HomeMy WebLinkAboutAgenda - Read Before Packet - 7/27/2021 - City Council Work Session July 27, 2021 Agenda Item 3 - Civic Center Master Plan - Revised July 26, 2021Link to
Civic Center Master Plan
Click here to access Complete Master Plan
Due to the file size, please download the file
rather than view in browser.
DATE:
STAFF:
July 27, 2021
Tyler Marr, Deputy Director, Information & Employee
Services
Ken Mannon, Operations Services Director
Blake Visser, Senior Facilities Project Manager
WORK SESSION ITEM
City Council
SUBJECT FOR DISCUSSION
Civic Center Master Plan.
EXECUTIVE SUMMARY
The purpose of this item is to discuss the Civic Center Master Planning process. Staff and consultants, Clark &
Enersen, will present an overview of the process including engagement to date, a draft site concept, and next
steps.
The City Operation Services Department is updating the Civic Center Conceptual Master Plan that was completed
in 2015. The intent is to identify space planning needs and efficiencies for current and future staffing, develop a
new conceptual master plan for the two-block site to account for facilities constructed since 2015, and align with
recent planning studies, such as the 2017 Downtown Master Plan. The upda ted master plan will provide design
concept and design cost estimates for new City Hall facilities and the Civic Center campus. The City will use the
updated plan to secure funding for design of a phased build-out.
GENERAL DIRECTION SOUGHT AND SPECIFIC Q UESTIONS TO BE ANSWERED
1. What additional information or changes are needed for the plan to be ready for Council consideration of
adoption?
BACKGROUND / DISCUSSION
As the city has grown over the past several decades, so has organizational staffing fo r city government and the
need to strategically house those staff members in buildings. With further growth expected over the next three
decades, combined with Council, staff, and the community outgrowing existing space, and some current buildings
not being viewed as ideal to keep as long-term City organization assets, there is a need to strategically plan the
spacing for the downtown campus where a large portion of City staff work.
As part of the 2021 budget, Council funded an update of the Civic Center Master plan, (Attachment 1) which is
intended to plan the Civic Center Block 32/42, current buildings, Washington Park, and streets. This update will
inform the Facilities team and City Leadership of investments required to meet the staffing and community needs
as we move into the future. Recognizing that the COVID-19 pandemic gave pause around the future of work, this
plan and the assumptions therein were developed with a hybrid model in mind. As one specific example, 60%
onsite staffing was determined to be the City’s operating model for this plan and moving forward.
Other assumptions:
• 60% Hybrid model (3 days in the office, 2 days remote work);
• Additional 15% area factor added to workstations to provide flexibility with overlapping schedules; and
• Greater emphasis on individual breakout spaces, collaboration rooms and conference rooms to meet all
meeting type needs.
Planning Process
• Space Planning - Facilities were analyzed with respect to the quality of architecture, mechanical, electrical,
and plumbing conditions. Current quantities of space were defined for each building and department. Staff
July 27, 2021 Page 2
growth projections were established by numerous interviews with department heads and staff.
• Development Staff Engaged - Park Planning and Development along with the Planning Department were
engaged in early meetings to discuss important considerations related to city planning, development
guidelines and goals.
• Charrettes - Three-day design charrettes were held involving the City’s leadership team, dep artment leaders,
key staff from across all departments, and the project team.
• Public Engagement - The charrette design outcome and survey were shared on OurCity website for comment
from the public.
• Boards and Commissions - A presentation was given regarding the process of the City Master Plan and
charrette outcome. The B&C representatives were invited to ask questions and give feedback. All items have
been recorded and are part of the draft for reference in future development of the design.
• Interdepartmental Staff Engagement - Park Planning and Development, CDNS, Engineering, Poudre Fire,
Police, and Utilities were gathered to give final comments on feasibility of the Master Plan Draft and any other
items that are relevant as the design develops further. These comments are available in the draft.
Draft Master Plan Concept
The concept of the master plan is focused on consolidating City operations for an improved customer experience.
1. Community
• A true front door for customer service to the Fort Collins community.
• Most parking will be kept to the exterior of the site and parking garages while perimeter gateways will act
as general wayfinding for people arriving to the site through various modes of transportation.
• Central gathering spaces that promote public use during and after hours, on weekends and during
holidays.
• Howes Street will support various community events while tying the two blocks together from both a visual
and a functional standpoint.
• The overall character of the site reflects Washington Park through the preservation of existing tree
canopy and the inclusion of softscape areas that define places of gathering and circulation.
• Art, landforms, and other site amenities will be used as visual wayfinding throughout the site.
• Howes will remain open to traffic but will become a convertible street for community events.
• Traffic calming elements will be used to create a safe pedestrian environment along Howes while allowing
for easy, accessible access to the buildings.
2. City Staff
• Improved department adjacencies for more efficient work flow.
• Staff can be re-located out of 281 North College to a more appropriate location on the Civic Center
campus and allows for the sale of the building.
• Accommodates growth for needed staff as the number of citizens increase.
Next Steps
1. Conceptual space planning of new and existing buildings to co-locate adjacencies for City departments. for an
improved customer experience.
2. Traffic and Parking Study.
3. Initial Design and Associated Public Engagement.
4. Develop 50% construction design to determine cost estimates.
July 27, 2021 Page 3
ATTACHMENTS
1. Link to Civic Center Master Plan (PDF)
2. Memo to Council, March 17, 2021 (PDF)
3. Powerpoint Presentation (PDF)
Link to
Civic Center Master Plan
Click here to access Complete Master Plan
Due to the file size, please download the file
rather than view in browser.
ATTACHMENT 1
Operation Services
300 LaPorte Ave, Building B
PO Box 580
Fort Collins, CO 80522
970.221.6610
970.221.6534
fcgov.com
MEMORANDUM
DT: March 17, 2021
TO: Mayor and City Councilmembers
TH: Darin Atteberry, City Manager
Kelly DiMartino, Deputy City Manager
Tyler Marr, Interim Director, IES
FR: Ken Mannon, Director of Operation Services
Brian Hergott, Facilities Project Manager
RE: Block 32/42 Civic Center Masterplan Refresh Update
The purpose of this memo is for your information to provide an update on this project funded by
the 2020 Budget revision package.
The City of Fort Collins Operation Services Department is updating the Block 32/42 Civic
Center Conceptual Master Plan that was completed in 2015. The intent of this update, is to
identify current space needs along with planning needs for future staffing, develop a new concept
master plan that sets a vision for the two-block site, and to align with recent planning studies,
like the 2017 Downtown Master Plan. The updated master plan will provide a design concept
and a cost estimate for new municipal facilities and community spaces on the Civic Center
campus. The City will use the updated master plan to help secure funding for design of a phased
build-out.
The space planning analysis involved over 30 departmental meetings to review existing and
future staff needs. The analysis developed city staffing projections for 15-year and 30-year time
frames. In addition, the analysis took into consideration consolidating city staff from other
locations to the Civic Center and a 60/40 hybrid work model where employees will average 3
days per week on site and 2 days a week from home. The City’s remote work experience during
the Covid-19 pandemic was the impetus for using this hybrid approach.
Based on this analysis, there is a need for two to three new buildings that may be constructed in
multiple phases over the 15–30-year planning period. Phase 1A: Look at existing facilities to
right size them with updated space standards to see if we have current space to vacate 281 N.
College. Phase 1B: A new municipal building accommodating City Hall/Municipal court
functions located on the east side of Howes. Phase 2: Option 2A-A Wellness Center addition to
the existing west portion of 300A Laporte, and Option 2B-An additional building expansion to
existing west portion of 300A Laporte.
ATTACHMENT 2
The project team hosted a 3-day design charrette with over 50 city stakeholders that resulted in
the creation of a master plan for the Civic Center that will accomplish the following objectives.
x Elicit community pride
x Promote performance, innovation and resilient, regenerative design
x Provide positive contributions to the City’s natural systems and ecology
x Enhance social and individual health & wellness
x Create opportunities for transparency, good governances, and efficient & effective
service delivery
x Become the vision for the City’s open spaces.
The master plan concept (see attached) identifies the location of the new municipal facilities, as
described above, and is focused around a central community gathering space that crosses Howes,
will support various community events, and creates a visual and functional front door for the
City campus. The overall character of the site is a reflection of Washington Park through the
preservation of existing tree canopy and the inclusion of landscaped areas that define places for
gathering and circulation. Art, landforms, and other site amenities will be used as visual
wayfinding throughout the site. Now that the concept has been developed, the project will focus
on community engagement to refine and improve the initial ideas. Project staff is partnering with
CPIO using the Our City platform to produce a webpage with engagement opportunities and will
meet with several boards and commissions.
Additional next steps in the planning process include:
x Conceptual Design Submittal for Planning and Zoning to provide feedback on conceptual
plan
x Develop an Estimate/Proposal for Phase 1 Costs
x Provide a Detailed Analysis with Recommendations for Review by City Council,
preliminarily through a work session this spring.
Civic Center Master Plan
Clark & Enersen
ATTACHMENT 3
2
•To identify space planning needs and efficiencies for current and future staffing
based on projected community growth.
•Develop a new conceptual master plan for the two-block site to account for
facilities constructed since 2015 in alignment with recent planning studies,
such as the 2017 Downtown Master Plan.
•Provide design concept and design cost estimates for needed municipal
building facilities (City Hall) and the Civic Center campus with public amenities.
Civic Center Master Plan-Context
3
•What additional information or changes are needed in order for the plan to be
ready for Council consideration of adoption?
Question for Council
4Process & Engagement
Guiding Principles
•World Class Leadership:become a point of
community pride in performance, innovation, and
regenerative design that sets an example for the
private sector in its reflection of Fort Collins’
character and culture.
•Vi brant Community Spaces:contribute nature
and ecology to the city while establishing places
for public engagement that promote social and
individual health.
•Resilient Design:create lasting quality that is
climate adaptive, accommodates growth,
flexibility, and a universal community.
•Intuitive Organization:support and activate site
connectivity externally and create a collaborative
environment internally.
•Enhance the Civic Heart:promote physical
embodiment of the city’s mission and plan that
meets immediate needs; establish a vision that
can be invested in and realized.
Hybrid Work Model 5
6Projected Staff Count & Area
612
718
827
923
1,048
1,196
1,368
0
200
400
600
800
1000
1200
1400
1600
CURRENT 5 YR 10 YR 15 YR 20 YR 25 YR 30 YR
STAFF (EMPLOYEES)
STAFF AVERAGE
-
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
CURRENT CURRENT (100%)CURRENT (60%+)15-YEAR 30-YEAR 15-YEAR 30-YEAR
RIGHT SIZE (100%)(60%+)
GROSS SQUARE FOOTAGE
PROGRAMMED NON-PROGRAMMED
295,433
226,064
354,004
265,403
170,530
195,897
218,951
7Conceptual Master Plan
8Opinion of Probable Costs
STAGE 1A & 1B
New Building & Howes Street Improvement
STAGE 1C
Right Size & Renovate Existing Buildings
CONSTRUCTION $58,233,760 -$67,395,541
PROJECT $75,703,889 -$87,614,204
9
•Space Planning Study
•Tr affic & Parking Study
•Initial Design and Associated Public
Engagement
Next Steps
10
•What additional information or changes are needed in order for the plan to be
ready for Council consideration of adoption?
Question for Council
For More Information, Visit
THANK YOU!