Loading...
HomeMy WebLinkAboutMemo - Mail Packet - 10/5/2021 - Memorandum From Lawrence Pollack Re: Councilmember Requests From The September 14 And 28 Work Sessions On The 2022 Budget 1 Financial Services 215 N Mason Street PO Box 580 Fort Collins, CO 80522 970.221.6795 fcgov.com/finance M E M O R A N D U M Date: September 30, 2021 To: Mayor Arndt and City Councilmembers Through: Kelly DiMartino, Interim City Manager Travis Storin, Chief Financial Officer From: Lawrence Pollack, Budget Director Re: Councilmember requests from the September 14 and 28 work sessions on the 2022 Budget City Council has completed the first two of three scheduled work sessions to review the 2022 budget requests (offers), as well as some more general inquiries about the budget. Staff follow-ups that were not answered during the meeting were summarized in the September 14 and 28 work session summary memos and some of those responses are included below in this memo. Other requests made during those work sessions, however, require additional time to adequately research and respond. Please refer to Attachment #1 to see the status of all requests currently being tracked. All unanswered requests are intended to be responded to in a memo to Council in the Oct 7 Thursday Packet. Outcome: Culture and Recreation 1) Questions from Kelly Ohlson: Why do we have separate funds within the Governmental Funds? For example, why is there a separate Recreation Fund instead of those revenues and expenses being contained within the General Fund? Response from Blaine Dunn (Accounting): Fund accounting is a system used within the Governmental and Non-Profit space, as required by the Governmental Accounting Standards Board. The main goal of fund accounting is accountability. Funds are created to track the amount of revenue and expenses for different activities the City is engaged in. Creating these funds restricts the use of how certain money may be used. By setting up different funds the City is able to create a separate balance sheet and income statement for each fund. This provides 2 more transparency and accountability in how different monies are being used across the organization. 2) Question from Kelly Ohlson: What is the history and consensus agreement around the use of Conservation Trust for Parks operations and maintenance expenses? Response from Lawrence Pollack (Budget) and Kurt Friesen (Parks Planning & Development): Per your request, below are the uses of 271-Conservation Trust Fund for operations and maintenance instead of trail development over the last decade. This funding has helped cover continually increasing expenses and highlights the structural challenges in the business model. Specifically, the City has dedicated funding sources for both the creation of new parks and additional paved trails. However, community driven design standards have significantly increased operations and maintenance costs, and there is no such dedicated funding source for existing parks as equipment needs replaced, additional parks come on-line, and more paved trails need to be maintained. Council has identified it as a priority to address this unsustainable model. 2011 - $161k Trail maintenance 2012 - $161k Trail maintenance 2013 - $161k Trail maintenance 2014 - $161k Trail maintenance 2015 - $95k Tree planting 2016 - $30k Tree planting 2017 - $0 2018 - $0 2019 - $400k Parks O&M 2020 - $400k Parks O&M 2021 - $800k Parks O&M 2022 - $400k Parks O&M Outcome: Environmental Health 3) Question from Kelly Ohlson: What is the status of construction and demolition (C&D) waste efforts, as it relates to Offer 48.14 1.0 FTE Construction and Demolition Waste ? Response from Lindsay Ex and Cassie Archuleta (Environmental Services): Existing efforts: In prior budget cycles, Council has funded 1.25 FTE to ensure compliance with 9 environmental compliance policy areas (pay-as-you-throw (residential recycling), cardboard landfill ban, Community Recycling Ordinance (commercial and multi-family recycling), hauler hours of operation, fugitive dust, outdoor residential burning, construction and demolition recycling, hauler licensing, and grocer composting). With this capacity, staff is able to respond on a complaint basis. This current level of staffing accomplishes the goal of having dedicated capacity and expertise to respond to these policies. Opportunities: The current level of 1.25 FTE staffing for compliance does not allow for proactive compliance. Thus, Offer 48.14 creates an enhanced role specifically for C&D 3 recycling compliance, as data have shown that when a dedicated position is added for proactive compliance, compliance has increased to 90% or higher for similar roles, e.g., nuisance violations. In addition, with a dedicated FTE, this position can support recycling market development for C&D materials at the state and regional level, which is critical for achieving our zero waste goals as this sector generates 53% of the material landfilled from Fort Collins (2020 data). 4) Question from Kelly Ohlson: How are we planning to address our air quality issues and what can we do for only $35k in Offer 48.13-Local and Regional Air Quality Monitoring - Improved AQ Priority & Regionalism? Response from Lindsay Ex and Cassie Archuleta (Environmental Services): ongoing Air Quality work and through an EPA grant, including the following: Offer 48.3 Air Quality ($451,785 and 4.00 FTE, ongoing): Supports continued operations for the Environmental Services department (ESD) Air Quality (AQ) Division. Currently, the AQ Division supports efforts related to air quality monitoring, messaging, volunteer management (Healthy Homes program), policy development (e.g., oil and gas) and compliance support (e.g., wood burning and fugitive dust). Also includes a match for a radon grant from the Colorado Department of Public Health and Environment ($6K) with staff support for implementation of radon program. EPA Grant ($0K City, $200K EPA, 2-years): In 2021, the AQ Division was awarded a grant from the U.S. Environmental Protection Agency (EPA) targeting program improvements to better address indoor air quality concerns in alignment with residential energy efficiency and resiliency efforts. Existing staff capacity (Offer 48.3) will be leveraged for grant and project management for this effort, and the grant includes additional capacity (0.5 FTE) to support grant coordination. The Recommended Budget also includes a one-time enhancement Offer to advance the following: Offer 48.13 - Local and Regional Air Quality Monitoring - Improved AQ Priority & Regionalism ($35,000, one-time): Supports purchase and installation of ten (10) low-cost particle monitoring sensors at additional locations within the community and potentially in the County. This would increase accessibility to accurate and highly localized information about particle pollution, especially during wildfire impacts, to better characterize the health threat from smoke. The offer also includes funds to support updated regional data displays (e.g., websites), including regional/County data to better reflect regional transport of particle pollution. Beyond these ongoing and enhancement offers, increasing the impact of the City Quality efforts could include funding for additional monitoring sites and/or increased capacity for air quality outreach, messaging, and public engagement. These ideas are planned for further discussion in the October 12 work session. 4 5) Question from Kelly Ohlson: Where is increased stream restoration work in the budget? Response from Theresa Conner (Utilities): Please refer to the detailed response included in Attachment #2. Outcome: Neighborhood Livability and Social Health 6) Questions from Shirley Peel: Regarding Offer 47.8 - Childcare System Support - ARPA Funded, is this going to become a permanent budget item or is it going to be taken away in the next? What additional capacity will this offer provide to the community? Response from Adam Molzer (Social Sustainability): Budget offers to support the childcare system in Fort Collins using City general funds have historically been submitted in the past several BFO cycles. Future budget offers are anticipated to continue to be requested since childcare is a Council priority and may also align with broader regional conversations about funding. Additional capacity within the Fort Collins childcare system may include deployment and activation of the substitute teacher recruitment pool technology (recruitment goal of 50- 100 subs); additional enrollments in EAP services for childcare teachers/staff; additional mental health staffing hours for childcare programs; approximately 100 additional subsidized spots for families needing summer care/enrichment. Utilities 700 Wood Street PO Box 580 Fort Collins, CO 80522 970.221-6700 970.221-6619 - fax fcgov.com M E M O R A N D U M DATE: September 29, 2021 TO: City Council Members THROUGH: Kelly DiMartino, Interim City Manager Theresa Connor, Interim Utilities Executive Director FROM: Matt Fater, Interim Deputy Director Water Engineering Ken Sampley, Director, Stormwater Engineering and Development Review RE: Stream Rehabilitation Program Update (Council Priority #22) SUMMARY Improving and accelerating the stream rehabilitation program has been identified as a 2021 City Council Priority. City Council funded $3.1M to support the Mail Creek Stream Rehabilitation project in the 2021 budget. This project will take through 2022 to complete, so there is not funding in the 2022 budget as the funds are already appropriated. Staff will present options for systematically accelerating the program at the Council Finance Committee in November as part of the discussion on Utility Rates and Strategic Financial Plans to assure alignment as we are moving forward. BACKGROUND The City is divided into thirteen stormwater basins each with a master pIan addressing the unique set of stormwater challenges for that basin. In 2012, the City updated these basin master plans to incorporate stream rehabilitation and water quality best management practices. The updates were based on an urban stream health assignment, completed by Colorado State University on behalf of the City. The following ten stream sections within the city limits were evaluated: Burns Tributary Fossil Creek McClellands Creek Boxelder Creek Clearview Channel Mail Creek Spring Creek Page 2 of 6 Foothills Creek Stanton Creek The study identified detailed habitat, susceptibility to erosion, and baseline geomorphic data for approximately 18 miles of channels across ten City streams. These streams have been impacted and degraded over time due to agricultural practices and urban development. The information was utilized to identify and prioritize rehabilitation projects to be incorporated into the stormwater capital improvement plan. The study did not evaluate the Poudre River as the river has been evaluated with other efforts led by the Natural Areas Program. A Multi-Criterion Decision Analysis (MCDA) tool for prioritizing stream rehabilitation projects was developed to identify areas where the greatest opportunities exist for simultaneously improving habitat and stream connectivity while stabilizing high-risk, erosion-susceptible reaches. Based on 2012 Council direction, 16% of stormwater capital funding was to be budgeted for stream rehabilitation and water quality best management practices. The remaining funding was to be budgeted for flood mitigation (64%) and opportunity projects such partnerships with new developments and other agencies (20%). This translated to approximately $650,000 annually for stream rehabilitation and water 1,150,000/year. Projects Completed Since 2013, four stream rehabilitation projects have been complete. All four projects were identified as high priority based on the stream health assessment. Stream rehabilitation is an emerging science and success of projects is dependent upon site specific criteria. A lot has been learned through the initial projects to build a solid foundation for accelerating the program. The following table outlines the projects completed: Stream Location Reach Length (feet) Completed Total Cost Fossil Creek Upstream Lemay through Fossil Creek Community Park 2,250 2015 $1,370,000 Spring Creek Union Pacific RR to Riverside Ave. 810 2019 $1,342,000 Spring Creek Riverside Ave. to Edora Park Dam 780 2019 $575,000 Mail Creek North of Meadow Passway 980 2020 $1,541,000 Total 4,820 feet $4,848,000 Page 3 of 6 Future Projects The 2021 budget identified $3.1M for continuing the stream rehabilitation program. The next high priority project is the 3,200 feet reach of Mail Creek within the Two Creeks Natural Area. The design is underway with construction planned for the fall of 2022. Staff from Natural Areas is part of the multi-disciplinary design team. Staff has also been partnering with the developer of the Gateway at Prospect development at the intersection of I-25 and Prospect Road. Boxelder Creek borders the eastern edge of the site and is identified as part of the stream rehabilitation program. The construction of the development may be leveraged to also accomplish rehabilitation goals for Boxelder Creek. If the project moves forward, a budget offer for the 2023 budget would be submitted. There is significant work remaining for the stream rehabilitation program with 55 projects to be completed with an estimated cost of approximately $70M (based on 2019 estimate). Utilities is in the process of updating the overall Stormwater Capital Improvement Plan which includes flood mitigation, water quality, and stream rehabilitation projects. This plan and associated financing options will be reviewed with the Council Finance Committee in November 2021. Options to accelerate the build out of the program will be discussed at that time. Accelerating the stream rehabilitation projects can be done either by delaying the implementation of other stormwater projects or by increasing fees so that we can accomplish more work. Some of the options that can be considered for accelerating this program include: Combining two segments to make larger projects that allow us to complete more linear feet of stream rehabilitation in any given project. This could be more efficient administratively and with staff resources. Have a segment in design while we are constructing another segment. This could take additional staff resources to administer. Currently the Stormwater CIP assigns $800,000 to Stream Rehabilitation each year. That could be increased to $1,200,000 each year that allows flexibility to address larger projects or partnerships depending on conditions that exist at the time. Attachment: Prioritized List of Stream Rehabilitation Projects Page 4 of 6 Attachment 1: Prioritized List of Stream Rehabilitation Projects Rank Creek Name Reach Subreach Reach Length (ft) Location Status 1 Fossil 4 1 2,250 Upstream of Lemay through Fossil Creek Community Park Completed 2 Spring 1 5 810 Between RR tracks and Riverside Completed 7 Spring 1 6 780 Between Riverside Ave and Edora Dam Completed 3 Mail 3 1 980 Directly north of Meadow Passway Completed 4 Mail 1 1 3,240 Confluence with Fossil Creek, northwest from Fossil Park Under Design 5 Fossil 1 1 1,120 Between RR tracks and Trilby Rd 6 Spring Remove Edora Dam NA Along north side of Edora Park, west of Riverside Ave 8 Spring 3 2 1,040 Directly west of Lemay Ave 9 Fossil 2 1 1,880 North of Trilby Rd partway through Paragon Point open space 10 Spring Reconnect to Poudre NA From confluence with Poudre River through Cattail Chorus NA 11 Fossil 9 1 2,130 From Applewood Estates pond through neighborhood to Shields 12 Fossil 8 1 2,020 From RR tracks through open space to Applewood Estates pond 13 Stanton 1 1 4,630 From confluence with Fossil Creek to Carpenter Rd 14 Mail 2 1 1,370 Between Mail Creek Ln and Meadow Passway 15 Boxelder 3 3 1,180 16 Fossil 3 1 1,130 Runs southeast partly through the gold course 17 Spring 5 1 1,590 Just east of Stover St to just southwest of Stuart St 18 Spring 1 4 870 Between Timberline Rd detention Pond and RR tracks 19 Fossil 3 2 1,210 From Lemay Ave southeast partly through the golf course 20 Spring 6 2 1,150 Between Centre Ave and Hillpond 21 McClellands 7 2 From RR tracks west of Timberline Rd east through neighborhood 22 Fossil 6 2 3,530 From College Ave east through HOA open space 23 McClellands 5 2 Through Stetson Creek HOA open space 24 Fossil 2 2 3,430 Through Paragon Point HOA open space Page 5 of 6 Attachment 1: Prioritized List of Stream Rehabilitation Projects (continued) Rank Creek Name Reach Subreach Reach Length (ft) Location 25 Clearview 2 1 1,440 Between Castlerock Dr and Taft Hill Rd 26 Spring 4 1 1,550 Just west of Lemay Ave to just east of Stover St 27 Boxelder 6 1 1,330 Through private property south of Vine Dr 28 Spring 2 1 1,070 Between Edora Dam and Welch St 29 Spring 1 3 1,180 Between Prospect Rd and Timberline Rd 30 Foothills 1 1 1,470 Between confluence with FCRID and Chase Dr 31 McClellands 7 1 From White Willow Dr west through HOA open space 32 Mail 3 2 1,490 From Fairway Estates dam south through HOA open space 33 McClellands 6 1 Through Stetson Creek HOA open space 34 Burns 1 1 1,780 From confluence with Fossil Creek north to Shields St 35 Boxelder 3 1 2,860 Directly north of Prospect Rd through provate property 36 Fossil 6 1 2,410 Through HOA open space along Fossil Creek Pkwy 37 Foothills 2 1 1,530 Between Chase Dr and Rigden Pkwy 38 Boxelder 1 4 Through open space south of Prospect Rd 39 McClellands 3 1 1,250 Between Ziegler Rd and Corbett Dr through HOA open space 40 Spring 3 1 1,600 Between Welch St and Lemay Ave 41 Spring 5 2 1,890 From just SW of Stuart St to RR tracks west of College 42 McClellands 4 1 630 Between Corbett Dr and Rabbit Creek Rd through HOA open space 43 Boxelder 4 1 1,410 private property 44 Boxelder 1 3 2,340 Through open space south of Prospect Rd 45 Boxelder 5 1 770 Through private property north of Mulberry St 46 Spring 1 1 520 From entrance to Cattail Chorus NA west to bike trail crossing 47 Fossil 7 1 2,610 Between College and RR tracks through natural area 48 Spring 7 1 820 From entrance to Hill Pond west through open space 49 Boxelder 1 2 1,270 Through open space south of Prospect Rd 50 Boxelder 5 2 1,240 Through private property north of Mulberry St 51 Boxelder 1 1 1,770 From confluence with Poudre River north adjacent to BE Sanitation Page 6 of 6 Attachment 1: Prioritized List of Stream Rehabilitation Projects (continued) Rank Creek Name Reach Subreach Reach Length (ft) Location 52 Boxelder 6 3 1,450 Through private property south of Vine Dr 53 McClellands 5 1 2,200 Through private property SE of Stetson Creek neighborhood 54 Spring 1 2 580 Through open space directly north pf Prospect Rd 55 Boxelder 5 3 1,880 Through private property north of Mulberry St 56 Boxelder 6 2 1,460 Through private property south of Vine Dr 57 Clearview 1 1 360 Between Avery Park pond and Castlerock Dr 58 Foothills 3 B From Horsetooth Rd NE through HOA property to Power Trail 59 Clearview 3 D Between Taft Hill Rd and Hillcrest Dr 60 Foothills 2 C Between Rigden Pkwy and Power Trail