Loading...
HomeMy WebLinkAboutConfidential Memo - Mail Packet - 03/18/2025 - Memorandum from Brian Tholl and Leland Keller re Upcoming Riverside Community Solar Project Restoration Energy Services 222 Laporte Ave PO Box 580, Fort Collins, CO 80522 CC: Joe Wimmer Director, Utilities Finance MEMORANDUM Date: March 11, 2025 To: Mayor and City Councilmembers Through: Kelly DiMartino, City Manager Travis Walker, Utilities Light & Power Director From: Brian Tholl, Energy Services Director Leland Keller, Sr. Energy Services Engineer Subject: Upcoming Riverside Community Solar Project Restoration BOTTOM LINE This memo serves to provide a status update on the restoration and participant engagement efforts for the Riverside Community Solar Project. On August 20, 2023, the Riverside Community Solar Project experienced an inverter failure and stopped generating electricity. Currently, Utilities staff are in the final stages of replacing the inverter and restoring solar power generation. The Project is expected to be operational in the next week or two, by the end of March, if final testing goes as planned. The panel owners will soon begin receiving solar credits on their utility bill. PARTICIPANT ENGAGEMENT During the restoration process, Utilities staff have actively and frequently engaged Riverside Solar Panel Owners, who are also Utilities customers. Engagement efforts have included seven in-person meetings. Five of these meetings held were with a recently formed Riverside Owner Advisory Group, a subset of approximately 18 owners. Staff’s goal in forming the Advisory Group is to provide more detailed updates on the project’s progress to the most engaged owners, gain their general feedback, and answer their questions. The formation of the Riverside Owner Advisory Group was motivated largely due to the panel owner’s regularly expressed frustration with the repair timeline and the desire to receive additional communication about the Project. Additionally, monthly updates to our website and emails to the entire panel owner group Docusign Envelope ID: 258F8EEF-BC41-4791-95C0-E365B69E7271 provided project updates and summaries of the Advisory Group meetings. Updates can be found at fcgov.com/RiversideUpdates. BACKGROUND The Riverside Community Solar Project was established in 2015 under an agreement with Clean Energy Collective to develop, own and operate Riverside. Community Solar provides Utilities electric customers the opportunity to own solar generation assets without installing solar at their home. Utilities acquired the Project, including all responsibilities and assets owned or controlled by Clean Energy Collective, in 2020, and adopted Program Rules as approved by Council (Ordinance No. 141-2020). The electricity produced at Riverside not only benefits the participating solar owners but also benefits the broader community in our pursuit towards delivering 100% non-carbon electricity. City Council supported repowering Riverside (Ordinance No. 058, 2024), by making supplemental appropriations of the 2050 tax on May 21, 2024. The approval to use the 2050 tax funds was a timely funding solution that reaffirmed the City’s commitment to advancing the Our Climate Future goals through supporting local solar generation at Riverside and improving relationships with the participating solar owners. The replacement project resulted in a new design at the site. The significance of this new design is its ability to enhance reliability of the array by not having one point of failure that was a consequential flaw of the previous central inverter design. Additionally, the parts to repair the site are more readily available with the new design, so if there is an equipment failure in the future, re-powering the array will likely be quicker. Overall, the new design will make the project more sustainable and will enhance the site’s functionality long-term. NEXT STEPS Utilities staff and customer-owners look forward to returning to regular operations. To achieve this, staff must do the following: Docusign Envelope ID: 258F8EEF-BC41-4791-95C0-E365B69E7271 •Finalize site repowering and commissioning activities to optimize solar generation. •Communicate progress in the repowering project to Riverside Solar owners. •Resume bill credit operations for energy produced by Riverside Community Solar Project. •Continue with site operation and maintenance with our selected vendor. Docusign Envelope ID: 258F8EEF-BC41-4791-95C0-E365B69E7271