HomeMy WebLinkAboutReport - Mail Packet - 5/13/2014 - City Manager�S Monthly Update - May 8, 2014May 8, 2014 ISSUES BEFORE COUNCIL Time of Use Pilot Project for Electric Rates .......................................................................................... 2 Disposable Bags ..................................................................................................................................... 2 Summit Parking Garage Appeals ........................................................................................................... 2 Spring Competitive Funding Process ..................................................................................................... 2 Spirituous Alcohol Tastings Ordinance .................................................................................................. 3 Lincoln Corridor Plan Adoption ............................................................................................................. 3 Affordable Housing Policy Study .......................................................................................................... 3 Transit-Oriented Development Study ..................................................................................................... 4 Poudre Fire Authority Intergovernmental Agreement ............................................................................ 4 ECONOMY Fort Collins Sales and Use Tax .............................................................................................................. 4 CAPITAL PROJECTS Citywide Pedestrian Access Project ....................................................................................................... 5 Mulberry Bridge (SH 14) at the Poudre River Enhancements ............................................................... 5 West Mulberry Bridge Replacement ...................................................................................................... 6 West Prospect Bridge Replacement ....................................................................................................... 6 Bryan Bridge Replacement..................................................................................................................... 7 Arthur Ditch at Mountain Avenue and at Myrtle Street ......................................................................... 7 Arthur Ditch Box Section Replacement ................................................................................................. 8 Ziegler Roundabout Landscape Renovations ......................................................................................... 8 Shields Street and Drake Road Intersection Improvements ................................................................... 9 Timberline Improvements – Prospect To Blackbird .............................................................................. 9 Horsetooth and Timberline Intersection Improvements ....................................................................... 10 Vine and Shields Roundabout .............................................................................................................. 10 Kechter and Timberline Right Turn Lanes ........................................................................................... 11 Foothills Mall – Larimer County Canal No. 2 Relocation ................................................................... 12 North College Improvements – Conifer to Willox ............................................................................... 12 Downtown River District Improvements ............................................................................................. 13 Spring Creek (NRCC) Overpass .......................................................................................................... 14 Mason Corridor MAX Bus Rapid Transit Project ................................................................................ 14 Utilities Capital Projects .................................................................................................................. 15-20 COMMUNITY EVENTS ........................................................................................................................ 21 PUBLIC SAFETY UPDATE Fort Collins Police Services ............................................................................................................ 22-25 Poudre Fire Authority ...................................................................................................................... 25-27 BUILDING ACTIVITY ...................................................................................................................... 28-31 2 ISSUES BEFORE COUNCIL May 13 Work Session Time of Use Pilot Project for Electric Rates  With the full residential deployment of our advanced meter infrastructure, several rate structures can now be implemented that were previously not possible.  The purpose of this agenda item is to briefly present some of the possible rate structures and gain direction from the City Council on whether to pursue any of the possible rate structures as a pilot study in 2015 ahead of adoption on a larger scale in 2016. Disposable Bags  The City Council will review a proposal for a “Merchant Regulation” ordinance that would prohibit grocers from giving away single-use disposable shopping bags to customers. Last year, a similar proposal for a disposable bags ordinance received a split vote by City Council (3-3-0). The 2013 ordinance would have required grocers to charge 10 cents per single-use disposable plastic or paper bag, with revenue to be evenly split between grocers and the City, for use in conducting training, education, and outreach.  The difference with the 2014 ordinance is that the City would not receive a share of the revenues from sales of shopping bags. The proposal would: o require grocers to apply a minimum cost (5 or 10 cents) per single-use disposable plastic or paper bag at the check-out register; o provide that all revenue be retained by merchants. A specified portion (to be determined) would be used by the grocery stores to post signage about disposable bag issues and other educational materials, provide low-cost/free durable bags to customers, and enhance their on-site plastic bag recycling programs. May 20 Regular Meeting Summit Parking Garage Appeals  Council will consider three appeals of the Administrative Hearing Officer’s March 19, 2014 decision to approve the major amendment to the Summit’s parking structure on College Avenue. Spring Competitive Funding Process – CDBG, HOME and Human Services Program Funds  The City received 42 applications for funding in 2 categories: 5 in Affordable Housing and 37 in the Public (Human) Service category.  The total amount requested is $2,940,889; $2,188,191 in Affordable Housing and $1,305,649 in Public Service.  Funding availability for Affordable Housing is $2,082,352 (95% of requests) from CDBG and HOME Program Income.  Funding availability for Public Service is $858,537 (66% of requests) from CDBG and the City’s Human Services Program.  The CDBG Commission held their deliberations meeting on Thursday, April 10, 2014 to make their funding recommendations to City Council. 3  In the Affordable Housing category the recommendations are to fully fund all 5 proposals. Full funding is short by $105,839. The recommendation is to use HOME Entitlement funds, usually allocated in the fall cycle.  In the Public Service category 37 proposals were received; of these, 32 are recommended for funding (6 full funding, 26 partial funding from 24% - 91% of requests) and 5 for zero funding. Spirituous Liquor Tastings  Currently, only beer and wine tastings at licensed liquor stores are permitted in Fort Collins. This ordinance would add spirituous alcohol to the list of permitted tastings. Additionally, this ordinance would expand the number of days tastings are permitted from 52 days to 104 days.  This request came to staff by a merchant in Old Town who wishes to have spirituous tastings in his establishment. The proposed ordinance was discussed with the Leadership Planning Team and will be considered by City Council on first reading on May 20.  City Clerk staff is reaching out to those liquor stores who currently hold a Tastings Permit to assess their position on this proposed change.  Staff is also gathering data from other municipalities regarding what they charge for tasting permits.  Police Services has indicated they have no concerns with adding spirituous liquors as a permitted alcohol to the tastings ordinance. Lincoln Corridor Plan Adoption  The purpose of the Lincoln Corridor Plan is to summarize and document the planning process and extensive community engagement to: o develop a vision and preliminary long-term multi-modal roadway design for Lincoln Avenue; o identify related neighborhood improvement projects in the study area; and o identify potential funding options, project phasing, and specific strategies and actions to implement the Plan.  City Council will consider adoption of the Plan on May 20. May 27 Work Session Affordable Housing Policy Study  Starting in January staff has been working with consultants, an internal City technical assistance team and stakeholders, and conducting public outreach about housing affordability in Fort Collins.  Staff will discuss with Council consultants’ findings related to our community’s housing needs and affordability trends as well as how to address gaps in the available housing inventory.  Best practices and specific policy options will be briefly presented.  Staff will seek direction from Council about the City’s role in ensuring housing choices for all residents. 4 Transit-Oriented Development (TOD) Study  Staff will present alternatives and recommendations from the TOD Parking Study and ask for direction in implementing new parking requirements and parking policy in the TOD Overlay Zone. June 3 Regular Meeting Poudre Fire Authority Intergovernmental Agreement  City Council and the Poudre Valley Fire Protection District Board met in a joint work session on April 2, 2014 regarding the draft updates to the Intergovernmental Agreement (IGA) which established the Poudre Fire Authority (PFA). Staff has revised the draft IGA in response to City Council and District Board Member suggestions. The last full update to the IGA was in 1987.  The new IGA will reaffirm the City and the District’s commitment to providing fire and rescue services to the community in a joint service model through the PFA, update and clarify the funding arrangements that provide City and District resource to PFA, delineate support service arrangements between the two entities, and make a variety of minor updates and clarifications to the agreement. ECONOMY FORT COLLINS SALES AND USE TAX COLLECTIONS March 2014 Sales tax collections increased 2.8% Use tax collections excluding rebates increased 43.6% Sales and use tax collections excluding rebates increased 9.8% 2014 YTD Sales tax collections increased 4.3% Use tax collections excluding rebates increased 30.6% Sales and use tax collections excluding rebates increased 8.2% 5 CAPITAL PROJECTS (new information noted in blue text) ENGINEERING CITYWIDE PEDESTRIAN ACCESS PROJECT Funding Source: KFCG Funds Estimated Project Budget: $450,000 Status: On Budget, On Schedule  The City of Fort Collins Pedestrian Plan addresses citywide pedestrian needs and is a data-driven approach based on the importance of safe, sustainable walking within City limits. It, however, lacks comprehensive condition data for the City’s sidewalk system. Prior to the beginning of the Pedestrian Needs Assessment project, there was not an inventory of existing sidewalks or sidewalk deficiencies. This project provides a complete City sidewalk inventory, identifies sidewalk inadequacies, and identifies inadequate handicap accessibilities according to Americans with Disabilities Act (ADA) requirements.  Data collection has been completed with approximately 540 street miles of sidewalk assessed and inventoried at this time.  37,741 accessible ramps have been identified as acceptable, substandard, or missing in accordance with the ADA requirements.  Staff has implemented a methodology and analysis program used to prioritize pedestrian projects. This program takes into account a variety of factors such as, but not limited to, demand, corridor function, and high priority areas. o Upcoming project locations scheduled include Jackson, Cherry, Boardwalk, and Lemay. o Current projects include installation of new ramps at Maple and Howes and various ramp locations along Cherry Street as part of SMP preparation. o Recently completed project: new sidewalk installation along the north side of Fairway to provide access to South Transit Center.  Staff has identified approximately 21 projects for 2014.  Level of service is being implemented for the sidewalk program. MULBERRY BRIDGE (SH 14) AT THE POUDRE RIVER ENHANCEMENTS Funding Source: City of Fort Collins Estimate Project Budget: $750,000 Status: On Budget, On Schedule  Colorado Department of Transportation (CDOT) is replacing the Mulberry Bridge (State Highway 14) over Poudre River Bridge starting in the fall of 2014. Construction was delayed due to the September 2013 flood. 6  Due to the construction, eastbound traffic on Mulberry will be detoured for the duration of construction.  The City is working with CDOT to add City-funded enhancements to the bridge including decorative railings, landscaping and urban design features. WEST MULBERRY BRIDGE REPLACEMENT DESIGN Funding Source: Colorado Off System Bridge Program (BRO) Funds and KFCG 2011 Estimated Project Budget: $1.1 million Status: On Budget, On Schedule  The goal of the project is to replace the existing structurally deficient bridge with a new bridge that meets the current standards.  The posted weight limit on this bridge precludes the passage of emergency vehicles from the nearby fire station.  In December 2011, the City received a grant for $700,000 in Colorado Off System Bridge Program (BRO) funds for some of the construction cost.  Design efforts are underway. Construction is planned for fall 2014. WEST PROSPECT BRIDGE REPLACEMENT DESIGN Funding Source: KFCG 2011 Estimated Project Budget: $1.2 million Status: On Budget, On Schedule  The goal of the project is to replace the existing structurally deficient bridge with a new bridge that meets the current standards.  The State of Colorado inspected this bridge in March 2011 and found significant structural issues resulting in a temporary plate being installed and load posting restricted to 15 tons.  City Engineering has awarded the construction contract to Mountain Constructors.  Construction began November 18, 2013.  Phase 1: Construction of the north half of the structure and reconstruction of the north half of the roadway is complete.  Phase 2: Construction will replace the south half of the structure and will be completed by late May 2014. 7 BRYAN BRIDGE REPLACEMENT Funding Source: Colorado Off System Bridge Program (BRO), City Bridge & KFCG Funds Estimated Project Budget: $1 million Status: On Budget, On Schedule  The goal of the project is to replace the existing structurally deficient bridge with a new bridge that meets the current standards.  The posted weight limit on this bridge precludes the passage of emergency vehicles from the nearby fire station.  The City received a grant for $552,000 in Colorado Off System Bridge Program (BRO) funds to cover some of the project cost.  Construction is underway with completion expected in May 2014.  Bryan Avenue will be operating as a One-Way directional street heading north into City Park only until project completion, with occasional temporary short-term closures when needed to pour concrete. ARTHUR DITCH AT MOUNTAIN AVENUE AND AT MYRTLE STREET Funding Source: KFCG Funds Estimated Project Budget: $975,000 Status: On Budget, On Schedule  The intent of this project is to replace two structurally deficient bridges with new concrete box culverts. Both bridges are located on the Arthur Ditch, within residential areas of the City.  Utility upgrades will also occur at both locations. Improvements to existing storm sewer, along with waterline and private utility upgrades, can be expected.  Bridge and roadway construction at the Mountain Avenue location has been completed. The roadway is open to the public. Trolley track reconstruction has also been completed. Landscaping improvements continues at the site. Expect periodic traffic impacts as this work continues.  Roadway and bridge construction at the Myrtle Street location has been substantially completed. Landscaping improvements are expected to be complete by the first part of May, at which point the road will be reopened to traffic.  Staff continues to perform outreach to potentially impacted residents to provide additional information on the project and its schedule.  Additional project information can be found at http://www.fcgov.com/engineering/arthur- ditch.php. 8 ARTHUR DITCH BOX SECTION REPLACEMENT – OAK/WHITCOMB, LOOMIS/OLIVE, CANYON AT MULBERRY POOL Funding Sources: KFCG / Operation Services, Facilities Estimated Project Budget: $2.5-3 million Status: On Budget, On Schedule  The intent of this project is to replace three structurally deficient bridge/box sections with new concrete box culverts.  Value engineering and best practices are being applied to develop the most cost efficient replacement methods. All three locations lie within local floodplains and will be evaluated prior to final design approval. Coordination efforts also include the Streets Department maintenance schedules to ensure the roadway is reviewed for both short and long-term impacts.  Design is at approximately 40-50% complete and is currently undergoing floodplain modeling by City staff.  Staff continues to perform outreach to adjacent residents to provide additional information on the project and its schedule as it becomes available. ZIEGLER ROUNDABOUT LANDSCAPE RENOVATIONS – HORSETOOTH & KECHTER Funding Source: Street Oversizing / Parks Maintenance Funding Status: On Budget, On Schedule  The main goal of this project is to revive and enhance the existing landscape features and vegetation within the center of the roundabouts to provide a more visual element to the intersections.  Kechter update: numerous more colorful, vibrant plant species were installed in early October with the anticipation of enhanced appearance in the spring of 2014.  Following the flagstone boulder wall installation in March 2014, tree delivery and planting began the last week in April. Completion of Horsetooth/Ziegler should be the first week of May.  Staff has received several inquiries from the community regarding limited visibility with the new landscape treatment. This action is part of the enhancement that provides limited, safe sight triangles that help drives make appropriate choices when entering the roundabout. 9 SHIELDS STREET AND DRAKE ROAD INTERSECTION IMPROVEMENTS Funding Sources: Federal Hazard Elimination Grant (90%) / Local Match (10%) Estimated Project Budget: $986,000 Status: On Budget, On Schedule  The main goal of this project is to reduce the accident rate that occurs at this intersection by installing dedicated right turn lanes in the north and southbound movements. A reduced movement concept is also being considered to the Raintree Drive/Davidson Road intersection 400 feet south of Shields and Drake.  This project has multiple funding sources: Federal Hazard Elimination Grant - $887,400 City BOB funding - $98,600  Design RFP’s have been reviewed and short listed. Interviews will be conducted May 6, and a final candidate will be selected shortly after. Contracts pending, a project kick-off will occur late May or early June 2014.  Other safety components that will be corrected at the intersection include providing higher visibility for bicyclists by removing right turn movement conflict and installing ADA compliant ramps.  The City anticipates construction of the intersection to occur in summer 2015. TIMBERLINE IMPROVEMENTS – PROSPECT TO BLACKBIRD Funding Source: Building on Basics (BOB) Estimated Project Budget: $3,500,000 Status: On Budget, On Schedule  The goals of this project are to improve air quality, reduce vehicle wait time and reduce the accident rate by constructing a free right turn and acceleration lane from eastbound Prospect to southbound Timberline, as identified in our Arterial Intersection Prioritization Study.  The 2005 ballot language stated this project will expand Timberline Road to four (4) lane arterial standards including: o travel lanes, sidewalks, bike lanes and landscaped medians; and o improvements to the Prospect and Timberline intersection and all its approaches to add additional turn lanes.  The project will add a sidewalk connection for southbound Timberline from Prospect to Blackbird.  Additionally, water quality features will be constructed to minimize the flow rates and volumes as they outlet to the Spring Creek basin. 10  A communication plan (public outreach) is being developed and will be implemented with the final design through construction.  A Historical Report is being finalized for the silos and Johnson family farm house.  The project website is available through the Engineering homepage at http://www.fcgov.com/engineering/prospect-timberline.php. HORSETOOTH AND TIMBERLINE INTERSECTION IMPROVEMENTS Funding Source: Building on Basics (BOB) and Federal Grant (CMAQ) Estimated Project Budget: $3,500,000 Status: On Budget, On Schedule  The goal of this project is to relieve traffic congestion and vehicle wait time by constructing additional intersection turn lanes.  The need for these safety and operational improvements were identified in the Engineering Department’s recently completed Arterial Intersection Prioritization Study. Turn lane needs are as follows: o right turn lane (southbound Timberline to westbound Horsetooth); o right turn lane (eastbound Horsetooth to southbound Timberline); and o second left turn lane (northbound and southbound Timberline).  City staff appropriated the CMAQ funds through Council in February 2013. These funds were applied for based upon the need for a dedicated, southbound right turn lane.  The project has moved to the final design phase, streetscape visioning and coordination with property owners for real estate purchases (right-of-way and easements).  Additionally, the project will include median and landscape improvements, sidewalk and bicycle lane improvements and pavement improvements.  A communication plan (public outreach) is being developed and will be implemented with the final design through construction. The project website is available through the Engineering homepage at http://www.fcgov.com/engineering/horsetooth-timberline.php. VINE AND SHIELDS ROUNDABOUT Funding Source: Building on Basics (BOB), Federal Grant (STP Metro) and Regional Road Impact Fees Estimated Project Budget: $1,700,000 Status: On Budget, On Schedule  The main goal of this project is to increase mobility at the intersection via multimodal transportation improvements. Currently, the east- west lanes on Vine Drive are not aligned causing additional independent traffic movements which effect the overall operation of the signal timing. 11  The City received a federal grant award for $1,054,000 through the North Front Range Metropolitan Planning Organization in the STP-Metro category.  Other safety concerns which will be corrected at the intersection entail adding sidewalks along the northern portion of the project, installing ADA compliant ramps/crosswalks, and adding bike lanes.  The City continues to coordinate our intersection project with Larimer County’s proposed improvements to Shields Street from 400’ north of Vine Drive to Willox Lane. The County received three federal grants for this stretch of roadway to accomplish the following: o replace the Shields Street Bridge over the Poudre River; o improve the Poudre River trailhead parking area and river access; and o reconstruct approximately one mile of Shields Street.  The project has moved to the preliminary design phase and streetscape visioning. With this phase we’ll finalize the horizontal geometry, and define the required right-of-way acquisition areas.  A communication plan (public outreach) is being developed and will be implemented with the final design through construction.  The project website is available through the Engineering homepage at http://www.fcgov.com/engineering/vsi.php. KECHTER AND TIMBERLINE RIGHT TURN LANES Funding Source: Building on Basics (BOB) Estimated Project Budget: $725,000 Status: On Budget, On Schedule  The goal of this project is to relieve traffic congestion and vehicle wait time by constructing two dedicated right turn lanes along southbound and northbound Timberline Road.  The need for the northbound turn lane improvement was identified in the Engineering Department’s recently completed Arterial Intersection Prioritization Study. The need for the southbound turn lane improvement was triggered by the proposed traffic impacts for the Crowne on Timberline development. The developer funds were appropriated into the Capital Project so the two turn lanes could be designed and built as one package.  The proposed improvements will reduce the peak hour delay by 15%.  The project will include an interim, detached sidewalk along Timberline Road, with accessible curb ramps being installed on the northeast and southeast corners.  The City will purchase the ultimate right-of-way from the southeast corner property owner to accommodate the future four-lane Timberline section.  A communication plan (public outreach) is being developed and will be implemented with the final design through construction.  The project website is available through the Engineering homepage at http://www.fcgov.com/engineering/kechter-timberline.php. 12 FOOTHILLS MALL – LARIMER COUNTY CANAL NO. 2 RELOCATION Funding Source: Mall Redevelopment Project Status: Phase 2 Construction Estimated Construction Date: January to mid-April Project Lead: Robert Mosbey, Engineering and Greg Powell, Beck Group  This project is to relocate the irrigation ditch as a separate but related project to the Foothills Mall Redevelopment Plan. This section of the canal is located between West Monroe Drive and West Foothills Parkway. The relocation project will allow room for additional building construction on the mall’s main site and a pedestrian/bicyclist underpass under College Avenue.  Construction is scheduled to occur in phases starting at West Monroe heading north through early April 2014. The overall project has ten phases.  The scope of the work includes: o general excavation; o utility relocation; o new canal box culvert installation; and o street and landscaping improvements.  College Avenue is to remain open for the duration of the project with a single southbound lane restriction.  Typical working hours are from 7am to 7pm; however, variances will be granted for construction to occur during certain phases for night work, or on the weekends to minimize impacts to existing businesses.  It is anticipated that 6 - 7 box culverts will be installed per day. Installation includes excavation, installation, and backfill.  As of April 4, all culvert boxes were installed and have been inspected and approved by the ditch company. Minor punchlist items were addressed by the contractor.  Pavement is complete along the Frontage Road, Monroe, and Red Lobster parking lot.  South sidewalk connection is complete.  Additional items remaining are to install fencing, railings, street inlets, and striping.  Culvert is anticipated to be 100% complete, other than landscaping, by May 2. NORTH COLLEGE IMPROVEMENTS – CONIFER TO WILLOX Funding Source: Federal Grants, Local Matching Funds Estimate Project Budget: $12 million Status: On Budget, On Schedule  The intent of this project is to design and construct improvements along North College Avenue from the Conifer/Hickory intersection to Willox Lane, bringing this section of North 13 College up to four-lane arterial standards as defined by the Larimer County Urban Area Street Standards. Both medians and sections of the planned rear access roads are included in the project.  The overall project budget is $12.0 million. This is comprised of roughly 60% federal funds and 40% local funds.  The engineering design is roughly 90% complete. Staff expects completed plans and project specifications over the next two months. Staff is also in active negotiations to acquire all property interests necessary to construct the project.  The original project schedule had construction beginning in early 2014. The project team now anticipates construction will not be cleared by the State until September 2014. Staff continues to investigate every possibility to mitigate this delay.  Staff anticipates pre-project construction activities, including utility relocations and the construction of a rear access road west of North College, to begin in the summer of 2014.  Additional project information is available at http://www.fcgov.com/engineering/ncollege.php. DOWNTOWN RIVER DISTRICT IMPROVEMENTS Funding Source: Federal Grants, Local Funds, DDA Funds Estimate Project Budget: $1.48 million Status: On Budget, On Schedule  The goal of this project is to develop a consulting contract capable of providing engineering services and subsequent construction projects for various improvements within the Downtown River District.  The project will also have the capability to provide various engineering services in preparation of anticipated development.  The first two projects to be addressed are developing an implementation plan for improvements along Jefferson Street between College Avenue and the Mountain /Lincoln intersection, based on the available budget; and to develop a conceptual design for improvements along Willow Street.  Additional projects to follow include the development of engineering plans and specifications, as well as construction of these improvements along both Jefferson and Willow based on the results of the above. 14 SPRING CREEK (NRRC) OVERPASS Funding Source: Federal Congestion Mitigation and Air Quality (CMAQ) Grant and Building on Basics (BOB) Funds Estimated Project Budget: $2.75 million Status: On Budget, On Schedule  The goal of the project is to construct a new pedestrian/bike overpass that will link the Mason Bike Trail and the federal campus on the west side of the railroad tracks to the Mason Corridor Bus Rapid Transit MAX station on the east side of the tracks.  Concrete Express, Inc. (CEI) was awarded the construction contract to install the steel bridge structure on top of the ramps that they are currently building.  The bridge was installed on February 12, 2014.  There are several construction tasks remaining before the City can open the overpass for public use. The contractor is currently installing steel railings, electrical systems, and concrete flat work at the bottom of the ramps. The structure will not be opened to the public until the work is completed.  The proposed schedule is to complete construction by May 2014 in conjunction with the opening of the MAX Bus Rapid Transit.  An additional phase of construction will add stairs to the structure in the summer of 2014. MASON CORRIDOR MAX Bus Rapid Transit (BRT) PROJECT Funding Source: FTA 80%, Local Match (CDOT SB-1, CDOT FASTER, City, and Downtown Development Authority) 20% Estimate Project Budget: $87 million Status: On Budget, On Schedule  As of March 31, the MAX project is substantially complete. Crews are currently focused on punch list items for final completion as the MAX will become operational on Saturday May 10, 2014.  Construction of all 19 bus stations is nearing completion. Crews are now concentrating on MIS and electrical components including programming of the ticket vending machines and variable message boards.  Final landscaping and irrigation work at the stations and along the guideway continues to progress.  The traffic signal at Fairway and College has been installed and is operational.  Installation of chain link/split cedar fencing identified in the plans is now complete.  Construction at the South Transit Center is substantially complete. The City has now taken over the project due to lack of performance by Growling Bear in order to meet the May 10 opening date. Crews are working on landscaping, IT installation, and various punch list items. 15 UTILITIES COLLEGE AVENUE WATER LINE REPLACEMENT Project Description: In anticipation of CDOT paving in 2015, this project will replace the existing 4” cast iron waterline in College Avenue from Mulberry to Buckeye. Project Status: Final design complete; working on contract negotiations and public outreach. Anticipated Completion Date: This project is planned to start May 5 and be completed by mid-August. Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $2.5 Million Budget Status: Project is within budget. Highlights:  This project will use trenchless technology to minimize the impact to traffic and local business.  This project will have significant impacts to traffic and businesses along College Avenue. WEST VINE OUTFALL CHANNEL Project Description: This is a joint project between the City and Larimer County to design and construct a stormwater outfall channel for the West Vine Basin to the Poudre River. The project is being coordinated with Larimer County’s widening of Shields Street from the Arthur Ditch to Willox. Project Status: Construction is underway. Excavation and hauling is approximately 60% complete. Anticipated Completion Date: Fall 2014 Ahead/Behind/or on Schedule: On Schedule Total Project Budget: Alternatives Analysis Phase ($104,000); Final Design ($243,000); Total Project Cost $2.8 million Budget Status: Project is within budget. Highlights: Construction is underway. GRANDVIEW AVENUE VALVES REPLACEMENT PROJECT Project Description: Decommissioning of Utilities’ 20 inch water transmission main between Tarragon Lane and Grandview Avenue and the removal of the existing valve vault in LaPorte Avenue at Grandview Avenue. The project involves removing services and distribution lines from the 20-inch steel line and tapping them into other nearby mains. There will also be a 12-inch HDPE 16 sliplining at Lilac Apartments. The valve vault in LaPorte Avenue at Grandview will be taken out of service. This will remove four 90-year-old inoperative valves from the distribution system. The 20-inch cast iron main will then be cut, drained and plugged. Work scheduled to precede repaving of LaPorte Avenue by Streets from Shields Street to LaPorte Avenue in August 2014. Project Status: Sliplining drawings complete; valve replacement under design by Stantec Consulting Engineers. Anticipated Completion Date: Work to be completed by August 2014. Ahead/Behind/or on Schedule: Construction scheduled to start May 27, 2014. Total Project Budget: Design and Valve Procurement $750,000.00 Budget Status: Project is within budget. Highlights:  90-year-old valve vault containing 4 inoperative 20-inch valves to be abandoned.  3 new 20-inch butterfly valves and valve vaults to be installed. BOXELDER CREEK OUTFALL IMPROVEMENTS Project Description: Large regional flood control project to be designed and constructed under intergovernmental agreements with Timnath Development Authority and Boxelder Basin Stormwater Authority. Project involves channel grading and road crossing improvements from I-25 to the Poudre River along the Boxelder Creek Corridor. Project Status: Preliminary design complete; environmental assessment filed with Colorado Division of Wildlife; CLOMR submittal in preparation. Final Design and Permitting Requirements: May 2014 – April 2015 Anticipated Completion Date: December 30, 2016 On Schedule: On Schedule Total Project Budget: $4.1 million Budget Status: Funding for project under negotiation with Timnath. Highlights:  Preliminary design complete.  Project suspended pending intergovernmental agreement between Timnath and Fort Collins.  Project construction schedule subject to delay due to delay in the construction of the Mulberry Bridge Replacement Project by CDOT and the proposed detour route for trucks on East Prospect. 17 CATHODIC PROTECTION OF WATER TREATMENT AND TRANSMISSION AND DISTRIBUTION SYSTEM WATER LINES Project Description: Investigation of existing systems in place used to protect waterlines from corrosion; design of rehabilitation of existing and new systems to prevent corrosion; and construction of modified and new systems. Project Status: On Schedule Anticipated Completion Date: This is an ongoing project. Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $318,000 (2014) Budget Status: Within Budget Highlights:  Working with consultant and contractor on testing current cathodic protection levels and locations, and installing modified and new systems where needed.  Reviewing projects and work status for 2014 with consultant and contractor to create schedule and work orders.  Working at the Water Treatment Facility (WTF) on the new yard piping project to include and update cathodic protection of the new piping, then connect into rectifiers.  Working with Cathodic Protection consultant to study integrity and continuity of 60” PCCP transmission main from WTF to intersection of Overland Trail and Lake Street. STREAM REHABILITATION AND ENHANCEMENT PROGRAM Project Description: Stream restoration and habitat enhancement across City including stabilizing stream channel morphology, restoring/creating new native in- stream and riparian habitat to attract and support native fish and wildlife populations, and promote BMPs to improve water quality. First watershed in program is Fossil and Mail Creek. Project Status: Working with consultant on design. Anticipated Completion Date: Construction of first project, Fossil Creek reach upstream of Lemay, to begin fall of 2014. Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $1.2 million Budget Status: Within Budget Highlights:  Centennial Archaeology conducted a Limited Results Cultural Resource Survey which was requested by the Corps of Engineers.  Reviewing requirements for groundwater permit with CDPHE.  Working with team on costs and schedule for construction.  Working with PR on website. 18  Met with Engineering to discuss opportunity of stream rehabilitation along Spring Creek just north of EPIC.  On track for Fossil Creek segment construction to begin this fall. RIGDEN MUNICIPAL STORAGE POND Project Description: The project will consist of the construction of a gravel pit water storage reservoir to include a pump station and associated piping. The project is located northeast of the Ziegler Road and Horsetooth Road intersection. Purpose of the storage is to retime flows to meet water rights return flow obligations and meet augmentation requirements. Project is a cooperative effort with Natural Areas and Parks. Project Status: Under Construction Anticipated Completion Date: Design complete in 2013; construction in 2014 Ahead/Behind/or on Schedule: On Schedule Total Project Design Budget: $457,782 Total Project Construction Budget: $10.6 million Budget Status: Within Budget Highlights:  Construction of the reservoir has started and is progressing.  Light & Power continues installation of the electrical service to the pump station.  Installation of the Fossil Creek Reservoir Inlet Ditch diversion is near completion.  The pump station below grade walls have been placed.  Approximately 275,000 cubic yards of dirt has been moved. WATER TREATMENT FACILITY YARD PIPING MODIFICATIONS Project Description: Design and construction of a new 48-inch diameter steel raw water pipeline to replace the aged 30 and 36-inch Horsetooth raw water pipelines, and a new 36-inch diameter steel backwash pump station influent line to replace the existing cast iron pipeline. Both of these pipelines have shown damage due to electrolysis. The existing finished water backwash influent line is also located under an existing sludge drying pond, increasing the possibility of cross contamination, so it will be abandoned. Project Status: Kicked off design May 2013; construction began in October 2013. Anticipated Completion Date: Planned for fall 2014. Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $2.3 million Budget Status: On Budget Highlights:  Constructed blow-off structure at 60 x 42 x 60 19 reducer/valve/reducer on 60” west reservoir outlet pipe.  Backfilled area where 60 x 42 x 60 reducer/valve/reducer, blow-off and 54” x 42” reducer/valve assembly were constructed.  Completed installation of 36” backwash pump station feed, stacked manholes at valve operators and returned BWPS to service.  Backfilled trench for 36” backwash pump station feed.  Excavated for and installed new 24” DIP connection between existing 42” and 27” finished water lines, including air valve assembly.  Backfilled new meter vault and associated piping.  Removed asphalt near Flow-Blend building roadway and installed first joint of 48” steel Horsetooth Raw Water Line. Excavated for next joint. PLUM STREET SANITARY SEWER IMPROVEMENTS Project Description: Design and construction of a replacement sanitary sewer system that currently lies in Shields Street, Plum Street between Shields and City Park Avenue, and City Park Avenue. This sewer is in very poor condition and will soon be undersized as new development occurs in the immediate vicinity. Project Status: Selected design engineer, Ditesco, and contractor, Connell Resources. Kick-off meeting scheduled for August 7, 2013. Project on hold until spring 2014 when asphalt is available. Anticipated Completion Date: Design scheduled for completion September 2013. Construction is scheduled to start mid-March 2014 and be complete by July 2014. Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $1 million Budget Status: On Budget Highlights:  Constructed remainder of storm sewer piping in Shields and Plum Streets, including two new type R inlets.  Completed restoration of asphalt, irrigation and landscaping on Shields Street.  Moved road closure of Plum Street west from Shields Street to Aster Street. Remainder of work will be in a moving closure approximately 300 feet long.  Installed approximately 900 LF of 12” PVC sanitary sewer in Plum Street, including manholes and service connections. 20 WATER TREATMENT FACILITY – 2014 MASTERPLAN UPDATE Project Description: Fort Collins Utilities currently has two planning documents: the 2007 Water Treatment Facility Electrical Master Plan (EMP) and the 2010 Water Treatment Facilities Master Plan. This document will update the Water Treatment Facilities Master Plan and incorporate the EMP. Project Status: Issued RFP in December 2013. Anticipated Completion Date: Master plan to be completed by December 2014. Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $350,000 Budget Status: On Budget Highlights:  Contract is complete; work has started on the master plan, including initial review and collection of data. DRAKE WATER RECLAMATION FACILITY SOUTH PROCESS TRAIN IMPROVEMENTS Project Description: The project will consist of the demolition of a portion of the existing process train, construction of new tanks for the new biological nutrient removal process, upgrading the south aeration system, and replacement of old mechanical and electrical systems. Project Status: Design in progress. Site Application submitted to the State. Anticipated Completion Date: December 2015 Ahead/Behind/or on Schedule: On Schedule Total Project Design Budget: $1.2 million Total Project Construction Budget: $7.7 million Budget Status: Within Budget Highlights:  Met with CDPHE to discuss Process Design Report submittal.  Received Site Application amendment approval. 21 COMMUNITY EVENTS Envirovation: A ClimateWise Celebration Location: Hilton Fort Collins Date/Time: Wednesday, May 14, 2014 2:00 PM Details: Join City officials and business leaders on May 14 to recognize and celebrate the environmental stewardship of over 360 ClimateWise partners. Web address: http://www.fcgov.com/climatewise/envirovation.php Contact Information: Debra Harris Phone: 970-224-6121; E-mail address: dharris@fcgov.com Wildflowers through the Seasons Location: Bobcat Ridge Natural Area (off CR 27, south of Masonville) Date/Time: Wednesday, May 21, 2014 5:30 PM Details: Depending on the season, different wildflowers are blooming. Come every third Wednesday through September to see current flowers in bloom and learn about native plants. 1-2 miles, easy. Free. REGISTRATION REQUIRED for each month's session at www.naturetracker.fcgov.com Web address: http://www.fcgov.com/naturalareas Contact Information: Deborah Price Phone: 970-416-2815; E-mail address: naturalareas@fcgov.com Restoration Along the River Location: N. Shields Ponds Natural Area (meet at parking lot on Shields Street, north of Shields and Vine) Date/Time: Tuesday, June 10, 2014 10:00 AM Details: A Natural Areas Department environmental planner will share information about restoration work being done along the Poudre River and the importance of the flood plain. See some of the new plantings that will help the river corridor thrive. 1-2 miles, easy. Free. No registration required, but you can get a reminder and updates by signing up at www.naturetracker.fcgov.com Web address: http://www.fcgov.com/naturalareas Contact Information: Deborah Price Phone: 970-416-2815; E-mail address: naturalareas@fcgov.com To view the full calendar of events, visit http://www.fcgov.com/events/ 22 PUBLIC SAFETY UPDATE FORT COLLINS POLICE SERVICES Nationwide Drug Take-Back Event Fort Collins police again partnered with the U.S. Drug Enforcement Administration (DEA) on Saturday, April 26 for the National Prescription Drug Take-Back Day event. The event focuses attention on the issue of pharmaceutical controlled substance abuse and proper disposal methods. Additionally, Fort Collins Police Services now offers a daily drug take-back service that complements the Nationwide DEA Drug Take- Back events. Residents may now safely dispose of unused, unneeded and expired over-the-counter and prescriptions medications any day of the week to Fort Collins Police Services, 2221 S. Timberline Road, Monday through Friday, 8 am – 10 pm; Saturday & Sunday, 8 am – 6 pm. Between the two activities, citizens dropped off 1,082 pounds of unused, unneeded, and expired over-the-counter and prescription medications to the Fort Collins Police Services site for safe disposal. This service is free and anonymous. Items not accepted include intravenous solutions, injectables, syringes, mercury (thermometers), oxygen containers, chemotherapy/radioactive substances, pressurized canisters and illicit drugs. Coffee with Chief Hutto The Coffee with Chief Hutto monthly community outreach activity was held on April 24 at Alley Cat, 120½ W. Laurel Street. The next event will be held on June 26 from 9-10 a.m. at Starbucks, 4609 S. Timberline Rd. Home Invasion Aggravated Robbery Fort Collins police responded to a home invasion robbery in the 800 block of West Laurel on April 7. Three male suspects entered the residence seeking drugs and brandished baseball bats during the robbery. Two people sustained injuries (one suspect and one resident) and were transported for treatment of minor injuries and released. Two suspects, Dillon Cosgrove, 21, and Spencer Crocker, 18, were arrested and booked into the Larimer County Jail on charges of Aggravated Robbery, Burglary, and Theft. A third suspect is being sought. 23 The Pigeon Drop Scam Alert This is the one where a stranger hangs out in a store, looks for a person and approaches them for help in a "situation." The theme is that the stranger (suspect) has somehow "won" monies (like the Lottery) that they can't get cash for (some reason), and they will be more than happy to share the winnings with the victim if they help them get cash. The suspect is friendly, and the victim's new best friend. The victim goes to the bank and obtains cash. Once the money is out of the bank, the scam goes really fast. The suspect drops the victim off to do an errand, giving them an envelope that contains “the cash.” The suspect leaves, and the victim finds that there is cut up newspaper and such in the envelope. The Pigeon Drop recently occurred in Aurora, CO. The suspect(s) may move up and down the Front Range looking for targets. Be aware of this type of scam and if you see anything like this occurring, please call police. Party/Disturbance Shortly after midnight on Sunday, April 13, officers from Fort Collins Police Services were called to 500 Blevins Court on a party/disturbance call. A resident at this location called for assistance to help break up a party which had gotten out of hand. This party had been registered using the party registration system. Upon arrival, officers encountered a crowd of a couple hundred people, most likely comprised of people from the party as well as others in the area. Commands were issued to clear the street and disperse the crowd, requests which many heeded. A group of approximately sixty ignored the commands to leave and escalated their behavior, throwing rocks and bottles towards the police as well as threatening property in the area by jumping on and rocking cars. Fort Collins police, along with Colorado State University police, responded with a limited, directed application of pepper-balls which, along with continued verbal direction to disperse, was effective in ending the situation. There were no reported injuries and no arrests have been made at this time. Fort Collins police continue to investigate this event in conjunction with CSU police in an effort to identify any participants against whom charges may be filed. Quail Hollow Neighbors Connect Meeting Fort Collins Police Chief John Hutto hosted a community outreach meeting with residents of the Quail Hollow neighborhood on April 23 to talk about neighborhood crime, what’s working well for the residents and how services can improve. This is the first of four neighborhood meetings planned in 2014. Fort Collins 911 On April 18, the Colorado Association of Public Safety Communications Officials (APCO) and National Emergency Number Association (NENA) Chapter awarded the Longmont Department of Public Safety, Loveland Emergency Communications Center, Estes Park Police Department, Larimer County Sheriff’s Department and the Fort Collins 9-1-1 Center with the 2014 Center(s) of the Year award. The four Larimer County Agencies each received a plaque and $250. The centers received this award for their work during the 2013 flood. 24 Crime Trends Robberies in Fort Collins are not a common occurrence. The numbers vary wildly from month to month, with no real peak seasonality. Even with relatively low numbers, the trend is decreasing over the past five years. Offenses were higher in 2009, tapered off by 2012, and have remained relatively low. Crime Prevention During April, the Crime Prevention Specialist handled 25 telephone calls ranging from personnel safety training to a chronic false alarm problem with a local business. There were presentations/interactions with 1,798 people which included the 9 News Health Fair and the Drug Take Back Event. A breakdown of the month’s Crime Prevention activities follows: • RESTORE - 53 attended • Fire and Life Safety Conference in Estes Park - 160 attended • 9 Health Fairs (2 days) – 1,200 attended • Rx Drug Take-Back - 381 vehicles came by • CPTED, Peace with Christ Church - 4 attended Crime Prevention Tip Although an infrequent occurrence, occasionally someone will impersonate a police officer in an attempt to stop an unsuspecting motorist. If you believe you are being stopped by a person who may be impersonating a police officer, be cautious, and observe the following safety tips: - Lock your car doors, turn on your flashers, call 9-1-1 from your cell phone and drive slowly to a safe place such as a well-lit, busy area (i.e., parking lot of a busy store). Tell the 9-1-1 dispatcher that you are concerned. - Do not stop your vehicle or get out of your car until a dispatcher can confirm you are being pulled over by a legitimate police officer. 25 - If the dispatcher cannot confirm you are being pulled over by a police officer, stay on the line with the dispatcher and drive carefully to a safe place, such as a local police department. - If you are stopped and issued documents that may be suspicious, contact the issuing agency about their legitimacy. - Report anything suspicious. For more information about personal safety, visit www.fcgov.com/police/crime-prevention.php. POUDRE FIRE AUTHORITY Explosion with Structure Fire Firefighters responded to reports of an explosion in the 500 Block of N. Bryan Avenue at approximately 2:45 a.m. on April 19. Two males and one female were found outside the structure and had suffered injuries resulting from the explosion and structure fire at an apartment complex. One male was transported in serious condition to Medical Center of the Rockies with burn injuries. He was later flown to University Hospital in Denver for further treatment. The duplex suffered approximately $150,000 in damage from the explosion and fire. Investigators with Poudre Fire Authority and Larimer County Sheriff’s office are continuing their investigation to determine the cause and origin of the explosion. MAX Emergency Preparedness Drill PFA participated in a simulated vehicle crash involving a MAX bus on the Mason Causeway. The exercise was held during the evening of April 16 and involved many agencies in the preparation, planning and exercise phases. ‘Patients’ were removed from vehicles with the aid of hydraulic prying devices by firefighters so they could gain access, treat and transport them. This exercise fulfills a federal requirement for the start-up and operation of the MAX Bus service. 26 9Health Fair A wonderful opportunity to interact with our customers in a non-emergency setting where they are looking for information was not passed up as PFA was invited once again to join the 9Health Fair this last month. Hundreds of people attend this yearly event to obtain many types of health screenings because this may be their only chance to do so throughout the year. Firefighters are able to talk to our customers about fire and life safety issues, sometimes even arranging for additional services such as a home safety check or installation of a smoke or carbon monoxide alarm. Incident Statistics (by category) Report Period: April 2014 Total Loss Fires 28 $563,000 Overpressure/rupture, explosion-no fire 2 Rescue / EMS 1,001 Hazardous Condition - no fire 22 Service Call 60 Good Intent Call 116 False Alarms / False Calls 77 Severe Weather & Natural Disaster 0 Special Incident Type 2 Total = 1,308 YEAR-TO-DATE 2014 Total Loss Fires 103 $1,055,050 Overpressure/rupture, explosion-no fire 4 Rescue / EMS 4,051 Hazardous Condition - no fire 106 Service Call 218 Good Intent Call 394 False Alarms / False Calls 390 Severe Weather & Natural Disaster 0 Special Incident Type 11 Total = 5,277 Comparison: April 2013 Total Loss Fires 18 $51,000 Overpressure/rupture, explosion-no fire 0 Rescue / EMS 1,015 Hazardous Condition - no fire 29 Service Call 63 Good Intent Call 102 False Alarms / False Calls 97 Severe Weather & Natural Disaster 0 Special Incident Type 3 Total = 1,327 27 Comparison: YEAR-TO-DATE 2013 Total Loss Fires 113 $602,846 Overpressure/rupture, explosion-no fire 2 Rescue / EMS 3,886 Hazardous Condition - no fire 113 Service Call 239 Good Intent Call 365 False Alarms / False Calls 404 Severe Weather & Natural Disaster 0 Special Incident Type 7 Total = 5,129 *Information subject to change due to updated data. 28 BUILDING & PLANNING ACTIVITY COMMUNITY DEVELOPMENT & NEIGHBORHOOD SERVICES 2013 YTD 2014 YTD % Change Development Project Submittals Received 112 107 -5% Conceptual/Staff Reviews Performed 89 79 -11% Building Permits Issued 1,801 1,882 +5% Building Permit Valuations ($M) $109 $166 +52% Building Inspections Performed 9,974 10,890 +9% Plan Reviews Performed 651 675 +4% Development Review revenues are approximately $226,000 over projections for 2014 as of April 30. The General Fund portion of this is approximately $253,000 over 2014 projections (Transportation Development Review Fees are currently under projection). Development Projects of Note  Avondale Cottages – Affordable Housing Project – New affordable housing residential project to include 10 single-family dwelling units built by Habitat for Humanity.  Foothills Mall Redevelopment – The Foothills Mall Redevelopment Phase One Final Plan and development agreement have been recorded and site work has commenced. All phases are anticipated to be finalized and recorded by May 10.  Harmony and I-25 – Overall Development Plan submitted that will reshape the land and ponds at the corner of East Harmony Road and I-25 to prepare for the development of office space, a convenience shopping center and restaurants.  Summit on College Parking Structure – The Project Development Plan (PDP) was approved by a hearing officer on March 19 and the approval was appealed on April 2. The project proposes a parking structure at the south end of The Summit student housing project to provide 427 spaces, replacing 96 surface spaces for a net gain of 331 spaces. This project has been appealed. The appeal is scheduled to be heard by City Council on May 20, 2014.  Timberline Subdivision – New subdivision to include 146 single-family detached units, a 1-acre neighborhood park and 1.5+ miles of new trail system.  Woodward – Final plans for the river restoration area have been approved. The final mylars and development agreement for Phase 1 of the Woodward campus is nearing completion and will likely be recorded in early May. Projects that submitted final plans in April: o Uptown Plaza retail project - submitted 4/4/2014 o Rigden Farm Filing 18 residential project – submitted 4/18/2014 o Learning Experience at Miramont child development center project – submitted 4/29/2014 o Geico office building – submitted 4/30/2014 29 Construction Projects of Note  Commercial addition at the Anheuser Busch agricultural resources site located at 3515 Richards Lake Road  Remodel for Bohemian Companies at 240 E Mountain Avenue Other items of Note  Downtown River District – Standards and Guidelines for the River Downtown Redevelopment (R-D-R) Zone – This project is moving forward and has recently been presented to the Natural Resources Advisory Board, Economic Advisory Commission and City Council Worksession. The standards are to be codified in conjunction with the Land Use Code 2014 annual update. The guidelines are to be adopted by Resolution in a separate document. The Planning and Zoning Board will make a recommendation on May 8, 2014 and Council First Reading is scheduled for June 3, 2014.  Lincoln Corridor Plan – The purpose of the Lincoln Corridor Plan is to summarize and document the planning process and extensive community engagement to: o Develop a vision and preliminary long-term multi-modal roadway design for Lincoln Avenue; o Identify related neighborhood improvement projects in the study area; and o Identify potential funding options, project phasing, and specific strategies and actions to implement the plan. City Council will consider adoption of the Plan on May 20, 2014. For more information on the project, including summary of public outreach, visit www.fcgov.com/lincoln.  Nature in the City – The Nature in the City strategic plan was funded through the Annual Appropriation Ordinance and launched in January 2014. This strategic plan will develop a vision for incorporating nature into the urban environment and include design guidelines, policies, and actions for achieving this vision. o We are currently conducting the inventory and assessment (using existing data, e.g., GIS, Natural Areas bird data, etc., and field data to be collected this summer at 180 sites throughout the City) using a triple bottom line approach and have already engaged almost 300 citizens and met with four City Boards. o The project was also awarded $25,000 from the City’s Sustainability Innovation Fund to build the first green wall in our community. We are collaborating with the Institute for the Built Environment and the Urban Lab (urbanlab.colostate.edu) to design and install the wall this year. A task force comprised of CSU, City staff, and private sector representatives has been formed to oversee this effort. For more information about the project, please see our website at fcgov.com/natureinthecity.  Oil & Gas – A moratorium is now in place for all hydraulic fracturing within the City of Fort Collins. The moratorium will remain in place for up to five years and stops the current operator from using hydraulic fracturing to enhance existing wells or drill new ones. Staff has ceased working on Land Use Code revisions until further direction is 30 received from Council. Council passed a resolution directing staff to hire professional services to research and make recommendations on methods of compliance related to property values and health impacts of hydraulic fracturing. Staff has provided legal services with recommendations for filling those positions.  Smoking Ordinance Expansion Options – City Council Work Session April 8, 2014. City Council directed staff to move forward in all five of the areas discussed in the following manner: Items to consider as soon as possible (July 1): 1. Electronic Smoking Devices – Council directed staff to bring an ordinance for consideration that would prohibit the use of electronic smoking devices in all places where conventional smoking is prohibited. Additional outreach to bars/restaurants will be conducted to ensure they are aware of this potential regulation. 2. 100% Hotel/Motel Rooms – Council directed staff to bring an ordinance for consideration that would require 100% of hotel/motel rooms to be smoke-free (this direction was not unanimous). Some concern was expressed about the potential negative impacts to hospitality businesses and their customers. Staff will personally contact all hotels/motels in Fort Collins that currently allow smoking to better understand their business situations, perspectives, and how the City could make the transition of this potential new requirement as easy and least impactful as possible. 3. Parks, Trails, and Natural Areas – Council also directed staff to bring an ordinance for consideration that would prohibit smoking in all parks, trails, and Natural Areas. Golf courses would be exempt from this requirement (this direction was not unanimous). Additional information about enforcement will be provided. Additional communication with Fossil Ridge High School Student Council members will occur to ensure staff understands the issues occurring at the park next to the school. A public open house to further collect community feedback will occur in May. Items to consider later (October 7): 1. Public Events – Council directed staff to bring an ordinance for consideration that would require public events to be smoke-free. Council did not request the allowance of designated smoking areas. Because many public events for 2014 have already begun the permitting process, as well as their marketing process, Council agreed that this requirement should be considered with implementation beginning for the 2015 public event season. Staff will visit with event planners and patrons during the 2014 event season to gain additional feedback. 2. Old Town/Downtown – Council directed staff to bring an ordinance for consideration that would require certain areas within the Old Town/Downtown area to be smoke- free. Different options about the boundaries for this area were discussed. Staff will provide options for consideration, including Old Town Square, as well as an expanded area that could possibly be phased in over time. Staff will meet with business owners within these areas to discuss their thoughts, concerns, questions, and suggestions. Staff will also meet with Boulder staff to get a better understanding of implementation and potential unintended consequences of the smoke-free regulations 31 of the Pearl Street Mall. Additionally, staff will provide detailed enforcement information and potential costs for Council consideration.  Transit-Oriented Development (TOD) Parking Study – Kimley-Horn and Associates have been hired to assist with the study. This item is scheduled for Council work session on May 27, 2014. Study development and implementation are scheduled to be complete by the expiration of the temporary ordinance (September 13, 2014) which was approved by City Council on September 3, 2013.  Urban Agriculture o Phase 2 code changes were adopted by Council on March 18, 2014. o To focus efforts more strategically from here on out, staff continues to work with the Local Food Cluster on the development of a strategic plan to ensure the City of Fort Collins has a healthy, resilient local food system. o A budget offer has been prepared for the 2015-2016 BFO Cycle to align internal staff efforts in the development of the local food and wellness strategic plan.  West Central Area Plan / Prospect Corridor Design – Generally encompasses the neighborhoods south and west of CSU and was adopted in 1999. Since then, several development projects have been completed with varying degrees of impact. Given City Plan’s emphasis on infill versus sprawl, CSU’s increased enrollment projections, and the possibility of an on-campus stadium, it is now time to re-assess plans and policies that so that the quality of life is preserved and enhanced. Transportation needs, such as connections to the MAX Bus Rapid Transit and a new conceptual design for a segment of Prospect Road, will also be addressed. Four public outreach listening sessions were conducted in March and April, with more than 175 residents, property owners, and other interested stakeholders in attendance. More than 15 neighborhood walking tours were conducted between April 21-May 1 at various times and locations. An online “WikiMap” is being used to collect input and ideas from those interested in the planning effort, including those unable to attend other public events. Presentations were made in April to the Parking Advisory Board, Transportation Board, and the UniverCity Connections Transportation and Mobility Task Force. Development Projects under Appeal  Bella Vira, Phase Two Major Amendment and Replat, FDP140001. Amended appeal was filed on March 28, 2014. Council hearing is scheduled for May 6, 2014.  Bella Vira, Final Plan Extension of Vested Rights, MIS140002. Appeal was filed on April 24, 2014. Council hearing date to be determined.  Summit Parking Structure, FDP130056. Three appeals were filed on April 2, 2014. Council hearing is scheduled for May 20, 2014.