HomeMy WebLinkAboutMemo - Mail Packet - 1/7/2014 - Memorandum From Platte River Power Authority Re: Platte River Power Authority 2014 Strategic Plan And Community & Environment Publication Dated December 20132014 STRATEGIC PLAN
THE ENERGY WE LIVE BY™
ESTES PARK | FORT COLLINS | LONGMONT | LOVELAND
www.PRPA.org
Our
Mission…
Provide safe,
reliable,
environmentally
responsible, and
competitively
priced energy and
services.
Our
Vision…
As a respected
leader and
responsible
energy partner,
improve the quality
of life for the
citizens served
by our owner
communities.
WHAT’S INSIDE…
VALUES
SAFETY
Working safely and protecting the public, our employees,
and the assets we manage is non-negotiable.
INTEGRITY
Being ethical and holding ourselves accountable to
conduct business in a fair, honest, open, compliant, and
environmentally responsible manner is at the core of
what we do.
CUSTOMER SERVICE
Providing quality service at a competitive price while being
responsive to our owners’ needs creates added value and
improves customer satisfaction.
RESPECT
Encouraging constructive dialogue that promotes a culture
of inclusiveness, recognizes our differences, and accepts
varying viewpoints will lead us to optimal solutions for even
the most difficult challenges.
OPERATIONAL EXCELLENCE
Engaging employees to strive for excellence and continuous
improvement ensures that we provide reliable service while
managing costs and creating a rewarding work environment.
INNOVATION
Supporting the development of technologies to promote the
efficient use of electricity, protect the environment, and create
a diversified energy supply portfolio mitigates risk and creates
opportunities.
SUSTAINABILITY
Maintaining financial integrity, minimizing our environmental
impact, and supporting responsible economic development in
our owner communities ensures the long-term viability of the
organization and the communities we serve.
General Manager’s Message ................ 3
Board of Directors.................................. 5
Management Team ................................ 6
Introduction ............................................ 7
Initiatives & 2014 Goals ........................ 9
Planning Process ................................ 15
Resource Planning .............................. 22
Risk & Financial Management ............ 27
Legislative & Regulatory ...................... 29
Municipal Planning Coordination ........ 34
Appendix A........... Official Load Forecast
Appendix B ......... Risk Management Plan
Appendix C .......................Financial Plan
Appendix D ............. Acronym Definitions
2
Platte River Power Authority is honored to provide
safe, reliable, environmentally responsible and
competitively priced energy and services to Estes
Park, Fort Collins, Longmont and Loveland,
Colorado. This mission has allowed us to improve
the quality of life for the citizens of our four owner
communities over the past forty years.
Our Board of Directors and staff have begun an
in-depth planning process—one that will support
strategic thinking and the development of adaptive
strategies for the future. The result of our effort
thus far is outlined in this summary document.
Platte River’s 2014 Strategic Plan is fluid, and will
be updated annually as detailed analyses of future
scenarios are completed, new technologies evolve,
and market opportunities develop. The plan is not
set in stone, but is rather a guide for developing
an adaptive strategy to sustain Platte River Power
Authority and the communities we serve for the next
forty years and beyond.
from the…
GENERAL MANAGER
Jackie Sargent - General Manager
PLATTE RIVER POWER AUTHORITY
The plan is not set in stone, but is rather a guide for developing
an adaptive strategy to sustain Platte River Power Authority and the
communities we serve for the next forty years and beyond.
3
from the…
GENERAL MANAGER
In managing any business, it is important to think strategically about risks and opportunities—no
different from how one would manage an investment portfolio. Generation resources currently
serving the four cities are comprised of coal, hydropower, wind and natural gas. Because we
rely heavily on coal resources, we are faced with potentially significant financial, legislative and
regulatory risks. The lack of intermediate resources in the existing resource mix also limits our
flexibility in potential future electric markets. Citizens have expressed interest in more renewable
generation and innovative technologies that will help reduce the carbon footprint of Platte River’s
energy resources. We are listening closely to discern customers’ future resource preferences.
Understanding the implications of potential future changes to our resource mix will require
detailed analysis—we have so far only scratched the surface. Platte River is committing staff
and other resources to evaluate options to diversify our future energy supply portfolio and
reduce our carbon footprint while remaining the lowest cost wholesale power provider based in
Colorado. We will be considering a number of potential future scenarios and comparing these to
a “business as usual” base case, trying to identify the associated risks and opportunities. We’re
also stepping up our capabilities to ensure expanded collaboration and communications with the
communities. As we develop these new areas, we will continue to focus on our values of safety,
integrity, customer service, respect and operational excellence. We will seek opportunities to
integrate technological innovation and sustainability in all areas of Platte River’s business.
We are committed to building on our strong foundation
to create the energy future our communities deserve.
CONTINUED
4
5
TOM ROINIOTIS
CHAIRMAN
Director, Power & Communications
City of Longmont
CECIL GUTIERREZ
SECRETARY
Mayor
City of Loveland
BILL PINKHAM
VICE CHAIRMAN
Mayor
Town of Estes Park
DENNIS COOMBS
Mayor
Town of Longmont
STEVE ADAMS
Director, Water and Power
City of Loveland
REUBEN BERGSTEN
Utilities Director
Town of Estes Park
KAREN WEITKUNAT
Mayor
City of Fort Collins
GERRY HORAK
Mayor Pro Tem
City of Fort Collins
BOARD OF DIRECTORS
Platte River Power Authority is a joint action agency and political subdivision of the State of Colorado. It
is governed by an independent eight-member Board of Directors that provides local decision making and
control. The Board has been actively involved in the development of the 2014 Strategic Plan.
6
SENIOR MANAGEMENT TEAM
JASON E. FRISBIE
Chief Operating Officer
JACKIE SARGENT
General Manager
KARIN L. HOLLOHAN
Corporate Services Director
JOHN R. BLEEM
Strategic Planning &
Customer Service Director
JOSEPH B. WILSON
General Counsel
BARBARA ATESHZAR
Government &
External Affairs Officer
DEBORAH R. SCHANEMAN
Environmental Services &
Compliance Director
DAVID D. SMALLEY
Chief Financial & Risk Officer
Platte River Power Authority operates under the direction of a General Manager who serves at the pleasure
of the Board of Directors. Platte River’s senior management has extensive experience, with an average of
over 25 years of service in the utility industry.
INTRODUCTION
Since its inception, Platte River has been active in planning for the future. Planning has taken many forms over
the years, with the primary focus on new electric supply resources to serve the needs of the Municipalities.
Planning efforts have continued to evolve over Platte River’s history. As indicated in the graphic below, the initial
focus of the organization was on building resources to meet the growing Municipal loads as federal hydropower
sources were limited (1970’s - 1980’s). Once these resources were built, the focus shifted toward operational
considerations, along with ensuring sales of excess capacity and energy (1980’s - 1990’s). The last planning
cycle (early 2000’s) was dominated by the addition of new gas generation to meet the fast growing summer
peak demands of the Municipalities. Rate increases were also a significant consideration during this time, with
the first rate increase since 1983 occurring in 2004 and cumulative rate increases of over 50% of the 2003 level
implemented by 2013. Other considerations during this period included expansion of demand side management
resources, increased maintenance costs for aging infrastructure, expansion of transmission capacity and
increased focus on water resource management.
Going forward, the organization faces new, significant risks, including the challenges of climate change, other
new environmental legislation and regulations related to coal generation, fuel and market price volatility, physical
and cyber security threats, an aging workforce, increasingly diverse needs among the Municipalities and new
transitions in wholesale markets. The next phase of planning will require Platte River to increase its flexibility,
focusing on new areas, while building on existing strengths.
Platte River’s management team began a new strategic planning effort in late 2012 by reviewing challenges and
opportunities facing the organization. Gaps were identified and a reorganization was implemented to allow for
increased attention to long-term planning and risk management. Working with the Board of Directors, a new set
of Mission, Vision and Value statements were developed and multiple activities were initiated to prepare for an
in-depth discussion with Board members regarding future direction of Platte River.
BUILDING:
• Craig
• Rawhide
• Transmission
OPERATIONS:
• Craig
• Rawhide
• Transmission
• Municipal sales
• PSCo CAE sale
• Debt reduction
SUMMER PEAK:
• Five new gas CTs
• Transmission
• End of PSCo sale
• Hydro (drought)
• Craig & Rawhide
operations
• Rate increases
FLEXIBILITY:
• Renewables
• Demand response
• Distributed generation
• New technologies
• Diverse member
needs
• Balancing multiple
uncertanties &
managing risks
Phases of Planning at Platte River
7
As part of the strategic planning process, a special all-day meeting of the Board of Directors
was held in July 2013 to review planning-related information and to allow management to
gather direction from the Board regarding Platte River’s future. During this meeting, seven
statements of strategic direction were provided to the management team by the Board.
strategic planning direction
STRATEGIC DIRECTION STATEMENTS
Management should explore ways to improve collaboration and communication among the
partner cities, facilitated by Platte River.
Platte River should investigate options to reduce/mitigate its carbon footprint using Colorado’s
approved Climate Action Plan as a guide (20% below 2005 levels by 2020 and 80% below 2005
levels by 2050).
Platte River management should be directed to look at diversifying and balancing the generation
supply portfolio.
Platte River management should be directed to look at the expansion of renewable resources
using the measures established for cooperatives in Colorado SB 13-252 as a guide (20% of
retail energy from qualified sources by 2020).
In the context of above items (2, 3 and 4), Platte River management should present to the Board
an energy-portfolio diversification plan [in the context of a comprehensive strategic plan] that
keeps us competitive, meaning Platte River should remain the lowest cost wholesale
power provider located in Colorado.
Platte River management should explore opportunities for administering a common
survey with the four Cities.
Platte River should become strategically aware of technology, innovation trends and
opportunities.
8
Review and update the Emergency Response Plan.
Reach out to local law enforcement, emergency management services, and fire departments to
engage in tabletop exercises and support coordinated emergency response planning and
communications.
Continue to define and implement a safety focused culture and further document safety procedures.
OUR 2014
INITIATIVES & GOALS
Based on the directives from the Board and other planning efforts
completed to date, a set of initiatives, objectives and goals has
been developed for 2014. These provide high level direction
and focus for all divisions within Platte River. Six of these
relate to bolstering existing strengths and enhancing ongoing
efforts in the areas of safety, customer service, operations,
compliance, financial strength and employee engagement.
Three new initiatives have been developed in response to
Board direction and staff’s initial risk analysis: (1) improving
collaboration and communications among the Municipalities
and Platte River, (2) evaluating options to reduce greenhouse
gas emissions and, (3) increasing focus on technology and
innovation. It is anticipated that these Initiatives, Objectives
and Goals will be updated by management and brought to the
Board of Directors for approval on an annual basis—as part of
the annual strategic planning process.
It is the basic safety policy of Platte River that no job is so important and no service so urgent that
an employee must violate a safety rule or risk injury/illness over taking the time to perform work
safely.
GOALS
safety focus
9
GOALS
Meet energy savings and peak demand reduction targets for established Common DSM
programs and services.
Expand DSM program offerings to include implementation of new innovative technologies.
Support the Municipalities’ key account program by engaging more actively with Municipal staff
and targeting program and service offerings more directly to these customers.
Support economic development efforts in the Municipalities through program and service
offerings with a focus toward contributing to the success of local businesses.
Develop proactive and comprehensive methods of obtaining feedback from Municipalities and
customers, including implementing joint customer satisfaction surveys.
Work jointly with the Municipalities, establish customer satisfaction goals for Platte River
services, and provide staff support to the Municipalities.
Align strategic planning efforts to support key 2014 initiatives of the Municipalities.
Engage in expanded outreach opportunities to Municipality and community groups.
Work with the Municipalities on legislative and regulatory issues that impact all of us.
Identify and implement co-branding opportunities with the Municipalities.
Continuously improve services to the Municipalities by maintaining a high level of
knowledge regarding Municipality and retail customer needs and preferences, identifying
and tracking key performance metrics, and integrating new information into future program/
services planning decisions.
exceptional customer service
10
Platte River will implement a coordinated process whereby we optimally manage physical
and personnel assets and their performance in a way that maximizes value, while taking
into account risk, costs, safety, efficiency and performance for the purpose of achieving our
mission and strategic objectives.
Platte River will reinforce, support and sustain a strong and consistent culture of compliance
which builds compliance consciousness into our daily activities and operations and
encourages each employee to conduct business with the highest standards of integrity,
operational excellence and sustainability.
GOALS
GOALS
Provide system-wide transmission reliability to maximize safe and efficient energy delivery to
our owner communities and surplus sales customers.
Operate and maintain safe, reliable, affordable and environmentally responsible generating
assets to provide owner communities a strategic advantage in wholesale power costs.
Maximize fuel efficiency at all generating facilities in order to minimize fuel costs.
Reduce generation and transmission operating and maintenance expenditures to manage
delivered energy costs.
Maximize asset utilization to improve opportunities to generate surplus sales revenue.
Manage our water resources through a comprehensive Board approved water policy that
facilitates asset utilization and optimization both now and into the future.
Work with our local, state and federal government and regulatory agencies to ensure a favorable
political climate for our continued operations.
Develop a long-term facilities master plan.
Develop an overall security policy.
Develop and implement a formalized project management process.
No regulatory compliance violations resulting in fines.
No environmental compliance violations.
Review and update policies to enhance operations, create efficiencies, and ensure that
appropriate controls are in place.
Review and update the process for contract administration and compliance.
operational excellence
compliance assurance
11
Platte River will evaluate options for diversifying its future mix of resources – integrating
both supply and demand side technologies and capitalizing on regional competitive strengths
(proximity to natural gas and coal, excellent wind and solar resources and local/regional
energy technology research and development).
GOALS
Manage budgeted revenues and expenditures to meet Strategic Financial Plan targets.
Review and update the Strategic Financial Plan to ensure targets are adequate based on new
strategic initiatives that are developed.
Review and analyze opportunities for the next bond financing.
Evaluate new technology to improve efficiency and effectiveness of budgeting, analysis and
reporting.
Provide timely and accurate reporting of financial information as well as the implementation of
new accounting standards.
Review and revise Risk Plan assessments and mitigations with the Risk Oversight Committee.
Review and revise internal processes to improve efficiency and controls.
Platte River will maintain long-term financial stability by focusing on financial planning,
financial reporting and risk management.
financial stability
GOALS
Evaluate natural gas combined cycle generation and other options to support integration of
additional renewable energy resources, to diversify the resource mix and to provide flexibility for
future electric market scenarios.
Conduct an analysis to evaluate alternatives for decreasing Platte River’s greenhouse gas
emissions and identify the associated cost implications.
Conduct an analysis for meeting retail customer energy requirements using increasing levels of
renewable resources and the associated cost implications.
Update Platte River’s Renewable Energy Supply Policy.
Analyze the potential benefits and costs of distributed generation at Municipal utility and retail
customer levels and integrate cost effective alternatives into the next Integrated Resource Plan.
Track innovative technologies to enhance energy supply and implement cost effective
improvements utilizing new technology opportunities.
Seek Board approval of a new Integrated Resource Plan that integrates increased renewable
energy, distributed generation, resource diversification and greenhouse gas reduction, while
maintaining Platte River’s position as the lowest cost wholesale electric supplier located in
Colorado.
diversified energy
supply portfolio
12
GOALS
Design a Leadership Development Program that identifies successor candidates for all levels
of supervision and builds current and emerging leaders’ skills to support Platte River’s mission
and strategy.
Develop a Diversity and Inclusion Program that equips leaders and employees to provide
a welcoming and respectful work environment, model inclusive behavior as well as support an
inclusive and diverse workplace, and links all Platte River programs and initiatives.
Implement an Ethics and Compliance Program that empowers employees to not only report but
also prevent, identify and stop noncompliant behavior, ensuring that ethics is at the core of
Platte River’s culture and providing transparency in everything we do.
By continuing to invest in its human resources, Platte River Power Authority will leverage
diversity, grow internal talent, attract innovative skills and facilitate high standards of
professional and ethical behavior.
employee engagement
Platte River will explore options for increased coordination and collaboration in the areas
of joint planning, new programs and services, stakeholder communications and leverage of
resources.
GOALS
Evaluate options for a system-wide demand response pilot program.
Evaluate potential for system-wide solar energy programs such as solar gardens.
Form a joint load forecasting team to investigate options for utilizing end-use load research,
improved measurement/verification of DSM programs and other coordinated approaches to
enhance system forecasting.
Study options for expanding joint training among the Municipalities and Platte River.
Evaluate new services and other opportunities identified in the 2013 Utility Director Survey.
Expand the joint strategic planning team among the Municipalities and Platte River to identify
issues of mutual interest, evaluate potential new areas for collaboration and integrate
appropriate aspects of the Municipalities’ plans into Platte River’s Strategic Plan.
Develop and implement a stakeholder involvement process to enhance communications and
gain support for key initiatives and the next Integrated Resource Plan / Strategic Plan.
Collaborate with Municipalities’ teams on stakeholder communications, joint marketing
programs, sponsorships and educational events.
Through effective external communications, ensure that stakeholders are well-informed of the
value Platte River’s partnership brings.
improved collaboration
and communication
13
GOALS
Dedicate staff resources to actively research and advance the use of new, emerging
technologies in areas such as electric vehicles, distributed generation, demand response,
demand side management, energy storage and smart grid applications.
Deploy cost effective system efficiency improvements available through application of new
technologies and techniques.
Continue to support the FORTZED initiative through active participation on committees and
working groups.
Support the Net Zero Cities conference in 2014.
Establish a technology working group with subject matter experts from Platte River, the
Municipalities, Colorado State University and other stakeholders.
Actively seek funding for new technology applications in areas that provide benefits to the
Municipalities and Platte River.
Coordinate joint seminars with expert speakers on new technology and sustainability.
Platte River will actively monitor research and advance the use of new, emerging technologies
in all areas of business to enhance performance and support the needs of the Municipalities
and their customers.
technological innovation
and sustainability
14
Historically, separate planning documents were produced for operations, financial, legislative/regulatory,
climate action, transmission, and risk management areas. For 2014, many of these separate plans have
been incorporated into the overall Strategic Plan prepared for approval by the Board of Directors. Through
consolidation of these separate documents the Board will be provided a more straightforward summary of the
issues confronting the organization as well as the efforts underway to address identified risks and opportunities.
The figure below provides a graphical representation of this effort.
The Strategic Plan is a business tool used to sustain and promote the long-term success of the organization. It
provides context through a description of existing issues and sets out a framework for analyzing how a variety
of factors will impact the organization and its ability to perform in current and potential new market scenarios.
New scenarios may include greenhouse gas emission reductions, FERC initiatives (regional transmission
organizations, energy imbalance markets, etc.), significant expansion of renewable energy resources, evolution
and integration of new and innovative technologies, changing customer needs and other factors.
STRATEGIC PLANNING PROCESS
15
STRATEGIC PLANNING PROCESS
One significant aspect of the new planning initiative is a greater focus on coordinated planning with the
Municipalities. Over the last several years, multiple teams have been formed to enhance planning and project
management, including the Joint Technical Advisory Committee and joint teams in the areas of demand side
management, renewable energy, key account customer services and rates. Going forward, Platte River’s
strategic planning process will include integration of Municipal plans and initiatives. Municipality efforts in
areas such as load forecasting, energy policy, sustainability, climate change and strategic planning will be
reviewed with a focus toward identifying key aspects of the Municipalities’ plans that should be integrated into
Platte River’s future Strategic Plans. This effort to collaborate more formally on planning will expand in 2014,
with new Platte River staff resources dedicated to this effort.
The strategic planning process also provides an opportunity to gather information on the preferences of
the Municipalities as customers. An initial survey of potential new services that may be of interest to the
Municipalities was conducted with Utility Directors and their staffs during 2013. This effort will be expanded
and clarified during 2014. In addition, staff is collecting and aggregating information from past retail customer
surveys conducted by the Municipalities. Platte River and the Municipalities began collaboration on customer
surveys during 2013 by adding some questions related to resource preferences as part of the Municipal
surveys. Additional survey efforts will be conducted during 2014 to enhance planning.
The coordinated planning activities of Platte River have always included other utilities in this region. Due
to recent Federal Energy Regulatory Commission (FERC) initiatives this level of regional planning will be
increased. To anticipate and prepare for new regional market structures that may result, Platte River will
continue to monitor the development of energy imbalance markets.
It is anticipated that a new Integrated Resource Plan (IRP) will be developed during 2014 and will be
incorporated into the 2015 Strategic Plan. Five integrated resource plans have been developed since the mid-
1990’s, leading to the addition of simple cycle natural gas generation and providing guidance for expanding
energy efficiency and renewable energy resources. The most recent IRP approved by the Board (the 2012
IRP) will remain a separate planning document until it is updated and integrated into the 2015 Strategic Plan.
16
As part of the process of considering how to ensure the long term success of Platte River and its Municipalities,
a SWOT analysis was initiated by the management team in late 2012. A summary of this initial analysis was
reviewed by the Board of Directors during 2013 and updates were made to develop the list of items below. This
type of analysis will continue as part of the ongoing strategic planning process and the list will likely change
over time.
STRENGTHS, WEAKNESSES,
OPPORTUNITIES AND THREATS (SWOT)
Strong financial position
Technical expertise
Well maintained power plants and infrastructure
Lowest wholesale rates in Colorado
Excellent reputation/Well respected in the industry
Culture of commitment and operational excellence
Strategic planning and lack of adaptive strategy
Lack of diverse resources
Lack of bench strength and succession planning
Lack of energy market knowledge and experience
Relationships with cities at a policy level
STRENGTHS WEAKNESSES
Community involvement
Strengthen partnerships
Asset optimization
(water, transmission, generation, sales)
Improved communications
Leverage the four Municipalities’ resources
for improved efficiency
Partnering with the Municipalities to create
regional collaboration
Partnership opportunities with others to build
generation
Increased communication & educational outreach
Leadership development
Regulatory and legislative uncertainty
Looming knowledge loss as employees retire
Lack of process documentation
Long term reliable water supply
– need for firming project
Fuel price volatility including transportation costs
Outside pressures and not having an adaptive
strategy
Loss of tax exempt financing
Continued consolidation of large utilities
so there are fewer players in the market
Increased negative outlook for hydraulic fracturing
and impact on natural gas supply
Litigation
OPPORTUNITIES THREATS
17
RATES
RESOURCE MIX
ADDITIONAL PLANNING CONSIDERATIONS
Balancing costs with risk mitigation will be a key consideration going forward. Even though rates have increased
significantly over the last several years, Platte River’s rates remain the lowest among wholesale electricity
suppliers located in Colorado (see figure below).
The energy provided to Platte River’s Municipalities is comprised of the resources shown in the figure below.
2012 Average Wholesale Rates ($/MWh)
Municipality Electricity Supply Mix – 2012
18
RESOURCE MIX
One of the most significant factors to consider for the current resource mix is the large amount of coal generation.
Currently, 72.5% of all energy provided to the Municipalities comes from coal and this is expected to increase to
about 75% by 2020 under a business as usual scenario. About 81% of all sales from all Platte River resources
were generated by coal in 2012. This relatively high saturation of coal generation brings several potential risks,
including:
Relatively low emissions from its coal units combined with hydropower have allowed Platte River to provide
electricity to the Municipalities with a strong environmental record. Through continued investment in new
technologies over time, Platte River has reduced emissions levels for criteria pollutants (those associated with
human health effects). A comparison of NOx and SO2 for U.S. coal plants (nearly 500 units) is provided in the
following chart. As indicated, both Rawhide and Craig plants are among the lowest emitting plants in the U.S.
U.S. Coal Plant Emissions of NOx and SO2
Legislative and regulatory risks:
8 CO2 emissions (climate change)
8 SO2, NOx, Hg, VOC, air toxics (health)
8 Coal ash, cooling water, etc. (environment)
Financial risks:
8 Greenhouse gas charges (carbon tax or other
approaches)
8 Emission control installation & operation costs
8 Waste / water management costs
8 Credit rating downgrade
Constrained resource optimization:
8 High base and peaking / no intermediate
resource
8 Limited ability to integrate intermittent
renewable energy sources
8 Less flexible overall resource operation
Eroding public confidence:
8 Customer preferences vs. current resources
CONTINUED
19
As indicated in the chart, Platte River’s average CO2 emissions are about 4% above the Colorado average
and about 50% above the U.S. national average. Platte River ranks second among wholesale electric suppliers
located in Colorado.
Having a relatively high CO2 emission rate could lead to significant rate increases in the event that a carbon
tax or other action is implemented to reduce CO2 emissions. As part of the 2009 Climate Action Plan analysis,
Platte River and its consultant (KEMA, Inc.), estimated that costs to meet a 20% reduction in CO2 emissions
by 2020 could be about $31 million annually, resulting in a wholesale rate increase of about 16%. If “Cap and
Trade” were implemented (the dominant legislative approach being considered at the time), cost increases
could be much higher. Working with another consultant (Ventyx) during 2013, preliminary resource analysis
showed potential wholesale rate impacts of 18% to over 50%, depending on the level of CO2 charges assessed
($10 per ton to $50 per ton).
Many options exist for reducing Platte River’s CO2 emissions, including increased renewable energy sources
(utility scale or distributed), increased energy efficiency (at customer, distribution and generation levels),
integration of distributed generation resources, increased use of natural gas generation vs. coal and other new
technologies. Additional options may exist through coordination / collaboration with the Municipalities in areas
such as transportation, waste, natural gas usage and vegetation management. CO2 mitigation options will be
evaluated in detail as part of the process for developing the 2014 Integrated Resource Plan.
Going forward, emissions of greenhouse gases, particularly CO2, will be a major factor in resource planning. A
comparison of estimated CO2 emissions for wholesale suppliers located in Colorado is provided in the following
figure. This graph also includes average CO2 emissions from electric utilities in the U.S. and Colorado.
CO2 Emissions Comparison for Wholesale Suppliers in Colorado
RESOURCE MIX CONTINUED
20
A new strategic planning process has just begun and this 2014 Strategic Plan is limited in specific details
regarding Platte River’s future plans. The first full cycle of the annual strategic planning process will be completed
next year, leading to a more detailed 2015 Strategic Plan. Efforts in several key areas are planned, as outlined
in the table below. Once new staff, software, market data and other tools have been acquired, detailed analysis
of potential future resource options can begin. This analysis will inform the development of the 2014 Integrated
Resource Plan and 2015 Strategic Plan.
SCHEDULE
21
RESOURCE PLANNING
OVERVIEW - 2012 IRP ACTION ITEMS
Resource planning is the most significant element of the 2014 strategic plan. This is in large part due to the fact
that Platte River was created and exists to meet the resource needs of the Municipalities—but also in direct
response to strategic direction received from the Board: four of the seven strategic direction statements focused
on future resources. Historically, Platte River’s process for planning new resources has been conducted through
the development, public review and Board approval of an Integrated Resource Plan (IRP). In coordination with
its owner municipalities, Platte River has prepared four IRPs since the mid 1990s (one approximately every five
years). The most recent IRP, approved by the Board of Directors in May 2011 and referred to as the 2012 IRP,
focuses primarily on the five year period 2012 to 2016. This plan is available on Platte River’s web site at the
following link: www.prpa.org/irp.
No changes are recommended to the 2012 IRP at this time. It is anticipated that the next formal IRP will be
developed during 2014 – and will be integrated into the 2015 Strategic Plan, the final form of which is anticipated
to be approved by the Board in December 2014.
Though no changes are recommended to the 2012 IRP, several developments have occurred since this plan
was approved in May 2011. The following sections provide background and updates on key items related to
resource planning.
Five action items were identified for implementation by Platte River and the owner Municipalities as a result of
the 2012 IRP. These are summarized below, along with brief updates reflecting the current situation. More detail
on changes since the 2012 IRP are provided after this overview.
1. CONTINUE OPERATING DEMAND SIDE MANAGEMENT (DSM) PROGRAMS – Platte River
funding for Common Programs (those offered in all four Municipalities) was projected as approximately
$2 million annually (2012 to 2016), while funding from the Municipalities was anticipated to increase
significantly relative to historical levels. Verifiable peak demand and energy savings were to be
integrated into the overall system load forecast beginning in 2013.
UPDATE – The budget for 2014 provides for an increase in Common Program funding of
$200,000 – ten percent above the level approved for the 2012 IRP. The process of integrating
DSM into the load forecast that began in 2013 will be expanded during 2014. Additional details
on DSM are provided below.
2. CONTINUE IMPLEMENTATION OF THE RENEWABLE ENERGY SUPPLY POLICY – Anticipating
the need for new renewable energy resources in approximately 2015, the process for seeking new
renewable supply options was expected to begin in 2012. About 45,000 MWh/yr of new supply was
anticipated by 2015, roughly one-third more than historical deliveries from existing sources.
UPDATE – Platte River has executed a Power Purchase Agreement for delivery of approximately
130,000 MWh/yr of new renewable energy supply by the fall of 2014. This purchase will more
than double the amount of wind delivered to Platte River’s system – adding more than three
times the amount of renewable energy contemplated in the 2012 IRP and doing so ahead of
the 2012 IRP schedule.
22
OVERVIEW - 2012 IRP ACTION ITEMS
The Renewable Energy Supply Policy will be reviewed during 2014 to reflect changes in renew-
able supply due to the strategic planning process, to address accounting of renewable supply
through Tariff 1 and Tariff 7, and to integrate other changes that have occurred since this Policy
was last approved.
3. UPDATE SYSTEM RESOURCE PLANNING CRITERIA – In order to remove the risk of relying on
real-time market purchases to meet load obligations when the Rawhide coal unit is out of service.
Rather than planning on up to 65 MW in real-time market purchases (allowed in the 2007 IRP), only
pre-arranged purchase options and other firm resources are to be considered for firm capacity needs.
UPDATE – Based on the most recent load forecast, new capacity will be needed to meet the
Municipalities’ peak load in about 2023 (see Load Forecast section). Criteria for addition of new
resources will be expanded in the next IRP – to address planning reserve, loss of load probability,
integration of new renewable supply, increased flexibility of resource operations, participation in
new markets and other factors.
4. MONITOR DEVELOPMENTS OF NEW REGIONAL GENERATION & TRANSMISSION RESOURCES
To ensure a position in new resource options that may be of benefit to Platte River and the municipalities
over the long term.
UPDATE – A preliminary analysis of combined cycle gas generation was completed during 2013.
During 2014, potential benefits and costs of adding new resources will be modeled in more detail
using computer simulations. New combined cycle gas generation and other resources with high
levels of operating flexibility will be considered. Opportunities for joint development, sales of
surplus capacity and other factors will be considered with regional power suppliers.
5. MONITOR OTHER DEVELOPMENTS – In municipal loads, technology development, wholesale
electricity markets and regulation/legislation in order to support contingency planning.
UPDATE – New information sources for monitoring markets have been purchased and are being
integrated into financial and resource planning efforts. To better track changes to municipal loads,
a joint effort is planned for integrating end-use forecasting into the overall municipal load forecast.
Information such as housing starts and planned business expansions should improve forecasting
accuracy. Enhancements to DSM measurement and verification will also improve forecasting. A
study is planned during 2014 to evaluate the risks and potential benefits of an energy imbalance
market in the region.
CONTINUED
23
DEMAND SIDE MANAGEMENT
In 2013, Platte River retained Nexant, Inc. (Nexant) to characterize and quantify the potential summer peak
reduction and annual energy savings achievable in Platte River’s service territory through implementation of
energy efficiency, demand response, and distributed generation programs. The study considered potential
impact over the next five years, and provided estimates of costs and benefits for the programs. The following
chart provides a summary of the study results for energy efficiency programs. Note that a range of potential
savings are possible, depending on investment in these programs. The study estimated that with an investment
of up to 5.7% of retail revenues, energy savings of about 1.3% of total load could be realized (year after year).
This result is fairly consistent with a study conducted by KEMA, Inc. in 2009. It is also consistent with a study of
utility DSM programs conducted by the Large Public Power Council of the American Public Power Association.
LOAD FORECAST
The load forecast provided in the 2012 IRP has also been updated. The most recent Official Load Forecast for
the Platte River System is included in Appendix A. This forecast indicates that new capacity resources will be
needed in approximately 2023. Key updates in forecasting since the 2012 IRP include the following items.
Municipal load growth over the last several years has remained below levels experienced during the 1990’s.
The forecasting model has used data since 1991 to predict future loads. Beginning this year, data from the
period 2002 forward will be used and the load data from 1991 to 2002 will be removed.
Demand side management programs continue to expand, but evaluation, measurement and verification of
impacts on future loads needs to be completed for many of the programs. Going forward, a team will be
formed among the Municipalities and load forecasting staffs to discuss how best to integrate the effects
of DSM.
24
RATE STRUCTURE EVALUATION
During 2010 and 2011, Platte River staff, a rates consultant (Utility Financial Solutions) and rates staff from the
Municipalities met several times to discuss and evaluate options for changing the wholesale rate (Tariff 1) to
more accurately reflect costs and mitigate risks. After about 15 months of effort, a seasonal wholesale rate was
approved by the Board of Directors and was initiated in January 2012. This new rate was recognized as a first
step in a longer term process of developing more innovative rates. During 2014, additional opportunities are
planned for collaboration on future electric rates. It will be important to have a more coordinated effort on rate
making in the future; one that integrates wholesale and retail rate design and implementation.
CLIMATE ACTION PLAN
Platte River staff served on the working group that developed Colorado’s Climate Action Plan and on the
Fort Collins Climate Action Task Force. Platte River developed its own unique Climate Action Plan (CAP),
a summary of which was provided in the 2012 IRP. The full report is available on Platte River’s web site at:
www.prpa.org. Since this CAP was approved, additional cursory studies were conducted to estimate costs of
replacing coal generation with natural gas resources. Rate impacts associated with such replacements were
significant. Natural gas prices have dropped considerably since the last studies were performed.
During the 2013 strategic planning retreat, the Platte River Board directed staff to investigate options to reduce/
mitigate Platte River’s carbon footprint using Colorado’s Climate Action Plan as a guideline. The CAP and
associated analysis conducted over the last several years will be expanded and updated – then included as
part of the 2014 IRP (integrated into the 2015 Strategic Plan). No separate Climate Action Plan document is
planned going forward.
WIND GENERATION
About 32 MW of wind generation will be added to Platte
River’s supply mix in the Fall of 2014 from the Spring
Canyon II Wind Project. The anticipated renewable energy
resource mix for 2015 is shown in the pie chart. The new
wind resource represents a 117% increase in renewable
supply relative to 2013 levels. This will increase wind
sources to about 7% of Platte River’s energy supply mix.
Wind and hydropower combined will be about 27% of the
total energy supply to the Municipalities in 2015 (assuming
normal water conditions). Platte River has also moved the
Medicine Bow and Silver Sage Wind Projects into Public
Service Company’s balancing authority (BA), removing
them from Western Area Power Administration’s BA. In the
future, Platte River may need to dedicate firm resources
to follow the wind generation. This consideration will be
studied as part of the overall resource planning effort.
25
TRANSMISSION SYSTEM UPDATE
Since the 2012 IRP was approved, a large number of long-term transmission projects have been completed,
representing over $120 million in infrastructure investment. These projects have enhanced long-term reliability
of wholesale electric service to Fort Collins, Longmont and Loveland. In December 2012, a new Transmission
Plan was developed. This plan is updated annually to assure that an adequate transmission system is planned
for the reliable delivery of electricity to the Municipalities and to other Platte River transmission customers. The
planning studies and reliability assessments for the near-term and longer-term planning horizons demonstrate
that the transmission system meets performance requirements of the Western Electricity Coordinating Council
(WECC) and of the North American Electric Reliability Corporation (NERC). A summary of planned transmission
projects is provided in the following table.
Note that this list does not include transmission infrastructure additions that may be needed to support new
generation resources on the Platte River system such as combined cycle gas and renewable energy. Considering
new permitting requirements, lead times for transmission equipment and coordination of transmission operations
with regional utilities, new transmission additions for future generation resources could take five years or more
to permit and construct. It is anticipated that detailed modeling, planning and permitting research for new
transmission will begin in 2014. This effort will be completed in parallel with an integrated evaluation of combined
cycle gas generation, renewable energy, distributed generation and other alternatives.
26
Improve reliability to each transformer.
Meet Platte River Power Authority
design criteria.
PUBLIC PARTICIPATION
Details of past communications with stakeholders in the four Municipalities are outlined in the 2012 IRP. During
May of 2013, Platte River held an initial set of “listening sessions” in each of the Municipalities to begin the
process of gathering stakeholder comments for future resource planning. About 60 people participated (total
for all four communities). Comments from participants indicated an interest in pursuing generation resources
that would reduce reliance on coal, support for solar and other distributed generation, and interest in more wind
resources, small hydro, and energy efficiency. There was interest in the use of more natural gas generation (vs.
coal), but also concern regarding the potential risks of hydraulic fracturing. The majority of these participants
indicated a willingness to pay more for electricity to have a more balanced portfolio, though some said cost
was very important to them.
A detailed plan for public participation will be prepared for the 2014 IRP and presented to the Board of Directors
in 2014. This expanded public participation effort will include customer surveys, public meetings and other
means of gathering public comments.
RISK AND FINANCIAL MANAGEMENT
RISK MANAGEMENT
For several years, Platte River has developed a stand-alone Risk Management Plan. Beginning in 2013, the
Risk Management Plan is included in the Strategic Plan as Appendix B.
The Risk Oversight Committee consisting of the General Manager and senior management is charged with
managing Platte River’s risks and approving the Risk Management Plan. The Risk Management Plan is a
summary of Platte River’s proactive efforts to identify, evaluate, rank, and mitigate risks significant to Platte
River which could negatively impact electric supply, finances, reputation, and safety requirements. Platte
River’s risk management process provides the framework to identify and assess specific risks by soliciting
subject matter expert input and developing mitigation strategies.
27
RISK AND FINANCIAL MANAGEMENT
FINANCIAL MANAGEMENT
Historically, Platte River has also developed a stand-alone Strategic Financial Plan (SFP). Beginning in 2013,
the SFP is included as part of the overall Strategic Plan. The SFP, which includes detailed policies and targets,
is available as Appendix C to Platte River’s Strategic Plan.
Platte River’s SFP is designed to provide long-term financial stability by generating adequate cash flows,
maintaining access to low cost capital, providing stable and competitive wholesale rates and effectively managing
financial risk. The Board of Directors reviews the SFP policies, goals, and financial projections at least annually.
Many of the SFP goals establish targets used in setting Municipal wholesale rates. The SFP is designed with
the intent of maintaining Platte River’s current AA senior lien debt credit rating by all three rating agencies: Fitch
Ratings (AA), Moody’s Rating Service (Aa2), and Standard & Poor’s Rating Service (AA).
The SFP policies and goals are interrelated. By achieving the minimum target debt service coverage, the net
income target, and the minimum days unrestricted cash on hand, Platte River should generate adequate cash
flows to meet liquidity targets, exceed its debt to capitalization goal, and maintain access to low cost capital.
Maintaining the minimum unrestricted days cash on hand ensures a strong cash position, significantly enhancing
future operating and financing flexibility. The Rate Stabilization Fund is available to help mitigate financial
impacts if an unforeseen event were to occur, such as an extended unplanned Rawhide outage.
The remaining financial goals focus on providing competitive wholesale rates to the Municipalities, prudently
investing capital, and establishing appropriate and cost effective programs to manage Platte River’s risk against
catastrophic losses.
28
LEGISLATIVE AND REGULATORY
Platte River’s legislative and regulatory efforts support the mission of providing safe, reliable, environmentally
responsible, and competitively priced energy and services while mitigating the environmental impacts of power
generation. Platte River strives to maintain positive relationships with members of Colorado’s Congressional
delegation, the Governor’s office, state departments, and the Colorado General Assembly. Coalitions are a
cost effective way to participate in legislative and regulatory proceedings. Platte River works with a variety of
local, state, regional, and national coalitions on issues of relevance.
Many of the key issues Platte River faces from a legislative and regulatory perspective relate to the environment.
This section summarizes Platte River’s Environmental Policy, outlines key environmental issues facing Platte
River, and reviews other important energy policy issues.
ENVIRONMENTAL POLICY AND PRINCIPLES
Platte River uses state-of-the-art air quality control systems at its power generation stations to meet or exceed
all applicable environmental laws and regulations. As new legislation and regulations are proposed, Platte River
participates in public processes and supports additional control requirements when costs are commensurate
with measurable environmental benefits. As technology develops and opportunities arise, Platte River is
proactive in evaluating and implementing improvements in its power operations that balance environmental
and other socio-economic concerns.
The following principles are used to guide Platte River’s decision making and operations:
Consider environmental factors in planning, design, construction, and operating decisions,
Ensure compliance with applicable laws, rules, regulations, and permits,
Conserve natural resources,
Reduce environmental risks,
Encourage pollution prevention,
Communicate environmental values,
Encourage public participation,
Support cost-effective programs to conserve energy,
Coordinate generation and transmission planning with neighboring utilities, and
Consider environmentally progressive technologies to meet future generation needs.
Key environmental issues and associated activities are summarized on the following pages.
29
CARBON EMISSIONS MITIGATION
Platte River’s management believes that carbon emissions mitigation will be one of the most significant issues
facing the utility industry during the coming decades. The very resources that have allowed Platte River to
be a regional leader in cost of service and reliability pose significant risks if carbon emissions are controlled
or taxed. Management is beginning an aggressive effort to evaluate options to diversify the future energy
supply portfolio and reduce its risk exposure, while also remaining the lowest cost wholesale provider located
in Colorado. Despite its heavy reliance on coal-fired generation, Platte River is commencing this endeavor
with some significant positives, including a large cost advantage over other regional utilities, a solid planning
foundation derived from the Platte River Climate Action Plan developed in 2009 and the analyses performed
to support the 2013 Board strategic planning retreat, a history of proven demand-side management programs
and renewable resource production, and strong support and direction from the Board as a result of the retreat.
In order to prepare the Board to make the best decisions concerning the optimal future resource portfolio,
extensive and sophisticated analysis is necessary. The 2014 budget is designed to devote the appropriate
human and financial resources to the task.
REGIONAL HAZE RULE
The Regional Haze Rule (RHR) was promulgated in 1999 by the EPA. State implementation has been on-
going since promulgation. EPA formally approved the Colorado RHR SIP in September 2012. The Rawhide
compliance plan was submitted to the Air Pollution Control Division on September 16, 2013. Platte River
had voluntarily installed low NOx burners on Rawhide Unit 1 in 2005. New air dampers, air nozzle tips, and
burner tips were installed during the 2012 maintenance outage and boiler tuning was conducted. Cost for this
equipment was approximately $1.5 million. With these modifications Rawhide is presently meeting RHR SIP
NOx emission limits. Meeting the emission limits associated with the rule requires significant investment in new
NOx reduction technologies at the Craig Station. Platte River’s portion of these costs is estimated at about $43
million over the next five years.
OZONE STANDARDS
New and more stringent ozone standards are being considered by the EPA. Presently parts of Larimer County
are in a non-attainment area for ozone, but the Rawhide Station is in an attainment area. It is uncertain whether
this will change, and if so how the change will affect the Rawhide Station.
HAZARDOUS WASTE DESIGNATION
FOR COAL COMBUSTION RESIDUALS (CCR)
The EPA is evaluating options for revising federal regulations for CCR, including potentially regulating CCR as
hazardous waste. CCR includes fly ash, some SO2 scrubber waste products, and bottom ash from Rawhide
and Craig generation facilities. The economic consequences of a hazardous waste designation to utilities,
beneficial use industries and electricity consumers would be severe. The final rule is on hold and it is presently
unclear when it will be issued.
LEGISLATIVE AND REGULATORY
30
MERCURY
Although federal efforts to regulate mercury are tied up in the courts, Colorado adopted rules to implement
mercury reductions in early 2007 for Colorado utilities. These regulations, also known as the Colorado Utilities
Mercury Reduction Program, are still in effect as state-only requirements. Installation of mercury monitoring
equipment at Rawhide in 2008 was certified for operation to meet the State regulatory deadline of January 1,
2009. Mercury removal equipment was installed and the system was placed in service in November 2010. A
mercury emission limit of 0.0174 lb/gigawatt hour (GWh) is required under the State program at Rawhide by
2012 and an emission limit of 0.0087 lb/GWh is required by 2018. Platte River is in compliance with the 2012
requirements and will meet the 2018 emission reduction requirements. Due to the type of coal burned, boiler
chemistry and other factors, mercury emissions from Craig Station are low and no emission control equipment
is currently required at that facility.
ELECTRIC UTILITY MERCURY
AND AIR TOXICS STANDARD (MATS)
In response to the 2008 court ruling that vacated the federal mercury rule, EPA promulgated the electric utility
MATS rule. The MATS rule establishes national emissions limits, monitoring and reporting requirements, and
work practice standards for listed Hazardous Air Pollutants emitted from coal-fired and oil-fired electric utility
steam generating units. Despite pending legal challenges to the MATS rule, Platte River has taken all necessary
compliance steps. Platte River does not anticipate significant cost increases associated with MATS, since
investments already have been made to reduce air emissions.
A number of other policy issues that could impact Platte River are also being considered by legislative and
regulatory bodies at the federal and state level. Key items of concern to Platte River are outlined below and the
following pages.
TAX-FREE STATUS OF MUNICIPAL BONDS
OTHER FEDERAL AND STATE POLICY ISSUES
Federal budget concerns have put the tax-free status of municipal bonds at risk. The unique tax-exempt status
of public financings dates back to the inception of the income tax, and recognizes the public nature of the capital
projects funded by municipal bonds. Platte River has issued $2.4 billion in debt during its history. The issuance
of this debt has been critical for developing the infrastructure necessary to meet the needs of the growing
populations in our owner Municipalities, and the reduced interest costs associated with tax-exempt financings
are passed directly to electric utility customers in these communities. Platte River strongly opposes repealing
or altering the current tax-exempt status of municipal bonds.
LEGISLATIVE AND REGULATORY
31
TRANSMISSION GRID PROTECTIONS FROM
CYBER, PHYSICAL & GEOMAGNETIC DISTURBANCES
Platte River takes a proactive approach to securing infrastructure from hazards such as cyber or physical
attacks or geomagnetic storms—not only because it is best practice, but also because it makes good business
sense. An array of measures involving prevention, protection, mitigation, response and recovery are employed
to withstand and rapidly recover from cyber, physical, and geomagnetic threats. Platte River supports the North
American Electric Reliability Corporation (NERC) approach to cyber and physical security.
LEGISLATIVE AND REGULATORY
DODD-FRANK REFORM
The Dodd-Frank legislation and subsequent rulemakings affect a number of Platte River business practices.
Platte River has complied with new Dodd-Frank protocols for natural gas hedging. Platte River supports on-
going legislative and statutory efforts to limit the application of Dodd-Frank requirements so that public power
business transactions that bear no relationship to the types of transactions creating the need for financial
reform are not affected.
TRANSMISSION ACCESS REFORM
The Federal Energy Regulatory Commission (FERC) requires jurisdictional utilities to operate their transmission
systems as common carriers. Platte River is non-jurisdictional, but voluntarily adopted an open access
transmission tariff. The Platte River open access tariff is modeled after the FERC pro forma tariff with rates
established using a rate setting formula consistent with those applied by the FERC.
The FERC also requires jurisdictional utilities to engage in regional transmission planning. Platte River is
involved with regional planning initiatives and has been involved in WestConnect, a regional transmission
planning organization. Platte River is concerned about movements toward a region-wide transmission operator
and centralized power markets, but also recognizes that under the proper circumstances such reforms may be
beneficial.
RENEWABLE ENERGY STANDARD
Platte River believes locally owned and controlled utilities are best suited to determine the proper mix of
renewable resources for power generation and delivery. The Colorado RES currently only applies to municipal
utilities with more than 40,000 customers. The 40,000 customer threshold means that the RES presently applies
only to Fort Collins and Colorado Springs; it is estimated it could apply to Longmont and Loveland within the
next 10 years.
Platte River supports the continuation of federal financial incentives to encourage the development of renewable
energy. Renewable energy incentives should continue, be expanded, and be made available on an equal basis
to municipal power systems, rural electric cooperatives, and investor-owned utilities.
32
LEGISLATIVE AND REGULATORY
FUEL AND RESOURCE DIVERSITY
Platte River supports policies that promote improved technology for all electricity generation sources including
coal, natural gas, hydro, nuclear, wind, solar, geothermal, and biomass as vital components of the country’s
energy portfolio. Plans to encourage diversity should include classifying hydroelectric generation as a renewable
fuel source, providing clean coal technology funding, and increasing research and development funds to make
renewable energy sources more plentiful and cost competitive.
PREVENTING MARKET ABUSES
EPAct 2005 grants FERC expanded jurisdiction to address market manipulation, including authority over public
power systems. In 2006, Platte River adopted a policy prohibiting market manipulation and implemented training
and audit programs in pursuit of this policy. Subsequently, Platte River has conducted biannual audits; none of
the audits have revealed any market manipulation activities.
SYSTEM RELIABILITY
In 2007, FERC approved enforceable reliability standards. Platte River is registered to perform ten functions,
and the Municipalities are registered as distribution providers. Platte River has a well-established Reliability
Compliance Program and promotes a culture of compliance. Platte River continues to assist the Municipalities
with reliability compliance.
FEDERAL HYDROPOWER
Federal hydropower comprises a significant portion of the electricity delivered to the Municipalities. Platte
River supports continued federal ownership and management of hydropower resources through regional
Power Marketing Administrations (PMAs). Platte River supports the continued operation of the PMAs within the
constraints set forth by Congress through authorizing legislation.
COOPERATIVE PLANNING AND PARTICIPATION
Platte River supports cooperative planning and participation in joint generation resources and transmission
infrastructure. Platte River is a member of the Colorado Coordinated Planning Group and the Foothills Planning
Group, and has established a transmission planning process as part of its open access transmission tariff.
Platte River has participated in recent CPUC transmission planning investigatory and rulemaking dockets as
its interests dictate.
LOCAL DECISION MAKING AUTHORITY
OVER MUNICIPALLY OWNED UTILITIES
Platte River firmly believes that operating decisions affecting municipal utilities are best made at the local level.
Federal or state legislation should not mandate actions or decisions regarding the operations of locally owned
utilities.
33
LEGISLATIVE AND REGULATORY
MUNICIPAL PLANNING COORDINATION
MUNICIPAL ANNEXATION
AND UTILITY SERVICE TERRITORY
Platte River believes that Colorado’s Constitution and the existing state statutes regarding electric service
provision in newly annexed areas are equitable to all parties. Any proposed changes will be closely scrutinized
to ensure that equity is maintained for all parties.
One of the most significant issues addressed by the Board during the strategic planning retreat was the perception
that “DNA” differentiates the four Municipalities. Outlooks on the future do vary among the Municipalities, but the
Board provided consistent strategic direction regarding the need for greater collaboration and communication
among the Municipalities facilitated by Platte River.
During 2013, meetings were held among the Municipal utility staffs and Platte River to consider the potential for
integrating long-term municipal plans with Platte River’s strategic planning. A brief summary of current planning
activities within the Municipalities is provided below based on input provided by each of the Municipalities.
ES
ESTES PARK
The Town is cost sensitive, having higher costs relative to large municipalities. Rates are still lower
than regional investor owned or rural electric utilities. Cost consciousness will impact future planning.
Significant environmental advocacy exists within the Town and there is interest from utility staff in providing
information regarding costs of renewable energy or other environmental initiatives.
The current focus is toward capital investment. Other areas of focus include cost management, identifying
risks/opportunities and prioritization.
Some key initiatives currently underway or being considered include economic development, land use and
water / energy planning – part of an overall planning process.
No official strategic plan exists at this time for the municipal utility.
Estes Park may engage in a formal strategic planning process during 2014.
34
ESTES PARK FORT COLLINS LONGMONT LOVELAND
MUNICIPAL PLANNING COORDINATION
FORT COLLINS
The “City Plan” has been developed as a comprehensive overall City planning document. This includes a
set of principles along with policies to consider key initiatives for the next 25 years of city planning. The
past round of updating the City Plan was the first time utilities were included directly. Items include codes for
energy efficiency, transportation (electrification), demand response, Smart Grid development, safety and
security, reliability and other items.
The Energy Policy sets metrics for reliability, efficiency (1.5% of load growth year after year – goals met for
the first time this year on a gross basis), demand reduction (5% by 2015 and 10% by 2020), renewable
energy (meet Renewable Energy Standard) and encouragement to coordinate closely with Platte River on
resource planning and other issues. The Energy Policy is being reviewed / updated this year.
Utilities for the 21st Century – A plan specifically for the Utilities department that seeks ways to sustain the
utility for the long term (50 years +). It includes things like work force planning, triple bottom line evaluation
of alternatives (economic, social and environmental) and a stakeholder initiative (to better communicate
with customers and other stakeholders). The next iteration of strategic planning for Utilities for the 21st
Century kicked off this year and will be completed in March of 2014. This is a broader planning effort
incorporating all aspects of the Utilities operations. The revised plan is intended to inform the development
of the 2015/2016 budget.
2009 IT Strategic Road Map – A 10 year plan for IT development. This initiative ties to the Utilities Smart Grid
efforts and other work involving information technologies. The IT strategic plan was updated in 2013 to
account for the work that has been accomplished and to look forward for the next ten years.
Climate Action Plan – City Council approved plan that includes carbon reduction goals (20% below 2005 by
2020, 80% by 2050). This is also being reviewed / updated this year.
Other plans include a Transportation Master Plan, Green Building Plan and Road to Zero Waste plan.
LONGMONT
Focus on Longmont (developed in 2005) is a plan that sets direction at a City level. Five key categories
/ initiatives are included (Healthy Business Climate, Education, Enhance the Natural Environment, Revitalize
Downtown and Community Identity).
Longmont Power and Communications (LPC) has a tie to “healthy business climate” (low rates as an
economic driver), “enhance the natural environment” (energy efficiency programs, etc.), and other areas
(reliability). The focus on deliverables from LPC to this plan is currently providing reporting statistics – no
specific goals are set for LPC from the Focus on Longmont effort.
City Manager Initiatives – The new City Manager set up six city-wide groups (one of which is strategic
planning). All groups have LPC representatives.
35
MUNICIPAL PLANNING COORDINATION
LONGMONT CONTINUED
Outage Management System upgrade – LPC is in the middle of evaluating options and has some preferences.
There may be some coordination opportunities with Loveland in this area.
Broadband initiative – staff active in the area of telecommunications planning.
A Sustainability Plan was presented to City Council in the fall of 2011 (Utilities & Natural Resources worked
together on this with RW Beck, now known as SAIC). City Council did not approve the plan and the
Sustainability Coordinator was not refilled when this position was vacated.
LOVELAND
The Utility Commission provides direction to management / staff and is engaged in planning efforts. City
Council conducts an annual retreat for planning purposes.
The City Manager has set initiatives in the areas of improved communication / coordination of city direction,
conducting meetings with the management team (expanding to mid-management).
Loveland has a general fund plan for setting financial priorities.
A sustainability plan is being developed. The Public Works department is leading this effort with support from
Water and Power.
The City plans to develop an Energy Policy by 2015.
City Council adopted the “Comprehensive Plan” (2005), which serves as a guide for aspects of Loveland’s
planning. It provides mission / vision statements and is mostly focused on land use planning. There are no
direct utilities goals from this effort.
Loveland has an Economic Development Strategic plan and Incentive Policy adopted in February 2012.
Key planning items for Loveland include cost control, demand side management, demand response,
renewable supply integration, new rate design / implementation for large customers, economic development,
energy efficiency programs, workforce planning, leveraging new technologies, public outreach and
addressing aging infrastructure.
Once additional staffing resources are available, Platte River will establish a formal strategic planning group
to guide coordination / collaboration of planning going forward (among the Municipalities and Platte River
staff). During 2014, key aspects of the Municipalities’ strategic plans will be integrated into Platte River’s 2015
Strategic Plan.
36
A-1
APPENDICES
APPENDIX A
2014 OFFICIAL LOAD FORECAST
TABLE OF CONTENTS
NERC Requirements ......................................................................................................................................A-3
Forecast Methodology ....................................................................................................................................A-3
2014 Forecast Adjustments ............................................................................................................................A-3
Demand Side Management ...........................................................................................................................A-4
Direct Control Load Management...................................................................................................................A-4
Forecast Descriptions ....................................................................................................................................A-4
Foundation Forecast ......................................................................................................................................A-4
Base Forecast ...............................................................................................................................................A-5
Low Growth Forecast ....................................................................................................................................A-5
High Growth Forecast ....................................................................................................................................A-5
2014 Forecast Summaries ............................................................................................................................A-5
Load and Resources Summary .....................................................................................................................A-6
Base Forecast Analysis .................................................................................................................................A-7
Renewable Energy Forecast .........................................................................................................................A-7
Seasonal Forecast and Historical Analysis ....................................................................................................A-9
Historical and Forecasted Load Details .......................................................................................................A-10
Monthly Historical and Forecasted Load Detail ...........................................................................................A-10
Annual Historical and Forecasted Load Detail ............................................................................................A-11
January Historical and Forecasted Load Detail ...........................................................................................A-11
February Historical and Forecasted Load Detail .........................................................................................A-12
March Historical and Forecasted Load Detail ..............................................................................................A-12
April Historical and Forecasted Load Detail ................................................................................................A-13
May Historical and Forecasted Load Detail .................................................................................................A-13
June Historical and Forecasted Load Detail ................................................................................................A-14
July Historical and Forecasted Load Detail .................................................................................................A-14
August Historical and Forecasted Load Detail .............................................................................................A-15
September Historical and Forecasted Load Detail ......................................................................................A-15
October Historical and Forecasted Load Detail ...........................................................................................A-16
November Historical and Forecasted Load Detail .......................................................................................A-16
December Historical and Forecasted Load Detail .......................................................................................A-17
A-2
NERC REQUIREMENTS
This document serves as Platte River Power Authority’s official load forecast. Upon completion, the Planning
Coordinator, the responsible entity that coordinates and integrates transmission facility and service plans,
resource plans, and protection systems, will be notified. Additionally, the Load Serving Entity, which secures
energy and transmission service (and related interconnection operations services) to serve the electrical
demand and energy requirement of the end-use customers, is also notified. The demand data contained herein
does not include any nonmember entities.
FORECAST METHODOLOGY
Platte River uses an econometric model to develop long-term energy forecasts and five-year average monthly
load factors to develop demand forecasts. Econometric modeling uses multiple forecasts of independent
variables, along with historical values for these variables to project the future growth of a dependent variable.
Platte River’s econometric model uses independent variable projections including population, employment, and
weather to project demand and energy growth in the Owner Municipalities.
Population and employment forecasts were provided by Woods & Poole (W&P), an independent, economic
forecasting firm. W&P’s employment and population forecasts for Larimer County continue to decline from
historical growth rates. While Platte River’s Municipalities’ populations grew at an annual average rate of 1.7%
between 2001 and 2012; more recently, from 2008 to 2012, the population growth has decreased to an average
annual rate of 1.4%. W&P projects an average annual population growth of 2.3% between 2014 and 2023.
Historical population data for the four Municipalities is provided by the Colorado State Demography Office, a
division of the Department of Local Affairs.
The future independent weather variables used are assumed to be for typical weather conditions; therefore the
average conditions, beginning 2001 through present, were applied. Weather variability in any given year may
be higher or lower than the historical average. Weather data incorporated into the model is supplied by Day
Weather, Inc., which provides daily meteorological data specific to the City of Fort Collins. This weather data is
deemed representative of the majority of Platte River’s system. Energy forecasts are based on monthly Cooling
Degree Days (CDD) values for summer and Heating Degree Days (HDD) values for winter. CDD and HDD were
selected as the independent weather variables based on past recommendations by Utility Financial Solutions, a
consulting firm that assisted with the development of the econometric model and past Official Load Forecasts.
APPENDIX A
2014 OFFICIAL LOAD FORECAST
2014 FORECAST ADJUSTMENTS
During 2013, despite experiencing system growth, Platte River’s energy growth did not achieve forecasted
values and demand experienced large deviations from monthly forecasted loads. Monthly deviations may be
attributed to multiple factors: weather variations from historical trends, demand side management programs
in the Municipalities, and the continued economic recovery among, other factors. After many years of strong
growth, the recession caused loads in 2009 and 2010 to decrease significantly relative to 2008. As loads began
to recover with the economy, Platte River experienced a new system peak in 2011. Once again, in 2012, the
A-3
DEMAND SIDE MANAGEMENT
As demand side management (DSM) programs continue to evolve and grow, their impacts upon Platte River’s
Municipalities’ loads have also grown. DSM includes Common Programs, which are funded and operated by
Platte River, and offered to all the Municipalities. These Common Programs are focused on energy efficiency
and do not include Direct Control Load Management as defined by NERC. In addition to Common Programs,
each Municipality funds and operates DSM programs specific to their communities (referred to as Municipal
Programs). Staffs from Platte River and the Municipalities have been working collaboratively to aggregate
effects of DSM programs into system forecast planning – particularly those programs for which energy and
demand savings have been tracked, evaluated, measured, and verified.
DIRECT CONTROL LOAD MANAGEMENT
Direct Control Load Management (DCLM) is DSM that is under direct control of a system operator. DCLM does
not include interruptible load. Platte River currently has no DCLM forecasted for the ten-year planning horizon.
FORECAST DESCRIPTIONS
During the development of the Official Load Forecast, various scenarios are considered, producing multiple
forecast results. Platte River uses four forecasts for planning and analysis purposes:
Foundation Forecast
Base Forecast
Low Growth Forecast
High Growth Forecast
All forecasts incorporate identical weather variables mentioned earlier in the Forecast Methodology section.
Historical population and load data also remains the same in all cases.
FOUNDATION FORECAST
The Foundation Forecast is the first forecast generated and is used to create the Base forecast described
below. Along with the standard independent variables mentioned above, this case incorporates the population
growth rates provided by W&P, a 2.3% average growth rate from 2014 to 2023.
2014 FORECAST ADJUSTMENTS CONTINUED
all-time system peak was exceeded, with similar peaks in June and July. Although economic variables are
incorporated into the econometric model, these variables, combined with historical loads, caused the model
to project 2014 loads higher than would be predicted using only recent trends. This effect, combined with the
continued economic recovery, resulted in a modification of the 2013 forecasting methodology. In order to reflect
current economic conditions, load projections more consistent with recent system growth and econometric
projections were combined to forecast 2014 demand and energy. For 2015 and beyond, the escalation rates
generated by the econometric model were used to forecast system growth.
APPENDIX A
2014 OFFICIAL LOAD FORECAST
A-4
APPENDIX A
2014 OFFICIAL LOAD FORECAST
FORECAST DESCRIPTIONS CONTINUED
BASE FORECAST
The Base forecast receives the primary focus and serves as Platte River’s official forecast in base modeling
scenarios used in rate setting and financial planning. Forecasted DSM savings for Common Programs, measured
and verified by Platte River, are subtracted from the Foundation Forecast to produce the Base Forecast.
LOW GROWTH FORECAST
Along with the standard independent variables mentioned above, this case incorporates lower population
growth rates than projected by W&P. A 1.0% annual population growth rate is used from 2014 to 2023. The Low
Growth scenario includes DSM savings estimates for both Common Programs and Municipal Programs. DSM
savings are subtracted from the resulting forecast to produce the Low Growth Forecast.
HIGH GROWTH FORECAST
The High Growth Forecast case includes the same independent variables as the Base and Low Growth cases
but incorporates higher population growth rates than the W&P projections. A 2.5% annual population growth
rate, the historical population growth rate between 1991 and 2012, is used from 2014 to 2023. DSM savings from
Common Programs are also subtracted to produce the final High Growth Forecast. The annual peak demand
produced by the High Growth Forecast – assumed to occur in July – additionally serves as the Transmission
Planning Forecast.
2014 FORECAST SUMMARIES
The following table summarizes the three primary scenarios: Base, Low Growth and High Growth forecast.
A-5
APPENDIX A
2014 OFFICIAL LOAD FORECAST
LOAD AND RESOURCES SUMMARY
Based on Platte River’s current (Base) Ten-Year Load Forecast, the following are updated peak month loads
and resource tables. The first table shows loads and resources with all sources available and the second table
provides information on loads and resources with Platte River’s largest generation source (Rawhide coal unit)
out of service. According to the latest Integrated Resource Plan’s criteria, the need for additional capacity will
occur in approximately 2023.
A-6
APPENDIX A
2014 OFFICIAL LOAD FORECAST
BASE FORECAST ANALYSIS
The following table summarizes the historical and forecasted loads; the values represent the Base Forecast.
RENEWABLE ENERGY FORECAST
Platte River works jointly with the Municipalities to develop a forecast of wholesale renewable energy supply.
Historically, all renewable energy from sources other than federal hydropower have been provided to the
Municipalities through Tariff 7, which charges a premium for wholesale renewable energy supply based on the
level of such supply requested by the individual Municipalities. As part of Platte River’s strategic planning process,
the Board of Directors approved additional renewable energy in 2013, to be provided to all of the Municipalities
through Tariff 1, the standard rate for wholesale supply. Forecasting Municipal wholesale renewable energy
requirements is driven by several factors:
Renewable energy supply guidelines from the strategic planning process;
The Colorado Renewable Energy Standard;
Individual Municipal policies regarding renewable energy;
Voluntary purchases by the Municipalities and their retail customers;
Distributed renewable energy resources; and
Availability and performance of existing wholesale resources.
A-7
APPENDIX A
2014 OFFICIAL LOAD FORECAST
RENEWABLE ENERGY FORECAST CONTINUED
The following table provides a ten-year forecast of estimated output from renewable resources that currently
exist or are under contract (Existing Resources) and shows deliveries requested to date by the Municipalities
(Requested Deliveries).
As indicated in the table, Existing Resources are anticipated to exceed Requested Deliveries throughout the
ten year period shown. The expansion of existing resources shown in 2015 is due to addition of the 32 MW
Spring Canyon II wind facility. All of the output from this site (currently estimated as 130,000 MWh annually)
will be delivered to Platte River under a 25-year purchase agreement. Reductions over time are due to planned
changes in renewable energy certificate purchases and due to the potential shut down of the Medicine Bow
facility as it reaches its 20 year design life. Options may exist for expanding the life of the Medicine Bow plant.
Any changes that are implemented will be included in future forecasts.
The renewable energy forecast does not include further renewable energy supplies that may come from the
strategic planning process. The table also does not reflect accounting of deliveries for Tariff 7 vs. Tariff 1. Tariff 7
resources may diminish over time as the Medicine Bow Wind Project ages, possibly resulting in a future deficit
of Tariff 7 resources relative to requests. Platte River and Municipality staff will work together during 2014 to
bring the projected Tariff 7 supply and demand into alignment. The renewable energy forecast will be updated
over time to reflect these factors and other changes that may occur. A more complete treatment of renewable
energy forecasting is anticipated for the 2015 Strategic Plan.
Existing wholesale renewable energy resources (currently all wind sources) are not considered to provide
firm capacity at time of system peak. These sources do not currently impact planning of new firm capacity
additions, though they reduce the amount of energy delivered to the Municipalities from fossil fuel sources.
Future wholesale renewable resources may provide both energy and system peak capacity and more detailed
analysis of existing resources may influence future decisions regarding resource capacity value.
A-8
APPENDIX A
2014 OFFICIAL LOAD FORECAST
SEASONAL FORECAST
AND HISTORICAL ANALYSIS
The following table summarizes the seasonal energy forecasts along with historic figures. Per Tariff 1, the
Summer Season begins June 1 and ends August 31 of every year. The Winter Season shall be the period
January 1 through May 31, and September 1 through December 31.
Seasonal demand forecasts along with historic loads are displayed in the below table.
A-9
APPENDIX A
2014 OFFICIAL LOAD FORECAST
HISTORICAL AND FORECASTED LOAD DETAILS
MONTHLY HISTORICAL AND FORECASTED LOAD DETAIL
A-10
APPENDIX A
2014 OFFICIAL LOAD FORECAST
ANNUAL HISTORICAL AND FORECASTED LOAD DETAIL
JANUARY HISTORICAL AND FORECASTED LOAD DETAIL
A-11
APPENDIX A
2014 OFFICIAL LOAD FORECAST
FEBRUARY HISTORICAL AND FORECASTED LOAD DETAIL
MARCH HISTORICAL AND FORECASTED LOAD DETAIL
A-12
APPENDIX A
2014 OFFICIAL LOAD FORECAST
APRIL HISTORICAL AND FORECASTED LOAD DETAIL
MAY HISTORICAL AND FORECASTED LOAD DETAIL
A-13
APPENDIX A
2014 OFFICIAL LOAD FORECAST
JUNE HISTORICAL AND FORECASTED LOAD DETAIL
JULY HISTORICAL AND FORECASTED LOAD DETAIL
A-14
APPENDIX A
2014 OFFICIAL LOAD FORECAST
AUGUST HISTORICAL AND FORECASTED LOAD DETAIL
SEPTEMBER HISTORICAL AND FORECASTED LOAD DETAIL
A-15
APPENDIX A
2014 OFFICIAL LOAD FORECAST
OCTOBER HISTORICAL AND FORECASTED LOAD DETAIL
NOVEMBER HISTORICAL AND FORECASTED LOAD DETAIL
A-16
APPENDIX A
2014 OFFICIAL LOAD FORECAST
DECEMBER HISTORICAL AND FORECASTED LOAD DETAIL
A-17
APPENDIX B
RISK MANAGEMENT PLAN
The Risk Management Plan is a summary of Platte River’s proactive efforts to identify, evaluate, rank, and
mitigate risks significant to Platte River which could negatively impact electric supply, finances, reputation,
and safety requirements. The Risk Management Plan is included in Platte River’s Strategic Plan summarizing
Identified Risks and risk mitigation strategies. Platte River’s risk management process provides the framework
to identify and assess specific risks by soliciting staff input and following an assessment and documentation
process.
Identified Risks are evaluated through a risk assessment process coordinated by the Chief Financial and Risk
Officer, Financial Planning staff, and a Risk Oversight Committee (ROC) consisting of the General Manager and
senior management. The ROC identifies subject matter experts throughout Platte River to provide expertise
and information regarding each Identified Risk and to alert the ROC of additional risks. As risks are identified,
Platte River data, industry data, staff and management experience, and evaluation tools are utilized as a
component of a detailed review process to assess the Magnitude and Probability. Magnitude and Probability
ranks are assigned by the ROC based on specific criteria (see Risk Definitions, Table 1 and Table 2); higher
rated risks are prioritized for the development and implementation of mitigation strategies when possible.
Mitigation strategies include, but are not limited to insurance coverage, financial and physical contracts,
operational business practices, and monitoring processes. All Identified Risks and the effectiveness of mitigation
strategies are reassessed by the ROC as scheduled and prioritized for action if warranted. Assessment
documentation and supporting analysis is maintained by Financial Planning staff and reviewed by the ROC.
All Identified Risks are listed in Table 3, the Risk Inventory. Risks included in the Risk Inventory, assessments,
and supporting documentation are approved by the Chief Financial and Risk Officer.
B-1
APPENDIX B
RISK MANAGEMENT PLAN
IDENTIFIED RISK Risks identified as significant to Platte River which could negatively
impact electric supply, finances, reputation, and safety requirements.
-------------------------------------------------------------------------------------------------------------------------------------------------
MAGNITUDE The impact of an Identified Risk occurring. Ranking classifications are
detailed in Table 1.
-------------------------------------------------------------------------------------------------------------------------------------------------
PROBABILITY The likelihood of an Identified Risk occurring within a specified
time period. Ranking classifications are detailed in Table 2.
-------------------------------------------------------------------------------------------------------------------------------------------------
RISK OVERSIGHT COMMITTEE ROC; a committee consisting of the General Manager and senior
management, charged with managing Platte River’s risks and approving
the Risk Management Plan.
-------------------------------------------------------------------------------------------------------------------------------------------------
RISK MANAGEMENT PLAN A document included as an integral part of Platte River’s Strategic
Plan summarizing Platte River’s Identified Risks and risk mitigation
strategies.
-------------------------------------------------------------------------------------------------------------------------------------------------
RISK INVENTORY A table within the Risk Management Plan that summarizes Identified
Risks’ Magnitude, Probability, and risk mitigation strategies.
RISK DEFINITIONS
Platte River’s identified risks are analyzed and assigned a Magnitude and Probability classification as defined
in Table 1 and Table 2 respectively.
B-2
TABLE 1: Magnitude
Magnitude Rank Electric Supply
Safety
Financial Reputation and
Interests
HIGH Loss of supply to an
entire city
Loss of life or
serious bodily injury
Significant impact
>$10 million
Significant long-term
damage
MEDIUM Loss of supply to
part of a city
Bodily injury Limited impact
$5 - $10 million
Short-term damage
LOW Momentary loss to a
city substation
No injury Modest impact
<$5 million
No appreciable
damage
--------------------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------
TABLE 2: Probability
Magnitude Rank Probability Rank Definition
HIGH The identified Risk is likely to occur within five (5) years.
--------------------------------------------------------------------------------------------------------------------------------------------------
MEDIUM The identified Risk could occur within five (5) years and should be anticipated.
--------------------------------------------------------------------------------------------------------------------------------------------------
LOW The identified Risk is unlikely to occur within five (5) years.
APPENDIX B
RISK MANAGEMENT PLAN
RISKS & MITIGATION STRATEGIES
B-3
TABLE 3: Risk Inventory, Five-Year Planning Horizon
Identified Risk Magnitude Probability Page No.
1. Defined Benefit Plan Investment Under-Performance High High B-4
2. Mandated Renewable Energy Standard Medium High B-4
3. Damage by Outside Contractor Employees High Medium B-4
4. New Mandated Emission Reductions High Medium B-5
5. Business Cyber Security System Intrusions Medium Medium B-5
6. Coal Expense Volatility Medium Medium B-5
7. Interest Rate Changes Medium Medium B-5
8. Physical Security Systems Affecting Reliability or Human Life Medium Medium B-5
9. Sustained Market Price Reductions (Wholesale Electricity) Medium Medium B-6
10. Credit Risk High Low B-6
11. Cyber Security - Generation Combustion Turbines High Low B-6
12. Cyber Security - Generation Unit 1 and Gas Yard Balance of Plant High Low B-6
13. Cyber Security - System Operations High Low B-6
14. Environmental Violations High Low B-7
15. Extended Baseload Forced Outage: Rawhide High Low B-7
16. Increases To Capital Expenditures High Low B-7
17. Interruption of Coal Supply (Fuel and Rail, Trapper Mine) High Low B-7
18. Interruption of Water Supply for Rawhide Generation High Low B-7
19. Increased Turnover of Employees (Knowledge Loss) Low High B-8
20. Corporate Conduct Medium Low B-8
21. Elimination of Tax Exempt Status of Newly Issued Power
Revenue Bonds Medium Low B-8
22. Financial Internal Controls Medium Low B-8
23. Increased Regulation of Coal Combustion Residuals Medium Low B-8
24. Interruption of Natural Gas Supply (Fuel and Pipe) Medium Low B-9
25. Electric Facility Siting Constraints Low Medium B-9
26. Employee Errors That Result in Loss of Electric Service Low Medium B-9
27. Extended Baseload Forced Outage: Craig Low Medium B-9
28. FERC/NERC Regulatory Compliance Violation Low Medium B-9
29. General Liability Low Medium B-10
30. Increase Natural Gas Prices Low Medium B-10
RISKS & MITIGATION STRATEGIES
APPENDIX B
RISK MANAGEMENT PLAN
Mitigation strategies are discussed below for each Identified Risk. Each mitigation strategy requires the ROC’s
attention and follow-up to evaluate alternative courses of action.
1.) Defined Benefit Plan Investment Under-Performance
Magnitude: High Probability: High
Mitigation:
The Defined Benefit Plan was closed for employees hired on or after September 1, 2010, and a
Defined Contribution Plan was created for new employees.
Reinstate the lump sum distribution option which reduces the risk of obtaining the Plan’s assumed
rate of return on assets.
2.) Mandated Renewable Energy Standard
Magnitude: Medium Probability: High
Mitigation:
Evaluate costs and benefits of renewable energy in the context of risk associated with CO2
charges. Integration of additional renewable resources may be prudent, particularly if renewable
source costs decline.
Staff will work with legislators to encourage respect of local control during the state legislative
process and to educate elected officials on the steps taken by municipal utilities to diversify energy
portfolios.
Municipal utilities affected by the current renewable energy standards are allowed to create a
renewable energy program substantially similar to the state mandate. Staff will work with the
Municipalities to implement the present mandates to position Platte River and the Municipalities for
the possibility of expanded mandates.
3.) Damage by Outside Contractor Employees
Magnitude: High Probability: Medium
Mitigation:
Contractor qualifications are thoroughly evaluated during the selection process.
Project managers provide oversight as work progresses. When appropriate, a surety bond, or other
form of financial security, is obtained prior to the commencement of work.
TABLE 3: Risk Inventory, Five-Year Planning Horizon CONTINUED
Identified Risk Magnitude Probability Page No.
31. Increased Federal Oversight Low Medium B-10
32. Reduction or Modification of Federal Hydroelectric Resources Low Medium B-10
33. Increased State Oversight Low Low B-10
34. Loss of Communication Systems (Phone, Fiber, Etc.) Low Low B-11
35. Misalignment of Capacity Resources and System Loads Low Low B-11
36. Physical Property Loss Low Low B-11
37. Transmission Interruption Low Low B-11
38. Wholesale Electric Market Manipulation Low Low B-11
B-4
B-5
APPENDIX B
RISK MANAGEMENT PLAN
4.) New Mandated Emission Reductions
Magnitude: High Probability: Medium
Mitigation:
Supply side mitigation options include reduced coal generation through scheduling changes,
capacity reductions or retirements, installing combined cycle gas turbine units, fuel switching
(coal to gas) and increasing use of renewable energy sources.
Demand side mitigation options include increased energy efficiency, addition of distributed
generation having relatively lower emission rates, combined heat and power applications
(cogeneration and district heating) and fuel switching.
Working with the Municipalities, other emission reduction opportunities may be considered:
transportation (e.g. electric vehicles), waste to energy applications, vegetation management, and
new/innovative technology applications.
5.) Business Cyber Security System Intrusions
Magnitude: Medium Probability: Medium
Mitigation:
Security firewalls and current monitoring systems effectively guard against typical or historical
intrusion attempts.
Continued assessments of IT system security standards are planned to ensure appropriate
measures are in place, and to identify necessary future actions.
As technology evolves, additional updates are evaluated.
6.) Coal Expense Volatility
Magnitude: Medium Probability: Medium
Mitigation:
Continue to monitor coal markets for future opportunities to remove price volatility and fix
forward pricing.
Continue negotiations of the Rawhide rail contract renewal.
7.) Interest Rate Changes
Magnitude: Medium Probability: Medium
Mitigation:
Continue a laddered maturity investment strategy based on cash flow projections.
Laddered maturities spread interest rate risk over time reducing interest rate volatility. Staff will
analyze various debt options to help mitigate potential rising rates.
8.) Physical Security Systems Affecting Reliability or Human Life
Magnitude: Medium Probability: Medium
Mitigation:
A Security Assessment team was established to develop a security policy. The team identified
security gaps and deficiencies, along with recommended industry best practices for solutions.
Projects to enhance physical security are either progressing, in planning stages, or budgeted for
future years.
APPENDIX B
RISK MANAGEMENT PLAN
B-6
9.) Sustained Market Price Reductions (Wholesale Electricity)
Magnitude: Medium Probability: Medium
Mitigation:
The Energy Risk Management Committee (ERMC) evaluates market prices and alternative sales
arrangements to enhance surplus sale revenues.
Continue negotiations with regional suppliers for medium term, day ahead and real time surplus
energy sales.
Continue sales strategies that optimize the use of lower cost baseload generation in the spring,
fall, and winter and avoid contracted sales in the summer when margins are lower.
10.) Credit Risk
Magnitude: High Probability: Low
Mitigation:
Platte River diversifies its portfolio by purchasing different types of securities allowed
under State Statute: agency debt, treasury notes, investment pools, bank deposits and money
market accounts. Within direct purchase agency debt, Platte River limits its exposure to each
individual agency to less than 20% (subject to review by the Chief Financial and Risk Officer).
Continue to maintain a diversified investment portfolio.
Continue to monitor the Federal Housing Finance Agency reports to ensure the counterparties
remain stable.
11.) Cyber Security – Generation Combustion Turbines
Magnitude: High Probability: Low
Mitigation:
Multiple layers of cyber-security protection exist, along with built-in redundant, independent
protections. These measures prevent total system failures, and are independent of the turbine
control system, therefore not subject to cyber security threats.
The presence of five smaller, independent generation units mitigates the impact versus
possessing all peaking capacity on a single unit. Additionally, control of the combustion turbines is
not completely dependent on network communication because each unit can be independently
controlled locally at the machine.
12.) Cyber Security – Generation Unit 1 and Gas Yard Balance of Plant
Magnitude: High Probability: Low
Mitigation:
Continue assessing security needs, and implement the immediate and intermediate term
measures that have been identified.
Strategies to further improve network security have been identified and will be implemented.
13.) Cyber Security – System Operations
Magnitude: High Probability: Low
Mitigation:
Continued process and internal controls improvement, capital investment, employee training, and
proper staffing will provide the foundation and resources necessary to adapt to ever changing
technology, vulnerabilities, threats, and regulatory requirements specific to SCADA systems.
B-7
APPENDIX B
RISK MANAGEMENT PLAN
14.) Environmental Violations
Magnitude: High Probability: Low
Mitigation:
Continue training staff to ensure environmental compliance. Training programs are enhanced as
regulations and other requirements evolve.
15.) Extended Baseload Forced Outage: Rawhide
Magnitude: High Probability: Low
Mitigation:
Platte River has built excess capacity with the installation of five natural gas combustion
turbines to not only meet peak summer demands, but to ensure electric supply during outages.
The forced outage assistance agreement with Tri-State Generation & Transmission, whic
provides 100 MW of replacement power for up to one continuous week, lessens the exposure to
purchase power and natural gas markets in the event of a Rawhide Unit 1 forced outag
Extension of this agreement and expanding similar agreements to other units will be evaluated.
Continue excellent maintenance practices including, but not limited to, regular inspections,
planned outages, and operating standards.
Strategic Planning efforts are underway to analyze and plan future capacity expansion plans.
Planning tools will also provide additional metrics on loss of load to better evaluate outage risk.
16.) Increases to Capital Expenditures
Magnitude: High Probability: Low
Mitigation:
Capital funds are budgeted annually.
Capital expenditures are prioritized to cover higher risk projects.
Budget contingency is available for capital expenditures not included in the budget.
Standard accounting practices spreads the impact of capital expenditures over years of service.
17.) Interruption of Coal Supply (Fuel and Rail, Trapper Mine)
Magnitude: High Probability: Low
Mitigation:
Continue to seek long-term coal supply and rail contracts.
Maintain strong relationships with coal and rail providers.
Continue representation on the Trapper Mine Board of Directors, as well as the Fuel Buyers
Team for Craig Station to guide and direct future fuel supply decisions.
Maintain a minimum of 60 days of stockpile inventory at both Rawhide and Craig.
18.) Interruption of Water Supply for Rawhide Generation
Magnitude: High Probability: Low
Mitigation:
Continue participation in the Windy Gap Firming Project.
Research alternative water supplies needed for Rawhide coal unit operations.
Evaluate water supply infrastructure, and research options for redundancy and/or maintenance and
replacement opportunities.
APPENDIX B
RISK MANAGEMENT PLAN
B-8
19.) Increased Turnover of Employees (knowledge loss)
Magnitude: Low Probability: High
Mitigation:
Workforce development to build expanded knowledge base within the organization.
Strengthening the recruiting and selection process.
Organizational structure alignment to support cross training.
Implementation of succession planning strategies.
20.) Corporate Conduct
Magnitude: Medium Probability: Low
Mitigation:
Expand the ethics policy section of the Employee Handbook.
Provide workforce training on ethics guidelines for public employees.
Implement a compliance hotline for reporting potential violations.
21.) Elimination of Tax Exempt Status of Newly Issued Power Revenue Bonds
Magnitude: Medium Probability: Low
Mitigation:
Analyze various debt options which may be used in the event that tax exempt financing is eliminated.
Continue to support APPA and LPPC in their efforts to ensure the continuance of tax-exempt
financing.
22.) Financial Internal Controls
Magnitude: Medium Probability: Low
Mitigation:
The formation of the Internal Audit Committee prioritized the internal audit program.
The committee reviews internal controls and processes, and verifies there is no management
override of controls.
23.) Increased Regulation of Coal Combustion Residuals
Magnitude: Medium Probability: Low
Mitigation:
Continue monitoring the federal Coal Combustion Residuals (CCR) rulemaking and participating
through various trade associations.
Continue participating in all stakeholder meetings and public process coordinated by Colorado
Department of Public Health and Environment concerning state regulations affecting CCR
management.
Groundwater monitoring wells at Rawhide detect problems early, establish baseline conditions,
and track natural variations.
B-9
APPENDIX B
RISK MANAGEMENT PLAN
24.) Interruption of Natural Gas Supply (Fuel and Pipe)
Magnitude: Medium Probability: Low
Mitigation:
Continue regular inspection and maintenance of natural gas pipeline infrastructure, including the
CIG interconnects, to ensure reliability.
Ensure scheduling staff is familiar with scheduling procedures on CIG’s pipeline as an alternate
source.
Monitor potential alternative supply sources.
Support expanded risk evaluation for potential new combined cycle gas generation.
25.) Electric Facility Siting Constraints
Magnitude: Low Probability: Medium
Mitigation:
Proper project planning and communication can mitigate environmental issues.
26.) Employee Errors That Result in Loss of Electric Service
Magnitude: Low Probability: Medium
Mitigation:
Job training focused on the acquisition and maintenance of skills through updating apprenticeship
step progression requirements, regular refresher training on specialized processes or activities,
and documenting processes.
Building in time to review job hazards prior to beginning work will minimize the potential for errors.
27.) Extended Baseload Forced Outage: Craig
Magnitude: Low Probability: Medium
Mitigation:
Platte River has built excess capacity with the installation of five natural gas combustion turbines
not only to meet peak summer demands, but also to ensure electric supply during outages.
Continue representation on the Yampa Engineering and Operating Committee and the Yampa
Coordinating Committee, to ensure/influence best business practices.
Strategic Planning efforts are underway to analyze and plan future capacity expansion plans.
28.) FERC/NERC Regulatory Compliance Violation
Magnitude: Low Probability: Medium
Mitigation:
Clear and ongoing communication from the General Manager that a culture of high ethics and
reliability compliance is expected.
Allocation of appropriate financial support, personnel and resources.
A well documented and widely disseminated Reliability Compliance Program is reviewed and
modified.
Manage and operate the internal Reliability Compliance Program independently of areas
responsible for complying with Reliability Standards.
Mandatory education and training for all relevant employees on compliance responsibilities and
risks.
Internal compliance monitoring processes.
APPENDIX B
RISK MANAGEMENT PLAN
29.) General Liability
Magnitude: Low Probability: Medium
Mitigation:
With the assistance of insurance brokers, appropriate insurance policies with adequate limits are
maintained.
Policy terms and limits to ensure appropriate coverage are regularly assessed.
Clear and ongoing communication from the General Manager that a culture of high safety
standards is expected.
Continue to maintain industry recommended business policies and procedures.
30.) Increase Natural Gas Price
Magnitude: Low Probability: Medium
Mitigation:
In 2013 staff completed the necessary actions to become compliant with Commodity Futures
Trading Commission (CFTC) regulations resulting from the Dodd-Frank Act. As a result, hedging
activities have resumed in accordance with current hedging guidelines to mitigate upward price risk.
The ERMC will continue to evaluate and enter natural gas hedging contracts for summer seasons
to mitigate price risk volatility. The ERMC will also evaluate the effectiveness of, and update as
necessary, natural gas hedging strategies.
Continue regular updates of natural gas requirements and price projections.
Reanalyze in the context of adding combined cycle gas generation in the future.
31.) Increased Federal Oversight
Magnitude: Low Probability: Medium
Mitigation:
Continue to actively monitor changes to the legislative and regulatory landscape. When necessary,
communicate Platte River’s positions to legislators and regulators.
Remain an active member of coalitions that monitor and participate in the legislative and regulatory
process.
32.) Reduction or Modification of Federal Hydroelectric Resources
Magnitude: Low Probability: Medium
Mitigation:
Work with federal power customer groups such as the Loveland Area Customers Association and
the Colorado River Energy Delivery Association to ensure early notification of delivery reductions or
modifications.
Fully utilize WAPA transmission to reach alternative wholesale energy supplies in the event of
reductions from federal hydropower sources.
33.) Increased State Oversight
Magnitude: Low Probability: Low
Mitigation:
Continue to actively monitor changes to the legislative and regulatory landscape. When
necessary communicate Platte River’s positions to legislators and regulators.
Remain an active member of coalitions that monitor and participate in the legislative and
regulatory process.
B-10
B-11
APPENDIX B
RISK MANAGEMENT PLAN
34.) Loss of Communication Systems (Phone, Fiber, Etc.)
Magnitude: Low Probability: Low
Mitigation:
Continue maintenance and operation of the redundant communication network and perform
necessary upgrades to ensure reliability.
35.) Misalignment of Capacity Resources and System Loads
Magnitude: Low Probability: Low
Mitigation:
The load forecast is annually updated to include recent load trends, energy efficiency efforts,
weather conditions, and population and economic projections. The load forecast can be
enhanced by including end-use forecasting.
Continue active involvement in municipal energy efficiency and load management planning
efforts.
Strategic Planning efforts are underway to analyze future capacity expansion plans. Planning
tools will also provide additional metrics on loss of load probability and system constraints.
Capacity sales are reviewed by the ERMC to ensure sales are maximized but not overextended
to the degree native loads are jeopardized.
36.) Physical Property Loss
Magnitude: Low Probability: Low
Mitigation:
Continue excellent maintenance standards to avoid mechanical failures, and maintain training
and education programs for safe operating procedures.
As replacement costs continue to rise, conduct Maximum Foreseeable Loss (MFL) analysis
annually as the MFL approaches the policy limit.
37.) Transmission Interruption
Magnitude: Low Probability: Low
Mitigation:
Review the emergency plan and consider maintaining inventory of temporary transmission
equipment to bypass emergency out-of-service sections of the transmission system.
Consider assisting owner Municipalities in the risk evaluation of their distribution system.
38.) Wholesale Electric Market Manipulation
Magnitude: Low Probability: Low
Mitigation:
Continue bi-annual internal audits to ensure manipulative activity is not occurring.
Continue annual staff training.
APPENDIX C
STRATEGIC FINANCIAL PLAN
RATE REQUIREMENTS
Under Colorado law, Platte River’s Board of Directors has the exclusive authority to establish electric rates. The
Power Supply Agreements with the Municipalities require the Board to review rates at least once each calendar year.
The Power Supply Agreements with the Municipalities and the General Power Bond Resolution contain specific
provisions governing Platte River’s rate setting. The Power Supply Agreements require that rates be sufficient
to cover all operating and maintenance expenses, purchase power costs, debt service expenses, and provide
for the establishment of reasonable reserves and adequate earnings margins so that Platte River may obtain
favorable debt financing. The General Power Bond Resolution requires that rates be sufficient to generate net
revenues sufficient to cover debt service expense at a minimum 1.10 times.
Platte River’s Strategic Financial Plan (SFP) is designed to provide long-term financial stability by generating
adequate cash flows, maintaining access to low cost capital, providing stable and competitive wholesale rates
and effectively managing financial risk. The Board of Directors reviews the SFP policies, goals, and financial
projections at least annually.
POLICIES AND GOALS
Generate Minimum Debt Service Coverage of 1.50 times;
Generate Minimum Net Income Equal to $6 Million;
Target Minimum 200 Unrestricted Days Cash on Hand;
Maintain $20 Million in Rate Stabilization Fund;
Target Debt to Capitalization Ratio Less than 50%;
Maintain Access to Low Cost Capital and Favorable Credit Ratings;
Provide Stable and Competitive Wholesale Rates;
Maintain Bond Required Reserves;
Prudently Manage and Invest Reserves;
Variable Rate Debt Managed In Accordance With Interest Rate Risk Management Policy;
Manage Financial Risk.
The above policies and goals are interrelated. By achieving the minimum target for debt service coverage of
1.50 times, the net income target of $6 million, and the minimum 200 days unrestricted cash on hand, Platte
River should generate adequate cash flows to meet liquidity targets, exceed its debt to capitalization goal and
maintain access to low cost capital. Each policy and goal is discussed in more detail on the next pages.
C-1
C-2
APPENDIX C
STRATEGIC FINANCIAL PLAN
GENERATE MINIMUM DEBT SERVICE COVERAGE OF 1.50 TIMES.
While the legal requirements for debt service coverage is 1.10 times, coverage at this level does not generate
adequate cash flows, increases future debt issuance, and significantly impacts Platte River’s credit rating,
which increases the cost of future financings. Target debt service coverage of 1.50 times provides sufficient
annual cash flows to partially fund future capital additions as well as maintain favorable credit ratings.
GENERATE MINIMUM NET INCOME OF $6 MILLION.
Power Supply Agreements with the Municipalities require Platte River to earn an adequate earnings margin
to obtain revenue bond financing on favorable terms. A target minimum of $6 million net income is a sufficient
earnings margin to ensure cash balances are maintained, liquidity requirements are met, and financial flexibility
remains available.
TARGET MINIMUM DAYS UNRESTRICTED CASH ON HAND.
A minimum 200 days unrestricted cash on hand target ensures adequate cash is generated and maintained,
thus ensuring Platte River’s financial flexibility, strength, and liquidity. Included in the days unrestricted cash on
hand target is a Rate Stabilization Fund target of $20 million. The Rate Stabilization Fund’s purpose is to lessen
or eliminate the rate impact due to an unforeseen event that impacts Platte River’s ability to meet the minimum
legal debt service coverage requirement.
TARGET DEBT TO CAPITALIZATION LESS THAN 50%.
A debt to capitalization ratio less than 50% provides Platte River with a strong balance sheet and reduces the
risk of becoming over leveraged in the debt market.
MAINTAIN ACCESS TO LOW COST CAPITAL AND FAVORABLE CREDIT RATINGS.
Interest rates between various credit ratings can fluctuate significantly depending on market conditions.
Maintaining a strong credit rating provides access to low cost capital and favorable financing terms, resulting in
lower overall debt service expense.
PROVIDE STABLE AND COMPETITIVE WHOLESALE RATES.
Rate projections are developed and reviewed by the Board at least annually. If possible, projected rates
modifications required to meet SFP criteria will be spread over multiple years to provide more stable rates from
year to year. Retail rate comparisons with other utilities in the region are used to measure the competitiveness
of wholesale rates charged to the Municipalities.
MAINTAIN BOND REQUIRED RESERVES.
The General Power Bond Resolution requires a Reserve and Contingency Fund be maintained at a minimum
of 2% of net plant. Bond service and bond reserve funds are maintained as required.
APPENDIX C
STRATEGIC FINANCIAL PLAN
PRUDENTLY MANAGE AND INVEST RESERVES.
Platte River’s investments will be managed in accordance with Platte River’s Investment Policy. The primary
objectives of the investment activities shall be safety, liquidity, and yield while achieving market returns
comparable to benchmark performance.
VARIABLE RATE DEBT MANAGED IN ACCORDANCE WITH INTEREST RATE RISK MANAGEMENT
POLICY.
The Board-approved Interest Rate Risk Management policy has established guidelines to govern variable rate
debt.
MANAGE FINANCIAL RISK.
Platte River’s financial risks will be managed in accordance with, but not limited to, the following Board
approved documents: Energy Risk Management Policy, General Power Bond Resolution, Interest Rate Risk
Management Policy, and Power Supply Agreements. The Energy Risk Management Committee and the Risk
Oversight Committee are charged with managing Platte River’s business risks.
C-3
APPENDIX D
ACRONYM DEFINITIONS
24
BART .......................... Best Available Retrofit Technology
BNSF .......................... Burlington Northern Santa Fe Railway
CAMR ......................... Clean Air Mercury Rule
CCR ............................ Coal Combustion Residuals
CDPHE ....................... Colorado Department of Public Health and Environment
CO2 ............................. Carbon Dioxide
CPUC ......................... Colorado Public Utilities Commission
CRSP .......................... Colorado River Storage Project
CT ............................... Combustion Turbine
DG .............................. Distributed Generation
DSM ............................ Demand Side Management
EMS ............................ Environmental Management System
EPA ............................. Environmental Protection Agency
EPAct 2005 ................. The Energy Policy Act of 2005
ERMC ......................... Energy Risk Management Committee
ERMP ......................... Energy Risk Management Policy
FERC .......................... Federal Energy Regulatory Commission
GHG ........................... Greenhouse Gases
GWh ........................... Gigawatt Hour
Hg ............................... Mercury
IRP .............................. Integrated Resource Plan
kV ............................... kilovolt
LAP ............................. Loveland Area Projects
MATS .......................... Mercury and Air Toxics Standard
MBWP ........................ Medicine Bow Wind Project
MW ............................. Megawatt
MWh ........................... Megawatt Hour
NERC ......................... North American Electric Reliability Corporation
NOx ............................ Nitrogen Oxides
O&M ........................... Operations and Maintenance
PSCo CAE .................. Public Service Company Capacity and Energy Sale
PSD ............................ Prevention of Significant Deterioration
PV .............................. Photovoltaic REPI Renewable Energy Production Incentive
RES ............................ Renewable Energy Standard
RHR ............................ Regional Haze Rule
RMRG ......................... Rocky Mountain Reserve Group
ROC ............................ Risk Oversight Committee
SFP ............................. Strategic Financial Plan
SIP .............................. State Implementation Plan
SO2 ............................. Sulfur Dioxide
TRI-STATE ................. Tri-State Generation and Transmission Association, Inc.
WESTERN .................. Western Area Power Administration
WECC ......................... Western Electricity Coordinating Council
D-1
Platte River Power Authority is a not-for-profit utility that generates and delivers safe,
reliable, environmentally responsible and competitively priced energy and services
to its owner communities of Estes Park, Fort Collins, Longmont and Loveland,
Colorado where it is distributed by each municipal utility to residents and businesses.
®
THE ENERGY WE LIVE BY™
ESTES PARK | FORT COLLINS | LONGMONT | LOVELAND
WWW.PRPA.ORG
2000 East Horsetooth Road - Fort Collins, CO 80525
970.226.4000 | 888.748.5113