Loading...
HomeMy WebLinkAboutEmail - Read Before Packet - 7/1/2014 - Email From Darin Atteberry Re: Agenda Item #18 Re: Perimeter Wall At The Harmony Substation (Council Sar #26566)1 Debra Unger From: Debra Unger on behalf of Darin Atteberry Sent: Tuesday, July 01, 2014 11:08 AM To: Bob Overbeck Cc: CCSL; Sarah Kane; Steve Catanach; Kevin Gertig; Robin Pierce Subject: Agenda Item #18 RE: Perimeter Wall At The Harmony Substation (Council SAR #26566) Bob, Please see the response below from Steve Catanach, Light & Power Operations Manager, re: your inquiry about the total perimeter and square footage of the wall proposed around the Harmony Substation and how the cost estimate was determined: ~~~~~ The perimeter around the Harmony Substation is approximately 1,504 feet. The wall will be approximately 1,455 linear feet of brick with one 25 foot gate and another 24 foot gate. The total square footage will be approximately 17,460 square feet of wall face. The price given in the AIS is a ballpark estimate developed from Platte River's experience with the Dixon and Timberline Substation walls. An exact price cannot be determined until the proper civil engineering, such as soil analysis to determine the depth of footers, etc., has been done. The IGA defines how the City and Platte River will work together to design and construct the wall. Until the IGA is in place, Platte River cannot proceed with detailed design, which, in turn, will define the cost of construction more closely. Should the price of the wall come in well above the estimated cost, Light & Power will evaluate other alternatives. ~~~~~ Debra Unger Executive Administrative Assistant City Manager’s Office (970) 221-6266 Click here to Tell Me About My Service ... I Want to Know!