HomeMy WebLinkAboutReport - Mail Packet - 6/15/2021 - City Manager’S Monthly Update - June 2021 Traverse Park Groundbreaking - May 14, 2021 June 2021 JUNE 10, 2021 Table of Contents ISSUES BEFORE COUNCIL ................................................................................................................. 4 JUNE 15 REGULAR MEETING ..................................................................................................................................4 JUNE 22 WORK SESSION- CANCELED FOR MID YEAR REVIEWS .............................................................................4 JUNE 22 ADJOURNED MEETING .............................................................................................................................4 JUNE 24 URA BOARD MEETING - CANCELED ..........................................................................................................4 JUNE 29 CITY COUNCIL RETREAT FOLLOW UP MEETING .......................................................................................4 JULY 6 REGULAR MEETING .....................................................................................................................................4 PUBLIC ENGAGEMENT – UPCOMING EVENTS ................................................................................ 5 SALES TAX - MONTHLY & YEAR TO DATE ....................................................................................... 5 CP - ENGINEERING ............................................................................................................................. 6 CITYWIDE PEDESTRIAN ACCESS PROJECT ...............................................................................................................6 LINDEN STREET RENOVATION PROJECT .................................................................................................................7 VINE AND LEMAY BNSF IMPROVEMENTS ..............................................................................................................8 CP - PARK PLANNING & DEVELOPMENT ......................................................................................... 9 BUCKING HORSE PARK ............................................................................................................................................9 CRESCENT PARK STORAGE SHED ......................................................................................................................... 10 EAST PARK DISTRICT MAINTENANCE FACILITY .................................................................................................... 10 MAIL CREEK TRAIL................................................................................................................................................ 11 OAK STREET PLAZA WATER FEATURE .................................................................................................................. 11 POUDRE TRAIL AT I-25 ......................................................................................................................................... 12 SPRING CANYON DOG PARK ................................................................................................................................ 12 TRAVERSE PARK ................................................................................................................................................... 13 VETERANS PLAZA AT SPRING CANYON PARK ...................................................................................................... 13 CP - OPERATION SERVICES ............................................................................................................ 14 FORT COLLINS/LOVELAND POLICE TRAINING CENTER ........................................................................................ 14 BLOCK 32/42 – CIVIC MASTER PLAN REFRESH .................................................................................................... 14 UTILITIES SERVICES CENTER-RENOVATION FOR SCO AND NOC .......................................................................... 15 CP - UTILITIES.................................................................................................................................... 15 CIS/OSS ................................................................................................................................................................ 15 CABLE REPLACEMENT PRIORITY #8-BROWN FARM CABLE ................................................................................. 16 LIGHT & POWER JOINT TRAINING FIELD WITH POUDRE FIRE AUTHOURITY....................................................... 16 ADVANCED DISTRIBUTION MANAGEMENT SYSTEM-IVR ENHANCEMENTS ........................................................ 17 CORRAL OVERHEAD CONVERSION PROJECT ....................................................................................................... 18 NORTH MASON STORMWATER DRAINAGE SYSTEM FINAL DESIGN ................................................................... 18 OAK STREET STORMWATER IMPROVEMENTS PROJECT ..................................................................................... 19 27” POUDRE CANYON RAW WATERLINE ............................................................................................................. 19 PUBLIC SAFETY ................................................................................................................................ 20 POUDRE FIRE AUTHORITY ................................................................................................................................... 20 POLICE SERVICES .................................................................................................................................................. 22 PLANNING, DEVELOPMENT &TRANSPORTATION ......................................................................... 24 BUILDING, PLANNING AND DEVELOPMENT REVIEW .......................................................................................... 24 GRAFFITI UPDATE ............................................................................................................................ 25 SUSTAINABILITY SERVICES ............................................................................................................ 25 ENVIRONMENTAL SERVICES ................................................................................................................................ 26 SOCIAL SUSTAINABILITY ...................................................................................................................................... 27 ECONOMIC HEALTH ............................................................................................................................................. 27 UTILITIES ............................................................................................................................................ 27 CUSTOMER CONNECTIONS .................................................................................................................................. 27 WATER RESOURCES AND TREATMENT OPERATIONS .......................................................................................... 29 COMMUNITY SERVICES .................................................................................................................... 29 RECREATION ........................................................................................................................................................ 29 PARKS ................................................................................................................................................................... 30 CULTURAL SERVICES ............................................................................................................................................ 30 NATURAL AREAS .................................................................................................................................................. 31 PUBLIC ENGAGEMENT ..................................................................................................................... 32 BROADBAND – FORT COLLINS CONNEXION ................................................................................. 33 COMMUNITY DASHBOARD HIGHLIGHT .......................................................................................... 33 CITY MANAGER’S UPDATE 4 ISSUES BEFORE COUNCIL JUNE 15 REGULAR MEETING Municipal Immigration Legal Fund o Consider adoption of an appropriation ordinance to provide municipal funding of an immigration Legal Fund grant program to provide direct legal representation, offer legal advice and clinics, provide self-advocacy resources and education, support assistance with application and renewal fees for Fort Collins residents with pathways to lawful citizenship or legal presence in the United States, and increase safe equitable access to community resources. Neighborhood Livability & Social Health 1.4 - Advance equity for all, leading with race, so that a person’s identity or identities is not a predictor of outcomes. Staff Report: Linden Street Project Update o Provide an update on the Linden Street project; a status update of work completed and discussion of final phase work on Linden Street. Transportation 6.5 - Maintain existing and aging transportation infrastructure and addressing missing facilities to meet community needs and expectations. Staff Report: Connexion Transparency Update o A service availability map and an address look-up feature have now been added to the Connexion website. Economic Health 3.6 - Deploy and deliver reliable, high speed internet services throughout the community. Executive Session o Discuss issues related to Broadband. JUNE 22 WORK SESSION- CANCELED FOR MID YEAR REVIEWS JUNE 22 ADJOURNED MEETING Mid-year review of City Manager, City Attorney and Chief Judge JUNE 24 URA BOARD MEETING - CANCELED JUNE 29 CITY COUNCIL RETREAT FOLLOW UP MEETING 5:00-9:00 p.m. at Innosphere Ventures, 320 E Vine Drive, Suite 101. Agenda materials ready closer to event. JULY 6 REGULAR MEETING Northeast Frontage Road Annexation (First Reading - consent) o To find substantial compliance and initiate annexation proceedings for the Northeast Frontage Road Annexation. Neighborhood Livability & Social Health 1.7 - Provide a high-quality built environment, support quality, diverse neighborhoods and foster the social health of citizens. Please note that this list is subject to frequent change. Please call the City Clerk’s Office for up-to-date information. 970-416-2774. CITY MANAGER’S UPDATE 5 Utilities Income Qualified Assistance Program (IQAP) o Propose code amendments to continue offering and modify the Income-Qualified Assistance Program (IQAP) to be an ‘opt-out’ program for LEAP-enrolled Fort Collins Utilities customers. Neighborhood Livability & Social Health 1.3 - Improve accessibility of City and community programs to low- and moderate-income residents and increase participation in services to eligible, income-qualified residents. Future of Remote Work Sessions o Discuss a policy related to work sessions continuing to be held remotely post-COVID emergency. High Performing Government 7.1 - Provide world-class municipal services through operational excellence and a culture of innovation. Community Report: West Nile Virus o Larimer county Health Director Tom Gonzales will present an update on activities related to West Nile Virus. PUBLIC ENGAGEMENT – UPCOMING EVENTS Community members invited to share priorities, funding ideas for 2022 City Budget The City of Fort Collins is developing its 2022 Recommended Budget and there are a variety of opportunities for community members to have a say on how their tax dollars will be spent next year. At ourcity.fcgov.com/2022budget, participants can select from several feedback mechanisms, whether they have just a few minutes, or a little more time to dive deep into budget proposals. On that page, visitors can learn more about the Budgeting for Outcomes (BFO) process, share their top community priorities and how those may have changed due to the pandemic, submit specific funding ideas, and more. An engagement toolkit is also available. DEI Officer Interviews & Forums In mid-June we are conducting interviews for our new Diversity, Equity & Inclusion Officer. Eight candidates are meeting with several interview panels, and we expect to narrow that pool to a handful of finalists later this week. Those finalists will participate in additional interviews next week, as well as two online community forums and two online employee forums. The community forums will be: • Monday, June 21, from 5:30-6:45 p.m. • Tuesday, June 22, from 12:45 p.m. -2:00 p.m. Please review https://ourcity.fcgov.com/deiofficer for more information. We have some outstanding candidates for this important position. Thank you to everyone who has participated in this process earlier this year that helped shape the position description. SALES TAX - MONTHLY & YEAR TO DATE APRIL SUMMARY OVER PRIOR YEAR Month Year to Date Net Sales Tax Collected: 27.6% 11.4% Net Use Tax Collected: 16.9% -4.2% Net Sales and Use Tax Collected: 26.1% 9.2% Year to date, sales and use tax collections excluding rebates are up 9.2% and total $49.5M. CITY MANAGER’S UPDATE 6 APRIL SUMMARY OVER BUDGET Month Year to Date Net Sales Tax Collected: 22.5% 18.1% Net Use Tax Collected: 10.4% 0.2% Net Sales and Use Tax Collected: 20.8% 15.6% Year to date, the City has collected 15.6% more sales and use tax revenue, totaling $6.7M over budget. CP - ENGINEERING CITYWIDE PEDESTRIAN ACCESS PROJECT Funding Source: Community Capital Improvement Program (CCIP) Estimated Project Budget: 2020 - $1.2M Estimated Completion Date: Ongoing Phase: Construction Project Details: This project maintains a complete City sidewalk inventory, identifies sidewalk inadequacies, and access needs under the Americans with Disabilities Act (ADA), and develops a prioritized work program to achieve goals of providing unobstructed access for transportation and recreation. Project Status:  Sidewalk improvements along south side of Harmony Road and east of College Ave have been completed in May to address significant ADA concerns. CITY MANAGER’S UPDATE 7 More information is available at http://www.fcgov.com/engineering/pedneeds.php LINDEN STREET RENOVATION PROJECT Overall Project Improvements 2021 Construction Funding Source: Community Capital Improvement Program (CCIP) Estimated Project Budget: $3.8M Estimated Completion Date: 2022 Phase: Construction Project Details: The goals of this project are to renovate Linden Street between Walnut Street and Jefferson Street. Initial concepts include converting this section of Linden Street to a “convertible” street; one that can function primarily as a roadway but can also be closed to vehicles and converted to a pedestrian plaza during specialty events. CITY MANAGER’S UPDATE 8 Project Status:  Work at the Linden/Jefferson intersection was substantially completed on May 7, 2021 and was reopened to vehicular traffic.  All roadway work associated with the 2021 construction phase has been completed. Staff will coordinate with the Downtown Development Authority (DDA) on remaining paver repairs near Old Town Square. Paver repair work is dependent on contractor availability.  Staff will continue discussions with the DDA, KCI Construction, adjacent business and property owners, and others regarding the Phase II construction start date and project phasing. More information is available at: https://www.fcgov.com/engineering/linden-street-renovation/ VINE AND LEMAY BNSF IMPROVEMENTS Funding Source: Keep Fort Collins Great (KFCG), Transportation Capital Expansion Fee (TCEF), 2017 / 2018 BFO, 2021 BFO Estimated Project Budget: $24M Estimated Completion Date: 2021 Phase: Construction Project Details: The existing Vine and Lemay intersection, which includes the Burlington Northern Santa Fe (BNSF) Railway crossing, is severely congested with limited options to expand through or turn lane capacity due to land use constraints. Project Status:  Work has begun in the Lincoln/Lemay intersection with potholing and utility investigation. Plan to begin major impacts at intersection after July 4 with lane and road closures.  Bridge work has continued with the abutments approximately 30% complete. Roadway embankment construction is approximately 50% complete. A4 Lateral storm connection is complete. More information is available at fcgov.com/engineering/vine-lemay CITY MANAGER’S UPDATE 9 CP - PARK PLANNING & DEVELOPMENT BUCKING HORSE PARK Funding Source: Neighborhood Parkland Funds Total Project Cost: $2.5 - $4 million Phase: Design Estimated Completion: 2022 or 2023 Project Details: Bucking Horse Park is a park planned for the Bucking Horse neighborhood. Project Status:  Successful online second neighborhood meeting took place the last week of May.  Currently working on concept design. More information available on project webpage. CITY PARK RESTROOM Funding Source: Building On Basics Total Project Cost: $850k-$1M Phase: Phase I project identification Estimated Completion: Spring 2021 Project Details: The City Park Restroom Project provides a new, year-round restroom along with surrounding site improvements. Construction began on September 7, 2020 and landscaping is planned for spring 2021. Visit the project web site for additional information regarding the project at ourcity.fcgov.com/city-park- tomorrow. Project Status: CITY MANAGER’S UPDATE 10  The art-in-public-places piece has been installed.  The restroom opened for public use prior to Memorial Day weekend.  Minor asphalt work remains. More information available on project webpage. CRESCENT PARK STORAGE SHED Funding Source: Neighborhood Parkland Total Project Cost: $275,000 Phase: Construction Estimated Completion: May 2021 Project Details: The irrigation pump house remodel is under contract. The permitted addition will alter the existing building to allow utility vehicle storage that will be used for operation and maintenance for parks and trails in the northeast portion of Fort Collins, particularly for snow removal equipment. Project Status:  Structure is 100% complete, landscaping restoration is underway. EAST PARK DISTRICT MAINTENANCE FACILITY Funding Source: Neighborhood Parkland & Community Parkland Funds Total Project Cost: $5 million Phase: Design Estimated Completion: Fall/Winter 2021-2022 Project Details: A maintenance facility to serve the East Park District, which includes multiple neighborhood and community parks, is proposed near the intersection of Drake & Ziegler near the water treatment facility. The maintenance facility will house Parks Department staff, equipment, and some minor material storage. CITY MANAGER’S UPDATE 11 Project Status:  Project team evaluating project construction schedule due to escalating steel prices. MAIL CREEK TRAIL Funding Source: Multiple Funding Sources including Grants, TCEF, and Conservation Trust Funds Total Project Cost: $750,000 Phase: Pre-Design Estimated Completion: Fall 2022 Project Details: When completed, the Mail Creek Trail will create a trail connection from Kinard Middle School to the Power Trail, providing much needed trail access for southeast Fort Collins. Currently, design of the Siphon overpass and Timberline trail widening/underpass are in progress, in partnership with the Engineering Department. In addition, Park Planning & Development is working to identify the best location for the future Mail Creek Trail. Project Status:  Coordinating with railroad on siphon overpass alignment. More information available on project webpage. OAK STREET PLAZA WATER FEATURE Funding Source: GID & Parks life cycle funds Total Project Cost: $100,000 CITY MANAGER’S UPDATE 12 Phase: Construction Estimated Completion: Summer 2021 Project Details: Park Planning & Development will be improving the water features in Oak Street Plaza to resolve drainage and safety challenges in the plaza. Project Status:  Currently under construction. More information available on project webpage. POUDRE TRAIL AT I-25 Funding Source: Conservation Trust Fund & GOCO Grant ($1M for Fort Collins) Total Project Cost: $3 million Phase: Design Estimated Completion: 2023 Project Details: Construction of this 2-mile section of the trail will complete the entire extent of the approximately 10- mile Poudre Trail in the City of Fort Collins. Fort Collins partnered with Timnath, Windsor, and Larimer County in 2019 to win a $2 million GOCO Connect Initiative Grant to complete all remaining segments of the Poudre Trail. The GOCO project will complete approximately 4-miles of missing trail segments, to complete the entre 40+ mile Poudre Trail from Bellvue to Greeley. The Fort Collins project will connect the existing trail ending at the Colorado State Environmental Learning Center through the future East Community Park to the proposed I-25 underpass to be constructed by the Colorado Department of Transportation (CDOT) with the North I-25 project, and thereafter to the existing trail segment in Timnath. Project Status:  Final construction documents preparation underway. SPRING CANYON DOG PARK Funding Source: NIC Grant for $75,000 Total Project Cost: TBD Phase: Design Estimated Completion: TBD Project Details: The water quality at Spring Canyon Community Park was adversely affected by the drainage out of the dog park pond. Particularly, issues like E. coli were difficult to manage and put the dog park pond at risk of closure. Park Planning & Development worked with Stormwater, Parks, and Environmental Regulator Affairs to seek and receive a grant from Nature in the City. This grant will allow for much needed Low Impact Development improvements and restoration work on the dog park and SCCP water quality pond. CITY MANAGER’S UPDATE 13 Project Status:  Council appropriation of Nature in the City Grant occurred in May.  Consultant design team is being onboarded and preliminary design is starting.  Construction anticipated to start after Labor Day. TRAVERSE PARK Funding Source: Neighborhood Parkland Funds Total Project Cost: $3.5 - 4 million Phase: Construction Estimated Completion: Fall 2021 Project Details: A new neighborhood park to be built in the Trail Head neighborhood, located on East Vine Street. The park will include typical park features including a shelter, playground, multi-purpose field, basketball court, and play area for teens. Project Status:  On Friday, May 14, a well-attended park groundbreaking event took place where plans for the new park were shared and the new park name, Traverse Park, was announced (formerly Trail Head Park).  Construction is underway with anticipated completion in the fall of 2021. More information available on project webpage. VETERANS PLAZA AT SPRING CANYON PARK Funding Source: PPD Special Projects Fund Total Project Cost: TBD Phase: Planning Estimated Completion: Fall 2021 Project Details: Framework planning meeting was held with representatives of the Veterans Plaza group, Parks, and Park Planning & Development. Purpose of the meeting was to begin developing a framework plan for potential future improvements at the Veterans Plaza location. Project Status:  Initial planning was held in early June to begin project discussions. CITY MANAGER’S UPDATE 14 CP - OPERATION SERVICES FORT COLLINS/LOVELAND POLICE TRAINING CENTER Funding Sources: $9.25M generated from bonds for the City of Fort Collins $9.25M from City of Loveland $1M from DOLA Grant Estimated Project Cost: $19.5M Phase: Phase III Added Site Amenities - Permitting Estimated Completion Date: Fall 2021 Project Details: The City of Fort Collins is partnering with The City of Loveland to construct a new Police training facility which will be located on the west side of the Northern Colorado Regional Airport. This new site will offer a 50-yard pistol range, a 1.4-mile driving track, concrete skills pad, and classrooms for special training. Project Status: Phase I – Track & Skills pad is open and being used. Phase II - Building Construction is open and being used. - LEED Certification – Finalizing the submittals for USGBC review. Phase III – Adding Site Items with project savings. - Storage Shed – Awaiting permit approval. - Breach/Blast Pad – Processing shop drawings. - K9 Training area – Processing shop drawings - Observation Tower for Track and Skills Pad – Processing shop drawings.  Construction start for phase III items has been pushed back to early May, weather permitting.  Scheduled to complete phase III scope - fall of 2021. BLOCK 32/42 – CIVIC MASTER PLAN REFRESH Funding Source: Capital Project via BFO: $300,000 Estimated Project Cost: TBD Phase: Conceptual Master Plan Estimated Completion Date: Fall 2021 Project Details: Space planning for Block 32 and 42 that was performed in 2013-2014 and needs to be updated. The new planning effort will involve each affected department to determine their space needs and anticipated growth over the next 10-12 Years. With the completion of the refresh the City can decide which departments to house in 215 N. Mason, 300 Laporte Ave - Building A, and the new City Hall. The refresh will also help determine an appropriate size of the new City Hall. Once this is determined and a conceptual design is produced it will be submitted to Council for review, next recommended steps and approval. One Possible Conceptual Plan New Observation Tower for Track CITY MANAGER’S UPDATE 15 Project Status:  Coordinating new conceptual plan with Planning, and various Boards and Commissions.  Incorporating what we learn from these meetings to make some modifications and then bring an updated plan to Council in June.  There will need to be multiple phases for this project. - Look at existing spaces and make sure they are right sized with the updated space standards. - Look at department adjacency and determine who needs to be located where. - Look at which departments should be in the new municipal building and determine the size. - Submitted BFO offers to fund these phases. UTILITIES SERVICES CENTER-RENOVATION FOR SCO AND NOC Funding Sources: $2.61M – Light & Power (SCO) $1.75M – Broadband (NOC) Estimated Project Cost: TBD Phase: Conceptual Master Plan Estimated Completion Date: Fall 2021 Project Details: This project will renovate approximately 9,800 square feet of interior space at the Utilities Services Center. The existing space occupied by Light and Power - SCO will be renovated to serve current and future needs. Existing interior space will be reconfigured to accommodate the needs of Broadband for a Network Operations Center (NOC). Conference rooms will be developed to replace those displaced by interior renovation. SCO staff will be housed in the existing Training Room for the duration of the renovation. Project Status:  Installation of interior finish materials is 90% complete.  Installation of NOC Workstations is in progress.  The Technology Contractor (Diversified) has mobilized for the Audio/Visual scope of work. CP - UTILITIES CIS/OSS The Customer Information/Operational Support System (CIS/OSS) billing system project, delivered through Open SmartFlex (OSF), is in a reduced activity phase that is primarily focused on prioritizing, planning, and executing identified gaps within the live production OSF software that supports the Connexion/ Broadband Service Area. CITY MANAGER’S UPDATE 16 CABLE REPLACEMENT PRIORITY #8-BROWN FARM CABLE Funding Source: BFO # 8.9 Estimated Project Budget: $153,000 Phase: Construction Complete Project Details:  Electric primary cable has been evaluated throughout the Light & Power (L&P) service area based on the year of installation, style of cable and manufacturer to establish a prioritized failure risk. This area was calculated as Priority Area #8 citywide and involves the replacement of 30 sections of single-phase power. The replacement primarily occurs within the Brown Farm Third Subdivision located west of S. Taft Hill Drive and south of W. Stuart Street. The replacement will also include the installation of MaxCell innerduct to facilitate the future installation of Connexion within the same conduit used by L&P. Project Status:  All transformers and cable sections have been replaced and construction is complete. LIGHT & POWER JOINT TRAINING FIELD WITH POUDRE FIRE AUTHOURITY Funding Source: Offer # 11.21 Estimated Project Budget: $110,000 Phase: Design Project Details:  Poudre Fire Authority (PFA) and Utilities staff have been coordinating a plan to collaborate on training services that will benefit both agencies at the PFA Training Center on West Vine Drive. The development of these props will benefit the City’s Utilities Service Area by eliminating the need to purchase land on which to erect the props, and PFA benefits through the partnership by adding new dimensions to special rescue training, as well as partnering with Utilities to facilitate other site improvements. In this arrangement, PFA staff is working with Utilities staff to develop the construction drawings, surveys, and any excavation and installation work that is necessary for the project. PFA’s cost is expected to be minimal, and Utilities has existing and future offers in the City’s budgeting process to cover their portion of the expenses. Project Status:  Project has been approved by Energy and PFA Boards  Staking for construction of training poles for climbing is in process.  Poles will be set in July. Electric Field Service crew in training. Aerial view of the Brown Farm replacement area. CITY MANAGER’S UPDATE 17  Access road improvements expected to be constructed in July/August. ADVANCED DISTRIBUTION MANAGEMENT SYSTEM-IVR ENHANCEMENTS Funding Source: Offer #11.15 Estimated Project Budget: $150,000 Phase: Design Project Details: This offer will provide enhanced functionality in the Advanced Distribution Management System (ADMS). Specifically, it will provide a better customer experience with an integration between the ADMS and the new Customer Information System (CIS). Some of the functions it will enable are: • Upgrades to the existing Interactive Voice Response (IVR) system. This is currently a one-way communication tool when customers call Utilities. Upgrading the IVR will allow two-way communication to customers and provide flexibility for how customers and Utilities communicate with each other. • The integration to CIS will ensure that all three systems are aligned with updated customer and electric network connectivity information. Project Status:  This project's scope is largely dependent on an upgrade to the City's Interactive Voice Response (IVR) system and could be dependent on the upgrade to the Utilities CIS upgrade.  Preliminary discussions with the City staff who are responsible for the IVR system are in process to understand what functionality could be enabled with the current IVR vendor knowing that the CIS software could be OSF or still be Banner.  Staff has paused project work at this time until the future of the CIS upgrade is clearer. IVR upgrades will provide efficient communications between CIS, OMS, and Utilities Customers CITY MANAGER’S UPDATE 18 CORRAL OVERHEAD CONVERSION PROJECT Funding Source: Offer 8.9 Estimated Project Budget: $125,000 Phase: Construction Project Details: Efforts are continuing to replace aging overhead electric lines with much more reliable underground facilities. The recent acquisition of the Corral Annexation by Natural Areas made this project possible. It will replace 3,000 lineal feet of overhead three-phase primary with 1,700 lineal feet of underground cable and conduits. Project Status:  Underground conduit and cable installation is complete. Removal of overhead lines expected to be complete by end of June 2021. NORTH MASON STORMWATER DRAINAGE SYSTEM FINAL DESIGN Funding Source: BFO#14.13 Stormwater – N Mason/N College Phase 1 Design and some construction BFO#12.29 Water – N Mason Waterline - Design BFO#12.87 Wastewater – N Mason Sewer Main - Design Estimated Project Budget: SW = $1,500,000, Wtr = $100,000, WW = $100,000 Status: Purchasing issued of POs, setting up meeting schedule Estimated Completion Date: December 2021 Project Details: The objective of this project is to complete a final stormwater design as well as water and sanitary sewer design along the North Mason transportation corridor. Specifically, the water utility final design will include a stormwater drainage outfall from just north of Hickory Street to the Poudre River along the proposed North Mason transportation corridor. A conceptual pond design will be developed for the pond north of Hickory. The final design is planned to be completed by fall of 2021, in the hopes of beginning initial construction in 2022. Project Status:  Project design meetings in progress and held bi-weekly.  Scheduled and working on design charette for internal stakeholders.  Design assumptions based on management input and affirmation – Lake Canal removed/abandoned, 10-yr WSEL in Poudre for outfall, minimal attenuation in WQ and outfall detention pond, so minimal impact to NA and Parks,  Coordinating with Engineering downtown on design and land acquisition  Obtaining Licenses to Enter for potholing and geotechnical information. Location Map Aerial view of Two Creeks Natural area where the project is taking place. CITY MANAGER’S UPDATE 19  With constraints and opportunity design input from charette will move more into design. OAK STREET STORMWATER IMPROVEMENTS PROJECT Funding Source: Stormwater Estimated Project Budget: $2.0M (Design), $23M (Construction), $25M Total. Status: In Design Estimated Completion Date: Fall 2022 (Design), Winter 2024 (Construction) Project Details: This project is for the design and construction of stormwater infrastructure for the Oak Street Stormwater Improvements Project (OSSP) that is part of the larger Downtown Stormwater Improvement Program (DSIP). The project is generally located on Oak Street from Mason to Jackson and will include storm laterals extending to the blocks both north and south of Oak Street. There will be approximately 8500 LF of new storm pipe installed with this project, ranging in size from 78” to 48”. Project Status:  Data Collection: geotechnical drilling to gather soil data and to set groundwater monitoring wells along the corridor.  Public Engagement and Communication  Planning is underway, including planning for a Streetscape Design Workshop to be held June 22 - 28.  Conceptual design is underway, anticipated completion in late July.  Contractor BT Construction has been selected as the General Contractor for this project. 27” POUDRE CANYON RAW WATERLINE Funding Source: Water - BFO#12.21 (2021) Estimated Project Budget: $3,2000,000 Status: In Design Estimated Completion Date: • Final Design – March 2022 • Construction - August 2023 Project Details: The goal of this project is to ensure the structural integrity and operational longevity of the City’s 27” raw waterline in the Poudre Canyon. An existing, exposed section of the pipeline in the river near Gateway Natural Area will be replaced to eliminate the risk of failure which ensures the continued delivery and reliability of raw water from the Poudre River to the Water Treatment Facility. The design will consider the existing geomorphology of the river to develop a long-term solution which may require pipe alignment modifications and deeper burial depths of the pipeline. Final design and construction of the selected alternative are included in this project. Geotechnical Drilling at Oak & Whitcomb Alternative Pipe Alignments being evaluated CITY MANAGER’S UPDATE 20 Project Status:  Project Teaming and Kick-Off meetings have been completed.  First two workshops for Final Alternative Analysis process have been completed. o Reviewed/Edited MCDA criteria and importance. o Reviewed overall project schedule and milestones. o Discussed information gaps. o Developed Risk Register o Developed draft contractor cost estimate for both alternatives. PUBLIC SAFETY POUDRE FIRE AUTHORITY Welcome to the New Fire Chief | PFA welcomed Fire Chief Derek Bergsten. He was sworn in by both boards, the Poudre Valley Fire Protection District Board and the Poudre Fire Authority Board, on May 24th and May 25th. Chief Bergsten comes to Fort Collins from the Rockford Fire Department in Illinois. He began his firefighting career as a firefighter/EMT volunteer in 1989 for the City of Loves Park, IL. He was hired as a firefighter/EMT by the Rockford Fire Department in 1994 and rose through the ranks. Chief Bergsten has a strong history of prioritizing innovation, collaboration, and diversity. He was named the 2020 Illinois Fire Chief of the Year by the Illinois Fire Chief Association. He is incredibly excited to become part of this community and spent time during his first two weeks on the job visiting fire stations and meeting the crews. There will be an official change of command ceremony on Friday, June 11 at Fire Station 8. CITY MANAGER’S UPDATE 21 Play It Safe | Water Recreation Safety Awareness PFA has rescued 10 people from the river already this year (at time of report publishing) and diverted two more just before a dangerous hazard. Firefighters have been called to multiple still water calls as well, one of which ended in tragedy. Units were dispatched to the north end of Douglas Reservoir at 2:38 p.m. on Saturday, May 1. The responding party reported seeing an adult male in the water who they thought had been in a watercraft. The individual was transported to the dock. CPR was performed, an AED applied, and the patient was transported emergent. The Larimer County Coroner’s Office confirmed that sadly the patient did not survive. The river is not safe right now especially for tubers and small watercraft. The water is flowing high, fast, and cold. Still water such as lakes and ponds can also be dangerous, so recreators should always wear a life vest. Weather and water conditions can change quickly, especially this time of year. Each year, PFA is dispatched to water rescues in which people became separated from tubes or boats by high winds, when just minutes before it was completely calm. Learn more at Play It Safe on the Poudre | Poudre Fire Authority (poudre-fire.org) Vehicle Crashed into Business on Mountain Ave. | May 29 CITY MANAGER’S UPDATE 22 PFA and partners responded to a vehicle that crashed into a business at the corner of Mountain Ave. and N. Loomis Ave. There were three people in the vehicle and three people in the business at the time of the crash. The driver was transported to the hospital with unknown injuries. Fortunately, there were no other injuries reported. PFA units remained on scene for several hours shoring up the structure. A restoration company responded to board up the large hole in the front of the building. The cause of the crash is under investigation by Fort Collins Police Services. Equipment Fire on N. Lemay | June 3 At 6:39 a.m., the Engine 1 Crew responded to a piece of equipment on fire on the 600 block of N. Lemay Ave. When firefighters arrived, the equipment was fully involved. A large plume of black smoke could be seen from a distance. The crew had the flames under control in less than 10 minutes. The equipment was a crack seal machine. There were no injuries reported. POLICE SERVICES Notable Cases Police investigate domestic violence homicide: Around 4:30 a.m. on May 21, 2021, Fort Collins Police Services responded to a residential shooting in the 1600 block of Sagewood Drive. The two involved people lived in the home together, and police learned that verbal arguments and physical violence had occurred between them overnight. The woman reportedly shot the man, then called police to report the incident and remained on scene. The man was transported to an area hospital where he was pronounced deceased. Police are investigating the circumstances surrounding this incident to determine what, if any charges, are appropriate. Anyone with information, who has not already spoken to police, is encouraged to contact Detective Laura Knudsen at 970-416-2771. Police investigate suspicious substance found in backpack: On May 6, 2021 around 10 a.m., Fort Collins Police Services received a report of a suspicious backpack in the 4800 block of Boardwalk Drive. Staff at a commercial storage facility were removing abandoned items from a unit no longer being rented. During this process, they found a backpack containing multiple packages of a powdery chemical substance and reported it to law enforcement. Fort Collins Police, Poudre Fire Authority, and the Northern Colorado Bomb Squad responded. Out of precaution, the area immediately surrounding the scene was evacuated for approximately 2.5 hours. The commercially-packaged substance was ultimately identified as pre-mixed ANFO, or ammonium nitrate/fuel oil, an industrial explosive frequently used in mining operations. Fort Collins Police Services notified public safety partners at the Bureau of Alcohol, Tobacco, Firearms and Explosives (ATF) and the Federal Bureau of Investigation (FBI). First responders remained on scene for approximately 8.5 hours to investigate. Upon further investigation, detectives did not find indications of any intentional threat associated with this incident. Community Engagement Police in the Park: Members of the FCPS Neighborhood Engagement Team, Executive Staff, and Patrol Officers participated in several “Police in the Park” events in May. These events, held periodically at parks around the City, have been a great way for officers to create positive connections with community members in a fun, friendly environment. With no agenda and an informal setting, attendees have had the opportunity to chat about whatever’s on their mind, play on the playground CITY MANAGER’S UPDATE 23 with officers, and generally connect on beautiful summer evenings. This program will continue throughout the summer. Locations are advertised a week in advance on Nextdoor. Recognize a Responder: The Mental Health Response Team, School Resource Officers, and K9 Eleiko and his handler have all been active participants in Recognize a Responder, a program that connects neurodivergent community members with police, fire, and EMS in order to create positive interactions and reduce anxiety. In May, the group visited Shepardson Elementary, Boltz Middle School, and Fossil Ridge High School. This program has provided great opportunities to share information and learn about ways that we can better serve our community members with behavioral health and sensory sensitivities. Agency News “It Only Takes a Moment” Campaign Launches: The Larimer County Juvenile Gun Safety Coalition works to support safe gun ownership and responsible storage to reduce gun-related crimes and unintended uses. The coalition, which includes FCPS and many local partners, launched a suicide prevention campaign in May. Watch the “It Only Takes a Moment” video and learn more at www.larimer.org/gun-safety. Fort Collins Police Academy Begins: On May 17, Fort Collins Police Services launched our first in- house police academy. Before now, we've sent all of our new hires to academies around the region for their basic training. This new program means we'll have the opportunity to teach our recruits from day 1 in our Colorado P.O.S.T. Certified Academy. In addition to learning operational skills, they'll also CITY MANAGER’S UPDATE 24 spend 21 weeks gaining an understanding of our agency culture, values, and expectations. Safety and Service for ALL is a mindset that begins on day 1. Thank you to everyone who has spent years building this program. High-quality training is an investment that serves our officers and our community, and we're extremely excited to begin this next chapter! PLANNING, DEVELOPMENT &TRANSPORTATION BUILDING, PLANNING AND DEVELOPMENT REVIEW Monthly Reporting Monthly construction reporting and mapping of development review proposals and construction can be found by visiting: http://citydocs.fcgov.com/?dt=MONTHLY+REPORT&dn=NEIGHBORHOOD+%26+BUILDING+SERVI CES%2FZONING&vid=2&cmd=showdt For a detailed listing of development Proposals under review, please visit: https://www.fcgov.com/developmentreview/proposals/ Neighborhood Services CityWorksEDU at ITGA JC Ward and Jenn “JR” Rieskamp recently presented a session called “CityWorksEDU: CityWorksEDU: A Key Civic Community Curriculum” at the 2021 International Town Gown Association conference. CityWorksEDU is an experiential learning course for CSU students to engage with CITY MANAGER’S UPDATE 25 material that is focused on the ways that City of Fort Collins provides world-class municipal services to residents and how residents can engage with the local municipality through civic participation. Mini Grants Neighborhood Services Mini grants are currently open. Deadline is July 1st. Details available here: https://www.fcgov.com/neighborhoodservices/grants.php YEAR TO DATE COMPARISON 2020 2021 YTD % Change Development Project Submittals Received 145 77 -46.90% Conceptual/Preliminary Design/Staff Reviews 96 104 8.33% Building Permits Issued 5,128 3,904 -23.87% Building Permit Valuations ($M) $143.55 $136.49 -4.91% Building Inspections Performed 11,428 12,686 11.01% Zoning Inspections Performed 180 173 -3.89% Zoning Plan Reviews Performed 1,146 1,342 17.10% Overall Development Review Center revenues are $233,694 over projection for 2021 as of May 31st with Building Services over by $222,120, Neighborhood Services and Code Compliance over by $28,268, Development Review over by $3,587 and Engineering Development Review under by $(20,281). GRAFFITI UPDATE During the month of April 2021, the Graffiti Abatement Team abated 54 issues consisting of 212 tags measuring 601 square feet of graffiti-covered surfaces. The issues were distributed throughout the City in the following Council Districts: Month One Two Three Four Five Six January 12 0 3 2 6 2 February 5 3 0 3 2 6 March 4 1 0 3 5 11 April 23 5 4 2 6 12 May 16 14 1 5 9 8 SUSTAINABILITY SERVICES Month Access FC Hotline Pro-Active Total January 7 2 17 26 February 8 2 9 19 March 5 2 17 24 April 21 8 23 52 May 20 9 25 54 CITY MANAGER’S UPDATE 26 ENVIRONMENTAL SERVICES City Healthy Homes Program Celebrates 10 Years this June This month, the City of Fort Collins celebrates ten years of its Healthy Homes program and encourages all community members to sign up for a free home assessment for the chance to win an anniversary gift bag. The program educates participants about how to improve the indoor air quality and general safety of their living spaces. It aims to help connect the dots between home and health by offering free assessments that include tips and best practices for keeping our residences places of safety and respite. Included with each assessment is a free radon test kit, Healthy Homes cleaner, carbon monoxide detector, and smoke alarm, plus a wealth of information. The program provides low cost or no cost recommendations that can be easily implemented. Currently assessments are provided over the phone by trained Master Home Educators and typically take less than an hour. For more information, please visit the City of Fort Collins Healthy Homes Program. The Healthy Homes program is also excited to share the online Healthy Homes Do-It-Yourself assessment, where you can assess your home at your convenience. This tool is intuitive, easy to use, and contains short videos to explain the process. Try it out https://healthyhomes.fcgov.com/. Lawn and Garden Equipment Rebates Gas-powered lawn mowers emit greenhouse gases and contribute to ground-level ozone pollution. Electric mowers are quiet, start instantly, and don’t require gas, engine oil, fuel filters and other related maintenance. And, there are no fumes to breathe as you are mowing your lawn! The Regional Air Quality Council's (RAQC) 2021 Mow Down Pollution (MDP) program is now accepting applications for $150 vouchers toward the purchase of a new electric lawnmower in partnership with The Home Depot at 4502 JFK Parkway in Fort Collins. Please note: this is the only Home Depot location participating in Fort Collins. The MDP program is open beginning May 10, 2021 and until the funding is expended. How Does It Work? 1. Apply for a voucher at www.mowdownpollution.org/residential. 2. Within 21 days of receiving your Drop-Off Verification form, recycle your gas mower at an approved metal recycler. o RMB Recycling at 1475 N. College Avenue is listed as the only approved recycler, however, you may utilize other locations in Fort Collins such as the Timberline Recycling Center or Colorado Iron and Metal. o All fluids must be drained and properly disposed prior to recycling. Fluids, e.g., gasoline and oil, are accepted for free at the Larimer County Landfill's Household Hazardous Waste facility. o You must obtain a receipt from the metal recycler that states "lawnmower" or have the recycler sign the Drop-Off Verification form. 3. Submit your recycling receipt or Drop-Off Verification form to the Mow Down Pollution program, following directions provided in your Approved Applicant email. 4. Within 3-5 days, you will receive your $150 voucher to use in-person at the Service Desk at The Home Depot on JFK Parkway. While this program is not managed by the City of Fort Collins, we are happy to help if you have questions. You may also visit the RAQC's Mow Down Pollution website for more information and contact them directly. CITY MANAGER’S UPDATE 27 SOCIAL SUSTAINABILITY Join us in Library Park for fun activities and conversations with City Staff on June 23, Wednesday, 5:30 to 7:00 pm. Neighborhood Services and Police Services are hosting an opportunity for you to meet one-on-one with a variety of City Staff to discuss whatever is on your mind. There will also be several activities available for you to enjoy. City staff available that evening:  Neighborhood Services  Police Services  Social Sustainability Department  Library Services Planned activities:  Block Party Trailer  Lemonade Stand  Children’s activities with Library  And more ECONOMIC HEALTH Public Health Orders Lifted for Businesses Larimer County is currently aligned with statewide Colorado public health orders and recommendations. There are currently no local public health orders related to COVID-19. Businesses may implement their own policies so long as they are meeting the minimum requirements set forth by the state of Colorado. We're asking all residents to be kind to others and respectful when visiting business establishments as everyone adapts to new requirements and recommendations. For more details, please visit the LCDHE guidance page. UTILITIES CUSTOMER CONNECTIONS After taking a year off, the Xeriscape Garden Party is back! Water Conservation staff has put together a month-long Garden Party celebration that will take place online in June. The team is hosting free webinars, prize drawings, a discount compost bin sale, and resources on the website: www.fcgov.com/garden-party. Staff anticipates hosting an in-person event in June, 2022. The second cohort of 2021 Xeriscape Incentive Program for HOAs and Commercial properties grant recipients was selected in May. 12 total projects will be supported and completed through this commercial water-wise landscape program in 2021. The Sprinkler Checkup Program (previously Sprinkler Audit Program) has already scheduled 175 checkups throughout ELCO, FCLWD, and Fort Collins Utilities. Our Sprinkler Technicians will complete training the first week of June. Staff hopes to complete 400 checkups in 2021. To learn more or sign up, visit: fcgov.com/sprinklers CITY MANAGER’S UPDATE 28 In 2021, Utilities Customer Connections has reached 823 participants through 37 outreach events and programs. In the month of May, Utilities offered the following engagement opportunities:  May 3 – Canal Importation – A virtual public meeting where 15 participants learned and asked questions about proposed changes to the Canal Importation Basin. Spanish interpretation was available.  May 5, 6, 11– Werner Stream Ecology Field Trip – A water education program was held for 67 fifth grade students.  May 14 – Polaris Expeditionary Learning School – A water education program was held for 15 high school students.  May 7 – XIP Basics Training – Staff virtually presented how to participate in a Utilities Xeriscape Incentive Program and be eligible to receive a 2021 rebate for transforming their high-water use areas into water-wise landscapes to 43 residents.  May 7 – UAP Housing Catalyst Resident Resource Event – Utilities, N2N, Bike Fort Collins, Gardens on Spring Creek, and Larimer County Conservation Corps collaborated with Housing Catalyst to bring resources to 20 residents at Stanford Property. (Postponed from April 16 due to adverse weather conditions)  May 8 – Bike Fix-it Bonanza – Utility outreach booth was set up during an FC Moves organized event and reached 25 community members.  May 10 – Foothills Basin Public Meeting – Hosted a virtual public meeting where 22 participants learned and asked questions about proposed changes to the Foothills Basin. Spanish interpretation was available.  May 11 – Epic Homes Training Series for Real Estate Professionals – Staff presented virtually to 7 participants, how property owners can keep their rental competitive with Epic Homes for Rentals.  May 12 – RiskMAP Open House – Hosted a virtual public meeting where 13 participants learned and asked questions about updated FEMA floodplain mapping for the Poudre River. Spanish interpretation was available. In the month of May, Utilities will offer the following engagement opportunities:  June 8 - Safe Water Action Program (SWAP) Focus Group – Staff gather feedback from community members on the communications and outreach approach for SWAP.  June 10 – Rotate to Rotary Nozzles – During this Xeriscape Garden Party virtual presentation, residents will learn how to identify high water pressure on their sprinkler system, and how to convert spray head nozzles to rotary nozzles to save water.  June 15 – UAP presents to Partners Mentoring Youth – Staff will present Utilities’ Affordability Program Roadshow to Partners Mentoring Youth Program Team.  June 16 - Conserving Water in the Garden with Rain Barrels – During this Xeriscape Garden Party virtual presentation, residents will learn what type of rain barrel to buy and step- by-step instructions to install it at home.  June 17, 2021– Water Efficiency for Businesses – Staff hosts a virtual meeting in partnership with Efficiency Works to discuss water opportunities for businesses. Learn about water rebates, upcoming opportunities, and other ways to save water.  June 22 – Some Like it Hot: Waterwise Perennials – During this Xeriscape Garden Party virtual presentation, residents will learn the best heat-loving perennials for the Colorado Front Range.  June 22-29 – Oak St Project Streetscape Design Workshops – Participate in a series of online workshops to create a streetscape design that reduces street flooding and meets other City goals as well. CITY MANAGER’S UPDATE 29  June 23 – Bike to Work/Anywhere Day (BTWD) – Utilities will sponsor a booth during BTWD on Oak street. We will provide information about different utilities projects throughout the city.  June 25 – Poudre River Fest- Water Education Program & Outreach Booth – The Poudre River Fest is a collaborative, mostly online event. Utilities will lead an in-person education program covering water quality at the river as well as host an outreach booth.  June 28 – Boys & Girls Club with Natural Areas – This collaborative program will focus on water education reaching young people participating in Boys & Girls Club summer programming.  June 30 – We Are Here For You – Utilities staff will present about payment assistance options and programs available to customers wanting to lower their utility costs. Open to the public. WATER RESOURCES AND TREATMENT OPERATIONS Environmental Regulatory Affairs (ERA) Division Senior Environmental Regulatory Specialist Susan Strong has been mentoring Fort Collins High School student Emma Eddy, who is a finalist in Caring for Our Watersheds Colorado. This educational program engages students in preserving and improving local watersheds through student-led solutions. Emma’s solution focuses on watershed contamination from car washing at home. She created a video and contest where participants can win free car wash passes by commenting on the video https://youtu.be/wMNwtTbAhWo or creating their own video and sharing the hashtag #WaterShedWash. ERA would like to recognize the 10-year work anniversary of our colleague, Bonnie Pierce. Bonnie has contributed to the organization in many ways, including overseeing the development of the first City database used for the annual Greenhouse Gases Inventory for Environmental Services, the administration of the Brownfields Grant program, and very detailed technical work related to both Clean Water Act stakeholder processes and permitting issues for the Water Reclamation and Biosolids division and the complex Larimer County Landfill groundwater remediation issue. Thank you, Bonnie! COMMUNITY SERVICES RECREATION  The local skating club hosted their annual figure skating competition, "Fort Collins Classic", at EPIC.  Learn to Swim classes saw a 70% increase in participation.  In-person fitness classes are now taking more enrollments than virtual options.  Goat Yoga began at The Farm.  Youth programs enrolled over 900 community children in over 3,000 programs and activities for the upcoming summer season, resulting in $389,000 in revenue.  Hiring teams throughout Recreation collaborated with the Parks Department to host an in-person hiring fair held at EPIC, and also collaborated with Larimer County Workforce Center to host a virtual hiring fair for community job seekers. Seasonal and part-time positions were recruited for in aquatics, customer support, facility attendants, farm and youth instructors, and sports supervisors. CITY MANAGER’S UPDATE 30 PARKS  Irrigation systems, drinking fountains, and restrooms are turning on for the season.  Downtown annual flower planting was started and is 75% complete.  Memorial Day Festivities: o Grandview and Roselawn – flags were placed on Veteran memorials by Boy Scout Troops, thousands of visitors honored loved ones throughout the weekend, and a ceremony was put on by the American Legion in honor of our Veterans (not public due to COVID-19 restrictions) o Spring Canyon Community Park – a very popular event with the Traveling Vietnam Wall Memorial and the Field of Flags (500 flags) o Special thank you statue (pic attached) provided to Parks for continued support of the SCCP Veteran’s Plaza!  March Storm Response is mostly wrapped up and Forestry is transitioning back to pruning rotation and other core services. CULTURAL SERVICES Artist Zulay Rueda Painting a Piano in 2020  The eleventh season of Pianos About Town is underway! Look for a new artist painting every two weeks in the Art in Action Tent, located on Mountain Avenue at the south end of Old Town Square. Ten artists will paint murals on pianos Downtown mid-May through early October, and two artists will paint in inside locations over the winter. So far, 133 pianos have been painted as part of the program, with another twelve to be painted this year. The project is a collaboration among the Bohemian Foundation, Downtown Development Authority and the City of Fort Collins Art in Public Places. CITY MANAGER’S UPDATE 31  The Fort Collins Museum of Discovery opens the new temporary exhibition, Life in One Cubic Foot on June 12th. In this new Smithsonian exhibition, visitors will discover the biodiversity found in places around the globe and learn what a cubic foot of land, water, or air reveals about the amazing diversity of our planet.  Starting in June, The Gardens on Spring Creek will be open until 8 p.m. on Wednesday evenings for family-friendly activities, cooler temperatures and 12 acres of botanical beauty at dusk. Each Wednesday evening, scavenger hunts will be available for kids, the Butterfly House will be open and other activities including Yoga in the Gardens are planned. NATURAL AREAS Volunteering Reawakened Engaging with volunteers is an important way for the Natural Areas Department to achieve its mission and connect with the community. This spring, staff trained 96 new long-term volunteers and worked with 68 one-day volunteers who planted over 1,400 native trees and shrubs. Volunteer Naturalist Assistant trainees enthusiastically participated in a three-day training to learn to educate the community about natural areas. Nature in the City volunteers learned to tend native plant gardens, maintain Nature in the City sites, and monitor for birds and butterflies on urban natural areas to help inform management decisions. At Coyote Ridge Natural Area, in partnership with the FC Volunteer program, volunteers helped plant 800 mountain mahogany native shrubs for foothills wildlife habitat. At Bobcat Ridge Natural Area, volunteers helped clear a drainage filled with cottonwood branches as part of fire recovery efforts. At the newly acquired and not yet open to the public, Kestrel Fields Natural Area, volunteers planted 600 native trees and shrubs over three days. One volunteer shared: “The event at Kestrel Fields was a real pleasure. It was well-organized, well-managed onsite, and well-supported- with holes pre-dug and a plethora of details anticipated before the event began. I especially appreciated the City employees who were there. They were all extremely friendly, energetic and professional. They were also great with kids. I had a grandson and two granddaughters there, and the city employees were great with them, too.” This summer, volunteers will continue to help with educational activities, trail work, community science, restoration, and much more. Thank you volunteers! CITY MANAGER’S UPDATE 32 PUBLIC ENGAGEMENT Meeting with The Family Center’s Mi Voz City staff participated in a meeting with community leaders participating in The Family Center’s Mi Voz program. The Mi Voz program is a leadership program led by The Family Center and CSU’s Family Leadership Training Institute. The purpose of the program is to develop community leaders and to increase civic capacity. City staff participated in a conversation with Mi Voz participants to learn about their community projects to identify opportunities for collaboration and support. . CITY MANAGER’S UPDATE 33 BROADBAND – FORT COLLINS CONNEXION Monthly Reports Connexion is publishing our monthly reports on our website. Visit fcconnexion.com/reports to view and download. Address Look-up Fort Collins residents can now input their address and see whether their residence is In Design, In Construction, or has Service Available! Our address look-up tool can be found on the Connexion website at www.fcconnexion.com. Local Sponsorships Going to the Holiday Twin Drive-In theater this summer? Be sure to get some popcorn—sponsored by Fort Collins Connexion—and don’t miss our commercial during the previews and at intermission! We will be sponsoring our neighborhood drive in theater all summer long so definitely stop by and enjoy the movies again! Social Media Follow us on Facebook and Twitter! Join the Connexion community—get updates and information on services and more! @FCConnexion @ConnexionFC COMMUNITY DASHBOARD HIGHLIGHT The Community Dashboard features performance data and information that highlights how the City is doing in achieving its seven Outcome areas: Neighborhood Livability and Social Health, Culture and Recreation, Economic Health, Environmental Health, Safe Community, Transportation, and High Performing Government. The Dashboard is made up of 37 total metrics that are published quarterly and demonstrate where the City is doing well and where there are opportunities to improve. The color status of performance for each metric is determined based on the actual result for the quarter CITY MANAGER’S UPDATE 34 compared with the target. The color status of performance for the Outcome is determined based on the average calculation of the performance of each metric within that Outcome. Each month the City Manager’s Update will highlight a metric from the Community Dashboard. This month’s feature is from the High Performing Government Outcome Area. Analysis:  Metrics for Q1 regarding employee turnover at the City show we are on target. In Q1, turnover is 2.23% for the quarter, with a target of 2.5%. This metric includes all turnover, including retirement, voluntary resignations, and terminations.  Comparatively, 2020 was Q1 2.83%.  Turnover rates for Northern Colorado in 2020 have not been posted. A related statistic is the unemployment number. Unemployment in Colorado is 6.6% compared to 6.2% nationally.  A temporary policy was approved to allow employees in facilities that were closed or had reduced services the ability to float to other areas of the City. This allowed employees to continue to have meaningful work during the pandemic.  An executive onboarding guide and interview guide were developed to recruit and retain employees successfully. Future work will include a guide for non-executive positions.  Development of a recruitment guide is currently underway with a focus on Diversity, Equity, and Inclusion.  As of January 1, 2021, all positions must be posted at least City Wide, allowing our talent to see and apply for City-Wide opportunities. Definition: Turnover is a measure of the rate at which employees leave employment with the City. It includes classified and unclassified management employees and all separation reasons (layoffs, and voluntary and involuntary terminations). While turnover is typically measured annually, this report includes turnover reported on a year-to-date basis for each calendar year. The rate is calculated by dividing the total number of employees who separated year-to-date by the average headcount for that reporting period (quarters are cumulative). CITY MANAGER’S UPDATE 35 Why is this metric important? Turnover is an important measure for three primary reasons – cost (replacing an employee can cost as much as 200% of the annual compensation for the vacated position), business performance (continuity of operations, productivity) and ability to maintain a qualified workforce. City’s impact on this metric: High – Turnover rate is directly related to the quality and continuity of service provided to citizens. The City is committed to being an employer of choice, however the rate at which employees leave City employment is impacted by factors such as job market, retirement, and personal lifestyle choices. Benchmarks: Benchmarking in progress To view the entire Dashboard, please visit: http://fortcollins.clearpointstrategy.com/