Loading...
HomeMy WebLinkAboutReport - Mail Packet - 2/16/2016 - City Manager�S Monthly Update - February 11, 2016February 11, 2016 CONTENTS ISSUES BEFORE COUNCIL ................................................................................................................. 3 February 16 Council Meeting .................................................................................................................................3 February 23 Work Session ......................................................................................................................................3 Monday, February 29 - State of the City ................................................................................................................3 March 1 Council Meeting .......................................................................................................................................3 Thursday, March 10 Work Session .........................................................................................................................3 SALES AND USE TAX COLLECTION .................................................................................................. 4 Monthly & Year to Date ..........................................................................................................................................4 CAPITAL PROJECTS ........................................................................................................................... 4 CITYWIDE PEDESTRIAN ACCESS PROJECT ...............................................................................................................4 WEST MULBERRY BRIDGE REPLACEMENT DESIGN.................................................................................................5 ARTHUR DITCH BOX SECTION REPLACEMENT - LOOMIS/OLIVE ............................................................................5 SHIELDS STREET AND DRAKE ROAD INTERSECTION IMPROVEMENTS ...................................................................5 TIMBERLINE IMPROVEMENTS – PROSPECT TO BLACKBIRD ...................................................................................6 HORSETOOTH AND TIMBERLINE INTERSECTION IMPROVEMENTS ........................................................................6 VINE AND SHIELDS ROUNDABOUT .........................................................................................................................7 REMINGTON GREENWAY .......................................................................................................................................7 DOWNTOWN RIVER DISTRICT IMPROVEMENTS ....................................................................................................8 NORTH COLLEGE PEDESTRIAN GAP ........................................................................................................................8 NORTH COLLEGE IMPROVEMENTS – CONIFER TO WILLOX ....................................................................................9 LINCOLN CORRIDOR PROJECT – 1ST STREET TO LEMAY AVENUE ...........................................................................9 COLLEGE AND PROSPECT INTERSECTION IMPROVEMENTS ...................................................................................9 VINE AND LEMAY BNSF IMPROVEMENTS ........................................................................................................... 10 LINCOLN CORRIDOR PROJECT – POUDRE RIVER BRIDGE TO 1ST STREET ............................................................. 11 COLORADO STATE UNIVERSITY PROJECT COORDINATION ................................................................................. 11 CAPITAL PROJECTS – UTILITIES .................................................................................................... 12 HARMONY SUBSTATION SECURITY WALL ........................................................................................................... 12 EAST HARMONY DUCT BANK – TIMBERLINE TO I-25 .......................................................................................... 12 DRAKE TO LAKE STREET DUCT BANK ................................................................................................................... 12 BOXELDER CREEK OUTFALL ................................................................................................................................. 13 MICHIGAN DITCH TUNNEL ................................................................................................................................... 13 LINCOLN AND WILLOW STORM SEWER OUTFALL ............................................................................................... 14 PUBLIC SAFETY UPDATE ................................................................................................................. 14 Police Services ..................................................................................................................................................... 14 Poudre Fire Authority .......................................................................................................................................... 15 BUILDING AND PLANNING ACTIVITY .............................................................................................. 16 Year to Date Comparisons ................................................................................................................................... 16 Projects Of Note: Status and Updates ................................................................................................................. 16 Projects Under Appeal ......................................................................................................................................... 19 SUSTAINABILITY SERVICES ............................................................................................................ 19 Environmental Services ....................................................................................................................................... 19 Social Sustainability ............................................................................................................................................. 19 Economic Health .................................................................................................................................................. 20 CITY MANAGER’S UPDATE 3 ISSUES BEFORE COUNCIL FEBRUARY 16 COUNCIL MEETING  Capstone Cottages Appeal o Consideration of an appeal of the Administrative Hearing Officer Decision regarding the Capstone Cottages PDP, located northeast of Lincoln Avenue and Lemay Avenue. FEBRUARY 23 WORK SESSION  Short Term Rentals o Staff will bring a draft regulatory framework for Council discussion  Implementation Plan for Utilities Low Income Assistance Program o Provide the recommended implementation plan for Utilities Low Income Assistance Program, to include a low income rate in partnership with the City’s Rebate program, and payment assistance fund enhancements.  Airport Work Plan and Financial Plan o Update City Council on the adopted Airport Strategic Plan including action item timelines and financial forecasting considerations MONDAY, FEBRUARY 29 - STATE OF THE CITY  Lory Student Center, 1101 Central Avenue Mall, CSU o Join the Fort Collins Mayor and City Manager this year for an intimate and candid conversation about the state of the city. o This year’s theme for the event is “Let’s Talk About It,” with a new conversational format offering participants the chance to weigh in and ask questions of their own. MARCH 1 COUNCIL MEETING  Water Efficiency Plan Adoption o Adopt the Water Efficiency Plan prior to submittal to the Colorado Water Conservation Board. The purpose of the WEP is to set a community “gallons per capita per day” (gpcd) goal with supporting objectives, and implementation principles that will guide activities undertaken and funded by Utilities.  Instream Flow Augmentation Agreement, Phase 1 o Review a proposed agreement with various parties to implement Phase I of a three-phase project to develop an Instream Flow Augmentation Plan.  Amend the City District-Precinct Map o Amending the City’s District-Precinct map to align City precinct boundaries with County precinct boundaries and adjust District boundaries to achieve a required population deviation between the most populous and least populous district. THURSDAY, MARCH 10 WORK SESSION  Climate Action Plan Implementation o Provide City Council with an update and receive input on the direction of the 2020 CAP Strategic Plan, including a draft roadmap to reach the City’s 2020 greenhouse gas emissions reduction goal of 20% below 2005 levels.  Staff will share the initial prioritization of strategies, which is based modeling that assesses the costs versus benefits (including greenhouse gas reductions) of each strategy.  Staff will also outline a timeline for implementation, including strategies that could be implemented immediately if Council so desires. 4 CITY MANAGER’S UPDATE  Old Town Planning Projects o Provide City Council with an update on the Old Town Planning Projects including the Downtown Plan, Old Town Neighborhoods Plan, and the Old Town Neighborhoods Plan – Design Guidelines, and receive input from Council on recommended policy direction and strategies for implementation.  West Elizabeth Enhanced Travel Corridor Plan o Provide City Council with an update on the West Elizabeth Enhanced Travel Corridor Plan and receive input from Council on the Preferred Alternative, preliminary recommendations, and the overall direction of the project SALES AND USE TAX COLLECTION MONTHLY & YEAR TO DATE DECEMBER SUMMARY OVER PRIOR YEAR Month Year to Date Sales Tax Collected: 6.6% 4.9% Use Tax Collected Excluding Rebates: 38.8% 10.2% Sales and Use Tax Collected Excluding Rebates: 11.7% 6.0% CAPITAL PROJECTS CITYWIDE PEDESTRIAN ACCESS PROJECT Funding Source: KFCG/BOB Funds Estimated Project Budget: $450,000 Status: On Budget, On Schedule Project Details:  This project provides a complete City sidewalk inventory, identifies sidewalk inadequacies, and identifies inadequate handicap accessibilities according to Americans with Disabilities Act (ADA) requirements.  37,741 accessible ramps have been identified as acceptable, substandard, or missing in accordance with the ADA requirements. Project Updates:  Current Projects – o Upcoming project locations: Working on project design for installation of sidewalk at Overland and Prospect. Bus stop design is complete. Working on landscaping layout. Current projects: Staff is finalizing work plan for 2016. o Staff is continuing to collaborate with CSU staff regarding final layout for the NRRC connection between Centre Avenue and MAX Spring Creek Station.  Staff is preparing a memo to Council to provide an update to Safe Routes to Everywhere prioritization. More information is available at http://www.fcgov.com/engineering/pedneeds.php CITY MANAGER’S UPDATE 5 WEST MULBERRY BRIDGE REPLACEMENT DESIGN Funding Source: Colorado off system bridge program (BRO) funds and KFCG Estimated Project Budget: $1.1m Status: On Budget, On Schedule Project Details:  The goal of the project is to replace the existing structurally deficient bridge with a new bridge that meets the current standards.  The posted weight limit on this bridge precludes the passage of emergency vehicles from the nearby fire station.  Construction is planned for winter 2015/spring 2016. Project Updates:  Phase 1 is complete  The project is currently in Phase 2, which began January 20. During this phase, both east and west bound traffic will have one travel lane each on the north side of the road.  The bridge is expected to be completed by May 2016. ARTHUR DITCH BOX SECTION REPLACEMENT - LOOMIS/OLIVE Funding Source: KFCG/Operation Services, Facilities Estimated Project Budget: $900,000 Status: On Budget, On Schedule Project Details:  The intent of this project is to replace a structurally deficient bridge/box sections with new concrete box culverts. Project Updates:  Project commenced January 11.  Door to door notification given to residents not directly impacted. Residents immediately impacted had received previous notice and were reminded recently. Extensive social media utilized to inform the community. SHIELDS STREET AND DRAKE ROAD INTERSECTION IMPROVEMENTS Funding Source: Federal Hazard Elimination Grant (90%)/Local Match (10%) Estimated Project Budget: $986,000 Status: On Budget, On Schedule Project Details:  The main goal of this project is to reduce the accident rate that occurs at this intersection by 6 CITY MANAGER’S UPDATE installing dedicated right turn lanes in the north and southbound movements. A reduced movement concept is also being considered to the Raintree Dr./Davidson Rd. intersection 400 feet south of Shields and Drake.  As a result of meeting Federal requirements this project is anticipated to go to construction in the summer of 2016. Project Updates:  Final Office Review completed in early 2016. Project is entering final revision to both plan set and cost estimates.  All rights of way acquisitions/transactions have been completed. Request of rights of way clearance approval were sent to CDOT for approval in December 2015. TIMBERLINE IMPROVEMENTS – PROSPECT TO BLACKBIRD Funding Source: Building on Basics (BOB) Estimated Project Budget: $5.0m Status: On Budget, On Schedule Project Details:  The goals of this project are to improve air quality, reduce vehicle wait time and reduce the accident rate by constructing a free-right turn and acceleration lane from eastbound Prospect to southbound Timberline; as identified in our Arterial Intersection Prioritization Study.  The 2005 ballot language stated this project will expand Timberline Road to four (4) lane arterial standards including:  Travel lanes, sidewalks, bike lanes and landscaped medians.  Improvements to the Prospect and Timberline intersection and all its approaches to add additional turn lanes.  The project will add a sidewalk connection for southbound Timberline from Prospect to Blackbird.  The project is likely a Two Phase project (Phase One – Roadway work 2016, Phase Two – Great Western Maintenance and Signal Improvements).  Construction is expected to begin in the spring of 2016. Project Updates:  No current updates More information is available at http://www.fcgov.com/engineering/prospect-timberline.php HORSETOOTH AND TIMBERLINE INTERSECTION IMPROVEMENTS Funding Source: Building on Basics (BOB)/Federal Grant (CMAQ) Estimated Project Budget: $3.5m Status: On Budget, On Schedule Project Details: CITY MANAGER’S UPDATE 7  The goal of this project is to relieve traffic congestion and vehicle wait time by constructing additional intersection turn lanes.  The need for these safety and operational improvements were identified in the Engineering Department’s recently completed Arterial Intersection Prioritization Study. Turn lane needs are as follows: o Right turn lane (southbound Timberline to westbound Horsetooth) o Right turn lane (eastbound Horsetooth to southbound Timberline) o Second left turn lane (northbound and southbound Timberline)  Additionally, the project will include median and landscape improvements, sidewalk and bicycle lane improvements and transit infrastructure. Project Updates:  Landscape work is substantially complete with urban design elements installed. The contract time count for final completion has been suspended for winter shutdown.  Final completion will be done in spring of 2016, with minor restoration work on PRPA property delayed until next spring due to weather. More information is available at http://www.fcgov.com/engineering/horsetooth-timberline.php VINE AND SHIELDS ROUNDABOUT Funding Source: Building on Basics (BOB)/Federal Grant (STP Metro)/Regional Road Impact Fees Estimated Project Budget: $1.7m Status: On Budget, On Schedule Project Details:  The main goal of this project is to increase mobility at the intersection via multimodal transportation improvements. Currently, the east-west lanes on Vine Drive are not aligned causing additional independent traffic movements which effect the overall operation of the signal timing.  Other safety concerns which will be corrected at the intersection entail: adding sidewalks along the northern portion of the project, installing ADA compliant ramps/crosswalks and adding bike lanes. Project Updates:  Landscaping will be postponed until the spring of 2016 due to weather. More information is available at http://www.fcgov.com/engineering/vsi.php REMINGTON GREENWAY Funding Source: FC Moves Funding Estimated Project Budget: $650,000 Status: On Budget, On Schedule Project Details:  The goal of this pilot project is to offer flexibility in street design to calm traffic, support active modes of transportation and integrate stormwater management strategies. 8 CITY MANAGER’S UPDATE  The design calls for buffered bike lanes, removal of the traffic signals between Prospect and Mulberry, and the construction of a mini roundabout with curb bulb outs at Remington and Laurel. Project Updates:  Construction is substantially complete, with final punch list items scheduled for spring 2016. More information is available at http://www.fcgov.com/advanceplanning/remingtongreenway.php DOWNTOWN RIVER DISTRICT IMPROVEMENTS Funding Source: Federal Grants/Local Funds/DDA Funds Estimated Project Budget: $1.4M Status: On Budget, On Schedule Project Details:  The City has completed two design projects within the Downtown River District: 1. Developing an implementation plan for improvements along Jefferson Street between College Avenue and the Mountain /Lincoln intersection based on the available budget, and 2. Developing a conceptual design for improvements along Willow Street between North College Avenue and Linden Street. Project Updates:  Staff finalized contracts enabling the initiation of the Preliminary Engineering Design and ROW Acquisition phases of the Jefferson Street Improvements Project. NORTH COLLEGE PEDESTRIAN GAP Funding Source: CMAQ Grant/URA Contribution/Pedestrian Program Funds Estimated Project Budget: $900,000 Status: On Budget, On Schedule Project Details:  The primary goal of this project is to complete a gap in pedestrian infrastructure from Highway 1 to the south side of the Larimer & Weld Canal.  This project will construct a pedestrian connection crossing the Larimer & Weld Canal extending north to SH 1 (Terry Lake Rd). The project impacts a federal highway, and is located outside the City limits but within the Growth Management Area. Project Updates:  Staff has initiated the design phase of the project. Staff is working to develop alternatives which accomplish the project’s design goals. CITY MANAGER’S UPDATE 9 NORTH COLLEGE IMPROVEMENTS – CONIFER TO WILLOX Funding Source: Federal Grants/Local Matching Funds Estimated Project Budget: $12m Status: On Budget, On Schedule Project Details:  The intent of this project is to design and construct improvements along North College Avenue from the Conifer/Hickory intersection to Willox Lane, bringing this section of North College up to four-lane arterial standards as defined by the Larimer County Urban Area Street Standards. Both medians and sections of the planned rear access roads are included in the project. Project Updates:  Project has been suspended due to winter weather.  Project is 95% complete. Roadway, sidewalks, medians and utilities are installed. Landscaping to be installed in Spring of 2016. LINCOLN CORRIDOR PROJECT – 1ST STREET TO LEMAY AVENUE Funding Source: General Fund Reserves, Street Oversizing Fund, previously committed developer local street obligations, savings from Woodward interim improvements Estimated Project Budget: $6.5m Status: On Budget, On Schedule Project Details:  This phase of the overall Lincoln corridor plan includes improvements along Lincoln Avenue between 1st Street and Lemay Avenue.  Subsequent phases include improvements to the Poudre River Bridge and improvements along Lincoln Avenue to Jefferson Street.  Project intent is to create a multi-modal design along Lincoln Avenue that will include creating a street with a unique identity, improving the mobility, safety, and experience for bicyclists, pedestrians, transit users, and vehicles, and creating an environment where local businesses can thrive. Project Updates:  The 30% design submittal has been reviewed; consultant currently working updates.  Eminent Domain request through City Council has been completed, and the ROW acquisition process has begun.  The RFP for the construction contractor was released in December; contractor will be chosen in Feb. COLLEGE AND PROSPECT INTERSECTION IMPROVEMENTS Funding Source: Mid-Budget Approval of 2016 Capital Projects Fund Estimated Project Budget: $2.7 M Status: On Budget, On Schedule 10 CITY MANAGER’S UPDATE Project Details:  The Colorado State University (CSU) Medical Center project at the northwest corner of this intersection, presented an opportunity for the City to address other existing deficiencies which were identified in the 2011 Arterial Intersection Prioritization Study.  The goals of the project are to address safety, operational, and congestion issues primarily focused on Prospect Road by: o Adding turn lane capacity to existing turn lanes o Constructing new turn lanes and medians on Prospect Road o Improving bicycle and pedestrian facilities  The City and Colorado State will work collaboratively on the intersection improvements, with each entity funding their own design and construction obligations. Project Updates:  The consultant is on board, and is analyzing traffic data and alternatives for design concepts. Coordinating design work with CSU development on NW corner.  Existing topographic survey of the intersection and property owner information is being done. Meeting with property owners to discuss preliminary design concepts and ROW needs. More information available at: http://www.fcgov.com/engineering/college-prospect.php VINE AND LEMAY BNSF IMPROVEMENTS Funding Source: Keep Fort Collins Great (KFCG) Estimated Project Budget: $1.0 M Status: On Budget, On Schedule Project Details:  The existing Vine and Lemay intersection, which includes the Burlington Northern Santa Fe (BNSF) Railway crossing, is severely congested with limited options to expand through or turn lane capacity due to land use constraints.  Lemay Avenue realignment and intersection improvements have been prioritized as the City’s #1 Transportation Capital Improvement Project  The realignment has been on the City’s Master Street Plan since the mid-1980’s  The project area is included within the City’s Mountain Vista Subarea Plan which was created as a long-term planning vision for the northeast section of Fort Collins  The improvements will construct a new roadway and intersection slightly northeast of the existing Vine and Lemay intersection. The new intersection will be realigned Lemay and Suniga Drive.  The City is investigating a number of interim and ultimate solutions that include new at-grade intersections or overpass/underpass of the BNSF Railway and existing Vine Drive Project Updates:  AECOM and City staff have developed a communication and public outreach plan as preparation for collecting public feedback related to alternative crossings of the BNSF Railway. CITY MANAGER’S UPDATE 11  Public outreach has begun and the City is hosting a public meeting February 10 from 6-8PM at the Streets Facility.  Staff is currently working on right-of-way acquisitions and an alternatives analysis report, as well as moving towards a 30% design. Coordinating schedules with Stormwater work in the area for excavation of the NECCO backbone, and detention pond to use the fill material for realigned Lemay. More information is available at http://www.fcgov.com/engineering/vine-lemay.php LINCOLN CORRIDOR PROJECT – POUDRE RIVER BRIDGE TO 1ST STREET Funding Source: BOB 2.0 Estimated Project Budget: $5.4m Status: On Budget, On Schedule Project Details:  This phase of the overall Lincoln corridor plan includes replacement of the Poudre River bridge and road between the bridge and 1st Street.  Project intent is to add to the ongoing Lincoln Corridor project creating a street with a unique identity, improving the mobility, safety, and experience for bicyclists, pedestrians, transit users, and vehicles, to include an enhanced bridge that will meet the intent of the overall project. Project Updates:  Currently the consultant is working toward 3 options to present at a 20% conceptual design level. One of these 3 options will be chosen to proceed to 100% design. The preferred bridge option will be chosen in February. COLORADO STATE UNIVERSITY PROJECT COORDINATION Funding Source: Colorado State Estimated Project Budget: There is no City budget, it’s all CSU. It’s a coordinated effort. Status: On Schedule Project Details:  Prospect and Center bicycle and pedestrian underpass, along with Center Avenue improvements between Bay Farm and Lake  Elizabeth and Shields feasibility study of grade separation, along with surface intersection improvements to improve safety and relieve congestion  Laurel / Washington and Laurel / Sherwood pedestrian enhancements  Whitcomb sidewalk improvements (east side) Prospect to Lake  Whitcomb sanitary sewer line (stadium flow)  College and Lake (northbound left turn lane improvements)  Lake and Center intersection improvements  Lake Street bicycle and pedestrian improvements Project Updates:  Center Avenue closure from Bay Farm to Prospect February 8-18 for utility relocations  Elizabeth and Shields feasibility report will be completed in mid-February  City and CSU Communications kick off meeting in February o Discuss combined events, messaging, outreach, and launch of the Prospect corridor website More information available at http://source.colostate.edu/construction-and-parking/ 12 CITY MANAGER’S UPDATE CAPITAL PROJECTS – UTILITIES HARMONY SUBSTATION SECURITY WALL Funding Source: System Improvement & Additions Estimated Project Budget: $718,842 Status: Under Budget, Complete Project Details:  Substation security wall installation, including increased physical increased physical site security Project Updates:  Increased measure of physical security  Enhanced aesthetics of substation property  12 x 14771.9 foot block fence  Two vehicle entry gates constructed of steel and one man door gate  Automated gate opener with keypad entry EAST HARMONY DUCT BANK – TIMBERLINE TO I-25 Funding Source: Development Fees Estimated Project Budget: $3,000,000 Status: On Budget, On Schedule Project Details:  2.5 miles of duct bank installation  Design, route identification, and project coordination  Locates, pot holing, excavation and construction  Duct bank, vault, conduit, and cable installation  Electric termination and reenergizing Project Updates:  Project survey and design complete  Identifying potential routes from Northern Engineering horizontal map  Project coordination is on going DRAKE TO LAKE STREET DUCT BANK Funding Source: Development Fees Estimated Project Budget: $600,000 Status: On Budget, On Schedule Project Details:  1.2 miles of duct bank  Design, easements, and project coordination  Locates and pot holing, excavation, and construction  Duct bank, vault and conduit installation, and cable pulling 1.2 Miles of Duct Bank – Site Map 2.5 Miles of Duct Bank Security Wall Installation CITY MANAGER’S UPDATE 13  Electric termination, and reenergizing Project Updates:  Project coordination continues with Stanley Engineering, Colorado State University, Hilton Hotel and City of Fort Collins Real Estate Services to complete easements.  Legal description is under review  Work with Stanley and Utilities Water department is underway to obtain permitting  Determination of vault location is 90% complete BOXELDER CREEK OUTFALL Funding Source: Fort Collins and Timnath Escrow Fund Estimated Project Budget: $4,100,000 Status: On Schedule Project Details:  6 – 12’ wide x 4’ high RCBC under East Prospect  2 – 14’ wide x 5’ high RCBC on Boxelder Creek under East Prospect  New siphon to replace existing flume on Lake Canal at Boxelder Creek Upcoming Work:  Construction of Siphon on Lake Canal and grading in front of I-25 culverts  Flood diversion channel north and south of East Prospect MICHIGAN DITCH TUNNEL Funding Source: Water Estimated Project Budget: $8,308,000 Status: On Budget, On Schedule Project Details:  Engineering final design and construction services contract complete  Complete cost estimate being done Upcoming Work:  Easements and permitting are being done  Final design complete by end of January 2016  Construction scheduled to begin approximately June 1, weather permitting Installing the Manhole on the Siphon Tunnel Boring Machine Cutting Head…similar to proposed unit 14 CITY MANAGER’S UPDATE LINCOLN AND WILLOW STORM SEWER OUTFALL Funding Source: Stormwater Estimated Project Budget: $2,831,000 Status: On Budget, On Schedule Project Details:  Began construction on January 25, 2016  Outfall structure excavation is complete Upcoming Work:  Outfall structure form work and concrete pour  Pipe crew arrives on site February 22, 2016  On-going public relations coordination PUBLIC SAFETY UPDATE POLICE SERVICES  Protecting Houses of Worship Fort Collins Police Services, in conjunction with Larimer County Sheriff, Weld County Sheriff, the Anti-Defamation League, FBI, and US Attorney’s Office, met with leaders from local faith communities to discuss security concerns and safety planning for houses of worship.  Victim Advocate Program Recruits Volunteers FCPS held an informational meeting for those interested in the volunteer Victim Advocate program, which provides crime victims with information on the criminal justice system, resources in the community, aid in acquiring emergency shelter, and facilitate other immediate needs. They also conduct follow-up assistance by providing victim compensation benefits information as well as updates on the status and progression of a victim’s case through preliminary stages of the judicial system. Applications are still being accepted.  Suspects Arrested in Marijuana Exchange Robbery On January 24, dispatchers received a report of a robbery on S Timberline Rd. The victims said they had arranged a deal through Craigslist to trade marijuana for a donation. Four buyers arrived in a vehicle, and when there was a dispute about the donation amount, a male suspect pointed a gun at the victims from inside of the vehicle. Longmont Police issued a “Be on the Look Out” alert when a similar incident occurred later that evening. Larimer County Sheriff subsequently stopped the vehicle and notified FCPS. Fort Collins Police arrested the suspects on charges of Aggravated Robbery of a Controlled Substance (class 2 felony). Excavating for the Outfall Structure CITY MANAGER’S UPDATE 15  Crime Prevention This month, the Crime Prevention Specialist had 18 telephone calls that ranged from dealing with illegal dumping occurring at one of the Environmental Department locations to helping Loveland Police with a cold case and setting up a Crime Stoppers reward. Presentations were made to staff at Good Samaritan Facility and the Catholic Mission on Dealing with Difficult People. Difficult People Presentation: Catholic Charities/Murphy Center Staff, 20 attended RESTORE: 55 attended Difficult People Presentation: Good Sam Staff, 110 attended Personal Safety: Civil Air Patrol, 83 attended Presentations to 268 People and 18 incoming calls POUDRE FIRE AUTHORITY  Citizen Lifesaving Award– On Thursday January 14, 2016, Chief Tom DeMint presented the Citizen Lifesaving Award to Matt Lorimer, an employee of the T-Mobile store on East Harmony Road. The award was presented in a ceremony held at the store in the presence of Matt’s co- workers, friends, and family. On October 29th, 2015, Matt was working at the store when a citizen came in seeking assistance for her spouse who was outside in their parked vehicle, suffering from a possible heart attack. Matt immediately went outside to assist while another employee dialed 911. He pulled the patient out of the car and began performing CPR. When the crew of PFA Engine 5 arrived, Matt turned patient care over to them. The care that Matt provided, allowed the victim to regain a pulse and cardiac function. The victim was transported to the hospital, but sadly died two days later. More than 326,000 people in the US suffer out-of-hospital cardiac arrests each year. Statistics prove that if more people knew CPR, more lives could be saved. The Poudre Fire Authority thanks Mr. Lorimer and his fellow employee for their willingness to get involved and save a life.  Firehouse Subs Grant Approved- PFA was notified of approval for a grant from the Firehouse Subs Public Safety Foundation. The latest grant request is for $3,600 worth of carbon monoxide alarms which equates to over 190 alarms. These alarms will be used as part of the PFA Smoke Alarm and Carbon Monoxide (CO) Alarm Program. The program distributes hundreds of alarms each year to customers within PFA’s jurisdiction who may not be able to afford them. Carbon monoxide is an odorless, colorless, tasteless gas that is produced when any fuel-burning equipment is used. Examples are gas-fired water heaters, furnaces, cook stoves, and automobiles. Unfortunately CO kills over 250 people and sickens thousands every year in the United States. Through the program we are trying to prevent such occurrences.  Smoke and Carbon Monoxide Program - In partnership with the American Red Cross Northern Colorado Chapter, an alarm event was held at a mobile home park in Southeast Fort Collins. Teams were able to speak with residents about the benefits of smoke and carbon monoxide alarms, and install much-needed alarms in an effort to keep residents safe. Without this program, residents either go without or have outdated alarms in their homes. 16 CITY MANAGER’S UPDATE BUILDING AND PLANNING ACTIVITY YEAR TO DATE COMPARISONS 2015 YTD 2016 YTD % Change Development Project Submittals Rec’d 314 36 376 27 +20 -25% Conceptual/Staff Reviews Performed 230 24 243 22 + 6 -8% Building Permits Issued 12,761 585 8,802 437 -31 -25% Building Permit Valuations ($M) $ 663.6 24.3 $ 537.4 19.4 - 19 -20% Building Inspections Performed 38,387 2,343 33,237 2,245 - 13 -4% Plan Reviews Performed 2,417 139 2,246 121 - 7 -13% Overall development review revenues are $50,293 under projection for 2016 as of January 31st. PROJECTS OF NOTE: STATUS AND UPDATES Development/Planning Projects of Note Status/Updates Capstone Cottages An appeal of the Capstone Cottages Final Development Plan will be considered by City Council at its February 16, 2016 hearing. Downtown Plan The Plan Update is in Phase 3 (Choices and Strategies) and the summary of the Phase 2 (Visioning) has been completed. A summary of the Phase 2 (Visioning) and recent updates are available online at http://fcgov.com/downtown. The next public events for the Downtown Plan are: - Choices Workshop #1 – February 25 - Choices Workshop #2 – March 2 The next City Boards and Commission meetings for the Downtown Plan are: - Superboard Meeting – February 18 - City Council Work Session – March 10 Foothills Mall Redevelopment Weekly meetings with City Staff and the developer have been suspended. Such meetings will be scheduled as needed. Increase in number of tenant finish permits being issued throughout the site. Inspection workloads on-site are increasing but still manageable with staff resources. Major Amendment moving forward for the residential portion. Phase 2 (old Sears location and new Sports Authority) core and shell is almost complete. I-25/392 Corridor Activity Center (CAC) Overlay use and design standards City staff has been working collaboratively with the Town of Windsor staff to evaluate possible amendments to the CAC Overlay use and design standards and/or IGA Amendments. A public open house was held on January 21, CITY MANAGER’S UPDATE 17 followed by a joint City Council/Town Board meeting on February 1st. Lincoln Corridor Plan – Neighborhood Project Implementation Of the ten funded neighborhood projects, three are complete and three are anticipated to be implemented this month (with some minor ongoing delays due to weather). Applications are currently open for residents to fill three vacancies on the Neighborhood Advisory Committee for the remainder of 2016, and this month Art in Public Places plans to release a Call for Artists to work with the committee on neighborhood art projects. The next committee meeting is tentatively scheduled for April, 2016. Mobile Food Vendor Mobility Options Staff is continuing to assess mobile food truck vendor operations changes. Staff will conduct additional public outreach that will consider how mobile food truck vending may be regulated through the City’s land use regulation framework in February and bring forward an agenda item for the Planning and Zoning Board in March. Mountain Vista Subarea Analysis As a second phase of the project, staff conducted a multiple-day Design Charrette with Mountain Vista Area property owners and stakeholders, exploring multiple land development scenarios which would incorporate Nature in the City policies and Urban Agriculture standards. A City Council Work Session is anticipated in late Spring 2016 summarizing final recommendations from the second phase. Neighborhood Districts Community engagement efforts have continued. Neighborhood Advisory Committee (NAC) concluded its meetings on December 9. The project team continued to develop program components during January in preparation for focus groups. The NAC recommended the following as staff moved forward with developing a neighborhood engagement program:  Need for flexibility in program format based on neighborhood needs  Need to provide access to increased funding opportunities  Need to develop ways for neighbors to come together for positive reasons Areas that are still being explored include:  Opportunities for expanded notification and participation for neighborhoods in development review  Better utilization of social media in neighborhood group outreach  Program logistics o How will membership be defined o How will this program work with neighborhood planning o What information will be included in the online toolbox o How will boundaries be defined 18 CITY MANAGER’S UPDATE o How do HOAs fit in Upcoming meetings:  Public focus groups occurred February 4 and 6, 2016  City Council Work Session - April 12, 2016 Continue to work with technology staff to explore options for a registration system and subscription service that would enable citizens to engage with the City and get information based on topic or location. Continue to work on identifying program incentives and best practices. Began working with Spencer and Karina Branson on ideas for capturing outreach process in a summary document. Old Town Neighborhood Plan and Design Guidelines Phase 3 (Framework Development) is now underway. For more information on the project please visit the project webpage at http://fcgov.com/otnp. Additional outreach opportunities will be taking this spring, including a City Council Work Session on March 10th. Smoking Ordinance Expansion Options New signage continues to be installed within the Downtown Smoke-Free Zone. Education is current focus of enforcement Social Host Outreach materials have been finalized and Web page and survey were created. They can be found at: http://www.fcgov.com/neighborhoodservices/socialhost.php Upcoming meetings:  February 8, 2016 - public meeting  February 15, 2016 - public meeting  March 1, 2016 - public meeting Boards & Commissions meeting on February 18, 2016. City Council meeting on April 5, 2016 (1st Reading). Uncommon (310 S. College) City Council upheld the Planning and Zoning approval at its January 12th hearing. Final Plans will now be submitted by the developer (anticipated soon). West Elizabeth Enhanced Travel Corridor Plan Phase II (alternatives development and evaluation) is nearing completion, and Phase III (recommended design and implementation planning) is beginning. The project currently has an online “Question of the Week” campaign to gather public input on key topics. Upcoming meetings:  Stakeholder Committee Meeting #4 – February 10  City Council Work Session – March 10 Woodward Campus On October 29th, the Building Review Board (BRB) reviewed Woodward’s claim that the Coy-Hoffman silos should be declared imminent danger and removed; however, the BRB upheld the City Building Official’s classification that the silos were not an imminent danger. The City Council has heard the appeal and has remanded it back to the BRB; there is a tentative BRB/Woodward meeting scheduled for March 3rd. CITY MANAGER’S UPDATE 19 Construction is moving along smoothly; final inspections are also continuing as planned. Some aspects of construction may extend into February 2016. 85% of the larger building construction has been completed and that part was given a Temporary Certificate of Occupancy (TCO). PROJECTS UNDER APPEAL Uncommon (310 S. College Avenue) On October 29, 2015, an appeal was filed for the Uncommon project, with questions about the project’s compliance with several Land Use Codes and the basis for the approval received from the Planning and Zoning Board. City Council upheld the Planning and Zoning approval at its January 12th hearing; Final Plans will now be submitted by the developer (anticipated soon). Woodward Silos On October 29, 2015, an appeal was filed for the Coy-Hoffman silos on the Woodward campus by the attorney for Woodward, contesting the “dangerous” classification by the Chief Building Official (CBO). Woodward is requesting that the silos be classified as an “imminent” danger. The Building Review Board did not overturn the CBO’s decision in November. The City Council has heard the appeal and has remanded it back to the BRB; there is a tentative BRB/Woodward meeting scheduled for March 3rd. Capstone Cottages PDP (NE corner of Lincoln/Lemay) On December 30, 2015, an appeal was filed for the Capstone Cottages project, contesting that the decision maker committed an error for failure to properly interpret and apply relevant provisions of the Land Use Code, and failure to conduct a fair hearing. The date for City Council to hear this appeal is February 16, 2016. SUSTAINABILITY SERVICES ENVIRONMENTAL SERVICES Did you know the City has a drop-off center that accepts a wide range of recycling materials including bottles and cans, all sorts of paper materials, as well as cardboard and glass? That center, currently north of the Rivendell School, will be moving later this year to a new location near the intersection of Prospect and Timberline. Stay updated at www.fcgov.com/recycling. City Council discussed the proposed Community Recycling Ordinance at a recent work session. Staff plans to revise a proposed ordinance based on Council feedback and will return to Council later this spring. The Coloradoan recently featured an article on the City’s efforts to encourage radon testing through its free Healthy Homes assessments. For more information, go to www.fcgov.com/healthyhomes. SOCIAL SUSTAINABILITY The City of Fort Collins is working with the Fort Collins Housing Authority to build an affordable housing development on a City Land Bank property on West Horsetooth Road. City Council on February 16 is expected consider an ordinance to convey the Land Bank property to the Housing Authority and discuss a code change regarding Land Bank policy. 20 CITY MANAGER’S UPDATE Our community has two primary homeless shelter providers—Catholic Charities and Fort Collins Rescue Mission. The City works closely with them, particularly for overflow shelter during the cold winter months. Read a monthly report of the use of both shelters at http://www.fcgov.com/sustainability/pdf/01.2016MonthlyTotalsChart.pdf. ECONOMIC HEALTH Redevelopment staff began to communicate with eligible taxing entities about the City’s plans to expand the Urban Renewal Authority Board of Directors. The Board will be expanded to include a representative of the school districts and Larimer County. An additional representative will be invited from the pool of remaining taxing entities. The City is hosting an informational session for those taxing entities in February. The private property owner that has allowed public parking on the lot adjacent to the former Armadillo Restaurant will close the lot on February 10 to begin preparing it for construction of a Downtown Hotel. The lot, located at 354 Walnut St., will close to prepare the site for demolition and construction. People who have been using that lot for public parking may park across the street in the Old Town Parking Garage or find on-street public parking.