Loading...
HomeMy WebLinkAboutReport - Mail Packet - 10/26/2021 - Fort Collins Connexion Monthly Report - October 20210 50 100 150 200 250 300 350 400 Y 2019Feb-20Apr-20Jun-20Aug-20Oct-20Dec-20Feb-21Apr-21Jun-21Aug-21Oct-21Dec-21Feb-22Apr-22Jun-22Aug-22Oct-22Dec-22#of AreasActual Forecasted 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Y 2019Feb-20Apr-20Jun-20Aug-20Oct-20Dec-20Feb-21Apr-21Jun-21Aug-21Oct-21Dec-21Feb-22Apr-22Jun-22Aug-22Oct-22Dec-22Fiber Pulled in FeetMillionsActual Forecasted CONNEXION MONTHLY REPORT OCTOBER 2021 Overall Fiber Construction through September ‘21 2018 2019 2020 2021 2022 2023 Design Construction Available Atlantic Engineering Group (AEG) work Connexion Service Available ongoing 76.8% Completed Bore Length 2,910,427 ft 89.4% Total Bore Length 3,254,371 ft* Completed Fiber Pulled through Conduit 3,802,799 ft Total Fiber Pulled through Conduit 4,952,640 ft Total Fiber Area Construction Completed 211 *A Fiber Area on average serves 225 homes*Adjusted for Interest Payments 59.1% Total Fiber Area* 357 Spent to Date $ 106,156,927 91% Total Construction Budget $ 116,808,249 * * Bore Length may be updated through the course of the project as design is completed. 31% Take Rate* * As of 10/10/2021. Take Rate of residential neighborhoods released for a minimum of 90 days. *Includes fibers areas that have construction completed and turned over for QC Total Fiber Areas Complete*Total Fiber Pulled CONNEXION MONTHLY REPORT Auxiliary aids and services are available for persons with disabilities. V/TDD: 711 OCTOBER 2021 21-23676 Fiber Areas Update Monthly info / highlights • Over 39.4 miles of fiber were installed in September, along with 389 vaults and 357 flowerpots (smaller vaults). • Project to date: 720.23 miles of fiber have been installed along with 9,379 vaults and over 17,000 flowerpots. • Fort Collins residents can input their address and see whether their residence is In Design, In Construction, or has Service Available! Our address look-up tool can be found on the Connexion website at fcconnexion.com. • It is that time of year again to turn off and blow out your sprinkler systems! Connexion crews and contractors do their best to not disturb your yard when installing conduit and fiber. But during the winter, it can be difficult to see if a sprinkler head or perennial was damaged. If you notice anything was disturbed, we will come back in the spring to get everything back to its original condition! If you have questions or concerns now, or in a few months, just call our construction hotline 970-674-7800 or email FCResidents@aeg.cc Finances Connexion YTD Budget to Actual as of September ‘21 • Connexion deployment remains on track for construction completion in Q4 2022. • Construction Budget reflects an additional appropriation of $8.2 Million from existing reserves authorized by City Council on September 7, 2021. We are approximately 91% spent on the appropriated construction Budget. • Net Operations and Net Total are both favorable to budget by approximately $1.4 million, a result of operating expense containment more than compensating for the shortfall in revenues YTD. BUDGET ACTUAL BETTER / (WORSE) Operating Revenues*$7,957,814 $3,902,830 ($4,054,984) Operating Expense**$9,843,551 $4,388,354 $5,455,197 Net Operations ($1,885,737)($485,524)$1,400,213 Investment Income (Expense)($2,486,160)($2,526,170)($40,010) Net Total ($4,371,897)($3,011,694)$1,360,203 APPROPRIATED BUDGET  PROJECT TO DATE REMAINING Construction $116,808,249 $106,156,927 $10,651,322 * Excludes investment earnings on bond proceeds ** Excludes Depreciation Interest Expense