Loading...
HomeMy WebLinkAboutReport - Mail Packet - 11/18/2014 - City Manager�S Monthly Report - November 13, 2014November 13, 2014 ISSUES BEFORE COUNCIL Adoption of the 2015-2016 Budget and the Annual Appropriation Ordinance .........................2 Airport Annual Appropriation ...................................................................................................2 Utility Rate Ordinances..............................................................................................................2 Fall Competitive Process ...........................................................................................................2 Extension of Resolution 2014-005 Regarding Partnership with Larimer County and Use of Tax Increment Financing................................................................................................2 Electric Capacity Fee Clarification ............................................................................................3 URA 2014 Budget......................................................................................................................3 Smoking Ordinance Expansion (Part 2) ....................................................................................4 Housing Affordability Policy .....................................................................................................4 Homelessness Update on 2014 Strategies ..................................................................................4 2014 Bicycle Master Plan ..........................................................................................................5 Appropriating General Fund Reserves for Transfer to the URA for URA Reimbursements for the Prospect Station Project and Approving a Loan Agreement ..............5 Capital Improvement 2025 and Street Maintenance Program Tax Renewal Discussion ..........5 ECONOMY Fort Collins Sales and Use Tax ..................................................................................................5 CAPITAL PROJECTS Engineering Capital Projects ................................................................................................ 6-13 Utilities Capital Projects .................................................................................................... 14-22 COMMUNITY EVENTS ...........................................................................................................23 PUBLIC SAFETY UPDATE Fort Collins Police Services ............................................................................................... 24-25 Poudre Fire Authority ........................................................................................................ 26-28 BUILDING ACTIVITY ........................................................................................................ 29-35 2 ISSUES BEFORE COUNCIL November 18 Regular Meeting Adoption of the 2015-2016 Budget and the Annual Appropriation Ordinance  This is Second Reading of the City of Fort Collins 2015-16 Biennial Budget, as well as the 2015 City of Fort Collins annual budget appropriation and mill levy. Airport Annual Appropriation  This is Second Reading of the 2015 Fort Collins-Loveland Airport annual budget appropriation. Utility Rate Ordinances  This is Second Reading of rate ordinances; First Reading passed unanimously.  1.9% increase in electric revenues driven by higher generation costs.  3.0% increase in wastewater revenues driven by capital improvement plan. Fall Competitive Process  The Community Development Block Grant (CDBG) Commission held a meeting on Thursday, October 16 to make their funding recommendations to City Council. The City received six affordable housing proposals which totaled $2,007,792. The available funding amount was $721,000. Funding sources were HOME Investment Partnership (HOME) funds ($264,644), HOME Program Income ($143,311) and the City’s Affordable Housing Fund (AHF) ($313,047). In addition, the City had $14,785 of HOME Program Income designated for Planning and Administration.  The recommendations for funding are: o CARE Housing: Uniform Federal Accessibility Standards (UFAS) Accessibility. Request $127,356; recommendation is $0 (0% of request). o Fort Collins Housing Authority: Administrative Fee for the CDDT Program. Request $26,449; recommendation is $0 (0% of request). o Fort Collins Housing Authority: Tenant Based Rental Assistance (TBRA) for Community Dual Disorders Treatment (CDDT). Request $225,730; recommendation is $0 (0%). o Fort Collins Housing Authority: Village on Redwood. Request $1,500,000; recommendation is $592,745 (40% of request). o Loveland Housing Development Corp: Larimer Home Improvement Program. Request $85,000; recommendation is $85,000 (100% of request). o Neighbor to Neighbor: Coachlight Plaza Windows Phase 2. Request $43,257; recommendation is $43,257 (100% of request). Extension of Resolution 2014-005 Regarding Partnership with Larimer County and Use of Tax Increment Financing  Council passed resolution 2013-45 in May 2013. Section 4 of the resolution directs staff to “work cooperatively with the County….and with other municipalities….to develop an appropriate fiscal impact analysis model for evaluating financial impacts associated with the formation of tax increment financing districts and the annexation of property into the 3 city; and to complete this work by December 15, 2013.” Resolution 2014-005 extended the date to complete the work to December 15, 2014.  A team led by County Manager Linda Hoffman has developed a purpose and goals statement, developed a Request for Proposal and selected EPS as a consultant to help develop the “fiscal impact analysis model.” The current timeline anticipates completion in the summer/fall of 2015.  Staff is seeking a third extension to December 15, 2015 consistent with the project team’s timeline. Electric Capacity Fee Clarification  This is First Reading after postponement by City Council on October 7, 2014 (this discussion focused on outreach); Second Reading scheduled on December 2, 2014.  Two options for City Council’s consideration include: o 100% collected before construction; o 50% collected before construction / 50% before energizing system. GID No. 1 Annual Appropriation  This is Second Reading of the 2015 General Improvement District No. 1 annual budget appropriation and mill levy. First Reading was postponed until November 4 due to the late hour on October 21. Skyview GID Annual Appropriation  This is Second Reading of the 2015 General Improvement District No. 15 mill levy. First Reading was postponed until November 4 due to the late hour on October 21. URA 2014 Budget  Approval of annual URA Budget for North College, Prospect South and Foothills Tax Increment Financing (TIF) Districts. URA Foothills Reimbursement Budget Reallocation  Alberta has reimbursed the URA for expenses incurred (legal, consulting, etc.) associated with the Mall redevelopment project per the Agreement to Negotiate. URA North College Marketplace (NCMP) Reimbursement  NCMP has submitted a reimbursement request for remaining obligation for the “gateway” improvements, as well as the obligations within the approved settlement agreement. This represents the final NCMP payment and is consistent with the executed Redevelopment Agreement. Approving a Loan from the City to the URA  Prospect Station is getting ready to submit for reimbursement and the URA agreed to reimburse half the total obligation with a lump sum payment ($247K), which requires the URA to take a loan from the City. The remaining obligation will be satisfied as TIF revenues are collected. This approval is contingent upon City Council approval, which is required by ordinance. 4 November 25 Work Session Smoking Ordinance Expansion (Part 2)  Staff will present potential options for discussion regarding further expansions to the City’s Smoking Ordinance. The expansion options will be in three main areas: 1) Old Town Square/Downtown Area 2) Public Events 3) Parks, Trails, and Natural Areas (also City Facilities)  Additionally, staff will provide background and information gained from several targeted outreach efforts that occurred over the summer. The targeted outreach efforts included: o Downtown Businesses o Downtown General Public o Downtown Development Authority o Parks Users o Public Events Patrons Housing Affordability Policy  The purpose of this item is for Council to review recommendations from the Housing Affordability Policy Study that staff and consultants have been working on since January.  Council will be asked to provide staff direction on the prioritization and implementation of selected strategies.  Council will be asked for policy guidance on short and longer term objectives.  Council will be provided with information about why certain regulatory options are not being recommended. Homelessness Update on 2014 Strategies  Social Sustainability staff continue to work on the issues of homelessness. The following activities are occurring in November: o staff has been researching and compiling comparative approaches to homelessness based on other communities in the United States; o Deputy City Manager Jeff Mihelich, Sustainability Services Director Bruce Hendee, and Police Lieutenant Jim Byrne visited Eugene Oregon to learn about strategies being used in this community; o staff will be meeting with City Council in November to review findings and discuss potential actions and policies regarding homelessness; o staff is bringing forward on November 12 an emergency ordinance to allow emergency shelter for homeless women from November through March. Catholic Charities and Fort Collins Rescue Mission are anticipating accommodating homeless men; o staff is working with Homeward 2020 to develop a summit on homelessness in January with various non-profit service agencies, the faith community and the business community; o Examine the results of 2014 January and Summer Point in Time Counts. 5 December 2 Regular Meeting 2014 Bicycle Master Plan  Staff is requesting that City Council consider adoption of the 2014 Bicycle Master Plan.  Staff initiated the development of the Bicycle Master Plan in October 2013 and, through extensive public outreach, has developed a final draft plan.  The final plan includes goals and strategies for achieving a world-class city for bicycling, where people of all ages and abilities have access to a comfortable, safe and connected network of bicycle facilities, and where bicycling is an integral part of daily life and the local cultural experience.  The final plan includes recommendations for a 2020 low-stress bicycle network and long term bicycle network, bicycle facility design and wayfinding guidelines, bicycle programs and policies, and an implementation approach. Appropriating General Fund Reserves for Transfer to the URA for URA Reimbursements for the Prospect Station Project and Approving a Loan Agreement  Prospect Station is getting ready to submit for reimbursement and the URA agreed to reimburse half the total obligation with a lump sum payment ($247K), which requires the URA to take a loan from the City. The remaining obligation will be satisfied as TIF revenues are collected. December 9 Work Session Capital Improvement 2025 and Street Maintenance Program Tax Renewal  Staff will present a more refined and narrowed list of potential projects for inclusion in a capital improvement tax renewal program. The goal of the discussion is to get Council direction on a preferred project package.  Staff will also provide a recommendation and seek Council direction on the term of the Street Maintenance tax renewal. ECONOMY FORT COLLINS SALES AND USE TAX COLLECTIONS September 2014 Sales tax collections increased 9.3% Use tax collections excluding rebates increased 77.2% Sales and use tax collections excluding rebates increased 19.5% 2014 YTD Sales tax collections increased 7.3% Use tax collections excluding rebates increased 32.2% Sales and use tax collections excluding rebates increased 11.4% 6 CAPITAL PROJECTS (new information noted in blue text) ENGINEERING CITYWIDE PEDESTRIAN ACCESS PROJECT Funding Source: KFCG Funds Estimated Project Budget: $450,000 Status: On Budget, On Schedule  The City of Fort Collins Pedestrian Plan addresses citywide pedestrian needs and is a data-driven approach based on the importance of safe, sustainable walking within City limits. It, however, lacks comprehensive condition data for the City’s sidewalk system. Prior to the beginning of the Pedestrian Needs Assessment project, there was not an inventory of existing sidewalks or sidewalk deficiencies. This project provides a complete City sidewalk inventory, identifies sidewalk inadequacies, and identifies inadequate handicap accessibilities according to Americans with Disabilities Act (ADA) requirements.  Data collection has been completed with approximately 540 street miles of sidewalk assessed and inventoried at this time.  37,741 accessible ramps have been identified as acceptable, substandard, or missing in accordance with the ADA requirements.  Staff has implemented a methodology and analysis program used to prioritize pedestrian projects. This program takes into account a variety of factors such as, but not limited to, demand, corridor function, and high priority areas. o Current projects: V&S Landscaping is working on the raised boardwalk along Jackson Street. Work to be complete by the middle of November. Vogel has begun work along the east side of Lemay north of Drake. In addition, Vogel completed work along Boardwalk at the intersection of JFK and was able to complete two missing sidewalk projects near Avery Park along Clearview and Castlerock. Banner Concrete completed the concrete repairs for Utilities and pedestrian improvements at the intersection of Mulberry and College.  Staff has identified approximately 21 projects for 2014.  Prioritization Model is complete and has been posted to the engineering website: http://www.fcgov.com/engineering/pedneeds.php.  Staff is continuing to collect and update data from projects and developments that occurred in 2013 and 2014.  Staff is implementing a project list for 2015. 7 MULBERRY BRIDGE (SH 14) AT THE POUDRE RIVER ENHANCEMENTS Funding Source: City of Fort Collins Estimate Project Budget: $750,000 Status: On Budget, On Schedule  The Colorado Department of Transportation (CDOT) is replacing the Mulberry Bridge (State Highway 14) over Poudre River Bridge starting in the fall of 2014. Construction was delayed due to the September 2013 flood.  Due to the construction, eastbound traffic on Mulberry will be detoured for the duration of construction.  CDOT has initiated the project. All detours are active. The City continues to work with CDOT to monitor the detours, making adjustments as needed. The City is also working with CDOT to ensure appropriate levels of outreach and messaging is provided to the public.  The City is working with CDOT to add city-funded enhancements to the bridge including decorative railings, landscaping and urban design features. WEST MULBERRY BRIDGE REPLACEMENT DESIGN Funding Source: Colorado Off System Bridge Program (BRO) Funds and KFCG 2011 Estimated Project Budget: $1.1M Status: On Budget, On Schedule  The goal of the project is to replace the existing structurally deficient bridge with a new bridge that meets the current standards.  The posted weight limit on this bridge precludes the passage of emergency vehicles from the nearby fire station.  In December 2011, the City received a grant for $700,000 in Colorado Off System Bridge Program (BRO) funds for some of the construction cost.  Construction is planned for winter 2014/spring 2015. 8 ARTHUR DITCH REPLACEMENT – WOOD STREET/SYCAMORE STREET Funding Sources: KFCG Estimated Project Budget: $700,000 Status: On Budget, On Schedule  The goal of this project is to replace the existing structurally deficient bridge/box section with a new bridge/box section that meets the current standards.  Currently, the bridge has weight limit posted.  Design efforts are at 90% complete, and construction is planned for winter 2014/spring 2015. ARTHUR DITCH BOX SECTION REPLACEMENT – OAK/WHITCOMB, LOOMIS/OLIVE, CANYON AT MULBERRY POOL Funding Sources: KFCG / Operation Services, Facilities Estimated Project Budget: $2.5-3M Status: On Budget, On Schedule  The intent of this project is to replace three structurally deficient bridge/box sections with new concrete box culverts.  Value engineering and best practices are being applied to develop the most cost efficient replacement methods. All three locations lie within local floodplains and will be evaluated prior to final design approval. Coordination efforts also include the Streets Department maintenance schedules to ensure the roadway is reviewed for both short and long term impacts.  The project has been focused on the completion of the Canyon Avenue location beginning January 2015. The plan sets have been developed and staff intends to advertise this location in November 2014.  Based on competitive bid line item cost and budget reviews, projects will be evaluated for completion in winter of 2015 or fall of 2015.  Floodplain clearances have been approved for construction, and the pertinent flood plain use permits are being issued.  Staff has sent the current plan sheets to the legal staff of the Arthur Ditch for review and impending ditch crossing agreement.  Staff continues to perform outreach to adjacent residents to provide additional information on the project and its schedule as it becomes available. 9 SHIELDS STREET AND DRAKE ROAD INTERSECTION IMPROVEMENTS Funding Sources: Federal Hazard Elimination Grant (90%) / Local Match (10%) Estimated Project Budget: $986,000 Status: On Budget, On Schedule  The main goal of this project is to reduce the accident rate that occurs at this intersection by installing dedicated right turn lanes in the north and southbound movements. A reduced movement concept is also being considered to the Raintree Drive/Davidson Road intersection 400 feet south of Shields and Drake.  Project status has moved to near completion of the 30% plans. The right of way legal descriptions are completed and being sent to CDOT for review and approval.  The right of way acquisition process is expected to be underway in November 2014.  This project has multiple funding sources: Federal Hazard Elimination Grant - $887,400 and City Building on Basics funding - $98,600.  Staff has selected Interwest Consulting Group for the design of these improvements.  The intersection location has several environmental clearances to complete prior to moving towards the design stage. However, a draft concept has been developed for illustration purposes and serves as a model while the state and federal hurdles are completed.  City staff anticipates construction of the intersection to occur in summer 2015. TIMBERLINE IMPROVEMENTS – PROSPECT TO BLACKBIRD Funding Source: Building on Basics (BOB) Estimated Project Budget: $3,500,000 Status: On Budget, On Schedule  The goals of this project are to improve air quality, reduce vehicle wait time and reduce the accident rate by constructing a free-right turn and acceleration lane from eastbound Prospect to southbound Timberline, as identified in our Arterial Intersection Prioritization Study.  The 2005 ballot language stated this project will expand Timberline Road to four (4) lane arterial standards including: o travel lanes, sidewalks, bike lanes and landscaped medians; o improvements to the Prospect and Timberline intersection and all its approaches to add additional turn lanes.  The project will add a sidewalk connection for southbound Timberline from Prospect to Blackbird. 10  Additionally, water quality features will be constructed to minimize the flow rates and volumes as they outlet to the Spring Creek basin.  Construction is expected to begin in the spring of 2016.  A communication plan (public outreach) is being developed and will be implemented with the final design through construction.  The team is pursuing options for the deconstruction and reuse of two silos which need to be removed for roadway, bicycle, pedestrian and landscape improvements.  The project website is available through the Engineering homepage at http://www.fcgov.com/engineering/prospect-timberline.php. HORSETOOTH AND TIMBERLINE INTERSECTION IMPROVEMENTS Funding Source: Building on Basics (BOB) and Federal Grant (CMAQ) Estimated Project Budget: $3,500,000 Status: On Budget, On Schedule  The goal of this project is to relieve traffic congestion and vehicle wait time by constructing additional intersection turn lanes.  The need for these safety and operational improvements were identified in the Engineering Department’s recently completed Arterial Intersection Prioritization Study. Turn lane needs are as follows: o right turn lane (southbound Timberline to westbound Horsetooth); o right turn lane (eastbound Horsetooth to southbound Timberline); o second left turn lane (northbound and southbound Timberline).  City staff appropriated the CMAQ funds through Council in February 2013. These funds were applied for based upon the need for a dedicated, southbound right turn lane.  The project has moved to the final design phase, streetscape visioning and coordination with property owners for real estate purchases (right-of-way and easements).  Additionally, the project will include median and landscape improvements, sidewalk and bicycle lane improvements and pavement improvements.  Construction is expected to begin in the spring of 2015.  A communication plan (public outreach) is being developed and will be implemented with the final design through construction. The project website is available through the Engineering homepage at http://www.fcgov.com/engineering/horsetooth-timberline.php. 11 VINE AND SHIELDS ROUNDABOUT Funding Source: Building on Basics (BOB), Federal Grant (STP Metro) and Regional Road Impact Fees Estimated Project Budget: $1.7M Status: On Budget, On Schedule  The main goal of this project is to increase mobility at the intersection via multimodal transportation improvements. Currently, the east- west lanes on Vine Drive are not aligned, causing additional independent traffic movements which effect the overall operation of the signal timing.  The City received a federal grant award for $1,054,000 through the North Front Range Metropolitan Planning Organization in the STP- Metro category.  Other safety concerns which will be corrected at the intersection include adding sidewalks along the northern portion of the project, installing ADA compliant ramps/crosswalks and adding bike lanes.  The City continues to coordinate our intersection project with Larimer County’s proposed improvements to Shields Street from 400’ north of Vine Drive to Willox Lane. The County received three federal grants for this stretch of roadway to accomplish the following: o replace the Shields Street Bridge over the Poudre River; o improve the Poudre River trailhead parking area and river access; o reconstruct approximately one mile of Shields Street.  Construction is expected to begin in the spring of 2015.  A communication plan (public outreach) is being developed and will be implemented with the final design through construction.  The project website is available through the Engineering homepage at http://www.fcgov.com/engineering/vsi.php. REMINGTON GREENWAY Funding Source: FC Moves Funding Estimated Project Budget: $450,000 Status: On Budget, On Schedule  The goal of this pilot project is to offer flexibility in street design to calm traffic, support active modes of transportation and integrate stormwater management strategies.  The conceptual design calls for buffered bike lanes, removal of the traffic signals between Prospect and Mulberry, and the construction of a mini roundabout with curb bulb outs at Remington and Laurel.  Future phases would add more bulb outs at 12 strategic locations to shorten the pedestrian crosswalk lengths.  Construction is expected to begin in the spring of 2015.  A communication plan (public outreach) is being developed and will be implemented with the final design through construction.  The project website is available at http://www.fcgov.com/advanceplanning/remingtongreenway.php. SH 392 AND I-25 INTERCHANGE SIGNS Estimated Project Budget: $300,000 Status: On Budget, On Schedule  The goal of this project is to construct welcoming and aesthetically pleasing signs for traffic entering the City of Fort Collins and the Town of Windsor along SH 392.  The City has pursued a number of potential sign locations. It was determined that the medians will be the best location for the signs.  The City is partnering with the Town of Windsor for the design and construction of the signs.  The project was bid in October. The apparent low bidder is L&M Enterprises. Contract negotiation is currently underway and the contracts are expected to be in place by the end of November.  Construction is expected to take place in early 2015. DOWNTOWN RIVER DISTRICT IMPROVEMENTS Funding Source: Federal Grants, Local Funds, DDA Funds Estimate Project Budget: $1.48M Status: On Budget, On Schedule  The City has contracted with Interwest Consulting to provide engineering services for various improvements within the Downtown River District.  The project will also have the capability to provide various engineering services in preparation of anticipated development.  The City has initiated two projects: 1) developing an implementation plan for improvements along Jefferson Street between College Avenue and the Mountain /Lincoln intersection based on the available budget, and 2) developing a conceptual design for improvements along Willow Street between North College Avenue and Linden Street. Additional projects to follow include the development of engineering plans and specifications, as well as construction 13 of these improvements along both Jefferson and Willow based on the results of the above.  Design work on the Jefferson Street and Willow Street projects has begun. SPRING CREEK (NRRC) OVERPASS Funding Source: Federal Congestion Mitigation and Air Quality (CMAQ) grant and Building on Basics (BOB) Funds Estimated Project Budget: $2.75M Status: On Budget, On Schedule  The goal of the project is to construct a new pedestrian/bike overpass that will link the Mason Bike Trail and the federal campus on the west side of the railroad tracks to the Mason Corridor Bus Rapid Transit MAX station on the east side of the tracks.  Stairs are anticipated to be delivered and installed in November 2014. LINCOLN AND LEMAY IMROVEMENTS / WOODWARD CAMPUS Funding Sources: City of Fort Collins General Fund, Intersection Improvement Fund Estimated Project Budget: $2.1-2.3M Status: On Budget, On Schedule  This project has several goals. The first is to install three new points of access/turn lanes to the Woodward Campus, two on Lemay, and one on Lincoln. The project will also complete the improvements along the west side of Lemay between Lincoln and Mulberry. This includes completion of the Magnolia intersection to a full movement location along with curb, gutter and sidewalk for the entire length. An interim sidewalk will also be constructed along the Lincoln front that connects pedestrians to the Poudre River bridge on Lincoln and into downtown. Lastly, a double left turn configuration will be installed on southbound Lemay to eastbound Mulberry as a result of anticipated traffic volumes for this area.  The City and Mortenson Construction have partnered to identify and employ best practices regarding communication, safety and general project information to the local businesses and nearby neighborhoods.  The contract for this project was approved by the City Manager on September 30, 2014. City staff conducted a preconstruction meeting with the awarded contractor, Walsh Construction, during the month of October.  Walsh Construction intends to mobilize during the month of November and begin utility installation, tree removal and pedestrian sidewalk construction.  Xcel Energy and their sub-contractor, Q-3, have substantially completed a 4” gas main that will serve the Woodward Campus. The remainder of the line needs to cross (bore) Lemay and Mulberry when a mutually agreed upon date with the Mulberry project is determined. 14  The City anticipates some construction this 2014 fall season, with a suspension of work until spring of 2015, at which time the substantial and final completion of the project is expected. This schedule alternative has been coordinated with the Woodward/Mortenson team who is receptive to the approach. UTILITIES BOXELDER CREEK OUTFALL IMPROVEMENTS Project Description: Large regional flood control project to be designed and constructed under Intergovernmental Agreements with Timnath Development Authority and Boxelder Basin Stormwater Authority. Project involves channel grading and road crossing improvements from I-25 to the Poudre River along the Boxelder Creek Corridor. Project Status: Preliminary design complete. Environmental assessment filed with Colorado Division of Wildlife. CLOMR submittal in preparation. Final Design and Permitting Requirements: May 2014 – April 2015 Anticipated Completion Date: December 30, 2016 On Schedule: On schedule Total Project Budget: $4.1M Budget Status: Project within budget projections Highlights:  Preliminary design complete.  Design of siphon at Lake Canal complete. Canal crossing agreement negotiations underway.  Project under final design.  Project scheduled for construction in 2016 after the Mulberry Bridge Replacement Project by CDOT is completed due to road closure restraints. CATHODIC PROTECTION OF WATER TREATMENT FACILITY AND TRANSMISSION AND DISTRIBUTION SYSTEM WATER LINES Project Description: Investigation of existing systems in place used to protect waterlines from corrosion; design of rehabilitation of existing and new systems to prevent corrosion; and construction of modified and new systems. Project Status: On schedule Anticipated Completion Date: This is an ongoing project. Ahead/Behind/or on Schedule: On schedule Total Project Budget: $304,000 (2014) 15 Budget Status: Within budget Highlights:  Working with consultant and contractor on testing current cathodic protection levels and locations, and installing modified and new systems where needed.  Working at the Water Treatment Facility (WTF) on the new yard piping project to include and update cathodic protection of the new piping, then connect into rectifiers.  Working with contractor on recommended repairs and modifications to cathodic protection on the 60” PCCP transmission main and at the WTF.  Installed new test station on the 60” PCCP transmission main to the west of the City’s L&P Electrical Substation.  Reviewing projects and work status for 2015 with consultant and contractor to create schedule and work order.  Hydro installed new CP test station at the WTF on the new 42” raw water line going into the Flow Blend. This is part of the WTF Yard Piping Modification project. STREAM REHABILITATION AND ENHANCEMENT PROGRAM Project Description: Stream rehabilitation and habitat enhancement across City including stabilizing stream channel morphology, rehabilitating/creating new native in-stream and riparian habitat to attract and support native fish and wildlife populations, and promote BMPs to improve water quality. First watershed in program is Fossil and Mail Creek. Project Status: Working with consultant and contractor on schedule for Fossil Creek construction, and Mail and Spring Creeks environmental surveys for future permitting. Anticipated Completion Date: Construction of first project, Fossil Creek reach upstream of Lemay, to begin October 1, 2014. Ahead/Behind/or on Schedule: Project on schedule Total Project Budget: $1.2M Budget Status: Within project budget Highlights:  Centennial Archaeology conducted a Limited Results Cultural Resource Survey for Mail Creek and Spring Creek for next year’s COE submittals.  Received Nationwide permit from Corps of Engineers.  Reviewing requirements for groundwater permit with CDPHE.  Received groundwater permit from CDPHE.  Working with team on costs and schedule for construction.  Working with PR on website.  Preparing contractor Phase 2 contract.  Construction began first week of October including regrading channel, reshaping banks and slopes, and installing riffle-pool structures. 16 RIGDEN MUNICIPAL STORAGE POND Project Description: The project will consist of the construction of a gravel pit water storage reservoir to include a pump station and associated piping. The project is located northeast of the Ziegler Road and Horsetooth Road intersection. Purpose of the storage is to retime flows to meet water rights return flow obligations and meet augmentation requirements. Project is a cooperative effort with Natural Areas and Parks. Project Status: Under construction Anticipated Completion Date: Design complete in 2013; construction in 2015. Ahead/Behind/or on Schedule: On schedule Total Project Design Budget: $457,782 Total Utility Project Construction Budget: $10,600,000 Budget Status: Within budget Highlights:  The earthwork contractor has removed 1,610,000 cubic yards of material.  The pump station construction is nearly complete.  The project piping has been completed.  The reservoir liner is nearly complete.  Fill is being hauled to the POE pit.  Pump testing will happen in November. WATER TREATMENT FACILITY YARD PIPING MODIFICATIONS Project Description: Design and construction of a new 48 inch diameter steel raw water pipeline to replace the aged 30 and 36 inch Horsetooth raw water pipelines, and a new 36 inch diameter steel backwash pump station influent line to replace the existing cast iron pipeline. Both of these pipelines have shown damage due to electrolysis. The existing finished water backwash influent line is also located under an existing sludge drying pond, increasing the possibility of cross contamination, so it will be abandoned. Project Status: Kicked off design May 2013; construction began in October 2013. Anticipated Completion Date: Planned for fall 2014 Ahead/Behind/or on Schedule: On schedule. Project suspended until October when water demand goes down to complete Horsetooth Raw Water lines. Total Project Budget: $2.3M Budget Status: On budget Highlights:  Placed asphalt base course on roadway where pipe is installed. 17  Rotated valve operators on 36” and 42” Butterfly valves.  Finished air valve construction at new 24” / 27” connection.  Performed final grading at the new Meter Vault and air valve.  Final graded backfill at 36” Backwash Pump Station feed.  Finished cleanup and final punch list items for work completed.  Removed existing Valve Vault #1 and hauled away debris.  Plugged existing 20”, 36”, 27” and 24” pipelines at Valve Vault #1 with concrete.  Finished 60” pipeline blowoff structure.  Worked on Punch List items.  Restarted work on 48” Horsetooth Raw Water Line.  Made downstream connection of 48” to existing 42” Flow Blend influent line and backfilled.  Concrete encased existing 8” sanitary sewer line.  Installed approximately 100 LF of 48” steel raw water line upstream towards HT Pressure Dissipation Vault and backfilled.  Removed two sections of existing 36” steel waterline scheduled for abandonment. PLUM STREET SANITARY SEWER IMPROVEMENTS Project Description: Design and construction of a replacement sanitary sewer system that currently lies in Shields Street, Plum Street between Shields and City Park Avenue and City Park Avenue. This sewer is in very poor condition and will soon be undersized as new development occurs in the immediate vicinity. Project Status: Project complete except closeout. Anticipated Completion Date: Project complete except closeout. Ahead/Behind/or on Schedule: Project complete except closeout. Total Project Budget: $1M Budget Status: On budget Highlights:  Asphalt patched Plum Street and City Park Avenue with base course.  Completed Punch List items.  All pipelaying and restoration complete.  Paving restoration complete.  Issued Certificate of Substantial Completion.  Project complete except closeout. 18 WATER TREATMENT FACILITY – 2014 MASTERPLAN UPDATE Project Description: Fort Collins Utilities currently has two planning documents, the 2007 Water Treatment Facility Electrical Master Plan (EMP) and the 2010 Water Treatment Facilities Master Plan. This document will update the Water Treatment Facilities Master Plan and incorporate the EMP. Project Status: Issued RFP in December 2013. Anticipated Completion Date: Masterplan to be completed by December 2014. Ahead/Behind/or on Schedule: On schedule Total Project Budget: $350,000 Budget Status: On budget Highlights:  Due to the resignation of current Water Production Manager, work on Water Treatment Facility – 2014 Masterplan Update has been suspended until new Water Production Manager is hired. WATER TREATMENT FACILITYSTORMWATER CONTAINMENT BERMS Project Description: Design and construction of a system of swales and berms around the existing solids drying beds to protect them from spilling in a 100-year rain event. Project Status: City Stormwater Division portion of design kicked off March 2013. Ayres Associates portion of design started March 2014, complete June 2014. Construction began in July 2014. Anticipated Completion Date: Substantial completion scheduled for October 2014. Ahead/Behind/or on Schedule: On schedule Total Project Budget: $300,000 Budget Status: On budget Highlights:  City Stormwater engineering completed design criteria.  Ayres Associates contracted to perform civil design.  Hydro Construction contracted to construct improvements.  Construction begins in July 2014 with completion scheduled for early October 2014.  South swale excavation started, with concrete crossing pan constructed.  South swale completed except seeding.  Solids Drying Areas #2 and #3 swales excavated.  Solids Drying Area #3 Berm is approximately 60% complete.  Access road to PRPA pump station complete.  Solids Drying Areas #3 and #2 Berms are complete except seeding. 19  Solids Drying Area #1 is approximately 90% complete. Will complete after NEWT II water line is installed through WTF.  All berms and swales were seeded with native seeding. WATER TREATMENT FACILITY T3 SEDIMENTATION BASIN IMPROVEMENTS Project Description: Design and construction of an equipment replacement project for the T3 Treatment Train at the WTF. Existing tube settlers, collection troughs and chain and flight collectors were installed in 1979 and have reached their useful life. Project Status: CH2M Hill was selected as design engineers and Hydro Construction selected as the contractor for this project. Design kicked off in June 2014. The first phase of this project will be to prepurchase the equipment with construction scheduled to begin in February/March 2015. Anticipated Completion Date: Substantial completion scheduled for May 2015. Ahead/Behind/or on Schedule: On schedule Total Project Budget: $1.3M Budget Status: On budget Highlights:  CH2M Hill is selected as design engineer.  Hydro Construction is selected as contractor.  Technical Memorandum and draft specifications are complete.  Hydro Material Pre-Purchase contract completed.  Equipment submittals complete.  Equipment to be replaced has been ordered.  Approximately 80% of existing tube settlers have been removed.  Contractor searching for recycler to take tube settlers.  Existing trough weirs have been removed and sent to trough manufacturer for inclusion with new troughs. NORTH SHIELDS STREET SANITARY SEWER INTERCEPTOR Project Description: Design and construction of a wastewater sewer interceptor line along North Shields Street from the Poudre River north to US 287. This project will accommodate future growth and provide a collection system for residential properties along US 287 with failing septic systems. Larimer County is preparing to reconstruct Shields Street from the new Poudre River Bridge north to Willox Street in 2015, and has agreed to coordinate its construction and road closures to accommodate the City’s project. 20 Project Status: Currently in final design and independent review. Anticipated Completion Date: April 2015 Ahead/Behind/or on Schedule: On schedule Total Project Budget: $2.2M Budget Status: Within budget Highlights:  Expanded the scope to include the design and construction of 8” trunk line from Arthur Ditch to the Poudre River.  Project budget limits construction from Arthur’s Ditch to Willox Lane.  Filed Location and Extent Application to Larimer County.  Independent Cost Estimate underway.  County is hosting an Open House November 18. Shields Project will have a table and information available to residents.  Re-Sampling groundwater to determine if Wastewater Treatment Facility will accept discharge.  Negotiating Fee for the Larimer and Weld Crossing.  Arthur Ditch Crossing Application underway.  Final construction plans have been submitted for review.  Ongoing coordination with Larimer County Engineering and City of Fort Collins Vine Drive/Shields Street Roundabout Project (also anticipated to be constructed concurrently). DRAKE WATER RECLAMATION FACILITY SOUTH PROCESS TRAIN IMPROVEMENTS Project Description: The project will consist of the demolition of a portion of the existing process train, construction of new tanks for the new biological nutrient removal process, upgrading the south aeration system, and replacement of old mechanical and electrical systems. Project Status: Demolition scheduled to start November 2014. Anticipated Completion Date: November 2015 (Substantial) Ahead/Behind/or on Schedule: On schedule Total Project Design Budget: $1.8M Total Project Construction Budget: $7.9M Budget Status: Budget adjusted based on latest estimates. Still awaiting blower bids. Highlights:  Partnering Session held  Demolition contract in progress 21 DRAKE WATER RECLAMATION DIGESTER LID REPLACEMENT Project Description: The project consists of the installation of digester lid 611. Project Status: 10% complete Anticipated Completion Date: June 2015 Ahead/Behind/or on Schedule: On schedule Total Project Budget: $500,000 Budget Status: Within budget Highlights:  Negotiating construction work order.  Lid submittal under review. NORTHEAST COLLEGE CORRIDOR OUTFALL PROJECT (NECCO) PHASE 3 Project Description: Analysis, feasibility, design, and construction of storm drainage outfall for the Lower Dry Creek Basin east of North College and south of the Larimer and Weld Canal; particularly, a regional detention pond just north of East Vine Drive and culverts to convey flows and provide an outfall under East Vine Drive and the BNSF along Dry Creek to create connectivity for flow conveyance and drainage for Dry Creek. Project Status: Currently in design and feasibility Anticipated Completion Date: December 2015 Ahead/Behind/or on Schedule: On schedule Total Project Budget: $1M (2014) Budget Status: Within budget Highlights:  Working with consultant on design and alternatives, as well as scheduling CLOMR preparation and permitting with BNSF and Corps of Engineers.  Working with ROW to begin discussions on purchasing land for regional pond and easements for conveyance pipes and channels.  Met with BNSF Roadmaster to discuss permit submittal to bore stormwater pipes under BNSF tracks.  Designing pond to minimize impacts to existing wetlands, and mitigate necessity for COE permit.  Preparing documents for submittals of application to the railroads to bore two new pipes for the Dry Creek connection to the south. 22 DOWNTOWN RIVER DISTRICT (DTRD) PROJECT PHASE 2 – OLD ELK DISTILLERY Project Description: Review and design feasibility of water, sewer, and stormwater utilities design in the DTRD area along Jefferson and Willow Streets in relation to the proposed conceptual development in the old Kiefer Concrete property at the SE corner of Willow and Linden - new Preliminary Development Review Old Elk Distillery project with the following uses including restaurant, private dining, pub, distillery, tasting room, retail, music venue, meeting space and offices. Project Status: Currently in feasibility and review Anticipated Completion Date: December 2016, depending on funding Ahead/Behind/or on Schedule: On schedule Total Project Budget: To be determined Budget Status: Within budget Highlights:  Internal discussion and review of project for roadway, utility, multimodal and urban design improvements along Jefferson and Willow Streets within the DTRD limits; according to Engineering downtown, constructed improvements, project limits, and schedule are dependent on funding. 23 COMMUNITY EVENTS Travel Film: "Mexico" Location: Senior Center, 1200 Raintree Drive Date/Time: Sunday, November 16, 2014, 12:45 PM Details: Mexico has always been a land of adventure, mystery, and the unexpected. Based on Bill Behrenbruch's 20 plus years of travel though the Sierra Madre mountains, viewers are transported to a place seldom seen by outsiders. In these mountains, destinations exist as grand as Yosemite, the Grand Canyon, Mesa Verde, and Zion. Fee includes transportation, ticket, and escort. Show is at UCCC in Greeley. $20 for Senior Center members or $25 for non-members. Contact Information: Fort Collins Senior Center Phone: 970-221-6644 / Email address: seniorcenterusers@fcgov.com Guided Winter Ride Location: Harmony Library, 4616 S. Shields, Lobby Date/Time: Saturday, December 6, 2014, 10:00 AM Details: Put your winter cycling knowledge to the test and join us for a beginner’s guided ride. This 2-hour leisurely ride will allow you to practice winter riding in a group setting, build your confidence and gain skills to venture out on your own. Registration required. Limited to 20 attendees. To register, please complete this form: http://fcgov.BIKE-WINTER-14-15-Guided- Winter-Ride-RSVP.sgizmo.com/s3/ Web address: http://www.fcgov.com/bikewinter Contact Information: Becky Moriarty Phone: 970-224-6112 / Email address: rmoriarty@fcgov.com Garden of Lights 2014 Location: Gardens on Spring Creek, 2145 South Centre Ave Date/Time: December 5-January 1, 5:00- 9:00 PM Details: Garden of Lights is a community favorite and must-do holiday activity with friends and family. Stroll through the whimsically decorated and twinkling Gardens lit by thousands of LED lights. Visit the perennial flower beds and vegetable gardens in addition to a brilliant blue LED pond, all created entirely from holiday lights! During the weekends, visit with Santa (Saturdays & Sundays only), listen to holiday music, see the Sugar Plum Hairies (canine fairies), and enjoy warm drinks. A friendly reminder that Garden of Lights is an outdoor event so dress warmly! $2 suggested donation per person. Web address: http://www.fcgov.com/gardens Contact Information: Gardens on Spring Creek / Phone: 970-416-2486 To view the full calendar of events, visit http://www.fcgov.com/events/ 24 PUBLIC SAFETY UPDATE FORT COLLINS POLICE SERVICES Coffee with the Chief The next Coffee with Chief Hutto monthly community outreach event will be held on November 20 from 9–10 a.m. at Starbucks, 838 W. Drake Road. Police Officer Shot in the Line of Duty On October 5, 2014, Officer Peter DeKraker responded to a welfare check called in by a passersby. When he arrived he encountered a suspicious male who, after contact, drew a gun and shot the officer once in his protective vest. Officer DeKraker returned fire, killing the suspect. Assaults on Women Investigation continues into the unknown male who is randomly assaulting women in Fort Collins and Larimer County. Both agencies are working closely together to solve this case. Police Investigate Shooting Police responded to a report of shots fired in the area of Avocet and Eagle. A 19-year-old male was shot in the head and transported to the hospital by private vehicle. On October 3, 2014 the suspect in this case was arrested and charged with several felonies. Arrests for Methamphetamine Distribution The Northern Colorado Drug Task Force closed a month’s long investigation into the distribution of methamphetamine. This included several simultaneous search warrants and several arrests related to the case. Police Vehicles Broken Into On October 24, 2014 suspects broke into two Fort Collins Police cars and stole their issued rifles. Those suspects were arrested the next day, but the rifles have not been recovered. Crime Prevention This month, the Crime Prevention Specialist had 23 telephone calls that ranged from a realtor office that wanted to set up personal safety training for their staff to Stanley Security trying to work with their client who has been having chronic false alarms since 2001. There were presentations/interactions with 174 people which included a Safety Event held at the Home Depot South with the Poudre Fire Authority to the semi-annual Landlord Class sponsored by Neighborhood Services. A breakdown of the month’s Crime Prevention activities follows:  Safety Event Home Depot  Neighborhood Watch Indian Meadows  Landlord Class  Realtor Safety  Neighborhood Watch Whedbee Street 25  Difficult People Old Town Library  RESTORE, 35 Crime Prevention Tip Recent news from Boulder, CO should have reminded us all of some basic personal safety efforts we should all practice. When strangers come to our doors, why do we open them? Often it is because we are "programmed" to do so. The same goes with when the telephone rings - we pick it up. The problem is that we are then stuck with dealing with whoever is there, and many times it is a solicitor. The quickest and safest way to avoid this from happening in the first place is to not answer the door. If you have a door that has a view to the outside, then please use it to help you make the decision. If you don't, peep holes are very inexpensive and easy to install. Do it and save yourself the grief of having to deal with a fast-talking sales person. You don't have to open the door just because someone knocks. You don't have to answer your phone just because it rings. And teach this to everyone in the home. Remember, once the door is opened, you have compromised your safety barrier, and now you must deal with whatever is on the other side. Most of the time it is just a nuisance, but if you just happened to draw the short straw, you will have your worst nightmare come true. And it was all avoidable. Putting a "No Soliciting" sign on or near your front door will help deter some solicitors, but they don't all play by the same rules. Please be aware of what is going on around you and make good decisions. And don't forget to call Fort Collins Police to report ANY solicitors (221-6540) when you see them going door-to-door. A number of them are selling bogus products and are scam artists, and police would like to make contact with them. But if you don't call, how are the police going to know? Partner up and help us to help you. 26 POUDRE FIRE AUTHORITY 2-Alarm Residential Fire A fire that almost claimed the life of three dogs was quickly extinguished, but not before causing quite a bit of fire, heat and smoke damage to the attic and kitchen. At least 30 firefighters responded on October 24, just after 8:00 p.m. to a single family home on Regency Drive in southwest Fort Collins. The owners had recently left for dinner, however, came back to a starkly different home. Firefighters simultaneously attacked the fire and searched the residence for any occupants. During the search two dogs were found and taken outside. Poudre Valley Hospital Ambulance personnel took the dogs and provided oxygen to them via special pet O2 masks. The masks are carried on all PFA apparatus. One civilian was able to let a dog out of the house prior to the arrival of firefighters. At least one of the dogs was transported, by the owners, to a local veterinarian for treatment. All were expected to make a full recovery. The fire origin was determined to be in the kitchen; however, the cause is still under investigation. Had this home been prepared with fire sprinklers, the damage would have been only a fraction of what it was. Fire Prevention Week/Month PFA recognizes October as Fire Prevention Month each year. Even though there is a national recognition of Fire Prevention Week, PFA works to turn that into a month-long push of safety information, but also keeps focused on safety messages throughout the year. PFA firefighters have fun interacting with customers and see an increase of station visits and speaking requests during this time. Emergencies don’t take time off, and neither does the Fire Prevention Bureau in trying to prevent them. CSU Chili Challenge Firefighter Ray Gillan successfully coordinated the widely popular Chili Challenge again this year. This week-long event puts students to the test with good ol’ Firehouse Chili. The event also is used to spread fire and life-safety messages to the college population. During this event, firefighters are also able to talk with the students in an informal setting. Fort Collins Museum of Discovery; FC150 Poudre Fire Authority continued to participate in the ‘Talks @ Two’ program instituted at FCMoD as part of the FC150 exhibit. Fort Collins Fire Department history was shared along with descriptions of how and why things were done the way they were back then. Cache La Poudre Elementary Walk Engine 7 in LaPorte, Firefighter Gillan, and PFA’s two fitness interns participated in the Pirate Peg Leg Parade at CLP Elementary. The purpose of the parade was to promote healthy living habits. PFA’s participation included helping with the exercise area and fire safety. It was a very fun event and everyone had a great time. New Education Specialist Hired PFA is happy to welcome Michael Durkin, the new Education Specialist, to the team. Michael comes to PFA from an unusual field: international development. He’s worked on education programs in Thailand, Kenya, and the Middle East and holds a Master’s Degree from the 27 American Graduate School in Paris. These experiences showed him firsthand the positive effects that education can have on keeping communities safe. PFA is hoping to put his years of classroom experience to good use in this much needed position. Incident Statistics (by category) Report Period: October 2014 Total Loss Fires 27 $26,200 Overpressure/rupture, explosion-no fire 1 Rescue / EMS 1,162 Hazardous Condition - no fire 35 Service Call 71 Good Intent Call 122 False Alarms / False Calls 78 Severe Weather & Natural Disaster 0 Special Incident Type 1 Total = 1,497 YEAR-TO-DATE 2014 Total Loss Fires 276 $1,734,722 Overpressure/rupture, explosion-no fire 8 Rescue / EMS 11,050 Hazardous Condition - no fire 291 Service Call 619 Good Intent Call 1,221 False Alarms / False Calls 1,001 Severe Weather & Natural Disaster 2 Special Incident Type 29 Total = 14,497 Comparison: October 2013 Total Loss Fires 23 $32,701 Overpressure/rupture, explosion-no fire 1 Rescue / EMS 1,048 Hazardous Condition - no fire 40 Service Call 50 Good Intent Call 106 False Alarms / False Calls 89 Severe Weather & Natural Disaster 0 Special Incident Type 1 Total = 1,358 28 Comparison: YEAR-TO-DATE 2013 Total Loss Fires 310 $2,788,502 Overpressure/rupture, explosion-no fire 12 Rescue / EMS 10,438 Hazardous Condition - no fire 302 Service Call 597 Good Intent Call 1,047 False Alarms / False Calls 1,015 Severe Weather & Natural Disaster 2 Special Incident Type 27 Total = 13,750 *Information subject to change due to updated data. 29 BUILDING & PLANNING ACTIVITY COMMUNITY DEVELOPMENT & NEIGHBORHOOD SERVICES 2013 YTD 2014 YTD % Change Development Project Submittals Received 307 280 -9% Conceptual/Staff Reviews Performed 236 198 -16% Building Permits Issued 4,939 10,827 +119% Building Permit Valuations ($M) $293 $583 +99% Building Inspections Performed 26,618 32,677 +23% Plan Reviews Performed 1,842 2,130 +16% Development Review revenues are approximately $1.89M over projections for 2014 as of October 31. The General Fund portion of this is $1.84M. Development Projects of Note  Foothills Mall Redevelopment – The Foothills Mall Redevelopment Phase One and Phase Two Final Plan and development agreement have been recorded and site work has commenced. Phase Three is anticipated to be finalized and recorded in early August. Two Minor Amendments have been submitted. Weekly construction coordination meetings are being held with City staff and the developer. Permits Issued: o Two master demolition permits to track all space renovations. American Demolition is current demo contractor of record. o Core & shell permit for Sears, 3400 S. College – final inspections have been completed. A Temporary Certificate of Occupancy is pending College Avenue turn lane construction. Sears has delayed their move-in date to March 2015. o Multiple alteration permits, 215 E. Foothills for common area and concourses in main mall structure – work is progressing. The south concourse near Macy’s is slated to be open by Thanksgiving. The old Sears building is empty and demo is anticipated to start within a week, closing the north concourse from Old Sears through the food court. o New parking structure, 315 E. Foothills – foundation caissons installed. o New core and shell, 3120 S. College – foundation installed framing stated. o Cinemark Movie Theater, 335 E. Foothills – a revised plan was submitted requiring a second plan review. Plan review complete, permit issued, footing/foundation work started. Permits under Review: o New core and shell, 3100 S. College – plan review is pending awaiting return of items requested. No change as of November 5. o Tenant Finish for Chico’s clothing at 3120 S. College – plan review is pending. Plan review underway. 30 o New core and shell, 3050 S. College – plan review comments sent awaiting response. o New core and shell, 8006 SF for 327 E. Foothills #B1410749 applied 10/28/14. o New core and shell, 6005 SF for 321 E. Foothills #B1410751 applied 10/28/14. Inspections: o The City building inspector assigned to this project will be available for 2 hours per day for inspections. The contractor is also authorized to use professional engineers for additional inspections if needed. o Damage occurred to the Ross Store during demolition of the ARC building. Water pipes were broken and there was slight damage to the building. Damage was assessed and repairs made. ARC building is completely down and no longer poses a risk to Ross. No other issues. Inspections General Due to the summer hail storm over 5,000 re-roofing permits have been issued, over 2,500 have been inspected using trained hourly employees. Estimates of 5,000-7,000 roofs still need to be replaced.  Summit Parking Garage – A remand hearing was held on September 4. The Hearing Officer approved the revised proposal. The decision has since been re-appealed. The appeal hearing is scheduled for the December 2 City Council meeting.  Woodward International Headquarters – Final plans for Phase One are complete and site work for the main campus building has commenced. o A minor amendment was also submitted on July 18, 2014 to change the approved Final Plans for Phase One. The changes remove the Production Support Building (PSB), located along East Lincoln Avenue, from the Phase One plans and expand the main building to include a portion of the PSB functions. The changes also integrate additional landscaping into the East Lincoln frontage to further buffer views toward the main building. The Final Plans reserve the option to include the PSB and/or other buildings along East Lincoln with subsequent phases. Comments for the minor amendment site, landscape and engineering plans have been addressed, and staff anticipates final approval of the amended ITS building elevations by the end of November. o A minor amendment was submitted on October 29, 2014 for the Final Plan approval of Phase Two which includes the 52,000 square foot Woodward Office Headquarters building. Overall comments have been minor and staff is anticipating final approval by the end of November.  Poudre Valley Hospital A-Wing Demolition and New Construction – The project consists of demolishing the existing A-Wing of the Poudre Valley Hospital which presently 31 contains 70,000 square feet, and is located at the north end of the hospital campus at the southeast corner of Lemay Avenue and Doctors Lane. This is the oldest part of the hospital. The new construction consists of a new Emergency Room Department on the first floor and a second floor for additional patient beds and expansion of hospital services. A new lab would be located in the basement. The total new square footage would be 111,000 square feet. The new building would be constructed to add two additional levels in the future, for a total of 4 stories. In addition, the existing helicopter landing pad would be relocated to the roof of the new building. A larger parking lot is proposed north of Doctor's Lane to serve the new building. Three existing buildings would be demolished to accommodate this new parking lot between Hospital Lane and Luke Street. Permits Issued: o Footing and Foundation (F&F) permit for the core and shell of the Phase One ITS building, which allows installation of all structural foundations and underground utilities. Underground inspections have begun with no issues at this time. o Full permit issued for the Phase One ITS building. Permits under Review: o Footing and foundation permit (B1411129) for Office Building Headquarters submitted, F&F plan review complete; SW Floodplain needs to release prior to F&F being issued. Inspections: o The City building inspector assigned to this project will be available for 2 hours per day for inspections. The contractor is also authorized to use professional engineers for additional inspections if needed. o No issues at this time. Projects that Submitted Final Plans in October  Riverside Self Storage – This is a request for a combined Project Development Plan/Final Plan to construct a self-storage unit complex on a 2.270 acre site located at 1640 Riverside Avenue (north of Rivendell School). The project would consist of 5 self- storage buildings, a one-two story 4,192 square foot office building, and a 4,772 square foot office/warehouse building.  Riverside Community Solar Garden - This is a request from Clean Energy Collective to construct a solar energy collection facility at 500 Riverside Avenue (the northeast corner of Riverside Avenue & E. Mulberry Street). The facility would consist of ground- mounted solar panels generating 333 kW with an additional potential phase of 192 kW for the ability of generating approximately 600 kW.  Prairie Village - This is a request for a Major Amendment to the previously approved Overlook/Seneca Center Planned Urban Development (PUD), and would correspond as 32 Phase III of the PUD. A residential building consisting of eight single-family attached (townhome) units with their own separate lots are proposed fronting Fromme Prairie Way. The units would be a mixture of 1.5 and 2 stories, with each unit ranging in size from approximately 1,750 square feet to 2,000 square feet. The 1.11 acre site is located at 1715 W. Harmony Road.  Verizon Wireless Telecommunication Facility - This is a request to add a wireless telecommunication facility on the roof of a large office building at 2950 E. Harmony Road, at the northwest corner of Ziegler Road and E. Harmony Road. The purpose of this site is to provide 4G-LTE voice and data capacity for Verizon Wireless customers in the surrounding area. The proposal will include a total of six panel antennas screened with opaque radio-frequency-transparent fiberglass material matching the existing material. Construction Projects of Note for October  New multi-family buildings (five) for the Carriage House Apartment complex. Includes 54 dwelling units. Location: Springfield Drive.  New 5-story, 100,591 square foot mixed-use building for Scott Plaza Apartments. Includes 79 dwelling units as well as commercial space and enclosed parking. Location: 3003 E. Harmony Road.  Tenant Finish permit for Trader Joes. Location: 3500 S. College Avenue.  New core and shell, 16,901 square feet, for commercial use. Location: 1501 W. Elizabeth Street.  New commercial/industrial building, 330,000 square feet, for Woodward International Headquarters. Location: 1041 Woodward Way.  Tenant Finish for Avago Technologies. Location: 4380 Ziegler Road.  Morningstar Assisted Living and Memory Care Facility: 69,540 square feet for senior care. Location: 3509 Lochwood Drive. Other Items of Note  Nature in the City – The Nature in the City strategic plan was funded through the annual appropriation ordinance and launched in January 2014. This strategic plan will develop a vision for incorporating nature into the urban environment and include design guidelines, policies, and actions for achieving this vision. City Council provided feedback on the project’s direction at the October 28 Council work session. Staff is planning to bring the Strategic Plan to a Council work session on February 10, 2015 with a tentative date for adoption set for March 17, 2015. For more information about the project, please see our website at www.fcgov.com/natureinthecity.  Oil & Gas – A moratorium is now in place for all hydraulic fracturing within the City of Fort Collins. The moratorium will remain in place for up to five years and stops the current operator from using hydraulic fracturing to enhance existing wells or drill new 33 ones. Staff has ceased working on land use code revisions until further direction is received from Council. Two firms have been retained to make recommendations on methods of compliance related to property values and health impacts of hydraulic fracturing. Staff members have met with both firms and reviewed a draft document on property values and health impacts.  Old Town Neighborhoods Plan Update (formerly /Eastside and Westside Neighborhoods Plan Update) - The purpose of updating the original East Side and West Side Neighborhood Plans is to revisit the original visions, policy directives, and implementation actions in the existing documents and revise these elements based on emerging issues and trends. As part of this new update process, the current plans for both the east side and west side areas are proposed to be combined into a single consolidated plan document and process, referred to as the “Old Town Neighborhoods Plan (OTNP). While the new approach reflects a single plan, the planning process and evaluation of both neighborhoods will not be compromised in the depth of analysis. The proposed effort will provide more efficiency of resources, effective community engagement and opportunity for collaboration of stakeholders and desired outcomes. The planning process is scheduled to officially start in January 2015. A related project that will process concurrently with the OTNP update includes developing Design Guidelines and Pattern Book, reflecting an implementation action recommended from the 2012 Neighborhood Character Study. This fall staff is preparing background information on the project including: o The Request for Proposal for consultant services o Identify staff technical team o Assess existing conditions and background information o Develop outline for community engagement plan  Smoking Ordinance Expansion Options – City Council passed two additions to the Smoking Ordinance on Second Reading on July 15: 1. Electronic Smoking Devices – prohibits the use of electronic smoking devices in all places where conventional smoking is prohibited. This becomes effective July 26. 2. 100% Hotel/Motel Rooms –100% of hotel/motel rooms required to be smoke free. This becomes effective January 1, 2015. Items to consider later (November 25 work session): 1. Parks, Trails, and Natural Areas – Council also directed staff to bring an ordinance for consideration that would prohibit smoking in all parks, trails, and Natural Areas. Golf courses would be exempt from this requirement (this direction was not unanimous). Additional information about enforcement will be provided. Additional communication with Fossil Ridge High School Student Council members will occur to ensure staff understands the issues occurring at the park next to the school. 34 2. Public Events – Council directed staff to bring an ordinance for consideration that would require public events to be smoke free. Council did not request the allowance of designated smoking areas. Because many public events for 2014 have already begun the permitting process, as well as their marketing process, Council agreed that this requirement should be considered with implementation beginning for the 2015 public event season. Staff surveyed event patrons at four of our larger events during the 2014 event season to gain additional feedback. 3. Old Town/Downtown – Council directed staff to bring an ordinance for consideration that would require certain areas within the Old Town/Downtown area to be smokefree. Different options about the boundaries for this area were discussed. Staff will provide options for consideration including Old Town Square as well as an expanded area that could possibly be phased in over time. Staff surveyed business owners within these areas to learn about their thoughts, concerns, questions, and suggestions. Staff will continue to meet with Boulder staff to get a better understanding of implementation and potential unintended consequences of the smoke-free regulations of the Pearl Street Mall. Staff has also met with staff from Golden since they passed an ordinance making their downtown area smoke free. Additionally, staff will provide detailed enforcement information and potential costs for Council consideration.  Transit-Oriented Development (TOD) Parking Study – On September 11, The Planning and Zoning Board recommended approval of the TOD Parking Study and the corresponding Land Use Code Revisions. At the November 4 meeting, City Council voted 4 – 3 to approve the Planning and Zoning Board’s recommendations, with a change of the applicability of alternative compliance for affordable housing from 50% AMI to 60% AMI. Second Reading is scheduled for November 18.  Urban Agriculture - A 6-month update on urban agriculture was provided to Council in July. This update highlighted the urban agriculture licenses issued to date and staff’s continued collaboration with the Northern Colorado Local Food Cluster. Staff is continuing to work with the North Colorado Food Cluster to develop a strategic plan for how we will create a sustainable food system. Pending funding, it is anticipated this effort will begin in 2015. A budget offer was prepared for the 2015-2016 Budgeting for Outcomes cycle to align internal staff efforts in the development of the local food and wellness strategic plan; this offer, entitled “Sustainability Policy and Project Manager,” is not recommended for funding in the City Manager’s Recommended Budget.  West Central Area Plan / Prospect Corridor Design – Updated vision and priorities for the West Central area of the City (generally south and west of the CSU main campus). This effort is updating the 1999 West Central Neighborhoods Plan based on emerging issues and trends. Areas of focus include land use and zoning, neighborhood character, transportation and mobility, parks and open space, and a new design for Prospect Road from Shields to College. The Draft Plan and recommended design for the Prospect 35 Corridor are currently being developed and will be presented to the public in early 2015. More information on the project can be found at fcgov.com/westcentral. The West Central Area Plan is scheduled for a work session with City Council on November 25. Outreach to date: o Four public outreach listening sessions – March/April, 175 attendees o 20 neighborhood walking tours – April/May, 80+ attendees o Online “Wiki Map” o Two visioning events – April/May, 74 attendees o Online Visioning Survey – 337 respondents o Open House – September, 85 attendees o Two Prospect Corridor Workshops – September and October, 69 attendees total o Outreach at the Drake Road Farmers’ Market, CSU Lagoon Concert Series, and Gardens on Spring Creek events o Presentations to boards and commissions: Planning & Zoning Board, Parking Advisory Board, Transportation Board, Affordable Housing Board, Senior Advisory Board, Air Quality Advisory Board, Parks and Recreation Board, Natural Resources Advisory Board, Landmark Preservation Commission, Commission on Disability, and the UniverCity Connections Transportation and Mobility Task Force o City Council work session – August 26 Development Projects under Appeal  The Summit Parking Garage – appeal hearing is scheduled for December 2 City Council meeting.