Loading...
HomeMy WebLinkAboutMemo - Mail Packet - 6/16/2015 - City Manager�S Monthly Update - June 9, 20151 June 9, 2015 ISSUES BEFORE COUNCIL Vine Drive/College Ave. Revitalization Study ..........................................................................2 Midtown TIF District Planning Process and HB-1348 ..............................................................2 City’s Naming Policy .................................................................................................................2 Community Recycling Center....................................................................................................2 Land Use Code Revisions ..........................................................................................................2 HUD Required 5-Year Strategic Consolidated Plan ..................................................................2 Time of Use Electric Rate Study ...............................................................................................2 Comcast Franchise Renewal ......................................................................................................2 Harmony Transfer Center ..........................................................................................................2 Addition of Permitted Use .........................................................................................................2 ECONOMY Fort Collins Sales and Use Tax ..................................................................................................3 CAPITAL PROJECTS Engineering Capital Projects ......................................................................................................3 Utilities Capital Projects ..........................................................................................................18 COMMUNITY EVENTS ...........................................................................................................32 PUBLIC SAFETY UPDATE Fort Collins Police Services .....................................................................................................33 Poudre Fire Authority .............................................................................................................35 BUILDING ACTIVITY………………………………………………………………………..38 2 ISSUES BEFORE COUNCIL June 15 Mid-Year Review of City Manager, City Attorney, Municipal Judge June 16 Meeting canceled for CML Conference June 23 Urban Renewal Authority Work Session  Vine Drive/College Ave. Revitalization Study o Provide preliminary market and economic analysis, as well as physical site analysis, including infrastructure requirements and costs to support redevelopment o This study will be used to inform Downtown Plan and the options for revitalization will be included with that Plan’s “Choices & Strategies” process  Midtown TIF District Planning Process and Status of HB-1348 re: Urban Redevelopment o Provide an update on the status of HB-1348 and its impact on City URA projects in Midtown and North College June 23 Work Session  Amending the City’s Naming Policy o Review the City’s naming policy for properties and facilities for the purpose of considering amendments to the Municipal Code  Community Recycling Center o Review options for funding the operations and maintenance costs of the new Community Recycling Center on Timberline Road for “hard-to-recycle- materials” July 7 Council Meeting  Annual Land Use Code Revisions o Consideration of a variety of changes, additions and clarifications to the Land Use Code that have been identified since the last update in December 2014  HUD Required 5-Year Strategic (Consolidated) Plan 2015-2019 o Consideration of a resolution adopting this plan that is federally required since the City is a recipient of HUD funds.  Time of Use Electric Rate Study o Establish the rates and time frame for a pilot study on a time of use rate structure for residential electric customers  Comcast Franchise Renewal o Consideration of the renewal of the non-exclusive Cable Franchise Agreement between the City of Fort Collins and Comcast Of California/Colorado, LLC.  Harmony Transfer Center-CDOT IGA and Funding Agreement Regarding Parking Enforcement o Consider a CDOT Intergovernmental Agreement and Funding Agreement for the City to provide parking enforcement services at the Harmony Transfer Center.  Addition of Permitted Use-Land Use Code Amendment 3 o Consider adoption of a Land Use Code amendment removing the Addition of a Permitted Use process from certain zones in the City ECONOMY FORT COLLINS SALES AND USE TAX COLLECTIONS Sales and Use Tax Collections April 2015 Sales tax collections increased 4.6% Use tax collections excluding rebates increased 65.6% Sales and use tax collections excluding rebates increased 14.1% 2015 YTD Sales tax collections increased 8.2% Use tax collections excluding rebates increased 46.3% Sales and use tax collections excluding rebates increased 14.7% CAPITAL PROJECTS (new information noted in blue text) 1. CITYWIDE PEDESTRIAN ACCESS PROJECT Funding Source: KFCG/BOB Funds Estimated Project Budget: $450,000 Status: On Budget, On Schedule  The City of Fort Collins Pedestrian Plan addresses citywide pedestrian needs and is a data-driven approach based on the importance for safe, sustainable walking within City limits. It however lacks comprehensive condition data for the City’s sidewalk system. Prior to the beginning of the Pedestrian Needs Assessment project, there was not an inventory of existing sidewalks or sidewalk deficiencies. This project provides a complete City sidewalk inventory, identifies sidewalk inadequacies, and identifies inadequate handicap accessibilities according to Americans with Disabilities Act (ADA) requirements.  Data collection has been completed with approximately 540 street miles of sidewalk assessed and inventoried at this time.  37,741 accessible ramps have been identified as acceptable, substandard, or missing in accordance with the ADA requirements.  Staff has implemented a methodology and analysis program used to prioritize pedestrian projects. This program takes into account a variety of factors such as, but not limited to, demand, corridor function, and high priority areas. 4 o Upcoming project locations: New sidewalk installation along Parker/Remington and Stuart/Remington. Sidewalk repairs along Meldrum/Oak. New sidewalk installation along City Park south of Birch. o Current projects: Contractor is currently working on other projects at this time. Staff is collaborating with CSU staff regarding final layout for the NRRC connection between Centre Avenue and MAX Spring Creek Station.  Prioritization Model is complete and has been posted to the engineering website: http://www.fcgov.com/engineering/pedneeds.php. Staff is performing additional public outreach to reassess the prioritization model.  Staff is continuing to collect and update data from projects and developments that occurred 2013 and 2014. 2. MULBERRY BRIDGE (SH 14) AT THE POUDRE RIVER ENHANCEMENTS Funding Source: City of Fort Collins Estimate Project Budget: $750,000 Status: On Budget, On Schedule  The Colorado Department of Transportation (CDOT) is replacing the Mulberry Bridge (State Highway 14) over Poudre River Bridge starting in the fall of 2014. Construction was delayed due to the September 2013 flood.  Due to the construction, eastbound traffic on Mulberry will be detoured for the duration of construction.  CDOT has initiated the project. All detours are active. The City continues to work with CDOT to monitor the detours, making adjustments as needed. The City is also working with CDOT to ensure appropriate levels of outreach and messaging is provided to the public.  The City is working with CDOT to add City-funded enhancements to the bridge including decorative railings, landscaping and urban design features.  CDOT initiated the second phase of the project, focusing on removing and replacing the remaining south section of the existing bridge. All remaining bridge girders have been placed. CDOT has shifted focus to completing surfaces improvements for the south half of the project. 5  Pedestrian traffic will be prohibited on Mulberry Street between Riverside Avenue and Lemay Avenue. A signed detour utilizing Lemay Avenue and Riverside Avenue is provided. Pedestrians and cyclists will continue to have access across Mulberry Street via the traffic signal at Lemay Avenue throughout Phase 2.  The City has initiated the final design phase for additional urban design elements and landscaping along Mulberry Street between Riverside Avenue and Lemay Avenue. Improvements are being coordinated with the various items planned for the bridge and surrounding developments. 3. WEST MULBERRY BRIDGE REPLACEMENT DESIGN Funding Source: Colorado Off System Bridge Program (BRO) funds and KFCG 2011 Estimated Project Budget: $1.1M Status: On Budget, On Schedule  The goal of the project is to replace the existing structurally deficient bridge with a new bridge that meets the current standards.  The posted weight limit on this bridge precludes the passage of emergency vehicles from the nearby fire station.  In December 2011, the City received a grant for $700,000 in Colorado Off System Bridge Program (BRO) funds for some of the construction cost.  Construction is planned for winter 2015/spring 2016. 4. ARTHUR DITCH BOX SECTION REPLACEMENT – OAK/WHITCOMB, CANYON AT MULBERRY POOL Funding Sources: KFCG / Operation Services, Facilities Estimated Project Budget: $2M Status: On Budget, On Schedule 6  The intent of this project is to replace two structurally deficient bridge/box sections with new concrete box culverts.  Value engineering and best practices are being applied to develop the most cost efficient replacement methods. Both locations lie within local floodplains and will be evaluated prior to final design approval. Coordination efforts also include the Streets Dept. maintenance schedules to ensure the roadway is reviewed for both short and long term impacts.  Both locations have achieved substantial completion with box enclosures. Property restoration continues to move forward as a result in weather delays from the month of May.  Continuous communication has been an integral part of this project, and will be essential as the process of property restoration begins.  Floodplain elevation information was collected during the month of May and will be evaluated next month for final certification. This will certify that the floodplain has not been negatively impacted with the reconstruction of the roadway. 5. ARTHUR DITCH BOX SECTION REPLACEMENT – LOOMIS/OLIVE Funding Sources: KFCG / Operation Services, Facilities Estimated Project Budget: $2M Status: On Budget, On Schedule 7  The intent of this project is to replace a structurally deficient bridge/box sections with new concrete box culverts.  Value engineering and best practices are being applied to develop the most cost efficient replacement methods. This location lies within local floodplains and will be evaluated prior to final design approval. Coordination efforts also include the Streets Dept. maintenance schedules to ensure the roadway is reviewed for both short and long term impacts.  The Olive and Loomis replacement location plan sheets are near complete. This project will have some front end utility work to coordinate and staff is sorting through those details for relocation efforts in advance of the box replacement to occur in the spring/summer of 2015.  Plan finalization will come after the completion of Canyon Street and Oak/Whitcomb. This is being done to allow any “lessons learned” to be incorporated into the project, which are expected to add efficiencies and savings to the project.  Floodplain clearances have been approved for construction, and the pertinent flood plain use permits are being issued.  Staff has received the approval of the Arthur Ditch for the necessary ditch crossing agreement.  Staff will continue to perform outreach to adjacent residents to provide additional information on the project and its schedule as it becomes available. 6. SHIELDS STREET AND DRAKE ROAD INTERSECTION IMPROVEMENTS Funding Sources: Federal Hazard Elimination Grant (90%) / Local Match (10%) Estimated Project Budget: $986,000 Status: On Budget, On Schedule 8  The main goal of this project is to reduce the accident rate that occurs at this intersection by installing dedicated right turn lanes in the north and southbound movements. A reduced movement concept is also being considered to the Raintree Dr./Davidson Rd. intersection 400 feet south of Shields and Drake.  This project has multiple funding sources - Federal Hazard Elimination Grant: $887,400, City BOB funding $98,600  This project has completed the FIR portion of the design and is nearing FOR design completion as well. As well, the project has received clearance from CDOT right of way agents to proceed with land acquisition, which is currently on-going.  Project is currently in a “hold pattern” until the appraisal process clears the review period and is approved by Colorado Department of Transportation, Row of Way Department, as federal funding requires.  As a result of meeting Federal requirements this project is anticipated to go to construction in the summer of 2016. 7. TIMBERLINE IMPROVEMENTS – PROSPECT TO BLACKBIRD Funding Source: Building on Basics (BOB) Estimated Project Budget: $3,500,000 Status: On Budget, On Schedule 9  The goals of this project are to improve air quality, reduce vehicle wait time and reduce the accident rate by constructing a free-right turn and acceleration lane from eastbound Prospect to southbound Timberline; as identified in our Arterial Intersection Prioritization Study.  The 2005 ballot language stated this project will expand Timberline Road to four (4) lane arterial standards including:  Travel lanes, sidewalks, bike lanes and landscaped medians.  Improvements to the Prospect and Timberline intersection and all its approaches to add additional turn lanes.  The project will add a sidewalk connection for southbound Timberline from Prospect to Blackbird.  Additionally, water quality features will be constructed to minimize the flow rates and volumes as they outlet to the Spring Creek basin.  Construction is expected to begin in the spring of 2016.  A communication plan (public outreach) is being developed and will be implemented with the final design through construction.  The team is pursuing options for the deconstruction and reuse of two silos which need to be removed for roadway, bicycle, pedestrian and landscape improvements.  The project website is available through the Engineering homepage athttp://www.fcgov.com/engineering/prospect-timberline.php 8. HORSETOOTH AND TIMBERLINE INTERSECTION IMPROVEMENTS Funding Source: Building on Basics (BOB) and Federal Grant (CMAQ) Estimated Project Budget: $3,500,000 Status: On Budget, On Schedule 10  The goal of this project is to relieve traffic congestion and vehicle wait time by constructing additional intersection turn lanes.  The need for these safety and operational improvements were identified in the Engineering Department’s recently completed Arterial Intersection Prioritization Study. Turn lane needs are as follows: o Right turn lane (southbound Timberline to westbound Horsetooth) o Right turn lane (eastbound Horsetooth to southbound Timberline) o Second left turn lane (northbound and southbound Timberline)  The project has moved to the final design phase, streetscape visioning and coordination with property owners for real estate purchases (right of way and easements).  Additionally, the project will include median and landscape improvements, sidewalk and bicycle lane improvements and transit infrastructure. This is a separate package that is currently out to bid and opens on May 27.  Construction began on May 18, with median removal, lane closures and temporary pavement/striping for traffic.  Horsetooth Road will be closed on the west leg from June 1 – July 25 and on the east leg from July 13 – Aug 15.  A communication plan (public outreach) has been developed and is being followed. There have been two press releases as well as updates to the website and email blasts detailing schedules and what to expect.  The project website is available through the Engineering homepage at http://www.fcgov.com/engineering/horsetooth-timberline.php 9. VINE AND SHIELDS ROUNDABOUT Funding Source: Building on Basics (BOB), Federal Grant (STP Metro) and Regional Road Impact Fees Estimated Project Budget: $1,700,000 Status: On Budget, On Schedule 11  The main goal of this project is to increase mobility at the intersection via multimodal transportation improvements. Currently, the east-west lanes on Vine Drive are not aligned causing additional independent traffic movements which effect the overall operation of the signal timing.  The City received a federal grant award for $1,054,000 through the North Front Range Metropolitan Planning Organization in the STP-Metro category.  Other safety concerns which will be corrected at the intersection entail: adding sidewalks along the northern portion of the project, installing ADA compliant ramps/crosswalks and adding bike lanes.  The City continues to coordinate our intersection project with Larimer County’s proposed improvements to Shields Street from 400’ north of Vine Drive to Willox Lane. The County received three federal grants for this stretch of roadway to accomplish the following: o Replace the Shields Street Bridge over the Poudre River o Improve the Poudre River trailhead parking area and river access o Reconstruct approximately one mile of Shields Street  The project is out to bid currently (bid opening June 17), with construction anticipated to start in early July.  A communication plan (public outreach) is being developed and will be implemented with the final design through construction.  The project website is available through the Engineering homepage at http://www.fcgov.com/engineering/vsi.php 10. REMINGTON GREENWAY Funding Source: FC Moves Funding Estimated Project Budget: $650,000 Status: On Budget, On Schedule 12  The goal of this pilot project is to offer flexibility in street design to calm traffic, support active modes of transportation and integrate stormwater management strategies.  The design calls for buffered bike lanes, removal of the traffic signals between Prospect and Mulberry, and the construction of a mini roundabout with curb bulb outs at Remington and Laurel.  Additional funds were added to the project with approval of the 2015 budget, and funds from the Pedestrian Needs Assessment, to rebuild sections of sidewalk and curb ramps. Also, Street Maintenance is using some of its 2015 budget for a surface treatment prior to restriping the corridor. This will take place in the fall of 2015, after the construction for this project is complete. Temporary striping will be applied to specific areas along the Remington Corridor prior to Street Maintenance work.  Construction will start in mid June.  We are actively coordinating our construction schedule with the US 287 (College Avenue) CDOT resurfacing project.  A communication plan (public outreach) has been developed and is currently being implemented.  The project website is available at http://www.fcgov.com/advanceplanning/remingtongreenway.php 11. SH 392 AND I-25 INTERCHANGE SIGNS Estimated Project Budget: $300,000 Status: On Budget, On Schedule 13  The goal of this project is to construct welcoming and aesthetically pleasing signs for traffic entering the City of Fort Collins and the Town of Windsor along SH 392.  The City has pursued a number of potential sign locations. It was determined that the medians will be the best location for the signs.  The City is partnering with the Town of Windsor for the design and construction of the signs.  Contracts are in place between the City and the Contractor (L&M Enterprises), and Windsor and the Contractor.  Construction of the signs is complete. Solar panel and lighting installation is complete. Landscaping and irrigation have been installed. The contractor is waiting for CDOT to repair interchange irrigation so that City staff can inspect and accept median irrigation. Once irrigation is accepted, project closeout will take place. 12. DOWNTOWN RIVER DISTRICT IMPROVEMENTS Funding Source: Federal Grants, Local Funds, DDA Funds Estimate Project Budget: $1.48 million Status: On Budget, On Schedule 14  The City has contracted with Interwest Consulting to provide engineering services for various City initiated improvements within the Downtown River District.  The project will also have the capability to provide various engineering services in preparation of anticipated development.  The City has initiated two projects: 1. Developing an implementation plan for improvements along Jefferson Street between College Avenue and the Mountain /Lincoln intersection based on the available budget, and 2. Developing a conceptual design for improvements along Willow Street between North College Avenue and Linden Street. Additional projects to follow include the development of engineering plans and specifications, as well as construction of these improvements along both Jefferson and Willow based on the results of the above.  The City has adjusted the proposed roadway cross section for Willow Street based on a thorough review of the original design intent, and the new and emerging land uses in the area. Focus will now shift to the preliminary engineering phase.  The City is nearing completion on final engineering plans along the Feeder Supply Development’s Willow Street frontage in an effort to coordinate developer and City planned improvements.  The City continues to work on the Jefferson Street Implementation plan, balancing planned improvements with available budget and proposed development along the corridor. 13. LINCOLN (INTERIM) AND LEMAY IMPROVEMENTS / WOODWARD CAMPUS Funding Sources: City of Fort Collins General Fund, Intersection Improvement Fund Estimated Project Budget: $2.1-2.3M Status: On Budget, On Schedule  This project has several goals. The first is to install three new points of access/turn lanes to the Woodward Campus, two on Lemay, and one on Lincoln. The project will also complete the improvements along the west side of Lemay between Lincoln and 15 Mulberry. This includes completion of the Magnolia intersection to a full movement location along with curb, gutter and sidewalk for the entire length. An interim sidewalk will also be constructed along the Lincoln front that connects pedestrians to the Poudre River bridge on Lincoln and into downtown. Lastly, a double left turn configuration will be installed on southbound Lemay to eastbound Mulberry for as a result of anticipated traffic volumes for this area.  The City and Mortenson Construction have partnered to identify and employ best practices regarding communication, safety and general project information to the local businesses and nearby neighborhoods.  Staff has been working closely with CDOT and contractor personnel to develop final coordination logistics that will allow for some portions of adjacent Lemay improvements to occur and tie in with the Mulberry Bridge progress.  Walsh Construction Inc. crews have begun working on the west side of Lemay Avenue, and are nearing completion of the curb/gutter and sidewalk, as well as new access points to the Woodward campus.  Major milestones include paving the west side of Lemay, installation of water and sewer utilities, median modification/new turn lane reconstruction, and traffic signal infrastructure at Magnolia and Lemay.  Anticipated substantial completion is mid-July 2015. This phase will be communicated via press releases and social media. 14. NORTH COLLEGE PEDESTRIAN GAP Funding Sources: CMAQ Grant, URA Contribution, Pedestrian Program Funds Estimated Project Budget: $900,000 Status: On Budget, On Schedule  The primary goal of this project is to complete a gap in pedestrian infrastructure from Highway 1 to the south side of the Larimer & Weld Canal.  This project will construct a pedestrian connection crossing the Larimer & Weld Canal extending north to SH 1 (Terry Lake Rd). The project impacts a federal highway, and is located outside the City limits but within the Growth Management Area. 16  The City received a Congestion Mitigation and Air Quality (CMAQ) grant for this project. Developer contributions through the Urban Renewal Authority (URA) as well as Pedestrian Program funds make up the local match portion of funding.  A signed IGA with CDOT has been executed, and authorization to begin design has been received.  Interwest Consulting Group has developed a conceptual level plan through a work order for coordination purposes. City staff has begun coordination efforts with the ditch company, Larimer County and CDOT.  The City anticipates advertising a Request for Proposals (RFP) in late spring/early summer 2015 for full design of the project. 15. NORTH COLLEGE IMPROVEMENTS – CONIFER TO WILLOX Funding Source: Federal Grants, Local Matching Funds Estimate Project Budget: $12 million Status: On Budget, On Schedule  The intent of this project is to design and construct improvements along North College Avenue from the Conifer/Hickory intersection to Willox Lane, bringing this section of North College up to four-lane arterial standards as defined by the Larimer County Urban Area Street Standards. Both medians and sections of the planned rear access roads are included in the project.  The overall project budget is $12.0 million. This is comprised of roughly 60% federal funds and 40% local funds.  Pre-project utility relocations began in early June 2014, with an expected completion date of September 2014.  Construction of a rear access road west of North College was completed in Summer 2014.  Zak Dirt, Inc. was awarded the N. College construction contract and construction for the improvements along North College Avenue began in October 2014.  The project has completed the west side storm sewer system and waterline modifications.  The project is currently installing concrete pavement along the west side of N. College Ave. 17  The project is anticipated to be completed in November 2015.  Additional project information is available at http://www.fcgov.com/engineering/ncollege.php Boxelder Creek Ouƞall May 2015 Major Design Elements—Design Phase Underway/Upcoming Work Dredging Boxelder Creek Site Map  6 ‐ 12 foot wide x 4 foot high RCBC under East Prospect  200’ long Sidespill Weir on Boxelder Creek  2,700 cfs Flood Channel from Boxelder Creek to Poudre River  New RCBC on Boxelder Creek under East Prospect  New Siphon to replace exisƟng Flume on Lake Canal at Boxelder Creek  Dredging of Boxelder Creek Between Mulberry and I‐25  Dredging of Boxelder Creek between Mulberry and I‐25 Complete  ConstrucƟon of Siphon on Lake Canal  Flood Diversion Channel North and South of East Prospect  Box Culverts Under Prospect  Replacement of Bridge on Boxelder Creek on East Prospect Dredging Boxelder Creek Schedule July 2015 October 2015 January 2016 February 2016 May 2016 October 2016 Dredge Boxelder Creek Construct New Siphon UƟlity RelocaƟons at Prospect Box Culverts and Channel at Prospect Project Budget % Complete Total Budget $4,000,000 Total Design Spent $114,000 53% Total ConstrucƟon Spent $300,000 8% 18 Rigden Water Storage Project May 2015 Major Milestones/Completed/Underway Upcoming Work Installation of pump station foundation piers.mp Pump Station Interior Site Map  The reservoir lock test is complete  Reservoir filling has begun  Landscaping is proceeding Ramp to Bottom to Reservoir Bottom Schedule May 2015 June 2015 Landscaping Reservoir filling Begin Filling Project Complete CriƟcal Path Project Budget % Complete Total Budget $14,000,000 Total Design Spent $645,100 100% Total ConstrucƟon Spent $10,025,800 92% Total Other Expenses $980,800 19 WATER TREATMENT FACILITY 2015 MASTERPLAN May 2015 Major Milestones / Completed / Underway Upcoming Work Installation of pump station foundation piers.mp Site Map  Contracted with CH2M to provide assistance in developing Masterplan  Performed ExisƟng FaciliƟes and CondiƟon Assessment audit and tabulated results  Performed Water Resources and Demand ProducƟon audit and tabulated results  Electrical System Study  Perform a Regulatory Assessment and Energy Management Analysis  Develop Recommended Plan and Improvements Program Schedule Spring 2015 Summer 2015 Fall/Winter 2015 ExisƟng FaciliƟes/CondiƟon Assess Electrical System Study Recommended Plan Submission Final Masterplan Report Project Complete Project Budget % Complete Total Project Costs $560,000 Total Design Phase Costs $528,875 Design Complete $69,383 13% Total ConstrucƟon Costs N/A 20 WATER TREATMENT FACILITY CHLORINE CONTACT BASIN May 2015 Major Milestones / Completed / Underway Upcoming Work Installation of pump station foundation piers.mp Site Map  Contracted with CH2M to provide final design services  Performed Geotechnical Study  Performed ComputaƟonal Fluid Dynamic Modeling  Value Engineering Review of DraŌ Documents and SpecificaƟons  Potholing ExisƟng FaciliƟes  Pre‐purchase Long Lead Items Schedule Spring 2015 Summer 2015 Fall/Winter 2015 Geotechnical InvesƟgaƟon CFD Modeling Potholing / InvesƟgaƟons Final Plans and SpecificaƟons Pre‐purchase Long Lead Items Phase I Complete Project Budget % Complete Total Project Costs $1,000,000 Total Design Phase Costs $37,800 Design Complete $1232 3% Total ConstrucƟon Costs $900,000 +/‐ ConstrucƟon Complete 0 0% 21 COFC T3 Improvement & Equipment Replacement May 2015 Major Milestones/Completed/Underway Upcoming Work Installation of pump station foundation piers.mp Progress of UV wash water line Site Map installation  Completed installaƟon of UV wash water line  Completed interior pipe installaƟon  Paint interior piping  Install interior pipe supports  Complete compacƟon of wash water line trench  Asphalt Paving Progress of Interior Pipe Installation Schedule May 2015 June 2015 12” UV Wash water Line InstallaƟon T3 Project Complete Project Complete Asphalt patching Interior pipe installaƟon, pipe support, and paint Project Budget % Complete Total Budget $2,008,000 Total Design Costs $135,578 Design Complete $121,960 90% Total ConstrucƟon Costs $1,814,011 ConstrucƟon Complete $1,655,121 91% 22 Installation of pump station foundation piers.mp NORTH SHIELDS STREET SANITARY SEWER INTERCEPTOR May 2015 Major Milestones/Completed/Underway Upcoming Work Shields looking north Site Map  Placed 2000 feet of 21” sewer (To date on north side of river)  Placed 8 manholes (on north side of river)  Placed 12 service stubs  ConƟnue placing sewer north along Shields Street  Place service stubs  Cross Larimer and Weld Canal through sleeve previously installed Service Stub Schedule June 2015 July 2015 Poudre River north to Willox Lane‐21” Sanitary Sewer Service Stubs Clean‐Up/Project CompleƟon (7/7/15) ConstrucƟon Budget % Complete Total Budget $2,425,000 Total Design Spent $239,000 %99 Total ConstrucƟon Spent $878,000 %53 Total Other Expenses $365,000 23 POUDRE RIVER SEWER CROSSING AT SHIELDS STREET May 2015 Major Milestones/Completed/Underway Upcoming Work Installation of pump station foundation piers.mp Final manhole Site Map  ConstrucƟon Complete  Re‐submiƩed No Rise CerƟficaƟon  Completed as‐built survey  Complete as‐built drawings Project complete (prior to County finishing bank work) Schedule June 2015 AS‐Built Drawings ConstrucƟon Budget % Complete Total Budget $210,500 Total Design Spent $26,400 95% Total ConstrucƟon Spent $146,584 89% Total Other Expenses ‐ ‐ 24 DWRF Digester 611 Lid Replacement May 2015 Major Milestones/Completed/Underway Upcoming Work Installation of pump station foundation piers.mp Digester Piping ModificaƟons Site Map  Digester Lid construcƟon pad completed  Digester valve installaƟon complete  Digester piping modificaƟons underway  Digester Lid delivery underway  Complete delivery and begin fabricaƟon  Finish Digester piping modificaƟons  Start weld tesƟng Digester Lid ConstrucƟon Pad Schedule Project Budget % Complete Total Budget $1,128,000 60% Design Spent $18,080 100% ConstrucƟon Spent $268,000 60% May 2015 June 2015 July 2015 August 2015 September 2015 October 2015 Digester Lid FabricaƟon On‐Site Lid Assembly InstallaƟon and TesƟng 25 DWRF South Process Train BNR & Replacement Project May 2015 Major Milestones/Completed/Underway Upcoming Work Installation of pump station foundation piers.mp Completed East Side of DWRF Basin Site Map with Hydrostatic Test in Progress  Wall formwork and rebar underway  Wall concrete placement complete on east half of basin  East basin hydrostaƟc test underway  AeraƟon piping installaƟon underway  Electrical infrastructure underway  Neuros blower and associated piping installaƟon  HydrostaƟc tesƟng of west basins  UƟlity Chase, Walkway and Mixed Liquor wall installaƟon  AeraƟon piping installaƟon DWRF Basin Wall Rebar and Form Work Installation Schedule May 2015 June 2015 July 2015 August 2015 September 2015 Wall Rebar and Placement HydrostaƟc Test Basins Chemical Duct Bank InstallaƟon Major Equipment Procurement Electrical Infrastructure October 2015 Project Budget % Complete Total Budget $9,596,000 52% Design Spent $907,600 99% ConstrucƟon Spent $4,090,000 47% 26 Mountain Avenue Waterline Replacement May 2015 Major Elements Upcoming Work Example of Work to Be Completed Site Map  Water Main Replacement from Grant to Shields  Replacement of 80 year old cast iron water mains with new PVC  InstallaƟon of new copper services to curb stop  InstallaƟon of new fire hydrants  ConstrucƟon has begun on South Side.  Eastbound lane of Mountain is Closed.  ExcavaƟon of service pits for pipe burst is complete. ExisƟng Cast Iron Pipe to Be Replaced Schedule May 2015 June 2015 July 2015 August 2015 South Side ConstrucƟon North Side ConstrucƟon Total Budget $1,300,000 % Complete Expenses To Date $110,000 10% 27 Old Town Water and Wastewater Master Plan May 2015 Major Elements Upcoming Work Wastewater Flow Data Site Map  Comprehensive assessment of water and wastewater system in Old Town  Develop a prioriƟzed list or replacement projects  Develop Cost EsƟmates for replacement projects  Plan for infrastructure upgrades for downtown redevelopment  Water and Wastewater Model Updates  PrioriƟzaƟon Model  Downtown Redevelopment Review  DefiniƟon of Improvements ExisƟng Cast Iron Pipe Schedule May 2015 June 2015 July 2015 August 2015 System Assessment & Problem IdenƟficaƟon Project PrioriƟzaƟon DefiniƟon of Improvements Cost EsƟmaƟng Final Report City Council AdopƟon September 2015 October 2015 Project Budget % Complete Total Budget $250,000 45% 28 Cathodic ProtecƟon May 2015 Major Milestones/Completed/Underway Upcoming Work Installation of pump station foundation piers.mp NEWT Phase 2 Water Line Bonded to Site Map City AB Water Line  Contractor on board for AB conƟnuity correcƟons  Contractor installed CP test sites at WTF  Rustnot will return in a September to adjust WTF recƟfiers  ConƟnuity correcƟons on AB line to start in September NEWT Phase 2 Water Line Bonded to City AB Water Line Schedule May 2015 June 2015 July 2015 August 2015 September 2015 Contractor installed CP test sites at WTF On‐going Project Budget % Complete Total Budget $130,000 Total Design Spent $0 Total ConstrucƟon Spent $15,000 11% Total Other Expenses $6,000 29 Fossil Creek Stream RehabilitaƟon Project May 2015 Major Milestones/Completed/Underway Upcoming Work Channel with IrrigaƟon Flushing Flows Site Map  Visited site to view the newly rehabilitated channel handle irrigaƟon ditch inflow of flushing flows and unusual rain storm events for May  PlanƟngs to conƟnue into June with final plants scheduled for September  Site closed with fencing and signage for the next 3‐5 years to allow for naƟve vegetaƟon restoraƟon  Contractor invoices sƟll coming in NaƟve Willows Planted In Wetland Areas Schedule May 2015 June 2015 July 2015 August 2015 September 2015 Visited site with contractor and engineer Further PlanƟngs Project Budget % Complete Total Budget $1,420,000 Total Design Spent $318,000 93% Total ConstrucƟon Spent $650,000 66% Total Other Expenses $97,000 30 Northeast College Corridor Ouƞall Phase 3 (NECCO3) May 2015 Major Milestones/Completed/Underway Upcoming Work Set up Bore #1 Site Map  Completed flashfill between bored pipes and boxes  Regraded and seeded construcƟon area and swale Bores complete, preparing for flashfill around casing Schedule May 2015 June 2015 Completed flashfill between bored pipes and boxes Regraded and seeded construcƟon area and swale Project Budget % Complete Total Budget $1,042,000 Total Design Spent $88,000 51% Total ConstrucƟon Spent $285,000 34% Total Other Expenses $25,000 31 COMMUNITY EVENTS Fort Collins Studio Tour and Sale Preview Exhibit Location Lincoln Center, 417 Magnolia, Lincoln Center Galleries Date/Time Friday, June 12, 2015, 10:00 AM Details See sample artwork for more than 60 artists who will participate in the Fort Collins Studio Tour and Sale on the weekend of June 26-28. The Studio Tour is a free, self-guided tour of local private artist studios. Visitors can see art in action in the places where it is made, meet local artists and buy art directly from the artists. See everything from Painting to Pottery, Watercolor to Woodworking and more! It’s fun, educational and inspiring! Web Address http://www.fcgov.com/studiotour Contact Information Jeanne Shoaff, Phone: 970-416-2737, E-mail address: jshoaff@fcgov.com Bike to Work Day Location Stations all across the City Date/Time Wednesday, June 24, 2015, 6:30 AM Details Fort Collins' Bike to Work Day is a biannual event to encourage people to bicycle for transportation, experience the benefits of riding a bike, highlight Fort Collins' extensive bike routes, and demonstrate that bicycling is an easy, fun and healthy means of traveling around the city. Web Address http://www.fcgov.com/bikemonth Contact Information Becky Moriarty, Phone: 970-224-6112 , E-mail address: rmoriarty@fcgov.com Independence Day Celebration Location City Park, 1599 City Park Drive, Parade along Mountain Avenue Date/Time Saturday July 4, 2015, 10:00 AM Details Celebrate America’s Independence with a day and evening full of family fun activities and events in City Park. Day events include a 4th of July Golf Tournament, discounted admission to City Park Pool, and a musically saturated parade extending all along Mountain Avenue. In the evening, come out to City Park for live music, and of course an evening sky full of fireworks (generously sponsored by Blue Ocean Enterprises and the Richardson Foundation). Web Address http://www.fcgov.com/july4th Contact Information John Litel, Phone: 970-221-6875, E-mail address: jlitel@fcgov.com To view the full calendar of events, visit http://www.fcgov.com/events/ 32 PUBLIC SAFETY UPDATE FORT COLLINS POLICE SERVICES Police Week Each May a week is set aside to honor those law enforcement officers who have paid the ultimate sacrifice for their community. From May 10 th through May 16 th law enforcement officers across the nation paid special honors to those fallen heroes. Fort Collins Police Services had several officers who participated, on their own time, in the Police Unity Tour which is a 350 mile bicycle ride arriving at the National Law Enforcement Officer Memorial. This ride is a fundraiser for the memorial and this year raised $1.9 million nationally. Police Services held a memorial service in the lobby of the police building in remembrance of those who, past and present, have fallen including the two Fort Collins officers who were killed in the line of duty many years ago. Bike Education and Enforcement Week From April 26 to May 2, Police Services engaged in an enforcement and education week concentrating on bike safety for both bicyclists and motorists. During the week officers targeted specific areas where there have been high incidents of bicycle accidents. During that week officers contacted both bicyclists and motorists who were committing violations that reduced bike safety. Officers issued a combination of citations and warnings during this week. Officers also issued several hundred safety lights to bicyclists who were riding at night without a light. Solicitor calls on the rise Police Services received an increased number of calls for service reference solicitors. This is directly related to an increase in solicitation activity in the city. Police Services has been releasing educational information to the citizens on the subject. Missing Person Investigation On May 14 th , Police Services handled a report of a missing 18 year old female who had been missing for a few days prior to being reported by her mother. Police Service conducted an extensive investigation and public release on the report. When the female saw her information released through social media she immediately contacted police to confirm that she was fine and was not indeed missing. Missing Endangered Adult On May 15th, Police Services investigated a report of a missing endangered adult. Considerable police resources were used to locate this person as soon as possible. Due to a medical condition it was critical that this person have access to her medication and that she not go untreated. Police Services followed several tips and dedicated considerable resources to this event. It was later found out that the female was not missing but had intentionally not been in contact and that she was fine. Applications accepted for the Fort Collins Police Explorer Program 33 Fort Collins Police Services accepted applications for the annual recruitment of youth for the Police Explorer program. Several applications were submitted and new members accepted in to the program. This begins several years for the youth to learn about the profession of law enforcement as well as volunteer time to the City of Fort Collins. Crime Prevention This month, the Crime Prevention Specialist had 12 telephone calls that ranged from a resident in the Wallenberg neighborhood dealing with suspicious behavior on the bike path to a grandmother needing a child car seat installed. Staff spoke to employees at Plato’s Closet who endured an armed robbery and helped them with security issues at their store and did several presentations during the month. A breakdown of the month’s Crime Prevention activities follows: Skyline Neighborhood Watch, 25 attend RESTORE, 25 attend Northern Colo. Rental Property Managers Personal Safety, 15 attend Plato’s Closet Security Survey & Personal Safety, 2 attend Wildlife Aware & Safety, 12 attend Crime Prevention Tip So often at gatherings and neighborhood meetings staff is contacted by residents who tell of things that have already happened in the past. When asked if they called Police at the time, they say that they did not. Often the reason is that they did not “want to bother Police.” Please, if you see something unusual or suspicious, call the Police when it is happening and let them respond to check it out. It may be nothing, or it might turn out to be a crime in progress or someone needing help. 34 POUDRE FIRE AUTHORITY Notable Incidents/Items/Events:  PFA Annual Report-New Format- Poudre Fire Authority’s 2014 Annual Report is here! The new user-friendly format was developed after months of diligent work compiling data and verifying results from each of PFA’s four divisions. The report was presented to City Council Tuesday, May 26 th . Customers will find many interesting facts along with an introductory video from Fire Chief DeMint. Some facts include what type and how many calls we responded to including where our busiest companies are located. Other areas look at key performance outcomes, budget and the accreditation process. “We have a great fire department in a great community; however, we are always trying to improve our service delivery any way we can” stated Chief DeMint. To submit a question or comment for the 2014 report or anything else please follow this link (www.poudre-fire.org/about-us/contact-us). Prior year reports and surveys can be found at www.poudre-fire.org/about-us/reports-surveys.  Fire in Old Town- This fire resulted in numerous businesses having to be closed for multiple days, thereby impacting revenue. Firefighters found a large amount of smoke and fire coming from at least one manhole cover in Old Town Square after numerous 911 calls on the afternoon of May 9 th . Crews initially attempted to locate the source of the fire and evacuate surrounding buildings. The fire involved energized electrical equipment, some underground, so firefighters could not immediately extinguish the blaze. Fort Collins Light & Power crews were on scene to assist with disconnecting and isolating electrical supplies to buildings. A second alarm was immediately requested to assist with building evacuation and to contain any potential fire spread. Once electrical service was disconnected, crews were able to extinguish the fire and keep it from extending to surrounding buildings. PFA’s Hazardous Materials Team worked through the afternoon with other firefighters to remove smoke from the buildings. Damage appears to be limited to two transformers and some interconnecting lines. Investigators are working to determine an origin and cause. Assisting agencies: City of Fort Collins Light & Power, Police Services, Fort Collins 911; PVH/UC Health Emergency Services.  Apartment Fire- Occupants of a two story apartment building were woken by smoke alarms sounding, which allowed them to safely escape a quickly spreading fire in the early-morning hours of May 20 th . Upon arrival, firefighters encountered large flames and dark smoke with partial evacuation of the apartment building. A second alarm was immediately called due to 35 a rapidly growing fire. The initial arriving engine engaged in fire suppression while additional resources hurried to get full evacuation of the occupants. At approximately 0528 hours, a third alarm was ordered due to fire extension in the attic and need for additional resources. An aggressive interior and exterior fire attack along with fire walls prevented further extension within the building and to adjoining buildings. The complex sustained a large collapse of the roof approximately 20 minutes into the operation. Severe fire, smoke, and water damage was limited to six units. Poudre Fire Authority and the Red Cross are diligently working to assist 24 citizens displaced. Agencies will be providing short-term shelter, food, and clothing needs for the 13 displaced long-term and 11 short-term. One civilian reported a minor injury and was later treated at an urgent care facility. Two firefighters reported minor injuries. One uninjured dog was rescued. Investigators are working to determine an origin and cause. Assisting agencies: Bureau of Alcohol Tobacco, Firearms & Explosives, City of Fort Collins Light & Power, Police Services, Fort Collins 911, Larimer Humane Society, Northern Colorado Red Cross, PVH/UC Health Emergency Services.  New Apparatus Logo/Paint Scheme- A fire engine with a new paint and logo scheme was placed in service May 8 th at Fire Station 2 in City Park off West Mulberry Street. In a nod to fire department heritage and PFA’s commemoration year, this new paint scheme brings engine colors more in line with the history of Fort Collins’ fire apparatus. When the fire department began ordering mechanized fire apparatus in 1914, the color was most notably red. Not until 1937, under the direction of Chief Thomas Treadwell, were fire apparatus changed to white. The first one with the new color was a 1937 Diamond T ladder truck. When the City of Fort Collins Fire Department and Poudre Valley Fire Protection District formed Poudre Fire Authority in 1981, apparatus colors remained unchanged. Soon thereafter a blue stripe was added to enhance visibility of apparatus. While it looks brand new, Engine 2 is a product of months of hard work planning, designing, and building in order to reuse many components from an older PFA fire engine. After being evaluated, rebuilt and/or serviced, the diesel engine, transmission, fire pump, rear axle and rear compartments now have a new life. Not only does this reduce the overall cost of the vehicle by $150,000 to $170,000, it also reduces the amount of material required to construct a new fire engine and material entering the waste stream. There are no plans to retrofit any existing PFA vehicles. The intent is for the new scheme only to be placed on vehicles received from this date forward. 36  Incident Statistics (by category)- Report Period: May 2015 Total Property Loss Fires 24 $ 444,811 Overpressure/rupture, explosion-no fire 0 Rescue / EMS 1,166 Hazardous Condition - no fire 36 Service Call 66 Good Intent Call 179 False Alarms / False Calls 115 Severe Weather & Natural Disaster 0 Special Incident Type 1 Total = 1,587 YEAR-TO-DATE 2015 Total Property Loss Fires 149 $ 2,285,222 Overpressure/rupture, explosion-no fire 5 Rescue / EMS 5,704 Hazardous Condition - no fire 154 Service Call 295 Good Intent Call 754 False Alarms / False Calls 496 Severe Weather & Natural Disaster 0 Special Incident Type 11 Total = 7,568 Comparison: May 2014 Total Property Loss Fires 38 $ 57,012 Overpressure/rupture, explosion-no fire 0 Rescue / EMS 1,139 Hazardous Condition - no fire 27 Service Call 64 Good Intent Call 117 False Alarms / False Calls 96 Severe Weather & Natural Disaster 0 Special Incident Type 6 Total = 1,487 Comparison: YEAR-TO-DATE 2014 Total Property Loss Fires 140 $ 1,112,062 Overpressure/rupture, explosion-no fire 4 Rescue / EMS 5,189 Hazardous Condition - no fire 134 Service Call 281 Good Intent Call 515 False Alarms / False Calls 486 Severe Weather & Natural Disaster 0 Special Incident Type 17 Total = 6,766 *Information subject to change due to updated data. 37 BUILDING & PLANNING ACTIVITY COMMUNITY DEVELOPMENT & NEIGHBORHOOD SERVICES Thru May 2015 2014 YTD 2015 YTD % Change Development Project Submittals Received 138 157 +14% Conceptual/Staff Reviews Performed 103 84 -19% Building Permits Issued 2,424 3,859 +59% Building Permit Valuations ($M) $ 202.6 $ 185.7 -8% Building Inspections Performed 13,712 13,634 -1% Plan Reviews Performed 1,025 944 -8% Overall development review revenues are $46,405 over projection for 2015 as of May 31 st . General Fund revenues are $104,116 over projection; however, Engineering Development Review revenues are under projection by $57,711. Development Projects of note include: Foothills Mall Redevelopment – The Foothills Mall Redevelopment has been approved and is under construction. There have been five Minor Amendments submitted and approved for Foothills Mall Redevelopment. These amendments included the following types of changes, addition of notes to the site plan, a temporary access point for Macy’s along Stanford Road, revisions to building elevations for individual tenant needs, and utility changes. Construction coordination meetings are continued to be held with City Staff and the developer as needed. Permits Issued (Mall): • Two master demolition permits to track all space renovations. Sears asbestos abatement continues, building to be demolished in the next couple of weeks. Sears building down, recyclable materials being separated. • No interior activity on new Sears building. • New parking structure, 315 E Foothills – foundation caissons installed and tilt-up concrete wall panels being erected; majority of the walls now standing. • Cinemark Movie Theater, 335 E Foothills – concrete tilt-up walls being erected, interior trades moving forward. • New core and shell, B1408666, 3050 S College and B1402938, 3100 S. College framing progressing. • Tenant Finish for Chico’s clothing at B1408817, 3120 S. Tenant finish completed, permit closed. • Tenant finish for Harrison’s Jewelry B1500098, 3120 S College, work progressing. • New 24,276 sq ft addition to existing mall for the FAC building for 241 E. Foothills Pkwy #B1411718 (applied 11/14/14). Plan review comments pending permit issued for “footing and foundation”. • New Core and Shell 8006 SF. for 327 E Foothills #B1410749 (applied 10/28/14). Plan review completed; permit ready. Permit issued as Footing and Foundation. • New Core and Shell 6005 SF. for 321 E Foothills #B1410751. Plan review completed; permit ready. Permit issued as Footing and Foundation. 38 • New Core and shell B1412731, 170 E Foothills 9,467 sq. ft. plan review under way; comments sent, awaiting response. Permit issued full Permits under Review (Mall): • Tenant Finish for Victoria’s Secret at 215 E. Foothills Pkwy #B1411229 (applied 10/30/14). Plan review completed; permit ready. Inspections (Mall): • The City building inspector assigned to this project will be available for 2 hours per day for inspections. The contractor is also authorized to use professional engineers for additional inspections if needed. A second inspector has been assigned to outlying buildings, leaving one inspector to handle major mall construction; work progressing without issues 633/639 S. College Ave @ Laurel Rehabilitation will consist of renovating three existing buildings:  633 ½ S College Ave.  621 S College Ave., and  627 S College Ave. Applicable permits have been issued:  B1411516 - Tenant finish - permit issued in full.  B1501004 - Tenant finish of 820 square feet - work to include repair of exterior facade, installation of overhead door and roof repair as needed.  B1504226 - Interior only demolition of non-structural partition walls Fort Collins Hotel: A 162-room hotel is proposed at 354 Walnut Street with 98 parking spaces across the alley at 363 Jefferson Street. Restaurant and retail uses are included on the ground floor. Here are upcoming project dates:  Landmark Preservation Commission: June 10  Neighborhood Meeting: June 11  Planning and Zoning Board: Tentatively September 10 Woodward Campus items: Permits Issued: • Full permit (B1403329) issued for the Phase One ITS building; structural steel well underway. Permits under Review: • Footing and foundation permit (B1411129) 1081 Woodward Way for Office Building Headquarters submitted. F&F permit issued, below grade work has commenced; steel and concrete allowed to start above ground. Inspections: • No issues at this time; inspectors available to assist the one assigned inspector. 39 CSU Medical Center – This is a request to construct a new CSU Medical Center facility at the northwest corner of Prospect and College. The medical center will be four stories and will provide 155 surface parking spaces on-site. The proposal is subject to a Site Plan Advisory Review by the Planning and Zoning Board. The review process is anticipated to begin in August. CSU Parking Garage – The plan was approved by P&Z in May. The site is located southeast of Pitkin and the Mason Trail. The parking structure will provide approximately 476 additional parking spaces for the campus and the Medical Center. CSU Parking Lot – The plan was approved by P&Z in May. CSU has started some of the site work while the Final Utility Plans currently under review are approved by staff. This is a request to construct a surface parking lot on an undeveloped parcel at the southeast corner of Research Boulevard and Centre Avenue. The parking lot will contain approximately 900 parking stalls, with access points on Research Boulevard, Centre Avenue and Gillette Drive. General Inspection Information - Due to the summer hail storms last year, over 6,400 re-roofing permits have been issued, and more than 3,900 have been inspected using trained hourly employees. Staffing issues and inclement weather have slowed progress. Estimates 3,500-5,500 roofs still need to be replaced. Two new hourly inspectors hired, trained, and now inspecting, weather permitting. Recent snow and rain storms have greatly hampered the number of roofs that can be inspected. Hourly inspectors are also being trained in basic building inspections to assist when weather prevents them from performing roofing inspections. Progress has been made in clearing the back log of roofing inspections; however, a second wave of re-roofing permits is currently being processed. We remain approximately two to three weeks behind in performing inspections based on the time an inspection is scheduled. In May, the City issued over 300 new re-roofing permits and performed more than 450 roofing inspections. Projects that submitted final plans in May:  Landmark Residence on Mountain Avenue: This is a request to replace the existing gas station convenience store at 1032 W. Mountain Ave. with a mixed use building containing six single-family attached houses and a commercial/retail space planned for a coffee shop or similar tenant. The residential portion of the proposed building is 2.5 stories; the retail portion is one story. Ten garage parking spaces and five open parking spaces are proposed. The zoning for the site is Low Density Mixed Use Neighborhood (LMN). Two modifications are proposed, one related to increased density and one related to contextual setbacks. The parcel size is .62 acres.  Young People’s Learning Center: This is a request to expand the second story of the existing Young People’s Learning Center, located at 209 E. Plum Street. The proposed addition would add approximately 1700 square feet of office space to the second story of the current building. An Addition of a Permitted Use request accompanied the PDP submittal to allow the office change of use. The parcel is located in both the 40 Neighborhood Conservation - Medium Density (NCM) zone district and the Neighborhood Conservation - Buffer (NCB) Zone District.  CSU Parking Lot at Research Boulevard: This a Final Plan utility submittal for the previous Site Plan Advisory Review SPA#150002 to construct a surface parking lot at 2400 Research Boulevard (parcel #'s 9723400906 and 9723300901). SPA#150002 was approved by the Planning and Zoning Board on May 14, 2015. The parking lot will contain approximately 900 parking stalls, with access points on Research Boulevard, Centre Avenue and Gillette Drive. One parcel is located in the Employment (E) zone district while the other parcel is on the CSU campus, with a total site area of approximately 11 acres.  CSU Parking at 620 S. Lemay Avenue: This is a request for a combined Major Amendment/Final Plan for additional parking for a medical clinic located at 620 S Lemay Avenue. An addition of a 36-space parking lot will supplement the parking at the existing Concentra building across the street. The site is located in the Community Commercial Poudre River (CCR) Zone District. Construction Projects of Note for May:  New 11,850 square foot, multi-family building with post tension slab foundation and 1,700 square foot attached garage. Location: 5020 Cinquefoil Lane  New 8,054 square foot multi-family (6 units) building with 3,904 square foot unfinished basement and 2,302 square foot attached garage. Location: 2521 Des Moines Drive  New one-story, 17,991 square foot structural frame, stand-alone medical building for Poudre Valley Health Systems, to include a new emergency department with entrance canopy and snow-melt system. Location: 4630 Snow Mesa Drive  New 7,458 square-foot single-story commercial building for Big-O Tires vehicle service/repair/sales store. Building will consist of a showroom, sales space, 8-bay service garage and a new tire storage area. Location: 2007 S. Timberline Road  A residential restoration that will consist of removing and replacing 60% of the roof system, electrical, plumbing, insulation, drywall, paint, finish carpentry, and other necessary repairs from fire damage (16 units). Location: 2736 Raintree Drive G Other items of note:  Nature in the City – Staff is now focusing on implementation of the Strategic Plan, with recent developments including the installation of the Living Wall project, the completion of a CSU graduate seminar that has assisted in the development of design guidelines and the inclusion of City Manager’s Office staff to facilitate a suite of dark skies-related projects. In addition, more than 30 trained volunteers for the project’s first citizen science effort are collecting bird and butterfly data on a portion of the sites sampled in 2014. Updates on the project will continue to be housed on the project’s website fcgov.com/natureinthecity. 41  Oil & Gas – The project team sent a project summary memo plus the corresponding health and property studies to Council on Thursday, May 30, 2015. An FAQ has been developed for the website regarding the results of the study and the FAQ and studies have been posted on the Oil & Gas Website. Staff is in process to hold a neighborhood meeting for the Hearthfire neighborhoods to review the results of the study and hold a community meeting for the same purpose. A community meeting occurred June 4, 2015. The project team awaits direction from Council as to whether a work session should be scheduled for the same purpose.  Old Town Neighborhoods Plan (formerly Eastside and Westside Neighborhoods Plan Update) - Phase I of the planning process beginning in March is nearing completion. Initial steps included an assessment of existing conditions, identification of issues and opportunities and first round of public meetings. The first series of neighborhood stakeholder group meetings were held in May. For more information on the project including summaries of public input to date, visit: fcgov.com/otnp.  Lincoln Corridor Plan - Implementation: 1) Neighborhood Projects - The Lincoln Corridor Plan was adopted by Council in May 2014. The Plan includes a list of recommended infrastructure projects in the surrounding neighborhoods that are funded for implementation in 2015-2016. Neighborhood Advisory Committee applications were reviewed by the City Manager and staff and selections were confirmed on May 22, with the first meeting held on May 27. 2) Lincoln Avenue Improvements – The Lincoln Corridor Plan estimated the total cost of the Lincoln Avenue improvements to be $19.3 million. This estimate includes final design, construction, and a planning-level contingency of 30% for the full project limits from Jefferson to Lemay, and includes replacement of the Poudre River Bridge. The corresponding estimated budget for the segment from 1 st Street to Lemay Avenue is $8 million. The Lincoln Corridor Plan presents a design framework with the flexibility for refinement, scalability, and phasing during the final design process, including potential opportunities for cost savings. Based on this idea and feedback from Council that the project does not need to include the complete level of envisioned enhancements, the approved budget for this section was reduced to $6.5 million with the understanding that the enhancements will be scaled back as needed to meet the budget. An RFP will be released in the 2 nd quarter of 2015 for project design. Engineering is exploring alternate project delivery models using a design/build process that would hopefully allow for construction to begin in 2016. There will be a right of way acquisition that will need to be prioritized.  Downtown Plan – The process to update the Downtown Plan has begun! We are wrapping up the Issue Identification phase of the project and will be moving on to Visioning in the next month. Visit fcgov.com/downtown for more information and to sign up for email updates. 42 o Visioning Kick-Off Event: July 13, 6 p.m. at Lincoln Center  Mountain Vista Subarea Plan -- Alternative Rural Analysis – In response to potential concerns regarding the cost to provide the full range of urban services to the Mountain Vista area, the City of Fort Collins has evaluated a hypothetical rural development scenario for the adopted Mountain Vista Subarea Plan that would reduce the density/intensity of planned development. The evaluation of the alternative considers a broad range of topics that fall under environmental, economic and social outcomes. The analysis is scheduled for discussion at the June 9, 2015, City Council work session.  Smoking Ordinance Expansion Options – No word on a citizen initiative at this point; however, we did receive a citizen request for all information related to this item, costs for the upcoming outreach and education efforts that will be conducted, solutions for people who work and visit the smoke-free zones, and enforcement mechanisms. The project team is meeting weekly on the education and outreach campaigns, as well as identifying costs and placement of needed signage. A campaign roll out for the first phase is expected by August 1 st .  Neighborhood Districts (formerly referred as to as associations) – In an effort to increase connection, communication, collaboration, and access to the City for residents, staff is exploring implementation of a neighborhood association model in Fort Collins. These associations are intended to build unity within neighborhoods, provide systems of support, and ensure individuals have a voice and the ability to influence what happens in their neighborhoods and surrounding areas. Our hope is that, through these associations, Fort Collins residents will have another way to engage with the City and have opportunity to participate in creating and maintaining a healthy, vibrant, and dynamic community. Current efforts include: o Neighborhood Leadership Event was held on April 25, 2015: 39 attendees o Neighborhood Advisory Group applications have been received; letters will go out to participants the week of June 15  Additional members are being targeted for inclusion and diversity  3 residents requested from each Council District  Meeting date may be delayed due to staff changes o Employee Group met to identify potential members of an employee committee and an engagement team (for study) o Scope of engagement study has been discussed; plans are in process o Project Charter is being revamped to reflect recent approval of engagement study  Urban Agriculture - A 6-month update on urban agriculture was provided to Council in March. Staff is continuing to work with the North Colorado Food Cluster to develop a strategic plan for how we will create a sustainable food system. Development Projects under Appeal:  The CDNS Director’s decision to approve the 201 E Elizabeth Street building permit application to change the use to a fraternity has received 4 appeals. These appeals are to 43 the Zoning Board of Appeals. The appeals were heard at the ZBA May 14, 2015 meeting. The Zoning Board of Appeals decision to uphold the CDNS Director’s decision to approve the 201 E Elizabeth Street building permit application to change the use to a fraternity has received 3 appeals. These appeals will go to City Council on July 21. The deadline for City Council to hear the appeal is August 10, 2015. 44