timeline for trail completion unknown PUBLIC SAFETY UPDATE POLICE SERVICES In March, the Crime Prevention Specialist had 34 telephone calls ranging from setting up more Neighborhood Watches Programs to how to collect donations for Crime Stoppers. Presentations ranged from doing an annual Robbery Prevention Class for Adams State Bank to several more classes for seniors concerning scams and frauds. Here’s the breakdown on activities in March:  Adams Bank Robbery Prevention, 17 attended  RESTORE, 32 attended  Sanctuary Seniors, Senior Safety, 25 attended  Scams & Frauds, MacKenzie Place, 25 attended  Retired Teachers Assn, Personal Safety, 28 attended  Forney Industries, Difficult People, 10 attended  Aspen Club, Pedestrian Safety, 7 attended POUDRE FIRE AUTHORITY MARCH 8 | Firefighters worked through the evening and overnight, fighting a fire that destroyed a home above Horsetooth Reservoir, west of Fort Collins. One PFA firefighter was transported to the hospital for treatment of fatigue. Two cats are also unaccounted for. As is common in remote areas, firefighters transported water to the scene to fight the fire. Poudre Fire Authority investigators determined that the cause of the fire at 3408 Continental Circle, was accidental, due to improper disposal of ashes. The fire caused an estimated $495,000 in damage, destroying a boat, motorcycle, two trailers and camper, in addition to the home. Ashes and embers from fireplaces may ignite fires up to four days after they are removed if full extinguishment is not completed via complete cooling, water or other extinguishing methods that render them “cold and out.” Read more about the Continental Circle investigation at: bit.ly/circleinvestigationpfa MARCH 16 | New Engine 12 was put into service March 16 and will join the ranks of other vehicles used in firefighters' service to the community. Built by Rosenbauer Group LLC, in Wyoming, Minnesota, the engine is housed at Station 12, 321 Country Club Road, in north Fort Collins. Engine 12 employs state-of-the-art technology and is a Page 17 CITY MANAGER’S UPDATE “Green Star” vehicle, meaning it utilizes battery power, instead of fuel, when at idle. This results in less fuel used and a decrease in its overall footprint. MARCH 20 | Need to laugh? Check out this video, which went viral and was shared across the nation, of PFA firefighters in LaPorte ushering some turkeys across the road. Why did the turkeys cross the road? Watch http://bit.ly/pfaturkeys to find out. APRIL 1 | Though this particular incident happened on April Fool’s Day, it’s no joke that fire-sprinkler systems save lives and property. PFA firefighters were called that morning, to Suite B7 within an industrial complex at 1713 E. Lincoln Ave, to respond to an activated fire alarm. After searching the building, they discovered light smoke and entered the unit, discovering that a sprinkler system extinguished a fire inside the wood-working business called Wood Masters. A PFA investigator determined the fire started in a plastic trash can within the unit. Its cause was unintentional, due to the improper disposal of rags used for staining wood. Estimates are that the contents loss totaled approximately $5,000. However, that number and the life loss – which was zero in this case -- could have been significantly higher, had the fire-sprinkler system not been there to put the fire out. PUBLIC EDUCATION SUCCESS STORY PFA instructors teach more than 2,000 people how to use fire extinguishers annually. Like a lot of prevention work, it has an impact; although, we rarely hear about it. Recently, PFA heard from a resident of how this training saved lives and property. Every February, PFA trains employees of the USDA on the use of fire extinguishers. Not one month after the 2017 training, a USDA employee successfully used an extinguisher to put out a fire in an electrical box at a USDA lab. PFA got valuable feedback from this resident on his experience, which will improve future trainings. PFA Education Specialist Michael Durkin said, “This incident serves as a reminder of the importance of this program as well as other prevention programs.” FOSSIL RIDGE SENIOR SERVICE PROJECTS Two groups of Fossil Ridge students’ senior service projects involved PFA. On March 3, 4 and 5, one group of students prepared and delivered dinner to firefighters (A-, B- and C-shift) at the southeast Fort Collins Station 14 (which responds to the school). The students ate dinner with the firefighters, got a station tour and sat in the fire engine. A second group of students planned and executed a fundraiser, in partnership with the great folks at Firehouse Subs, on March 24. A portion of proceeds (and money the students raised), totaling more than $400, will go to PFA’s non-profit Fire and Life Safety Education fund, which pays for educational materials and life-saving devices such as smoke alarms. BUILDING AND PLANNING ACTIVITY YEAR TO DATE COMPARISONS 2016 YTD 2017 YTD % Change Development Project Submittals Rec’d 71 116 61 87 -14.08% -25.00% Conceptual/Preliminary Design 54 45 -16.67% Page 18 CITY MANAGER’S UPDATE Reviews/Staff Reviews Performed 81 76 -6.17% Building Permits Issued 905 1,474 1,042 1,665 +15.14% +12.96% Building Permit Valuations ($M) $43.02 $69.77 $71.27 $106.33 +66.73% +52.40% Building Inspections Performed 4,571 7,280 4,635 7,487 +1.40% +3.87% Plan Reviews Performed 283 465 473 705 +39.58% +51.61% Overall development review revenues are $596,218 over projection for 2017 as of March 31st with Development Review over by $385,013 and Engineering Development Review over by $211,204. PROJECTS OF NOTE-STATUS AND UPDATES Development/Planning Projects of Note Status/Updates Downtown Plan  City Council adopted the Downtown Plan on March 21st  The final version of the Plan can be downloaded from the project webpage at fcgov.com/downtown Foothills Mall Redevelopment  Residential construction is fully underway  Work continues with the General Contractor and other City staff to address concerns  Have received complaints over construction dust and the black mesh that has been rolled back during high wind days  There has also been concern expressed with the amount of water standing on Stanford Road that has come off of the site during the rain I-25/392 Interchange Corridor Activity Center (CAC) design standards  Amendments to the IGA will be finalized with additional review by staff, to be considered for Planning and Zoning Board on April 20 and adoption by City Council on May 2, 2017 Lincoln Corridor Plan – Neighborhood Project Implementation  Of the ten funded neighborhood projects, six are complete and four are ongoing  The neighborhood artwork, Streets Facility park enhancements, and brewery wayfinding are being Page 19 CITY MANAGER’S UPDATE items include: o Round-table discussion on the Climate Action Plan o Training on positions and interests Noise Committee  Met with Noise Committee on March 20, 2017. Shared with them the same information that was provided at the Council Work Session. Recommendation is to continue with existing process and not move forward with code changes  Based on this direction, staff intends to: Follow up with a memo to City leadership with the Committee’s recommendation  Continue to look at existing process and make improvements where possible. Will include: o Researching and implementing venue-specific recommendations for things such stage location/orientation, speaker distribution, etc. o Looking for additional ways to streamline process o Researching noise reading options The Standard  The Standard is a request for two five-story, multi-family apartment buildings; 239 dwelling units, 776 bedrooms, and a parking structure. The project site includes re- developing five parcels along the north side of West Prospect Road just east of S. Shields St.  The Planning and Zoning Board approved the project subject to one condition at its March 16, 2017 hearing Water’s Edge  Waters’ Edge proposal is a 55+ age-targeted community located West of Turnberry Road and North of the Richard’s Lake Subdivision  The site consists of 249 single-family dwellings, 82 townhomes, and 48 multi-family dwellings Old Town Neighborhood Plan and Design Guidelines  City Council unanimously approved the Old Town Neighborhoods Plan and the Neighborhood Design Guidelines documents February 21st meeting  Additional outreach will be launching this summer on implementation actions exploring potential changes to neighborhood zoning and accessory dwelling unit standards  The final version of each document can be downloaded from the project webpage at fcgov.com/otnp Smoking Ordinance Expansion Options  Police Services and Neighborhood Services Code Compliance staff teamed up to provide increased enforcement throughout the Smoke-Free area  184 tickets have been issued over 3 subsequent weekends. An ongoing enforcement schedule is being discussed  Police and Code Compliance staff will be working with representatives from the Downtown Development Association and Downtown Business Association to identify some possible smoking areas within the Downtown Smoke Free Zone for Council consideration Page 20 CITY MANAGER’S UPDATE  Concerns about criminal nature of the violation. No- Smoking committee to meet with City legal staff to discuss possibility of changing to a civil infraction  Additional receptacles for cigarettes are being placed along the perimeter of the Downtown Smoke-Free Zone. Each will contain “entering restricted area” signage  Signage is being created for the dome-shaped ashtrays Smoke-Free Zone to alert people they are in a restricted area and request that they extinguish all cigarettes or other smoking devices  Additional signage will be added to problematic areas throughout the Smoke-Free Zone  Replacing the blue and white Smoke Free in FC signs with more regulatory ones is being considered  The new receptacles and signage will be in place by the end of May, 2017 Electronic Plan Review  Staff is working towards implementation, with an emphasis on completing the electronic building permit review process first  Building inspectors now have I-pads allowing better access to electronic plans while performing inspections in the field  Large screen and equipment has been installed in the inspectors work room for reviewing of electronic files, allowing for group discussions about a project  Starting May 1, 2017 applications for all new buildings must be submitted electronically (some exceptions apply) Historic Preservation Code Review  Clarion Associates has been selected to complete the project, contract is being finalized. Clarion’s participation will begin July 1, 2017 and carry through until Q2, 2018  Priority issues, including Area of Adjacency for development review projects, compatibility criteria in Land Use Code Section 3.4.7, and non-consensual landmark designations will be reviewed first  18 stakeholders confirmed; stakeholders will meet on the first Wednesday of each month. The first stakeholders’ meeting was held on March 7, 2017  To jump-start the project, Clarion Associates was hired to research two key issues, Area of Adjacency and Demolition by Neglect. Draft final reports have been submitted, and Clarion is preparing final edits Joint Historic Preservation and Recreation Department Grant Application for the James Ross Proving Up House at Lee Martinez Park  Staff has prepared and submitted a grant request to the Cache la Poudre Heritage Alliance for a grant to restore the Proving-Up House  Grant request is for $39,643, to be matched equally by funds from Historic Preservation and Recreation  Notice of grant award will occur in early April, 2017 Page 21 CITY MANAGER’S UPDATE PROJECTS UNDER APPEAL  Water’s Edge Project appeal is scheduled to come to City Council on May 2, 2017 SUSTAINABILITY SERVICES ENVIRONMENTAL SERVICES The City of Fort Collins is now accepting applications for innovative projects that help achieve the community’s aspirational Climate Action Plan goals. The Innovate Fort Collins Challenge will provide $5,000 to $250,000 in funds for projects capable of achieving greenhouse gas reductions through a variety of approaches. The competition allows participating businesses and organizations to explore new ideas or technologies, leverage funding, and showcase their projects to a broader audience. Letters of intent are due April 28. More information at http://www.fcgov.com/innovate. With the election which just occurred, are you wondering what to do with that political sign in your yard? Election signs that are made of paperboard (single-layer cardboard) can be separated from the metal wicket and placed in a household or business recycling bin. Plastic sleeve-style signs can be recycled at the Timberline Recycling Center at 1903 S. Timberline Road as part of a new pilot project for accepting “stretchy film” plastic materials (more information at http://www.fcgov.com/recycling ). Plastic- sleeve signs may also be accepted in the plastic-bag recycling barrels offered at grocery stores and big-box retailers. Metal sign “wickets” can be recycled at local scrap metal companies, or taken to the “backyard” area (for a small fee) at the recycling center. Starting in April, single-family residents have the option to pay for yard trimmings collection at the curb. All three residential trash haulers now offer this service from April to November for an additional fee as part of the City’s updated recycling ordinance. Go to http://www.fcgov.com/recycling for more information. SOCIAL SUSTAINABILITY Save the date! The City’s Multicultural Retreat will be 8 a.m. to 5 p.m., September 8-9, Foothills Unitarian Church, 1815 Yorktown Ave., Fort Collins. The annual Multicultural Community Retreat provides participants an opportunity to explore diversity and inclusion issues in a safe environment while becoming better stewards of cultural competency. To register: Janet Freeman at jfreeman@fcgov.com or 970.221.6758. The Homeless Resource Guide provides a list and map of resources available including: shelters, meals, warming centers, healthcare, employment, etc. See the map and resources at http://www.fcgov.com/socialsustainability. About 90 residents attended the City’s briefings on the Land Bank program, a long-term affordable housing tool. The program allows the City to strategically buy vacant sites lacking Page 22 CITY MANAGER’S UPDATE infrastructure and wait until nearby development occurs and land value has increased before selling to a developer. What should the Land Bank program look like in the future? Stay tuned: Staff will gather additional public input at a workshop later this year. ECONOMIC HEALTH Five Fort Collins firms have been named finalists as Colorado Companies to Watch – a program sponsored by the Colorado Office of Economic Development and International Trade. The state launched the program in 2009 in conjunction with the Edward Lowe Foundation and valuable sponsors and community partners, including the City of Fort Collins Economic Health Office. The companies: A- Train Marketing Communications, Brinkman, Community Funded, LoCo Food Distribution and Motherlove Herbal Co. The NoCO Manufacturing Partnership, which includes the City of Fort Collins, will host the NOCOM 2017 Manufacturing Trade Show on April 27. The event will be 9 a.m. to 5 p.m. at The Ranch Events Complex in Loveland. Cost is $10 for pre-registration or $15 at the door. For more information or to register, go to http://www.nocomfg.com/. PUBLIC ENGAGEMENT UPDATE Fort Collins Police Services April Fools Post Goes Viral Video: FCPS Debuts the Nation’s First Feline Unit Reached nearly 2.3 million people See the full video on FCPS’ Facebook page at https://www.facebook.com/fortcollinspoliceservices/ Project & Engagement Recap  Boards and Commissions Participation Survey – Open March 20-April 7 o Over 55% response rate, information on the current demographics of our boards and commissions in order to create more customized outreach to increase diversity  Elections – 28% voter turnout  Master Naturalist 2017 Class – Year 25 of program, 19 people in training o Currently 126 active Master Naturalist that donate 3,000 hours each year  Pathways to Health – Transportation equity summit put on by Bike Fort Collins, co-sponsored by Nature in the City and with the support of the City’s Transportations Equity Team o 110 attendees – 10 City staff Upcoming Outreach  Community Issues Forum – April 26, 6-8:30 p.m. Senior Center, 1200 Raintree Drive., Prairie Sage Room 1 o City Plan Update and Engagement Tools (How People Want and Can Be Involved)  Transportation Behavior Survey – Conducted last two weeks of April o Statistically valid Travel Survey and Trip Diary CITY MANAGER’S UPDATE 23 o Data will be used in updating of Transportation Master Plan  Alta Vista Sidewalk Project – Door to door neighborhood outreach to gather input on potential installation of two new sidewalk sections o Project put on hold because of neighborhood petition  Summer in the City Program – Youth edition of CityWorks 101 class, structured as short term, service learning based summer camp for high school students o Applications available April 12 o 27 students will be selected o Outreach through PSD, homeschool associations, and private schools  National Volunteer Week – April 24-April 28 Daily educational and engagement activities o Includes plant tagging, youth experiences training, City facility tours, free passes to Recreation facilities and Gateway Natural Area, tee shirts, water bottles, and more o Culminates in a Volunteer Summit Friday April 28 from 4-7 p.m. at the Lincoln Center LAND CONSERVATION 1ST QUARTER 2017 managed by City staff in various departments  Community events planned for 2017 with the full implementation of the neighborhood artwork and park improvements  The new sidewalk along Lemay between Buckingham and Lincoln will be constructed with The Cottages in Fort Collins development Neighborhood Connections  Program meeting is scheduled for April 10th. Agenda