Loading...
HomeMy WebLinkAboutMemo - Read Before Packet - 4/12/2016 - Updated Power Point Presentation For Agenda Item #1 - College & Prospect Proposed Intersection Improvements1 College and Prospect – Proposed Intersection Improvements 4-12-16 Direction Sought What feedback does Council have regarding the Recommended Concept for the College and Prospect intersection? 2 Project Context 3 Project Need & Goals Existing: • 70,000 vehicles/day • High congestion • Narrow sidewalks, sub-standard turn lanes Goals: • Reduce congestion • Safety – pedestrians, bicycles, vehicles • Landscaping/Urban Design/Gateway • Minimize adjacent property impacts 4 Schedule 5 Design Alternatives Process • Full range of alternatives and iterations considered • Context Sensitive – Flexible standards without affecting safety • Congestion Relief is key outcome • Constrained corridor = compromise • Design for all modes • Incorporate feedback from property owners 6 Draft Recommended Concept Key Design Elements: • Add dual left turn lanes and extend right turn lanes • Upgrade substandard infrastructure (utilities, sidewalks, etc.) • Improve bike/pedestrian connections and crossings • Requires rebuilding wall/removing tree 7 Alternate Concept Key Design Elements: • Best addresses property owner concerns • Cannot include 2nd WB Left Turn 8 Residential Properties 9 Residential Properties 10 Public Outreach Outreach: • Staff has contacted all property owners • Staff has held ~15-20 individual meetings with property owners • Concept plan has been adjusted to balance project needs/property impacts • Outreach effort will continue through final design and construction • Mitigation (landscaping, parking, wall details, new trees, etc.) is a focus of the next several months 11 Neighborhood Traffic Mitigation • Phasing and Detour Routes developed with final design • Communication is an on-going focus • Official Detours on appropriate streets • Neighborhood cut-through discouraged with: • Signing • Enforcement (speeding) • Additional measures if needed 12 13 10 ' T H R U 10 ' T H R U 10' DETACHED WALK 12' THRU STRIPE TO FL 11' THRU STRIPE TO FL 11' LEFT STRIPE TO FL MATCH CSU 10' WALK 12' THRU STRIPE TO FL 11' THRU STRIPE TO FL 11' LEFT STRIPE TO FL 5' WALK 10' LEFT 10' THRU 10' THRU 12' RIGHT STRIPE TO FL 10' DETACHED WALK 10 ' W A L K 4 ' W A L K EXISTING WALK 9' LEFT 10' THRU 10' THRU 11' THRU STRIPE TO FL 10' THRU STRIPE TO FL EXISTING WALK 12 ' R I GH T S T R I P E T O F L MATCH CSU 10' WALK 12' THRU STRIPE TO FL 11' THRU STRIPE TO FL 11' LEFT STRIPE TO FL 11' LEFT 12' RIGHT STRIPE TO FL 11' THRU 11' THRU 11' LEFT 11' LEFT STRIPE TO FL 11' THRU STRIPE TO FL 12' THRU 10' DETACHED WALK 10' WALK 4 ' W A L K EXISTING WALK 10' DETACHED WALK 11' THRU 11' THRU 12' RIGHT STRIPE TO FL 9' WALK 10 ' W A L K 11' THRU STRIPE TO FL 10' THRU 9' LEFT 10' THRU 10' THRU STRIPE TO FL 0' 30' 60' 120' COLLEGE P R O SP E C T PROSPECT REMINGTON BNSF RR NORTHWEST QUADRANT DETAILS SEE CSU DESIGN FOR 04/12/2016 SINGLE LEFT OPTION COLLEGE AND PROSPECT 0' 30' 60' 120' 04/12/2016 DUAL LEFT OPTION COLLEGE AND PROSPECT COLLEGE P R O SP E C T PROSPECT REMINGTON BNSF RR NORTHWEST QUADRANT DETAILS SEE CSU DESIGN FOR MAINTAIN EXISTING DRIVEWAY MAINTAIN EXISTING DRIVEWAY ACCOMODATE NB TO EB WB-67 TURNING RECONFIGURED SE CORNER TO ACCOMODATE NB TO EB WB-67 TURNING RECONFIGURED NE CORNER TO TREES EXISTING TREES EXISTING DRIVEWAY EXISTING MAINTAIN DRIVEWAYS EXISTING MAINTAIN MAINTAIN EXISTING DRIVEWAY DRIVEWAY EXISTING MAINTAIN MAINTAIN EXISTING DRIVEWAY MAINTAIN EXISTING DRIVEWAY ACCOMODATE NB TO EB WB-67 TURNING RECONFIGURED SE CORNER TO ACCOMODATE NB TO EB WB-67 TURNING RECONFIGURED NE CORNER TO TREES EXISTING TREES EXISTING DRIVEWAY EXISTING MAINTAIN DRIVEWAYS EXISTING MAINTAIN MAINTAIN EXISTING DRIVEWAY DRIVEWAY EXISTING MAINTAIN MAINTAIN EXISTING DRIVEWAY MAINTAIN EXISTING DRIVEWAY