Loading...
HomeMy WebLinkAboutReport - Mail Packet - 4/11/2013 - City Manager�S Monthly Update � April 11, 2013April 11, 2013 ISSUES BEFORE COUNCIL 2013 Water Supply Management Action Plan...........................................................................2 Resolution Concerning the URA and Its Tax Increment Revenue Bonds .................................2 USA Pro Challenge ...................................................................................................................2 Urban Agriculture Land Use and Municipal Code Changes ...................................................2 621 South Meldrum PDP Appeal .............................................................................................3 URA Debt Refinance ................................................................................................................4 ECONOMY Fort Collins Sales and Use Tax ..................................................................................................4 CAPITAL PROJECTS Harmony Road Maintenance – College to Timberline ..............................................................5 Citywide Pedestrian Access Project...........................................................................................5 South Shields Street Bridge over Larimer Canal No. 2 .............................................................6 Mulberry Bridge at the Poudre River Enhancements ................................................................6 West Mulberry Bridge Replacement Design .............................................................................7 West Prospect Bridge Replacement Design ..............................................................................7 Westbury and Shields Improvements ........................................................................................7 Troutman Underpass ..................................................................................................................8 Spring Creek (NRRC) Overpass ................................................................................................8 Mason Corridor MAX Bus Rapid Transit Project .....................................................................8 Utilities Capital Projects ...................................................................................................... 9-14 COMMUNITY EVENTS ...........................................................................................................15 NATURAL AREAS QUARTERLY REPORT ........................................................................16 PUBLIC SAFETY UPDATE Police Services ................................................................................................................... 17-20 Poudre Fire Authority ........................................................................................................ 20-22 BUILDING ACTIVITY ........................................................................................................ 23-24 2 ISSUES BEFORE COUNCIL April 16 Regular Meeting Staff report: 2013 Water Supply Management Action Plan  Staff will provide a brief update on water supplies and potential changes to water restrictions. Resolution Concerning the URA and Its Tax Increment Revenue Bonds, Declaring the City’s Intent to Appropriate Funds to Replenish the Reserve Fund Securing Such Bonds, if Necessary  In conjunction with the URA Debt Refinancing, the City will make a Moral Obligation Pledge to replenish the URA’s debt reserve fund if the funds were needed and used to make a debt service payment.  Such a pledge will improve the credit rating of the debt issue and make more money available to repay the City. Creation of Joint Powers of Authority to Manage USA Pro Challenge  The City of Fort Collins, Larimer County, City of Loveland, Town of Estes Park and Town of Windsor have successfully secured a stage of the 2013 USA Pro Challenge; the event will be in Northern Colorado on Saturday, August 24, 2013.  The Pro Challenge is an annual professional road cycling stage race featuring riders from sixteen international, professional teams.  The participating entities have created an Intergovernmental Agreement (IGA) that creates a new public entity, the Northern Colorado USA Pro Challenge Local Organizing Committee (LOC), which will be responsible for planning, funding, promoting and conducting the Fort Collins-Loveland stage of the event.  The LOC will be governed by a nine member Executive Committee which includes one representative from each municipality; other members will be appointed by the municipal representatives based on expertise needed to put on the event.  The event is anticipated to bring approximately 40,000 – 60,000 people to downtown Fort Collins for the Finish Festival, and approximately 250,000 people throughout the entire Northern Colorado course. April 23 Work Session 2013 Water Supply Management Action Plan  Staff will provide: o A detailed update on water supplies and potential changes to water restrictions; o A general description of the City’s water supplies and demands; o Continued communication and public outreach related to water restrictions. Urban Agriculture Land Use and Municipal Code Changes  This is the first reading of amendments to the Land Use Code and Municipal Code regarding urban agriculture, e.g., Community Supported Agriculture, Community Gardens, and urban farms.  As a response to requests from the community, work began in summer 2012 to identify ways for the Land Use Code to reflect urban agriculture land uses currently practiced in 3 Fort Collins. Currently, the Land Use Code only allows these uses as a primary use on the land in four of the City’s 25 zone districts.  This work is in alignment with the City Plan Principle SW 3, which states, “The City will encourage and support local food production to improve the availability and accessibility of healthy foods, and to provide other educational, economic, and social benefits.”  Extensive public outreach, including a project website, an online survey (611 responses), a public open house (95 attendees), several focus group discussions with local farmers as well as Homeowners Associations and the Larimer County Humane Society, and discussions with seven City Boards and Commissions have occurred since the project was initiated.  As the discussions with the public have taken place, citizens have requested that urban agriculture be allowed in all zone districts and that additional farm animals be allowed in the City, e.g., allow for more chickens and allow for ducks and goats to be raised as well.  On March 21, 2013, the Planning and Zoning Board unanimously recommended the proposed Land Use Code changes related to this topic.  On April 23, City Council will review and take public comment on the proposed Land Use Code and Municipal Code changes, including the following elements: o Instead of requiring urban gardens to go through a full development review process, staff is proposing to create an urban agriculture licensing system that includes standards to address neighborhood compatibility but does not require urban gardens to plat or meet the Larimer County Urban Area Street Standards, which could prove prohibitive to this land use; o Allows farmers markets to take place in more areas of the City; o Allows produce stands and backyard gardens to be processed under the home occupation license if food is to be sold on-site; o Scales the number of chickens allowed on a lot based on lot size, and allows ducks as well; o Allows two miniature (dwarf or pygmy) goats per household for milk production (must meet minimum space and human condition requirements, as with the allowance of chickens). May 7 Regular Meeting 621 South Meldrum PDP Appeal  621 South Meldrum PDP is a request to demolish an existing 626 square foot single family structure, and construct a multi-family building containing four units. The existing residence, which is located a half block north of West Laurel Street, has been functioning as a college student rental. The site is approximately 0.22 acres or 9,513 square feet, and is bisected by the Arthur Ditch. The ditch is an underground concrete water canal approximately 13 feet wide in a 33 feet wide easement. The property abuts a 20 foot alley to the west.  The proposed multi-family building is two stories in height with approximately 4,900 total square feet and will contain three-bedroom/two bathroom dwelling units. The project proposes four off-street parking spaces to be accessed from the alley. The property will be re-platted to include new easements. The site is in the (N-C-B) Neighborhood Conservation, Buffer zone district, and falls within the TOD (Transportation Overlay Development) zone. One Modification of Standard accompanies 4 this request addressing Section 3.2.2(J) of the Land Use Code, which requires that any vehicular use area containing six or more parking spaces or 1,800 or more square feet shall be set back from the side lot line a minimum average of five feet. The Modification requests a reduction of the setback from five feet to three feet.  The appellant objects to the setback reduction, and requests that the proposed retaining wall along the south property line be redesigned. URA Debt Refinance  The City is owed $16.2 million in loans to the URA.  Investments in the North College Plan area are now generating Property Tax Increment revenue of $1.3 million annually. Investors buying the debt will provide better terms now that there is an established and ‘proven’ revenue stream.  Investor/lenders will require a debt reserve fund and coverage ratio to ensure the URA can repay the debt.  The specific debt terms are still being designed and negotiated. The net amount available to pay back the City will be presented at the May 7 meeting, but staff anticipates at least $11-12 million of the $16.2 million can be refinanced.  The Council Finance Committee reviewed the preliminary refinancing proposal on December 17, 2012. ECONOMY FORT COLLINS SALES AND USE TAX February 2013 Sales tax collections increased 4.5% Use tax collections excluding rebates increased 46.5% Sales and use tax collections excluding rebates increased 9.1% 2013 YTD Sales tax collections increased 4.2% Use tax collections excluding rebates increased 21.7 % Sales and use tax collections excluding rebates increased 6.3% 5 CAPITAL PROJECTS (new information noted in blue text) ENGINEERING HARMONY ROAD MAINTENANCE – COLLEGE TO TIMBERLINE Funding Source: Harmony Maintenance Fund and Building on Basics (BOB) Funds Estimated Project Budget: $2.5 million Status: On Budget, On Schedule  Phase Two of the project will consist of safety improvements and signal upgrades at the Harmony Road and Union Pacific Railroad crossing. The existing railroad equipment does not meet the current code requirements for a six-lane roadway crossing.  The City and Union Pacific have executed all necessary agreements. We are working on  After the construction Union Pacific dates installs and expect their new the work facilities, to be the completed City will in have May some 2013. minor asphalt patching and striping work to do adjacent to the crossing. Harmony Road will then be a  six-The lane project roadway website from is located Boardwalk at the to following I-25. link: http://www.fcgov.com/engineering/hmp.php CITYWIDE PEDESTRIAN ACCESS PROJECT Funding Source: KFCG Funds Estimated Project Budget: $100,000 Status: On Budget, On Schedule  The City of Fort Collins Pedestrian Plan addresses citywide pedestrian needs. However, there was not an inventory of existing sidewalks or sidewalk deficiencies. The Citywide Pedestrian Access Project (a.k.a. Pedestrian Needs Assessment) will provide a complete sidewalk inventory, as well as identify sidewalk inadequacies, and also identify inadequate handicap accessibilities according to Americans with Disabilities Act (ADA) requirements. The project will: o Determine the condition, missing location, and City and ADA compliance of sidewalks and ramps within the City right of way. o Be cataloged in a database, which also manages the street pavement maintenance, bridge inventory, and utilities inventory. o Bring all the different data together; pedestrian needs project work will be coordinated with other projects for cost savings and minimization of impacts to the public. o Use data collection to provide maps, cost estimates, and a prioritized project list for a repair program to begin in the fall of 2013.  Data collection is ongoing with approximately 528 street miles of sidewalk assessed and inventoried at this time.  35,494 accessible ramps have been identified as acceptable, substandard, or missing in accordance with the ADA requirements.  Staff is implementing a program to determine the level of service for sidewalks. 6  Staff is reviewing the 2012 departmental street repair data to update the pedestrian needs map.  Staff is implementing a methodology and analysis program used to prioritize pedestrian projects. This program will take into account a variety of factors such as, but not limited to, demand, corridor function, and high priority areas.  Staff has identified approximately 30 projects for 2013 and has begun to collaborate with various departments to prioritize those projects. SOUTH SHIELDS STREET BRIDGE OVER LARIMER CANAL NO. 2 Funding Source: Colorado Off System Bridge Program (BRO) Funds and KFCG 2011 Estimated Project Budget: $1.5 million Status: On Budget, On Schedule  The main goal of this project is to replace the second worst rated, structurally deficient bridge in the City.  Construction will include the removal of the existing structure, the construction of a new structure, relocation and upgrading of existing utilities, and the construction of urban design features. The new bridge will be similar in size to the existing bridge.  The project will be constructed in phases, starting on the east half of the structure, followed by the west half. During construction, traffic lanes will be reduced to one lane in each direction. Bicycles will be asked to merge with traffic or find alternate routes. Pedestrian access will always be available during the duration of the project.  Traffic has been switched over to the east half of the new structure so work on the west half of the structure can begin. Urban design improvements continue on the east half of the new structure.  Upcoming months will see the demolition of the remaining half of the existing bridge, and foundation construction and girder placement for the new structure.  This project was bid together with the Laporte/Whitcomb Bridge to achieve overall project savings.  Additional project information and information on planned roadway closures can be found at http://www.fcgov.com/engineering/shields-bridge.php MULBERRY BRIDGE (SH 14) AT THE POUDRE RIVER ENHANCEMENTS Funding Source: City of Fort Collins Estimate Project Budget: $750,000 Status: On Budget, On Schedule  Colorado Department of Transportation (CDOT) is replacing the Mulberry Bridge (State Highway 14) over Poudre River Bridge starting in the fall of 2013.  Due to the construction, eastbound traffic on Mulberry will be detoured for approximately 18 months.  The City is working with CDOT to add City funded enhancements to the bridge including decorative railings, landscaping and urban design features. 7 WEST MULBERRY BRIDGE REPLACEMENT DESIGN Funding Source: Colorado Off System Bridge Program (BRO) Funds and KFCG 2011 Estimated Project Budget: $250,000 (Design only) Status: On Budget, On Schedule  The goal of the project is to replace the existing structurally deficient bridge with a new bridge that meets the current standards.  The posted weight limit on this bridge precludes the passage of emergency vehicles from the nearby fire station.  In December 2011, the City received a grant for $700,000 in Colorado Off System Bridge Program (BRO) funds for some of the construction cost.  Design efforts are underway and will be complete by this fall. Construction is planned for fall 2014. WEST PROSPECT BRIDGE REPLACEMENT DESIGN Funding Source: KFCG 2011 Estimated Project Budget: $250,000 (Design only) Status: On Budget, On Schedule  The goal of the project is to replace the existing structurally deficient bridge with a new bridge that meets the current standards.  The State of Colorado inspected this bridge in March 2011 and found significant structural issues resulting in a temporary plate being installed and load posting restricted to 15 tons.  Design efforts are underway and will be completed by summer 2013. WESTBURY AND SHIELDS IMPROVEMENTS Funding Source: Building on Basics (BOB) Funds along with Xcel Energy contributions Estimated Project Budget: $650,000 Status: On Budget, On Schedule  The goal of this project is to relieve traffic congestion and vehicle wait time by constructing an additional northbound travel lane on Shields from Clarendon Hills to Westbury.  The need for this safety and operational improvement was identified in the Engineering Department’s recently completed Arterial Intersection Prioritization Study. The lane addition on Shields will improve traffic flow by relieving congestion for northbound traffic, whereby the outside lane will act as a right turn lane during the peak hours and a through lane during the off-peak hours.  The proposed improvements will reduce the morning peak hour delay by 18%.  Xcel Energy will be constructing its West Main Natural Gas Pipeline Replacement Project through this area. The roadway improvements will be coordinated with Xcel’s schedule.  Southbound Shields has existing curb and gutter along this stretch of roadway. The project will patch two locations southbound, and place a 2-inch asphalt overlay over the entire roadway with new striping.  We anticipate the work being completed in the summer of 2013. 8  The final product will reshape Shields Street to a four-lane arterial with a center left turn lane and on-street bike lanes from Harmony Road to Clarendon Hills Drive (approx. 0.5 miles).  A communication plan (public outreach) is being developed and will be implemented with the final design through construction.  The project website is available through the Engineering homepage at http://www.fcgov.com/engineering/shields-westbury.php TROUTMAN UNDERPASS Funding Source: Federal Congestion Mitigation and Air Quality (CMAQ) grant and Building on Basics (BOB) Funds Estimated Project Budget: $1.5 million Status: On Budget, On Schedule  The goal of the project is to construct a new pedestrian/bike underpass that will link the Mason Bike Trail to Troutman Road.  The Public Utilities Commission (PUC) process is complete.  The project was awarded to Structures, Inc. Construction will begin July 2012 and will be completed by February 2013.  The portion of structure in the BNSF railroad right-of-way was constructed during the end of July railroad closure.  Mason Trail reopened to the public in December 2012.  Steel railing, fencing, and electrical lighting are currently being installed.  The underpass concrete and railing will be painted in April 2013 when overnight temperatures allow for proper paint curing. SPRING CREEK (NRRC) OVERPASS Funding Source: Federal Congestion Mitigation and Air Quality (CMAQ) grant and Building on Basics (BOB) Funds Estimated Project Budget: $2.75 million Status: On Budget, On Schedule  The goal of the project is to construct a new pedestrian/bike overpass that will link the Mason Bike Trail and the federal campus on the west side of the railroad tracks to the Mason Corridor Bus Rapid Transit MAX station on the east side of the tracks.  All approvals and clearances have been obtained.  Staff is reevaluating the project design including the possibility of an alternate design with ramps instead of elevators.  The proposed schedule is to complete construction in by May 2014 in conjunction with the opening of the MAX BRT. MASON CORRIDOR MAX BUS RAPID TRANSIT (BRT) PROJECT Funding Source: FTA 80%, Local Match (CDOT SB-1, CDOT FASTER, City, and Downtown Development Authority) 20% Estimate Project Budget: $87 million 9 Status: On Budget, On Schedule  Prospect Road at the railroad tracks remains closed through early April as crews finalize drainage, conduit, sidewalk, concrete pavement, and curb and gutter placement.  McClelland south of Foothills Parkway is also closed as crews replace the box culvert at the Larimer #2 canal.  Station construction has begun at the Mulberry, University, Drake, Horsetooth and Troutman.  Stations have been set at southbound Mountain, northbound Swallow, southbound Swallow, and Harmony.  Crews are working on the aesthetic detailing for the Downtown Transit Center Station, northbound Mountain Station, and southbound Olive Station.  Intersection improvements at Maple and Mason are nearing completion with the installation of truncated domes for the handicap ramps. The northeast corner is scheduled to be completed in April.  CEI crews continue to make progress on the drainage installation throughout the project area. The focus this month has been at Spring Creek as well as the Mason Street Outfall south of Prospect.  Conduit installation for the MIS duct bank is ongoing, and approximately 1700 feet have been installed this month.  Construction for the super-structure of the bridge at Mail Creek continues to progress. The bridge girders have been installed and it is anticipated that the bridge deck will be poured in early to mid-April.  Growling Bear continues construction of the South Transit Center, including installation of structural concrete columns and beams, and structural steel framing on the north canopy.  Heath Construction continues work on the Maintenance Facility Expansion and has completed the installation of the foundation. UTILITIES WEST VINE OUTFALL CHANNEL Project Description: This is a joint project between the City and Larimer County to design and construct a stormwater outfall channel for the West Vine Basin to the Poudre River. The project is being coordinated with Larimer County’s widening of Shields Street from the Arthur Ditch to Willox. Project Status: Alternative Analysis Phase completed; negotiating with landowners. Anticipated Completion Date: Preliminary design underway; construction in the fall of 2013 Ahead/Behind/or on Schedule: On Schedule Total Project Budget: Alternatives Analysis Phase ($104,000); Final Design ($243,000); Total Project Cost $2.4 million Budget Status: $201,000 spent to date. Project is within budget. Highlights:  Cost estimates of alternatives have been developed.  The two property owners (Arnett and Scott) have been presented with a proposal to purchase land for the project. 10  Working on collaboration with Natural Areas.  Preliminary Design for the Water Quality area north of Vine Drive and the Outfall to the Poudre River has begun. WASTEWATER COLLECTION SYSTEM – SMOKE TESTING Project Description: This project will identify defects in the sanitary sewer system that lead to excess flow at the wastewater treatment plant. The project involves blowing smoke into manholes in the area of concern and identifying locations where smoke comes to the surface. Measures will be taken to minimize the risk of smoke entering homes and businesses. Flow monitoring data since 2009 was used to identify areas throughout town that should be tested for possible defects. Project Status: The testing is planned to start in mid-March. Anticipated Completion Date: Ongoing Ahead/Behind/or on Schedule: On Schedule Total Project Budget: The project is being conducted with City staff. Budget Status: The project is being conducted with City staff. Budget is minimal other than staff time. Highlights:  Flow monitoring has been conducted for the majority of the system since 2009.  Smoke Testing plan for the spring of 2013 has been developed.  A public relations plan is being developed.  The neighborhood surrounding Irish Elementary was tested the week of March 25. LAPORTE AVENUE TRANSMISSION MAIN IMPROVEMENTS Project Description: Removal and/or rehabilitation of Utilities’ 20 inch and 27 inch water transmission mains in LaPorte Avenue between Taft Hill Road and Vine Drive, during 2013, as directed by the Water Master Plan. LaPorte Avenue is scheduled for paving west of Taft Hill Road by the Streets Department in the summer of 2013. Water Utility work will continue in 2014 to accommodate full depth pavement reconstruction in LaPorte Avenue between Shields Street and Taft Hill Road by the Streets Department in 2014. The project will involve valve installations and removals, new vault installation, old vault demolition, pipe lining, and new service connections. City water crews will perform new service connections this winter in preparation for the major construction next summer. Project Status: Project scheduled to start in April 2013 Anticipated Completion Date: Work completed by July 15, 2013 Ahead/Behind/or on Schedule: On Schedule Total Project Budget: Under development Budget Status: $2,100,000 remaining Highlights:  Entire 27 inch Steel main between Vine Drive and Grandview to be abandoned by mid- summer 1013 11 42 INCH SANITARY SEWER MAIN AND 12 INCH WATER MAIN RELOCATION AT MULBERRY BRIDGE Project Description: In order to accommodate the construction of the new bridge over the Poudre River on Mulberry Street by CDOT, conflicting utility lines must be relocated. At CDOT expense, the 42 inch sanitary sewer main and the 12 inch water main will be relocated to the north of their current location so they will not conflict with the new wider bridge. The project includes the design, permitting, and construction necessary to remove the utility lines from conflict with the new bridge. Project Status: On schedule. Intergovernmental Agreement for both design and construction phase in place. Project funded by CDOT. Anticipated Completion Date: May 15, 2013 Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $942,000 Budget Status: In Budget Highlights:  Water, Sewer, communications conduit, and power conduit constructed through the river. Project crew was able to save the project money by placing the electric and communications conduits in the 42 inch sewer encasement.  Project design and construction using Utilities Alternative Product Delivery System approved by CDOT.  Relocation of large utility mains under the Poudre River presents numerous engineering and construction management costs.  There are many existing utility conflicts and relocations required to allow for the new 42 inch sewer and the 12 water main.  Both the water and sewer lines have been relayed across the river. The lines will be completed in April. BOX ELDER CREEK OUTFALL IMPROVEMENTS Project Description: Large regional flood control project to be designed and constructed under Intergovernmental Agreements with Timnath Development Authority and Boxelder Basin Stormwater Authority. Project involves channel grading and road crossing improvements from I-25 across Prospect Road with major bridge or box culverts and then south to the Poudre River along the Boxelder Creek Corridor. Project Status: Engineering design Scope of Work in preparation. Conceptual level cost estimate in preparation.  Preliminary Design: April 2013 - August 2013  CLOMR Submittal: September 2013  Right of Way Requirements: March 2013 - April 2014  Final Design and Permitting Requirements: October 2013 - April 2014 Anticipated Completion Date: December 30, 2014 Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $2,900,000 Highlights: Scope of work for preliminary design under negotiation with Timnath. 12 CATHODIC PROTECTION OF WATER TREATMENT AND TRANSMISSION AND DISTRIBUTION SYSTEM WATER LINES Project Description: Investigation of existing systems in place used to protect water lines from corrosion; design of rehabilitation of existing and new systems to prevent corrosion; and construction of modified and new systems. Project Status: On Schedule Anticipated Completion Date: This is an ongoing project Total Project Budget: $552,000 (2013) Budget Status: Within budget Highlights:  Working with consultant and contractor on testing current cathodic protection levels and locations, and installing modified and new systems where needed.  Modified the cathodic protection test sites on the raw water line going into the treatment plant in March 2012.  Took readings and conducted continuity testing of AB line, Mulberry, Lemay, and Lincoln lines.  Designing rectifiers and locations for rectifiers along the AB line and at the WTP.  Prepared legal exhibits and obtaining easements for the rectifier locations along the AB line.  Working with contractor on work order for cathodic protection work in preparation for anode and rectifier installation at the WTF.  Meeting with other water districts to discuss cathodically bonding to their systems which cross the City’s system.  Working with contractor on costs to install rectification system in order to determine budget needed for 2013 and 2014. BUS RAPID TRANSIT (BRT) WATER AND SEWER RELOCATES Project Description: Relocation and protection of major water and sewer utility lines due to the construction of the BRT. Project Status: Utility projects complete; working on administrative issues, including invoices, Buy America requirements, and completion reports. Anticipated Completion Date: Winter 2011 – Fall 2013; Utility project work completed Ahead/Behind/or on Schedule: Ahead of schedule; project work complete March 2013 Total Project Budget: $1,250,000 Budget Status: Within Budget Highlights:  All Utilities impacted by the BRT have been identified and cost estimates were developed.  Coordination with the BRT continues.  Contract for design services completed, construction contracts for all identified projects in effect.  Council approved reallocation of water and wastewater budget.  Completed Prospect water line move and sanitary sewer replacements.  Water Utility work in Prospect completed the second week in March. 13 STREAM REHABILITATION AND ENHANCEMENT PROGRAM Project Description: Stream restoration and habitat enhancement across City including stabilizing stream channel morphology, restoring/creating new native in-stream and riparian habitat to attract and support native fish and wildlife populations, and promote BMPs to improve water quality. First watershed in program is Fossil and Mail Creek. Project Status: Initial program visioning charrette completed, working with consultant on design work order. Anticipated Completion Date: First project design to be complete by fall 2013 with construction to begin fall of 2014. Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $600,000 each year Budget Status: Within Project Budget Highlights:  Conducted several vision meetings and site visits.  Met with Corps of Engineers representative to discuss Individual Permit requirements – may conduct “Threatened and Endangered Species” survey and other items which will not fit timeframe for construction this fall, so preliminarily scheduled for fall 2014.  Conducted vision charrette in February.  Working on design with contractor and consultant. RIGDEN MUNICIPAL STORAGE POND Project Description: Final design of the Flatiron gravel pit east of Ziegler and north of Horsetooth as a municipal storage pond below the Drake Water Reclamation. Purpose of the storage is to retime flows to meet water rights return flow obligations and meet augmentation requirements. Project is a cooperative effort with Natural Areas and Parks. Project Status: On schedule Anticipated Completion Date: Design complete in 2013; Construction in 2014 Ahead/Behind/or on Schedule: On Schedule Total Project Design Budget: $336,112 Total Project Construction Budget: $8,000,000 Budget Status: Preliminary Design is complete; final design has begun. Highlights:  Anderson Consulting is preparing the final design.  City Attorneys are preparing the draft purchase agreement.  Acquisition costs being are finalized.  Cost estimate and schedule are being updated. PLEASANT VALLEY PIPELINE FOREBAY SEDIMENATATION POND Project Description: Design and construction of a Sedimentation Pond at the intake structure for the Pleasant Valley Pipeline to remove sedimentation from the High Park Fire in the Poudre River raw water before it goes into the pipeline. Project Status: Phase I construction almost complete. Phase II construction to begin when work order is complete. Anticipated Completion Date: Phase I – April 1, 2013; Phase II – June 2013 14 Ahead/Behind/or on Schedule: On Schedule Total Project Budget: $1,700,000 Budget Status: On Budget Highlights:  February 5, 2013: selected Ayres Associates as consultant for the design and construction administration phases.  Executed Permission to Enter document with property owner, Northern Colorado Water Conservancy District.  February 25, 2013: Phase I design complete, issued Notice to Proceed to Hydro Construction. Began mobilization.  Excavated to pond bottom and constructed embankment surrounding pond.  Excavated for and constructed inlet structure and backfilled.  Installed slide gates at inlet structure.  Cut new gate opening in existing PVP inlet structure and installed new 3’ x 9’ RCBC at opening. 15 COMMUNITY EVENTS Spring Artisan Market Location: Senior Center, 1200 Raintree Drive Date/Time: Saturday, April 13, 2013 9:00 AM Details: Local artists and small businesses will display their homemade goods and products. This market is a unique blend of homemade and commercial products for spring shoppers thinking about graduation, Mother's Day, and Father's Day gifts. You will find the practical, whimsical, lotions and potions, and everything in between. Cost is $1 per person. Food and drinks are available for purchase. Contact Information: Recreation Phone: (970) 221-6644 E-mail address: pmoore@fcgov.com Earth Day Event Location: Call for details Date/Time: Saturday, April 20, 2013 9:00 AM Details: Celebrate Earth Day with the City of Fort Collins Natural Areas Department! Volunteers are needed to plant native trees and shrubs along the Poudre River. All supplies (and yummy snacks) provided; no experience necessary. Registration is required. Project location and logistical details will be provided with registration - call (970) 416-2815 or email naturalareas@fcgov.com to register. Web address: http://www.fcgov.com/naturalareas/ Contact Information: Phone: (970) 416-2815 E-mail address: naturalareas@fcgov.com Burning Questions: Fire and Our Watershed Location: Midtown Arts Center, 3750 S. Mason Street Date/Time: Wednesday, May 8, 2013 7:00 PM Details: Find out how the High Park Fire impacted the Poudre River watershed and the City's water supply. Fort Collins Utilities staff will share fire mitigation efforts to ensure high quality water. Web address: http://www.fcgov.com/reps Contact Information: Fort Collins Utilities Phone: (970) 221-6700 E-mail address: utilities@fcgov.com To view the full calendar of events, visit http://www.fcgov.com/events/ 16 NATURAL AREAS QUARTERTLY REPORT Land Conservation Update - March 2013 Acreage Cost Land Conserved: Jan - Mar 14.94 $ 800,000 Land Conserved: Apr - Jun Land Conserved: Jul - Sept Land Conserved: Oct - Dec Total Land Conserved: Year to Date 14.94 $ 800,000 Land Conservation Summary - To Date Acreage Cost Acres of Land Purchased 35,004 Acres of Land Leased 1,128 Acres of Land Placed in Conservation Easements 5,548 Total Acres Conserved 41,680 $ 79,768,582 Land Conservation Funds Budgeted for 2013* $ 1,703,000 Under Contract 10 acres King-Hatch Property $ 380,000 Acquisitions To Date - 2013 14.94 acres - Forney Property (partnership with Stormwater, total 37.35 acres) $ 420,000 TOTALS - $ 800,000 Net Land Conservation Funds Remaining for 2013 $ 903,000 *Does not include prior year reserves and unanticipated revenues that will be appropriated in June. 17 PUBLIC SAFETY UPDATE FORT COLLINS POLICE SERVICES Call Load In March 2013, officers responded to 8,317 incidents resulting in 1,548 cases compared to 8,600 incidents and 1,668 cases for the same period last year. Year-to-date totals reflect a decrease in both categories when compared to the same period last year. 2012 - YTD 2013 - YTD Incidents 24931 23990 Cases 4595 4421 Resident Meeting with Police Chief John Hutto Fort Collins Police Chief John Hutto hosted a meeting on Wednesday, April 3 from 6:00-8:00 p.m. with the residents of Park Lane Towers, 415 S. Howes Street. City staff provided a brief presentation on neighborhood crime data and nuisance activity followed by a Q&A session to discuss what’s working well for the residents and how we can improve. This was the first of four neighborhood meetings planned in 2013. Party Registration The Party Registration Project, a partnership between CSU, City Police and the City’s Neighborhood Services, reminds people to register their spring parties in advance to avoid a pricey noise violation fine. Students should contact Off-Campus Life to register parties. Non- students may register with Neighborhood Services. When you register your Friday or Saturday party in advance, the police will call if they receive a noise complaint about your party, offering hosts an opportunity to break up the party on their own without a visit from the police. The program runs year round. All parties must be registered by the preceding Thursday at 5 p.m. Sign Up for Emergency Notifications When a disaster strikes, or an emergency situation arises, such as a wildfire, you need to know about it. Emergencies are defined as imminent or potential threats to life and or property. Residents in Larimer County can receive emergency notifications on their cell phones, business phones, via text messages, and email in addition to receiving phone calls on their traditional home phones. In addition, you can sign up to receive an alert at multiple addresses within Larimer County. To take advantage of this free service, you must sign up at www.leta911.org If you don’t sign up, you will still receive notifications on your traditional home phone, but nowhere else. If we can’t reach you, we can’t alert you. Nationwide Prescription Drug Take-Back Day The U.S. Drug Enforcement Administration (DEA) is once again partnering with local law enforcement agencies for the National Prescription Drug Take-Back Day on Saturday, April 27 from 10 a.m. to 2 p.m. to focus national attention on the issue of pharmaceutical controlled substance abuse and proper disposal methods. Drop off unused, unneeded, and expired over-the- 18 counter and prescription medications to the Fort Collins Police Services north parking lot at 2221 S. Timberline Road. The service is free and anonymous. Internet Safety for Kids Fort Collins police will host a series of Internet safety presentations for parent and kids to increase awareness and provide tools to keep everyone safe from the dangers of the Internet. Topics covered will include:  Sexual predators  Online enticement and grooming  Social networking websites  Cyberbullying  Email, Instant Messaging (IM), Smartphones and Sexting The presentations will be held from 6:30-8:30 p.m. on April 2, May 7, June 4, September 3, October 1, November 5 and December 3 in the Fort Collins Police Services Community Room located at 2221 S. Timberline Road. Contact Detective Keith Maynard at (970) 416-2051 or by e-mail at kmaynard@fcgov.com to reserve your space. 100-Year Anniversary April 21 marks the 100-Year Anniversary of the Fort Collins Department. The agency roots can be traced to the late 1800’s when Edwin Lakin Peterson was elected to serve as the first Constable in 1873 followed by a system of other constables and marshals until 1913 when the Police Department was officially formed. The recognition that citizens deserved full-time, professional law enforcement was an important step in the evolution of the community. To commemorate this historic event, Police Services is planning a year of celebration with many activities to honor the past. On April 16, Chief Hutto will accept a City Council proclamation declaring April 21 as Fort Collins Police Day and encourage residents to join the City in celebrating a “Century of Service.” In the 100 years of service many things have changed, yet the agency remains committed in providing professional and compassionate police services for the community. Crime Trends Fort Collins Police Service normally initiates approximately 1,700 case numbers per month. That number has started to trend downward in the past five years. Part I Crimes, defined by the FBI as Murder, Rape, Robbery, Aggravated Assault, Burglary, Theft, Vehicle Theft and Arson, have been decreasing across the country for that past few years. This decrease is reflected in the overall decrease in the number of cases that Fort Collins Police initiate every month. In the past five months, we have not initiated more than 1,600 cases. The coming warmer months will typically see a slight increase in those numbers. 19 Crime Prevention During March, the Crime Prevention Specialist spoke to 2,179 people and handled 36 telephone calls on topics ranging from notification of a Crime Stoppers tip that led to the arrest of one of Larimer County’s Most Wanted (Bryan Uhl) in Washington State to conducting a threat assessment for mediation services. The presentations included the annual CSU Housing Fair that brings in a large number of freshmen who are venturing out away from dorm life and into the city. A breakdown of the month’s Crime Prevention activities follows:  CSU Housing Fair - 2100 attended  Crime Prevention Through Environmental Design at City Mediation Office - 3 attended  Sustainability Group - 8 attended  RESTORE - 40 attended  Dealing with Difficult People, City Planning - 7 attended  Courthouse Alarms - 1 attended  Personal Safety at Park Lane Towers - 20 attended Crime Prevention Tip With the weather warming up, we often see a rise in indecent exposures. Although the people committing these crimes are often in it for the “shock factor,” they could later escalate into more harmful crimes. Most of these incidents are not reported to police, and therefore the perpetrators are able to continue victimizing. These suspects usually hang out in public places such as parks, bike trails, and shopping areas where they can approach the victim and then blend into their surroundings. Please be aware of your surroundings and don’t walk towards something that 20 makes you feel uncomfortable (listen to that inner voice). If you see a crime or something unusual, please call police to report it. If we don’t know about it, we can’t help you. POUDRE FIRE AUTHORITY Residential Fire in Southwest Area An elderly resident narrowly escaped a burning garage on March 5 in west Fort Collins. Firefighters responded to a reported garage fire and were informed while responding that the fire was most likely extinguished. In contrast, when they arrived they found the attached garage with fire coming from the rear door. The resident who was attempting to extinguish the fire was helped to escape by a home health care employee, a City of Fort Collins Utilities employee and a neighbor. Two of these people were evaluated on scene for minor smoke inhalation by Poudre Valley Hospital Emergency Services. They were not transported. Firefighters were able to quickly control and extinguish the fire that had extended to the garage attic but not the living area of the residence. There was moderate fire damage to the contents in the garage and very light smoke damage to the residence. Fans were used to remove smoke from the living area. PFA Customer Assistance Response Team assisted the occupants with immediate shelter needs. Assisting agencies: City of Fort Collins Light & Power, Police Services, Poudre Emergency Communications Center and PVH Emergency Services. A PFA investigator determined the origin to be in the garage; cause was determined to be accidental. No further information is available. Galena Wildland Fire Poudre Fire Authority fire crews, with help from surrounding agencies, responded just before noon March 15 to what is known as the Galena wildland fire. The fire started on Galena Court, quickly spread to surrounding vegetation and threatened structures. The fire moved quickly to the south/southeast, fanned by winds blowing around 15 mph and gusting over 30 mph. The fire eventually burned approximately 1,348 acres and was contained on Wednesday, March 20. At one point, 130 firefighters worked to control the fire. Evacuations were initially sent for residents of Soldier Canyon Estates. Additional evacuations were also sent to residents living west of Horsetooth Reservoir on the south end. The fire was pushed from the north by strong, erratic winds. Cache la Poudre Elementary in LaPorte was used as the evacuation center. The investigation revealed the origin to be at a residence on Galena Court. The cause was found to be ‘accidental;’ the resident was attempting to make a connection for an electrified fence when it sparked and ignited dry grass. The Larimer County District Attorney ruled there was no evidence to support any criminal charges. 21 Residential Fire in Southeast Area Firefighters were called on March 29 to a split-level, single-family home that had fire coming from the front windows, extending into the attic and spreading upstairs from the inside. Crews were able to attack the fire while searching the residence and cut a hole in the roof for ventilation, bringing the fire under control within 15 minutes. There was heavy fire damage to the living room, dining and kitchen areas. The other areas of the residence suffered heat and smoke damage. PFA Customer Assistance Response Team assisted the occupants with immediate shelter needs. Assisting agencies: City of Fort Collins Police Services, Poudre Emergency Communications Center and PVH Emergency Services. PFA investigators determined the origin to be in the first floor living room; cause is still being investigated. No further information is available. EMS Spring Conference The Emergency Medical Services Spring Conference was held again at the Lincoln Center on March 7. This conference brings emergency medical service providers from around northeast Colorado to get continuing education credits. Topics ranged from burns to dealing with unruly patients. Instructors are both local and from around the state. A huge benefit to the location is that, not only can attendees be there in person, but we stream content to all PFA fire stations and others in the area. Read Across America Crews from Tower 1 and Engine 10 helped in this event that draws more than 45 million participants across the country to help highlight the importance of developing a love for reading at an early age. Firefighters enjoyed the visits to Laurel and Linton Elementary Schools, and are looking forward to next year. Leadership Fort Collins PFA hosted another event to allow citizens to learn about different City services. PFA crews took part in this very worthwhile community centered program that educates citizens about the inner workings of certain governmental departments. PFA crews were able to give the group of ‘students’ general information about PFA, in addition to watching demonstrations of a vehicle extrication, spraying a fire hose and walking through a smoke-filled building. 22 Incident Statistics (by category) Report Period: March 2013 Total Loss Fires 33 $643,980 Overpressure/rupture, explosion-no fire 1 Rescue / EMS 1,010 Hazardous Condition - no fire 29 Service Call 62 Good Intent Call 91 False Alarms / False Calls 95 Severe Weather & Natural Disaster 0 Special Incident Type 2 Total = 1,323 YEAR-TO-DATE 2013 Total Loss Fires 98 $1,014,846 Overpressure/rupture, explosion-no fire 2 Rescue / EMS 2,873 Hazardous Condition - no fire 84 Service Call 178 Good Intent Call 261 False Alarms / False Calls 306 Severe Weather & Natural Disaster 0 Special Incident Type 4 Total = 3,806 Comparison: March 2012 Total Loss Fires 60 $432,205 Overpressure/rupture, explosion-no fire 0 Rescue / EMS 976 Hazardous Condition - no fire 18 Service Call 80 Good Intent Call 101 False Alarms / False Calls 87 Severe Weather & Natural Disaster 0 Special Incident Type 7 Total = 1,329 Comparison: YEAR-TO-DATE 2012 Total Loss Fires 109 $621,665 Overpressure/rupture, explosion-no fire 1 Rescue / EMS 2,757 Hazardous Condition - no fire 63 Service Call 210 Good Intent Call 260 False Alarms / False Calls 286 Severe Weather & Natural Disaster 0 Special Incident Type 9 Total = 3,695 *Information subject to change due to updated data. 23 BUILDING ACTIVITY COMMUNITY DEVELOPMENT & NEIGHBORHOOD SERVICES 2012 YTD 2013 YTD % Change Development Project Submittals Received 45 77 + 71% Conceptual/Staff Reviews Performed 42 69 + 64% Building Permits Issued 1,611 1,315 -18% Building Inspections Performed 7,631 7,683 +1% Plan Reviews Performed 415 450 +8% General Fund Development Review revenues are approximately $193,000 above projections for 2013 as of March 31. Projects of note include:  Link-N-Greens/Woodward – A formal submittal was received and the initial review completed. The project was approved by the Planning & Zoning Board on February 21, 2013 and became effective March 7, 2013. The proposed easements required for the project and a Business Assistance package were approved by City Council on March 26, 2013.  Foothills Mall Redevelopment – Efforts on this project continue. The project was approved by the Planning & Zoning Board on February 7, 2013. An appeal regarding the approval of the modification of standards requests in connection with the sign package was filed and heard by City Council on March 19, 2013. At this meeting, Council upheld the Planning & Zoning Board decision allowing two electronic message center signs along South College Avenue; however, overturned the Board’s decision to allow full color. Next steps include a final plan submittal, vacation of Foothills Parkway (Council Action) and completion of a development agreement. Construction Projects of Note:  Multi-family permits issued for the Trails at Timberline and One Boardwalk Place developments, with an associated 154 dwelling units.  4-story addition to the Engines & Energy Lab for CSU. Other items of note:  Streetscape Design Standard updates were approved by City Council at the February 26, 2013 meeting.  A ban on oil and gas fracturing was adopted by City Council on March 5, 2013. An Operator Agreement between the City and Prospect Energy, LLC was approved by City Council on March 19, 2013. Termination of the moratorium earlier imposed with respect 24 to oil and gas operations conducted under an Operator Agreement was considered on March 19 as well.  Land Use Code amendments: o to extend the period of time that Project Development Plans and Plats for large base industries remain in effect were approved by City Council on March 19, 2013; o to address recommendations contained in the Student Housing Plan were approved on March 19, 2013; and o to implement Eastside and Westside Neighborhood Character Study were approved by City Council on March 5, 2013.