Loading...
HomeMy WebLinkAboutReport - Mail Packet - 9/28/2021 - Fort Collins Connexion Monthly Report - September 20210.0 1.0 2.0 3.0 4.0 5.0 6.0 Y 2019Feb-20Apr-20Jun-20Aug-20Oct-20Dec-20Feb-21Apr-21Jun-21Aug-21Oct-21Dec-21Feb-22Apr-22Jun-22Aug-22Oct-22Dec-22Fiber Pulled in FeetMillionsActual Forecasted CONNEXION MONTHLY REPORT SEPTEMBER 2021 Overall Fiber Construction through August ‘21 2018 2019 2020 2021 2022 2023 Design Construction Available Atlantic Engineering Group (AEG) work Connexion Service Available ongoing 72.2% Completed Bore Length 2,854,860 ft 87.7% Total Bore Length 3,254,371 ft* Completed Fiber Pulled through Conduit 3,576,561 ft Total Fiber Pulled through Conduit 4,952,640 ft Total Fiber Area Construction Completed 188 *A Fiber Area on average serves 225 homes*Adjusted for Interest Payments 52.7% Total Fiber Area* 357 Spent to Date $ 101,829,602* 87.2% Total Construction Budget $ 116,808,249 * Bore Length may be updated through the course of the project as design is completed. 30% Take Rate* * As of 9/3/2021. Take Rate of residential neighborhoods released for a minimum of 90 days. 0 50 100 150 200 250 300 350 400 Y 2019Feb-20Apr-20Jun-20Aug-20Oct-20Dec-20Feb-21Apr-21Jun-21Aug-21Oct-21Dec-21Feb-22Apr-22Jun-22Aug-22Oct-22Dec-22#of AreasActual Forecasted *Includes fibers areas that have construction completed and turned over for QC Total Fiber Areas Complete*Total Fiber Pulled CONNEXION MONTHLY REPORT Auxiliary aids and services are available for persons with disabilities. V/TDD: 711 SEPTEMBER 2021 21-23609 Fiber Areas Update Monthly info / highlights • Over 36.6 miles of fiber were installed in August, along with 266 vaults and 539 flowerpots (smaller vaults). • Project to date: 677.4 miles of fiber have been installed along with 7,704 vaults and over 16,709 flowerpots. • Fort Collins residents can input their address and see whether their residence is In Design, In Construction, or has Service Available! Our address look-up tool can be found on the Connexion website at fcconnexion.com. • Restoration crews are still installing sod so please make sure to water your newly installed sod. New sod should be watered consistently for 10 days after install to promote growth and help it settle. For questions about landscape repairs or to report construction damage, please call our Help Line at 970-674-7800 or email FCResidents@aeg.cc. Finances Connexion YTD Budget to Actual as of August ‘21 • Connexion deployment remains on track for construction completion in Q4 2022. • Construction Budget reflects an additional appropriation of $8.2 Million from existing reserves authorized by City Council on September 7, 2021. We are approximately 87% spent on the appropriated construction Budget. • Net Operations and Net Total are both favorable to budget by approximately $1.4 million, a result of operating expense containment more than compensating for the shortfall in revenues YTD. BUDGET ACTUAL BETTER / (WORSE) Operating Revenues*$ 6,724,369 $ 3,370,725 ( $ 3,353,644 ) Operating Expense**$ 8,765,675 $ 3,999,146 $ 4,766,529 Net Operations $ 2,041,306 ( $ 628,421 )$ 1,412,885 Investment Income (Expense)( $ 2,533,686 )( $ 2,526,266 )$ 7,420 Net Total ( $ 4,574,992 )( $ 3,154,687 )$ 1,420,305 APPROPRIATED BUDGET  PROJECT TO DATE REMAINING Construction $ 116,808,249 $ 101,829,602 $ 14,978,647 * Excludes investment earnings on bond proceeds ** Excludes Depreciation Interest Expense