Loading...
HomeMy WebLinkAboutReport - Mail Packet - 8/13/2013 - City Manager�S Monthly Report - August 8, 2013August 8, 2013 ISSUES BEFORE COUNCIL Amendments to the Smoking in Public Places Ordinance.........................................................2 Climate Action Planning ............................................................................................................2 Custom Blending Business Assistance Package ........................................................................2 Land Use Code – Amend Definition of Large Base Industry ....................................................2 Amending the Intergovernmental Agreement for the Delivery of Potable Water Between Fort Collins Utilities and the Fort Collins-Loveland Water District .....................3 Historic Preservation Process Improvements, Phase 2 ..............................................................3 Energy Conservation On-Bill Financing First Year Review .....................................................3 Temporary Ban – Amendment 64 (Retail Marijuana) ...............................................................4 Social Sustainability Gap Analysis and Strategic Plan Update .................................................4 2014 Budget Revisions ..............................................................................................................4 Capital Improvement Tax Renewal ...........................................................................................4 ECONOMY Fort Collins Sales and Use Tax ..................................................................................................5 CAPITAL PROJECTS Citywide Pedestrian Access Project...........................................................................................6 South Shields Street Bridge over Larimer Canal No. 2 .............................................................6 Mulberry Bridge (SH 14) at the Poudre River Enhancements ..................................................7 West Mulberry Bridge Replacement .........................................................................................8 West Prospect Bridge Replacement ...........................................................................................8 Bryan Bridge Replacement ........................................................................................................9 Arthur Ditch at Mountain Avenue and at Myrtle Street ............................................................9 Westbury and Shields Improvements ......................................................................................10 Spring Creek (NRCC) Overpass ..............................................................................................10 Mason Corridor MAX Bus Rapid Transit Project ...................................................................11 Utilities Capital Projects .................................................................................................... 11-19 COMMUNITY EVENTS ...........................................................................................................20 PUBLIC SAFETY UPDATE Fort Collins Police Services ............................................................................................... 21-23 Poudre Fire Authority ........................................................................................................ 24-26 BUILDING ACTIVITY ........................................................................................................ 27-28 2 ISSUES BEFORE COUNCIL August 13 Work Session Amendments to the Smoking in Public Places Ordinance  The purpose of this work session is to discuss options for expansion of the City of Fort Collins Smoking Ordinance.  Neighborhood Services and Transfort have received guidance on public health trends and best practices from Larimer County Department of Health and Environment to develop potential options for expansion of the Fort Collins Smoking Ordinance including: o smoke-free outdoor dining and bar patios, and o smoke-free Transfort transit areas.  This work session discussion will focus on data and community feedback regarding potential options, as well as information about the health impacts related to secondhand smoke. Climate Action Planning  Fort Collins’ 2008 Climate Action Plan requires annual progress reporting to City Council.  An invited guest, Dr. Scott Denning, CSU Professor of Atmospheric Science, will provide current information about climate change science.  Staff will present information on 2012 progress that Fort Collins is making towards its community greenhouse gas reduction goals.  Staff will also outline a process to review the existing greenhouse gas goal, followed by an update to the Climate Action Plan, and seek Council feedback. August 20 Regular Meeting Custom Blending Business Assistance Package  Custom Blending, a local spice manufacturer in Fort Collins, is requesting Business Assistance from the City of Fort Collins for the expansion of their facility to take control of the vanilla extract manufacturing process.  The physical expansion is an additional 34,000 square feet, which will double their physical foot print.  The company anticipates spending $4 million on building costs, $2 million in manufacturing equipment, and hiring an additional 16 full-time employees (average salaries of $45,000 - $47,000).  Custom Blending is requesting a rebate of $31,100 in use tax rebate (no rebate is offered for the dedicated fund portions of use tax), and $12, 400 in business personal property tax rebate over a 7-year span. Land Use Code – Amend Definition of Large Base Industry  Staff is proposing an amendment to add other types (e.g., health care) into the definition of large base industries to better address other campus-like development that is occurring or may occur within the City. 3 Amending the Intergovernmental Agreement for the Delivery of Potable Water between Fort Collins Utilities (FCU) and the Fort Collins-Loveland Water District (FCLWD)  Two separate agreements with FCLWD are being presented to City Council for approval.  The first agreement is the Amended and Restated Intergovernmental Agreement for the Delivery of Potable Water. o This agreement allows FCLWD to utilize Fort Collins Utilities water transmission system to convey water to the FCLWD customer base. o The proposed amendments update the delivery points to FCLWD and the terms of the agreement, including going from annual settlement to monthly settlement of any imbalance between the water provided by FCLWD to FCU and the water delivered by FCU to FCLWD. o New requirements include paying the full cost of treatment for any monthly imbalance and the transfer of raw water between parties.  The second agreement is the Intergovernmental Agreement for Water Treatment Service. o This agreement allows FCLWD to acquire 5 million gallons of daily treatment capacity at the FCU Water Treatment Facility. o Excess treatment capacity exists because of community conservation. o FCLWD will provide raw water to FCU each month that will be treated by FCU and delivered to FCLWD. o FCLWD will pay an amortized plant investment fee as well as the full cost of treatment. o The agreement utilizes existing treatment resources to meet the growing needs of another water district serving Fort Collins customers. August 27 Work Session Historic Preservation Process Improvements, Phase 2  Staff will provide Council with information on the results of its research into best practices, on enhancements that are currently being implemented to increase program transparency and improve service, and on the results of a survey on the historic review requirement for buildings that are 50 years old or older.  Additionally, staff will be asking for Council’s direction on proposed changes to the Landmark Codes, and for direction on further study of options that could address the issue of the large number of properties that will soon turn 50 and become subject to historic review. Energy Conservation On-Bill Financing First Year Review  Council requested an update on progress of the On-Bill Financing Program when it was approved in May 2012.  Uptake of the program has been very slow since starting in January 2013 (3 closed loans, 3 approved, 3 denied, 1 withdrawn).  Staff will recommend revisions to the program to make it more successful over time and seek Council feedback. 4 September 3 Regular Meeting Temporary Ban – Amendment 64 (Retail Marijuana)  Staff is proposing an ordinance to put in place a temporary ban on recreational marijuana businesses.  The ban will allow time for state regulations to be implemented and for local outreach. September 10 Work Session Social Sustainability Gap Analysis and Strategic Plan Update  A Gap Analysis was funded in Budging for Outcomes offer for consultant assistance.  The Request for Proposal process is complete and staff is in final negotiations on contract and scope of services.  The first step is a Gap Analysis report that will address current conditions trends and resources in the community, both City as well as other organizations.  The second step in the Gap Analysis will be to identify gaps that exist and may need to be filled.  A Strategic Plan will identify and prioritize actions the City organization will take to implement the overall vision for social sustainability services, and further delineate the City’s role.  Two Council work sessions are planned for the Gap Analysis, which will be completed before the end of 2013; Strategic Plan will be completed in 2014.  During the September work session, staff will review the proposed process, timeline and products; review the stakeholder engagement plan; and refine the topic areas. 2014 Budget Revisions  In 2012, Council adopted the 2013-14 Budget, but we only approve spending for a year at a time.  Council will be presented with the City Manager's recommendation of 2014 Revision Requests (programs and services) that could be added to the 2014 budget.  Guidance is sought from Council on which 2014 Revision Requests should be considered for 1 st reading on October 15, 2013. Capital Improvement Tax Renewal  The Current Capital Improvement Tax, Building on Basics, will expire in 2015.  This will be a discussion of a possible future Capital Improvement Tax. 5 ECONOMY FORT COLLINS SALES AND USE TAX COLLECTIONS June 2013 Sales tax collections increased 6.5% Use tax collections excluding rebates decreased 4.4% Sales and use tax collections excluding rebates increased 4.3% 2013 YTD Sales tax collections increased 3.9% Use tax collections excluding rebates increased 1.3% Sales and use tax collections excluding rebates increased 3.5% Capital Expansion Fee Revisions In the fall of 2012, Finance staff initiated a comprehensive review of the Capital Expansion Fees that were first implemented in 1996. The goal of the review was to ensure that the methodology first implemented was still applicable and to assess the fee structure using current asset data. Staff contracted with Duncan Associates, a nationally known firm that specializes in impact fees, to assist with the fee study. Fees included in the study are:  Neighborhood Parks  Community Parks  Fire  Police  General Government Staff presented the information to City Council at a July work session. Direction was given to proceed with the fee update and incorporate the following items into the August 20 th update:  Options to phase in Commercial/Industrial fees over time but implement residential fees at 100% in 2013;  Consider reviewing at less than the 3-5 year interval recommended by staff due to rapid change in asset replacement costs;  Present examples of the fee impact on various sized commercial projects;  Clarification on how redevelopment impact fees are calculated. 6 CAPITAL PROJECTS (new information noted in blue text) ENGINEERING CITYWIDE PEDESTRIAN ACCESS PROJECT Funding Source: KFCG Funds Estimated Project Budget: $450,000 Status: On Budget, On Schedule  The City of Fort Collins Pedestrian Plan addresses citywide pedestrian needs and is a data-driven approach based on the importance of safe, sustainable walking within City limits. It, however, lacks comprehensive condition data for the City’s sidewalk system. Prior to the beginning of the Pedestrian Needs Assessment project, there was not an inventory of existing sidewalks or sidewalk deficiencies. This project provides a complete City sidewalk inventory, identifies sidewalk inadequacies, and identifies inadequate handicap accessibilities according to Americans with Disabilities Act (ADA) requirements.  Data collection has been completed with approximately 540 street miles of sidewalk assessed and inventoried at this time.  37,675 accessible ramps have been identified as acceptable, substandard, or missing in accordance with the ADA requirements.  Staff has implemented a methodology and analysis program used to prioritize pedestrian projects. This program takes into account a variety of factors such as, but not limited to, demand, corridor function, and high priority areas.  Staff has identified approximately 30 projects for 2013 and has begun to collaborate with various departments to prioritize those projects. Construction began in May. o Vermont Street sidewalk is complete with some minor grading and irrigation work. o City Park projects began construction July 8. Oak Street is 90% complete with minor grading and landscaping work to be performed. Sidewalk construction along Bryan Road is scheduled to start mid-August with Jackson to begin this fall. o Upcoming project locations scheduled include: Cherry, Linden, Wagner, Lemay, Boardwalk, and Rolland Moore (two access ramps). SOUTH SHIELDS STREET BRIDGE OVER LARIMER CANAL NO. 2 Funding Source: Colorado Off System Bridge Program (BRO) funds and KFCG 2011 Estimated Project Budget: $1.5 million Status: On Budget, On Schedule  The main goal of this project is to replace the second worst rated, structurally deficient bridge in the City.  Construction will include the removal of the existing structure, the construction of a new structure, relocation and upgrading of existing utilities, and the construction of urban design features. The new bridge will be similar in size to the existing bridge. 7  The project will be constructed in phases, starting on the east half of the structure, followed by the west half. During construction, traffic lanes will be reduced to one lane in each direction. Bicycles will be asked to merge with traffic or find alternate routes. Pedestrian access will always be available during the duration of the project.  All structural and surface improvements for the new bridge have been completed, and the bridge has been re-opened to traffic. Minor construction, including landscaping installation and the installation of the decorative rail, will continue at the bridge. All work within the ditch has been completed.  Substantial completion is expected by the first week of August, with Final Acceptance anticipated shortly thereafter.  Additional project information and information on planned roadway closures can be found at http://www.fcgov.com/engineering/shields-bridge.php MULBERRY BRIDGE (SH 14) AT THE POUDRE RIVER ENHANCEMENTS Funding Source: City of Fort Collins Estimate Project Budget: $750,000 Status: On Budget, On Schedule  Colorado Department of Transportation (CDOT) is replacing the Mulberry Bridge (State Highway 14) over Poudre River Bridge starting in the fall of 2013.  Due to the construction, eastbound traffic on Mulberry will be detoured for approximately 18 months.  The City is working with CDOT to add city- funded enhancements to the bridge including decorative railings, landscaping and urban design features. 8 WEST MULBERRY BRIDGE REPLACEMENT DESIGN Funding Source: Colorado Off System Bridge Program (BRO) funds and KFCG 2011 Estimated Project Budget: $1.1 million Status: On Budget, On Schedule  The goal of the project is to replace the existing structurally deficient bridge with a new bridge that meets the current standards.  The posted weight limit on this bridge precludes the passage of emergency vehicles from the nearby fire station.  In December 2011, the City received a grant for $700,000 in Colorado Off System Bridge Program (BRO) funds for some of the construction cost.  Design efforts are underway. Construction is planned for fall 2014. WEST PROSPECT BRIDGE REPLACEMENT DESIGN Funding Source: KFCG 2011 Estimated Project Budget: $1.2 million Status: On Budget, On Schedule  The goal of the project is to replace the existing structurally deficient bridge with a new bridge that meets the current standards.  The State of Colorado inspected this bridge in March 2011 and found significant structural issues resulting in a temporary plate being installed and load posting restricted to 15 tons.  Design efforts are underway and will be completed by summer 2013. 9 BRYAN BRIDGE REPLACEMENT Funding Source: Colorado Off System Bridge Program (BRO), City Bridge & KFCG Funds Estimated Project Budget: $1 million Status: On Budget, On Schedule  The goal of the project is to replace the existing structurally deficient bridge with a new bridge that meets the current standards.  The posted weight limit on this bridge precludes the passage of emergency vehicles from the nearby fire station.  The City received a grant for $552,000 in Colorado Off System Bridge Program (BRO) funds to cover some of the project cost.  Construction is planned for fall 2013.  A three week full closure is planned for Phase 1 of the construction.  The road will be open to northbound traffic only for the second phase of construction. ARTHUR DITCH AT MOUNTAIN AVENUE AND AT MYRTLE STREET Funding Source: KFCG Funds Estimated Project Budget: $750,000 Status: On Budget, On Schedule  Replacement of two load posted Arthur Ditch bridges.  Full closure is planned for removal of existing bridges and the construction of the replacement bridges. Construction will begin fall 2013.  Access manholes will be added to the new bridges for safety. 10 WESTBURY AND SHIELDS IMPROVEMENTS Funding Source: Building on Basics (BOB) along with Xcel Energy Contributions Estimated Project Budget: $650,000 Status: On Budget, On Schedule  The goal of this project is to relieve traffic congestion and vehicle wait time by constructing an additional northbound travel lane on Shields from Clarendon Hills to Westbury.  The need for this safety and operational improvement was identified in the Engineering Department’s recently completed Arterial Intersection Prioritization Study. The lane addition on Shields will improve traffic flow by relieving congestion for northbound traffic, whereby the outside lane will act as a right turn lane during peak hours and a through lane during off-peak hours.  The proposed improvements will reduce the morning peak hour delay by 18%.  Xcel Energy is currently constructing its West Main Natural Gas Pipeline Replacement Project through this area. The roadway improvements will be coordinated with Xcel’s schedule, and are expected to be completed in mid-September.  Southbound Shields has existing curb and gutter along this stretch of roadway. The project will patch two locations southbound, and place a 2-inch asphalt overlay over the entire roadway with new striping.  The final product will reshape Shields Street to a four-lane arterial with a center left turn lane and on-street bike lanes from Harmony Road to Clarendon Hills Drive (approximately 0.5 miles).  A communication plan (public outreach) is being developed and will be implemented with the final design through construction.  The project website is available through the Engineering homepage at http://www.fcgov.com/engineering/shields-westbury.php SPRING CREEK (NRRC) OVERPASS Funding Source: Federal Congestion Mitigation and Air Quality (CMAQ) Grant and Building on Basics (BOB) Funds Estimated Project Budget: $2.75 million Status: On Budget, On Schedule  The goal of the project is to construct a new pedestrian/bike overpass that will link the Mason Bike Trail and the federal campus on the west side of the railroad tracks to the Mason Corridor Bus Rapid Transit (BRT) MAX station on the east side of the tracks. 11  Construction of the ramps is underway in conjunction with the MAX project.  The project is currently advertised with bids due on August 13, 2013.  The proposed schedule is to complete construction by May 2014 in conjunction with the opening of the MAX BRT. MASON CORRIDOR MAX BUS RAPID TRANSIT (BRT) PROJECT Funding Source: FTA 80%, Local Match (CDOT SB-1, CDOT FASTER, City, and Downtown Development Authority) 20% Estimate Project Budget: $87 million Status: On Budget, On Schedule  Installation of the Sherwood lateral box culvert is on hold south of Spring Creek at Johnson Drive until the irrigation water is shut off in order for crews to install the proposed headwall.  Station structures were set at the University Station, Laurel southbound station, and the Olive northbound station.  Only the Prospect Station and Bay Farm Station are yet to be constructed, which will occur in the near future. Station work continues in various stages at several MAX BRT stations, and includes architectural aspects and concrete.  CEI crews continue to make progress on the storm pipe installation throughout the project area. The focus this month has been on the CSU campus from Lake Street to University.  Conduit installation for the MIS duct bank is nearing completion.  The construction of the bus guideway was completed near McClelland and Horsetooth.  Intersection improvements occurred at Harmony, Horsetooth and Olive. Work included crosswalk installation, curb, ramps and paving.  Construction of the retaining wall between Prospect Street and Spring Creek west of the railroad tracks is 30% complete.  Construction of the bridge at Mail Creek is completed.  The South Transit Center contract is currently on hold due to the termination of Growling Bear. The surety company is now in control of the contract and intends to restart construction on the project. Completion is still expected by May 2014.  Heath Construction is ahead of schedule on the Maintenance Facility Expansion and is nearing substantial completion. UTILITIES WEST VINE OUTFALL CHANNEL Project Description: This is a joint project between the City and Larimer County to design and construct a stormwater outfall channel for the West Vine Basin to the Poudre River. The project is being coordinated with Larimer County’s widening of Shields Street from the Arthur Ditch to Willox. Project Status: Alternative Analysis Phase completed; negotiating with land owners. Anticipated Completion Date: Preliminary design underway; construction in the of fall 2013. Ahead/Behind/or on Schedule: On Schedule 12 Total Project Budget: Alternatives Analysis Phase ($104,000); Final Design ($243,000); Total Project Cost $2.4 Million Budget Status: $211,000 spent to date; project is within budget. Highlights:  Cost estimates of alternatives have been developed.  The two property owners (Arnett and Scott) have been presented with a proposal to purchase land for the project.  Working on collaboration with Natural Areas.  Final Design for the Water Quality area north of Vine Drive and the outfall to the Poudre River has begun.  Currently working on the IGA for construction with Larimer County.  Presented project at Poudre River Open House.  Draft purchase agreement are complete for property owners (Arnett and Scott). WASTEWATER COLLECTION SYSTEM - SMOKE TESTING Project Description: This project will identify defects in the sanitary sewer system that lead to excess flow at the wastewater treatment plant. The project involves blowing smoke into manholes in the area of concern and identifying locations where smoke comes to the surface. Measures will be taken to minimize the risk of smoke entering homes and businesses. Flow monitoring data since 2009 was used to identify areas throughout town that should be tested for possible defects. Project Status: The testing is planned to start in mid-March. Anticipated Completion Date: Ongoing Ahead/Behind/or on Schedule: On Schedule Total Project Budget: The project is being conducted with City staff. Budget Status: Budget is minimal other than staff time. Highlights:  Flow monitoring has been conducted for the majority of the system since 2009.  Smoke Testing plan for the spring of 2013 has been developed.  A public relations plan is being developed.  The neighborhood surrounding Irish Elementary was tested the week of March 25.  North College subbasin was tested during the week of April 1. 13 LAPORTE AVENUE TRANSMISSION MAIN REHABILITATION Project Description: Decommissioning of Utilities’ 27 inch water transmission main in LaPorte Avenue between Grandview Avenue and the pressure relief vault at Impala Street. LaPorte Avenue is scheduled for paving west of Taft Hill Road by the Streets Department in the summer of 2013. The project involves removing services and distribution lines from the 27 inch steel line and tapping them into the 27 inch concrete line. The steel main will then be cut, drained and plugged. Project Status: Project started in May 2013. Anticipated Completion Date: Work to be completed by August 15, 2013. Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $425,000.00 Budget Status: On Budget Highlights:  Entire 27 inch steel main between PRV and Grandview Avenue to be abandoned by end of summer 2013. 42 INCH SANITARY SEWER MAIN AND 12 INCH WATER MAIN RELOCATIONS AT MULBERRY BRIDGE Project Description: In order to accommodate the construction of the new bridge over the Poudre River on Mulberry Street by CDOT, conflicting utility lines must be relocated. At CDOT expense, the 42 inch sanitary sewer main and the 12 inch water main will be relocated to the north to a location that will not conflict with the new wider bridge. The project will include the relocation design, permitting, and relocation construction necessary to remove the utility lines from conflict with the new bridge. Project Status: Project completed in June. Ahead/Behind/or on Schedule: One month behind schedule due to poor spring weather conditions. Total Project Budget: $942,000 Budget Status: Within Budget Highlights:  Water, sewer, communications conduit, and power conduit constructed through the river. Project crew was able to save the project money by placing the electric and communications conduits in the 42 inch sewer encasement. 14  Project design and construction using Utilities Alternative Product Delivery System approved by CDOT.  Relocation of large utility mains under the Poudre River presents numerous engineering and construction management challenges.  There are many existing utility conflicts and relocations required to allow for the new 42 inch sewer and the 12 inch water main.  Project complete. BOX ELDER CREEK OUTFALL IMPROVEMENTS Project Description: Large regional flood control project to be designed and constructed under Intergovernmental Agreements with Timnath Development Authority and Boxelder Basin Stormwater Authority. Project involves channel grading and road crossing improvements from I-25 to the Poudre River along the Boxelder Creek Corridor. Project Status: Engineering contract in place. Conceptual level cost estimate in preparation.  Preliminary Design: May 2013 – October 2013  CLOMR Submittal: October 2013  Right of Way Requirements: May 2013 – June 2014  Final Design and Permitting Requirements: October 2013 – April 2014 Anticipated Completion Date: December 30, 2014 On Schedule: On Schedule Total Project Budget: $2,900,000 Budget Status: Within Budget Highlights: Project in Preliminary Design WEST VINE SLIPLINING Project Description: Sliplining 27 inch steel transmission main with 12 inch HDPE between 48 inch Budweiser line north of Vine Drive and 8 inch distribution main in Sunset Court. The new 12 inch HDPE line will be connected to the new 12 inch and existing 6 inch mains in Vine Drive. Project Status: Project started in May 2013. Anticipated Completion Date: Work to be completed by July 1, 2013. Ahead/Behind/or on Schedule: Project Complete Total Project Budget: $260,000.00 Budget Status: On Budget 15 Highlights:  Entire 27 inch steel main between PRV and 48 inch Budweiser line to be abandoned by mid-summer 2013. CATHODIC PROTECTION OF WATER TREATMENT AND TRANSMISSION AND DISTRIBUTION SYSTEM WATER LINES Project Description: Investigation of existing systems in place used to protect water lines from corrosion; design of rehabilitation of existing and new systems to prevent corrosion; and construction of modified and new systems. Project Status: On Schedule Anticipated Completion Date: This is an ongoing project. Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $552,000 (2013) Budget Status: Within Budget Highlights:  Working with consultant and contractor on testing current cathodic protection levels and locations; and installing modified and new systems where needed.  Modified the cathodic protection test sites on the raw water line going into the treatment plant in March 2012.  Took readings and conducted continuity testing of AB line, Mulberry, Lemay, and Lincoln lines.  Designing rectifiers and locations for rectifiers along the AB line and at the WTP.  Prepared legal exhibits and obtaining easements for the rectifier locations along the AB line.  Working with contractor on work order for cathodic protection work in preparation for anode and rectifier installation at the WTF.  Meeting with other water districts to discuss cathodically bonding to their systems which cross the City’s system.  Working with contractor on costs to install rectification system in order to determine budget needed for 2013 and 2014.  Construction of deep ground bed anodes and installation of rectifiers scheduled to begin mid-July.  Construction of deep ground bed anodes began July 24, continuing in August with anode junction boxes and wire/conduit installation. Rectifiers scheduled to be installed around the end of August with activation sometime this fall. 16 BUS RAPID TRANSIT (BRT) WATER AND SEWER RELOCATES Project Description: Relocation and protection of major water and sewer utility lines due to the construction of the BRT. Project Status: Utility projects complete; working on administrative issues, including invoices, Buy America requirements, and completion reports. Anticipated Completion Date: Winter 2011 – fall 2013; Utility project work completed. Ahead/Behind/or on Schedule: Ahead of schedule; project work complete March 2013. Total Project Budget: $1,250,000 Budget Status: Within Budget Highlights:  All Utilities impacted by the BRT have been identified and cost estimates were developed.  Coordination with the BRT continues.  Contract for design services completed; construction contracts for all identified projects in effect.  Council approved reallocation of water and wastewater budget.  Completed Prospect water line move and sanitary sewer replacements.  Water Utility work in Prospect completed the second week in March. STREAM REHABILITATION AND ENHANCEMENT PROGRAM Project Description: Stream restoration and habitat enhancement across the City, including stabilizing stream channel morphology, restoring/creating new native in-stream and riparian habitat to attract and support native fish and wildlife populations, and promote BMPs to improve water quality. First watershed in program is Fossil and Mail Creek. Project Status: Working with consultant on design. Anticipated Completion Date: First project design to be complete by fall 2013 with construction to begin fall of 2014. Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $600,000 each year Budget Status: Within Budget Highlights:  Conducted several vision meetings and site visits.  Met with Corps of Engineers representative to discuss Individual Permit requirements – may conduct “Threatened and Endangered Species” survey and 17 other items which will not fit timeframe for construction this fall, so preliminarily scheduled for fall 2014.  Conducted vision charette in February.  Draft Vision report complete; to be sent to appropriate interested parties.  Working on design with contractor and consultant.  Attended Poudre River Open House and presented Fossil Creek project.  Planning for a neighborhood open house the first week in September. RIGDEN MUNICIPAL STORAGE POND Project Description: The project will consist of the construction of a gravel pit water storage reservoir to include a pump station and associated piping. The project is located northeast of the Ziegler Road and Horsetooth Road intersection. Purpose of the storage is to retime flows to meet water rights return flow obligations and meet augmentation requirements. Project is a cooperative effort with Natural Areas and Parks. Project Status: The project is on hold pending the resolution of some issues the property owner is having with other City departments. This may affect the availability of our contractors who will be completing the work. Anticipated Completion Date: Design complete in 2013; construction in 2014. Ahead/Behind/or on Schedule: Behind Schedule Total Project Design Budget: $336,112 Total Project Construction Budget: $9,500,000 Budget Status: Preliminary Design is complete; final design has begun. Highlights:  Anderson Consulting is preparing the final design.  City Attorneys are preparing the draft purchase agreement.  Acquisition costs being are finalized.  Cost estimate and schedule are being updated.  The size of the reservoir is being increased from 1400 acre/feet to 1970 acre/feet.  The owner is working on resolving issues with other City departments which has slowed the completion of the purchase agreement. 18 PLEASANT VALLEY PIPELINE FOREBAY SEDIMENTATION POND Project Description: Design and construction of a Sedimentation Pond at the turnout structure for the Pleasant Valley Pipeline, to remove sedimentation from Poudre River raw water before it goes into the pipeline. The unusual sedimentation load is being caused by the effects of the High Park Fire. Project Status: Phase I construction, work that would be affected by the use of the Munroe Canal, was substantially complete as of March 31. Phase II construction began March 15 and will continue until mid-June. Anticipated Completion Date: Phase I – April 1 2013; Phase II – June 2013 Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $1,700,000 Budget Status: On Budget Highlights:  Ayres Associates selected on February 5, 2013 as consultant for the design and construction administration phases.  Executed Permission to Enter document with property owner, Northern Colorado Water Conservancy District.  Phase I design completed on February 25, 2013; issued Notice to Proceed to Hydro Construction. Began mobilization.  Excavated to pond bottom and constructed embankment surrounding pond.  Excavated for and constructed inlet structure and backfilled.  Installed slide gates at inlet structure.  Cut new gate opening in existing PVP inlet structure and installed new 3’ x 9’ RCBC at opening.  Graded pond bottom in preparation for footers/slab segments.  Installed 9’ x 3’ RCBC pond outlet and backfilled.  Installed perimeter drain and dry manhole drain.  Formed and poured weir wall structure.  Installed concrete footers, slab segments and knee walls on north, east and south sides of pond. Concrete work approximately 1/3 complete.  Completed all concrete work, including floor slab, knee walls, inlet structure and truck ramp.  Caulked all construction and expansion joints in floor slab and knee walls.  Soil pond slopes have been cut, graded and finished for installation of polyethylene liner.  Finished connections of the perimeter drain.  Site mostly rough graded, including sludge drying ramp and impoundment area.  Polyethylene liner installed.  Final grading complete.  Sludge drying bed and berm complete.  Site seeded and mulched.  New sedimentation pond filled on June 18, 2013 and brought online. 19  Contractor demobilized.  Phases I and II substantially complete. Pond and site fencing only work items remaining. WATER TREATMENT FACILITY YARD PIPING MODIFICATIONS Project Description: Design and construction of a new 48 inch diameter steel raw water pipeline to replace the aged 30 and 36 inch Horsetooth raw water pipelines, and a new 36 inch diameter steel backwash pump station influent line to replace the existing cast iron pipeline. Both of these pipelines have shown damage due to electrolysis. The finished water backwash influent line is also located under an existing sludge drying pond, increasing the possibility of cross contamination. Project Status: Kicked off design May 2013. Construction scheduled for October 2013 thru January 2014. Anticipated Completion Date: Design scheduled to be complete by September 2013; construction will follow in October 2013. Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $1,550,000 Budget Status: On Budget Highlights:  Selected design engineer, CH2M HILL ENGINEERS, and contractor, Hydro Construction Company.  Executed design contract with CH2M HILL.  Design Kickoff Meeting held May 1, 2013.  Gathering information and evaluating alternative alignments.  Selected preferred alternative alignments.  Set up locates for potholing existing utilities.  Potholing of existing utilities with potential conflicts with new installation is complete.  90% plans and specifications complete and being reviewed by team. 20 COMMUNITY EVENTS US Pro Cycling Challenge Location: See http://www.nococycling.com/route/ for route map Date/Time: Saturday August 24, 2013 11:00 AM-4:00 PM Details: Join us for Stage 6 of the 2013 USA Pro Cycling Challenge! The Challenge will include 128 of the world's best cyclists from 25 countries making up 16 professional teams. Be sure to come see world and Olympic medalists, national champions, and Tour de France and Giro d'Italia heroes battle on Colorado's majestic landscape and killer climbs for a piece of history. The largest spectator event in the history of Colorado continues to set records in professional cycling by taking the world's best riders to unprecedented elevations, providing heart pounding excitement and drama for all seven days… this year's route promises to bring even more! Web address: http://www.usaprocyclingchallenge.com Contact Information: Tessa Greegor Phone: (970) 416-2471 Email address: tgreegor@fcgov.com Free Household Hazardous Waste Collection Location: Parking lot at NW corner of Lake Street and College Avenue Date/Time: Saturday September 7, 2013 9:00 AM Details: Drop off unwanted household chemicals (non-leaking): • household batteries • paint and pesticides • compact fluorescents • cleaning and automotive products • mercury-containing items (thermostat and appliance switches, thermometers, button- shaped batteries) Who: Fort Collins residents (no commercial waste) Items not accepted: • explosives • asbestos • pharmaceuticals • bio-waste (needles, bandages) Web address: http://www.fcgov.com/hazwaste Contact Information: Errin Henggeler Phone: (970) 221-6700 Email address: ehenggeler@fcgov.com To view the full calendar of events, visit http://www.fcgov.com/events/ 21 PUBLIC SAFETY UPDATE FORT COLLINS POLICE SERVICES Call Load In July 2013, officers responded to 8,934 incidents resulting in 1,663 cases, compared to 8,543 incidents and 1,757 cases for the same period last year. While the monthly incident call totals are up, case numbers were lower with year–to-date totals reflecting a decrease in both categories when compared to the same period last year. 2012 YTD 2013 YTD Incidents 59030 57344 Cases 11446 10906 Police Seek Explorer Applicants The Fort Collins Police Explorer program is currently accepting applications. Applicants must be 16 years old, possess a valid Colorado driver’s license, and be able to pass a background check and mandatory drug screening. Explorers volunteer their time to learn about the field of law enforcement and are provided training in a variety of law enforcement topics enabling them to assist police and the community. Explorers often assist with traffic control and other non- enforcement functions. Applications can be obtained from the Records Division at the Fort Collins Police Services building, 2221 S. Timberline Road. All applications must be received by August 16. For more information on the Explorer Scout program, visit the webpage at http://www.fcgov.com/police/scouts.php or e-mail explorers@fcgov.com. Coffee with the Chief The second Coffee with Chief Hutto community outreach activity was held at Starbucks in the Scotch Pines Shopping Center on Thursday, July 18, with many people stopping by for an informal chat with the Chief. The next Coffee with Chief Hutto will be held Friday, August 16, from 10–11 a.m. at Dazbog, 401 Mason Court. This is a monthly event that will be held at different coffee shops through the end of the year. Police Investigate Pedestrian Collision A 14-year-old teen rollerblading on John F. Kennedy Parkway near Boardwalk Drive was hit by a car on July 26 and transported to the hospital for treatment of serious injuries. The teen was struck by a 2001 Lincoln sedan driven by an 89-year-old Fort Collins resident as he crossed the street in front of the vehicle. He was not in a marked crosswalk and was not wearing a helmet. The driver was not injured. 22 Charges Filed in Officer Involved Collision Fort Collins police have concluded the investigation into the June 6 collision involving Fort Collins Police Officer Biberos and presented their findings to District Attorney’s Office (DA) for review. The DA concluded Officer Biberos may have committed a traffic infraction, which is not prosecutable by their office. Officer Biberos was cited for failing to yield the right-of-way to a pedestrian in the crosswalk. Ms. Cruz was cited for riding a bicycle between sunset and sunrise without a headlamp. Both traffic infractions were filed in Fort Collins Municipal Court. Police do not believe alcohol or speed contributed to the collision. There was no evidence Officer Biberos was distracted by his cellular phone, police radio or laptop at the time of the collision. Officer Biberos returned to his normal patrol duties on June 12, 2013. Police Investigate Fraudulent Utility Collection Calls Fort Collins police are investigating several reports of suspicious collection calls from an unknown suspect(s) to Fort Collins Utilities’ customers stating their account was delinquent and demanding immediate payment or their utilities would be disconnected within 30 minutes. The intended victims were instructed to go to a local business and wire money to the suspect in order to prevent their utilities from being shut off. Police have confirmed the suspicious calls were fraudulent and had not originated from City of Fort Collins Utilities’ personnel. Several intended victims reported the suspicious calls came from a phone number with a Colorado Springs prefix (719) which investigators believe were computer generated from a location outside the United States. Please remember the following information should you receive a call related to your City of Fort Collins Utilities account or speak with someone claiming to work for the City of Fort Collins Utilities Department: 1. All calls from City of Fort Collins Utilities to their customers will display the phone number (970) 212-2900 on the customer’s caller identification. 2. Staff from City of Fort Collins Utilities wear City of Fort Collins Utilities uniforms and carry identification paperwork readily available. 3. Payment requests from employees of the City of Fort Collins Utilities department are never demanded within 30 minutes of the call. 4. The City of Fort Collins Utilities Department will never instruct their customers to wire money from a local business to an unknown account. Police Investigate Two Accidental Shootings in Two Days Shortly after 9:00 p.m. on July 29, police responded to a report of a shooting at 517 East Trilby Road and discovered a 24-year old Fort Collins man with a single gunshot wound. The victim was transported by ambulance to the hospital for treatment of serious injuries. Donald Hughes, 28, was taken into custody and later booked into Larimer County Jail on suspicion of one count of Second Degree Assault and one count of Prohibited Use of a Weapon. It appears the shooting was not intentional. In a separate incident on July 30, police received information that a 19-year-old man had been shot in the abdomen by a 16 year-old juvenile while standing near a car in Fossil Ridge Park, 5833 S. Lemay Avenue. Officers located a .22 caliber pistol in the bushes near the vehicle. 23 Interviews at the scene led investigators to believe it was an unintentional shooting. The victim was transported by ambulance to the hospital for treatment of serious injuries. The suspect was taken to the HUB and charged with Second Degree Assault and Possession of a Handgun by a Juvenile. Crime Prevention During July, the Crime Prevention Specialist interacted with 787 people and handled 30 telephone calls. Topics included working with a regional security office on chronic burglar alarms, improving security for the Food Bank of Larimer County, assisting a day care center with facility security, and hosting a crime prevention table at the Woodward Governor Annual Safety Fair and Employee picnic attended by over 675 people. A breakdown of the month’s Crime Prevention activities follows:  Personal Safety, Oakbrook II - 25 attended  Child Safety, Little Bears - 35 attended  RESTORE - 51 attended  Woodward Governor Annual Safety Fair - 675 attended  CPTED, St. Luke’s Day Care - 1 attended Crime Prevention Tip It’s that time of year again when children are getting ready for school. Please take the time to show your children the safe route to school and home again. Whether walking, riding a bicycle or the bus, teach them all the safety rules. Visit the Safe Kids of Larimer County website for information: http://www.safekidslcc.org. 24 POUDRE FIRE AUTHORITY Citations Up, Fireworks Complaints Down over Fourth of July The use of illegal fireworks and complaints this Independence Day was lower than in past years. From June 28 through July 6 (the annual peak of fireworks complaints), the City of Fort Collins saw a 36% reduction in fireworks related complaints and a significant increase in citations and seizure of unlawful fireworks when comparing 2013 numbers to 2011, leading officials to believe education coupled with a comprehensive enforcement approach and zero tolerance was effective. Authorities handed out 30 citations for fireworks violations, said Fort Collins Police Lt. Mike Trombley. The possession and use (without a permit) of fireworks of any kind in the city of Fort Collins is illegal with a violation resulting in a summons into municipal court and a fine of $1,000. Last year was a statistical anomaly, as multiple wildfires roared throughout the State resulting in a statewide fire and fireworks ban skewing comparison data. The City used 2011 as the benchmark year for comparisons netting the following:  2011 - 478 complaints, 7 citations, no tracking on the amount of fireworks seized;  2012 - 99 complaints, 8 citations, 15 lbs. of fireworks seized;  2013 - 308 complaints, 30 citations, over 60 lbs. of fireworks seized. Of the 308 complaints received over the nine days, approximately half came in during a 7-hour period on July 4. Frequently, one fireworks event is called in by several complainants. Evidence is needed to prove the person cited was in possession or discharged the fireworks. Comfort Dental Fire Firefighters responded early morning on July 12 to a report of a possible explosion and fire in a Comfort Dental building. When crews arrived they found a one story, block building with fire coming from two windows on the street side. An aggressive attack was able to knock down most of the fire in five minutes with full control coming about 30 minutes later. A life-safety search was also performed while crews were working to contain the fire. At least two exam and storage areas (slightly less than 25% of the building) suffered heavy fire damage with the remainder incurring heavy smoke damage. Assisting agencies: City of Fort Collins Building Services, Light & Power, Police Services, and Water departments; Fort Collins 9-1-1; PVH/UC Health Emergency Services. PFA investigators are working with Fort Collins Police Services to determine origin and cause. No further information is available. Apartment Fire One firefighter suffered non-life-threatening injuries on July 7 after a ceiling and partial roof collapse during a three-alarm apartment fire. When firefighters arrived they faced a large 25 amount of fire on the exterior and in the attic of the two story, wood-frame apartment building. The fire spread quickly up an exterior wall and into the attic, plus into individual units. With the help of Fort Collins police officers and other residents, all occupants were evacuated safely. In the meantime, firefighters also launched aggressive interior search and suppression efforts in the units most threatened by fire. A defensive fire attack strategy had to be used due to the collapse and pending collapse of the roof and ceilings. Firefighters worked hard to bring the fire under control within one hour. The injured firefighter was transported to Poudre Valley Hospital/UCH, treated and released. The building has eight units that suffered damage: heavy damage to the second floor and roof of two units; light, mostly water and smoke damage, to two units; no damage to the remaining four units. The PFA Customer Assistance Response Team (CART) worked with the Red Cross to provide displaced residents assistance with immediate food, clothing, housing, medication and pet needs. Assisting agencies: City of Fort Collins Police Services, Loveland Fire Rescue Authority, Fort Collins 9-1-1, PVH/UC Health Emergency Services, Red Cross, Wellington Fire Protection District. PFA investigators are working with Fort Collins Police Services to determine origin and cause. No further information is available. Captain Earns Designation Captain Holger Durre has successfully completed the process that awards him the professional designation of “Fire Officer” (FO). The Commission on Professional Credentialing (CPC) met on July 2, 2013, to officially confer the designation upon Captain Durre. Captain Durre is one of only 151 FO’s worldwide. The CPC awards the FO designation only after an individual successfully meets all of the organization’s stringent criteria. The process includes an assessment of the applicant’s education, experience, professional development, technical competencies, contributions to the profession and community involvement. In addition, all applicants are required to identify a future professional development plan. The FO designation program uses a comprehensive peer review model to evaluate candidates seeking the credential. The Commission on Professional Credentialing, an entity of the Center for Public Safety Excellence, Inc., (CPSE) administers the FO Designation Program. The CPSE consists of individuals from academia, federal and local government, and the fire and emergency medical services profession. To learn more about CPC, visit www.publicsafetyexcellence.org. Captain Durre has been a member of PFA for 13 years and currently is the Accreditation Manager. 26 Incident Statistics (by category) Report Period: July 2013 Total Loss Fires 40 $534,380 Overpressure/rupture, explosion-no fire 2 Rescue / EMS 1,113 Hazardous Condition - no fire 27 Service Call 57 Good Intent Call 103 False Alarms / False Calls 109 Severe Weather & Natural Disaster 1 Special Incident Type 2 Total = 1,454 YEAR-TO-DATE 2013 Total Loss Fires 240 $2,219,681 Overpressure/rupture, explosion-no fire 8 Rescue / EMS 7,124 Hazardous Condition - no fire 212 Service Call 434 Good Intent Call 718 False Alarms / False Calls 703 Severe Weather & Natural Disaster 1 Special Incident Type 17 Total = 9,457 Comparison: July 2012 Total Loss Fires 24 $344,800 Overpressure/rupture, explosion-no fire 0 Rescue / EMS 1,155 Hazardous Condition - no fire 33 Service Call 68 Good Intent Call 107 False Alarms / False Calls 110 Severe Weather & Natural Disaster 0 Special Incident Type 2 Total = 1,499 Comparison: YEAR-TO-DATE 2012 Total Loss Fires 240 $6,297,946 Overpressure/rupture, explosion-no fire 8 Rescue / EMS 7,124 Hazardous Condition - no fire 212 Service Call 434 Good Intent Call 718 False Alarms / False Calls 703 Severe Weather & Natural Disaster 1 Special Incident Type 17 Total = 9,457 *Information subject to change due to updated data. 27 BUILDING ACTIVITY COMMUNITY DEVELOPMENT & NEIGHBORHOOD SERVICES 2012 YTD 2013 YTD % Change Development Project Submittals Received 182 217 + 19% Conceptual/Staff Reviews Performed 107 166 + 55% Building Permits Issued 4,461 3,842 -14% Building Inspections Performed 17,458 18,349 +5% Plan Reviews Performed 1,157 1,313 +13% General Fund Development Review revenues are approximately $800,000 above projections for 2013 as of July 31. Development Projects of Note  Link-N-Greens/Woodward – Phase 1 Final Plans for overlot grading have been approved and recorded. Clearing and grading site work is expected to commence as early as next week.  Foothills Mall Redevelopment – Final plans were submitted and reviewed on June 5. A second round of review is required. There has been no further movement on this project.  Approved projects that submitted final plans during the past month: o Prospect Station – July 3, 2013 o Stoner Subdivision – July 3, 2013 o LDS Temple – July 10, 2013 Construction Projects of Note  New 13,728 square foot greenhouse building for Cargill. Other Items of Note  Lincoln Corridor Project – Staff and consultant team are finalizing a summary of public input received at the vision outreach sessions together with a draft vision document. The process to assess design alternatives for the corridor is starting, with the next community engagement event scheduled for mid-September.  Urban Agriculture – Code changes were adopted on 2 nd reading on July 16. Staff is beginning to implement these changes by (1) working with CSU to develop the research study on Q fever for goats; (2) meeting with CSU, the Humane Society, and other staff to implement the animal licensing portion of the code changes; and (3) developing a workshop on goats for the Sustainable Living Fair that will be held September 14-15. The next phase of code changes will include allowing hoop houses for year-round growing and developing standards for raising farm animals in the zone districts where they are allowed. 28  Oil & Gas – On July 16, City Council discussed the existing moratorium on accepting oil and gas permits and declined to extend it beyond the July 31, 2013 termination. Options discussed included a 7-year extension and an extension to December 31, 2013. Staff has been working on securing technical assistance to assess the Prospect Energy Operator Agreement terms and securing a contractor capable of doing ongoing monitoring at oil and gas sites within Fort Collins. Staff is developing communication pieces for the website and distribution to interested parties explaining the Operator Agreement term and the status of the oil and gas project. Staff is also working on Land Use Code revision options for oil and gas and looking to bring those to the public, Boards and Commissions, and eventually Council in late 2013. The public discussions of oil and gas will be scheduled so as not to interfere with the citizen initiative on a five-year oil and gas moratorium.  Award – The City is receiving an American Association of State and Local History (AASLH) Leadership Award of Merit for the restoration of the Coca-Cola Sign on East Mountain Avenue. The AASLH Leadership in History Awards, now in its 68th year, is the most prestigious recognition for achievement in the preservation and interpretation of state and local history. The award ceremony is part of a special banquet, hosted by The History Channel, during AASLH’s annual meeting in Birmingham, Alabama, on Friday, September 20.  Exterior Property Maintenance Code – City Council directed staff to move forward with first phase code amendments that include enforcement of deficient buildings and excessive outdoor storage in public view as well as the development of a vacant/ dangerous building registry. These items are scheduled to go to City Council for formal consideration on September 13, 2013.  Smoking Ordinance – Staff will be receiving direction from City Council at the August 13, 2013 work session regarding whether the City’s smoking ordinance should be expanded to prohibit smoking in certain outdoor public places. Development Projects under Appeal  None