Loading...
HomeMy WebLinkAboutReport - Mail Packet - 9/16/2014 - City Managers Monthly Report - September 11, 2014September 11, 2014 ISSUES BEFORE COUNCIL Establishing Regulations for Two or More Persons Cultivating Marijuana in Non-Residential Structures ....................................................................................................................................................... 2 Public Hearing Regarding the 2015-2016 Budget ......................................................................................... 2 Building on Basics (BOB) 2.0 and Street Maintenance Program Tax Renewal Discussion .......................... 2 Commercial Water Allotments ...................................................................................................................... 3 Housing Affordability Policy ......................................................................................................................... 3 Natural Areas Master Plan ............................................................................................................................. 3 Clydesdale Park Annexation .......................................................................................................................... 3 Adoption of the Downtown Poudre River Plan ............................................................................................. 4 ECONOMY Fort Collins Sales and Use Tax ...................................................................................................................... 4 CAPITAL PROJECTS Citywide Pedestrian Access Project ............................................................................................................... 5 Mulberry Bridge (SH 14) at the Poudre River Enhancements ....................................................................... 6 West Mulberry Bridge Replacement .............................................................................................................. 6 West Prospect Bridge Replacement ............................................................................................................... 7 Arthur Ditch Box Section Replacement ......................................................................................................... 8 Shields Street and Drake Road Intersection Improvements ........................................................................... 9 Timberline Improvements – Prospect To Blackbird ...................................................................................... 9 Horsetooth and Timberline Intersection Improvements ............................................................................... 10 Vine and Shields Roundabout ...................................................................................................................... 11 Kechter and Timberline Right Turn Lanes .................................................................................................. 12 Remington Greenway .................................................................................................................................. 13 State Highway 392 and I-25 Interchange Signs ........................................................................................... 14 North College Improvements – Conifer to Willox....................................................................................... 15 Downtown River District Improvements ..................................................................................................... 16 Spring Creek Overpass................................................................................................................................. 16 Lincoln and Lemay Improvements / Woodward Campus ........................................................................... 17 Utilities Capital Projects .............................................................................................................................. 18 COMMUNITY EVENTS ................................................................................................................................ 29 PUBLIC SAFETY UPDATE Fort Collins Police Services ......................................................................................................................... 30 Poudre Fire Authority .................................................................................................................................. 31 BUILDING ACTIVITY ................................................................................................................................... 35 2 ISSUES BEFORE COUNCIL September 16 Regular Meeting Establishing Regulations for Two or More Persons Cultivating Marijuana in Non-Residential Structures  The purpose of this item is to prohibit two or more people from growing marijuana in a non-residential structure without having complete physical separation within the structure. September 23 Adjourned Meeting Public Hearing Regarding the 2015-2016 Budget  This is an opportunity for citizens to have their opinions and perspectives about the 2015- 16 Budget heard by City Council. September 23 Work Session Budget  During the September 9th work session, there was a review of the first 4 of 7 Outcomes for the 2015-16 Budget: 1. Community and Neighborhood Livability 2. Economic Health 3. Environmental Health 4. High Performing Government  This work session on September 23rd will continue the discussion with a review of the remaining 3 Outcomes: 5. Culture and Recreation 6. Safe Community 7. Transportation  The general direction sought and questions to be answered are as follows: o What clarifying questions does City Council have on three Outcomes being presented? o What follow-up items are there on Budget issues related to those three Outcomes? September 30 URA Adopting the URA Financial Management Policies  The purpose of this item is to consider a Resolution of the Board of Commissioners of the Fort Collins Urban Renewal Authority adopting revised policies and procedures relating to financial management for the Urban Renewal Authority. The Policy is intended to provide a set of operating norms for future TIF commitments to be used by URA staff. September 30 Work Session Building on Basics (BOB) 2.0 and Street Maintenance Program Tax Renewal Discussion  Staff will provide an update on public engagement efforts and seek direction on recommendations for the term of the Street Maintenance tax, how to incorporate 3 Operation and Maintenance dollars in the BOB 2.0 program, and seek any clarifications needed for the October 11, 2014 off-site meeting. Commercial Water Allotments  2/3rds of commercial customers have no annual water allotment.  For the 1/3rd of the commercial customers with an allotment, this increases annual operating costs.  The economic inequity could be addressed in several ways which will be presented to City Council for consideration.  Direction sought from the Work Session: o Does Council want us to address this inequity? o If so, how? October 7 Regular Meeting Public Hearing Regarding the 2015-2016 Budget  This is an opportunity for citizens to have their opinions and perspectives about the 2015- 16 Budget heard by City Council. Housing Affordability Policy  The purpose of this item is for Council to review staff recommendations based on the Housing Affordability Policy Study that staff and consultants have been working on since January.  Council will consider the prioritization and implementation of selected strategies.  Council will be asked for policy guidance on long term objectives.  Council will be informed about why certain regulatory options are not being recommended. Natural Areas Master Plan  The Natural Areas Master Plan has been updated through 2014. City Council will consider adoption of the revised Plan. The Plan reviews the history of the program and identifies land and water conservation, recreation, education/outreach, public safety, habitat restoration and other priorities for the next decade. Clydesdale Park Annexations  This is the first reading of the ordinance for the annexation of the existing Clydesdale Park subdivision located east of Interstate 25, south of the intersection of East Mulberry Street and Carriage Parkway. Clydesdale Park includes 217 single-family residential lots on approximately 75 acres.  Residents of the Clydesdale Park neighborhood have requested this annexation. Should the annexation be accepted, a second reading of the ordinance is scheduled for October 21st.  The approval of the annexation will enable the neighborhood’s streets, including Carriage Parkway, to be accepted into the City of Fort Collins' Street Maintenance Program. Residents have expressed concern that their continued maintenance responsibility for their existing portion of Carriage Parkway is no longer reasonable if the parkway is extended and used by future development to the south. 4 Adoption of the Downtown Poudre River Plan  This Plan has been under development for about 1½ years and describes a vision for Poudre River improvements from Shields Street to Mulberry. The improvements are related to stormwater management, habitat enhancements, and recreation enhancements.  The Plan describes potential improvements for six different sections, or reaches, of the river. Reach #3, from College Avenue to the Burlington Northern Railroad Bridge has drawn a great deal of public attention, in particular because there is an opportunity to build a kayak park along with other improvements that will enhance habitat, as well as mitigate the 100-year flood overtopping of College Avenue. Supplemental Appropriation to Complete Woodward Public Improvements  Woodward Public Improvements included 3 projects: Transmission line relocation, Natural Areas restoration, and Right of Way improvements to Lincoln & Lemay.  The Natural Areas & Right of Way improvements are on or under budget.  The transmission relocation improvements are complete and final costs exceeded budget by $254K primarily due to additional costs associated with the footing of each tower. While PRPA developed the estimates, the City bears the risk of any additional costs.  Staff recommends funding the additional cost of $254K from unanticipated 2014 General Fund revenue on October 7 th . ECONOMY FORT COLLINS SALES AND USE TAX COLLECTIONS July 2014 Sales tax collections increased 7.7% Use tax collections excluding rebates increased 15.7% Sales and use tax collections excluding rebates increased 9.1% 2014 YTD Sales tax collections increased 6.7% Use tax collections excluding rebates increased 25.3% Sales and use tax collections excluding rebates increased 9.7% 5 CAPITAL PROJECTS (new information noted in blue text) ENGINEERING 1. CITYWIDE PEDESTRIAN ACCESS PROJECT 2. MULBERRY BRIDGE (SH 14) AT THE POUDRE RIVER ENHANCEMENTS 3. WEST MULBERRY BRIDGE REPLACEMENT DESIGN 4. WEST PROSPECT BRIDGE REPLACEMENT DESIGN 5. ARTHUR DITCH BOX SECTION REPLACEMENT – OAK/WHITCOMB, LOOMIS/OLIVE, CANYON AT MULBERRY POOL 6. SHIELDS STREET AND DRAKE ROAD INTERSECTION IMPROVEMENTS 7. TIMBERLINE IMPROVEMENTS – PROSPECT TO BLACKBIRD 8. HORSETOOTH AND TIMBERLINE INTERSECTION IMPROVEMENTS 9. VINE AND SHIELDS ROUNDABOUT 10. KECHTER AND TIMBERLINE RIGHT TURN LANES 11. REMINGTON GREENWAY 12. SH 392 AND I-25 INTERCHANGE SIGNS 13. NORTH COLLEGE IMPROVEMENTS – CONIFER TO WILLOX 14. DOWNTOWN RIVER DISTRICT IMPROVEMENTS 15. SPRING CREEK OVERPASS 16. LINCOLN AND LEMAY IMROVEMENTS / WOODWARD CAMPUS 1. CITYWIDE PEDESTRIAN ACCESS PROJECT Funding Source: KFCG Funds Estimated Project Budget: $450,000 Status: On Budget, On Schedule  The City of Fort Collins Pedestrian Plan addresses citywide pedestrian needs and is a data-driven approach based on the importance for safe, sustainable walking within City limits. It however lacks comprehensive condition data for the City’s sidewalk system. Prior to the beginning of the Pedestrian Needs Assessment project, there was not an inventory of existing sidewalks or sidewalk deficiencies. This project provides a complete City sidewalk inventory, identifies sidewalk inadequacies, and identifies inadequate handicap accessibilities according to Americans with Disabilities Act (ADA) requirements.  Data collection has been completed with approximately 540 street miles of sidewalk assessed and inventoried at this time.  37,741 accessible ramps have been identified as acceptable, substandard, or missing in accordance with the ADA requirements.  Staff has implemented a methodology and analysis program used to prioritize pedestrian projects. This program takes into account a variety of factors such as, but not limited to, demand, corridor function, and high priority areas. o Upcoming project locations scheduled are to include: 2014 – Cherry, Boardwalk, Lemay 6 o Current projects: Irish Drive sidewalk was completed with the SMP group. Jackson is complete with the exception of the raised boardwalk through a group of trees. Parks is reviewing the proposed idea with construction being scheduled for late September. Additional projects are currently on hold while the contractor completes higher priority projects for other City groups.  Staff has identified approximately 21 projects for 2014.  Level of service is being implemented for the sidewalk program and is scheduled for August 2014.  Prioritization Model is complete and has been posted to the engineering website: http://www.fcgov.com/engineering/pedneeds.php  Staff is continuing to collect and update data from projects and developments that occurred 2013 and 2014.  Staff is beginning to review projects for 2015. 2. MULBERRY BRIDGE (SH 14) AT THE POUDRE RIVER ENHANCEMENTS Funding Source: City of Fort Collins Estimate Project Budget: $750,000 Status: On Budget, On Schedule  Colorado Department of Transportation (CDOT) is replacing the Mulberry Bridge (State Highway 14) over Poudre River Bridge starting in the fall of 2014. Construction was delayed due to the September 2013 flood.  Due to the construction, eastbound traffic on Mulberry will be detoured for the duration of construction.  CDOT plans to begin pre-construction activities in September 2014, with bridge work anticipated to begin shortly thereafter.  The City is working with CDOT to add city-funded enhancements to the bridge including decorative railings, landscaping and urban design features. 3. WEST MULBERRY BRIDGE REPLACEMENT DESIGN Funding Source: Colorado Off System Bridge Program (BRO) funds and KFCG 2011 Estimated Project Budget: $1.1M 7 Status: On Budget, On Schedule  The goal of the project is to replace the existing structurally deficient bridge with a new bridge that meets the current standards.  The posted weight limit on this bridge precludes the passage of emergency vehicles from the nearby fire station.  In December 2011, the City received a grant for $700,000 in Colorado Off System Bridge Program (BRO) funds for some of the construction cost.  Design efforts are underway. Construction is planned for fall 2014. 4. WEST PROSPECT BRIDGE REPLACEMENT DESIGN Funding Source: KFCG 2011 Estimated Project Budget: $1.2M Status: On Budget, On Schedule  The goal of the project is to replace the existing structurally deficient bridge with a new bridge that meets the current standards. 8  The State of Colorado inspected this bridge in March 2011 and found significant structural issues resulting in a temporary plate being installed and load posting restricted to 15 tons.  City Engineering has awarded the construction contract to Mountain Constructors.  All sidewalks, bicycle lanes, and driving lanes on the Prospect / New Mercer bridge were reopened on May 6, 2014.  The decorative steel railings are being fabricated and will not be available to install until late July. Decorative rock work will follow the railing installation and the project will be completed in mid-August, 2014. 5. ARTHUR DITCH BOX SECTION REPLACEMENT – OAK/WHITCOMB, LOOMIS/OLIVE, CANYON AT MULBERRY POOL Funding Sources: KFCG / Operation Services, Facilities Estimated Project Budget: $2.5-3M Status: On Budget, On Schedule  The intent of this project is to replace three structurally deficient bridge/box sections with new concrete box culverts.  Value engineering and best practices are being applied to develop the most cost efficient replacement methods. All three locations lie within local floodplains and will be evaluated prior to final design approval. Coordination efforts also include the Streets Dept. maintenance schedules to ensure the roadway is reviewed for both short and long term impacts.  Staff is currently reviewing the 95% plan sheets. Final plans are expected to be available for bid by the end of September 2014. Coordination within City departments and outside companies continues be an active part of the design process.  Floodplain clearances have been approved for construction, and the pertinent flood plain use permits are being issued.  Staff has sent the current plan sheets to the legal staff of the Arthur Ditch for review and impending ditch crossing agreement. 9  Staff continues to perform outreach to adjacent residents to provide additional information on the project and its schedule as it becomes available. 6. SHIELDS STREET AND DRAKE ROAD INTERSECTION IMPROVEMENTS Funding Sources: Federal Hazard Elimination Grant (90%) / Local Match (10%) Estimated Project Budget: $986,000 Status: On Budget, On Schedule  The main goal of this project is to reduce the accident rate that occurs at this intersection by installing dedicated right turn lanes in the north and southbound movements. A reduced movement concept is also being considered to the Raintree Dr./Davidson Rd. intersection 400 feet south of Shields and Drake.  This project has multiple funding sources - Federal Hazard Elimination Grant: $887,400, City BOB funding $98,600.  Staff has selected Interwest Consulting Group for the design of these improvements.  The intersection location has several environmental clearances to complete prior to moving towards the design stage. However, a draft concept has been developed for illustration purposes and serves as a model while the state and federal hurdles are completed.  Proposed alignments are currently being reviewed for impacts and cost, and shared with adjacent neighbors and property owners.  Other safety components that will be corrected at the intersection include: providing higher visibility for bicyclist by removing right turn movement conflict and installing ADA compliant ramps.  City staff anticipates construction of the intersection to occur in summer 2015. 7. TIMBERLINE IMPROVEMENTS – PROSPECT TO BLACKBIRD Funding Source: Building on Basics (BOB) Estimated Project Budget: $3,500,000 Status: On Budget, On Schedule 10  The goals of this project are to improve air quality, reduce vehicle wait time and reduce the accident rate by constructing a free-right turn and acceleration lane from eastbound Prospect to southbound Timberline; as identified in our Arterial Intersection Prioritization Study.  The 2005 ballot language stated this project will expand Timberline Road to four (4) lane arterial standards including:  Travel lanes, sidewalks, bike lanes and landscaped medians.  Improvements to the Prospect and Timberline intersection and all its approaches to add additional turn lanes.  The project will add a sidewalk connection for southbound Timberline from Prospect to Blackbird.  Additionally, water quality features will be constructed to minimize the flow rates and volumes as they outlet to the Spring Creek basin.  Construction is expected to begin in the spring of 2016.  A communication plan (public outreach) is being developed and will be implemented with the final design through construction.  The team is pursuing options for the deconstruction and reuse of two silos which need to be removed for roadway, bicycle, pedestrian and landscape improvements.  The project website is available through the Engineering homepage at http://www.fcgov.com/engineering/prospect-timberline.php 8. HORSETOOTH AND TIMBERLINE INTERSECTION IMPROVEMENTS Funding Source: Building on Basics (BOB) and Federal Grant (CMAQ) Estimated Project Budget: $3,500,000 Status: On Budget, On Schedule 11  The goal of this project is to relieve traffic congestion and vehicle wait time by constructing additional intersection turn lanes.  The need for these safety and operational improvements were identified in the Engineering Department’s recently completed Arterial Intersection Prioritization Study. Turn lane needs are as follows: o Right turn lane (southbound Timberline to westbound Horsetooth) o Right turn lane (eastbound Horsetooth to southbound Timberline) o Second left turn lane (northbound and southbound Timberline)  City Staff appropriated the CMAQ funds through Council in February 2013. These funds were applied for based upon the need for a dedicated, southbound right turn lane.  The project has moved to the final design phase, streetscape visioning and coordination with property owners for real estate purchases (right of way and easements).  Additionally, the project will include median and landscape improvements, sidewalk and bicycle lane improvements and pavement improvements.  Construction is expected to begin in the spring of 2015.  A communication plan (public outreach) is being developed and will be implemented with the final design through construction. The project website is available through the Engineering homepage at http://www.fcgov.com/engineering/horsetooth-timberline.php 9. VINE AND SHIELDS ROUNDABOUT Funding Source: Building on Basics (BOB), Federal Grant (STP Metro) and Regional Road Impact Fees Estimated Project Budget: $1,700,000 Status: On Budget, On Schedule 12  The main goal of this project is to increase mobility at the intersection via multimodal transportation improvements. Currently, the east-west lanes on Vine Drive are not aligned causing additional independent traffic movements which effect the overall operation of the signal timing.  The City received a federal grant award for $1,054,000 through the North Front Range Metropolitan Planning Organization in the STP-Metro category.  Other safety concerns which will be corrected at the intersection entail: adding sidewalks along the northern portion of the project, installing ADA compliant ramps/crosswalks and adding bike lanes.  The City continues to coordinate our intersection project with Larimer County’s proposed improvements to Shields Street from 400’ north of Vine Drive to Willox Lane. The County received three federal grants for this stretch of roadway to accomplish the following: o Replace the Shields Street Bridge over the Poudre River o Improve the Poudre River trailhead parking area and river access o Reconstruct approximately one mile of Shields Street  Construction is expected to begin in the spring of 2015.  A communication plan (public outreach) is being developed and will be implemented with the final design through construction.  The project website is available through the Engineering homepage at http://www.fcgov.com/engineering/vsi.php 10. KECHTER AND TIMBERLINE RIGHT TURN LANES Funding Source: Building on Basics (BOB) Estimated Project Budget: $725,000 Status: On Budget, On Schedule 13  The goal of this project is to relieve traffic congestion and vehicle wait time by constructing two dedicated right turn lanes along southbound and northbound Timberline Road.  The need for the northbound turn lane improvement was identified in the Engineering Department’s recently completed Arterial Intersection Prioritization Study. The need for the southbound turn lane improvement was triggered by the proposed traffic impacts for the Crowne on Timberline development. The developer funds were appropriated into the Capital Project so the two turn lanes could be designed and built as one package.  The proposed improvements will reduce the peak hour delay by 15%.  The project will include an interim, detached sidewalk along Timberline Road, with accessible curb ramps being installed on the northeast and southeast corners.  The City will purchase the ultimate right-of-way from the southeast corner property owner to accommodate the future four-lane Timberline section.  Construction will be completed by mid-September.  A communication plan (public outreach) is being developed and will be implemented with the final design through construction  The project website is available through the Engineering homepage at http://www.fcgov.com/engineering/kechter-timberline.php 11. REMINGTON GREENWAY Funding Source: FC Moves Funding Estimated Project Budget: $450,000 Status: On Budget, On Schedule 14  The goal of this pilot project is to offer flexibility in street design to calm traffic, support active modes of transportation and integrate stormwater management strategies.  The conceptual design calls for buffered bike lanes, removal of the traffic signals between Prospect and Mulberry, and the construction of a mini roundabout with curb bulb outs at Remington and Laurel.  Future phases would add more bulb outs at strategic locations to shorten the pedestrian crosswalk lengths.  Construction is expected to begin in the spring of 2015.  A communication plan (public outreach) is being developed and will be implemented with the final design through construction.  The project website is available at http://www.fcgov.com/advanceplanning/remingtongreenway.php 12. SH 392 AND I-25 INTERCHANGE SIGNS Estimated Project Budget: $300,000 Status: On Budget, On Schedule 15  The goal of this project is to construct welcoming and aesthetically pleasing signs for traffic entering the City of Fort Collins and the Town of Windsor along SH 392.  The City has pursued a number of potential sign locations. It was determined that the medians will be the best location for the signs.  The City is partnering with the Town of Windsor for the design and construction of the signs.  Design is currently underway, with construction expected to take place in fall 2014 / spring 2015. 13. NORTH COLLEGE IMPROVEMENTS – CONIFER TO WILLOX Funding Source: Federal Grants, Local Matching Funds Estimate Project Budget: $12 million Status: On Budget, On Schedule  The intent of this project is to design and construct improvements along North College Avenue from the Conifer/Hickory intersection to Willox Lane, bringing this section of North College up to four-lane arterial standards as defined by the Larimer County Urban Area Street Standards. Both medians and sections of the planned rear access roads are included in the project.  The overall project budget is $12.0 million. This is comprised of roughly 60% federal funds and 40% local funds.  Pre-project utility relocations began in early June 2014, with an expected completion date of September 2014.  Construction of a rear access road west of North College began in late-July 2014. The expected completion date of this project is late September 2014.  Construction for the improvements along North College Avenue is anticipated to begin in late September 2014.  Additional project information is available at http://www.fcgov.com/engineering/ncollege.php 16 14. DOWNTOWN RIVER DISTRICT IMPROVEMENTS Funding Source: Federal Grants, Local Funds, DDA Funds Estimate Project Budget: $1.48 million Status: On Budget, On Schedule  The goal of this project is to develop a consulting contract capable of providing engineering services and subsequent construction projects for various improvements within the Downtown River District.  The project will also have the capability to provide various engineering services in preparation of anticipated development.  The first two projects to be addressed are developing an implementation plan for improvements along Jefferson Street between College Avenue and the Mountain /Lincoln intersection based on the available budget, and to develop a conceptual design for improvements along Willow Street.  Additional projects to follow include the development of engineering plans and specifications, as well as construction of these improvements along both Jefferson and Willow based on the results of the above.  Design work on the Jefferson Street and Willow Street projects has begun. 15. SPRING CREEK (NRRC) OVERPASS Funding Source: Federal Congestion Mitigation and Air Quality (CMAQ) grant and BOB funds Estimated Project Budget: $2.75 million Status: On Budget, On Schedule 17  The goal of the project is to construct a new pedestrian/bike overpass that will link the Mason Bike Trail and the federal campus on the west side of the railroad tracks to the Mason Corridor Bus Rapid Transit MAX station on the east side of the tracks.  An additional phase of construction will add stairs to the structure. 16. LINCOLN AND LEMAY IMROVEMENTS / WOODWARD CAMPUS Funding Sources: City of Fort Collins General Fund, Intersection Improvement Fund Estimated Project Budget: $2.1-2.3M Status: On Budget, On Schedule  This project has several goals. The first is to install three new points of access/turn lanes to the Woodward Campus, two on Lemay, and one on Lincoln. The project will also complete the improvements along the west side of Lemay between Lincoln and Mulberry. This includes completion of the Magnolia intersection to a full movement location along with curb, gutter and sidewalk for the entire length. An interim sidewalk will also be constructed along the Lincoln front that connects pedestrians to the Poudre River bridge on Lincoln and into downtown. Lastly, a double left turn configuration will be installed on southbound Lemay to eastbound Mulberry for as a result of anticipated traffic volumes for this area.  The City and Mortenson Construction have partnered to identify and employ best practices regarding communication, safety and general project information to the local businesses and nearby neighborhoods.  City of Fort Collins Light and Power will complete the power supply ductbank conduit in the coming weeks.  It is anticipated that the public water and sewer system will be completed and largely accepted by the end of September.  The roadway improvement bids were opened with Walsh Construction as the lowest apparent bidder. With the negotiations, the pending construction start time will also be vetted. 18  The City maintains the ability to start improvement in the fall of 2014 or spring of 2015. This schedule alternative has been coordinated with the Woodward / Mortenson team who remains receptive to either option. UTILITIES COLLEGE AVENUE WATER LINE REPLACEMENT Project Description: In anticipation of CDOT paving in 2015, this project will replace the existing 4” cast iron waterline in College Avenue from Mulberry to Buckeye. Project Status: Construction phase and Public Outreach continues. Anticipated Completion Date: This project is planned to start May 5 th and be completed end of August. Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $2.5 Million Budget Status: Project is within budget. Highlights:  All work is complete. College Avenue is open to traffic. WEST VINE BASIN OUTFALL CHANNEL Project Description: This is a joint project between the City and Larimer County to design and construct a stormwater outfall channel for the West Vine Basin to the Poudre River. The project is being coordinated with Larimer County’s widening of Shields Street from the Arthur Ditch to Willox. Project Status: All construction is complete except for final landscaping to be completed in September. Anticipated Completion Date: Fall 2014 Ahead/Behind/or on Schedule: On Schedule Total Project Budget: Alternatives Analysis Phase - $104,000; Final Design - $243,000; Total Project Cost - $2.8 Million Budget Status: Project is within budget. Highlights:  All work is complete. 19 GRANDVIEW AVENUE VALVES REPLACEMENT PROJECT Project Description: Decommissioning of Utilities’ 20 inch water transmission main between Tarragon Lane and Grandview Avenue and the removal of the existing valve vault in LaPorte Avenue at Grandview Avenue. The project involves removing services and distribution lines from the 20 inch steel line and tapping them into other nearby mains. There will also be a 12 inch HDPE sliplining at Lilac Apartments. The valve vault in LaPorte Avenue at Grandview will be taken out of service. This will remove four-90 year old inoperative valves from the distribution system. Three new 20 inch butterfly valves and new valve vaults will replace the old obsolete valve system. The 20 inch cast iron main will then be cut, drained and flash-filled. Work scheduled to proceed repaving of LaPorte Avenue by Streets from Shields Street to LaPorte Avenue in August 2014. Project Status: Project complete Anticipated Completion Date: Work to be completed by August 2014. Ahead/Behind/or on Schedule: Project completed on schedule. Total Project Budget: Design and Valve Procurement $750,000.00 Budget Status: Project completed under budget. Highlights:  90 year old valve vault containing 4 inoperative 20 inch valves to be abandoned.  3 new 20 inch butterfly valves and valve vaults to be installed. BOXELDER CREEK OUTFALL IMPROVEMENTS Project Description: Large regional flood control project to be designed and constructed under Intergovernmental Agreements with Timnath Development Authority and Boxelder Basin Stormwater Authority. Project involves channel grading and road crossing improvements from I-25 to the Poudre River along the Boxelder Creek Corridor. Project Status: Preliminary design complete. Have filed the environmental assessment with Colorado Division of Wildlife. CLOMR submittal in preparation. Final Design and Permitting Requirements: May 2014 – April 2015 Anticipated Completion Date: December 30, 20 2016 On Schedule: On Schedule Total Project Budget: $4,100,000.00 Budget Status: Project within budget projections. Highlights:  Preliminary Design Complete.  Design of siphon at Lake Canal and canal crossing agreement negotiations underway.  Project under final design.  Project scheduled for construction in 2016 after the Mulberry Bridge Replacement Project by CDOT is completed due to road closure restraints. CATHODIC PROTECTION OF WATER TREATMENT FACILITY AND TRANSMISSION AND DISTRIBUTION SYSTEM WATER LINES Project Description: Investigation of existing systems in place used to protect waterlines from corrosion; design of rehabilitation of existing and new systems to prevent corrosion; and construction of modified and new systems. Project Status: On Schedule Anticipated Completion Date: This is an ongoing project. Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $304,000 (2014) Budget Status: Within Budget Highlights:  Working with consultant and contractor on testing current cathodic protection levels and locations; and installing modified and new systems where needed.  Reviewing projects and work status for 2014 with consultant and contractor to create schedule and work orders.  Working at the Water Treatment Facility on the new yard piping project to include and update cathodic protection of the new piping, then connect into rectifiers.  Working with Cathodic Protection consultant to study integrity and continuity of 60” PCCP transmission main from WTF to intersection of Overland Trail and Lake Street.  Working with contractor on recommendations for repairs and modifications to cathodic protection on the 60” PCCP transmission main and at the WTF.  Working with contractor to install new test station on the 60” PCCP transmission main this fall 2014. 21 STREAM REHABILITATION AND ENHANCEMENT PROGRAM Project Description: Stream rehabilitation and habitat enhancement across City including stabilizing stream channel morphology, rehabilitating/creating new native in-stream and riparian habitat to attract and support native fish and wildlife populations, and promote BMPs to improve water quality. First watershed in program is Fossil and Mail Creek. Project Status: Working with consultant and contractor on schedule for Fossil Creek construction, and Mail and Spring Creeks environmental surveys for future permitting. Anticipated Completion Date: Construction of first project, Fossil Creek reach upstream of Lemay, to begin October 2014. Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $1,200,000 Budget Status: Within Budget Highlights:  Centennial Archaeology conducted a Limited Results Cultural Resource Survey for Mail Creek and Spring Creek for next year’s COE submittals.  Received Nationwide permit from Corps of Engineers.  Reviewing requirements for groundwater permit with CDPHE.  Received groundwater permit from CDPHE.  Working with team on costs and schedule for construction.  Working with PR on website.  On track for Fossil Creek segment construction to begin this fall.  Preparing contractor work order contract documents as well as consulting engineer resident engineering contract. RIGDEN MUNICIPAL STORAGE POND Project Description: The project will consist of the construction of a gravel pit water storage reservoir to include a pump station and associated piping. The project is located northeast of the Ziegler Road and Horsetooth Road intersection. Purpose of the storage is to retime flows to meet water rights return flow obligations and meet augmentation requirements. Project is a cooperative effort with Natural Areas and Parks. Project Status: Under construction. Anticipated Completion Date: Design complete in 2013; construction in 2014. Ahead/Behind/or on Schedule: On Schedule Total Project Design Budget: $457,782 22 Total Project Construction Budget: $10,600,000 Budget Status: Within Budget Highlights:  The earthwork contractor has removed 1,311,000 cubic yards of material or over half of what will be removed.  The pump station construction is nearly complete.  The project piping has been completed. WATER TREATMENT FACILITY YARD PIPING MODIFICATIONS Project Description: Design and construction of a new 48 inch diameter steel raw water pipeline to replace the aged 30 and 36 inch Horsetooth raw water pipelines, and a new 36 inch diameter steel backwash pump station influent line to replace the existing cast iron pipeline. Both of these pipelines have shown damage due to electrolysis. The existing finished water backwash influent line is also located under an existing sludge drying pond, increasing the possibility of cross contamination, so it will be abandoned Project Status: Kicked off design May 2013. Construction began in October 2013. Anticipated Completion Date: Planned for fall 2014. Ahead/Behind/or on Schedule: On schedule. Project suspended until October when water demand goes down to complete Horsetooth Raw Water lines. Total Project Budget: $2,300,000 Budget Status: On Budget Highlights:  Placed asphalt base course on roadway where pipe is installed.  Rotated valve operators on 36” and 42” Butterfly valves.  Finished air valve construction at new 24” / 27” connection.  Performed final grading at the new Meter Vault and air valve.  Final graded backfill at 36” Backwash Pump Station feed.  Finished cleanup and final punch list items for work completed.  Removed existing Valve Vault #1 and hauled away debris.  Plugged existing 20”, 36”, 27” and 24” pipelines at Valve Vault #1 with concrete.  Finished 60” pipeline blowoff structure.  Worked on Punch List items. 23 PLUM STREET SANITARY SEWER IMPROVEMENTS Project Description: Design and construction of a replacement sanitary sewer system that currently lies in Shields Street, Plum Street between Shields and City Park Avenue and City Park Avenue. This sewer is in very poor condition and will soon be undersized as new development occurs in the immediate vicinity. Project Status: Project complete except closeout. Anticipated Completion Date: Project complete except closeout. Ahead/Behind/or on Schedule: Project complete except closeout. Total Project Budget: $1,000,000 Budget Status: On Budget Highlights:  Asphalt patched Plum Street and City Park Avenue with base course.  Completed Punch List items.  All pipelaying and restoration complete.  Paving restoration complete.  Issued Certificate of Substantial Completion. WATER TREATMENT FACILITY – 2014 MASTERPLAN UPDATE Project Description: Fort Collins Utilities currently has two planning documents, the 2007 Water Treatment Facility Electrical Master Plan (EMP) and the 2010 Water Treatment Facilities Master Plan. This document will update the Water Treatment Facilities Master Plan and incorporate the EMP. Project Status: Issued RFP in December 2013. Anticipated Completion Date: Masterplan to be completed by December 2014. Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $350,000 Budget Status: On budget Highlights:  Due to the resignation of current Water Production Manager, work on Water Treatment Facility – 2014 Masterplan Update has been suspended until new Water Production Manager is hired. 24 WATER TREATMENT FACILITYSTORMWATER CONTAINMENT BERMS Project Description: Design and construction of a system of swales and berms around the existing solids drying beds to protect them from spilling in a 100 year rain event. Project Status: City Stormwater Division portion of design kicked off March 2013. Ayres Associates portion of design started March 2014, complete June 2014. Construction began in July 2014. Anticipated Completion Date: Substantial completion scheduled for October 2014. Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $300,000 Budget Status: On Budget Highlights:  City Stormwater engineering completed design criteria.  Ayres Associates contracted to perform civil design.  Hydro Construction contracted to construct improvements.  Construction begins in July 2014 with completion scheduled for early October 2014.  South swale excavation started, with concrete crossing pan constructed.  South swale completed except seeding.  Solids Drying Areas #2 and #3 swales excavated.  Solids Drying Area #3 Berm is approximately 60% complete. WATER TREATMENT FACILITY T3 SEDIMENTATION BASIN IMPROVEMENTS Project Description: Design and construction of an equipment replacement project for the T3 Treatment Train at the WTF. Existing tube settlers, collection troughs and chain and flight collectors were installed in 1979 and have reached their useful life. Project Status: CH2M Hill was selected as design engineers and Hydro Construction selected as the contractor for this project. Design kicked off in June 2014. The first phase of this project will be to prepurchase the equipment with construction scheduled to begin in February / March 2015. Anticipated Completion Date: Substantial completion scheduled for May 2015. Ahead/Behind/or on Schedule: On schedule. 25 Total Project Budget: $1,300,000 Budget Status: On budget Highlights:  CH2M Hill is selected as design engineer.  Hydro Construction is selected as contractor.  Technical Memorandum and draft specifications are complete. NORTH SHIELDS STREET SANITARY SEWER INTERCEPTOR Project Description: Design and construction of a wastewater sewer interceptor line along North Shields Street from the Poudre River north to US 287. This project will accommodate future growth and provide a collection system for residential properties along US 287 with failing septic systems. Larimer County is preparing to reconstruct Shields Street from the new Poudre River Bridge north to Willox Street in 2015, and has agreed to coordinate its construction and road closures to accommodate the City’s Project. Project Status: Currently in final design. Anticipated Completion Date: May 2015. Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $2,200,000 Budget Status: Within Budget Highlights:  Completed conceptual level design and currently working towards final construction plans.  Coordinating design and construction with Larimer County Engineering and City of Fort Collins Vine Drive/Shields Street Roundabout Project (also anticipated to be constructed concurrently).  Coordinating with utility companies that have existing lines along the proposed sewer alignment.  Coordinating internally with City staff on the floodplain use permit for the sewer crossing of the Poudre River.  Coordinating easements with surrounding property owners and interests. DRAKE WATER RECLAMATION FACILITY SOUTH PROCESS TRAIN IMPROVEMENTS Project Description: The project will consist of the demolition of a portion of the existing process train, construction of new tanks for the new biological nutrient removal process, upgrading the south aeration system, and replacement of old mechanical and electrical systems. Project Status: Independent Estimate in progress. Anticipated Completion Date: March 2016 Ahead/Behind/or on Schedule: Behind Schedule 26 Total Project Design Budget: $1.2 million Total Project Construction Budget: $7.7 million Budget Status: Currently within budget. Budget could be adversely impacted by aeration blower quotes +/- $400k. Highlights:  Independent Estimate underway.  90% Design completed. DRAKE WATER RECLAMATION DIGESTER LID DEMOLITION Project Description: The project consists of the demolition of failed anaerobic digester lid 611 in preparation for replacement of the lid. Project Status: 100% complete Anticipated Completion Date: June 2014 Ahead/Behind/or on Schedule: 60 days behind schedule. Total Project Design Budget: $25,000 Total Project Construction Budget: $210,000 Budget Status: Within Budget Highlights:  Digester Lid completely removed. Site cleanup complete. DRAKE WATER RECLAMATION DIGESTER LID REPLACEMENT Project Description: The project consists of the installation of digester lid 611 Project Status: 10% complete. Anticipated Completion Date: May 2015 Ahead/Behind/or on Schedule: On Schedule. Total Project Budget: $500,000 Budget Status: Within budget. Highlights:  Digester Lid procurement work order complete.  Negotiating design and construction work orders. 27 NORTHEAST COLLEGE CORRIDOR OUTFALL PROJECT (NECCO) PHASE 3 Project Description: Analysis, feasibility, design, and construction of storm drainage outfall for the Lower Dry Creek Basin east of North College and south of the Larimer and Weld Canal, particularly a regional detention pond just north of East Vine Drive and culverts to convey flows and provide an outfall under East Vine Drive and the BNSF along Dry Creek to create connectivity for flow conveyance and drainage for Dry Creek. Project Status: Currently in design and feasibility. Anticipated Completion Date: December 2015 Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $1,000,000 (2014) Budget Status: Within Budget Highlights:  Working with consultant on design and alternatives, as well as scheduling CLOMR preparation and permitting with BNSF and Corps of Engineers.  Working with ROW to begin discussions on purchasing land for regional pond and easements for conveyance pipes and channels.  Met with BNSF Roadmaster to discuss permit submittal to bore stormwater pipes under BNSF tracks.  After meeting with COE, delineated wetlands to determine location of detention pond, outside of wetlands for virtually no impacts to existing wetlands.  Designing pond to minimize impacts to existing wetlands, and mitigate necessity for COE permit. DOWNTOWN RIVER DISTRICT (DTRD) PROJECT – PHASE 2 – OLD ELK DISTILLERY Project Description: review and design feasibility of water, sewer, and stormwater utilities design in the DTRD area along Jefferson and Willow Streets in relation to the proposed conceptual development in the old Kiefer Concrete property at the SW corner of Willow and Linden - new Preliminary Development Review Old Elk Distillery project with the following uses including restaurant, private dining, pub, distillery, tasting room, retail, music venue, meeting space and offices. Project Status: Currently in feasibility and review. 28 Anticipated Completion Date: December 2016 – depending on funding Ahead/Behind/or on Schedule: On Schedule Total Project Budget: To be determined Budget Status: Within Budget Highlights:  Internal discussion and review of project for roadway, utility, multimodal and urban design improvements along Jefferson and Willow Streets within the DTRD limits; according to Engineering downtown, constructed improvements, project limits, and schedule are dependent on funding. 29 COMMUNITY EVENTS Wild Animal Sanctuary Tour Location: Senior Center, 1200 Raintree Drive Date/Time: Tuesday, September 16, 2014 8:30 AM Details: African Lions and more! The Wild Animal Sanctuary has been rescuing exotic wildlife and endangered species since 1980, and is currently home to more than 290 Lions, Tigers, Bears, Jaguars, Leopards and other wildlife. Since our last visit, they have added a number of new habitats and rescued over 100 new animals. Note: Fee includes transportation, admission, tour and escort. Lunch is on your own at the Pepper Pod. Located in Keenesburg, CO. Contact Information: Recreation / Phone: (970) 221-6655; Email address: recreation@fcgov.com Harvest Festival 2014 Location: Gardens on Spring Creek, 2145 South Centre Ave Date/Time: Saturday, September 20, 2014 10:00 AM Details: Celebrate the abundance of the harvest with cooking and urban homesteading workshops, tastings of fresh produce, a marketplace full of local artisans and food producers, entertainment, kids' activities and food vendors.  Marketplace of artisans  Free homesteading workshops  Fall Plant Sale  Chile Roasting  Fun kids and family activities  Live local entertainment & Food Contact Information: Gardens on Spring Creek / Phone: 970-416-2486 WY Territorial Prison Tour Location: Senior Center, 1200 Raintree Drive Date/Time: Wednesday, October 1, 2014 8:30 AM Details: We’ll tour the Wyoming Territorial Prison State Historic Site in Laramie which has an incredibly rich history. Run as a federal (territorial) and state prison from 1872 to 1903, it was dedicated to “evil doers of all classes and kinds.” The most famous of these was Robert LeRoy Parker, better known as “Butch Cassidy.” Note: Fee includes motor coach transport, entrance fee, guided tour, lunch and escort. Buffet lunch at Cavalryman Steakhouse. Moderate walking. Wear comfortable shoes. Contact Information: Recreation / Phone: (970) 221-6655; E-mail address: recreation@fcgov.com To view the full calendar of events, visit http://www.fcgov.com/events/ 30 PUBLIC SAFETY UPDATE FORT COLLINS POLICE SERVICES Coffee with the Chief The Coffee with Chief Hutto monthly community outreach activity was held August 28 at Mugs Coffee Lounge, 261 S. College Ave. The next event will be held on September 25 from 9–10 a.m. at Starbucks, 2601 S. Lemay Avenue. Neighborhood Night Out Police Services participated in the annual Neighborhood Night Out event on August 5 th . Members visited several neighborhoods to share in the event. Community Welcome On August 27 th , Police Services, along with other community members, visited door to door with residents surrounding Colorado State University. Annual Citizen’s Academy On August 28 th 34 citizens began the 13 week Citizen Academy at Police Services. This is an opportunity for citizens to gain a better understanding and experience the activities of Police Services. Serious Assault Investigation On August 7, 2014, officers responded to a call of a seriously injured man in the 1900 block of Oakwood Drive. The victim had been assaulted and seriously injured. The investigation continues. Window Peeping and Burglaries Several burglaries and window peeping events happening over several months seem to be tied together. Police Services CID is actively investigation these events and requested assistance from the public in gaining information. Police Services also sent out information to the public on how to identify suspicious activity and urged citizens to call police immediately on these types of cases. Hit and Run Accident – Car versus Bike On August 28, 2014, Police Services investigated a motor vehicle accident where a vehicle hit a bicyclist on Vine Drive between Linden and Lemay. The motorist left the scene without reporting the accident. The bicyclist was seriously injured. This case continues to be actively investigated. Crime Prevention This month, the Crime Prevention Specialist had 26 telephone calls on a variety of topics. There were presentations/interactions with 515 people which included helping Boy Scouts earn their merit badge in learning about Alcohol, Tobacco, and Drugs to talking to a portion of the 9000 people attending the annual Rotary Club Peach Festival. 31 A breakdown of the month’s Crime Prevention activities follows:  Neighborhood Night Out - THOUSANDS attended the event  RESTORE - 40 attended  Dealing with Difficult People Course - 50 attended  Alcohol, Tobacco, & Drug prevention - 50 attended  Crime Stoppers Community Event - 75 attended  Peach Festival, Safety booth - 9000 attend the festival and 300 visited the booth provided by Crime Prevention Crime Prevention Tip The kids are back in school and vehicle drivers need to be even more cautious because children are walking and riding bicycles to school early in the morning and then again in the afternoon. As the season changes, the sun will be in drivers’ eyes for these times. Please be even more vigilant and careful. Parents also need to talk to their children about safety along the roadways and to make eye contact with drivers before their cross the roads. POUDRE FIRE AUTHORITY Poudre Fire Authority Recognized For Performance Management Focus Washington, DC, July 8, 2014—The International City/County Management Association (ICMA) is pleased to announce that Poudre Fire Authority, Colorado, is being recognized for its performance management efforts with a Certificate of Excellence from the ICMA Center for Performance Analytics™. “The certificate program recognizes the principles of performance management,” said Randall H. Reid, ICMA Director of Performance Initiatives. “Jurisdictions meeting the qualifications have demonstrated leadership in continuous improvement and community engagement, and they serve as examples for other governments to follow.” ICMA assesses a local government’s performance management program and encourages analysis of results by comparing to peers and gauging performance over time. Performance management aids in cost reduction, program prioritization, and quality improvement. It also encourages accountability and transparency. Certificates are awarded at the levels of Achievement, 32 Distinction, and Excellence. Poudre Fire Authority is among 29 jurisdictions receiving the Certificate of Excellence – the highest level awarded. Criteria for the Certificate of Excellence include:  Reporting of performance data to the public through budgets, newsletters, and/or information provided to elected officials  Data verification efforts to ensure data reliability  Staff training  Use of performance data in strategic planning and operational decision-making  Sharing of performance measurement knowledge with other local governments through presentations, site visits, and other networking  Commitment to tracking and reporting to the public key outcomes  Surveying of both residents and local government employees  Effective and timely reporting. Colorado State University Resident Hall Advisor Training The annual training was held the first week of August. This training first began in the fall of 2007 when PFA and Colorado State University Housing and Dining Services teamed up to provide extensive safety training for staff. The training provided in this program is applicable to staff for both on-campus and in everyday situations. The program involves RA’s who participate in sessions that include Community Policing & Emergency Response, Biohazard Clean-up, Fire Extinguisher Training, Smoke-filled Hallway/Emergency Egress and mock Residence Room Burns. PFA provides the space and a few personnel to act as liaisons and instructors for the Fire Extinguisher Training, Smoke-filled Hallway/Emergency Egress and Room Burns. CSU provides the transportation and instructors for all other sessions. The highlight of the day, the room burn, happens immediately after classroom-type sessions are concluded. Of the many reasons for this particular exercise, the main reason is to show how easily a fire can start, build, and become deadly in a matter of minutes. Staff is able to observe in graphic detail what few people ever witness; a structure fire from incipient stage to flashover where everything in an area (usually a room) reaches its ignition temperature and ignites. Many critical points are made regarding smoke alarms, or lack thereof, smoke production, types of chemicals contained in smoke from a typical residential fire, simulated time/temperature curve and possible emergency actions. Additionally, a room is burned that contains a fire sprinkler. The contrast from sprinklered to non-sprinklered, survivable to non-survivable is evident in the different paths taken by the growing fires. Neighborhood Night Out The annual night out was held August 5th. PFA crews proudly participated (when not called away for an emergency) in this wonderful opportunity to get out and meet our customers at almost twenty events; unfortunately crews could not make it to each one. As part of our visits, firefighters were able to pass along safety messages too. 33 Fire Station 7 Open House Station 7 held their annual open house to celebrate the community and bring members together. Firefighters have hosted this event for many years now and continue to see familiar faces from the LaPorte community. As usual, this event was well attended by residents. PulsePoint APP A press conference was held on August 11 th to notify our customers that the new PulsePoint APP is coming to the Fort Collins area. Survival rates drop by ten percent for every minute a victim of sudden cardiac arrest (SCA) waits for CPR. From 4-6 minutes, brain damage occurs, with few resuscitation attempts succeeding after 10 minutes. Now, technology can help citizens trained in CPR and automatic external defibrillator (AED) use become heroes through Pulse Point (www.pulsepoint.org), an innovative, free smart phone APP. Citizen responders are notified when there is a 911 call on a SCA and directed to the location. The nearest publicly accessible AED is also shown. Through a coalition consisting of the City of Fort Collins, Colorado State University, Poudre Fire Authority, University of Colorado Health and more, hands-only CPR, AED use and APP downloading training will be made available at several local venues: The New West Festival (August 15-17th, Old Town Square); The Peach Festival (August 23rd, Hughes Stadium); Annual Emergency Preparedness & Family Safety Expo (September 6th, The Ranch in Loveland). Another free educational opportunity will be citizen CPR trainers scheduling training sessions at local businesses throughout the summer and fall to educate staff and employees. The efficacy of the APP is determined by community involvement- get trained in CPR and sign up to receive the Pulse Point alerts. Additional certification CPR training is available through the American Heart Association and American Red Cross. Please download the APP through Google play or Apple APP store. Additionally, there is a Pulse Point AED APP, which allows the public to register locations of publically accessible AEDs. There will be a contest with prizes such as agency T-shirts, ball caps and lanyards. Recruit Welcome A small contingent of five new firefighter recruits was welcomed to PFA on August 20 th . They have been working on PFA-specific training and familiarization. The next step will be to spend 16 weeks of intense study with the Front Range Fire Consortium Academy. They should be online the first half of December 2014. 34 Incident Statistics (by category): Report Period: July 2014 Total Loss Fires 25 $38,550 Overpressure/rupture, explosion-no fire 0 Rescue / EMS 1,207 Hazardous Condition - no fire 33 Service Call 67 Good Intent Call 158 False Alarms / False Calls 114 Severe Weather & Natural Disaster 1 Special Incident Type 2 Total = 1,607 YEAR-TO-DATE 2014 Total Loss Fires 235 $1,580,307 Overpressure/rupture, explosion-no fire 6 Rescue / EMS 8,647 Hazardous Condition - no fire 222 Service Call 494 Good Intent Call 943 False Alarms / False Calls 803 Severe Weather & Natural Disaster 2 Special Incident Type 27 Total = 11,379 Comparison: July 2013 Total Loss Fires 22 $333,570 Overpressure/rupture, explosion-no fire 3 Rescue / EMS 1,144 Hazardous Condition - no fire 21 Service Call 54 Good Intent Call 114 False Alarms / False Calls 117 Severe Weather & Natural Disaster 1 Special Incident Type 2 Total = 1,478 Comparison: YEAR-TO-DATE 2013 Total Loss Fires 258 $2,556,251 Overpressure/rupture, explosion-no fire 11 Rescue / EMS 8,258 Hazardous Condition - no fire 233 Service Call 487 Good Intent Call 834 False Alarms / False Calls 820 Severe Weather & Natural Disaster 2 Special Incident Type 19 Total = 10,922 *Information subject to change due to updated data. 35 BUILDING & PLANNING ACTIVITY COMMUNITY DEVELOPMENT & NEIGHBORHOOD SERVICES 2013 YTD 2014 YTD % Change Development Project Submittals Received 239 247 +3% Conceptual/Staff Reviews Performed 181 157 -13% Building Permits Issued 4,448 6,810 +53% Building Permit Valuations ($M) $251 $385 +53% Building Inspections Performed 21,487 24,045 +12% Plan Reviews Performed 1,502 1,716 +14% Development Review revenues are approximately $1.1M over projections for 2014 as of August 31st. The General Fund portion of this is $1.08M. Development Projects of note include:  Capstone Cottages Project Development Plan - A proposed new student housing project located on the northeast corner of Lincoln/Lemay, includes approximately 185 dwelling units on 26 acres. The staff review for the initial round is complete and the Applicant is revising plans based on feedback, including comments from a second neighborhood meeting held on July 24, 2014.  City-initiated Annexation of existing Clydesdale Park neighborhood - Located at the intersection of East Mulberry Street (Hwy14) and Carriage Parkway, the annexation is proceeding forward with the following key dates scheduled: September 2: City Council Initiating Resolution; September 11: Planning and Zoning Board; Oct. 7: City Council 1st Reading; Oct 21: City Council 2nd Reading.  Foothills Mall Redevelopment – The Foothills Mall Redevelopment Phase One and Phase Two Final Plan and development agreement have been recorded and site work has commenced. Phase Three is anticipated to be finalized and recorded in early August. Two Minor Amendments have been submitted. Weekly construction coordination meetings are being held with City Staff and the developer. Permits Issued:  Two master demolition permits to track all space renovations. American Demolition is current demo contractor of record.  Core & shell permit for Sears, 3400 S College – permit is nearing completion.  Multiple alteration permits, 215 E Foothills for common area and concourses in main mall structure – work is progressing.  New parking structure, 315 E Foothills – work just getting started.  New core and shell, 3120 S. College – work just getting started. Permits Under Review: 36  Cinemark Movie Theater, 335 E Foothills – plan review is complete.  New core and shell, 3100 S. College – plan review is pending awaiting return of items requested.  Summit Parking Garage – Upon appeal Council remanded the Summit Parking Garage development project back to the Hearing Officer for further consideration. The remand hearing is scheduled for September 4, 2014.  Woodward – Final plans for Phase One are complete and site work for the main campus building has commenced. A minor amendment was also submitted on July 18, 2014 to change the approved Final Plans for Phase One. The changes remove the Production Support Building (PSB), located along East Lincoln Avenue, from the Phase One plans and expand the main building to include a portion of the PSB functions. The changes also integrate additional landscaping into the East Lincoln frontage to further buffer views toward the main building. The Final Plans reserve the option to include the PSB and/or other buildings along East Lincoln with subsequent phases. Permits Issued:  Footing and Foundation (F&F) permit for the core and shell of the Phase One ITS building, which allows installation of all structural foundations and underground utilities. Underground inspections have begun with no issues at this time. Permits Under Review:  Tenant finish plan review for the ITS building is currently in process and is anticipated to be complete by September 8. Projects that submitted final plans in August:  Mason Street Sustainable Development, 401 S. Mason, 7-story office building  Avondale Cottages, residential project with 10 dwelling units Construction Projects of Note for August:  Tenant finish permit for the Banner Health Medical Group to finish out new hospital.  New 337,566 square foot parking structure and a 14,647 core and shell building for the Foothills Mall.  Surge in re-roofing permits due to the June hail storm. Estimates are that 10,000 roofs were damaged and will need replacement. Other items of note:  Nature in the City – The Nature in the City strategic plan was funded through the annual appropriation ordinance and launched in January, 2014. This strategic plan will develop 37 a vision for incorporating nature into the urban environment and include design guidelines, policies, and actions for achieving this vision. o All field data have been collected at 166 sites across the City for birds, butterflies and vegetation. The draft analysis of these results will be presented to Council at the October 28 Work Session. We have met with six City Boards and Commissions and spoken with approximately 30 focus groups, classes, or organizations, with over 1,000 contacts through the project. Draft survey results indicate that residents want the project to focus on opportunities to escape from the urban environment, places to find beauty, peace or relaxation, and landscape- level connectivity for people and wildlife. o The Living Wall Task Force is finalizing a location for the community’s first living, or green, wall. It is anticipated the living wall will be located on the Mason Corridor between Old Town and CSU. We are collaborating with the Institute for the Built Environment and the Urban Lab (urbanlab.colostate.edu) to design and install the wall in the spring of 2015. o An update on the project was provided to Council via a staff report at the July 15, 2014 Council Meeting. The next discussion with Council will be at the October 28, 2014 Work Session. For more information about the project, please see our website at fcgov.com/natureinthecity.  Oil & Gas – A moratorium is now in place for all hydraulic fracturing within the City of Fort Collins. The moratorium will remain in place for up to five years and stops the current operator from using hydraulic fracturing to enhance existing wells or drill new ones. Staff has ceased working on land use code revisions until further direction is received from Council. Two firms have been retained to make recommendations on methods of compliance related to property values and health impacts of hydraulic fracturing. Staff members have met with both firms and reviewed a draft document on property values.  Smoking Ordinance Expansion Options – City Council passed two additions to the Smoking Ordinance on second reading on July 15: 1. Electronic Smoking Devices – prohibits the use of electronic smoking devices in all places where conventional smoking is prohibited. This becomes effective July 26. 2. 100% Hotel/Motel Rooms –100% of hotel/motel rooms required to be smoke-free. This becomes effective January 1, 2015. Items to consider later (October 21): 1. Parks, Trails, and Natural Areas – Council also directed staff to bring an ordinance for consideration that would prohibit smoking in all parks, trails, and Natural Areas. Golf courses would be exempt from this requirement (this direction was not unanimous). Additional information about enforcement will be provided. Additional 38 communication with Fossil Ridge High School Student Council members will occur to ensure staff understands the issues occurring at the park next to the school. 2. Public Events – Council directed staff to bring an ordinance for consideration that would require public events to be smoke-free. Council did not request the allowance of designated smoking areas. Because many public events for 2014 have already begun the permitting process, as well as their marketing process, Council agreed that this requirement should be considered with implementation beginning for the 2015 public event season. Staff will visit with event planners and patrons during the 2014 event season to gain additional feedback. 3. Old Town/Downtown – Council directed staff to bring an ordinance for consideration that would require certain areas within the Old Town/Downtown area to be smoke- free. Different options about the boundaries for this area were discussed. Staff will provide options for consideration including Old Town Square as well as an expanded area that could possibly be phased in over time. Staff will survey business owners within these areas to learn about their thoughts, concerns, questions, and suggestions. Staff will also meet with Boulder staff to get a better understanding of implementation and potential unintended consequences of the smoke-free regulations of the Pearl Street Mall. Additionally, staff will provide detailed enforcement information and potential costs for Council consideration.  Transit-Oriented Development (TOD) Parking Study – Kimley-Horn and Associates have been hired to assist with the study. The Planning and Zoning Board has requested more time to discuss possible commercial parking requirements, thus staff is requesting Council extend the temporary ordinance at the August 19 meeting. The Study recommendations and Land Use Code ordinance are scheduled for adoption by City Council on October 21 (1 st reading) and November 4 (2 nd Reading).  Urban Agriculture o A 6-month update on urban agriculture was provided to Council in July. This update highlighted the urban agriculture licenses issued to date and staff’s continued collaboration with the Northern Colorado Local Food Cluster. o Staff is continuing to work with the North Colorado Local Food Cluster to develop a strategic plan for how we will create a sustainable food system. Pending funding, it is anticipated this effort will begin in 2015. A budget offer had been prepared for the 2015-2016 BFO cycle to align internal staff efforts in the development of the local food and wellness strategic plan; this offer, entitled “Sustainability Policy and Project Manager,” is not recommended for funding in the City Manager’s Recommended Budget. o A new FAQ document has been developed to answer basic questions about what the City allows and where. This document can be viewed at fcgov.com/urbanagriculture. 39  West Central Area Plan / Prospect Corridor Design – Updated vision and priorities for the West Central area of the city (generally south and west of the CSU main campus). This effort is updating the 1999 West Central Neighborhoods Plan based on emerging issues and trends. Areas of focus include neighborhood character, transportation needs, the natural environment, and a new design for Prospect Road from Shields to College. To date, the project has concentrated on evaluating existing and future conditions and developing a vision for the plan. An open house is scheduled for September 18 from 4-7 p.m. at the Senior Center. A workshop focused on the Prospect Road corridor will be held on September 22 from 5:30-7:30 p.m. at Plymouth Congregational Church. More information on the project can be found at fcgov.com/westcentral. Outreach to date:  Four public outreach listening sessions – March/April, 175 attendees  20 neighborhood walking tours – April/May, 80+ attendees  Online “Wiki Map”  Two visioning events: April/May – 74 attendees  Online Visioning Survey – 337 respondents  Outreach at the Drake Road Farmers’ Market, CSU Lagoon Concert Series, and Gardens on Spring Creek events.  Presentations to boards and commissions: Planning & Zoning Board, Parking Advisory Board, Transportation Board, Affordable Housing Board, and the UniverCity Connections Transportation and Mobility Task Force.  City Council Work Session – August 26 Development Projects under appeal: No projects currently under appeal.