HomeMy WebLinkAboutAgenda - Read Before Packet - 4/16/2013 - Agenda Item Summary - #23 Oil And Gas Operator Agreement***REVISED***
DATE: April 16, 2013
STAFF: Laurie Kadrich, Lindsay Ex,
Dan Weinheimer
AGENDA ITEM SUMMARY
FORT COLLINS CITY COUNCIL 23
SUBJECT
Items Relating to the Oil and Gas Operator Agreement Between the City and Prospect Energy, LLC.
A. Second Reading of Ordinance No. 057, 2013 Terminating the Moratorium Imposed by Ordinance No. 145,
2012 with Respect to Oil and Gas Operations Conducted under an Oil and Gas Operator Agreement Between
the City and Prospect Energy, LLC and Exempting Such Operations from the Prohibitions Contained in
Section 12-135 of the City Code.
B. Resolution 2013-036 Approving an Amendment to the Oil and Gas Operator Agreement Between the City and
Prospect Energy, LLC.
EXECUTIVE SUMMARY
On March 19, 2013, Council approved an Operator’s Agreement with Prospect Energy to conduct oil and gas operation
in the city limits. The terms of the Agreement ensure stringent public health and safety measures are in place through
Best Management Practices (BMPs), which generally exceed current requirements mandated by the Colorado Oil and
Gas Conservation Commission (COGCC), and provide strict controls on the release of methane gases and other
volatile organic compounds (VOCs). The Council also adopted on First Reading, Ordinance No. 057, 2013, by a vote
of 5-1 (nays: Ohlson, absent: Poppaw), removing the Moratorium imposed by Ordinance No. 145, 2012, with respect
to an Oil and Gas Operator Agreement with Prospect Energy.
Resolution 2013-036 will further amend the Operator’s Agreement with Prospect Energy to clarify that no new drilling
will occur in any plugged or abandoned well in the Fort Collins Field and that all Colorado Oil and Gas Conservation
Commission rules to be effective August 1, 2013 will apply to any exploration and drilling activities in the Undeveloped
Acreage (UDA).
BACKGROUND / DISCUSSION
During Council discussion on March 19, 2013, questions arose regarding the inclusion of Undeveloped Acreage (UDA)
in the Operator Agreement. Staff responded incorrectly as to when staff was aware of the UDA. The UDA was
disclosed on March 1, 2013. Staff received the first Operator Agreement that included the UDA on March 7, 2013.
Council further inquired as to how development of the UDA may occur. Generally, Prospect Energy is limited to the
terms and conditions contained in a confidential Surface Use Agreement (SUA) with Anheuser-Busch, Incorporated
signed in April 2011. According to the Larimer County mineral lease notice (Attachment 4), the SUA is for a primary
term of three years expiring March 2014. If, at the expiration of the Primary Term of the SUA, lands not then included
within a producing or spacing unit are not engaged in drilling or reworking operations, then the lease expires.
According to the notice, an option to extend the agreement for an additional three years is available if Prospect Energy
makes an additional payment.
In addition to any requirements imposed by the SUA, any oil and gas development would be required to comply with
the Council-approved Operator Agreement. A key aspect of the Agreement requires the following:
Conceptual Review – No less than thirty (30) days prior to the submission of an Application for a Permit to Drill (APD)
(note: APD is the Colorado Oil and Gas Conservation Commission (COGCC) permitting process), Prospect Energy
will schedule a meeting with the City to review the proposed new well or drilling activity. The goal of this meeting would
be for staff and the applicant to review the proposed oil and gas operation in a manner that ensures compliance with
the operator agreement and applicable state and federal regulations. This pre-submittal meeting will also allow the
applicant and staff to:
April 16, 2013 -2- ITEM 23
• explore site-specific concerns
• discuss project impacts and potential mitigation methods including field design and infrastructure construction
to minimize impacts
• discuss coordination of field design with other existing or potential development and operators
• identify sampling and monitoring plans for air and water quality, and other elements of the operator agreement
as contained in Exhibit A (Best Management Practices).
STAFF RECOMMENDATION
Staff recommends adoption of the Ordinance on Second Reading.
ATTACHMENTS
1. Copy of First Reading Agenda Item Summary - March 19, 2013 (w/o attachments)
2. Copy of First Reading Agenda Item Summary – December 4, 2012 (LUC & Moratorium) (w/o attachments)
3. Ordinance No. 145, 2012, establishing the Moratorium
4. Larimer County Oil and Gas Lease notice
5. Signed Operator Agreement
RESOLUTION 2013-036
OF THE COUNCIL OF THE CITY OF FORT COLLINS
APPROVING AN AMENDED OIL AND GAS OPERATOR AGREEMENT
BETWEEN THE CITY AND PROSPECT ENERGY, LLC
WHEREAS, on March 19, 2013, the City Council adopted Resolution 2013-024, approving
an Oil and Gas Operator Agreement (the “Agreement”) between the City and Prospect Energy, LLC
(“Prospect”), which Agreement has been fully executed by both parties; and
WHEREAS, the purpose of the Agreement is to authorize Prospect to conduct oil and gas
operations in the City on identified lands under lease by Prospect as long as Prospect conforms to
certain air quality rules and the rules of the Colorado Oil and Gas Conservation Commission (the
“COGCC”); and
WHEREAS, the Agreement governs Prospect's operation of existing facilities in the “Fort
Collins Field,” as well as all new wells that may be operated by Prospect within the City during the
term of the Agreement; and
WHEREAS, the City Council has determined that the Agreement should be amended to
clarify that: (1) Prospect, in the course of its operations, will not re-enter any plugged or abandoned
wells within the area of its operation; (2) any new wells drilled by Prospect under the Agreement
must, as of the effective date of the Agreement, comply with the new rules of the COGCC, which
will officially take effect on August 1, 2013; and (3) the Amended Agreement must be executed by
both parties on or before May 1, 2013; and
WHEREAS, the City Manager has presented a proposed amended Agreement between the
City and Prospect to the City Council for its consideration that makes the foregoing changes (the
“Amended Agreement”); and
WHEREAS, the Amended Agreement continues to contain strict controls on methane release
and adequately protects the public health, safety and welfare; and
WHEREAS, the City Council has determined that the approval and execution of the
Amended Agreement between the City and Prospect is in the best interests of the City.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF FORT
COLLINS as follows:
Section 1. That the Amended Agreement, a copy of which is attached hereto as Exhibit
“A,” is hereby determined by the City Council to include strict controls on methane release and to
adequately protect the public health, safety and welfare of the City, and is hereby approved.
Section 2. That the City Manager is hereby authorized and directed to execute the
Amended Agreement on substantially the same terms and conditions shown on Exhibit “A,” subject
to such minor modifications in form or substance as the City Manager, in consultation with the City
Attorney, determines to be necessary and appropriate to protect the interests of the City or effectuate
the purpose of this Ordinance.
Section 3. That the Amended Agreement may only be further amended by the City
Council by resolution.
Passed and adopted at a regular meeting of the Council of the City of Fort Collins this 16th
day of April , A.D. 2013.
Mayor
ATTEST:
City Clerk
1
AMENDED OIL AND GAS OPERATOR AGREEMENT
THIS OIL AND GAS OPERATOR AGREEMENT (“Agreement”) is made and entered
into this _____ day of ___________, 2013 , by and through Prospect Energy, LLC, whose
address is 1600 Stout Street, Suite 1710, Denver, CO 80202 (referred to hereinafter as the
“Company”), and The City of Fort Collins (referred to hereinafter as the “City”) with an address
of 300 LaPorte Avenue, Fort Collins, CO 80522, which may be collectively referred to herein as
the “Parties”, or individually as a “Party”.
WHEREAS, the Company and its affiliates, namely, Black Diamond Minerals, LLC
(“BDM”), the parent of the Company, engage in the exploration, development, production and
marketing of natural gas, oil and natural gas liquids in the Rocky Mountains, including the State
of Colorado. The Company currently operates the Fort Collins Field (the “Field”) located in
Larimer County, with certain portions of the Field located within the City, as depicted in Exhibit
A, and, as such, is the only operator with active oil and gas operations within the City. The
Company also holds certain leasehold interests within the City described as the Undeveloped
Area (the “UDA”), as depicted in Exhibit B.
WHEREAS, the Field was discovered in 1924, and has continually produced oil and
associated hydrocarbons to this day. As is common with other older, once remote, oil and gas
developments around the state, urban growth and subsequent annexation of certain lands by the
City have encroached upon the Field. These annexations, including the Richard’s Lake
subdivision (developed in the late 1990’s) and the Hearthfire subdivision (developed in the mid
2000’s), have allowed developers to place residential areas in the vicinity of active oil and gas
operations. Some property lines are now within 150 feet of oil wells constructed on then-rural
well pads.
WHEREAS, the Field is an oil producing field unitized for waterflood operations from
the Muddy Sandstone Formation (which yields the majority of the Field’s production), but the
Field also produces oil from the Niobrara, Codell, Dakota, and Lyons Formations, all of which
may need future development.
WHEREAS, recent engineering and geological analysis indicates that certain parts of the
Field may yield substantial incremental resource recovery by expanding the secondary recovery
waterflood project by drilling and hydraulic fracturing new wells drilled from lands currently
called Waters Edge, Richard’s Lake and Hearthfire subdivisions (the “Subdivisions”). The
Company is presently studying the UDA to assess whether it would support the development of
mineral resources.
WHEREAS, in the Field and UDA, the Company has entered into Surface Use
Agreements with the surface owners, dated December 19, 1988, as amended April 19, 2001, and
2
March 17, 2011, respectively, which expressly govern the locations of wells and associated
facilities within the Subdivisions, and other specified terms, including, but not limited to,
landscaping and fencing around wells and associated production equipment.
WHEREAS, the City and the Company value a balanced approach to oil and gas
development that is protective of public health, safety and welfare, including the environment
and wildlife resources. To that end, in order to achieve those goals in a cooperative manner, the
City and the Company enter into this Agreement to identify best management practices
(“BMPs”) for the Company’s future drilling operations within the City’s boundaries.
WHEREAS, the Field extends beyond the City limits and the Company, as a responsible
oil and gas operator, has installed a vapor recovery unit at its existing production facility located
just south of Douglas Road (the “Fort Collins Tank Battery”) as shown in the Exhibit A attached
hereto which lies outside of the City limits. All water, oil and gas produced from any New Well,
as defined herein, and located in the Field, will flow into existing or future pipelines to the Fort
Collins Tank Battery where gas will be captured and sent to the thermal oxidizer for destruction.
Equipment, both at the Fort Collins Tank Battery and within City limits, will capture and destroy
at least 98% of any methane and volatile organic compounds (VOC).
WHEREAS, the Colorado Oil and Gas Conservation Act, C.R.S. §34-60-101 et. seq. (the
“Act”), authorizes the Colorado Oil and Gas Conservation Commission (“COGCC” or
“Commission”) to adopt statewide rules and regulations, which the Commission has done.
Further, the Commission continues to consider changes to the rules and regulations.
WHEREAS, on December 18, 2012, by the adoption of Ordinance 145, 2012, the City
Council imposed a temporary moratorium until July 31, 2013 on the acceptance, processing and
approval of any land use applications relating to new oil and gas development (the
“Moratorium”).
WHEREAS, on March 5, 2013, by the adoption of Ordinance No. 032, 2013, the City
Council enacted Sec. 12-135 of the City Code prohibiting the use of hydraulic fracturing in the
City, as well as the storage in open pits of solid or liquid wastes and /or flowback (the “Ban”)
and, through the enactment of City Code Sec. 12-136, exempted from the Ban any oil or gas
wells or pad sites existing within the City as of February 19, 2013, that become the subject of an
operator agreement between the operator of the same and the City, as long as such agreement
includes strict controls on methane release and, in the judgment of the City Council, adequately
protects the public health, safety and welfare.
3
WHEREAS, by Resolution ______, the City Council has approved this Oil and Gas
Operator Agreement with the Company, and the Parties agree to the terms and conditions
contained below.
NOW THEREFORE, in consideration of the covenants and mutual promises set forth in
this Agreement, including in the recitals, the Parties agree as follows:
1. Effective Date. When this Agreement is presented to the City Council for its
consideration, City staff will also present to the City Council an ordinance exempting all
Company operations from the Moratorium and the Ban, which exemption will continue in effect
as long as the Company’s operations are conducted in accordance with this Agreement. The
Effective Date of such ordinance shall be the “Effective Date” of this Agreement.
Notwithstanding the foregoing, this Agreement shall be void and of no effect as of May 1, 2013,
unless this Agreement is fully executed by the Parties on or before such date.
2. The Company’s Best Management Practices (“BMPs”) within City Limits. The
Company shall include the BMPs listed in Appendix A, attached hereto and by reference made a
part hereof, on all Applications for Permit-to-Drill, Form 2, and Oil and Gas Location
Assessments, Form 2A, submitted to the Commission for a ”New Well”. For the purposes of
this provision, “New Well” shall mean any Company-operated well spudded during the term of
this Agreement, and located on either a currently existing well pad or a New Well pad that is
located within the City limits, and a “New Well Pad” shall mean any area that is directly
disturbed during the drilling and subsequent operation of a New Well, including any production
facilities directly associated with such well, and its associated Well Pad, insofar as it covers
lands located in the City limits. The BMPs shall apply to all New Wells drilled by the Company
while this Agreement is effective. For purposes of this Agreement, New Well shall not include
the re-entry of a previously plugged and abandoned well, and accordingly the re-entry of a
previously plugged and abandoned well is not allowed.
3. City Regulatory Approvals. The Company shall not be required to obtain any project
development plan or final plan approval from the City to conduct its oil and gas operations
within the City limits, as long as the Company complies with the terms and conditions contained
herein, and this Agreement shall control all oil and gas operations conducted by the Company
within the City limits. Prior to the submission of a COGCC Form 2 and/or Form 2A to the
COGCC, the Company shall meet with the City to review the proposed oil and gas operation to
ensure compliance with this Agreement, all applicable state and federal regulations, and any site-
specific concerns, which concerns may include overall project impacts and economically and
technically feasible mitigation measures or BMPs related to field design and infrastructure
construction to minimize potential adverse impacts to public health, safety and welfare. At such
time, if at all, that the City and Larimer County, Colorado (the “County”) enter into a written
agreement that authorizes the City to regulate the oil and gas operations of the Company within
4
the Growth Management Area, such operations shall thereafter be governed by the terms and
conditions of this Agreement and shall be subject to the City’s regulatory authority as provided
in this Agreement. “Growth Management Area” shall be as described in that certain
Intergovernmental Agreement entered into by the City of Fort Collins and Larimer County on
June 24,2008, nunc pro func [sic] October 17, 2006.
4. Operations on Existing Facilities. For any Facility owned by the Company and existing
prior to the Effective Date and located within the City limits, the Parties hereby agree that the
Company may perform routine maintenance operations on said Facility and perform such
operations the Company deems prudent and necessary, including, but not limited to, stimulating
existing wells through hydraulic fracturing and temporarily storing chemicals on existing well
pads for that purpose. The Company agrees to conduct such operations as a prudent operator in
accordance with the rules and regulation of the COGCC; however, the Company shall not be
subject to the BMP’s as attached hereto, except for Appendix A paragraphs 21(j) and 21(k)
thereof. “Facility” as used in this provision shall include wells, pipelines, and all equipment
necessary and appurtenant to such wells and pipelines.
5. Term. This Agreement is effective upon the Effective Date and shall remain in effect for
five (5) years from the Effective Date, at which time the Agreement shall be automatically
renewed and extended for successive five (5) year terms, unless and until either Party elects to
terminate the Agreement at the end of the then current five (5) year term by providing written
notice of such intent to the other party at least thirty (30) days before the expiration of said term.
6. Force Majeure. Neither Party will be liable for any delay or failure in performing under
this Agreement in the event and to the extent that the delay or failure arises out of causes beyond
a Party’s reasonable control, including, without limitation, war, civil commotion, act of God,
strike or other stoppage (whether partial or total) of labor, or any law, decree, regulation, or order
of any government or governmental body (including any court or tribunal).
7. Authority to Execute Agreement. Each Party represents that the undersigned have the
full right and authority to enter into this Agreement and bind the Parties to the terms and
conditions contained herein. This Agreement may be amended only by an instrument executed
by both Parties hereto.
8. Successors and Assigns. The terms and conditions of this Agreement shall bind and
extend to the City and the Company, and the Company’s successors and assigns.
9. No Third Party Beneficiaries. Except for the rights of enforcement by the Commission
with respect to the BMPs, this Agreement is not intended to, and does not create, any right,
benefit, responsibility or obligation that may be enforced by any non-party. Additionally,
5
nothing in the Agreement shall entitle any third party to any claims, rights or remedies of any
kind.
10. Notices. All notices and other correspondence related to this Agreement shall be in
writing and shall be delivered by: (i) certified mail with return receipt, (ii) hand delivery with
signature or delivery receipt provided by a third party courier service (such as FedEx, UPS, etc.),
(iii) fax transmission if verification of receipt is obtained, or (iv) email with return receipt, to the
designated representative of the Party as indicated below. A Party may change its designated
representative for notice purposes at any time by written notice to the other Party. The initial
representatives of the Parties are as follows:
City: City of Fort Collins
300 LaPorte Avenue
P.O. Box 580
Fort Collins, CO 80522
Attn: City Manager
Telephone: 970-416-2253
Fax: 970-224-6107
Email: datteberry@fcgov.com
Company: Prospect Energy, LLC
1600 Stout Street, Suite 1710
Denver, CO 80202
Attn: Scott D. Hall, Manager
Telephone: 303-973-3228, ext. 223
Fax: 303-346-4893
Email: sdhall@bdminerals.com
11. Default; Remedies. If either party believes that the other Party has failed to comply with
any provision of this Agreement, or if any other kind of dispute arises under any provision of this
Agreement that cannot be resolved by good faith negotiation between the Parties, the Party
claiming that a breach of this Agreement has occurred or seeking resolution of any other dispute
under this Agreement shall send written notice to the other Party, specifying its position in the
matter and invoking the dispute resolution process in this section. Within fifteen (15) days of the
date of delivery of such notice, the Parties shall meet to resolve the matter described in the
notice. If either Party believes that mediation would be advantageous in connection with such
meeting, or if a resolution of the matter cannot be achieved at the meeting, both parties agree to
make a reasonable effort to work through and with a mutually acceptable mediator to attempt to
resolve the dispute. Notwithstanding the foregoing, if either Party believes that the dispute will
not otherwise be resolved in a sufficiently prompt and effective manner, such Party may, at its
discretion, take such legal action and seek such legal or equitable remedies as it determines to be
appropriate or necessary to protect and enforce its rights under this Agreement. Such remedies
6
may include, without limitation, an injunction to stop an alleged violation or an order requiring
the performance of all acts and things required to be performed hereunder by the other Party.
12. Integration Clause: This Agreement, along with all exhibits and appendices attached
hereto encompasses the entire agreement of the Parties and supersedes all previous
understandings and agreements between the Parties, whether oral or written.
13. Governing Law. This Agreement shall be governed and construed in accordance
with the laws of the State of Colorado without reference to its conflicts of laws provisions.
IN WITNESS WHEREOF, the Parties have caused this Agreement to be executed by a
duly authorized representative on the day and year first written above.
THE CITY:
CITY OF FORT COLLINS, COLORADO
A MUNICIPAL CORPORATION
By: _____________________________________
Darin Atteberry, City Manager
ATTEST:
__________________________
City Clerk
APPROVED AS TO FORM:
_________________________
Deputy City Attorney
THE COMPANY:
PROSPECT ENERGY, LLC
By (signature):
_________________________________________
Scott Hall, CEO
7
List of Exhibits
Exhibit A - Map of the Fort Collins Field and City boundaries
Exhibit B - Map of the Undeveloped Acreage (UDA) and City Boundaries
Appendix A – List of BMP’s
Appendix B – Submittal Requirements
8
APPENDIX A
BEST MANAGEMENT PRACTICES FOR LOCATIONS
WITHIN THE CITY LIMITS OF FORT COLLINS
Pursuant to the terms of this Agreement, the Company shall include the best management
practices listed below on all Applications for Permit-to-Drill, Form 2, and Oil and Gas Location
Assessments, Form 2A, (for New Well Pads only), submitted to the Commission for New Wells
the Company drills after the Effective Date within the city limits of Fort Collins.
1. Regulations. The Company shall comply with all applicable state, and federal regulations
in addition to the terms of this agreement and the Best Management Practices included
below. Any exploration or drilling activity occurring prior to August 1, 2013, must
comply with the new rules of the COGCC which will become effective on said date,
except as provided in Paragraph 2 below regarding setbacks. Whichever regulation is
most stringent shall apply.
2. Setbacks for New Wells. It is the intent of the Company to maximize equipment and
wellhead setbacks from occupied buildings and residences beyond the setbacks required
by the COGCC to the extent feasible and practicable.
The Parties recognize that a portion of the Field is within the Fort Collins City Limits and
as such, development has occurred within the already established Field. The surface
owner has obtained permitted plats for residential areas in the vicinity of existing oil and
gas activities, including a constructed city park and contemplated building units and
public roads within three hundred fifty (350) feet of an existing well. Further, the Parties
acknowledge that the Commission rules require a minimum of five hundred (500) feet
safety setback for New Well construction from a building unit and one thousand feet
(1,000) from a high occupancy building.
Any New Wells drilled in the UDA shall conform to the Commission setback rules then
in effect, except for any New Well in the UDA drilled before August 1, 2013, which well
shall comply with the Commission setback rules that will become effective on August 1,
2013. In the Fort Collins Field, New Wells shall be constructed on existing Well Pads,
which due to previous setback requirements, and City approval of residential
development, do not conform to five hundred (500) feet setbacks, and are given an
exemption from the Commission in the Rules now in effect.
The Parties recognize the existence of a Surface Use Agreement (the “SUA”) between
the Company and the surface owner which expressly governs the locations of wells and
associated facilities within the Water’s Edge, Richard’s Lake and Hearthfire subdivisions
9
(the “Subdivisions”), and that certain terms found in the SUA may affect Commission
setbacks and other Commission rules.
3. Conceptual Review. No less than thirty (30) days prior to the submission of an
Application for a Permit to Drill, the Company agrees to schedule a meeting with the City
to review the proposed new well or drilling activity. The goal of this meeting shall be for
staff and the applicant to review the proposed oil and gas operation in a manner that
ensures compliance with the operator agreement and applicable state and federal
regulations. This pre-submittal meeting shall also allow the applicant and staff to explore
site-specific concerns, to discuss project impacts and potential mitigation methods
including field design and infrastructure construction to minimize impacts, to discuss
coordination of field design with other existing or potential development and operators,
to identify sampling and monitoring plans for air and water quality, and other elements of
the operator agreement as contained in Appendices A and B. Based upon the foregoing,
applicants are encouraged to conduct the pre-submittal meeting with the City prior to
completing well siting decisions, to the extent reasonably feasible.
4. Mailed Notice. The City shall mail notice of the pending Application for a Permit to Drill
no more than ten (10) days after the conceptual review meeting has taken place. The
Company shall reimburse the City for the costs of the mailing. Owners of record shall be
ascertained according to the records of the Larimer County Assessor’s Office, unless
more current information is made available in writing to the City prior to the mailing of
the notices. Notice of the pending application shall include reference to the neighborhood
meeting, if applicable, and be made as follows:
⼀ To the surface owners of the parcels of land on which the oil and gas operation is
proposed to be located;
⼀ To the surface owners of the parcels of land within five hundred (500) feet of a
proposed gathering line;
⼀ To the surface owners of the parcels of land within two thousand six hundred
forty (2,640) feet of the parcel on which the oil and gas operation is proposed to be
located; and
⼀ To persons registered in writing with the City as representing bona fide
neighborhood groups and organizations and homeowners' associations within the area
of notification.
5. Posted Notice. The real property proposed to be developed shall also be posted with a
sign, giving notice to the general public of the proposed development. For parcels of land
exceeding ten (10) acres in size, two (2) signs shall be posted. The size of the sign(s)
required to be posted shall be as established in the Supplemental Notice Requirements of
Section 2.2.6(D) of the City’s Land Use Code. Such signs shall be provided by the City
and shall be posted on the subject property in a manner and at a location or locations
10
reasonably calculated by the City to afford the best notice to the public, which posting
shall occur within ten (10) days following the Conceptual Review meeting.
6. Neighborhood Meetings. A neighborhood meeting shall be required on any New Well,
even on existing Well Pads, that requires an Application for a Permit to Drill. Notice of
the neighborhood meeting shall be provided in accordance with Sections 4 and 5 above.
The Company shall attend the neighborhood meeting. The City shall be responsible for
scheduling and coordinating the neighborhood meeting and shall hold the meeting in the
vicinity of the proposed development. A written summary of the neighborhood meeting
shall be prepared by the City. The written summary shall be included in the Local
Government Designee (LGD) comments provided to the COGCC at the time of the
public hearing or permit review to consider the Application for a Permit to Drill.
7. Notification to the City and the public regarding commencement of operations. Prior to
the commencement of any new drilling operations, the Company shall provide to the City
Manager for posting on the website the information outlined in Appendix B regarding
commencement of operations, which the Company may revise from time-to-time during
operations, with prior approval from the City.
8. Inspections. The City shall have the right to inspect the Company’s operations and its
sites during business hours, upon the giving of twenty-four (24) hour advance written
notice to the Company.
9. Containment berms. The Company shall utilize steel-rim berms around tanks and
separators at new Well Pads. All berms and containment devices shall be inspected at
regular intervals and maintained in good condition. No potential ignition sources shall be
installed inside the secondary containment area unless the containment area encloses a
fired vessel. Refer to American Petroleum Institute Recommended Practices, API RP -
D16.
a) Containment berms shall be constructed of steel rings, designed and installed to
prevent leakage and resist degradation from erosion or routine operation.
b) Secondary containment for tanks shall be constructed with a synthetic or engineered
liner that contains all primary containment vessels and flowlines and is mechanically
connected to the steel ring to prevent leakage.
c) For locations within five hundred (500) feet and upgradient of a surface water body,
tertiary containment, such as an earthen berm, is required around production facilities.
10. Closed Loop Pitless Systems for the Containment and/or Recycling of Drilling and
Completion Fluids. Wells shall be drilled, completed and operated using closed loop
11
pitless systems for containment and/or recycling of all drilling, completion, flowback and
produced fluids.
11. Anchoring. All equipment at drilling and production sites shall be anchored to the extent
necessary to resist flotation, collapse, lateral movement, or subsidence. All guy line
anchors left buried for future use shall be identified by a marker of bright color not less
than four (4) feet in height and not greater than one (1) foot east of the guy line anchor.
12. Burning. No open burning shall occur on the site of any oil and gas operation.
13. Chains. Traction chains from heavy equipment shall be removed before entering a City
street.
14. Chemical disclosure and storage. The City shall be provided, in table format, the name,
Chemical Abstracts Service (CAS) number, volume, storage, containment and disposal
method for all drilling and completion chemicals (solids, fluids, and gases) used on
the Well Pad. Fracture chemicals shall be uploaded onto the Frac Focus website. The
Company shall not permanently store hydraulic fracturing chemicals, flowback from
hydraulic fracturing, or produced water in the City limits.
15. Color. Facilities shall be painted in a uniform, non-contrasting, non- reflective color, to
blend with the surrounding landscape and, with colors that match the land rather than the
sky. The color should be slightly darker than the surrounding landscape.
16. Cultural and Historical Resource Protection. If a significant surface or sub-surface
archaeological site is discovered during construction, the Company shall be responsible
for immediately contacting the City to report the discovery. If any disturbance of the
resource occurs, the Company shall be responsible for mitigating the disturbance to the
cultural or historical property through a data recovery plan approved by the City.
17. Discharge valves. Open-ended discharge valves on all storage tanks, pipelines and other
containers shall be secured where the operation site is unattended or is accessible to the
general public. Open-ended discharge valves shall be placed within the interior of the
tank secondary containment.
18. Dust suppression. Dust associated with on-site activities and traffic on access roads
shall be minimized throughout construction, drilling and operational activities such that
there are no visible dust emissions from access roads or the site to the extent practical
given wind conditions. No produced water or other process fluids shall be used for dust
suppression. The Company will avoid dust suppression activities within three hundred
(300) feet of the ordinary high water mark of any waterbody, unless the dust suppressant
12
is water. Material Safety Data Sheets (MSDS) for any chemical based dust suppressant
shall be submitted to the City for approval prior to use.
19. Electric equipment. Electric-powered engines for motors, compressors, and drilling
equipment and for pumping systems shall be used in order to mitigate noise and to
reduce emissions when feasible.
20. Emergency preparedness plan. The Company is required to develop an emergency
preparedness plan for each specific facility site, which shall be in compliance with the
International Fire Code. The plan shall be filed with the Poudre Fire Authority and
the City of Fort Collins Office of Emergency Management and updated on an annual
basis or as conditions change (responsible field personnel change, ownership changes,
etc.). The emergency preparedness plan shall consist of at least the following
information:
a) Name, address and phone number, including twenty-four (24)-hour emergency
numbers for at least two persons responsible for emergency field operations.
b) An as-built facilities map in a format suitable for input into the City’s GIS system
depicting the locations and type of above and below ground facilities including
sizes, and depths below grade of all oil and gas gathering and transmission lines and
associated equipment, isolation valves, surface operations and their functions, as well
as transportation routes to and from exploration and development sites, for
emergency response and management purposes. The information concerning
pipelines and isolation valves shall be held confidentially by the City's Office of
Emergency Management and the Battalion Chief, and shall only be disclosed in the
event of an emergency or to emergency responders. The City shall deny the right of
inspection of the as-built facilities maps to the public or for the training of emergency
responders pursuant to C.R.S. § 24-72-204.
c) Detailed information addressing each reasonable potential emergency that may be
associated with the operation. This may include any or all of the following:
explosions, fires, gas, oil or water pipeline leaks or ruptures, hydrogen sulfide or
other toxic gas emissions, or hazardous material vehicle accidents or spills. A
provision that any spill outside of the containment area, that has the potential to
leave the facility or to threaten waters of the state, or as required by the City-
approved Emergency Preparedness Plan shall be reported to the local emergency
dispatch and the COGCC Director in accordance with COGCC regulations.
d) Detailed information identifying access or evacuation routes, and health care
facilities anticipated to be used.
13
e) A project specific emergency preparedness plan for any project that involves
drilling or penetrating through known zones of hydrogen sulfide gas.
f) Detailed information showing that the Company has adequate personnel, supplies,
and training to implement the emergency response plan immediately at all times
during construction and operations.
g) The Company shall have current Material Safety Data Sheets (MSDS) for all
chemicals used or stored on a site. The MSDS sheets shall be provided
immediately upon request to City officials, a public safety officer, or a health
professional.
h) The plan shall include a provision establishing a process by which the Company
engages with the surrounding neighbors to educate them on the risks of the on-site
operations and to establish a process for surrounding neighbors to communicate with
the Company.
i) All training associated with the Emergency Preparedness plan shall be coordinated
with the City’s Office of Emergency Management and Poudre Fire Authority.
j) A provision obligating the Company to reimburse the appropriate emergency
response service providers for costs incurred in connection with any emergency in
accordance with Colorado State Statutes.
21. Air quality. The Company must comply with emissions regulations governed by the
Colorado Department of Public Health and Environment (CDPHE), Air Pollution
Control Division (APCD). Air emissions from wells shall be in compliance with the
permit and control provisions of the Colorado Air Quality Control Program, Title 25,
Section 7, C.R.S., COGCC Rule 805, and all state and federal regulations for the
control of fugitive dust, and control of ozone, ozone precursors, methane, and hazardous
air pollutants by the Larimer County Public Health Department, and the CDPHE-APCD.
The Company must comply with 40 CFR Subpart OOOO as published on August 16, 2012
(Quad O).
a) General Duty to Minimize Emissions. The Company shall incorporate in the
development plan; operations, procedures, and field design features to the
maximum extent feasible that minimize air pollutant emissions including but not
limited to:
1) Consolidation of product treatment and storage facilities
2) Centralization of compression facilities
14
3) Liquids gathering and water delivery systems
4) Telemetric control and monitoring systems
5) Pipeline infrastructure prior to well completion.
b) In the UDA, the Company shall utilize a high-low pressure vessel (HLP) and
vapor recovery unit (VRU) for New Wells that are placed on production. The
Company may remove the VRU at such time it determines that the VRU system is
no longer necessary due to reduced emission recoveries and/or efficiencies, but no
earlier than one (1) year after the New Well is placed on production. The
Company may opt to capture gas and send through a thermal oxidizer in lieu of a
HLP and VRU.
c) Plunger lifts are not typically used in the Fort Collins Field due to insufficient gas.
However if there is future use of plunger lifts, emissions shall be controlled from
the motor control valve using low bleed pneumatic controllers.
d) There will be no uncontrolled venting of methane. All gas vapors shall be
captured to the extent practicable. Vapor capture equipment shall operate at
ninety-eight percent (98%) efficiency or better. There are no gas sales lines in the
Fort Collins field because the quantity and quality of gas is low and not
marketable. If salable gas were to occur in the UDA, a sales line shall be
constructed.
e) Flaring during drilling and completions:
During well completion, the capture and beneficial use of natural gas is preferred
over flaring. Minimal flaring may occur in the Fort Collins field, because there is
minimal gas in the field. Flaring shall be continuously monitored on-site by the
Company, under twenty-four (24) hour watch and is regulated by COGCC Rules
317, 805B(3)B, and 912. No venting of gas may occur, except under COGCC
Green Completion Practices (Rule 805 B(3)B), or in very limit cases under Rule
912 with the COGCC Director approval.
f) Flaring during production operations:
1) The flare shall be fired with natural gas and shall be operated with a
ninety eight (98) percent or higher VOC destruction efficiency.
2) The flare shall be designed and operated in a manner that shall
ensure no visible emissions, pursuant to the provisions of 40 CFR
60.18(f), except for periods not to exceed a total of five (5) minutes during
any two (2) consecutive hours. Where applicable, flares shall also be in
15
compliance with 5 CCR 1001-9 Regulation 7 Section XVIIB for non-
condensate oil.
3) The flare shall be operated with a flame present at all times when
emissions may be vented to it, pursuant to the methods specified in 40
CFR 60.18(f).
4) An automatic pilot system shall be used when feasible. Other ignition
systems may include the installation and operation of a telemetry alarm
system or an on-site visible indicator showing proper function.
g) Leak Detection and Repair (LDAR) – The Company shall develop and maintain
a leak detection and component repair program according to EPA Method 21 for
equipment used in permanent operations. LDAR shall be performed on newly
installed equipment, and then on an annual basis. A Forward-Looking Infrared
(FLIR) camera shall be used as the preferred implementation method of EPA
Method 21 as available from the state; if unavailable, other methods shall be used
in compliance with this method. Upon request from the City, the Company shall
implement EPA Method 21 upon additional concerns. At least once per year, the
Company shall notify the City prior to FLIR camera use in case the City wishes
to observe the method.
h) One Time Baseline Air Quality Monitoring - the Company and the City shall split
the cost for a one time Baseline Sampling and Analytical. The work shall be done
by a third party consultant agreeable to both parties over a five day sampling
period with each location sampled per day. The sampling locations shall be as
follows:
1) Upwind of Tank Battery
2) Downwind of Tank Battery
3) City Park
4) One location downtown, such as New Belgium Brewery or Wild Boar
Coffee
i) One Time Air Sampling During Well Completion – The Company shall conduct
air sampling during well completion. The work shall be done by a third party
consultant agreeable to both parties. This shall be done over a five day sampling
period with each location sampled per day. The sampling shall be for one well
completion in the City (City’s choice of which well completion). The sampling
locations shall be as follows:
1) Upwind of well
16
2) Downwind of well
j) Ongoing Air Quality Monitoring - Periodic air monitoring shall be performed for
hydrogen sulfide (H2S), a hazardous air pollutant (HAP). The Company shall
perform field monitoring using the Jerome 631 XC or equivalent instrument
annually, or until such time that odors are not detected past the Fort Collins Tank
Battery fence line in City Limits.
k) The City may require the Company to conduct additional air monitoring as
needed to respond to emergency events such as spill, process upsets, or accidental
releases or in response to odor complaints in City Limits.
1) In response to emergency events that involve the potential release of
hazardous air pollutants, the Company may be required to conduct air
sampling in accordance with Subsection i. above.
2) In response to odor complaints, the Company may be required to conduct
air sampling in accordance with subsection j above or use a photo-
ionization detector (PID) to measure detected levels of VOCs that exceed
acute health-based exposure thresholds, or other air sampling
methodology depending on the nature of the complaint.
l) Air Quality Action Days. The Company shall respond to air quality Action Day
advisories posted by the Colorado Department of Public Health and Environment
for the Front Range Area by implementing air emission reduction measures
committed to in the Air Quality Mitigation Plan. Emission reduction measures
shall be implemented for the duration of an air quality Action Day advisory and
may include measures such as:
1) Minimize vehicle and engine idling
2) Reduce truck traffic and worker traffic
3) Delay vehicle refueling
4) Suspend or delay use of fossil fuel powered ancillary equipment
5) Postpone construction activities
22. Green completions.
a) Gas gathering lines, separators, and sand traps capable of supporting green
completions as described in COGCC Rule 805 shall be installed at any location at
which commercial quantities of gas are reasonably expected to be produced based on
existing adjacent wells within one (1) mile or well in the Fort Collins Field,
whichever is greater.
17
b) Uncontrolled venting is prohibited.
c) Temporary flowback flaring and oxidizing equipment shall include the following:
1) Adequately sized equipment to handle 1.5 times the largest flowback volume of
gas experienced in a one (1) mile radius (or well in the Fort Collins Field),
whichever is greater;
2) Valves and porting available to divert gas to flaring and oxidizing equipment; and
3) Auxiliary fueled with sufficient supply and heat to combust or oxidize non-
combustible gases in order to control odors and hazardous gases. The flowback
combustion device shall be equipped with a reliable continuous ignition source
over the duration of flowback, except in conditions that may result in a fire
hazard or explosion.
4) The Company has a general duty to safely maximize resource recovery and
minimize releases to the atmosphere during flowback and subsequent
recovery/operation.
23. Exhaust. The exhaust from all engines, motors, coolers and other mechanized equipment
shall be vented up or in a direction away from the closest existing residences.
24. Fencing. Permanent perimeter fencing shall be installed around production equipment,
and shall be secured. The main purpose of the fencing is to deter entrance by
unauthorized people. The Company shall use visually interesting fencing, when feasible,
but the parties recognize that there is a need for air circulation, and for the field personnel
who regularly inspect the facilities to be able to identify visual operational deficiencies
when driving by. Landscaping may be used for screening. If a chain link fence is required
to achieve safety requirements set by the COGCC, then landscaping and other screening
mechanisms shall be required that comply with the City’s Land Use Code regulations and
the Company’s safety requirements.
25. Flammable material. All land within twenty five (25) feet of any tank, or other structure
containing flammable or combustible materials shall be kept free of dry weeds, grass or
rubbish, and shall conform to Section 315 of the International Fire Code.
26. Floodplains. All oil and gas operations shall comply with Chapter 10 of the City
Code.
27. Water Quality Monitoring Plan. The Company shall comply with COGCC Rule 609.
In summary, this requires pre- and post-drilling testing. The rules require oil and gas
operators to sample all “Available Water Sources” (owner has given consent for sampling
and testing and has consented to having the sample data obtained made available to the
18
public), with a cap of four (4) water sources, within one-half (1/2) mile radius of a
proposed well, multi-well site, or dedicated injection well. Water sources include
registered water wells, permitted or adjudicated springs, and certain monitoring wells.
The Company agrees to the following requirements above and beyond the COGCC
requirements: analyzing for dissolved metals as indicated in the Land Use Code and
sampling intervals to be baseline (before drilling), post-drilling at one, three, and six
years. Analytical results shall be shared with the COGCC, the City, and the landowner.
All spills, for new and existing wells, shall be managed in accordance with COGCC
regulations.
28. Landscaping. In the Fort Collins Field, existing Well Pads shall be used for any
New Wells and all landscaping shall be in compliance with the City of Fort Collins
Land Use Code standards and in compliance with the safety requirements of the
Company. Existing vegetation shall be minimally impacted. In the UDA,
motorized equipment shall be restricted to the Well Pad and access roads to the
Well Pads. A Visual Mitigation Plan, along with fencing and landscaping shall be
developed for new construction.
29. Lighting. Except during drilling, completion or other operational activities requiring
additional lighting, down-lighting is required, meaning that all bulbs must be fully
shielded to prevent light emissions above a horizontal plane drawn from the bottom of
the fixture. A lighting plan shall be developed to establish compliance with this
provision. The lighting plan shall indicate the location of all outdoor lighting on the site
and any structures, and include cut sheets (manufacturer's specifications with picture or
diagram) of all proposed fixtures.
30. Maintenance of machinery. Routine field maintenance of vehicles or mobile
machinery shall not be performed within three hundred (300) feet of any water body.
31. Mud Tracking. The Company shall take all practicable measures to ensure that vehicles
do not track mud or debris onto City streets. If mud or debris is nonetheless deposited
on City streets, the streets shall be cleaned immediately by the Company using
pressured water from a water truck. This shall be done as part of maintenance. If for
some reason it cannot be done, or needs to be postponed, the LGD shall be notified of
the Company’s plan for mud removal.
32. Natural Resources – An Ecological Characterization Study shall be provided if any New
Well is within 500 feet of a Natural Habitat or Feature, and if impacting these resources,
mitigation plans to ensure no net resource loss per Fort Collins Land Use Code 3.4.1.
33. Noise mitigation. Noise mitigation measures shall be constructed along any edge of any
oil and gas operation site if such edge is between the oil and gas operation and existing
residential development or land which is zoned for future residential development. The
19
noise mitigation measures shall, to the maximum extent feasible, decrease noise from the
oil and gas operations to comply with the sound limitation regulations set forth in
Commission Rule 802. A noise mitigation study shall be submitted with the application
to demonstrate that noise will be decreased to the maximum extent feasible.
34. Pipelines. Any newly constructed or substantially modified pipelines on site shall meet the
following requirements:
(a) To the maximum extent feasible, all flow lines, gathering lines, and transmission lines
shall be sited a minimum of fifty (50) feet away from general residential, commercial,
and industrial buildings, as well as the high-water mark of any surface water body.
This distance shall be measured from the nearest edge of the pipeline. Pipelines and
gathering lines that pass within 150 feet of general residential, commercial, and
industrial buildings or the high water mark of any surface water body shall incorporate
leak detection, secondary containment, or other mitigation, as appropriate.
(b) To the maximum extent feasible, pipelines shall be aligned with established roads in
order to minimize surface impacts and reduce habitat fragmentation and disturbance.
(c) To the maximum extent feasible, operators shall share existing pipeline rights-of-way
and consolidate new corridors for pipeline rights-of-way to minimize surface impacts.
(d) To the maximum extent feasible, operators shall use boring technology when crossing
streams, rivers, or irrigation ditches with a pipeline to minimize negative impacts to
the channel, bank, and riparian areas.
35. Recordation of flowlines. All new flowlines, including transmission and gathering
systems, shall have the legal description of the location recorded with the City Clerk and
the Larimer County Clerk and Recorder within thirty (30) days of completion of
construction. Abandonment of any recorded flowlines shall be recorded with the
Larimer County Clerk and Recorder’s office within thirty (30) days after
abandonment.
36. Recreational Activity Standards. The installation and operation of any oil and gas
operation shall not cause significant degradation to the quality and quantity of
recreational activities in the City. Methods to achieve compliance with this standard
include, but are not limited to locating operations away from trails and from property
used for recreational purposes, or by using existing Well Pads.
37. Removal of debris. When an oil and gas operation becomes operational, all
construction-related debris shall be removed from the site for proper disposal. The site
shall be maintained free of debris and excess materials at all times during operation.
Materials shall not be buried or burned on-site.
20
38. Removal of equipment. All equipment used for drilling, re-completion and maintenance
of the facility shall be removed from the site within thirty (30) days of completion of
the work, unless otherwise agreed to by the surface owner. Permanent storage of
equipment on Well Pad sites shall not be allowed.
39. Soil Gas Monitoring – The City, at its discretion, may conduct soil gas monitoring to
assess well casing integrity. This shall be typically completed within ninety (90) days of
New Well completion. The City shall notify the Company prior to entering the site for soil
gas monitoring.
40. Spills. Chemical spills and releases shall be reported in accordance with applicable
state and federal laws, including the Emergency Planning and Community Right To
Know Act, the Comprehensive Environmental Response, Compensation and Liability
Act, the Oil and Pollution Act, the Clean Water Act, the Resource Conservation and
Recovery Act and the Spill Control Prevention and Countermeasure plan, as
applicable. If a spill or release impacts or threatens to impact surface water or a
water well, the Company shall notify the affected or potentially affected owner
immediately following discovery of the release, and the spill or release shall be reported
to the City and to the surface water or water well owner within twenty-four (24) hours of
becoming aware of the spill or release.
41. Stormwater control plan. All oil and gas operations shall comply and conform with the
Fort Collins Storm Criteria Manual (FCSCM), including submission of an Erosion
Control Report and Plan.
42. Temporary access roads. Temporary access roads associated with oil and gas operations
shall be reclaimed and re-vegetated to the original state.
43. Trailers. A construction trailer or office is permitted as an accessory use during active
drilling and well completion only.
44. Transportation and circulation. All applicants for drilling and completion operations
(New Wells) shall include in their applications detailed descriptions of all proposed
access routes for equipment, water, sand, waste fluids, waste solids, mixed waste, and
all other material to be hauled on the public streets and roads of the City. The
submittal shall also include the estimated weights of vehicles when loaded, a description
of the vehicles, including the number of wheels and axles of such vehicles, trips per
day and any other information required by the Traffic Engineer. Preliminary information
is required for this item for the Conceptual Review meeting, in accordance with Appendix
B. The Company shall comply with all Transportation and Circulation requirements as
contained in the Land Use Code as may be reasonably required by the City’s Traffic
Engineer.
21
45. Wastewater and Waste Management. In the Fort Collins Field, all fluids shall be
contained and there shall be no discharge of fluids, as described in the Closed Loop
System and Green Completions section of this Appendix. Waste shall be stored in tanks,
transported by tanker trucks, and disposed of at licensed disposal fields. In the UDA, new
secondary containment shall be constructed of steel, with sufficient perimeter and height
to hold one and one-half (1.5) times the volume of the largest tank and sufficient freeboard
to prevent overflow. No potential ignition sources shall be installed inside the secondary
containment area unless the containment enclosed a fired vessel. The requirements for
secondary containment will meet the Fort Collins Stormwater Criteria Manual. No land
treatment of oil impacted or contaminated drill cuttings are permitted. The use of a closed
loop drilling system precludes discharge of produced water or flowback to the ground or
the use of pits. Produced water or flowback will not be used for dust suppression. A copy
of the field’s Spill Prevention, Control, and Countermeasure Plan (SPCC) will be given to
the City, which describes spill prevention and mitigation practices. The Company will
provide the City documentation of waste disposal and its final disposition.
46. Water supply. The Company shall identify in the site plan its source for water used
in both the drilling and production phases of operations. The sources and amount of
water used in the City shall be documented and this record shall be provided to the
City annually or sooner, if requested by the City Manager. The disposal of water used
on site shall also be detailed including anticipated haul routes, approximate number of
vehicles needed to supply and dispose of water and the final destination for water used in
operation.
47. Weed control. The Company shall be responsible for ongoing weed control at oil and
gas operations, pipelines, and along access roads during construction and operation, until
abandonment and final reclamation is completed per City, Larimer County or other
applicable agency regulations. The appropriate weed control methods and species to be
controlled shall be determined through review and recommendation by the County Weed
Coordinator by reference to the Larimer County Noxious Weed Management Plan and in
coordination with the requirements of the surface owner.
22
APPENDIX B
SUBMITTAL REQUIREMENTS FOR THE COMPANY FOR NEW WELL
LOCATIONS WITHIN THE CITY LIMITS OF FORT COLLINS
1. Conceptual Review Submittal Requirements. The following documents shall be submitted
prior to the Conceptual Review meeting outlined in Appendix A:
a) A preliminary summary of planned operations, including identified access points and
operational timeline for posting to a local community information web-page;
b) A preliminary site plan for site preparation, mobilization and demobilization;
c) A preliminary plan for interim reclamation and revegetation of the well pad and final
reclamation of the well pad;
d) A preliminary plan for noise, light and dust mitigation;
e) A preliminary traffic management plan;
f) A preliminary Visual Mitigation Plan, including but not limited to, a list of the
proposed colors for the operations’ equipment, proposed fencing and screening in
accordance with Appendix A.
g) A preliminary list of permits that shall be submitted in conjunction with the APD and
any exceptions proposed to be requested.
h) A draft air quality mitigation plan in accordance with Appendix A.
i) A draft emergency response preparedness plan in accordance with Appendix A.
j) Preliminary list of chemicals proposed to be disclosed through the “Frac Focus”
uploading mechanism and regulated through the COGCC Rule 205.
k) Proposed sampling locations in accordance with the water quality monitoring plan
outlined in Appendix A.
2. Submittal Requirements Prior to Commencement. The following documents shall be
submitted by the Company prior to the commencement of drilling and completion:
a) A response letter that outlines how staff comments from the Conceptual Review were
addressed during the APD permitting process.
23
b) A summary of planned operations, including identified access points and operational
timeline for posting to a local community information web-page;
c) A site plan for site preparation, mobilization and demobilization;
d) A plan for interim reclamation and revegetation of the well pad and final reclamation
of the well pad;
e) A plan for noise, light and dust mitigation, to the extent reasonably feasible;
f) A traffic management plan, if applicable, and a reasonable bond to cover any damage
to public infrastructure during active drilling and completion;
g) A Visual Mitigation Plan, including but not limited to, a list of the proposed colors
for the operations’ equipment, proposed fencing and screening in accordance with
Appendix A.
h) Copies of all permits requested, including any exceptions.
i) A final air quality mitigation plan in accordance with Appendix A.
j) A final emergency response preparedness plan in accordance with Appendix A.
k) Updated preliminary Chemical disclosure using the “Frac Focus” uploading
mechanism, and Chemical Inventory per COGCC Rule 205.
l) Baseline water quality data collected in accordance with the Water Quality
Monitoring Plan.
3. Submittal Requirements Post Well-Completion. The following documents shall be
submitted by the Company after well-completion:
a) Chemical disclosure using the “Frac Focus” uploading mechanism, and Chemical
Inventory per COGCC Rule 205.
b) Water quality data collected at 1, 3, and 6 year post-completion intervals, as described
in Appendix A.
24
c) Air quality and other data collected throughout the post-completion phase, as
identified in Appendix A.