ISSUES BEFORE COUNCIL
URA Debt Refinance .................................................................................................................2
URA North College Storefront Improvement Program ............................................................2
Council Retreat Follow-up .........................................................................................................2
Harmony Road Enhanced Travel Corridor Plan ......................................................................2
Annual Land Use Code Update ................................................................................................3
Boards and Commissions Periodic Review ...............................................................................3
Amendment 64 Retail Marijuana ...............................................................................................3
ECONOMY
Fort Collins Sales and Use Tax ..................................................................................................4
CAPITAL PROJECTS
Harmony Road Maintenance – College to Timberline ..............................................................5
Citywide Pedestrian Access Project...........................................................................................5
South Shields Street Bridge over Larimer Canal No. 2 .............................................................6
Mulberry Bridge at the Poudre River Enhancements ................................................................7
West Mulberry Bridge Replacement Design .............................................................................7
West Prospect Bridge Replacement Design ..............................................................................7
Bryan Bridge Replacement ........................................................................................................8
Arthur Ditch at Mountain Avenue and at Myrtle Street ............................................................8
Westbury and Shields Improvements ........................................................................................8
Troutman Underpass ..................................................................................................................9
Spring Creek (NRRC) Overpass ..............................................................................................10
Mason Corridor MAX Bus Rapid Transit Project ...................................................................10
Utilities Capital Projects .................................................................................................... 11-16
COMMUNITY EVENTS ...........................................................................................................17
PUBLIC SAFETY UPDATE
Police Services ................................................................................................................... 18-21
Poudre Fire Authority ........................................................................................................ 21-23
BUILDING ACTIVITY ........................................................................................................ 24-25
2
ISSUES BEFORE COUNCIL
June 18 Regular Meeting
URA Debt Refinance
The City is owed $16.2 million in loans to the URA.
Investments in the North College Plan area are now generating Property Tax Increment
revenue of $1.3 million annually. Investors buying the debt will offer better terms now
that there is an established and ‘proven’ revenue stream.
Investor/lenders require a debt reserve fund and coverage ratio of at least 125% to ensure
the URA can repay the debt.
Staff anticipates about $11 million of the $16.2 million can be refinanced.
The Council Finance Committee reviewed the preliminary refinancing proposal on
December 17, 2012 and again on May 20, 2013.
URA North College Storefront Improvement Program
Council will consider a Resolution formally approving the Storefront Improvement
Program for the North College Urban Renewal Area.
The purpose of the Program is to encourage the voluntary rehabilitation of commercial
buildings, improvements and conditions within the North College Urban Renewal Area
by offering financial assistance to property owners and/or business tenants seeking to
renovate or restore their commercial storefronts and/or building façade.
June 25 Work Session
Council Retreat Follow-up
The Fort Collins City Council met on May 3 and 4 to conduct their annual planning
retreat.
A primary purpose of the retreat was to review the City’s Strategic Plan and the City Key
Initiatives for the next 12 to 24 months.
Information from the Retreat Final Report is being reviewed by the City Manager and
staff.
The purpose of the June 25 Work Session is to determine the Work Plan/Key Initiatives
for the Council’s term of office (2013-2015).
The review and discussion will focus on the City’s seven Key Outcomes: Economic
Health, Environmental Health, Safe Community, Community and Neighborhood
Livability, Culture and Recreation, Transportation, and High Performing Government.
Council’s questions, comments and suggested revisions about the Key Initiatives in each
of the Key Outcomes will be addressed.
July 2 Regular Meeting
Harmony Road Enhanced Travel Corridor Plan
This study is looking to define the next evolution of Harmony Road, with improvements
for bicycling, walking and high capacity transit service, all while maintaining a high level
of service for cars.
A draft Locally Preferred Alternative (LPA) has been developed as a result of the study
effort over the last year, including recommendations for all modes.
3
Annual Land Use Code Update
This is a request for a Recommendation to City Council regarding the annual update to
the Land Use Code. There are proposed revisions, clarifications and additions to the
Code that address a variety of subject areas that have arisen since the last annual update
in 2012.
There are 26 proposed items that change, clarify or add to the Land Use Code. The
revisions, by Article, are summarized as follows:
o Article One: Organization – one change;
o Article Two: Administration – four changes;
o Article Three: General Development Standards – nine changes;
o Article Four: Districts – seven changes;
o Article Five: Definitions – five changes.
July 9 Work Session
Boards and Commissions Periodic Review
Each year Council meets with several boards and commissions to review their functions
and goals.
Council will be reviewing the Human Relations Commission, the Planning and Zoning
Board, the Women’s Commission, and the Zoning Board of Appeals for this year’s
Periodic Review.
Amendment 64 Retail Marijuana
Staff will provide an update on medical marijuana and our local businesses.
The voters approved Amendment 64 in November and the State legislature has recently
passed three bills related to recreational marijuana.
Amendment 64 gives local jurisdictions three options regarding retail marijuana
businesses:
o Prohibit by ordinance;
o Refer a prohibition question to the voters (November 2014); or
o Impose local restrictions on retail establishments.
Staff will be seeking Council direction on these options.
4
ECONOMY
FORT COLLINS SALES AND USE TAX
April 2013
Sales tax collections increased 2.5%
Use tax collections excluding rebates decreased 14.8%
Sales and use tax collections excluding rebates decreased 0.6%
2013 YTD
Sales tax collections increased 3.8%
Use tax collections excluding rebates increased 6.4%
Sales and use tax collections excluding rebates increased 4.2%
Capital Expansion Fee Revisions
In the fall of 2012, Finance staff initiated a comprehensive review of the Capital Expansion Fees
that were first implemented in 1996. The goal of the review was to ensure that the methodology
first implemented was still applicable and to assess the fee structure using current asset data.
Staff contracted with Duncan Associates, a nationally known firm that specializes in impact fees,
to assist with the fee study.
Fees included in the study are:
Neighborhood Parks
Community Parks (Including a new Trail Impact Fee)
Fire
Police
General Government
Staff presented the information at a February Work Session. Direction was given to do
additional public outreach and further vet the topic. Council will review the findings of the study
and the feedback from the public outreach and determine if there is interest in proceeding with
the fee updates.
5
CAPITAL PROJECTS
(new information noted in blue text)
ENGINEERING
HARMONY ROAD MAINTENANCE – COLLEGE TO TIMBERLINE
Funding Source: Harmony Maintenance Fund and Building on Basics (BOB) Funds
Estimated Project Budget: $2.5 million
Status: On Budget, On Schedule
Phase Two of the project will consist of safety
improvements and signal upgrades at the
Harmony Road and Union Pacific Railroad
crossing. The existing railroad equipment does
not meet the current code requirements for a six
lane roadway crossing.
The City and Union Pacific have executed all
necessary Construction After Union agreements. Pacific started installs in May. their new facilities,
the City will have some minor asphalt patching
and striping work to do adjacent to the crossing.
Harmony Road will then be a six-lane roadway
from The project Boardwalk website to I-is 25. located at the following link.
http://www.fcgov.com/engineering/hmp.php
CITYWIDE PEDESTRIAN ACCESS PROJECT
Funding Source: KFCG Funds
Estimated Project Budget: $450,000
Status: On Budget, On Schedule
The City of Fort Collins Pedestrian Plan addresses citywide pedestrian needs, and is a
data-driven approach based on the importance of safe, sustainable walking within City
limits. However, it lacked comprehensive condition data for the City’s sidewalk system.
Prior to the beginning of the Pedestrian Needs Assessment project, there was not an
inventory of existing sidewalks or sidewalk deficiencies. This project provides a
complete City sidewalk inventory, identifies sidewalk inadequacies, and identifies
inadequate handicap accessibilities according to Americans with Disabilities Act (ADA)
requirements.
Data collection has been completed with approximately 540 street miles of sidewalk
assessed and inventoried at this time.
37,675 accessible ramps have been identified as acceptable, substandard, or missing in
accordance with the ADA requirements.
Staff is implementing a program to determine the level of service for sidewalks. Route
events have been created and staff is uploading the data into the software.
6
Staff has reviewed and updated the pedestrian needs map with the 2012 departmental
street repair data, and is reviewing 2013 current street repair work.
Staff has implemented a methodology and analysis program used to prioritize pedestrian
projects. This program takes into account a variety of factors such as, but not limited to,
demand, corridor function, and high priority areas.
Staff has identified approximately 30 projects for 2013 and has begun to collaborate with
various departments to prioritize those projects. Construction began in May.
o New project: Collaborating with Transfort for Mall Transfer Point sidewalk
reconstruction scheduled to begin June 3.
o New project: Collaborating with Utilities to install a missing sidewalk section
along the west side of Landings Drive just south of Spinnaker; scheduled to begin
June 10.
o City Park projects are anticipated to begin construction July 8.
o Upcoming project locations scheduled are to include Cherry, Linden, Wagner,
Vermont, and Lemay.
SOUTH SHIELDS STREET BRIDGE OVER LARIMER CANAL NO. 2
Funding Source: Colorado Off System Bridge Program (BRO) Funds and KFCG 2011
Estimated Project Budget: $1.5 million
Status: On Budget, On Schedule
The main goal of this project is to replace the
second worst rated, structurally deficient bridge in
the City.
Construction will include the removal of the
existing structure, the construction of a new
structure, relocation and upgrading of existing
utilities, and the construction of urban design
features. The new bridge will be similar in size to
the existing bridge.
The project will be constructed in phases, starting
on the east half of the structure, followed by the
west half. During construction, traffic lanes will
be reduced to one lane in each direction. Bicycles
will be asked to merge with traffic or find alternate routes. Pedestrian access will always
be available during the duration of the project.
Nearly all roadway and sidewalk improvements on the west half of the structure are
complete. Work on the urban design elements has begun, including construction of
decorative columns. All work within the ditch has been completed.
Substantial completion is expected in mid-June, with Final Acceptance anticipated
shortly thereafter.
Additional project information and information on planned roadway closures can be
found at http://www.fcgov.com/engineering/shields-bridge.php
7
MULBERRY BRIDGE (SH 14) AT THE POUDRE RIVER ENHANCEMENTS
Funding Source: City of Fort Collins
Estimate Project Budget: $750,000
Status: On Budget, On Schedule
Colorado Department of Transportation (CDOT)
is replacing the Mulberry Bridge (State Highway
14) over Poudre River Bridge starting in the fall
of 2013.
Due to the construction, eastbound traffic on
Mulberry will be detoured for approximately 18
months.
The City is working with CDOT to add City-
funded enhancements to the bridge including
decorative railings, landscaping and urban design
features.
WEST MULBERRY BRIDGE REPLACEMENT DESIGN
Funding Source: Colorado Off System Bridge Program (BRO) Funds and KFCG 2011
Estimated Project Budget: $1.1 million
Status: On Budget, On Schedule
The goal of the project is to replace the existing
structurally deficient bridge with a new bridge
that meets the current standards.
The posted weight limit on this bridge precludes
the passage of emergency vehicles from the
nearby fire station.
In December 2011, the City received a grant for
$700,000 in Colorado Off System Bridge
Program (BRO) funds for some of the
construction cost.
Design efforts are underway and will be complete
by this fall. Construction is planned for fall 2014.
WEST PROSPECT BRIDGE REPLACEMENT DESIGN
Funding Source: KFCG 2011
Estimated Project Budget: $1.2 million
Status: On Budget, On Schedule
The goal of the project is to replace the existing
structurally deficient bridge with a new bridge
that meets the current standards.
The State of Colorado inspected this bridge in
March 2011 and found significant structural
issues resulting in a temporary plate being
installed and load posting restricted to 15 tons.
8
Design efforts are underway and will be completed by summer 2013.
BRYAN BRIDGE REPLACEMENT
Funding Source: Colorado Off System Bridge Program (BRO) Funds, City Bridge &
KFCG Funds
Estimated Project Budget: $1 million
Status: On Budget, On Schedule
The goal of the project is to replace the existing
structurally deficient bridge with a new bridge that
meets the current standards.
The posted weight limit on this bridge precludes
the passage of emergency vehicles from the nearby
fire station.
The City received a grant for $552,000 in Colorado
Off System Bridge Program (BRO) funds to cover
some of the project cost.
Construction is planned for fall 2013.
A three week full closure is planned for Phase 1 of
the construction.
ARTHUR DITCH AT MOUNTAIN AVENUE AND AT MYRTLE STREET
Funding Source: KFCG Funds
Estimated Project Budget: $750,000
Status: On Budget, On Schedule
Replacement of two load posted Arthur Ditch
bridges.
Full closure is planned for removal of existing
bridges and the construction of the replacement
bridges. Construction will begin fall 2013.
Access manholes will be added to the new bridges
for safety.
WESTBURY AND SHIELDS IMPROVEMENTS
Funding Source: Building on Basics (BOB) Funds along with Xcel Energy contributions
Estimated Project Budget: $650,000
Status: On Budget, On Schedule
The goal of this project is to relieve traffic congestion and vehicle wait time by
constructing an additional northbound travel lane on Shields from Clarendon Hills to
Westbury.
9
The need for this safety and operational
improvement was identified in the Engineering
Department’s recently completed Arterial
Intersection Prioritization Study. The lane
addition on Shields will improve traffic flow by
relieving congestion for northbound traffic,
whereby the outside lane will act as a right turn
lane during the peak hours and a through lane
during the off-peak hours.
The proposed improvements will reduce the
morning peak-hour delay by 18%.
Xcel Energy will be constructing its West Main
Natural Gas Pipeline Replacement Project
through this area. The roadway improvements
will be coordinated with Xcel’s schedule.
Southbound Shields has existing curb and gutter along this stretch of roadway. The
project will patch two locations southbound, and place a 2-inch asphalt overlay over the
entire roadway with new striping.
We anticipate the work being completed in the summer of 2013.
The final product will reshape Shields Street to a four-lane arterial with a center left turn
lane and on-street bike lanes from Harmony Road to Clarendon Hills Drive
(approximately 0.5 miles).
A public outreach communication plan is being developed and will be implemented with
the final design through construction.
The project website is available on the Engineering homepage at
http://www.fcgov.com/engineering/shields-westbury.php
TROUTMAN UNDERPASS
Funding Source: Federal Congestion Mitigation and Air Quality (CMAQ) Grant and
Building on Basics (BOB) Funds
Estimated Project Budget: $1.5 million
Status: On Budget, On Schedule
The goal of the project is to construct a new
pedestrian/bike underpass that will link the Mason
Bike Trail to Troutman Road.
Steel railing, fencing, and electrical lighting are
currently being installed.
The underpass concrete and railing were painted
in May 2013 when overnight temperatures
allowed for proper paint curing.
10
SPRING CREEK (NRRC) OVERPASS
Funding Source: Federal Congestion Mitigation and Air Quality (CMAQ) Grant and
Building on Basics (BOB) Funds
Estimated Project Budget: $2.75 million
Status: On Budget, On Schedule
The goal of the project is to construct a new
pedestrian/bike overpass that will link the Mason
Bike Trail and the federal campus on the west
side of the railroad tracks to the Mason Corridor
MAX Bus Rapid Transit (BRT) station on the east
side of the tracks.
All approvals and clearances have been obtained.
Staff has redesigned the project with ramps
instead of elevators.
The proposed schedule is to complete
construction by May 2014 in conjunction with the
opening of the MAX BRT.
MASON CORRIDOR MAX Bus Rapid Transit (BRT) PROJECT
Funding Source: FTA 80%, Local Match (CDOT SB-1, CDOT FASTER, City, and
Downtown Development Authority) 20%
Estimate Project Budget: $87 million
Status: On Budget, On Schedule
Construction work located on Swallow Road was completed on schedule and is now
open. The scope of work included drainage, conduit, sidewalk, concrete pavement, and
curb and gutter placement.
McClelland south of Foothills Parkway is now open as crews completed the replacement
of the box culvert at the Larimer #2 canal.
Installation of the Sherwood lateral box culvert has been completed south of Spring
Creek at Johnson Drive.
Station construction has begun at the Laurel Northbound Station.
Station structures were set at Drake, Horsetooth, Laurel Northbound and Mulberry
Northbound.
Crews continue to work on the aesthetic detailing for the Downtown Transit Center
Station, northbound Mountain Station, southbound Mountain Station, southbound
Mulberry Station and Olive southbound station.
Station work continues in various stages at Harmony, Troutman, Horsetooth, Swallow,
Drake, University, Mulberry, Olive, and Mountain.
CEI crews continue to make progress on the drainage installation throughout the project
area.
Conduit installation for the MIS duct bank is also ongoing and approximately 296 feet
have been installed this month.
Construction for the super-structure of the bridge at Mail Creek continues to advance
with backfilling of abutments and rebar installation for the approach slabs. The bridge
deck was placed in May.
11
Growling Bear continues construction of the South Transit Center including detention
pond grading, utilities, installation of structural concrete columns and beams, and
structural steel framing.
Heath Construction continues work on the Maintenance Facility Expansion with interior
building work, site work and relocation of utilities. The building has been erected and the
interior concrete floors placed.
UTILITIES (project location maps will be provided next month)
WEST VINE OUTFALL CHANNEL
Project Description: This is a joint project between the City and Larimer County to design and
construct a stormwater outfall channel for the West Vine Basin to the Poudre River. The project
is being coordinated with Larimer County’s widening of Shields Street from the Arthur Ditch to
Willox.
Project Status: Alternative Analysis Phase completed; negotiating with land owners.
Anticipated Completion Date: Preliminary design underway; construction in the fall
Ahead/Behind/or on Schedule: On Schedule
Total Project Budget: Alternatives Analysis Phase ($104,000); Final Design ($243,000); Total
Project Cost $2.4 Million
Budget Status: $219,000 spent to date. Project is within budget.
Highlights:
Cost estimates of alternatives have been developed.
The two property owners (Arnett and Scott) have been presented with a proposal to
purchase land for the project.
Working on collaboration with Natural Areas.
Preliminary Design for the Water Quality area north of Vine Drive and the Outfall to the
Poudre River has begun.
Currently working on the Intergovernmental Agreement for construction with Larimer
County.
Purchase Agreements for Land Acquisition from Arnett and Scott nearly complete.
WASTEWATER COLLECTION SYSTEM - SMOKE TESTING
Project Description: This project will identify defects in the sanitary sewer system that lead to
excess flow at the wastewater treatment plant. The project involves blowing smoke into
manholes in the area of concern and identifying locations where smoke comes to the surface.
Measures will be taken to minimize the risk of smoke entering homes and businesses. Flow
monitoring data since 2009 was used to identify areas throughout town that should be tested for
possible defects.
Project Status: The testing is planned to start in mid-March.
Anticipated Completion Date: Ongoing
Ahead/Behind/or on Schedule: On Schedule
Total Project Budget: The project is being conducted with City staff.
Budget Status: Budget is minimal other than staff time.
12
Highlights:
Flow monitoring has been conducted for the majority of the system since 2009.
Smoke Testing plan for the spring of 2013 has been developed.
A public relations plan is being developed.
The neighborhood surrounding Irish Elementary was tested the week of March 25.
North College sub-basin was tested during the week of April 1.
LAPORTE AVENUE TRANSMISSION MAIN REHABILITATION
Project Description: Decommissioning of Utilities’ 27-inch water transmission main in LaPorte
Avenue between Grandview Avenue and the pressure relief vault at Impala Street. LaPorte
Avenue is scheduled for paving west of Taft Hill Road by the Streets Department in the summer
of 2013. The project involves removing services and distribution lines from the 27-inch steel
line and tapping them into the 27- inch concrete line. The steel main will then be cut, drained and
plugged.
Project Status: Project started construction May 2013
Anticipated Completion Date: Work to be completed by July 15, 2013.
Ahead/Behind/or on Schedule: On Schedule
Total Project Budget: $425,000.00
Budget Status: On Budget
Highlights:
• Entire 27-inch steel main between PRV and Grandview Avenue to be abandoned by mid-
summer 2013.
WEST VINE SLIPLINING
Project Description: Sliplining of the 27-inch steel transmission main with 12-inch HDPE
between 48-inch steel waterline north of Vine Drive and 8-inch distribution main in Sunset
Court. The new 12-inch HDPE line will also be connected to the new 12-inch and existing 6-
inch mains in Vine Drive.
Project Status: Project started in May 2013
Anticipated Completion Date: Work to be completed by July 1, 2013.
Ahead/Behind/or on Schedule: On Schedule
Total Project Budget: $260,000.00
Budget Status: On Budget
Highlights:
• Entire 27-inch steel main between PRV and 48-inch steel waterline to be abandoned by
mid-summer 2013.
42-INCH SANITARY SEWER MAIN AND 12-INCH WATER MAIN RELOCATIONS
AT MULBERRY BRIDGE
Project Description: In order to accommodate the construction of the new bridge over the
Poudre River on Mulberry Street by CDOT, conflicting utility lines must be relocated. At
CDOT expense, the 42-inch sanitary sewer main and the 12-inch water main will be relocated to
the north to a location that will not conflict with the new, wider bridge. The project will include
13
the relocation design, permitting, and relocation construction necessary to remove the utility
lines from conflict with the new bridge.
Project Status: On schedule. Intergovernmental Agreement for both design and construction
phase in place. Project funded by CDOT.
Anticipated Completion Date: June 15, 2013.
Ahead/Behind/or on Schedule: 1 month behind schedule due to wet spring weather conditions.
Total Project Budget: $942,000
Budget Status: Within budget
Highlights:
Water, sewer, communications conduit, and power conduit constructed through the river.
Project crew was able to save the project money by placing the electric and
communications conduits in the 42-inch sewer encasement.
Project design and construction using Utilities Alternative Product Delivery System
approved by CDOT.
Relocation of large utility mains under the Poudre River presents numerous engineering
and construction management challenges.
There are many existing utility conflicts and relocations required to allow for the new 42-
inch sewer and the 12-water main.
BOX ELDER CREEK OUTFALL IMPROVEMENTS
Project Description: Large, regional flood control project to be designed and constructed under
Intergovernmental Agreements with Timnath Development Authority and Boxelder Basin
Stormwater Authority. Project involves channel grading and road crossing improvements from
I-25 to the Poudre River along the Boxelder Creek Corridor.
Project Status: Engineering contract in place. Conceptual level cost estimate in preparation.
Preliminary Design: May 2013 – October 2013
CLOMR Submittal: October 2013
Right of Way Requirements: May 2013 – June 2014
Final Design and Permitting Requirements: October 2013 – April 2014
Construction: July – December 2014
Anticipated Completion Date: December 30, 2014
On Schedule: On Schedule
Total Project Budget: $2,900,000
Budget Status: Within Budget
Highlights: Scope of work for preliminary design in place
CATHODIC PROTECTION OF WATER TREATMENT AND TRANSMISSION AND
DISTRIBUTION SYSTEM WATER LINES
Project Description: Investigation of existing systems in place used to protect water lines from
corrosion; design of rehabilitation of existing and new systems to prevent corrosion; and
construction of modified and new systems.
Project Status: On Schedule.
Anticipated Completion Date: This is an ongoing project
Ahead/Behind/or on Schedule: On schedule
Total Project Budget: $552,000 (2013)
14
Budget Status: Within Budget
Highlights:
Working with consultant and contractor on testing current cathodic protection levels and
locations, and installing modified and new systems where needed.
Modified the cathodic protection test sites on the raw water line going into the treatment
plant in March 2012.
Took readings and conducted continuity testing of AB line, Mulberry, Lemay, and
Lincoln lines.
Designing rectifiers and locations for rectifiers along the AB line and at the WTP.
Prepared legal exhibits and obtaining easements for the rectifier locations along the AB
line.
Obtained contractor work order for cathodic protection work in preparation for anode and
rectifier installation at the WTF.
Meeting with other water districts to discuss cathodically bonding to their systems which
cross the City’s system.
Working with contractor on costs to install rectification system in order to determine
budget needed for 2013 and 2014.
Anode ground beds and rectifiers to be installed starting mid-July at the WTP.
BUS RAPID TRANSIT (BRT) WATER AND SEWER RELOCATES
Project Description: Relocation and protection of major water and sewer utility lines due to the
construction of the BRT.
Project Status: Utility projects complete; working on administrative issues, including invoices,
Buy America requirements, and completion reports.
Anticipated Completion Date: Winter 2011 – Fall 2013; Utility project work completed
Ahead/Behind/or on Schedule: Ahead of schedule; project work complete March 2013
Total Project Budget: $1,250,000
Budget Status: Within Budget
Highlights:
All Utilities impacted by the BRT have been identified and cost estimates were
developed.
Coordination with the BRT continues.
Contract for design services completed; construction contracts for all identified projects
in effect.
Council approved reallocation of water and wastewater budget.
Completed Prospect water line move and sanitary sewer replacements.
Water Utility work in Prospect completed the second week in March.
Utility administrative (invoices and other paperwork) work in progress.
STREAM REHABILITATION AND ENHANCEMENT PROGRAM
Project Description: Stream restoration and habitat enhancement across City including
stabilizing stream channel morphology, restoring/creating new native in-stream and riparian
habitat to attract and support native fish and wildlife populations, and promote BMPs to improve
water quality. First watershed in program is Fossil and Mail Creek.
Project Status: Working with consultant on design.
15
Anticipated Completion Date: First project design to be complete by fall 2013 with
construction to begin fall of 2014.
Ahead/Behind/or on Schedule: Project on schedule
Total Project Budget: $600,000 each year
Budget Status: Within Project Budget
Highlights:
Conducted several vision meetings and site visits.
Met with Corps of Engineers representative to discuss Individual Permit requirements;
may conduct “Threatened and Endangered Species” survey and other items which will
not fit timeframe for construction this fall, so preliminarily scheduled for fall 2014.
Conducted vision charette in February.
Draft Vision report complete, sent to appropriate interested parties.
Working on design with contractor and consultant.
RIGDEN WATER STORAGE RESERVOIR
Project Description: The project will consist of the construction of a gravel pit water storage
reservoir to include a pump station and associated piping. The project is located northeast of the
Ziegler Road and Horsetooth Road intersection. Purpose of the storage is to retime flows to
meet water rights return flow obligations and meet augmentation requirements. Project is a
cooperative effort with Natural Areas and Parks.
Project Status: On Schedule
Anticipated Completion Date: Design complete in 2013; construction in 2014
Ahead/Behind/or on Schedule: On Schedule
Total Project Design Budget: $336,112
Total Project Construction Budget: $9,500,000
Budget Status: Preliminary Design is complete; final design has begun.
Highlights:
Anderson Consulting is preparing the final design.
City Attorneys are preparing the draft purchase agreement.
Acquisition costs are finalized.
Cost estimate and schedule are being updated.
The size of the reservoir is being increased from 1400 ac/ft to 1970 ac/ft.
PLEASANT VALLEY PIPELINE FOREBAY SEDIMENTATION POND
Project Description: Design and construction of a Sedimentation Pond at the turnout structure
for the Pleasant Valley Pipeline, to remove sedimentation from Poudre River raw water before it
goes into the pipeline. The unusual sedimentation load is being caused by the effects of the High
Park Fire.
Project Status: Phase I construction, work that would be affected by the use of the Munroe
Canal, is substantially complete as of March 31. Phase II construction began March 15 and will
continue until mid-June.
Anticipated Completion Date: Phase I – April 1 2013; Phase II – June 2013
Ahead/Behind/or on Schedule: On Schedule
Total Project Budget: $1,700,000
Budget Status: On Budget
16
Highlights:
Selected Ayres Associates on February 5, 2013 as consultant for the design and
construction administration phases.
Executed Permission to Enter document with property owner, Northern Colorado Water
Conservancy District.
Phase I design completed February 25, 2013; issued Notice to Proceed to Hydro
Construction. Began mobilization.
Excavated to pond bottom and constructed embankment surrounding pond.
Excavated for and constructed inlet structure and backfilled.
Installed slide gates at inlet structure.
Cut new gate opening in existing PVP inlet structure and installed new 3’ x 9’ RCBC at
opening.
Graded pond bottom in preparation for footers/slab segments.
Installed 9’ x 3’ RCBC pond outlet and backfilled.
Installed perimeter drain and dry manhole drain.
Formed and poured weir wall structure.
Installed concrete footers, slab segments and knee walls on north, east and south sides of
pond. Concrete work approximately 1/3 complete.
Completed all concrete work, including floor slab, knee walls, inlet structure and truck
ramp.
Caulked all construction and expansion joints in floor slab and knee walls.
Soil pond slopes have been cut, graded and finished for installation of polyethylene liner.
Finished connections of the perimeter drain.
Site mostly rough graded, including sludge drying ramp and impoundment area.
WATER TREATMENT FACILITY YARD PIPING MODIFICATIONS
Project Description: Design and construction of a new 48-inch diameter steel, raw water
pipeline to replace the aged 30- and 36-inch Horsetooth raw water pipelines, and a new 36-inch
diameter steel backwash pump station influent line to replace the existing cast iron pipeline.
Both of these pipelines have shown damage due to electrolysis. The finished water backwash
influent line is also located under an existing sludge drying pond, increasing the possibility of
cross contamination.
Project Status: Kicked off design May 2013.
Anticipated Completion Date: Design scheduled to be complete by September 2013;
construction will follow in October 2013.
Ahead/Behind/or on Schedule: On Schedule
Total Project Budget: $1,550,000
Budget Status: On Budget
Highlights:
Selected design engineer, CH2M HILL ENGINEERS, and contractor, Hydro
Construction Company.
Executed design contract with CH2M HILL.
Design Kickoff meeting held May 1, 2013.
Gathering information and evaluating alternative alignments.
17
COMMUNITY EVENTS
Fort Collins Studio Tour & Preview Exhibition
Location: Lincoln Center, 417 W. Magnolia
Date/Time: Friday, June 14, 2013 10:00 AM
Details: The Fort Collins Studio Tour is a free, self-guided tour of over 40 local artist studios on
Saturday, June 22nd and Sunday, June 23rd, 10am-5pm, both days. Meet the artists and
learn about their artistic process. You’ll also have the opportunity to purchase artwork
directly from the studios. Visit the Lincoln Center Art Galleries from June 14 - 29 to
view sample artwork by each of the artists on the tour and pick up a free map to all the
studios.
Opening Reception: Friday, June 14th, 5-7 p.m.
Gallery hours are Tuesday–Friday 10 a.m. – 6 p.m., Saturday 12 – 6 p.m., and evenings
during most theatre performances at Lincoln Center.
Free maps are available at the Lincoln Center, Gardens on Spring Creek, Senior Center,
Northside Aztlan Center, and the Poudre River Libraries.
Web address: http://www.fcgov.com/studiotour
Contact Information: Jeanne Shoaff
Phone: (970) 416-2737; E-mail address: jshoaff@fcgov.com
Natural Area Adult Night Walk
Location: Location provided at registration
Date/Time: Sunday, June 23, 2013 8:00 PM
Details: Adults and accompanied children 16 and older experience a quiet walk with information
about the night, and time for reflection in the moonlight. Dress warmly, bring water.
Two miles, easy. REGISTRATION REQUIRED at https://naturetracker.fcgov.com
Web address: http://www.fcgov.com/naturalareas
Contact Information: Deborah Price
Phone: 970-416-2815; E-mail address: naturalareas@fcgov.com
Poudre River Projects Open House
Location: Lincoln Center, 417 W. Magnolia, Canyon West Room
Date/Time: Wednesday, June 26, 2013 4:00 PM
Details: Over 25 City-sponsored projects along the Cache La Poudre River corridor will be
happening soon! Come learn about them all, and give your feedback at this interactive
open house.
Contact Information: Zoe Whyman, Natural Areas Community Relations Manager
Phone: 970-221-6311; E-mail address: zwhyman@fcgov.com
To view the full calendar of events, visit http://www.fcgov.com/events/
18
PUBLIC SAFETY UPDATE
FORT COLLINS POLICE SERVICES
Call Load
In May 2013, officers responded to 9,000 incidents resulting in 1,755 cases compared to 9,215
incidents and 1,760 cases for the same period last year. Year-to-date totals reflect a decrease in
both categories when compared to the same period last year.
2012 YTD 2013 YTD
Incidents 42339 40396
Cases 8037 7702
National Police Week: Honoring and Remembering Fallen Law Enforcement Officers
Fort Collins joined communities across the United States during National Police Week, May 12-
18, to honor and remember law enforcement officers who made the ultimate sacrifice, as well as
the family members, friends and fellow officers left behind. This year, the names of 320 officers
killed in the line of duty were added to the National Law Enforcement Officers Memorial in
Washington, DC. Four Fort Collins Police Officers joined 350 other officers from the Southern
California chapter of the Police Unity Tour and finished the last leg of a three-day cycling tour
from New Jersey to Washington, DC to honor the thousands of fallen officers whose names are
etched on the walls of the National Law Enforcement Memorial. The Unity Tour was
established several years ago to raise money for the Memorial and the needs of family and
friends who have lost loved ones. All together approximately 2400 riders from across the globe
raised $1.72 million this year alone. The ride officially marked the beginning of National Police
Week.
Facebook Case Concluded
The investigation into the March Facebook incident where students posted derogatory comments
about others on sites launched by an anonymous person(s) has concluded. One 18-year-old
Poudre School District student has been issued a summons for misdemeanor harassment after
investigators and the District Attorney determined probable cause existed to support the charge.
As part of the investigation, officers reviewed over 400 documents, several thousand posts,
photographs, and messages and issued a search warrant to Facebook and the Internet Service
Provider, yet they were not able to develop conclusive information as to the identity of the
creator of the page.
Seeking Victim Advocates
Fort Collins Police and the Larimer County Sheriff’s Office are looking for compassionate and
caring people to act in the capacity of volunteer victim advocates. Victim advocates are trained
to offer emotional support and crisis intervention to crime victims as well as provide information
on the criminal justice system, resources in the community, aid in acquiring emergency shelter,
and facilitate other immediate needs. They also conduct follow-up assistance by providing
victim compensation benefits information as well as updates on the status and progression of a
19
victim’s case through preliminary stages of the judicial system. For more information, about the
program, contact Melissa Funk, Victim Services Supervisor at (970) 224-6089 or
mfunk@fcgov.com
Annual Awards Ceremony
The 21
st
Annual Fort Collins Police Services Awards ceremony will be held on Wednesday, June
5 at the Fort Collins Hilton, 425 West Prospect Road. The event opens at 3:00 p.m. and
presentations begin at 3:30 p.m. This year’s event will honor citizens and police employees with
awards and citations. Medals will also be presented to police employees for outstanding police
actions. This year’s ceremony will be especially meaningful to the Fort Collins Community and
Fort Collins Police Services employees as it will include a celebration of the 100
th
anniversary of
Fort Collins Police Services.
Citizen Academy Applications
Fort Collins Police Services is accepting applications for the fall Citizen Police Academy
scheduled to begin in August. The academy is a great opportunity for citizens to learn more
about their police department. Participants must be 18+ years of age; there is no fee to attend.
The academy will meet one evening a week for eleven weeks on topics covering the K-9 unit,
gang unit, crime scene investigations, officer survival techniques, the District One project and
many other components of policing in Fort Collins. Academy members will participate in a ride-
along with a police officer at least once. The deadline for submission of applications is July 19.
Fort Collins Police Services Turns 100!
2013 marks the 100-Year Anniversary of Fort Collins Police Services
(FCPS). Its long and rich history can be traced back to the late 1800’s
when Edwin Lakin Peterson was elected to serve as the first Constable
in 1873, followed by a system of other constables and marshals until
1913 when the Police Department was officially formed. The
recognition that citizens deserved full-time, professional law
enforcement was an important step in the evolution of the community.
To commemorate this historic event, Police Services is planning a year of celebration with many
activities to honor the past. This year, FCPS will be featured in the City’s 4
th
of July parade
down Mountain Avenue with Chief John Hutto as the Grand Marshall. The parade is a family
event starting at 9:30 a.m. The public is invited and encouraged to line West Mountain Avenue
to cheer and thank the police for all they do to protect and keep the community safe.
Crime Trends
The number of suicide calls is starting to move upward after a leveling off period experienced in
the past 18 to 24 months. May 2013 had the second highest number of suicide calls in the past 5
years, with 78.
Other counties in Colorado are also seeing an increase in suicide calls this year. This troubling
trend has a wide effect on the community as a whole. Due to their nature, suicide calls pose a
20
significant risk to law enforcement personnel. Suicide calls require more than one officer to
respond and can be lengthy in nature, tying up resources.
Crime Prevention
During May, the Crime Prevention Specialist interacted with 150 people and handled 33
telephone calls on topics ranging from setting up a neighborhood safety event for Harvest Park to
working with parents from Laurel Elementary School on ways to deal with an aggressive
bicyclist. Presentations included two sessions with Farmer’s Bank staff on robbery prevention
and another Neighborhood Watch meeting at the Harmony Mobile Home Park.
A breakdown of the month’s Crime Prevention activities follows:
• Robbery Prevention Farmer’s Bank - 20 attended
• Neighborhood Watch 2500 E. Harmony - 15 attended
• RESTORE - 35 attended
• Child Safety Kidz Town - 18 attended
• Neighborhood Watch (Sherwood Shores) - 13 attended
• Breakwater neighbor problem - 2 attended
• Child Safety Wee Cuddlers - 12 attended
• Child Safety Emmas Road Church - 35 attended
Crime Prevention Tip:
Now that school is out and vacations may be starting, don’t forget to keep your homes safe and
secure. Don’t leave mail and newspapers collecting in piles, make sure that your house looks
21
lived in, doors AND windows should be locked, and have at least one exterior light on a photo
cell that comes on at night.
Remember the crime triangle below:
POUDRE FIRE AUTHORITY
Fire at Buffalo Run Apartment Building
Firefighters responded to the report of an early morning apartment fire on May 21 where they
faced a large amount of fire on the exterior of a three-story, wood-frame building. The fire was
spreading quickly up the wall and into the attic, and into individual units. With the help of Fort
Collins Police Officers and other residents, all occupants were evacuated safely. In the
meantime firefighters also launched aggressive interior search and suppression efforts in the
units most threatened by fire. A defensive fire attack strategy had to be used within 12 minutes
of arrival by the first engine due to the collapse and pending collapse of the roof and ceilings.
Firefighters were aided by a fire sprinkler system in the building; however, these systems are not
normally installed in attic spaces and the exterior, therefore, the fire spread was quick. The
building has 24 total units: there was heavy damage to six units; moderate damage to four units;
and light, mostly water and smoke damage to two units.
The PFA Customer Assistance Response Team (CART) worked with the Red Cross to provide
displaced residents assistance with immediate food, clothing, housing and medication needs.
Assisting agencies: City of Fort Collins Police Services, Loveland Fire Rescue Authority, Poudre
Emergency Communications Center, PVH/UC Health Emergency Services, Red Cross, and the
Wellington Fire Protection District.
PFA investigators have determined the origin was on a second floor balcony on the exterior of
the building. The cause was accidental, improperly discarded smoking materials.
22
Cinco De Mayo
The PFA Safety House joined in the festivities at the Cinco De Mayo Festival held at the Aztlan
Community Center. The crew was well received and was able to have some great community
outreach with the crowds.
New Phone Message Line
PFA placed a new public information and education line into service this month. The new line,
970-416-2440, will be changed on a weekly basis to assist customers with fire and life safety
information. Additionally, this line can be used to promulgate emergency information.
CityWorks 101
PFA hosted another event to allow citizens to learn about different City services. PFA crews
took part in this very worthwhile community centered program that educates citizens about the
inner workings of certain governmental departments. PFA crews were able to give the group of
‘students’ general information about PFA, in addition to demonstrations of a vehicle extrication,
and the opportunity to spray a fire hose and witness what it is like for fire and ambulance crews
to work together to save a ‘patient’ in cardiac arrest.
Children’s Water Festival
Each spring, approximately 1,700 third-grade students and teachers from public, private and
home schools attend the festival. Sponsored by Fort Collins Utilities, Northern Colorado Water
Conservancy District (NCWCD) and the Bureau of Reclamation, the festival is packed with fun,
hands-on activities that teach students about water.
Students spend half a day attending classroom presentations, visiting many displays in the
exhibit hall, competing in a friendly trivia contest and watching a "mad scientist" perform
experiments. The Fort Collins Children's Water Festival is the longest running festival in the
state.
PFA attended this event to teach students about water and fire. And, of course, the chance to
spray a real fire hose.
23
Incident Statistics (by category)
Report Period: May 2013 Total Loss
Fires 42 $882,305
Overpressure/rupture, explosion-no fire 3
Rescue / EMS 1,075
Hazardous Condition - no fire 25
Service Call 64
Good Intent Call 127
False Alarms / False Calls 83
Severe Weather & Natural Disaster 0
Special Incident Type 5
Total = 1,424
YEAR-TO-DATE 2013 Total Loss
Fires 157 $1,485,151
Overpressure/rupture, explosion-no fire 5
Rescue / EMS 4,961
Hazardous Condition - no fire 138
Service Call 303
Good Intent Call 492
False Alarms / False Calls 487
Severe Weather & Natural Disaster 0
Special Incident Type 12
Total = 6,555
Comparison: May 2012 Total Loss
Fires 48 $120,050
Overpressure/rupture, explosion-no fire 1
Rescue / EMS 993
Hazardous Condition - no fire 34
Service Call 66
Good Intent Call 90
False Alarms / False Calls 65
Severe Weather & Natural Disaster 0
Special Incident Type 12
Total = 1,309
Comparison: YEAR-TO-DATE 2012 Total Loss
Fires 192 $756,931
Overpressure/rupture, explosion-no fire 4
Rescue / EMS 4,658
Hazardous Condition - no fire 119
Service Call 366
Good Intent Call 441
False Alarms / False Calls 434
Severe Weather & Natural Disaster 0
Special Incident Type 32
Total = 6,246
*Information subject to change due to updated data.
24
BUILDING ACTIVITY
COMMUNITY DEVELOPMENT & NEIGHBORHOOD SERVICES
2012 YTD 2013 YTD % Change
Development Project Submittals Received 112 145 + 30%
Conceptual/Staff Reviews Performed 83 117 + 41%
Building Permits Issued 3,072 2,516 -18%
Building Inspections Performed 12,471 12,527 +1%
Plan Reviews Performed 774 865 +12%
General Fund Development Review revenues are approximately $480,000 above projections for
2013 as of May 31.
Development Projects of note:
Link-N-Greens/Woodward: The project was approved by the Planning & Zoning Board
on February 21, 2013 and became effective March 7, 2013. The proposed easements
required for the project and a Business Assistance package were approved by City
Council April 2, 2013. Final plan submittal is pending.
Foothills Mall Redevelopment: The project was approved by the Planning & Zoning
Board on February 7, 2013. Consideration of public financing options by City Council is
currently underway with the next meeting scheduled for May 7, 2013. Final plans were
submitted and reviewed on June 5, 2013. A second round of review is required. There
are some current concerns on ditch alignment on the west side of College Avenue.
Mason Mixed Use Build: This proposal is for a 6-story, mixed-use building that will
include restaurant, office and residential components. It is currently in the Preliminary
Design Review stage.
Construction Projects of Note
o 30,000 square foot addition for the Cancer Center at the Harmony Campus.
o 5-story, 46,286 square foot, new mixed-use commercial building for Otterbox.
Other items of note:
Landmark Rehabilitation Program: Council approved appropriation of an additional
$33,000 for this program on June 4, 2013. This additional support will allow several
unfunded historic protection and revitalization projects to move forward.
Technology Efforts
o An update on development review transparency efforts was provided to City
Council on May 28, 2013, including a demonstration of the improved project
table and website upgrades. Additionally, numerous outreach efforts related to
this item occurred during May including a CityNews article, social media
posts/tweets, a www.fcgov.com spotlight, posters/handouts in the Development
Review lobby, a news release, and articles in Neighborhood News and the
Economic e-newsletter. Feedback to date has been very positive.
25
o Electronic Document Review: Community Development & Neighborhood
Services was awarded $30,000 from the City’s Innovation Fund for these efforts.
The initial focus will be e-review for building permit submittals. Acquisition of
the necessary hardware components as well as outreach to the vendor to start
configuration of a new Accela module have begun.
Oil & Gas: An informal open house to discuss this topic was held on May 8, 2013 from
6-8 p.m. at the Lincoln Center. The meeting focused on the operator agreement and the
impacted neighborhoods around Fort Collins Field and UDA. There were between 120-
140 citizens in attendance. This item is scheduled to go to a Council Work Session on
June 25 to discuss extending the existing moratorium, as well as potential local
regulations and related public outreach.
Land Use Code Amendments: Addition of parkway landscaping amendments were
approved on second reading May 7, 2013.
Development Projects Under Appeal
o 621 South Meldrum Street multi-family project – Appeal was heard on May 7,
2013. Council upheld the decision of the Administrative Hearing Officer and
approved the PDP and Modification of Standard as submitted.
o Carriage House Apartments – Appeal was heard on May 21, 2013. Council
upheld the Planning & Zoning Board’s decision and approved the project.
o Max Flats multi-family project – Appeal was heard on June 4, 2013. Council
approved the project with modifications.