Loading...
HomeMy WebLinkAboutMemo - Read Before Packet - 12/9/2014 - Memorandum From Ginny Sawyer Re; Agenda Item #1- Renewal Of The One-Fourth Cent Capital Improvement Program (Bob 2.0)1 Potential Capital Improvement Tax Projects Row # Page # Project Capital Annual O&M 4 Years of O&M Notes 1 CNL 2A 12 Pedestrian Sidewalk/ADA Compliance - Safe Routes to Everywhere 14,000 This is a fund and could be reduced - would result in fewer projects/improvements. 2 CNL 2B 13 Bicycle Infrastructure Improvements - Safe Routes to Everywhere 5,000 This is a fund and could be reduced - would result in fewer projects/improvements. 3 CNL 2C 14 Bus Stop Improvements - Safe Routes to Everywhere 1,000 This is a fund and could be reduced - would result in fewer projects/improvements. 4 ENV 3A 6 Downtown Poudre River Enhancements (Downtown/Kayak Park) 4,000 50 200 Cost reduced from $5M to $4M following October 11 Council session. 5 T 9 8 Bike/Ped Grade Separated Crossings Fund 6,000 20 80 This is a fund and could be reduced - would result in fewer projects/improvements. 6 T 11 9 Transfort Bus Fleet Replacement 2,000 This is a fund and could be reduced - would result in fewer projects/improvements. 7 T 12 9 Arterial Intersection Improvements Fund 6,000 This is a fund and could be reduced - would result in fewer projects/improvements. 8 CNL 6 14 Implementing Nature in the City 3,000 100 400 This is a fund and could be reduced - would result in fewer projects/improvements. Should this be increased? 9 CR 4 2 Completion of the Gardens on Spring Creek visitors center 2,000 40 160 10 CR 1 1 Southeast Community Center with Leisure Pool 14,000 230 920 11 CNL 1 11 Affordable Housing Fund 4,000 Changed to affordable housing fund. 12 T 5B 7 Lincoln Avenue Improvements Design & Construction(Without Bridge) 8,000 36 144 Need Council direction. $6 million option included in read before. 13 CR 7A 3 City Park Train 350 Moved up per Council direction on December 6th. 14 CR 7C 3 Fire Museum 400 25 100 Moved up per Council direction on December 6th. 15 CR 3 1 Renovation of the Historic Carnegie Building 2,000 25 100 Moved up per Council direction on December 6th. 17 ECH 6 4 Linden Street Renovations Design & Construction 3,000 12 48 Need Council direction. 16 Subtotal 74,750 538 2,152 18 ECH 11 4 Community Marketplace 3,500 Need Council direction. 19 ECH 7 5 Willow Street Improvements – College Avenue to Linden Street Design and Construction 3,500 11 42 Need Council direction. 20 T 6 7 Jefferson Street Improvements - College Avenue to Lincoln Avenue/Mountain Avenue 7,500 24 96 Need Council direction. 21 CR 7B 3 Club Tico Renovation 250 Need Council direction. 22 T 28 10 Arterial Roadway Improvements Fund 8,000 3 12 New project added at the direction of Council. 23 Subtotal 97,500 576 2,302 24 SC 2 Computer Aided Dispatch/Record Management System Upgrades Removed December 6th - to be funded in future budgets. 25 CR 2C Water Sustainability Improvements for Parks and Golf (Park Conversion to Raw Water Irrigation) Removed December 6th - to be funded in future budgets. 26 CR 2A Water Sustainability Improvements (Southridge Irrigation System) Removed December 6th - to be funded in future budgets. 27 CR 2B Water Sustainability Improvements (Fossil Creek Synthetic Turf) Removed December 6th - to be funded in future budgets. 28 ECH 1 Downtown Restroom 350 Moved into budget at October 11 session - funded in 2015/2016. 29 CR 5A Recreational Trail Enhancements (Spring Creek Trail) 750 Removed from project list at October 11 session due to dedicated funding 30 CR 5B Recreational Trail Enhancements (Pourdre River Trail) 1,500 Removed from project list at October 11 session due to dedicated funding 31 CR 6 EPIC Pool Improvements 1,500 Moved into budget at October 11 session - funded in 2015/2016. 32 CNL 7 Investments in Neighborhood Restoration 3,500 175 700 33 ECH 10 College Median and Streetscape Enhancement & Renovations 1,500 90 358 34 CNL 4 Lincoln Neighborhood Trail 500 30 120 35 T 10 Start up for Bike Share 505 150 600 36 T 13 Bridge Maintenance and Replacement 10,000 37 ENV 1 Climate Action Projects 2,000 38 ENV 2 Community Organics Composting and Recycling Facility 2,500 80 320 39 ENV 3B Downtown Poudre River Enhancements (Martinez Legacy Project) 5,000 50 200 40 CR 5C Recreational Trail Enhancements (Fossil Creek Trail) 250 Removed from project list at October 11 session due to dedicated funding 41 CR 5D Recreational Trail Enhancements (Power Trail) 900 Removed from project list at October 11 session due to dedicated funding ID ALL VALUES ARE IN THOUSANDS 12/9/2014 Version 23 Attachment 1 2 42 SC 3 Land for Police Maintenance Facility 1,000 5 20 43 ENV 3C Downtown Poudre River Enhancements (Linden Lincoln Project) 3,200 44 T 2 Realigned Vine Drive I - College to Lemay 10,000 30 120 45 T 7 College Midtown Transportation Plan Implementation Fund 8,000 33 132 46 CNL 2A Pedestrian/ADA Enhancement: Safe Routes to Everywhere 10,000 25 100 This enhancement was proposed to decrease compliance timeline. 47 T 5A Lincoln Avenue Improvements (Bridge) 5,000 48 CR 9A Prospect and Timberline - Gateway Enhancements (Purchase) 250 3 12 49 CR 9B Prospect and Timberline - Gateway Enhancements (Design) 750 3 12 50 SC 1 Regional Training Facility 10,500 320 1,280 51 SC 5 Campus West Policing Substation 460 486 1,944 52 ECH 4 Mason Street Enhancement 4,000 9 36 53 ECH 2 Quiet Zone Implementation I-(Downtown /CSU - 16 crossings + 2 ped crossings) 1,500 160 640 54 ECH 3 Quiet Zone Implementation II- (Drake to Trilby - 5 crossings) 1,250 50 200 55 CNL 5 Sustainable Child Care Center 2,000 825 3,300 56 CR 5E Recreational Trail Enhancements (Canal Trail) 500 Removed from project list at October 11 session due to dedicated funding 57 CR 5F Recreational Trail Enhancements (Overland Road Trail) 3,000 Removed from project list at October 11 session due to dedicated funding 58 CR 5G Recreational Trail Enhancements (Misc. Restrooms, Rest stops, Drinking Fountains) 350 Removed from project list at October 11 session due to dedicated funding 59 T 14 Southwest Annexation Road Improvements Fund 5,000 60 ECH 9 Downtown Maintenance Shop 3,500 61 T 4 West LaPorte Avenue Improvements - Impala Drive to Taft Hill Road 2,500 8 30 62 CR 1C Southeast Community Center/ Leisure and Competitive Pool 4,500 63 CR 8 Velo and Fitness Park 2,100 180 720 64 HPG 1 Parking Garage & Retail Space 10,500 300 1,200 65 ECH 5 East Mulberry Corridor planning, prelim design, and ROW purchase 300 Potential 5 Year $0.25 Tax Row # Page # Project Capital Annual O&M Notes 67 T 1 Vine & Lemay Grade Separated Crossing Design, ROW and Construct 25,000 68 T 3 South Timberline Road Improvements 12,000 69 Subtotal 37,000 ID ALL VALUES ARE IN THOUSANDS 12/9/2014 Version 23 CULTURE AND RECREATION CR1 PROJECT TITLE: Southeast Community Center and Pool ESTIMATED PROJECT COST: $14M ESTIMATED ANNUAL O&M: $230K Service Area: Community Services Department: Recreation and Cultural Services Project Location: Fossil Creek Community Park Project Description: A unique Community Center focused on innovation, technology, art, recreation and the creative process. The multifaceted complex will include a variety of well-equipped rooms for residents to gather, explore and share ideas. The Center will be a place for the community to try-out new technologies like 3-D printers, laser cutters, robotics and emerging software. It will be a true makerspace with power tools, drill presses, saws, routers, even welding. The Center will include a multi-functional performance space (an ideatorium) where community members can learn and express their creativity through performances, concerts and lectures. The Center will include a social area where local foods and even experimental beverages could be on the menu. The Center will focus on wellness with fitness rooms for classes from Aikido to Zumba and by connecting to the beautiful surrounding park environment. The Center will also have a large outdoor leisure pool with water slides, sprays and jets, decks, a lazy river and open swimming area. Why is this Project Needed? Southeast Fort Collins is rapidly growing but it does not have a community center. To improve their quality of life and to create a sense of place, citizens in the southeast need an interesting, creative, convenient place to gather, socialize, create and collaborate. This center, in combination with the surrounding park, will define this rapidly growing area as the epicenter for community-based ideas and innovation. Including an outdoor leisure pool takes the project to a new level by providing exciting, fun and healthy aquatic recreation for the whole family. CR3 PROJECT TITLE: Renovation of the Historic Carnegie Building ESTIMATED PROJECT COST: $2M ESTIMATED ANNUAL O&M: $10K Service Area: Community Services Department: Cultural Services Project Location: 200 Mathews Street Project Description: This project renovates the historic 1904 Carnegie library building to enhance its use as a Community Creative Center. The creative center concept includes flexible inexpensive spaces for the community to rent to support their creative endeavors. Once fully renovated, the building will house galleries, performance space, classrooms, innovative maker and idea spaces, and a digital class room. The building is currently offering rental gallery space and serving as the home for Beet Street. Fort Collins Public Access Network (FCPAN) will create a studio in the basement level of the building, allowing more of the community to access the cable station. Cultural Services partnered with Beet Street to secure a $100,000 National Endowment for the Arts Our Town grant in 2011. The grant included funds to work with an architect to develop a Attachment 2 1 | Page 12/9/2014 CULTURE AND RECREATION space use program for transitioning the building to the new community creative center. In addition, in 2012, A&E Design Associates surveyed the building to estimate historic restoration needs. The two plans call for the following work to be completed:  Uncover and restore windows  Add a main staircase to connect all three floors  Add restrooms to the main level  Create tech-rich think-space/lounge  Renovate the lower level to accommodate a studio, wet and dry classrooms, and gallery  Enlarge and outfit the lower level classroom with digital technology for live-streaming  Restore interior floors and finishes, improve HVAC, upgrade electrical, consolidate storage, and fix foundation drainage issues. Why is this project needed? The historic 1904 Carnegie building is one of the oldest, continuously operating public buildings in Fort Collins, designated a local Historic Landmark District by Resolution in 1978. The building is also a contributing structure to the Laurel School Historic District. The building is now the home of the Community Creative Center but it requires renovation and improvements to serve its new purpose, address long-term access and infrastructure issues, and to protect and stabilize this historic treasure. The Community Creative Center at the Carnegie Building is implementing the creative and innovation center concept that supports creative endeavors, provides maker and idea space, and serves as a hub for the integration and collaboration of innovation and creativity. This project will activate this prominent historic landmark building, the courtyard and the surrounding park. Additional Details: The estimated cost for this work is $2M: $1.47 for renovations and infrastructure improvements and $430,000 for historic restoration. It is possible to apply for a grant from the State Historic Fund up to $200,000 towards historic restoration components of the overall project. CR4 PROJECT TITLE: Completion of the Gardens on Spring Creek Visitor’s Center ESTIMATED PROJECT COST: $2M (Total project is $3M/ $1M will be private fundraising) ESTIMATED ANNUAL O&M: $40K Service Area: Community Services Department/Program: Parks Project Location: At the Gardens on Spring Creek Project Description: This project completes the Visitor’s Center at the Gardens on Spring Creek. The Visitor’s Center currently contains a production greenhouse, Evelyn Clark Classroom, a lobby and offices. The envisioned building contains a conservatory, large meeting room, observation tower, new entryway with gift shop, a small café, and additional office space. These additions will double the square footage of the facility. Why is this Project Needed? The Gardens on Spring Creek, thanks to funding from Building Community Choices and countless donations, opened in May 2004 with a mission to improve the lives of people and foster environmental stewardship through horticulture. The Gardens has become a destination for residents and tourists alike, with visitation increasing from 1,634 in 2004 to 60,000 in 2013. This 2 | Page 12/9/2014 CULTURE AND RECREATION increase is due to the addition of several large and popular gardens, the availability of high- quality educational programs for youth and adults, and a variety of special events for the community. The Gardens has 180 active volunteers and 25 partnerships with local non-profits and educational organizations. This project will build on The Gardens’ remarkable success and will establish the facility as a “must- see” destination for generations to come. The project will also enable The Gardens to significantly increase revenue through visitor fees and rental of the meeting room and conservatory. Gardens staff, in cooperation with the Friends of the Gardens on Spring Creek Board of Directors, is currently fundraising for the remainder of the Visitor’s Center expansion and the completion of the remaining gardens. CR7 PROJECT TITLE: Preserving Our Heritage: City Park Train, Club Tico Renovations, Fire Museum ESTIMATED PROJECT COST: $1M ESTIMATED ANNUAL O&M: $25K Service Area: Community Services and PFA Department/Program: Recreation and PFA Project Location: City Park and the Car Barn at Cherry and Howes Street Project Descriptions: Option A: City Park Train Cost: $350K/ O&M: 25K This project brings back the much loved City Park train in a new, expanded location east of the playground. Option B: Club Tico Renovation Cost: $250K This project completes the renovation of Club Tico at City Park by renovating the kitchen and restrooms and adding a second story deck on the south side of the facility. Option C: Creation of a Fire Museum at the Historic Car Barn Cost: $400K The volunteer supported Fire Museum would showcase historic fire engines, uniforms and equipment while telling the fascinating story of fire-fighting in Fort Collins. Why is this Project Needed? Option A: The historic train at City Park sadly reached the end of the tracks in 2011because it could no longer be operated safely. A new train on an expanded track will restore this treasured City Park experience. Option B: Club Tico is a popular dance and event venue but has been showing its age. Through donations and City support much of the facility has been renovated, including the stage and dance floor. This historic community center will realize its old glory through this final phase of restoration. It will also become a sought-after event venue once the kitchen and restrooms are upgraded. Option C: Fort Collins has a rich history of fire-fighting but we don’t have a fire museum. The Fire Museum project will showcase a wonderful collection of fire-fighting memorabilia in a great building and enrich the cultural landscape by telling the story of fire-fighting in our community. 3 | Page 12/9/2014 ECONOMIC HEALTH ECH6 PROJECT TITLE: Linden Street Renovations Design & Construction ESTIMATED PROJECT COST: $3M ESTIMATED ANNUAL O&M: $12K Service Area: PDT/CMO Department/Program: Engineering, CMO Project Location: Linden Street, Walnut to Jefferson Project Description: This project will fund the final design and construction of the preferred options for the renovation of this important downtown block of Linden Street. The Downtown Development Authority has funded the conceptual design which will be completed in 2014. This block is one of the city’s most programmed streets, hosting festivals, events and concerts throughout the year. While the streetscape is adequate, this block is primarily a place for cars. This project envisions the possibility of a more pedestrian-oriented space in the heart of downtown. Options include a rethinking of the street to make it more like an urban plaza from building face to building face. This concept would reconstruct the entire block into a brick street that could be closed off for special events but still allow vehicle parking in non-event days. As the conceptual design for this project progresses, the design concepts will become more clear and should be defined by the end of 2014. Note: BFO Offer 1.19 is similar. Why is this Project Needed? This project will create a more pedestrian friendly environment extending Old Town north along Linden Street. This project will help connect Old Town to the developing River District. ECH11 PROJECT TITLE: Community Marketplace ESTIMATED PROJECT COST: $3.5M This number anticipates a 50/50 public/private match, spearheaded by key community stakeholder organizations including the Northern Colorado Food Cluster. The marketplace would be operated by a non-profit. ESTIMATED ANNUAL O&M: $0 Service Area: Sustainability Services Department/Program: Economic Health Project Location: Block 33, south of the City parking lot along Howes. Project Description: The Community Marketplace project aims to create a multipurpose public facility, which will enhance and support our local food system. The Marketplace may include space to operate a year-round farmer’s market, and other supplementary components, including an artisanal bakery, a local butcher, a community kitchen, a winter greenhouse, and a minimal processing facility. The Marketplace would operate with permanent tenants open year-round for normal business hours, and additional open space for temporary stalls, flexible programming, and larger events. The intent is for the project to become a focal point for local food production in Fort Collins, and 4 | Page 12/9/2014 ECONOMIC HEALTH increase the availability of Northern Colorado products, serving as a primary economic driver. Why is this Project Needed? The Community Marketplace has been a past priority of the Fort Collins DDA. However, it has been deprioritized due to funding limitations. The project would also help to drive the supply of locally produced food by providing an additional venue for the sale of these products. Additional Details: A feasibility study was performed on the concept by the DDA in 2011. The results of the study indicate that Fort Collins can support a Community Marketplace as long as it includes an anchor rent-paying tenant. The study also found that Fort Collins could reasonably expect to capture $11.5 million a year in fresh food sales at a centralized Marketplace. Additional details can be provided from the Feasibility Study as requested. ECH7 PROJECT TITLE: Willow Street Improvements – College Avenue to Linden Street/ Design & Construction ESTIMATED PROJECT COST: $3.5M ESTIMATED ANNUAL O&M: $11K Service Area: Planning, Development, & Transportation Department/Program: Engineering Project Location: Willow Street Improvements from College Avenue to Linden Street Avenue Project Description: This project would fund final design and construction of improvements to Willow Street as identified in the River District Infrastructure Plan. This project is envisioned to extend vibrant, pedestrian- oriented activities to the River District. Wide sidewalks, on-street parking, urban design, landscaping and potentially a linear water feature are planned. BFO offer 1.11 is for final design. Why is this Project Needed? Willow Street lacks pedestrian and parking facilities to support current and planned adjacent land uses. These improvements are part of a larger River District Plan. Other Related Projects: Lincoln Boulevard Improvements, Jefferson Street Improvements 5 | Page 12/9/2014 ENVIRONMENTAL HEALTH ENV3 PROJECT TITLE: Downtown Poudre River Enhancements ESTIMATED PROJECT COST: $4M ESTIMATED ANNUAL O&M: $50K Service Area: Community Services Department/Program: Natural Areas and PP&D Project Location: Poudre River between Shields Street and Lincoln Avenue Project Descriptions: Option A: Coy Reach Cost: $4M/ O&M: 50K The Coy diversion project (near the Power Plant building) involves modifying or removing the Coy diversion structure, creating a whitewater park with viewing/picnic areas, improving access to the river, enhancing the river’s habitat and beauty, and adding a pedestrian bridge over the river east of College. The project also lowers the river channel to improve flood mitigation and prevent flooding of College Avenue. Why is this Project Needed? The Poudre River is an elemental part of Fort Collins yet it has never been integrated into the fabric of our community. This project will connect the community to the river. The project will significantly improve the river ecosystem and help restore the river’s natural beauty. River recreation will be greatly enhanced by trail improvements, play areas, river access points, picnic areas and a whitewater park. The project will also help protect life and property by improving management of storm water. Other Related Projects: Woodward natural area and river improvements; Sterling and McMurry Ponds river improvements; Shields bridge replacement (County). Additional Details: The Coy diversion project is estimated to cost $7.5 M, with $4M from the capital improvement tax, $1M from the Stormwater Utility, $1M from Natural Areas, and $1.5 M from fund raising efforts. 6 | Page 12/9/2014 TRANSPORTATION T5 PROJECT TITLE: Lincoln Avenue Improvements Design & Construction ESTIMATED PROJECT COST: $8M ESTIMATED ANNUAL O&M: $36K Service Area: Planning, Development, & Transportation Department/Program: Engineering Project Location: Lincoln Avenue between Jefferson Street and Lemay Avenue Project Descriptions: Option B: First Phase/First Street to Lemay Improvements Cost: $8M This project would fund the design and construction of improvements to Lincoln Avenue from Jefferson Street to Lemay Avenue excluding any bridge improvements and would represent the level of improvement identified in the Lincoln Corridor Plan for roadway, bike/ped, landscape, and urban design enhancements. This funding level represents the minimal improvement level specified by City Council at the time of the Lincoln Corridor Plan adoption. Why is this Project Needed? Lincoln Avenue currently lacks sidewalks, curb and gutter, left turn lanes and enhancements such as landscaping and urban design. The adjacent land uses are redeveloping, especially the south side (Woodward). Lincoln is an important connection between downtown, the River District, and the East Mulberry area. It is designated as a 2-lane arterial in the Master Street Plan (which is an Appendix to the Transportation Master Plan), but instead of simply applying the standard for 2- lane arterials, other plans (City Plan, 2013 Streetscape Standards) designated it as a special corridor warranting its own plan. The design laid out in the Lincoln Corridor Plan supports the vision areas laid out in the Transportation Master Plan. Additional Details: Note: BFO Offer 17.2 is for neighborhood projects in the plan area identified during the Corridor plan. T6 PROJECT TITLE: Jefferson Street Improvements-College Avenue to Lincoln Avenue/Mountain Avenue ESTIMATED PROJECT COST: $6M ESTIMATED ANNUAL O&M: $24K Service Area: Planning, Development, & Transportation Department/Program: Engineering Project Location: Jefferson Street Improvements from College Ave to Lincoln Avenue/Mountain Avenue Project Description: This project would implement modifications to Jefferson Street identified in the Jefferson Street Corridor Plan. These include a change to a three-lane cross section, improvements to the traditional intersections at Linden and Lincoln, pedestrian improvements, urban design, and a landscaped median. Why is this Project Needed? Jefferson Street is a narrow four lane street and carries significant truck traffic. The intent of this project 7 | Page 12/9/2014 TRANSPORTATION is to create a street more consistent with a downtown urban character while maintaining the function of the road as a State Highway and truck route. The design is the result of a detailed and collaborative corridor study completed by the City, the Downtown Development Authority (DDA), and the Colorado Department of Transportation (CDOT). A key goal of the design is to remove the perceived barrier the existing street causes between Old Town and the emerging River District. Additional Details: The final design of this project is currently funded through a federal grant. The project is planned to be in collaboration with utilities to replace and upgrade sewer, stormwater and water infrastructure. Other Related Projects: Lincoln Boulevard Improvements, Willow Street Improvements T9 PROJECT TITLE: Bicycle/Pedestrian Grade-Separated Crossings Fund ESTIMATED PROJECT COST: $6M ESTIMATED ANNUAL O&M: $ 30K Service Area: Planning, Development, & Transportation Department/Program: FC Moves/ Engineering/Park Planning and Development Project Location: Fort Collins Project Description: This project provides dedicated funding to design and construct high-priority bicycle and pedestrian under- and over-passes. Amount is sufficient to build approximates 4-5 crossings in the life of the tax. • These projects are good candidates for cooperative/partnership projects (CSU, CDOT, Larimer County, Railroads, etc.) and the funds are able to provide matching funds for leveraging opportunities for grants and partnership projects. • These projects are popular with residents and frequently requested. They improve the safety and experience of biking and walking and improve safety and operation of the roadways as well. • Potential projects could include the Power Trail at East Harmony Road, Shields Street west of the CSU Main Campus, Prospect Road near Center Avenue, major arterial crossings by the Mason Trail, and other crossings identified in the Harmony Road Enhanced Travel Corridor Plan and the Midtown in Motion College Avenue Transportation Study. • New grade separations in Fort Collins have a wide range of cost (between $750k and $4M) due to various factors including type of crossing (overpass, underpass), utility conflicts and relocations, flood plain issues, groundwater, railroad issues, etc. • Funding can also be maximized by identifying locations where existing projects or road reconstruction can be modified to include a grade separation for bikes and pedestrians. The intent of this project will be to build the most cost-effective crossings at the highest demand locations. Why is this Project Needed? Grade separated crossings allow bicyclists and pedestrians in high use areas to cross major roadways safely and efficiently. 8 | Page 12/9/2014 TRANSPORTATION T11 Continuation of Building on Basics Project PROJECT TITLE: Transfort Bus Fleet Replacement ESTIMATED PROJECT COST: Total $2M ESTIMATED ANNUAL O&M: 0 Service Area: Planning, Development, & Transportation Department/Program: Transfort Project Location: Fort Collins Project Description: The funding of this project would provide the 20% local match needed to replace 20 heavy duty buses over the next 10 years. This 20% or, $2 million, would be leveraged to receive $8 million of federal and state grant funding. Over the next ten years three-quarters of Transfort’s fleet will be beyond its useful life. The replacement of buses beyond their useful life will reduce maintenance expenses and ensure reliable service to the Transfort customer. Why is this Project Needed? With local match funding in place, Transfort can apply for federal funding to procure the needed vehicles. Oftentimes, federal grants require that local funds are already in place prior to the funding award and by ensuring that Transfort has access to local match funding, staff is free to seek out any and all grant opportunities. In turn, by not allowing Transfort’s fleet of vehicles to surpass its useful service life, the City of Fort Collins will reduce preventive maintenance costs by approximately $30,000 per vehicle per year or $1.5M over the span of the project. Additional Details: This project is requesting $4.2M over the next ten years to leverage local match funding for $16.8M in federal grant funding to purchase 50 replacement heavy duty vehicles. The project has the added benefit of saving in excess of $1.5M in preventive maintenance costs that would be incurred otherwise. T12 Continuation of Building on Basics Project PROJECT TITLE: Arterial Intersection Improvements Fund ESTIMATED PROJECT COST: Total $6M ($600K/year) ESTIMATED ANNUAL O&M: $2K Service Area: Planning, Development, & Transportation Department/Program: Engineering Project Location: Fort Collins Project Description: This project provides funding for improvements to arterial intersections prioritized by congestion and safety improvements for all travel modes. • Previous funding for these projects was highly successful as matching funds for grants and the dollars were doubled over the life of the tax. • Provides additional benefits with landscaping and urban design improvements (such as Harmony and College), bicycle and pedestrian facility improvements, and improved pavement condition. • The fund is a direct and effective way to address citizen concerns regarding worsening traffic, congestion and roadway safety. 9 | Page 12/9/2014 TRANSPORTATION This project creates a funding source to address the City’s highest priority safety and congestion problems at arterial intersections. Why is this Project Needed? A comprehensive Arterial Intersection Prioritization Study was completed in 2011 and identifies key improvement locations. Some of these projects were completed with BOB funding; this project would continue funding for improvements. Additional Details: These projects have historically been very competitive in the Federal Grant programs. Leveraging of similar funds in the previous Building on Basics tax measure more than doubled the available dollars. T28 PROJECT TITLE: Arterial Roadway Improvements Fund ESTIMATED PROJECT COST: Total $8M ESTIMATED ANNUAL O&M: $3K Service Area: Planning, Development, & Transportation Department/Program: Engineering Project Location: Fort Collins Project Description: This project would create a funding source to address the City’s highest priority safety, mobility, and congestion problems on arterial roadways. These will be high priority arterial roadway projects identified in the City’s Transportation Capital Improvement Plan, Corridor, Master, and Subarea plans. Example projects could include: Prospect between Shields and Lemay; Lincoln between Jefferson and Lemay; College in Mid-Town. Design for these projects would be based upon approved corridor plans and City standards. They typically include improvements for all modes of transportation, urban design features, and landscaping. Why is this Project Needed? The City has identified a number of high priority arterial roadway projects that are currently unfunded. Additional Details: A typical arterial roadway reconstruction can cost $8-12M per mile. These funds would be available to leverage other eligible funding sources including grants, developer contributions, partnership opportunities, and other agency funds. At this funding level, this amount could partially fund 2-3 arterial road improvement projects. This offer provides the flexibility to react to present and emerging needs, and opportunities as they arise. 10 | Page 12/9/2014 COMMUNITY AND NEIGHBORHOOD LIVABILTY CNL1 PROJECT TITLE: Housing Affordability Capital Fund ESTIMATED PROJECT COST: $4M ESTIMATED ANNUAL O&M: Estimated Annual O&M: Operations and management will be incorporated in the development budget of housing developed with these funds. Service Area: Sustainability Services Department/Program: Social Sustainability Project Location: TBD Project Description: This fund would provide a revenue source for the capital costs of development or rehabilitation of one or more housing projects designated specifically for low income individuals and families. These funds could be distributed through grants, contracts, or matching funds to assist in meeting the housing needs for low income residents of our community. The $4Million contribution may be combined with other sources of income directly related to housing affordability including potentially funds from the Housing Bank, licensing fees, Affordable Housing fund etc. An example of how these funds might be used is a project currently being discussed by the Fort Collins Housing Authority which would result in the construction of 60 units of permanent supportive housing for current homeless individuals. The total cost of this project is $12,485,584 and the City’s funds could be used to leverage other funding such as tax credit financing to complete this project if the other funds become available. Supportive housing is an innovative and proven solution to serve people who would not be able to stay housed without a wide range of supportive services. Affordable housing is combined with services to help people facing complex challenges to live with stability, autonomy and dignity. Supportive housing improves housing stability, employment, mental and physical health and reduces active substance use. People in supportive housing live more stable and productive lives. Housing stability and supportive services for these individuals has been proven to reduce other community costs in such areas as reduced emergency room use and reduced response needed by fire and police. These funds would support the capital construction of such possible programs, while local nonprofits would incur all Operations and Maintenance expenses. Why is this Project Needed? Principle LIV 7 in City Plan states that the City envisions that “a variety of housing types and densities for all income levels shall be available throughout the Growth Management Area.” Inclusion of this project in the Building on Basics 2 package will assist in bringing this goal to fruition. Studies estimate there are over 3,000 homeless people in Larimer County. At least 250 of these individuals are chronically homeless, and nearly 1,000 are school-aged children. Our community lacks a sufficient supply of affordable housing. In June 2011 the Colorado Division of Housing released a report on rent burdened households in Colorado. At that time, there were less than 22,000 affordable rental units in Larimer County for households earning $25,000 or less per year and more than twice as many households (roughly 45,700) at that income level. Nearly 54% of renters spend more than 30% of their income for housing. Larimer County is cited as the third most rent-burdened county in the state. When housing costs rise over 30% of a household’s income, the possibility of becoming homeless significantly increases. 11 | Page 12/9/2014 COMMUNITY AND NEIGHBORHOOD LIVABILTY The Murphy Center for Hope provided services to more than 1,700 (unduplicated) people in the last year and regularly provides services to more than 150 homeless or near homeless persons per day. Additionally, The FCHA’s waiting list currently has over 1,900 families/individuals waiting for affordable housing. Other Related Projects: Redtail Ponds is a 60-unit apartment community that will provide 40 units of permanent supportive housing for homeless adults with one or more disability and on-site services ranging from job training to case management. An additional 20 units will provide housing for low income individuals. The Single Room Occupancy (SRO) program provides 27 rooms for homeless individuals in Fort Collins. Resident Managers live on-site and provide a variety of programming to assist residents transitioning from homelessness to a more stable living arrangement. Referrals are made from Catholic Charities Mission and post shelter counseling is provided. Additional Funding Details: The financing for the development and rehabilitation of housing for the homeless is complicated. It is critical for the developer (such as the Fort Collins Housing Authority) to be able to demonstrate community commitment to a project to secure additional funders. This fund will demonstrate that commitment and streamline the development of severely needed housing for the City’s homeless population. CNL2- Safe Routes to Everywhere • Provides on-going funds to design and build pedestrian, bicycle, and transit stop improvements citywide. • Provides annual funds in the amounts of: $1.4M for pedestrian improvements; $500K for bicycle improvements; and $100K for transit stop improvements. • Provides funding for implementation of the Bicycle Master Plan. • Provides funding to eliminate gaps in the pedestrian network and improve ADA compliance. • Sidewalk program is based on $134M in needs identified in a 2013 comprehensive assessment of pedestrian facilities in Fort Collins. CNL2-A PROJECT TITLE: Pedestrian Sidewalk and ADA Compliance Program - Safe Routes to Everywhere ESTIMATED PROJECT COST: $14M ($1.4M/year) ESTIMATED ANNUAL O&M: $17.5K Service Area: Planning, Development, & Transportation Department/Program: FCMoves/Engineering Project Location: Citywide Project Description: The Pedestrian Sidewalk and ADA Compliance Program is based on the 2013 assessment and the program cost has been quantified into a 52-year program. With the $134 million Pedestrian Sidewalk and ADA Compliance Program needs, a sustainable and predictable revenue source is recommended to implement the overall cost of construction of a 52-year compliance program. 12 | Page 12/9/2014 COMMUNITY AND NEIGHBORHOOD LIVABILTY Projected costs will change over time due to inflation, construction of sidewalks by adjacent property owners and private development, and project scheduling based on construction of sidewalks by other City departments (Streets and Engineering Capital Projects Departments). Why is this Project Needed? • The City is not in compliance with the Americans with Disabilities Act. The Pedestrian Plan is unfunded. • Without funding for the required pedestrian facilities, the City of Fort Collins will continue to be in violation of ADA without a proactive effort toward compliance. Noncompliance puts the City at risk of losing federal grant funds. Other Related Projects: This project is part of a package (bicycle, pedestrian, and transit improvements) that provides funding to implement a suite of multimodal infrastructure improvements intended to support a wide array of transportation choices. Through a combined approach intended to provide safe routes to all destinations, these funds would construct pedestrian improvements for safety and Americans with Disabilities Act (ADA) compliance, integrated bus stop facilities, and bicycle network connections. Additional Funding Details: Staff will continually seek opportunities to leverage this limited local funding source to receive additional funding from state and federal grants to advance the improvements of the sidewalks, bus stops and bike facilities. CNL2-B PROJECT TITLE: Bicycle Infrastructure Improvements - Safe Routes to Everywhere ESTIMATED PROJECT COST: $5M ($500k/year) ESTIMATED ANNUAL O&M: $6.3K Service Area: Planning, Development, & Transportation Department/Program: FCMoves/Engineering Project Location: City-wide Project Description: The 2014 Bicycle Master Plan is in the final stages of development, with anticipated completion in the 4th quarter of 2014. This plan will identify specific bicycle infrastructure improvements that will contribute to a continuous, low-stress network. This package provides funding to be used toward stand-alone bicycle infrastructure projects as well as add-on elements to other projects that complete or enhance the City’s bicycle network. Projects will enhance safety, provide wayfinding, and improve comfort for bicyclists. Note: BFO Offer 1.6 is similar. Why is this Project Needed? This program would be a continuation and expansion of the current Bicycle Master Plan implementation funding in the existing Building on Basics program. This annual, ongoing allocation allows the City to enhance bicycle facilities to create safer, more convenient, and comfortable network. As a Platinum Bicycle Friendly Community, Fort Collins has a national reputation as a premier city for Bicycling. Other Related Projects: This project is part of a package (bicycle, pedestrian, and transit improvements) that provides 13 | Page 12/9/2014 COMMUNITY AND NEIGHBORHOOD LIVABILTY funding to implement a suite of multimodal infrastructure improvements intended to support a wide array of transportation choices. Through a combined approach intended to provide safe routes to all destinations, these funds would construct pedestrian improvements for safety and Americans with Disabilities Act (ADA) compliance, integrated bus stop facilities, and bicycle network connections. Additional Funding Details: Staff will continually seek opportunities to leverage this limited local funding source to receive additional funding from state and federal grants to advance the improvements of the sidewalks, bus stops and bike facilities. CNL2-C PROJECT TITLE: Bus Stop Improvements -Safe Routes to Everywhere ESTIMATED PROJECT COST: $1M ($100K/year) ESTIMATED ANNUAL O&M: $1.3K Service Area: Planning, Development, & Transportation Department/Program: TransFort Project Location: Citywide Project Description: Currently there are more than 200 bus stops within the Transfort system that do not meet Americans with Disabilities Act (ADA) access requirements. This funding would allow Transfort to upgrade 10 bus stops per year to be ADA accessible and improve mobility options for disabled residents of Fort Collins. Other Related Projects: This project is part of a package (bicycle, pedestrian, and transit improvements) that provides funding to implement a suite of multimodal infrastructure improvements intended to support a wide array of transportation choices. Through a combined approach intended to provide safe routes to all destinations, these funds would construct pedestrian improvements for safety and ADA compliance, integrated bus stop facilities, and bicycle network connections. Additional Funding Details: Staff will continually seek opportunities to leverage this limited local funding source to receive additional funding from state and federal grants to advance the improvements of the sidewalks, bus stops and bike facilities. CNL6 PROJECT TITLE: Implementing Nature in the City ESTIMATED PROJECT COST: $3M ($330K/year) ESTIMATED ANNUAL O&M: $100K Service Area: Sustainability Services Department: Environmental Services Project Location: Throughout the City Project Description: Nature is all around us. Whether it’s a hawk Downtown or a butterfly in our schoolyard; the shade of a cottonwood tree or the tranquility of a flowing creek, nature is the air we breathe, the land 14 | Page 12/9/2014 COMMUNITY AND NEIGHBORHOOD LIVABILTY that surrounds us and the species that inhabit the land. As Fort Collins grows, we want to ensure that every resident is within a 10-minute walk to nature from their home or office. In 2014, Nature in the City developed a vision and strategic plan to incorporate nature into the City’s increasingly urban environment. To achieve this vision, this project will restore 20-30 sites and/or acquire 4-6 parcels to create a connected open space network accessible by all. • Restoration includes adapting stormwater ponds, ditches, streams, waterways, parks and other neighborhood open spaces to include spaces that provide habitat, therapeutic benefits, and opportunities to play. The City will partner with neighborhoods, businesses and other City departments, including Natural Areas, Parks and Stormwater, to achieve these goals. • Acquisition includes parcels that provide key links to the broader corridors of the City, whether for habitat or recreation, as well as linking to existing patches of open space. It will also include sites with high wildlife value or the potential to provide high value. Sites will be prioritized based on their ability to provide all residents access to nature within a 10- minute walk and their contribution to the overall open space network. Why is this Project Needed? The City is transitioning from a large, suburban town to a small, urban city with a projected 250,000 residents. As this happens, it is critical that we protect access to nature and the key open spaces that define our community. Natural spaces within our urban setting are valuable not only as habitats and for aesthetics, but they are also key to preserving quality of life, and the sense of place that makes Fort Collins unique. Sometimes those spaces will be a formal park, trail or Natural Area. Others might be an informal open space or the community garden in your neighborhood or the detention pond where you walk your dog. Even more important than the type of space are the experiences they offer residents. That means having nature nearby, opportunities for personal or family recreation, and a chance to escape from the urban environment, even just for a moment. This project supports land restoration and acquisition beyond the scope of the Open Space tax dollars priorities; additional capital dollars invested now would further this effort in a more timely manner. Other efforts that highlight the need for this effort include the following: • Preserving access to nature and the City’s sense of place is included in four chapters of the City’s Strategic Plan (Community and Neighborhood Livability, Culture and Recreation, Environmental Health, and Economic Health). • The Midtown Urban Design Plan calls for providing open spaces (both small and large) within each character district. • The Plug in to Nature study, by Larimer County, found that the biggest barrier for accessing nature is time. Providing nature closer to home allows people to spend their time experiencing nature, rather than traveling to it. • A California study of 3,000 teenagers found that they had a significantly lower Body Mass Index (BMI) when in close proximity to nature or open spaces. • A United Kingdom study of more than1,000 people concluded that moving to an area with green space will increase your mental health compared with those that move into an area lacking open space. Another study found positive psychological benefits from interacting in urban open space increased with species richness – in other words, the greater the variety of species in a particular area, the happier people are in that space. 15 | Page 12/9/2014 Capital Improvement Project List by Outcome Area Recommended List as of December 6, 2014 Community and Neighborhood Livability Affordable Housing Fun- $4M Pedestrian Sidewalk and ADA Compliance Program - Safe Routes to Everywhere -$14M Bicycle Infrastructure Improvements - Safe Routes to Everywhere - $5M Bus Stop Improvements -Safe Routes to Everywhere -$1M Implementing Nature in the City - $3M Transportation Bicycle/Pedestrian Grade-Separated Crossings Fund - $8M Transfort Bus Fleet Replacement - $2M Arterial Intersection Improvements Fund - $6M Lincoln Ave Improvements Design & Construction-First Street to Lemay - $8M Environmental Health Downtown Poudre River Enhancements- Coy Reach between Shields St and Lincoln Ave - $4M Culture and Recreation Southeast Community Center/Outdoor Pool - $14M Completion of the Gardens at the Gardens on Spring Creek - $2M Preserving Our Heritage: Option A: City Park Train - $350K/ O&M: 25K Option C: Creation of a Fire Museum at the Historic Car Barn - $400K Renovation of the Historic Carnegie Building - $2M Economic Health Linden Street Renovations Design & Construction/ Walnut to Jefferson - $2M Attachment 3 Capital Improvement Projects Under Consideration As of December 6, 2014 Transportation Arterial Roadway Improvements Fund - $8M Jefferson Street Improvements-College Ave to Lincoln Ave/Mountain Ave - $7.5M Economic Health Community Marketplace - $3.5M Willow Street Improvements/College Ave to Linden Street/ Design & Construction -$3.5M Culture and Recreation Preserving Our Heritage Option B: Club Tico Renovation - $250K