Loading...
HomeMy WebLinkAboutReport - Mail Packet - 10/13/2015 - City Manager Monthly Update - October 8, 2015October 8, 2015 CONTENTS ISSUES BEFORE COUNCIL ................................................................................................................. 3 October 13 Council Work Session ..........................................................................................................................3 October 20 Council Meeting ...................................................................................................................................3 October 27 Council Work Session ..........................................................................................................................4 November 2 Joint Council Meeting with Windsor Town Board .............................................................................4 November 3 Council Meeting .................................................................................................................................4 November 10 Work Session - CANCELED ...............................................................................................................5 November 10 YEarly Evaluation of the City Manager, City Attorney and Municipal Judge ...................................5 SALES AND USE TAX COLLECTION .................................................................................................. 5 Monthly & Year to Date ..........................................................................................................................................5 CAPITAL PROJECTS ........................................................................................................................... 5 CITYWIDE PEDESTRIAN ACCESS PROJECT ...............................................................................................................5 MULBERRY BRIDGE (SH 14) AT THE POUDRE RIVER ENHANCEMENTS ..................................................................6 WEST MULBERRY BRIDGE REPLACEMENT DESIGN.................................................................................................6 ARTHUR DITCH BOX SECTION REPLACEMENT - LOOMIS/OLIVE ............................................................................7 SHIELDS STREET AND DRAKE ROAD INTERSECTION IMPROVEMENTS ...................................................................7 TIMBERLINE IMPROVEMENTS – PROSPECT TO BLACKBIRD ...................................................................................7 HORSETOOTH AND TIMBERLINE INTERSECTION IMPROVEMENTS ........................................................................8 VINE AND SHIELDS ROUNDABOUT .........................................................................................................................9 REMINGTON GREENWAY .......................................................................................................................................9 DOWNTOWN RIVER DISTRICT IMPROVEMENTS ....................................................................................................9 LINCOLN (INTERIM) AND LEMAY IMPROVEMENTS / WOODWARD CAMPUS ..................................................... 10 NORTH COLLEGE PEDESTRIAN GAP ..................................................................................................................... 10 NORTH COLLEGE IMPROVEMENTS – CONIFER TO WILLOX ................................................................................. 11 LINCOLN CORRIDOR Project – 1st STREET TO LEMAY AVENUE ............................................................................ 11 VINE AND LEMAY BNSF IMPROVEMENTS ........................................................................................................... 12 CAPITAL PROJECTS - UTILITIES ..................................................................................................... 12 Applewood Rebuild – Shields/North Fossil Creek Project ................................................................................... 12 Vine & Shields Round-about Project ................................................................................................................... 13 Timberline & Horsetooth Intersection Upgrade Project ..................................................................................... 13 Michigan Ditch Mudslide Repair ......................................................................................................................... 14 DWRF South Process Train BNR and Replacement Project ................................................................................. 14 Lincoln and Willow Storm Sewer Outfall ............................................................................................................. 15 NATURAL AREAS LAND CONSERVATION ...................................................................................... 15 2015 - 3rd Quarter Report .................................................................................................................................... 15 PUBLIC SAFETY UPDATE ................................................................................................................. 16 Police Services ..................................................................................................................................................... 16 Poudre Fire Authority .......................................................................................................................................... 17 BUILDING AND PLANNING ACTIVITY .............................................................................................. 19 Year to Date Comparisons ................................................................................................................................... 19 Projects of Note-Status and Updates .................................................................................................................. 19 Projects Under Appeal ......................................................................................................................................... 22 SUSTAINABILITY SERVICES ............................................................................................................ 22 Environmental Services ....................................................................................................................................... 22 Social Sustainability ............................................................................................................................................. 22 Economic Health .................................................................................................................................................. 23 CITY MANAGER’S UPDATE 3 ISSUES BEFORE COUNCIL OCTOBER 13 COUNCIL WORK SESSION  Water Topics o Water Development Fees o Ditch and Reservoir Company Boards o Water Efficiency Plan This discussion will: o Review the Utilities Raw Water Requirements and Plant Investment Fees for new development and requirements in surrounding water districts and consider potential changes to Utilities’ requirements. o Provide Council with an overview of ditch companies that operate in and around Fort Collins and to discuss key issues where ditch company operations and City interests intersect. o Provide City Council with a draft of the Water Efficiency Plan and receive input from Council on the key issues addressed in the plan and the direction of the project.  Community Recycling Ordinance o Provide information about a potential update to the 1995 Pay-As-You Throw ordinance, which requires trash haulers to provide recycling and charge variable rates to residents of single-family homes, so the ordinance continues to help Fort Collins achieve progress in meeting adopted Zero Waste goals.  Community Recycling Center o Discuss alternatives to construction of an entire Community Recycling Center.  Community Policing o Provide City Council with a summary of current community policing programs and activities. Also to receive direction from Council regarding a Campus West substation OCTOBER 20 COUNCIL MEETING  2016 DDA Annual Appropriation Ordinance (consent-First Reading) o Appropriate the 2016 Budget for the Downtown Development Authority  Extending the City’s Sales and Use Tax For Street Maintenance in Accordance with a voter- approved Ballot Measure (First Reading-consent) o Implement the voter approved ballot measure for Street Maintenance by amending City Code Section 25-75 to extend the Street Maintenance Tax through December 31, 2025  Annual Budget Adjustment Ordinance (consent-Second Reading) o Appropriation of expenses related to unanticipated revenue, grants and unforeseen costs that had not previously been budgeted.  Ordinance Updating Public Nudity Code Provision o Consideration of ordinance options to update the current Public Nudity provision of the City Code in light of recent public input related to differential treatment of males and females  Initiating Wood Street Second Annexation 4 CITY MANAGER’S UPDATE o Initiate annexation proceedings for the Wood Street Second Annexation, located at 832 Wood Street  Houska Rezoning (consent) o Rezone property located at 1005 Riverside Drive from Neighborhood Commercial, N-C zoning to Limited Commercial, C-L zoning. OCTOBER 27 COUNCIL WORK SESSION  6-month Update on the CSU IGA o Update Council on the progress of operationalizing the CSU-City Stadium Intergovernmental Agreement  Long Term Financial Plan o Review a draft of the Long Term Financial Planning baseline project and macro-level scenarios.  Block 32/42 Master Plan Update o Update Council on the conceptual Block 32/42 Master Plan, answer any questions and gain support on the overall plan.  Vacation Rentals o Follow-up from June 9, 2015 work session, including outreach to date and proposed next steps. NOVEMBER 2 JOINT COUNCIL MEETING WITH WINDSOR TOWN BOARD  Discuss possible amendments to the I-25/392 Interchange IGA to include auto-dealerships as a permitted use in the Corridor Activity Center Overlay Zone NOVEMBER 3 COUNCIL MEETING  2016 Annual Appropriation Ordinance (First Reading) o Appropriate the 2016 Budget for the City of Fort Collins.  2016 Airport Annual Appropriation Ordinance (consent-First Reading) o Appropriate the 2016 Budget for the Fort Collins Loveland Airport.  2016 Utility Rate Ordinances (First Reading) o Amending the rates for electric rates and development fees, water rates and plant investment fees (PIF), Wastewater rates and PIFs.  2016 DDA Annual Appropriation Ordinance (consent-Second Reading) o Appropriate the 2016 Budget for the Downtown Development Authority  Extending the City’s Sales and Use Tax For Street Maintenance in Accordance with a voter- approved Ballot Measure (Second Reading-consent) o Implement the voter approved ballot measure for Street Maintenance by amending City Code Section 25-75 to extend the Street Maintenance Tax through December 31, 2025.  Updating Council meeting procedures CITY MANAGER’S UPDATE 5 o Amending Council meeting procedures regarding Special Council meetings and adding procedures for the Addition of Permitted Use Process.  Energy Policy (consent) o Consideration of adoption of an updated Energy Policy  GID No. 1 o 2016 Annual Appropriation Ordinance (First Reading)  Skyview GID o 2016 Annual Appropriation Ordinance (First Reading) NOVEMBER 10 WORK SESSION - CANCELED NOVEMBER 10 YEARLY EVALUATION OF THE CITY MANAGER, CITY ATTORNEY AND MUNICIPAL JUDGE SALES AND USE TAX COLLECTION MONTHLY & YEAR TO DATE AUGUST SUMMARY OVER PRIOR YEAR Month Year to Date Sales Tax Collected: 4.3% 6.0% Use Tax Collected Excluding Rebates: 13.9% 28.8% Sales and Use Tax Collected Excluding Rebates: 6.4% 10.3% CAPITAL PROJECTS CITYWIDE PEDESTRIAN ACCESS PROJECT Funding Source: KFCG/BOB Funds Estimated Project Budget: $450,000 Status: On Budget, On Schedule Project Details:  This project provides a complete City sidewalk inventory, identifies sidewalk inadequacies, and identifies inadequate handicap accessibilities according to Americans with Disabilities Act (ADA) requirements.  37,741 accessible ramps have been identified as acceptable, substandard, or missing in accordance with the ADA requirements. Project Updates:  Current Projects – o Upcoming project locations: New sidewalk installation along City Park south of Birch. 6 CITY MANAGER’S UPDATE o Current projects: Completed installation of 100’ of missing sidewalk along Wayne Street near Woodford. Staff is continuing to collaborate with CSU staff regarding final layout for the NRRC connection between Centre Avenue and MAX Spring Creek Station. o Staff is currently working with Transfort to install new bus stop locations and updates to existing locations. In addition, staff is working with FCMoves to install new ramps and sidewalk connections for Safe Routes to Schools and the low-stress bicycle network.  Staff is revising prioritization model based on feedback received from Council Work Session, discussions with boards and commissions, and an online survey. http://www.fcgov.com/engineering/pedneeds.php MULBERRY BRIDGE (SH 14) AT THE POUDRE RIVER ENHANCEMENTS Funding Source: City of Fort Collins Estimated Project Budget: $750,000 Status: On Budget, On Schedule Project Details:  The Colorado Department of Transportation (CDOT) is replacing the Mulberry Bridge (State Highway 14) over the Poudre River starting in the fall of 2014. Construction was delayed due to the September 2013 flood.  Due to the construction, eastbound traffic on Mulberry will be detoured for the duration of construction. Project Updates:  Bridge enhancements for Phase II, including medians, concrete staining and stone columns, continue to be constructed. Additional project information can be found at https://www.codot.gov/projects/SH14PoudreRiver WEST MULBERRY BRIDGE REPLACEMENT DESIGN Funding Source: Colorado off system bridge program (BRO) funds and KFCG Estimated Project Budget: $1.1m Status: On Budget, On Schedule Project Details:  The goal of the project is to replace the existing structurally deficient bridge with a new bridge that meets the current standards.  The posted weight limit on this bridge precludes the passage of emergency vehicles from the nearby fire station.  Construction is planned for winter 2015/spring 2016. Project Updates:  Awaiting CDOT concurrence to award the project. CITY MANAGER’S UPDATE 7 ARTHUR DITCH BOX SECTION REPLACEMENT - LOOMIS/OLIVE Funding Source: KFCG/Operation Services, Facilities Estimated Project Budget: $1m Status: On Budget, On Schedule Project Details:  The intent of this project is to replace a structurally deficient bridge/box sections with new concrete box culverts. Project Updates:  Project design is substantially complete and in final comment and review.  Utility relocation expected to occur prior to 2016, with removal and replacement of the structure to occur in the beginning of 2016. SHIELDS STREET AND DRAKE ROAD INTERSECTION IMPROVEMENTS Funding Source: Federal Hazard Elimination Grant (90%)/Local Match (10%) Estimated Project Budget: $986,000 Status: On Budget, On Schedule Project Details:  The main goal of this project is to reduce the accident rate that occurs at this intersection by installing dedicated right turn lanes in the north and southbound movements. A reduced movement concept is also being considered to the Raintree Dr./Davidson Rd. intersection 400 feet south of Shields and Drake.  As a result of meeting Federal requirements this project is anticipated to go to construction in the summer of 2016. Project Updates:  Project design has entered the final stages.  Real Estate services have closed on one of two properties at the time of this update. The second property is in negotiations and expects to close prior to the end of 2015. TIMBERLINE IMPROVEMENTS – PROSPECT TO BLACKBIRD Funding Source: Building on Basics (BOB) Estimated Project Budget: $5.0m Status: On Budget, On Schedule Project Details:  The goals of this project are to improve air quality, reduce vehicle wait time and reduce the accident rate by constructing a free-right turn and acceleration lane from eastbound Prospect to southbound Timberline; as identified in our Arterial Intersection Prioritization Study. 8 CITY MANAGER’S UPDATE  The 2005 ballot language stated this project will expand Timberline Road to four (4) lane arterial standards including:  Travel lanes, sidewalks, bike lanes and landscaped medians.  Improvements to the Prospect and Timberline intersection and all its approaches to add additional turn lanes.  The project will add a sidewalk connection for southbound Timberline from Prospect to Blackbird.  The project is likely a Two Phase project (Phase One – Roadway work 2016, Phase Two – Great Western Maintenance and Signal Improvements).  Construction is expected to begin in the spring of 2016. Project Updates:  Two of the four right-of-way acquisitions have closed.  Staff is going before Council in October for final project appropriations. More info at http://www.fcgov.com/engineering/prospect-timberline.php HORSETOOTH AND TIMBERLINE INTERSECTION IMPROVEMENTS Funding Source: Building on Basics (BOB)/Federal Grant (CMAQ) Estimated Project Budget: $3.5m Status: On Budget, On Schedule Project Details:  The goal of this project is to relieve traffic congestion and vehicle wait time by constructing additional intersection turn lanes.  The need for these safety and operational improvements were identified in the Engineering Department’s recently completed Arterial Intersection Prioritization Study. Turn lane needs are as follows: o Right turn lane (southbound Timberline to westbound Horsetooth) o Right turn lane (eastbound Horsetooth to southbound Timberline) o Second left turn lane (northbound and southbound Timberline)  Additionally, the project will include median and landscape improvements, sidewalk and bicycle lane improvements and transit infrastructure. Project Updates:  Final roadway work is complete, with paving and final striping being finished by end of day September 30. Minor lane drops will be needed through Oct 2 to complete punchlist work, but there will be no more major delays or impacts. Final completion as of Oct 2.  Roadway work was completed one month ahead of schedule.  Landscaping and streetscaping began in early September and will continue through mid- November with single lane drops during the day as needed. Impacts should be much less significant during landscape construction. More information is available at http://www.fcgov.com/engineering/horsetooth-timberline.php CITY MANAGER’S UPDATE 9 VINE AND SHIELDS ROUNDABOUT Funding Source: Building on Basics (BOB)/Federal Grant (STP Metro)/Regional Road Impact Fees Estimated Project Budget: $1.7m Status: On Budget, On Schedule Project Details:  The main goal of this project is to increase mobility at the intersection via multimodal transportation improvements. Currently, the east-west lanes on Vine Drive are not aligned causing additional independent traffic movements which effect the overall operation of the signal timing.  Other safety concerns which will be corrected at the intersection entail: adding sidewalks along the northern portion of the project, installing ADA compliant ramps/crosswalks and adding bike lanes. Project Updates:  North/south thru traffic is anticipated to be open on Shields by early October  The west leg of the intersection will be closed to thru traffic for three weeks starting October 5. More information is available at http://www.fcgov.com/engineering/vsi.php REMINGTON GREENWAY Funding Source: FC Moves Funding Estimated Project Budget: $650,000 Status: On Budget, On Schedule Project Details:  The goal of this pilot project is to offer flexibility in street design to calm traffic, support active modes of transportation and integrate stormwater management strategies.  The design calls for buffered bike lanes, removal of the traffic signals between Prospect and Mulberry, and the construction of a mini roundabout with curb bulb outs at Remington and Laurel. Project Updates:  The City’s contractor will continue working on the rain garden, and pedestrian improvements throughout the corridor.  The intersection of Remington and Laurel is open to vehicle, bicycle and pedestrian traffic.  The City’s Traffic and Streets Departments have completed the roadway treatment and restriping. More information is available at http://www.fcgov.com/advanceplanning/remingtongreenway.php DOWNTOWN RIVER DISTRICT IMPROVEMENTS Funding Source: Federal Grants/Local Funds/DDA Funds Estimated Project Budget: $1.4M 10 CITY MANAGER’S UPDATE Status: On Budget, On Schedule Project Details:  The City has completed two design projects within the Downtown River District: 1. Developing an implementation plan for improvements along Jefferson Street between College Avenue and the Mountain /Lincoln intersection based on the available budget, and 2. Developing a conceptual design for improvements along Willow Street between North College Avenue and Linden Street. The focus of the project has now shifted to developing final engineering plans along Jefferson Street as well as coordinating planned improvements adjacent to active developments along Willow Street. Project Updates:  No current updates LINCOLN (INTERIM) AND LEMAY IMPROVEMENTS / WOODWARD CAMPUS Funding Source: City of Fort Collins General Fund/Intersection Improvement Fund Estimated Project Budget: $2.1-2.3M Status: On Budget, On Schedule Project Details:  This project has several goals. The first is to install three new points of access/turn lanes to the Woodward Campus, two on Lemay, and one on Lincoln. The project will also complete the improvements along the west side of Lemay between Lincoln and Mulberry. This includes completion of the Magnolia intersection to a full movement location along with curb, gutter and sidewalk for the entire length. An interim sidewalk will also be constructed along the Lincoln front that connects pedestrians to the Poudre River bridge on Lincoln and into downtown. Lastly, a double left turn configuration will be installed on southbound Lemay to eastbound Mulberry for as a result of anticipated traffic volumes for this area. Project Updates:  Milestone improvements were achieved in completing the installation of the new access off of Lincoln to the north side of the Woodward Campus. As well, all paving on Lemay has been achieved and is being prepared for new striping. . NORTH COLLEGE PEDESTRIAN GAP Funding Source: CMAQ Grant/URA Contribution/Pedestrian Program Funds Estimated Project Budget: $900,000 Status: On Budget, On Schedule Project Details:  The primary goal of this project is to complete a gap in pedestrian infrastructure from Highway 1 to the south side of the Larimer & Weld Canal. CITY MANAGER’S UPDATE 11  This project will construct a pedestrian connection crossing the Larimer & Weld Canal extending north to SH 1 (Terry Lake Rd). The project impacts a federal highway, and is located outside the City limits but within the Growth Management Area. Project Updates:  The City is working with CDOT to award the design contract to the selected consultant team. NORTH COLLEGE IMPROVEMENTS – CONIFER TO WILLOX Funding Source: Federal Grants/Local Matching Funds Estimated Project Budget: $12m Status: On Budget, On Schedule Project Details:  The intent of this project is to design and construct improvements along North College Avenue from the Conifer/Hickory intersection to Willox Lane, bringing this section of North College up to four-lane arterial standards as defined by the Larimer County Urban Area Street Standards. Both medians and sections of the planned rear access roads are included in the project. Project Updates:  No current updates LINCOLN CORRIDOR PROJECT – 1ST STREET TO LEMAY AVENUE Funding Source: General Fund Reserves, Street Oversizing Fund, previously committed developer local street obligations, savings from Woodward interim improvements Estimated Project Budget: $6.5m Status: On Budget, On Schedule Project Details:  This phase of the overall Lincoln corridor plan includes improvements along Lincoln Avenue between 1st Street and Lemay Avenue.  Subsequent phases include improvements to the Poudre River Bridge and improvements along Lincoln Avenue to Jefferson Street.  Project intent is to create a multi-modal design along Lincoln Avenue that will include creating a street with a unique identity, improving the mobility, safety, and experience for bicyclists, pedestrians, transit users, and vehicles, and creating an environment where local businesses can thrive. Project Updates:  Design is currently underway. Several initial scoping meetings have been conducted, and consultant is currently performing surveying work.  30% design milestone is scheduled to be delivered by end of 2015. 12 CITY MANAGER’S UPDATE VINE AND LEMAY BNSF IMPROVEMENTS Funding Source: Keep Fort Collins Great (KFCG) Estimated Project Budget: $1.0 M Status: On Budget, On Schedule Project Details:  The existing Vine and Lemay intersection, which includes the Burlington Northern Santa Fe (BNSF) Railway crossing, is severely congested with limited options to expand through or turn lane capacity due to land use constraints.  Lemay Avenue realignment and intersection improvements have been prioritized as the City’s #1 Transportation Capital Improvement Project  The realignment has been on the City’s Master Street Plan since the mid-1980’s  The project area is included within the City’s Mountain Vista Subarea Plan which was created as a long-term planning vision for the northeast section of Fort Collins  The improvements will construct a new roadway and intersection slightly northeast of the existing Vine and Lemay intersection. The new intersection will be realigned Lemay and Suniga Drive.  The City is investigating a number of interim and ultimate solutions that include new at-grade intersections or overpass/underpass of the BNSF Railway and existing Vine Drive Project Updates:  The City applied for TIGER grant funding in June 2015.  Staff is currently working on right-of-way acquisitions and an alternatives analysis report.  Staff is developing a communication and public outreach plan as preparation for collecting public feedback related to alternative crossings of the BNSF Railway More information is available at http://www.fcgov.com/engineering/vine-lemay.php CAPITAL PROJECTS - UTILITIES APPLEWOOD REBUILD – SHIELDS/NORTH FOSSIL CREEK PROJECT Funding Source: System Improvement & Additions Estimated Project Budget: $310,000 Status: On Budget, On Schedule Project Details:  Boring, pot holing, new conduit and cable installation  Remove overhead lines  Install new transforms and secondary boxes CITY MANAGER’S UPDATE 13  Energizing Project Updates:  SAGE Boring and pot holing coordination VINE & SHIELDS ROUND-ABOUT PROJECT Funding Source: System Improvement & Additions Estimated Project Budget: $227,370 Status: On Budget, On Schedule Project Details:  Design, pot holing, duct bank installation  Install conduit, and cable  Fiber relocation  Installation of new streetlights  Install south duct bank and tie into existing duct bank Project Updates:  Design, potholing and duct bank installation complete  Installation of conduit and cable complete to the east  Project is waiting for street closure to the south TIMBERLINE & HORSETOOTH INTERSECTION UPGRADE PROJECT Funding Source: System Improvement & Additions Estimated Project Budget: $136,388 Status: On Budget, On Schedule Project Details:  Design, and pot holing  Vault relocation, conduit installation, cable pulling  Electric termination, relocation of street lighting  Reenergizing Project Updates:  Design and pot holing complete  Vault relocation, and conduit installation complete  Pulling cable and wire underway  Relocation of street lighting complete Overhead Lines Scheduled for Replacement Double Wide Duct Bank Installation Vault Relocation 14 CITY MANAGER’S UPDATE  Terminating electric cable is underway MICHIGAN DITCH MUDSLIDE REPAIR Funding Source: Water Estimated Project Budget: TBD Status: On Schedule Project Details:  Horizontal cores completed  Tunnel option identified as best solution  Toured Ditch with State Land Board Upcoming Work:  Final design complete by end of 2015 DWRF SOUTH PROCESS TRAIN BNR AND REPLACEMENT PROJECT Funding Source: Sewer Estimated Project Budget: $9,595,709 Status: On Budget, On Schedule Project Details:  Electrical infrastructure (conduit/wire) underway  Instrumentation installation underway  Programming verification for process integration underway Upcoming Work:  Manufacturer and vendor visits  Irrigation and landscaping  Startup and testing of process and instrumentation and control Michigan Ditch Slide Area FRP Baffle Wall Installation in West Aeration Basin CITY MANAGER’S UPDATE 15 LINCOLN AND WILLOW STORM SEWER OUTFALL Funding Source: Stormwater Estimated Project Budget: $2,900,000 Status: On Budget, On Schedule Project Details:  Preliminary design underway  Soil sampling complete  Railroad/Natural Areas/resident coordination Upcoming Work:  Railroad crossing permit  Corps of Engineers permit-nationwide  Finalize design NATURAL AREAS LAND CONSERVATION 2015 - 3RD QUARTER REPORT Land Conservation Update Acreage Cost Land Conserved - Jan - Mar 22.57 $ 416,474 Land Conserved - Apr - Jun - $ - Land Conserved - Jul - Sept 853.00 $ 2,703,006 Land Conserved - Oct - Dec - $ - Total Land Conserved - Year to Date 875.57 $ 3,119,480 Land Conservation Summary - To Date Acreage Cost Acres of Land Purchased 35,879 Acres of Land Leased 893 Acres of Land Placed in Conservation Easements 5,816 Total Conserved - To Date 42,589 $ 83,963,442 Land Conservation Funds Budgeted for 2015* $ 8,855,120 * Includes prior year reserves and unanticipated revenues. Acquisitions To Date - 2015 Acreage Cost Kingfisher NA - Schneider Property in partner with Streets, Utilities and Forestry - 24 Total Acres 8.31 $ 146,330 Magpie Meander NA - Jensen Property 6.76 $ 270,144 Redwing Marsh - North Marketplace donation 7.50 $ - Springer - Fisher 7.00 $ 510,436 Williams Property 371.00 $ 531,402 Location of Storm Sewer Outfall into Poudre River 16 CITY MANAGER’S UPDATE Legacy Land Trust Property 362.00 $ 160,732 Lemaster, Wortley, Skogen Property 113.00 $ 1,500,436 Total Conserved - Year to Date 875.57 $ 3,119,480 Property Under Contract Acreage Cost Total Under Contract - $ - Net Land Conservation Funds Remaining for 2015 $ 5,735,640 PUBLIC SAFETY UPDATE POLICE SERVICES Bank Robbery Committed and Solved On September 15, First Citizens Bank (2420 E. Harmony Road) reported being robbed. Officers set up a perimeter and quickly located and arrested a male subject. Charges included aggravated armed robbery and theft. Arrests Made in Jefferson Park After several nights of issuing warnings to individuals for remaining in Jefferson Park after hours, police arrested two people on September 15 for Unlawful Conduct on Public Property. At the time of their arrest, the individuals were not actively protesting and were unlawfully remaining in the city park after hours. In the days prior to the arrests, police confirmed that there were beds available in local shelters and shared this information with those in the park; however, individuals refused services and vowed to “never leave the park.” Since the arrests, police have seen a decline in after-hours activity in Jefferson Park. Front Range Community College Evacuation On Friday, September 15, Fort Collins Police received a call from campus security at FRCC’s Larimer campus after a student reported seeing a fellow student’s Snapchat video referencing a Columbine- type incident. FRCC administrators made the decision to evacuate campus. Police located the suspect who had created the video and took him to Larimer County Jail. He was charged with Interference with Staff, Faculty, or Students of Educational Institutions C.R.S 18-9-109 (6a). Police Seek Information about Burglar and Police Officer Impersonator On September 30, a woman reported that a burglar had entered her residence while she was there. She hid in a closet, and the intruder left. Minutes later, she said another man entered, identified himself as a police officer, and went through the motions of taking a police report. When the woman followed up with Fort Collins Police later that evening, records showed that dispatch had not received a call regarding this incident, nor had they sent an officer. The victim worked with an artist to create composite drawings of the suspects. This incident is currently under investigation. CITY MANAGER’S UPDATE 17 Crime Prevention This month, the Crime Prevention Specialist had 46 telephone calls that ranged from answering questions about the Drug Take Back Event to setting up a class for a medical group on Dealing With Difficult People. More presentations were done for Neighborhood Watches, but the big event of the month was the Drug Take Back where 344 vehicles came to the Police Services building to drop off their unwanted medications. This event’s collection, plus the weight from the past few months collected from the lobby kiosk, totaled 1379.5 pounds. The D.E.A. collected this on October 1 and took it back to Denver for incineration. Here’s the breakdown on activities in September: Roger’s Park Neighborhood Watch, 15 attended Neighborhood Watch Listening Session, Councilman Overbeck, 25 attended Dealing with Difficult People, Parks & Rec, 25 attended CPTED Morningstar Retirement, 4 attended RESTORE, 53 attended Drug Take Back, 344 vehicles Neighborhood Watch Highland, 55 attended Presentations to 521 People, 46 incoming calls POUDRE FIRE AUTHORITY Notable Incidents/Items/Events:  Residential Fire – A man was able to notify Fort Collins-911 of a fire at his house in the early morning hours on September 11th. The resident drove to PFA Volunteer Fire Station 9 located at the south end of Horsetooth Reservoir to use the emergency phone located at the front of the station because he could not retrieve his personal phone prior to evacuating. The man’s family and their dog also were able to escape safely prior to him calling 911. Luckily there happened to be two volunteer firefighters that were also at the station and were alerted by the resident. They immediately responded to find a two-story residence with fire on the exterior of the building working its way to the interior. An aggressive external attack was successfully mounted which slowed the fire until additional units could arrive. Firefighters then were able to enter the residence and complete extinguishment. The residence suffered fire damage to one side of the exterior and one room on the second floor; heat and smoke damage throughout. Investigators are working to determine an origin and cause. Assisting agencies; Fort Collins 911; Larimer County Sheriff’s Office; PVH/UC Health Emergency Services.  City of Fort Collins/PFA Employee Graduates From FEMA’S Emergency Management Basic Academy - Christopher Wolf, Emergency Management Specialist graduated from FEMA’s National Emergency Management Basic Academy at the Emergency Management Institute in Emmitsburg, MD., after he completed the full curriculum that provides the basic knowledge and skills to help meet the unpredictable challenges in the field of emergency management. Wolf completed the five courses in the Basic Academy that includes Foundations of Emergency Management; Science of Disaster; Planning: Emergency Operations; Exercise Design; and Public Information and Warning. 18 CITY MANAGER’S UPDATE FEMA’s National Emergency Management Basic Academy is the entry-point for individuals pursuing a career in emergency management. Basic Academy offers the tools to develop comprehensive foundational skills needed in emergency management. For those who are new to emergency management or for those who are transferring from another profession, the Basic Academy also provides a unique opportunity to build camaraderie and establish professional contacts. Students learned to understand the roles, responsibilities, and legal boundaries associated with emergency management. It is the first of a three-level Academy series in the Emergency Management Professional Program (EMPP). The EMPP curriculum is designed to provide a lifetime of learning for emergency managers and includes three separate, but closely threaded, training programs including the National Emergency Management Basic Academy; a specialized and technical training program to develop specific, fundamental skill sets; the National Emergency Management Advanced Academy; a program to develop the next generation of emergency management leaders who are trained in advanced concepts and issues, advanced leadership and management, and critical thinking and problem solving; and the National Emergency Management Executive Academy; a program designed to challenge and enhance the talents of the nation’s emergency management senior executives through critical thinking, visionary strategic planning, challenging conventional concepts, and negotiation and conflict resolution applied to complex real-world problems. Wolf completed his training on August 19, 2015. Emmitsburg, MD August 19, 2015--FEMA’s Emergency Management Institute (EMI) graduated Christopher Wolf (left) who completed all requirements of the National Emergency Management Basic Academy. Tony Russell, Superintendent, EMI is shown congratulating Wolf as he graduates. Shane Gibbon /FEMA  Fire Festival/Open Streets Event- Sunday, September 20th brought PFA’s Fire Festival and the city’s second Open Streets event of the year to Remington Street. The Fire Festival hub was held CITY MANAGER’S UPDATE 19 in the spirit of open streets to bring out citizens so they could enjoy a vehicle-free street and have a good time with neighbors. The Fire Festival also helped mark the Commemoration Year for PFA of which will run until the end of 2015. Opportunities for citizens of all ages to have fun were available such as a dunk tank, kids’ fire safety challenge, historical fire tours, vintage apparatus displays and more.  Fill-the-Boot for MDA- PFA firefighters once again collected donations over Labor Day weekend for the Muscular Dystrophy Association. This year record $20,000+ was donated by our citizens for this great cause. Below are just a few examples of what services are gained by donated funds. $30 Flu shot $100 One support group session $150 One occupational, physical, respiratory or speech therapy consultation $300 Professional fees related to initial diagnostic work-up at an MDA clinic $500 Annual repairs of durable medical equipment $800 Week at MDA summer camp for one child BUILDING AND PLANNING ACTIVITY YEAR TO DATE COMPARISONS 2014 YTD 2015 YTD % Change Development Project Submittals Rec’d 249 273 +10 % Conceptual/Staff Reviews Performed 181 166 -8 % Building Permits Issued 8,644 7,026 -19 % Building Permit Valuations ($M) $527.0 $411.74 -22 % Building Inspections Performed 28,100 28,147 0 % Plan Reviews Performed 1,945 1,810 -7 % Overall development review revenues are $ 677,870 over projection for 2015 as of September 30th, with General Fund revenues $ 580,261 over projection and Engineering Development Review revenues over projection by $ 97,609. PROJECTS OF NOTE-STATUS AND UPDATES Development/Planning Projects of Note Status/Updates CSU Parking Lot at Research Boulevard Approved and under construction. CSU Medical Center Project has been formally Submitted and will be reviewed by P&Z on October 8. Downtown Plan The visioning phase of the Downtown Plan is complete, and Phase 3 (Choices and Strategies) is now underway. A Phase 2 Summary will be completed in mid-October. Recent updates can be found at http://fcgov.com/downtown. Downtown Hotel The Project Development Plan proposes a 164-room hotel 20 CITY MANAGER’S UPDATE in the Old Town area. The P&Z Board approved this project at their September 10th hearing. Downtown Hotel Parking Garage The parking garage portion of the hotel project has been separated and will be heard by the Planning and Zoning Board on October 8, 2015. - Approx. 319 parking spaces - 1/3 hotel & 2/3 public Uncommon (310 S. College) The Project Development Plan proposes a 6-story 127,800 square-foot, mixed-use building on the former Perkins lot:  119 dwelling units; 250 bedrooms  11,000 square-foot of commercial space on ground level  128 parking spaces This project goes before the P&Z Board on October 29th as part of a special hearing. Foothills Mall Redevelopment Under construction; construction meetings continue weekly with City Staff and developer. Increase in number of tenant finish permits being issued throughout the site. Final Inspections increasing as prelude to soft opening in Nov. Inspections workload on site increasing and still manageable with staff resources. Landmark Residences on Mountain Avenue Approved and awaiting final plans from developer (anticipated soon). Lincoln Corridor Plan – Neighborhood Project Implementation Of the ten funded neighborhood projects, three are complete and four are currently in design. Staff is working with Neighborhood Advisory Committee in support of project implementation. Mountain Vista Subarea Analysis As a second phase of the project, staff will conduct a multiple day Design Charrette with Mountain Vista Area property owners and stakeholders, exploring multiple land development scenarios which would incorporate Nature in the City policies and Urban Agriculture standards. Two charrettes are scheduled for November 2nd and 3rd. An Open House is also scheduled for November 9th. Nature in the City NIC is working on collaboration for several strategic plans and grant initiatives. Leadership for Nature in the City is in the process of being transferred to the Natural Areas Department. CDNS will still have involvement in the project from a land use and development context moving forward. Justin Scharton in Natural Areas will be the project point-of-contact and Rebecca Everette will be the CDNS contact. Neighborhood Districts Established partnership with Trebuchet Group and CSU’s Center for Public Deliberation as co-consultants on project; working on parameters for community engagement study and on finalizing public events. Created a community engagement study survey which is being advertised in City News and Utility bill inserts. It is available on our website at: CITY MANAGER’S UPDATE 21 Established Neighborhood Advisory Group. Meetings are scheduled for October 14, November 10, and December 8, 2015. Upcoming public events include the Community Issues Forum on November 5, 2015, and an HOA roundtable on December 7, 2015. Inter-disciplinary staff team reconvened. Continue to work with technology staff to explore options for a registration system and subscription service that would enable citizens to engage with the City and get information based on topic or location. Continue to work on identifying program incentives and best practices. Old Town Neighborhood Plan and Design Guidelines Phase I of the planning process complete; Phase II Visioning is in progress, including online survey. Design guidelines first draft posted for public comment. 633/639 S. College Ave @ Laurel Construction continuing on schedule. Smoking Ordinance Expansion Options Ordinance revisions approved by City Council. Requests include: 1) Exemption for retail tobacco establishments within the Downtown Smoke Free Zone, 2) Exemption for City facility users if smoking in a fully-enclosed, privately- owned vehicles on premises, and 3) Clarification on the City owned and maintained sidewalks included in ban. Phase I implementation is complete; education and outreach efforts continue. Phase II efforts will begin in earnest in late- October. Social Host Met with leadership group from Northern Colorado Rental Housing Authority and ASCSU to discuss topic and determine how they would like to be involved. Work on messaging and informational materials is underway; surveys of peer cities is occurring to determine whether social host ordinances have been adopted or whether other ordinances are in place to address similar issues; outreach to various stakeholders including ASCSU, Northern Colorado Rental Housing Association, Fort Collins Chamber of Commerce, FRCC, PSD is occurring to determine their preferred method of involvement; public outreach events are scheduled for November 1st and December 6th; Council work session expected in January/ February 2016. West Elizabeth Enhanced Travel Corridor Plan Phase II (visioning) is nearly complete, and Phase III (alternatives development and evaluation) is about to begin. An update memo to City Council is expected in October, and a public open house on the alternatives is tentatively scheduled for November. Woodward Campus Construction is moving along smoothly; final inspections are also continuing as planned. Coy-Hoffman silos have been declared dangerous structures requiring that stabilizing and shoring to take place. No “order to demolish” has been given, silos not declared “imminent danger”. Woodward filed an appeal to the BRB indicating that the silos should be declared imminent danger and removed. Possible appeal to Council. 22 CITY MANAGER’S UPDATE PROJECTS UNDER APPEAL None at present. SUSTAINABILITY SERVICES ENVIRONMENTAL SERVICES Education - Staff participated in Sustainable Living Fair to distribute materials on the Community Recycling Ordinance and other Environmental Services programs. Dust - Environmental Services staff is finalizing a project that addresses gaps in the prevention and control of fugitive dust. Staff has conducted extensive public outreach on this issue and is working to ensure that these gaps are being addressed via both regulations as well as through training, outreach and education. The project, and the accompanying regulations, will be considered for adoption by Council during the December 1, 2015, regular meeting. To learn more about this project, visit www.fcgov.com/dust. Radon Awareness Month – Staff is encouraging residents to test the radon levels in their homes as Radon Awareness Week approaches starting October 19. Radon is a colorless, odorless, naturally- occurring gas associated with serious health concerns such as cancer. The City offers zero-interest loans to assist with mitigation costs when radon is present. The loans range from $1,000 - $3,000 and can assist with up to 90 percent of the costs associated with radon mitigation. Radon tests must be completed prior to applying for these loans. More information about air quality loans may be found at www.fcgov.com/airquality/loan.php. SOCIAL SUSTAINABILITY Working with Front Range Community College, Colorado State University, Fort Collins Community Action Network and community partners, the City co-hosted a Multicultural Community Retreat at the Colorado Mountain State Campus September 18 and 19. About 50 citizens, including City staff, attended the two-day retreat, where diversity issues were explored in a safe, inclusive environment. With momentum gained from the retreat, City staff will be helping form a community roundtable on diversity issues. If interested in joining, please contact Janet Freeman at jfreeman@fcgov.com or at 221-6758. CITY MANAGER’S UPDATE 23 ECONOMIC HEALTH Foothills Mall – The mall, which is under construction and includes public funding for a recreation center and improved infrastructure, will host a November 13 holiday celebration and tree lighting ceremony involving Mayor Wade Troxell in the newly remodeled center court, mall officials have announced. The finished mall will include a new rec center, called the Foothills Activity Center, and improved sidewalks and bicycle access. Anheuser Busch – City staff from Economic Health, Utilities and Planning are assisting Anheuser- Busch as they navigate the planning process for their business expansion. http://www.fcgov.com/neighborhoodservices/leadership.php. Additional advertisement/outreach will occur at strategic times over the next four months. Attended Love Your City events with Peter Kageyama and will be working to integrate themes into ongoing project efforts.