Loading...
HomeMy WebLinkAboutReport - Mail Packet - 7/13/2021 - City Managers Monthly Update - July 8, 2021 Bike to Work Day - June 2021 July 8, 2021 JULY 8, 2021 Table of Contents ISSUES BEFORE COUNCIL ................................................................................................................. 4 JULY 13 WORK SESSION ..........................................................................................................................................4 JULY 20 REGULAR MEETING ...................................................................................................................................4 JULY 22 URBAN RENEWAL AUTHORITY MEETING ..................................................................................................4 JULY 27 WORK SESSION ..........................................................................................................................................5 AUGUST 3- CANCELED FOR NEIGHBORHOOD NIGHT OUT .....................................................................................5 AUGUST 4 - REGULAR MEETING .............................................................................................................................5 AUGUST 10 WORK SESSION - CANCELED ...............................................................................................................5 PUBLIC ENGAGEMENT – UPCOMING EVENTS ................................................................................ 5 SALES TAX - MONTHLY & YEAR TO DATE ....................................................................................... 6 CP - ENGINEERING ............................................................................................................................. 7 COLLEGE AVE (SH 287) AND TRILBY ROAD INTERSECTION IMPROVEMENTS ........................................................7 VINE AND LEMAY BNSF IMPROVEMENTS ..............................................................................................................7 NORTH MASON DESIGN – ALPINE TO HICKORY .....................................................................................................8 TAFT HILL ROAD IMPROVEMENTS – HORSETOOTH TO HARMONY .......................................................................8 CP - PARK PLANNING & DEVELOPMENT ......................................................................................... 9 BUCKING HORSE PARK ............................................................................................................................................9 EAST PARK DISTRICT MAINTENANCE FACILITY .................................................................................................... 10 MAIL CREEK TRAIL................................................................................................................................................ 10 OAK STREET PLAZA WATER FEATURE .................................................................................................................. 11 POUDRE TRAIL AT I-25 ......................................................................................................................................... 11 SPRING CANYON DOG PARK ................................................................................................................................ 12 TRAVERSE PARK ................................................................................................................................................... 12 VETERANS PLAZA AT SPRING CANYON PARK ...................................................................................................... 12 CP - OPERATION SERVICES ............................................................................................................ 13 FORT COLLINS/LOVELAND POLICE TRAINING CENTER ........................................................................................ 13 BLOCK 32/42 – CIVIC MASTER PLAN REFRESH .................................................................................................... 13 UTILITIES SERVICES CENTER-RENOVATION FOR SCO AND NOC .......................................................................... 14 CP - UTILITIES.................................................................................................................................... 14 CIS/OSS ................................................................................................................................................................ 14 ESCADA SERVER VIRTUALIZATION & 64BIT UPGRADE ........................................................................................ 15 CABLE REPLACEMENT PRIORITY #1-WOODWEST ............................................................................................... 15 USC REMODEL-SCO/NOC CONTROL ROOM ........................................................................................................ 16 DRAKE LEVEE RECERTIFICATION .......................................................................................................................... 17 OAK STREET STORMWATER IMPROVEMENTS PROJECT ..................................................................................... 18 27” POUDRE CANYON RAW WATERLINE ............................................................................................................. 19 PUBLIC SAFETY ................................................................................................................................ 19 POUDRE FIRE AUTHORITY ................................................................................................................................... 19 POLICE SERVICES .................................................................................................................................................. 21 PLANNING, DEVELOPMENT &TRANSPORTATION ......................................................................... 23 BUILDING, PLANNING AND DEVELOPMENT REVIEW .......................................................................................... 23 GRAFFITI UPDATE ............................................................................................................................ 23 SUSTAINABILITY SERVICES ............................................................................................................ 24 ENVIRONMENTAL SERVICES ................................................................................................................................ 24 SOCIAL SUSTAINABILITY ...................................................................................................................................... 24 ECONOMIC HEALTH ............................................................................................................................................. 25 UTILITIES ............................................................................................................................................ 25 CUSTOMER CONNECTIONS .................................................................................................................................. 25 WATER RESOURCES AND TREATMENT OPERATIONS .......................................................................................... 27 COMMUNITY SERVICES .................................................................................................................... 27 RECREATION ........................................................................................................................................................ 27 PARKS ................................................................................................................................................................... 28 CULTURAL SERVICES ............................................................................................................................................ 28 NATURAL AREAS .................................................................................................................................................. 29 PUBLIC ENGAGEMENT ..................................................................................................................... 31 BROADBAND – FORT COLLINS CONNEXION ................................................................................. 31 COMMUNITY DASHBOARD HIGHLIGHT .......................................................................................... 32 CITY MANAGER’S UPDATE 4 ISSUES BEFORE COUNCIL JULY 13 WORK SESSION Mobile Home Park Enforcement Program o Provide progress updates and gain Council direction on an MHP enforcement program that is being developed. Neighborhood Livability & Social Health 1.8 - Preserve and enhance manufactured housing communities as a source of affordable housing and create a safe and equitable environment for residents. Housing Strategic Plan - Implementation Roadmaps o Share themes from community engagement and invite Council feedback on the approach to implementation for the Housing Strategic Plan. Neighborhood Livability & Social Health 1.1 - Improve and increase availability and choice of quality housing that is affordable to a broad range of income levels. Broadband Work Session o Updates and highlights related to Connexion buildout and service delivery. Economic Health 3.6 - Deploy and deliver reliable, high-speed internet services throughout the community. JULY 20 REGULAR MEETING Tourism Improvement District o Consider adoption of a Tourism Improvement District. Economic Health 3.3 - Systematically engage the business community with an emphasis on starting, sustaining and renewing businesses. Hughes Stadium City Structure Plan Map Amendment o Amend the City Plan City Structure Plan map on the Hughes Stadium property to be consistent with the voter-directed zoning on the property. The zoning creates a significant inconsistency with the City Structure Plan map, which could create problems in further discussions of and use and development. Environmental Health 4.7 - Expand the Natural Areas land portfolio while simultaneously maintaining existing lands and improving equitable access to nature. Northeast Frontage Road Annexation (Second Reading - consent) o First Reading of Ordinance for annexation for the Northeast Frontage Road Annexation. Neighborhood Livability & Social Health 1.7 - Provide a high-quality built environment, support quality, diverse neighborhoods and foster the social health of citizens. Staff Report: Natural Areas Visitation o Update City Council on the very high visitation natural areas have been experiencing. Environmental Health 4.7 - Expand the Natural Areas land portfolio while simultaneously maintaining existing lands and improving equitable access to nature. JULY 22 URBAN RENEWAL AUTHORITY MEETING 5:00-7:00 p.m. - Remote Participation only Agenda posted at www.renewfortcollins.com Please note that this list is subject to frequent change. Please call the City Clerk’s Office for up-to-date information. 970-416-2774. CITY MANAGER’S UPDATE 5 JULY 27 WORK SESSION Homelessness Advisory Committee Report on Shelter Options o Share findings and recommendations from a report completed by the City Manager’s temporary Homelessness Advisory Committee including an assessment of future shelter needs (space and amenities), location options, ideas for mitigating impacts and leveraging opportunities, suggested engagement strategies, and funding considerations. Neighborhood Livability & Social Health 1.2 - Collaborate with other agencies to address poverty issues and other identified high-priority human service needs, and to make homelessness rate, short-lived and non-recurring. 1041 Regulations o Provide City Council with more information about the scope and resources needed to adopt 1041 Powers; a more in-depth analysis on how other jurisdictions are using 1041 Powers; and taking a closer look at activities and areas for designation. Neighborhood Livability & Social Health 1.6 - Align land use regulations and review procedures to guide development consistent with City Plan. Civic Center Master Plan Phase 1 Update o Review the Civic Center Master Plan Phase I process, current draft, and next steps. High Performing Government 7.8 - Maintain and protect assets and infrastructure to drive reliability, cost effectiveness, efficiency and improve the customer experience. AUGUST 3- CANCELED FOR NEIGHBORHOOD NIGHT OUT AUGUST 4 - REGULAR MEETING Sam’s Club Fuel Station Appeal o Consider an appeal of the Planning & Zoning Board decision to deny the Sam’s Club Fuel Station Major Amendment and Additional Permitted Use. Neighborhood Livability & Social Health 1.6 - Align land use regulations and review procedures to guide development consistent with City Plan. Tourism Improvement District (Second Reading) o Conduct a public hearing and consider adoption of a Tourism Improvement District. Economic Health 3.3 - Systematically engage the business community with an emphasis on starting, sustaining and renewing businesses. AUGUST 10 WORK SESSION - CANCELED PUBLIC ENGAGEMENT – UPCOMING EVENTS 2022 City Budget Planning You still have time to help shape the City’s budget! The City is developing our 2022 Recommended Budget, and it’s important that it reflects the priorities of our community – particularly if those priorities have shifted due to the pandemic. Please take a moment to check out the various engagement tools and opportunities at ourcity.fcgov.com/2022budget, and consider sharing them with your friends, neighbors or community stakeholders. CITY MANAGER’S UPDATE 6 Whether you and other community members can spare just a couple of minutes, or want to dive deep into specific budget proposals, all can share priorities, concerns and ideas with City staff and Council as the budget is created and refined. Online: At ourcity.fcgov.com/2022budget there are several ways to share priorities and concerns, and submit ideas for funding, no matter how much time you may have to spare. In addition, all of the 2022 budget offers and narratives are available to review, organized by outcome. With Your People: Want to host a conversation with your friends, neighbors or community group? The Budget Engagement Toolkit, available for download in English and Spanish, can help you do exactly that. It includes all the tools and information to help you talk about what City programs and services are most important to your group or organization. Generally, the City creates a biennial budget every two years using the Budgeting for Outcomes (BFO) process. BFO focuses on outcomes and results, rather than organizational structure, and puts the community’s values and priorities first. Due to the economic uncertainty related to COVID-19, the City created a one-year budget for 2021 and will do the same for 2022, before returning to the regular two-year cadence. If you have any questions, or suggestions for further engagement opportunities, contact the Communications & Public Involvement Office Streets & Transfort Hiring Events Do you know someone who would love to work for the City? Please spread the word about the hiring event hosted by Streets & Transfort! Event Details: - Enter to win $100 gift card - Meet and learn from current drivers & supervisors - Tour facilities & equipment - Apply & interview onsite Thursday, July 8 – 2:30-5:30 p.m. Location: 6570 Portner Rd., Fort Collins Open Positions: TRANSFORT BUS OPERATORS - starting wage $19.00/hour, PAID CDL TRAINING & TESTING, 15 part-time hourly positions open STREETS CDL DRIVERS & LABORERS - starting range $15.92-23.88/hr. based on experience, CDL PREFERRED, NOT REQUIRED, 6 full-time seasonal positions open. SALES TAX - MONTHLY & YEAR TO DATE MAY SUMMARY OVER PRIOR YEAR Month Year to Date Net Sales Tax Collected: 49.9% 17.4% Net Use Tax Collected: 53.9% 4.9% Net Sales and Use Tax Collected: 50.5% 15.6% CITY MANAGER’S UPDATE 7 Year to date, sales and use tax collections excluding rebates are up 15.6% and total $62.1M. MAY SUMMARY OVER BUDGET Month Year to Date Net Sales Tax Collected: 21.0% 18.7% Net Use Tax Collected: 19.4% 4.0% Net Sales and Use Tax Collected: 20.7% 16.5% Year to date, the City has collected 16.5% more sales and use tax revenue, totaling $8.8M over budget. CP - ENGINEERING COLLEGE AVE (SH 287) AND TRILBY ROAD INTERSECTION IMPROVEMENTS Funding Source: CDOT / FHWA grants, Transportation Capital Expansion Fee (TCEF), Development Contributions Estimated Project Budget: $9-10M Estimated Completion Date: End of year 2023 Phase: 30% Design Complete, ROW phase underway Project Details: Safety improvement project geared toward accident reduction and improved safety. Dual north and southbound turn lanes, multi-modal implementation, east / west (Trilby Road added turn movements). Project Status:  Staff has completed draft plans for rights of way acquisitions and intends to begin outreach with adjacent property owners in the coming months. VINE AND LEMAY BNSF IMPROVEMENTS Funding Source: Keep Fort Collins Great (KFCG), Transportation Capital Expansion Fee (TCEF), 2017 / 2018 BFO, 2021 BFO Estimated Project Budget: $24M Estimated Completion Date: 2021 Phase: Construction Project Details: The existing Vine and Lemay intersection, which includes the Burlington Northern Santa Fe (BNSF) Railway crossing, is severely congested with limited options to expand through or turn lane capacity due to land use constraints. CITY MANAGER’S UPDATE 8 Project Status:  Bridge and roadway construction continues; with work focusing on bridge abutment construction and roadway embankment construction.  The City is planning to close Lemay Avenue north of Lincoln Avenue beginning July 6 through mid-August to widen Lemay Avenue and to begin realigning the road to tie into the new bridge spanning the railroad and Vine Drive. More information is available at fcgov.com/engineering/vine-lemay NORTH MASON DESIGN – ALPINE TO HICKORY Funding Source: Transportation Capital Expansion Fee (TCEF), Storm Water Utility, Urban Renewal Authority (URA) funding Estimated Project Budget: $1.0M Estimated Completion Date: 2 quarter 2022 Phase: 30% Design Project Details: A collaborative effort between City departments and the North College URA to find solutions to existing drainage issues along the west side of College Avenue, north of the Poudre River. The project was approved through the 2019/2020 Budgeting for Outcomes (BFO) process and will focus on roadway and storm sewer alignments for North Mason. Construction of the storm sewer backbone is expected to occur in 2021/2022. No funding has currently been identified for the roadway construction. Project Status:  Staff has completed proposed rights of way plans for the purpose of acquisitions and intends to begin those conversations with adjacent property owners in the coming months. TAFT HILL ROAD IMPROVEMENTS – HORSETOOTH TO HARMONY Funding Source: Larimer County Regional Road Fees (RRF), Federal Surface Transportation Block Grant (STBG) Estimated Project Budget: $5.3M Estimated Completion Date: Fall 2022 Phase: Preliminary Design Project Details: This section of Taft Hill Road currently experiences significant congestion and safety concerns. In collaboration with Larimer County, the City will construct a 4-lane arterial roadway from the intersection at Horsetooth to Brixton Road (just south of Harmony). Improvements will include sidewalk, curb and gutter, bike lanes and storm sewer/utility improvements. The City and County were awarded a federal STBG grant for design and construction. Project Status:  City and County staff is nearing the completion of the proposed rights of way plans for the purpose of acquisition through CDOT. All proposed rights of ways acquisitions are within Larimer County and its residents. No rights of way will belong to the City of Fort Collins. CITY MANAGER’S UPDATE 9 More information is available at: https://www.fcgov.com/engineering/taft-hill CP - PARK PLANNING & DEVELOPMENT BUCKING HORSE PARK Funding Source: Neighborhood Parkland Funds Total Project Cost: $2.5 - $4 million Phase: Design Estimated Completion: 2023 Project Details: Bucking Horse Park is a park planned for the Bucking Horse neighborhood. Project Status:  Following a second neighborhood meeting, the park design is being refined by City staff.  Consultant and CMGC RFP’s will be issued soon. More information available on project webpage. CITY PARK RESTROOM Funding Source: Building On Basics Total Project Cost: $850k-$1M Phase: Construction Estimated Completion: Spring 2021 Project Details: The City Park Restroom Project provides a new, year-round restroom along with surrounding site improvements. Project Status:  Project closeout in process with minor work continuing on landscape and irrigation elements. The restroom is open to the public. More information available on project webpage. CITY MANAGER’S UPDATE 10 EAST PARK DISTRICT MAINTENANCE FACILITY Funding Source: Neighborhood Parkland & Community Parkland Funds Total Project Cost: TBD Phase: Design Estimated Completion: Fall/Winter 2021-2022 Project Details: A maintenance facility to serve the East Park District, which includes multiple neighborhood and community parks, is proposed near the intersection of Drake & Ziegler near the water treatment facility. The maintenance facility will house Parks Department staff, equipment, and some minor material storage. Project Status:  Project team evaluating project construction schedule due to escalating steel prices.  The selected contractor is preparing a bid for staff review. MAIL CREEK TRAIL Funding Source: Multiple Funding Sources including Grants, TCEF, and Conservation Trust Funds Total Project Cost: $750,000 Phase: Pre-Design Estimated Completion: fall 2022 Project Details: When completed, the Mail Creek Trail will create a trail connection from Kinard Middle School to the Power Trail, providing much needed trail access for southeast Fort Collins. Currently, design of the Siphon overpass and Timberline trail widening/underpass are in progress, in partnership with the Engineering Department. In addition, Park Planning & Development is working to identify the best location for the future Mail Creek Trail. Project Status:  Continued progress on Siphon overpass and Timberline underpass projects.  Potential trail alignment(s) are being coordinated with PSD. More information available on project webpage. CITY MANAGER’S UPDATE 11 OAK STREET PLAZA WATER FEATURE Funding Source: GID & Parks life cycle funds Total Project Cost: $100,000 Phase: Construction Estimated Completion: Summer 2021 Project Details: Park Planning & Development will be improving the water features in Oak Street Plaza to resolve drainage and safety challenges in the plaza. Project Status:  Water feature test successful. Concrete pour anticipated soon. More information available on project webpage. POUDRE TRAIL AT I-25 Funding Source: Conservation Trust Fund & GOCO Grant ($1M for Fort Collins) Total Project Cost: $3 million Phase: Design Estimated Completion: 2023 Project Details: Construction of this 2-mile section of the trail will complete the entire extent of the approximately 10- mile Poudre Trail in the City of Fort Collins. Fort Collins partnered with Timnath, Windsor, and Larimer County in 2019 to win a $2 million GOCO Connect Initiative Grant to complete all remaining segments of the Poudre Trail. The GOCO project will complete approximately 4-miles of missing trail segments, to complete the entre 40+ mile Poudre Trail from Bellvue to Greeley. The Fort Collins project will connect the existing trail ending at the Colorado State Environmental Learning Center through the future East Community Park to the proposed I-25 underpass to be constructed by the Colorado Department of Transportation (CDOT) with the North I-25 project, and thereafter to the existing trail segment in Timnath. Project Status:  Final construction documents have been prepared and submitted to the City for review. CITY MANAGER’S UPDATE 12 SPRING CANYON DOG PARK Funding Source: NIC Grant for $75,000 Total Project Cost: TBD Phase: Design Estimated Completion: TBD Project Details: The water quality at Spring Canyon Community Park was adversely affected by the drainage out of the dog park pond. Particularly, issues like E. coli were difficult to manage and put the dog park pond at risk of closure. Park Planning & Development worked with Stormwater, Parks, and Environmental Regulator Affairs to seek and receive a grant from Nature in the City. This grant will allow for much needed Low Impact Development improvements and restoration work on the dog park and SCCP water quality pond. Project Status:  Notification signage installed at the park pond site.  Design work continues to resolve the water quality issues. TRAVERSE PARK Funding Source: Neighborhood Parkland Funds Total Project Cost: $3.5 - 4 million Phase: Construction Estimated Completion: Fall 2021 Project Details: A new neighborhood park to be built in the Trail Head neighborhood, located on East Vine Street. The park will include typical park features including a shelter, playground, multi-purpose field, basketball court, and play area for teens. Project Status:  Construction is underway, including earthwork, utilities, and irrigation. More information available on project webpage. VETERANS PLAZA AT SPRING CANYON PARK Funding Source: PPD Special Projects Fund Total Project Cost: TBD Phase: Planning Estimated Completion: Fall 2021 Project Details: Framework planning meeting was held with representatives of the Veterans Plaza group, Parks, and Park Planning & Development. Purpose of the meeting CITY MANAGER’S UPDATE 13 was to begin developing a framework plan for potential future improvements at the Veterans Plaza location. Project Status:  Framework planning effort is underway, led by City staff. CP - OPERATION SERVICES FORT COLLINS/LOVELAND POLICE TRAINING CENTER Funding Sources: $9.25M generated from bonds for the City of Fort Collins $9.25M from City of Loveland $1M from DOLA Grant Estimated Project Cost: $19.5M Phase: Phase III Added Site Amenities - Permitting Estimated Completion Date: Fall 2021 Project Details: The City of Fort Collins is partnering with The City of Loveland to construct a new Police training facility which will be located on the west side of the Northern Colorado Regional Airport. This new site will offer a 50-yard pistol range, a 1.4-mile driving track, concrete skills pad, and classrooms for special training. Project Status: Phase I – Track & Skills pad is open and being used. Phase II - Building Construction is open and being used. - LEED Certification – Finalizing the submittals for USGBC review. Phase III – Adding Site Items with project savings. - Storage Shed – Awaiting permit approval. - Breach/Blast Pad – Processing shop drawings. - K9 Training area – Processing shop drawings - Observation Tower for Track and Skills Pad – Processing shop drawings.  Construction start for phase III items has been pushed back to July with permitting delays.  Scheduled to complete phase III scope - fall of 2021. BLOCK 32/42 – CIVIC MASTER PLAN REFRESH Funding Source: Capital Project via BFO: $300,000 Estimated Project Cost: TBD Phase: Conceptual Master Plan Estimated Completion Date: Fall 2021 Project Details: Space planning for Block 32 and 42 that was performed in 2013-2014 and needs to be updated. The new One Possible Conceptual Plan New Observation Tower for Track CITY MANAGER’S UPDATE 14 planning effort will involve each affected department to determine their space needs and anticipated growth over the next 10-12 Years. With the completion of the refresh the City can decide which departments to house in 215 N. Mason, 300 Laporte Ave - Building A, and the new City Hall. The refresh will also help determine an appropriate size of the new City Hall. Once this is determined and a conceptual design is produced it will be submitted to Council for review, next recommended steps and approval. Project Status:  Coordinating new conceptual plan with Planning, and various Boards and Commissions.  Currently finalizing deliverable and next steps to present to Council Work-Session in July.  There will need to be multiple phases for this project. - Look at existing spaces and make sure they are right sized with the updated space standards. - Look at department adjacency and determine who needs to be located where. - Look at which departments should be in the new municipal building and determine the size. - Submitted BFO offers to fund these phases. UTILITIES SERVICES CENTER-RENOVATION FOR SCO AND NOC Funding Sources: $2.61M – Light & Power (SCO) $1.75M – Broadband (NOC) Estimated Project Cost: $4.36M Phase: Conceptual Master Plan Estimated Completion Date: Fall 2021 Project Details: This project will renovate approximately 9,800 square feet of interior space at the Utilities Services Center. The existing space occupied by Light and Power - SCO will be renovated to serve current and future needs. Existing interior space will be reconfigured to accommodate the needs of Broadband for a Network Operations Center (NOC). Conference rooms will be developed to replace those displaced by interior renovation. SCO staff will be housed in the existing Training Room for the duration of the renovation. Project Status:  Installation of interior finish materials is 95% complete. CP - UTILITIES CIS/OSS The Customer Information/Operational Support System (CIS/OSS) billing system project, delivered through Open SmartFlex (OSF), is in a paused state following several failed attempts to recover the project. On July 2, 2021 The City of Fort Collins filed a lawsuit to terminate the contract with Open International. It was determined that it was no longer in the best interest of the City, its utility ratepayers, and residents to continue the relationship. CITY MANAGER’S UPDATE 15 ESCADA SERVER VIRTUALIZATION & 64BIT UPGRADE Funding Source: New Capital Estimated Project Budget: $290,000 Phase: Design/Construction Project Details:  Convert the existing ICONICS Genesis32 hardware, software, and screens to Genesis64. Project Status:  Alarms/Events are configured to be stored in SQL.  The process is in place for transferring HyperHistorian data into SQL. This has been tested and is ready for production.  All substation RTUs have been tested. The team will continue to work on testing the remaining field devices.  ESCADA client hardware has been ordered. The team will work on installing/configuring software once the hardware is in place. CABLE REPLACEMENT PRIORITY #1-WOODWEST Funding Source: BFO # 8.9 Estimated Project Budget: $275,000 Phase: Design Complete, Construction Initiated Project Details:  Electric primary cable has been evaluated throughout the Light & Power (L&P) service area based on the year of installation, style of cable and manufacturer to establish a prioritized failure risk. This area was calculated as Priority Area #1 citywide and involves the replacement of 26 sections of single-phase power and four sections of three-phase power. The replacement primarily occurs within Woodwest Subdivision and Cimmaron Square Subdivision located southeast of W. Drake Road and S. Shields Street. Project Status:  This project has been placed on hold with the priority being conduit proofing for Connexion. We plan to resume construction in August or September with an end date still occurring in 2021. Aerial View of Woodwest Priority Area SCADA Software CITY MANAGER’S UPDATE 16 USC REMODEL-SCO/NOC CONTROL ROOM Funding Source: ECON 8.25 (2020) Estimated Project Budget: $2,620,000 Phase: Phase II Construction Project Details:  Design and construct a remodel to the Wood Street Utilities Service Center (USC) that: a. Creates a cross-departmental (Light & Power and Connexion) control room for the Supervisory Control Operations (SCO) and Network Operations Center (NOC) personnel. This includes updated operator consoles and state of the art Audio/Video (AV) technology for dynamic mapping and SCADA displays. b. Reconfigures existing building space to create necessary office space for Network Engineering, GIS, and Substation personnel. c. Reconfigures existing building space to create new conference rooms that can be utilized by all Utilities personnel at USC. Project Status:  Physical construction is 95% complete.  NOC call center furniture installed and a but waiting on a few modifications will take place by July 1.  NOC engineering cubicles has begun with some parts not installed until temporary SCO is moved out of the Training Room.  Conference room furniture was installed on Thursday, July 1.  SCO consoles delivery is delayed from July 12 to July 28; if that date holds, we are still on schedule for a mid-August completion.  The new electrical panel that will source SCO/NOC and the new UPS was installed June 26. This required a power outage to the existing panel and the current eSCADA server was run successfully on UPS during the transfer. New Energy Conference Room (North & South) A look at the soon-to-be SCO Live Wall. CITY MANAGER’S UPDATE 17 DRAKE LEVEE RECERTIFICATION Funding Source: Storm Water Estimated Project Budget: $5,500,000 Status: In Design Estimated Completion Date: Late 2023 Project Details: During the in-progress FEMA Poudre River RiskMAP project, it was determined that WSEs on the Drake Levee are higher than the current adopted floodplain mapping. As a result, this existing levee do not meet FEMA certification requirements. The primary purpose of the Drake Levee is to provide 100-year regulatory flood protection for the Drake Water Reclamation Facility (DWRF), its attendant structures and properties located southwest of the site. Remediation measures are required for the levee to be re-certified by FEMA. If measures are not taken, DWRF and other downstream properties, currently protected by the levee, will be placed back into the 100-year FEMA regulatory Poudre River floodplain. Several improvement options are being explored to bring the levee into compliance. Project Status:  Design Consultant Under Contract  Preliminary Design Data Collection  Project notification and coordination  Construction projected in late 2022. CITY MANAGER’S UPDATE 18 OAK STREET STORMWATER IMPROVEMENTS PROJECT Funding Source: Stormwater Estimated Project Budget: $2.0M (Design), $23M (Construction), $25M Total Status: In Design Estimated Completion Date: Fall 2022 (Design), Winter 2024 (Construction) Project Details: This project is for the design and construction of stormwater infrastructure for the Oak Street Stormwater Improvements Project (OSSP) that is part of the larger Downtown Stormwater Improvement Program (DSIP). The project is generally located on Oak Street from Mason to Jackson and will include storm laterals extending to the blocks both north and south of Oak Street. There will be approximately 8500 LF of new storm pipe installed with this project, ranging in size from 78” to 48”. Project Status:  Data Collection: Potholing and Geotechnical Drilling, phase 1 completed.  Public Engagement and Communication Planning: Oak Street Design Workshop was held June 22nd – 28th. The workshop was held virtually and was open to both the public and city staff.  Conceptual design is underway; anticipated completion of 30% design plans by July 30th.  BT Construction to provide pricing from 30% plans by August 27th. Walking Tour for the Design Workshop on June 22, 2021 CITY MANAGER’S UPDATE 19 27” POUDRE CANYON RAW WATERLINE Funding Source: Water - BFO#12.21 (2021) Estimated Project Budget: $3,2000,000. Status: In Design Estimated Completion Date: • Final Design – March 2022 • Construction - August 2023 Project Details: The goal of this project is to ensure the structural integrity and operational longevity of the City’s 27” raw waterline in the Poudre Canyon. An existing, exposed section of the pipeline in the river near Gateway Natural Area will be replaced to eliminate the risk of failure which ensures the continued delivery and reliability of raw water from the Poudre River to the Water Treatment Facility. The design will consider the existing geomorphology of the river to develop a long-term solution which may require pipe alignment modifications and deeper burial depths of the pipeline. Final design and construction of the selected alternative are included in this project. Project Status:  Final Alternative Analysis process has been completed through a series of workshops.  The selected alternative is the River Crossing.  Final Design will begin next month. PUBLIC SAFETY POUDRE FIRE AUTHORITY Heroic Neighbors Notified Residents in Garage Fire on Spinnaker Ln. | June 9 An early morning fire caused extensive damage to a home on the 500 block of Spinnaker Ln. near Warren Lake. PFA units were dispatched at 3:58 a.m. The Engine 5 Crew arrived within six minutes and found an attached garage fully engulfed in flames. Firefighters aggressively fought the blaze and were able to confine most of the damage to the garage. Two neighbors played an important role in notifying the occupants, potentially saving their lives. At least one of the neighbors ran into the home Selected Alternative Pipe Route – River Crossing (approx. location) CITY MANAGER’S UPDATE 20 and was able to notify the residents. The residents and their dog exited uninjured thanks to the quick thinking and selfless efforts of the neighbors. Welcome to PFA’s Newest Firefighters | June 25 Congratulations and welcome to PFA’s newest firefighters, Gabriel Marquez and Jason Schneider. They graduated with the other members of the Front Range Fire Consortium (FRFC) Academy Class 2021-1 on June 5 but finished PFA’s post-academy on June 25. They started at their assigned stations the last week of June. Board Members Completed CPR Refresher | It Takes a Community to Save a Life Every second counts during a cardiac arrest and the hands of each community member can make a difference. Board members from both the PFA Board of Directors and the Poudre Valley Fire Protection District Board of Directors completed a CPR refresher taught by the EMS Battalion. From the person that calls 911, to the first responders, to the hospital staff, everyone plays a vital role in a response to a cardiac emergency. Hands-Only CPR can be just as effective as traditional CPR and it is easy to learn. Learn hands-only CPR through the American Red Cross here. River Safety Video | PFA produced a short video, "When There's a Rescue on the River," for the Poudre RiverFest. It combines the stories and experiences of a rafter turned rescuer, a firefighter and swiftwater technician, and a public educator. It teaches the community about the power of the river, what to do if someone needs help, and how to recreate safely. River flows have slowed dramatically in recent weeks. The route from Shields St. to Legacy Park is considered the safest option for tubing in town. Flows up the canyon still require more advanced skills and equipment. Watch the video here. Vehicle and Debris Fire Extinguished at Coyote Ridge | June 24 PFA and Loveland Fire Rescue Authority responded to reports of a dump truck on fire near Coyote Ridge a little after 9:00 a.m. When firefighters arrived, there were flames about four feet high coming CITY MANAGER’S UPDATE 21 from a debris pile in the parking lot of the natural area. They quickly knocked down the fire then worked to spread out the debris while locating and extinguishing hot spots. The driver of the dump truck was traveling along Taft Hill Rd. when she noticed smoke coming from the back. She looked for a clear area, pulled over, and dumped the load. “She did all the right things,” said the PFA captain on scene. Her quick thinking gave the firefighters a safe environment to attack the flames as well as potentially prevented a grass fire. POLICE SERVICES Notable Cases Suspect Arrested for Shooting: On June 23, 2021 around 1:15 a.m., police responded to a shooting with injuries at a home in the 3300 block of Red Mountain Drive. Three adult residents were in the house when the incident occurred. Officers learned that resident Samuel Power, 18, had been acting erratically and woke up the other two people. After a brief discussion, Power reportedly fired numerous shots, striking the female resident. The woman was able to leave the house and called police. The male resident convinced Power to drop the gun and kept him inside until police arrived. The woman was transported to an area hospital and is expected to recover. Power was safely taken into custody and arrested for First Degree Assault (class 3 felony). The investigation is ongoing and additional charges are pending. Community Engagement Police in the Park: Members of the FCPS Neighborhood Engagement Team, Executive Staff, and Patrol Officers participated in several “Police in the Park” events in June, including stops at Lee Martinez Park and Fossil Creek Park. This has been a great way to connect with community members in a relaxed setting. Recognize a Responder: FCPS participated in several Recognize a Responder events in June. RAR joined Police in the Park at Lee Martinez for a fun evening of engagement. FCPS also visited a summer camp group at Bacon Elementary in late June for a brief presentation, questions, and high- CITY MANAGER’S UPDATE 22 fives with some great kids. Recognize a Responder connects neurodivergent community members with police, fire, and EMS in order to create positive interactions and reduce anxiety. Bike to Work Day: Bike Patrol officers hosted a breakfast station at Drake/Power Trail. They gave out 24 dozen donuts to more than 350 visitors! We were glad to support this fun event and connect with community members on a beautiful morning. Boys and Girls Club: The 100 degree heat didn’t stop an epic kickball game between FCPS and the Boys and Girls Club on June 15. The lead went back and forth in a well-matched game, ultimately ending in a 9-9 tie. So thankful for this organization and the difference they make with the youth in our community. CITY MANAGER’S UPDATE 23 PLANNING, DEVELOPMENT &TRANSPORTATION BUILDING, PLANNING AND DEVELOPMENT REVIEW Monthly Reporting Monthly construction reporting and mapping of development review proposals and construction can be found by visiting: http://citydocs.fcgov.com/?dt=MONTHLY+REPORT&dn=NEIGHBORHOOD+%26+BUILDING+SERVI CES%2FZONING&vid=2&cmd=showdt For a detailed listing of development Proposals under review, please visit: https://www.fcgov.com/developmentreview/proposals/ YEAR TO DATE COMPARISON 2020 2021 YTD % Change Development Project Submittals Received 185 113 -38.92% Conceptual/Preliminary Design/Staff Reviews 114 132 15.79% Building Permits Issued 6,757 4,798 -28.99% Building Permit Valuations ($M) $173.24 $171.63 -0.93% Building Inspections Performed 11,428 12,686 11.01% Zoning Inspections Performed 180 173 -3.89% Zoning Plan Reviews Performed 1,146 1,342 17.10% Overall Development Review Center revenues are $252,371 over projection for 2021 as of June 30th with Building Services over by $234,864, Neighborhood Services and Code Compliance over by $28,723, Development Review over by $3,174 and Engineering Development Review under by $(14,390). GRAFFITI UPDATE During the month of June 2021, the Graffiti Abatement Team abated 63 issues consisting of 493 tags measuring 2185 square feet of graffiti-covered surfaces. The issues were distributed throughout the City in the following Council Districts: Month One Two Three Four Five Six January 12 0 3 2 6 2 February 5 3 0 3 2 6 March 4 1 0 3 5 11 April 23 5 4 2 6 12 Month Access FC Hotline Pro-Active Total January 7 2 17 26 February 8 2 9 19 March 5 2 17 24 April 21 8 23 52 May 20 9 25 54 June 22 9 32 63 CITY MANAGER’S UPDATE 24 Month One Two Three Four Five Six May 16 14 1 5 9 8 June 22 6 1 5 17 12 SUSTAINABILITY SERVICES ENVIRONMENTAL SERVICES Compost Bin Sale: To help reduce landfill waste and support healthy local soils, the City is sponsoring a discount sale of backyard compost bins and accessories. The bins allow residents to turn yard trimmings and food scraps into a nutrient-rich soil amendment. Compost bins are on sale now for pickup on Saturday, July 17, in the Front Range Community College parking lot. Ordering ends July 10. Order at: https://fortcollinscompostersale.ecwid.com/. Our Climate Future Tip of the Month: Our Climate Future (OCF) is all about our community and region taking action to achieve carbon neutrality, zero waste, and 100% renewable electricity in an equitable and resilient way. The Our Climate Future Action Guide is intended to help residents, businesses, and industries find their place of action and leadership – there is a role for everyone, including you! Last year, Colorado had a record-breaking wildfire season. When outdoor air quality is poor from pollution or wildfires, staying indoors and maintaining healthy indoor air quality is critical. Make sure you and your family are prepared this season with some OCF Action Guide Tips:  Monitor the daily air quality  Create a clean room to protect indoor air quality during wildfires  Sign up for the Air Quality Newsletter  Sign up for a free Healthy Home assessment for indoor air quality Find out more about the Our Climate Future Plan at: https://ourcity.fcgov.com/ourclimatefuture/. SOCIAL SUSTAINABILITY Competitive Grant Update: The City's annual competitive funding process for affordable housing and human services was completed in June, with City Council approving the recommendations of the Human Services & Housing Funding Board. 4 housing projects will receive $2.7M in support, and 39 nonprofit human service programs will receive $1.1M. Find out more at: https://www.fcgov.com/socialsustainability/competitive-process. CITY MANAGER’S UPDATE 25 ECONOMIC HEALTH Local Business Stories on Forfortcollins.com Every month forfortcollins.com features stories from amazing local businesses that help make Fort Collins the vibrant community that it is! Read recent business features here: https://forfortcollins.com/stories/. UTILITIES CUSTOMER CONNECTIONS JD Power Commercial Power Customer Satisfaction Survey was emailed to all commercial power customers (with emails is CIS) on Monday, June 28 The 2020 Energy Policy infographic and supplemental report are included in the Council packet for July 1 and posted at fcgov.com/utilities/what-we-do. The report summarizes 2020 activities and results related to the City of Fort Collins Utilities Energy Policy. The COVID‐19 pandemic forced Utilities to rethink how it provides services to the Fort Collins community, all while Colorado’s largest wildfire burned within our watershed. The resulting changes included different patterns of energy use for residential and business customers, and reimagining of the delivery of programs and services. This will be the last annual update under the Energy Policy format. Moving forward, Fort Collins has integrated Energy Policy objectives into the Our Climate Future Plan (adopted March 2021). Residential Water Budgets have been completed for approximately 29,000 customers. We are now soliciting participants to help us test the budgets with a series of surveys over the summer months, after reviewing their budget in the MyWater customer portal at fcgov.com/mywater. Participants can sign up to help test at fcgov.watersmart.com/waterbudget. These budgets are customized to each customer, based on occupancy and irrigated area. Building and Plumbing Code Updates are being reviewed by the Building Code Review Committee June - August. In addition to this outreach, Water Conservation and Community Engagement invited irrigation designers, landscape professionals and others to a virtual workshop on July 14 to provide input on the development of new irrigation standards for new single-family and duplex irrigation installations. Water Shortage Watch – the Water Shortage Action Committee met on June 29th to evaluate the status and path forward for the current water shortage watch, which was declared on April 29 due to potential for water shortage related to water quality impacts from the Cameron Peak Fire burn scar. The Committee will present a memo to the City Manager to recommend issuing a declaration to end the watch in the coming weeks. This response is due to increased water supply, minimal water quality CITY MANAGER’S UPDATE 26 impacts this spring, low water demand, which have resulted in ample water supply and no longer a potential for a shortage in 2021. Xeriscape Incentive Program for HOAs and Commercial Properties will launch for the 2022 program year on July 19, 2021. Utilities commercial water customers can receive up to $15k for landscape projects that reduce water use. In 2021, Utilities Customer Connections has reached 823 participants through 37 outreach events and programs. In the month of July, Utilities will offer the following engagement opportunities:  July 1 – Energy Education Program – Utilities education team will be collaborating with FoCo Café's summer youth program Kids Feeding Kids to provide a program about energy conservation.  July 2, 28, 30 – Wade the River: Boys & Girls Club – Utilities education team collaborates with Natural Areas on water education for Boys & Girls Club summer programming. Participants will dipnet for macroinvertebrates in the Poudre River.  July 20-23 – Water Education Program: Camp FunQuest – Utilities education team collaborates with Recreation’s summer camps for 5–16-year-olds to dipnet for macroinvertebrates in the Poudre River.  July 29 – Junior Naturalist Watershed Education Program – Utilities education team collaborates with Natural Areas on water quality, wildfire and watershed health education. In 2021, Utilities Customer Connections has reached 2,153 participants through 48 outreach events and programs. In the month of June, Utilities offered the following engagement opportunities:  June 8 – Safe Water Action Program (SWAP) Focus Group - Staff gathered feedback from 9 community members on the communications and outreach approach for SWAP.  June 10 – Rotate to Rotary Nozzles - During this Xeriscape Garden Party virtual presentation, 30 residents learned how to identify high water pressure on their sprinkler system, and how to convert spray head nozzles to rotary nozzles to save water.  June 15 – UAP presents to Partners Mentoring Youth – Staff presented Utilities’ Affordability Program Roadshow to 8 participants from Partners Mentoring Youth Program.  June 16 - Conserving Water in the Garden with Rain Barrels - During this Xeriscape Garden Party virtual presentation, 53 residents learned what type of rain barrel to buy and step-by-step instructions how to install it at home.  June 22 – Some Like it Hot: Waterwise Perennials - During this Xeriscape Garden Party virtual presentation, 88 residents learned the best heat-loving perennials for the Colorado Front Range.  June 22-29 – Oak St Project Streetscape Design Workshops – 143 community members and staff participated in a series of online workshops and activities to share feedback how the streetscape could look after the Oak St. stormwater project is complete.  June 23 – Bike to Work/Anywhere Day (BTWD) – Utilities partnered to sponsor a booth for BTWD, engaging 893 community members on Utilities programs and projects.  June 25 – Poudre River Fest- Water Education Program & Outreach Booth - The Poudre River Fest was a collaborative, mostly online event. Utilities lead an in-person education program covering water quality at the river as well as hosted an outreach booth to 64 participants.  June 23 – Boys & Girls Club with Natural Areas - This collaborative program focused on water education reaching 10 young people participating in Boys & Girls Club summer programming Club Outdoors.  June 30 – We Are Here For You - Utilities staff presented payment assistance options and programs available to 8 customers wanting to lower their utility costs. This program was open to the public. CITY MANAGER’S UPDATE 27  June 30 – Larimer County Office on Aging and Disability Resources (ADR) - Utilities staff presented the Utilities Affordability Program Roadshow to 24 team members that serve our customers. WATER RESOURCES AND TREATMENT OPERATIONS Environmental Regulatory Affairs (ERA) Division Senior Environmental Regulatory Specialist Susan Strong has been mentoring Fort Collins High School student Emma Eddy, who is a finalist in Caring for Our Watersheds Colorado. This educational program engages students in preserving and improving local watersheds through student-led solutions. Emma’s solution focuses on watershed contamination from car washing at home. She created a video and contest where participants can win free car wash passes by commenting on the video https://youtu.be/wMNwtTbAhWo or creating their own video and sharing the hashtag #WaterShedWash. ERA would like to recognize the 10-year work anniversary of our colleague, Bonnie Pierce. Bonnie has contributed to the organization in many ways, including overseeing the development of the first City database used for the annual Greenhouse Gases Inventory for Environmental Services, the administration of the Brownfields Grant program, and very detailed technical work related to both Clean Water Act stakeholder processes and permitting issues for the Water Reclamation and Biosolids division and the complex Larimer County Landfill groundwater remediation issue. Thank you, Bonnie! COMMUNITY SERVICES RECREATION  Summer youth activities are in full swing across Recreation, with day camps, youth sports, ARO (Adaptive Recreation Opportunities) inclusion support, and other valuable programming.  Staff collaborated with the Food Bank for Larimer County to provide 300 daily meals to children participating in summer childcare programs.  EPIC held a local Pond Hockey Tournament on May 22nd- May 23rd.  EPIC sold approximately 1200 tickets to the Summer Ice Show.  480 people enrolled in a group fitness activity for the month of June.  Aquatics teamed up with the ARO team to host a two-day Learn to Swim Training. CITY MANAGER’S UPDATE 28 PARKS  Managed river hazards over Memorial Day week.  Annual Planting Program in Downtown is 98% complete.  Groundwater infiltration issue at Shields underpass.  Memorial Day activities were a success at Spring Canyon Community Park, Edora-Larimer County Veterans Memorial and both cemeteries.  Emerald Ash Borer treatments began for 700 trees in the inventory.  Hosted two Free Mulch Days.  The Power Trail vandal has been caught and Parks will continue to work on the Twin Silo Community Park vandalism. CULTURAL SERVICES Grappling Juniper by Artist Tom Benedict  With the support of the City of Fort Collins Art in Public Places Program, the Gardens on Spring Creek recently installed the temporary sculpture exhibition “Mountain Wildwoods: The Resilient Beauty of Juniper Trees” by artist Tom Benedict. On display until February 12, 2022, the exhibit features several striking sculptures the artist carved from Rocky Mountain Juniper trees. CITY MANAGER’S UPDATE 29 There will be a Meet and Greet with the artist on Wednesday, July 21 from 6:00 - 7:30 p.m.  The Lincoln Center, with support from the Lincoln Center Support League, is offering the annual free Children's Summer Series on Wednesdays at 10:00 a.m. during the months of June and July. Great for children of all ages, this series features hour-long presentations of comedy, music, culture and fun. Head to The Lincoln Center lawn July 7, 14 and 21 to enjoy these whimsical performances that will entertain both young and old alike. Blankets and sunscreen are encouraged. NATURAL AREAS Maxwell Natural Areas Reopens In June, about 3100’ of the Foothills Trail at Maxwell Natural Area was repaired to protect ecological integrity and restore the trail’s natural drainage pattern. Though maintenance was performed annually by the Natural Areas Department staff and volunteers, the condition of the trail degraded past the point where any meaningful impact or improvement could be made with hand tools or even small heavy equipment. The trail suffered too much erosion through both use and weather and lost its ability to sheet water. The trail maintenance at Maxwell Natural Area was informed by extensive public engagement including during the Foothills Management Plan process in 2019 and stakeholder meetings in 2020. Volunteers from Colorado Addicted Trailbuilders Society, Larimer County Conservation Corps, a helicopter, and several pack llamas from Buckhorn Llama Company all participated in the trail restoration. 290 tons of specially blended soil (designed for durability and better drainage) was integrated into the trail. Thank you, volunteers! The multi-use Foothills Trail functions as a connector into two other natural areas and provides access to Horsetooth Reservoir. Outdoor enthusiasts of all types and abilities all use and enjoy this trail system. CITY MANAGER’S UPDATE 30 City of Fort Collins Recommended Plant List Staff from a wide variety of City departments, including the City Attorney’s Office, FC LEAN, Gardens on Spring Creek, Park Planning, Information Technology, Planning and Zoning, Code Compliance, Forestry, Utilities, and Natural Areas unveiled a rich resource to assist community members with choosing native plants for their landscaping. The City of Fort Collins Recommended Plant List is a user-friendly educational resource for the community to guide the creation of sustainable and ecologically diverse landscapes. Designed with the end-user in mind, this database promotes water conservation, highlights regionally appropriate and native plants, and supports local wildlife and pollinators. Many communities publish a static plant list; however, this resource is easily updatable, and highly informative. With searchable features including time of bloom, height, soil type, wildlife use, and many others, community members will find this an invaluable tool to assist with promoting pollinators, restoring native landscapes, supporting wildlife, and/or fulfilling development review requirements. Land Conservation Update Natural Areas had a successful quarter of land conservation efforts. Currently five properties are under contract: an 8.6-acre fee acquisition and a 1.6-acre fee acquisition along the Dry Creek corridor adjacent to Natural Areas-owned property, a 17.6-acre conservation easement along the Poudre River corridor, a 24-acre fee acquisition along the Cooper Slough corridor, and a 155-acre fee acquisition adjacent to Crossline Canyons Natural Area in the foothills. There are also ongoing negotiations to acquire other priority properties. CITY MANAGER’S UPDATE 31 Land Conservation Summary 2021 To Date Acreage Cost Acres of Land Purchased 38,812 Acres of Land Leased 897 Acres of Land in Conservation Easements 7,034 Total Conserved - To Date 46,743 $ 105,202,358 2021 Total Acquisitions Acreage Cost Total Conserved - Year To Date Property Under Contract Acreage Cost Conservation Easement Poudre River Corridor Closing Fourth Quarter 2021 17 $ 175,000 Fee Acquisition Northeast Fort Collins Closing Third Quarter 2021 1.6 $ 500,000 Fee Acquisition Northwest Fort Collins Closing Third Quarter 2021 24 $ 1,245,000 Fee Acquisition Northwest Fort Collins Closing Third Quarter 2021 8.5 $ 467,500 Fee Acquisition Regional - Foothills Closing Third Quarter 2021 155 $ 750,000 Total Under Contract 206.1 $ 3,137,500 Land Conservation Funds Budgeted for 2021 $3,900,000 + Re-appropriation $4,313,875 $ 8,213,875 Land Conservation Funds Expended in 2021 to Date $ - Acquisitions Under Contract $ 3,137,500 Net Land Conservation Funds Remaining for 2021 $ 5,076,375 PUBLIC ENGAGEMENT DEI Officer Community members had the chance to meet the candidates for the City’s new Diversity, Equity & Inclusion Officer candidates during two community forums that took place on Monday, June 21, and Tuesday, June 22. Community members had a chance to submit questions and provide feedback afterwards. The City of Fort Collins then hired Claudia Menéndez as its first Chief Diversity, Equity & Inclusion (DEI) Officer. As the Chief DEI Officer, Menéndez will be tasked with creating and building a DEI Office for the City, in order to grow the organization’s capacity to support DEI work internally and externally and ensure Fort Collins is a safe and welcoming place for all people. More information about this important position is at https://www.fcgov.com/news/index.php?id=8049. BROADBAND – FORT COLLINS CONNEXION Monthly Reports Connexion is publishing our monthly reports on our website. Visit fcconnexion.com/reports to view and download. Address Look-up Fort Collins residents can now input their address and see whether their residence is In Design, In Construction, or has Service Available! Our address look-up tool can be found on the Connexion website at www.fcconnexion.com. Taste of Fort Collins! Connexion is a proud sponsor of the 2021 Taste of Fort Collins! CITY MANAGER’S UPDATE 32 This summertime Fort Collins tradition is back on this summer, taking place on July 24 & 25 at Washington Park in Old Town Fort Collins. Stop by our booth (located on the corner of Laporte Ave. and N. Howes St.) to say hello to some of our staff, learn more about our products and services, check out our address lookup tool to see when Connexion will be in your neighborhood and score some cool Connexion swag! We look forward to seeing you there! Social Media Follow us on Facebook and Twitter! Join the Connexion community—get updates and information on services and more! @FCConnexion @ConnexionFC COMMUNITY DASHBOARD HIGHLIGHT The Community Dashboard features performance data and information that highlights how the City is doing in achieving its seven Outcome areas: Neighborhood Livability and Social Health, Culture and Recreation, Economic Health, Environmental Health, Safe Community, Transportation, and High Performing Government. The Dashboard is made up of 37 total metrics that are published quarterly and demonstrate where the City is doing well and where there are opportunities to improve. The color status of performance for each metric is determined based on the actual result for the quarter compared with the target. The color status of performance for the Outcome is determined based on the average calculation of the performance of each metric within that Outcome. Each month the City Manager’s Update will highlight a metric from the Community Dashboard. This month’s feature is from the Culture and Recreation Outcome Area. CITY MANAGER’S UPDATE 33 Analysis:  In the first quarter, COVID-19 restrictions continued, limiting programming and participation. There were 808 people who attended 29 activities, which is about 500 people below the target of 1,312 participants. Activities included Eagle Watches, Virtual Fireside Fridays, and Earth Day Facebook Live events highlighting stewardship actions.  COVID-19 accounts for the low participation as both participants and volunteer activity leaders avoided gathering to prevent the spread of the coronavirus. Some small group programming continued outdoors in accordance with health guidance and online offerings continued to be popular as well. Definition: The participants per capita attending Natural Areas programs. CITY MANAGER’S UPDATE 34 Why is this metric important? This metric provides an indication of the diversity and popularity of Natural Areas programs. Offering a wide range of popular programs is a hallmark of successful operation. City’s impact on this metric: Medium – Natural Areas influences this metric by providing a wide range of quality programs to community members. Participation numbers are also influenced by marketing and outreach. Benchmarks: This metric contains benchmark data for Colorado open space agencies that have similar educational programs, voter approved tax funding, land conservation missions, and community demographics. Fort Collins compares itself to county-wide programs because municipal open space programs are very rare. To view the entire Dashboard, please visit: http://fortcollins.clearpointstrategy.com/