Loading...
HomeMy WebLinkAboutEmail - Read Before Packet - 1/20/2015 - Email From Darin Atteberry Re: Agenda Item #13 Re: Carnegie Bldg (Sar #28548)1 Debra Unger From: Debra Unger on behalf of Darin Atteberry Sent: Tuesday, January 20, 2015 4:04 PM To: Bob Overbeck Cc: CCSL; Ginny Sawyer; Marty Heffernan; Jill Stilwell; Jeff Mihelich; Wendy Williams Subject: RE: Carnegie Bkdg (Council SAR #28548) Attachments: 201635_BOB_II_Carnegie_Renovation_Cost_Summary.xlsx Bob, Please see the response below from Jill Stilwell, Cultural Services Director, re: your request for a cost breakdown of the Carnegie Building renovations: ~~~~~ Please see the attached estimate for the Carnegie Building Renovation. This is an estimate for the conceptual project and includes a listing of the elements to be included. At this phase, the architects did not provide a breakdown or per item cost for each element of the project. ~~~~~ Staff time: 2.5 hours Debra Unger Executive Administrative Assistant City Manager’s Office (970) 221-6266 Click here to Tell Me About My Service ... I Want to Know! From: Bob Overbeck Sent: Friday, January 16, 2015 1:13 PM To: Darin Atteberry Cc: Jeff Mihelich Subject: Carnegie Bkdg Darin: On the Carnegie Bldg. I want to see the breakdown of cost from the list of projects proposed on the BOB 2 tax and O&M. Thanks Bob Sent from my iPhone ---------- Bob Overbeck City Councilmember 2 District 1 City of Fort Collins (970) 817-1411 boverbeck@fcgov.com --- With limited exceptions, emails and any files transmitted with them are subject to public disclosure under the Colorado Open Records Act (CORA). To promote transparency, emails will be visible in an online archive, unless the sender puts #PRIVATE in the subject line of the email. However, the City of Fort Collins can’t guarantee that any email to or from Council will remain private under CORA. Approx. SF 12,896 Description Cost Cost / SF Construction Costs $860,045 $66.69 Exterior Restoration: Foundation, Masonry, Roof, Eave/Cornice $44,750 $3.47 Window restoration $138,600 $10.75 Interior Restoration(floors/plaster/finishes) $132,900 $10.31 Upper level mechanical rehabilitation $249,700 $19.36 Design Fees - 8% $114,079.60 $8.85 Site-work/Gates (3300 sq ft) $9,600 $0.74 Surveys, Materials, Testing $500 $0.04 Building Permits $37,000 $2.87 IT Coax to the building (675 ft) $18,336 $1.42 Fiber Feed (3800 ft) $30,615 $2.37 Wireless Equipment $5,600 $0.43 Classroom/Gallery Technology $0 $0.00 $ 106,383 Furnishings, Fixtures, Equipment $70,000 $5.43 Project management $20,000 $1.55 Signage $16,000 $1.24 Contingency - 10% on construction $85,559.70 $6.63 Project Total $1,833,285.30 $ 142.16 APP 1% $18,333 TOTAL ESTIMATE $1,851,618.15 Includes* three story staircase, building attendant station, new ADA restrooms, repair and build-out of storage rooms, remove information desk, expand classroom, renovate existing restrooms/ramp for ADA , open and repair windows, repair drywall and plaster, add storm windows, sunshades (as needed) interior restoration (repair/refinish/carpet floors; repair/paint plaster; restore finishes), upper level mechanical rehabilitation, electrical upgrade, connect to fiber exterior restoration (foundation drainage repair, masonry repointing, eave/cornice repair/paint, roof/light well restoration) ADA signage, sidewalk upgrade, site work *Inclusions will be finalized based on actual construction costs during bid process CARNEGIE BUILDING RENOVATION AND REMODEL PROJECT COST SUMMARY