Loading...
HomeMy WebLinkAboutReport - Mail Packet - 2/16/2021 - City Managers Monthly Update - February 2021 Martin Luther King, Jr. Candlelight Vigil - January 18, 2021 February 2021 FEBRUARY 11, 2021 Table of Contents ISSUES BEFORE COUNCIL ................................................................................................................. 4 FEBRUARY 16 REGULAR MEETING ..........................................................................................................................4 FEBRUARY 23 WORK SESSION ................................................................................................................................4 FEBRUARY 25 URBAN RENEWAL AUTHORITY BOARD MEETING ............................................................................4 MARCH 2 REGULAR MEETING ................................................................................................................................5 MARCH 9 WORK SESSION .......................................................................................................................................5 PUBLIC ENGAGEMENT – UPCOMING EVENTS ................................................................................ 6 SALES TAX - MONTHLY & YEAR TO DATE ....................................................................................... 6 CP - ENGINEERING ............................................................................................................................. 7 VINE AND LEMAY BNSF IMPROVEMENTS ..............................................................................................................7 LINDEN STREET RENOVATION PROJECT .................................................................................................................7 TAFT HILL ROAD IMPROVEMENTS – HORSETOOTH TO HARMONY .......................................................................8 EAST PROSPECT WIDENING – SHARP POINT TO INTERSTATE 25 ...........................................................................9 DRAKE AND HAMPSHIRE SAFE ROUTES TO SCHOOL INTERSECTION PROJECT ......................................................9 CHERRY STREET ARTHUR DITCH BRIDGE IMPROVEMENTS ................................................................................. 10 CP - PARK PLANNING & DEVELOPMENT ....................................................................................... 10 CITY PARK REFRESH ............................................................................................................................................. 10 EAST PARK DISTRICT MAINTENANCE FACILITY .................................................................................................... 11 OAK STREET PLAZA WATER FEATURE .................................................................................................................. 12 PARKS & RECREATION MASTER PLAN ................................................................................................................. 12 RAW WATER SUPPLY MASTER PLAN ................................................................................................................... 13 REACH 4 FEASIBILITY STUDY ................................................................................................................................ 13 CP - OPERATION SERVICES ............................................................................................................ 13 FORT COLLINS/LOVELAND POLICE TRAINING CENTER ........................................................................................ 13 BLOCK 32/42 – CIVIC MASTER PLAN REFRESH .................................................................................................... 14 CP - UTILITIES.................................................................................................................................... 15 CIS/OSS ................................................................................................................................................................ 15 CABLE REPLACEMENT PRIORITY #8-BROWN FARM CABLE ................................................................................. 15 LIGHT & POWER JOINT TRAINING FIELD WITH POUDRE FIRE AUTHORITY ......................................................... 16 CORRAL OVERHEAD CONVERSION PROJECT ....................................................................................................... 16 27” POUDRE CANYON RAW WATERLINE ............................................................................................................. 17 OAK STREET STORMWATER IMPROVEMENTS PROJECT ..................................................................................... 18 NORTH MASON STORMWATER DRAINAGE SYSTEM FINAL DESIGN ................................................................... 18 PUBLIC SAFETY ................................................................................................................................ 19 POUDRE FIRE AUTHORITY ................................................................................................................................... 19 POLICE SERVICES .................................................................................................................................................. 20 PLANNING, DEVELOPMENT &TRANSPORTATION ......................................................................... 21 BUILDING, PLANNING AND DEVELOPMENT REVIEW .......................................................................................... 21 GRAFFITI UPDATE ............................................................................................................................ 22 SUSTAINABILITY SERVICES ............................................................................................................ 22 ENVIRONMENTAL SERVICES ................................................................................................................................ 22 SOCIAL SUSTAINABILITY ...................................................................................................................................... 23 ECONOMIC HEALTH ............................................................................................................................................. 23 UTILITIES ............................................................................................................................................ 23 CUSTOMER CONNECTIONS .................................................................................................................................. 23 COMMUNITY SERVICES .................................................................................................................... 24 RECREATION ........................................................................................................................................................ 24 PARKS ................................................................................................................................................................... 24 CULTURAL SERVICES ............................................................................................................................................ 25 NATURAL AREAS .................................................................................................................................................. 25 PUBLIC ENGAGEMENT ..................................................................................................................... 26 BROADBAND – FORT COLLINS CONNEXION ................................................................................. 26 COMMUNITY DASHBOARD HIGHLIGHT .......................................................................................... 27 CITY MANAGER’S UPDATE 4 ISSUES BEFORE COUNCIL FEBRUARY 16 REGULAR MEETING Housing Strategic Plan - Adoption o Adopt the Housing Strategic Plan and highlight key implementation steps post-adoption. Neighborhood Livability & Social Health 1.1 - Improve and increase availability and choice of quality housing that is affordable to a broad range of income levels. Plastic Pollution Code Amendment (Second Reading and Resolution) o To initiate a plastic pollution ballot measure for the April election. Environmental Health 4.3 - Enhance efforts to achieve 2030 zero waste goals. Land Use Code Update - Phase One o Appropriate funds to support the implementation of housing-related Land Use Code updates as recommended in the 2019 Land Use Code Audit. This item has been qualified as a “quicker win” in the Housing Strategic Plan process. Neighborhood Livability & Social Health 1.1 - Improve and increase availability and choice of quality housing that is affordable to a broad range of income levels. Hughes Stadium Ballot Language o Consider a Resolution to amend the ballot language based on County election rules and a potential court ruling. High Performing Government 7.1 - Provide world-class municipal services through operational excellence and a culture of innovation. Staff Report: Mail Creek Stream Rehabilitation Project o Provide an overview of the project. Environmental Health 4.6 - Sustain and improve the health of the Cache la Poudre River and all watersheds within the city. FEBRUARY 23 WORK SESSION Exterior Lighting Code Changes o Provide Council with options to better control the various aspects of light pollution (overlighting, glare, light trespass), and create contextually appropriate lighting plans by requiring lower lighting in areas with lower nighttime activity (Natural Areas and residential), and higher lighting levels in areas with higher nighttime activity (Downtown and Commercial Corridors). Neighborhood Livability & Social Health 1.6 - Align land use regulations and review procedures to guide development consistent with City Plan. Visit Fort Collins Destination Master Plan and Tourism Improvement District o Provide an update on the Destination Master Plan and to share information about a possible effort to form a Tourism Improvement District. Economic Health 3.1 - Facilitate government and local partners to achieve effective regional economic resilience. FEBRUARY 25 URBAN RENEWAL AUTHORITY BOARD MEETING Thursday, February 25 at 5:00-7:00 p.m. Zoom virtual meeting Agenda posted at www.renewfortcollins.com/meeting-agendas shortly before meeting date. . Please note that this list is subject to frequent change. Please call the City Clerk’s Office for up-to-date information. 970-416-2774. CITY MANAGER’S UPDATE 5 MARCH 2 REGULAR MEETING 2021 Reappropriation Ordinance, First Reading (consent) o Appropriate expenses related to the previous fiscal year’s appropriations that lapsed at year end, but for which the expenses were not completed. High Performing Government 7.1 - Provide world-class municipal services through operational excellence and a culture of innovation. Metro District Policy Amendment Adoption o Consider adoption of an update to the Metro District Policies related to the approval of Residential Metro District Service Plans. Neighborhood Livability & Social Health 1.5 - Align land use regulations and review procedures to guide development consistent with City Plan. Plastics Pollution Appropriation o Consider adoption of an ordinance approving an appropriation to support initial implementation of regulations regarding disposable bags. Environmental Health 4.3 - Enhance efforts to achieve 2030 zero waste goals. Staff Report: Cache la Poudre Instream Flow Project Update o Provide an update on the status of the Poudre River Instream Flow Plan, which is an effort by multiple partners to increase stream flows in Fort Collins and downstream. Environmental Health 4.6 - Sustain and improve the health of the Cache la Poudre River and all watersheds within the city. Executive Session o Discuss the Hughes Stadium property declaratory judgment ruling and the recent camping ruling. MARCH 9 WORK SESSION Time of Day Rate Structure Review after Two Years o Provide an update to City Council on the residential Time of Day rate structure which has been in effect since October 2018. Economic Health 3.5 - Invest in and maintain utility infrastructure and services while ensuring predictable utility rates. East Mulberry Corridor Planning o Share timeline and engagement strategies related to an update to the East Mulberry Corridor Plan, including future financial assessment and phasing scenarios of possible enclave incorporation. Neighborhood Livability & Social Health 1.7 - Develop options and assess the feasibility of the annexation of the Mulberry Corridor. E-Scooter/ Bike Share Annual Report o Provide Council with an overview of key successes and challenges from the 2020 e-scooter and bike share programs and discuss how these successes and challenges will inform the 2021 programs, which are scheduled for launch in April or May 2021. Transportation 6.2 - Manage traffic congestion and improve high-priority intersections for all users. CITY MANAGER’S UPDATE 6 PUBLIC ENGAGEMENT – UPCOMING EVENTS Budget 2022 Public Engagement City staff will kick off the public engagement efforts for the 2022 budget during the month of March. As part of the activities, the City will host a community meeting with community partners on Wednesday, March 3 to give more information about the different options to give feedback and learn about the budget. Staff will also give an overview of major public engagement efforts happening across the City during the year. City of Fort Collins Equity Office Listening Sessions City staff will host a series of listening sessions with community members and community partners to get input on the creation of the City's Equity Office. The events will help inform the creation of a new Equity & Inclusion Office. The sessions will take place on the following dates: * • Friday, February 12, 11:00am – 12:00pm (English) • Tuesday, February 16, 8:00am – 10:00am (Spanish) • Tuesday, February 16, 6:00pm – 7:00pm (Spanish) *To join one of the sessions, visit: https://www.fcgov.com/citymanager/ SALES TAX - MONTHLY & YEAR TO DATE DECEMBER SUMMARY OVER PRIOR YEAR Month Year to Date Net Sales Tax Collected: -0.8% -3.3% Net Use Tax Collected: -10.6% -10.0% Net Sales and Use Tax Collected: -2.3% -4.4% Year to date, sales and use tax collections excluding rebates are down 4.4% and total $135.3M. DECEMBER SUMMARY OVER BUDGET Month Year to Date Net Sales Tax Collected: -0.1% -3.7% Net Use Tax Collected: -7.1% 0.1% Net Sales and Use Tax Collected: -1.1% -3.2% Year to date, the City has collected 3.2% less sales and use tax revenue, totaling $4.4M under budget. CITY MANAGER’S UPDATE 7 CP - ENGINEERING VINE AND LEMAY BNSF IMPROVEMENTS Funding Source: Keep Fort Collins Great (KFCG), Transportation Capital Expansion Fee (TCEF), 2017 / 2018 BFO Estimated Project Budget: $24M Estimated Completion Date: 2021 Phase: Pre-construction Project Details: The existing Vine and Lemay intersection, which includes the Burlington Northern Santa Fe (BNSF) Railway crossing, is severely congested with limited options to expand through or turn lane capacity due to land use constraints. Project Status:  Construction is anticipated to begin in late February.  Construction contractor has been secured. More information is available at fcgov.com/engineering/vine- lemay LINDEN STREET RENOVATION PROJECT Funding Source: Community Capital Improvement Program (CCIP) Estimated Project Budget: $3.8M Estimated Completion Date: 2020 Phase: Engineering Design Project Details: The goals of this project are to renovate Linden Street between Walnut Street and Jefferson Street. Initial concepts include converting this section of Linden Street to a “convertible” street; one that can function primarily as a roadway but can also be closed to vehicles and converted to a pedestrian plaza during specialty events. CITY MANAGER’S UPDATE 8 Project Status:  The City plans to begin constructing improvements at the intersection of Linden and Walnut streets in early February.  To safely and efficiently construct these improvements, Linden Street will be closed to vehicular traffic near the Linden/Walnut Streets intersection. Access to Linden Street will be at Jefferson Street, and outdoor dining areas will not be affected by this work.  During daytime working hours, Walnut Street will accommodate two-way traffic through the use of on-site flaggers. Walnut Street will be fully open outside working hours.  Construction activities will shift to the Linden/Jefferson Streets intersection once work is completed at the Linden/Walnut Streets Intersection. Overall completion of the work is expected in Spring 2021. More information is available at: https://www.fcgov.com/engineering/linden-street-renovation/ TAFT HILL ROAD IMPROVEMENTS – HORSETOOTH TO HARMONY Funding Source: Larimer County Regional Road Fees (RRF), Federal Surface Transportation Block Grant (STBG) Estimated Project Budget: $5.3M Estimated Completion Date: Fall 2022 Phase: Preliminary Design Project Details: This section of Taft Hill Road currently experiences significant congestion and safety concerns. In collaboration with Larimer County, the City will construct a 4-lane arterial roadway from the intersection at Horsetooth to Brixton Road (just south of Harmony). Improvements will include sidewalk, curb and gutter, bike lanes and storm sewer/utility improvements. The City and County were awarded a federal STBG grant for design and construction. Project Status:  Project team is coordinating with CDOT for Right-of-Way plan approval in order to start acquisition. More information is available at: https://www.fcgov.com/engineering/taft-hill CITY MANAGER’S UPDATE 9 EAST PROSPECT WIDENING – SHARP POINT TO INTERSTATE 25 Funding Source: Transportation Capital Expansion Fee (TCEF) Estimated Project Budget: $8M – Currently have $2M Estimated Completion Date: Fall 2022 – Pending construction funding Phase: Final Design and right-of-way (ROW) acquisition Project Details: This project will widen East Prospect Road to the 4-lane arterial cross section from approximately Sharp Point on the west end to Interstate 25 (I-25) on the east end. This is a project being coordinated with current CDOT improvements at the interchange, as well as local development. This is the last major piece of Prospect Road to be upgraded to the Master Street Plan 4-lane arterial section, and involves constructing a new intersection at the Frontage Road and East Prospect on the west side of I-25, as well as improvements to the Summitview and Sharp Point intersections. Project Status:  Plan to begin right-of-way acquisition in late March. DRAKE AND HAMPSHIRE SAFE ROUTES TO SCHOOL INTERSECTION PROJECT Funding Source: Safe Routes to School Federal Grant Estimated Project Budget: $620,000 Estimated Completion Date: Winter 2020 Phase: Preliminary Design Project Details: This project will add a signalized intersection and bike/ped improvements to the intersection of Drake Road and Hampshire Drive. Planned improvements include: full signalized intersection, pedestrian ramp improvements, crosswalks, and revised roadway striping to better accommodate cyclists. This project will provide a Safe Route to School connection between Blevins Middle School and the Spring Creek Trail. Project Status:  Project is currently being awarded to Sturgeon Electric.  Construction is anticipated to begin in April. CITY MANAGER’S UPDATE 10 CHERRY STREET ARTHUR DITCH BRIDGE IMPROVEMENTS Funding Source: Capital Bridge Program Estimated Project Budget: $750K Estimated Completion Date: Spring 2021 Phase: Construction Project Details: This project will replace Arthur Ditch under Cherry Street between Wood Street and Grant Avenue. This bridge is structurally deficient, and load posted. The replacement bridge will be shallower and wider to allow for have full asphalt thickness over the structure. This project is fully funded through the City’s Capital Bridge Program. Project Status:  Construction began mid-January 2021.  Existing bridge has been removed. CP - PARK PLANNING & DEVELOPMENT CITY PARK REFRESH Funding Source: Building On Basics Total Project Cost: $850k-$1M Phase: Phase I project identification Estimated Completion: 2021 for Phase I project Project Details: After community feedback on several concepts, master plans, and improvement ideas, City Park is undergoing a restroom improvement project. CITY MANAGER’S UPDATE 11 The City Park Restroom Project provides a new, year-round restroom along with surrounding site improvements. Construction began on September 7, 2020 and landscaping is planned for spring 2021. Visit the project web site for additional information regarding the project at ourcity.fcgov.com/city-park- tomorrow. Project Status:  Restroom structure is near completion.  Landscape plantings and the art-in-public-place art piece planned for spring 2021 installation. EAST PARK DISTRICT MAINTENANCE FACILITY Funding Source: Parkland Funds Total Project Cost: $2.5 - $5 million Phase: Design Development Estimated Completion: Fall/Winter 2021-2022 Project Details: A maintenance facility to serve the East Park District, which includes multiple neighborhood and community parks, is proposed near the intersection of Drake & Ziegler near the water treatment facility. The maintenance facility will house Parks Department staff, equipment, and some minor material storage. Project Status:  Building will be net-zero, high efficiency building.  Construction anticipated to begin in spring 2021, with projected completion in fall 2021. CITY MANAGER’S UPDATE 12 OAK STREET PLAZA WATER FEATURE Funding Source: GID Total Project Cost: $80,000 Phase: Construction Estimated Completion: Spring 2021 Project Details: Park Planning and Development will be improving the water features in Oak Street Plaza this spring, to resolve drainage and safety challenges in the plaza. The work is anticipated to be completed by spring 2021. Project Status:  City on-call contractor will start work on the fountain in March 2021 with anticipated completion in May 2021. PARKS & RECREATION MASTER PLAN Project Status:  The Parks & Recreation Master Plan was unanimously approved by Council on January 19. Next, City staff will be investigating potential funding strategies to fully implement the plan. CITY MANAGER’S UPDATE 13 Full details regarding the planning process including documents and videos, along with the draft plan, are available at ourcity.fcgov.com/parksandrec. RAW WATER SUPPLY MASTER PLAN Project Details: Park Planning and Development will be conducting a non-potable water supply master plan to identify raw water needs for planned parks, with a focus on remaining parks in NE Fort Collins. The Master Plan will include an analysis and recommendation for available water sources for each park, required administrative and/or legal actions required to secure adequate supplies, delivery and storage infrastructure costs, and ongoing monthly operational costs. Water supply impacts to existing parks may also be included. An estimated one-year schedule is anticipated for completion of the Master Plan. Project Status:  Work anticipated to begin in spring 2021. REACH 4 FEASIBILITY STUDY Funding Source: CCIP Total Project Cost: $125,000 Phase: Study underway Estimated Completion: Winter 2021 Project Details: This study will evaluate feasibility of improvements proposed for Reach 4 as part of the Poudre River Downtown Master Plan, located along the Poudre River between the Whitewater Park and Linden Street. The report will include estimated construction costs for use in preparing a 2021-22 budget offer. Project Status:  A feasibility study of the enhancements called out in the 2013 Poudre River Downtown Master Plan is underway.  The study outlines project opportunities and constraints and assesses feasibility and cost.  The study is planned for completion Winter 2021. CP - OPERATION SERVICES FORT COLLINS/LOVELAND POLICE TRAINING CENTER Funding Sources: $9.25M generated from bonds for the City of Fort Collins $9.25M from City of Loveland $1M from DOLA Grant Estimated Project Cost: $19.5M Phase: Phase II Building – Punchlist and Training Estimated Completion Date: January 2021 CITY MANAGER’S UPDATE 14 Project Details: The City of Fort Collins is partnering with The City of Loveland to construct a new Police training facility which will be located on the west side of the Loveland Airport. This new site will offer a 50-yard pistol range, a 1.4-mile driving track, concrete skills pad, and classrooms for special training. Project Status: Phase II – Building Construction Closeout:  Contractor is working on final close-out items. - Building system testing and balancing - Owner training - Building envelope testing - System commissioning  Contractor is working on LEED Credit items. Starting building air flush out for LEED. - Building air flush out - Compiling LEED trash & recycling documents  Scheduled to turn over Phase II to Police Departments mid-February. Phase II – Adding Site Items with project savings. - Storage Shed for equipment, cones, barricades, etc. - Blast pad to train on building entry - K9 Training area - Observation tower for Track and Skills pad  Plan to start construction on phase III items in March as weather allows.  Scheduled to complete phase III scope in summer of 2021. BLOCK 32/42 – CIVIC MASTER PLAN REFRESH Funding Source: Capital Project via BFO: $300,000 Estimated Project Cost: TBD Phase: RFP Estimated Completion Date: TBD Project Details: Space planning for Block 32 and 42 that was performed in 2013-2014 and needs to be updated. The new planning effort will involve each affected department to determine their space needs and anticipated growth over the next 10-12 Years. With the completion of the refresh the City can decide which departments to house in 215 N. Mason, 300 Laporte Ave - Building A, and the new City Hall. The refresh will also help determine an appropriate size of the new City Hall. Once this is determined and a conceptual design is produced it will be submitted to Council for review, next recommended steps and approval. Project Status:  Finished up meetings with various departments and staff associated with the Civic Center Masterplan re-fresh for blocks 32 and 42 gathering information on current and future needs.  Have three-day charrette scheduled late February with City departments, Development Review, Park Planning along with several boards and commissions to discuss layout of the Civic Center Masterplan and gathering input as we look to update Conceptual Master plan.  We plan to have a deliverable by late April 2021 to include in the 2022 BFO offer. Large Classroom CITY MANAGER’S UPDATE 15  We plan to present to the new Council in late April or early May. CP - UTILITIES CIS/OSS The Customer Information/Operational Support System (CIS/OSS) billing system project, delivered through Open SmartFlex (OSF), is currently entering a different phase. OSF has been operating in a live environment supporting FC Connexion (Broadband) since August 2019. Project leaders and team members are temporarily pivoting focus back to the Broadband area to work on closing some identified post go-live gaps and enhance OSF for newly defined Broadband products. CABLE REPLACEMENT PRIORITY #8-BROWN FARM CABLE Funding Source: BFO # 8.9 Estimated Project Budget: $153,000 Phase: Design Complete, Construction Initiated Project Details:  Electric primary cable has been evaluated throughout the Light & Power (L&P) service area based on the year of installation, style of cable and manufacturer to establish a prioritized failure risk. This area was calculated as Priority Area #8 citywide and involves the replacement of 30 sections of single-phase power. The replacement primarily occurs within the Brown Farm Third Subdivision located west of S. Taft Hill Drive and south of W. Stuart Street. The replacement will also include the installation of MaxCell innerduct to facilitate the future installation of Connexion within the same conduit used by L&P. Project Status:  The project is currently designed and now within the construction phase.  Due to COVID 19 and with a lot of people working & learning from their homes, extra construction planning around outages is needed and may require outages to occur after hours or on weekends.  Excluding one MaxCell innerduct section, MaxCell installation is complete.  All but three cable sections have been replaced successfully.  Currently, half of the proposed transformers designated for replacement have occurred with minimum outages. Aerial view of Priority Area #8 CITY MANAGER’S UPDATE 16 LIGHT & POWER JOINT TRAINING FIELD WITH POUDRE FIRE AUTHORITY Funding Source: Offer # 11.21 Estimated Project Budget: $110,000 Phase: Design Project Details:  Poudre Fire Authority (PFA) and Utilities staff have been coordinating a plan to collaborate on training services that will benefit both agencies at the PFA Training Center on West Vine Drive. The development of these props will benefit the City’s Utilities Service Area by eliminating the need to purchase land on which to erect the props, and PFA benefits through the partnership by adding new dimensions to special rescue training, as well as partnering with Utilities to facilitate other site improvements.  In this arrangement, PFA staff is working with Utilities staff to develop the construction drawings, surveys, and any excavation and installation work that is necessary for the project.  PFA’s cost is expected to be minimal, and Utilities has existing and future offers in the City’s budgeting process to cover their portion of the expenses. Project Status:  Project has been approved by Energy and PFA Boards  PFA is in the process of informational outreach to CSURF- It owns the land.  Construction of training poles for climbing early spring 2021. CORRAL OVERHEAD CONVERSION PROJECT Funding Source: Offer 8.9 Estimated Project Budget: $125,000 Phase: Design Project Details:  Efforts are continuing to replace aging overhead electric lines with much more reliable underground facilities. The recent acquisition of the Corral Annexation by Natural Areas made this project possible. It will replace 3,000 lineal feet of overhead three-phase primary with 1,700 lineal feet of underground cable and conduits. Project Status:  Preliminary design is complete. Electric Field Service crew training Aerial view of Two Creeks Natural area where the project is taking place. CITY MANAGER’S UPDATE 17  The City Surveyor is completing both the construction and permanent easement descriptions for submission with the Notice of Alignment.  The project was unanimously approved by the Land Conservation and Stewardship Board at their November 3, 2020 meeting.  Construction is planned for Q2, pending the receipt of the approved Notice of Alignment. 27” POUDRE CANYON RAW WATERLINE Funding Source: Water - BFO#12.21 (2021) Estimated Project Budget: $3,2000,000 Status: In Design Estimated Completion Date: • Final Design – March 2022 • Construction - August 2023 Project Details: The goal of this project is to ensure the structural integrity and operational longevity of the City’s 27” raw waterline in the Poudre Canyon. An existing, exposed section of the pipeline in the river near Gateway Natural Area will be replaced to eliminate the risk of failure which ensures the continued delivery and reliability of raw water from the Poudre River to the Water Treatment Facility. The design will consider the existing geomorphology of the river to develop a long-term solution which may require pipe alignment modifications and deeper burial depths of the pipeline. Final design and construction of the selected alternative are included in this project. Project Status:  Preliminary design of two alternatives is complete.  Environmental Permitting Summary Memo is complete.  Cost and Constructability Memo is complete  Construction Contractor Selection Process is in process – proposals were received mid-January 2021 and are being evaluated by the selection committee with final selection planned to be made by March 2021 Existing, exposed raw waterline in Poudre River CITY MANAGER’S UPDATE 18 OAK STREET STORMWATER IMPROVEMENTS PROJECT Funding Source: • BFO #8.19 (2018) Stormwater – Magnolia St Outfall Ph 1 • BFO #14.12 (2021) Stormwater – Oak St Stormwater Improvements Project Estimated Project Budget: $1.8M (Design), $23.2M (Construction); $25M (Total) Status: In Conceptual Design Phase Estimated Completion Date: • Conceptual Design phase to be completed April 2021 • All Design phases to be completed Fall 2022 • Construction to be completed late 2024 or early 2025 Project Details: This project is for the design and construction of stormwater infrastructure for the Oak Street Stormwater Improvements Project (OSSP) that is part of the larger Downtown Stormwater Improvement Program (DSIP). The project is generally located on Oak Street from Mason to Jackson and will include storm laterals extending to the blocks both north and south of Oak Street. There will be approximately 8500 LF of new storm pipe installed with this project, ranging in size from 78” to 48”. Project Status:  Data Collection: field locates are underway and preliminary potholing starting February 9  Public Engagement and Communication Planning underway  Existing Hydrology review underway  Contractor RFP process underway NORTH MASON STORMWATER DRAINAGE SYSTEM FINAL DESIGN Funding Source: • BFO#14.13 Stormwater – N Mason/N College Phase 1 Design and some construction • BFO#12.29 Water – N Mason Waterline - Design • BFO#12.87 Wastewater – N Mason Sewer Main - Design Estimated Project Budget: • SW: $1,500,000, • Water: $100,000, • WW: $100,000 Status: Starting the work order process Estimated Completion Date: December 2021 Project Details: The objective of this project is to complete a final stormwater design as well as water and sanitary sewer design along the North Mason transportation corridor. Specifically, the water utility final design will include a stormwater drainage outfall from just north of Hickory Street to the Poudre River along the proposed North Mason transportation corridor. A conceptual pond design will be developed for the pond north of Hickory. The final design is planned to be completed by fall of 2021, in the hopes of beginning initial construction in 2022. Oak and Howes, Looking West Site Location CITY MANAGER’S UPDATE 19 Project Status:  Submitting work order for Purchasing Review, based on consultant scope of work, cost estimate and schedules. PUBLIC SAFETY POUDRE FIRE AUTHORITY Adult Male Deceased after Fire on McMurry Ave. | Feb. 4 PFA responded to reports of a smoke detector sounding in one of the units of a multi-residential facility on the 4700 block of McMurry Ave. The Engine 5 crew was first on scene. Upon entry, firefighters found heavy smoke and active flames. The engine crew located and removed one victim and extinguished the fire with a pressurized water extinguisher. Sadly, the patient succumbed to his injuries. No other injuries were reported and no other structures or units were involved. Additional fire crews searched the floor to ensure the safety of other residents. They made contact with those on the floor of the unit where the fire occurred to inquire about any other injuries or concerns. The air was monitored throughout the building and returned to safe levels after ventilation. Machinery and Storage Container Fire | Jan. 20 PFA responded to a report of a vehicle fire several miles north of Fort Collins at 12:53 p.m. The first arriving engine found a lumber saw machine and a storage container engulfed in flames. A second engine and tender responded to the fire to provide water supply. The crew was able to extinguish the fire rapidly. This enabled them to prevent any further spread. The fire cause was determined to be unintentional and from radiated heat. Fire Extinguished at Pinon Hall on CSU Campus | Jan. 17 Firefighters were dispatched to a fire in Pinon Hall on the CSU Campus at about 1:51 p.m. Engine 1 was the first crew on scene and found smoke in the lobby. The automatic sprinkler system activated, but firefighters still needed to attack fire in the ceiling. The fire was controlled by 2:20 p.m. and PFA investigators began their investigation. They believe the fire originated in a heating, ventilation, and air conditioning (HVAC) blower motor and determined it to be electrical in origin. CITY MANAGER’S UPDATE 20 Ice Training Week Every year firefighters respond to several ice rescue calls. Many involve dogs that run out onto the ice and additionally owners that attempted to retrieve them. Others involve people of all ages that get stuck in a precarious situation on very cold water or over estimate the thickness and safety of an ice layer. PFA responders completed training scenarios on and in freezing water to complete their ice rescue refresher training in January. Remember that ice is never completely safe, especially with the large fluctuation in temperatures recently. Loads of Safety in January | Dryer Fire Education Between 2010 and 2014, dryer and washing machine fires cost Americans an estimated $238 million in property damage annually and most were started by the ignition of dust, fiber, or lint. PFA shared dryer safety tips such as frequent lint cleaning and maintenance to help the community prevent this risk. POLICE SERVICES Chief Swoboda speaks out against violence leading up to inauguration – Following the violence at the Capitol Building on January 6, FCPS recognized the emotional impact that the incident had on many of our community members. Chief Swoboda shared a message rejecting this incident. As concerns about potential violence on inauguration day heightened around the country, Chief Swoboda shared a video with our community members to reinforce our shared values and commitment to safety and service for all here in Fort Collins. FCPS strives to stay present in conversations about issues of concern in our community and will continue to find ways to meet each moment to support the needs those we serve. Veteran Birthday - Officers were honored to participate in a local veteran’s 97th birthday celebration in January. In 1944, at the age of 20, Curt Cameron co-piloted one of the 867 gliders that crossed the English Channel in support of the invasion of Normandy. He was later awarded the Medal of the Jubilee of Liberty for his role in liberating France from the Nazis. Curt is a lifetime VFW member and has organized and run the All-Veteran Honor Guard for the past 35 years. CITY MANAGER’S UPDATE 21 Case Highlight – On January 16, a suspect stole a bike in midtown Fort Collins. A few days later, our Downtown officers spotted the man after recognizing him from the case information that had been shared. The suspect was not interested in providing information about the bike's whereabouts, but he did mention that he had recently come from the Mennonite Fellowship. Officers decided to follow up with staff there to see if the stolen property had been left in the area. Staff members were able to help police locate the bike, which officers returned to a very grateful owner. This wasn't the most extreme case, but it's a big part of the work officers do each day. It's putting lots of little pieces together and working with community members to solve problems. It's returning someone's transportation to them and righting wrongs that impact the quality of life for our neighbors. Traffic Safety – Traffic Safety is one of the agency’s four goals for 2021. In January, officers conducted enforcement in several areas to impact unsafe driving behaviors. A few examples include: • Officers from Patrol and our Traffic Unit spent time focusing on speed violations in the Ziegler/Horsetooth and Harmony/College areas. In total, they conducted 71 traffic stops and issued 48 citations. The average speed was approximately 14mph faster than the posted limit. • Traffic Unit officers spent time in the construction zone near Prospect Road on I-25 in response to concerns from community members about dangerous driving in this area. In just an hour and a half, 13 drivers were stopped for going more than 15mph over in the construction zone with the fastest driver going 102mph. FC911 Accreditation - FC911 is an Accredited Center of Excellence (ACE) through the International Academies of Emergency Dispatch (IAED). This accreditation is achieved by maintaining specific benchmarks of compliance as it pertains to handling medical calls. FC911 is routinely evaluated by IAED in order to maintain this designation. In January, FC911 announced that it had achieved the necessary benchmarks and remains an Accredited Center of Excellence. There are fewer than 150 ACE centers in the United States, 7 in Colorado, and 3 in Larimer County. PLANNING, DEVELOPMENT &TRANSPORTATION BUILDING, PLANNING AND DEVELOPMENT REVIEW Monthly Reporting Monthly construction reporting and mapping of development review proposals and construction can be found by visiting: http://citydocs.fcgov.com/?dt=MONTHLY+REPORT&dn=NEIGHBORHOOD+%26+BUILDING+SERVI CES%2FZONING&vid=2&cmd=showdt For a detailed listing of development Proposals under review, please visit: https://www.fcgov.com/developmentreview/proposals/ Home2Health and Housing Strategic Plan: The Housing Strategic Plan is on track for consideration of adoption on February 16, 2021 (First Reading) alongside an off-cycle appropriation for Phase 1 of Land Use Code updates related to housing. Plan draft materials, the final community engagement report, a Policy 101 document to help community engage with the planning process, and other supplemental documents are available at https://www.fcgov.com/housing. In the coming months the Home2Health core team will be focusing on the design of the spring Community Summit, tentatively scheduled for late April. CITY MANAGER’S UPDATE 22 Lighting Code A Revised Draft of the Lighting Code was made public on the first week of February with changes that reflect comments received through community engagement. For more information see the project webpage at https://www.fcgov.com/developmentreview/lighting-regulations. A City Council Work Session will be held on February 23rd with consideration of adoption on March 2nd (First Reading). YEAR TO DATE COMPARISON 2020 2021 YTD % Change Development Project Submittals Received 23 23 0% Conceptual/Preliminary Design/Staff Reviews 17 23 35.29% Building Permits Issued 1,000 723 -27.70% Building Permit Valuations ($M) $29.27 $16.75 -42.77% Building Inspections Performed 27,095 32,220 18.97% Zoning Inspections Performed 433 421 -2.77% Zoning Plan Reviews Performed 2,796 3,039 8.69% Overall Development Review revenues are ($110,540) under projection for 2021 as of January 31st with Development Review under by $(2,000) and Engineering Development Review under by $(112,541). GRAFFITI UPDATE During the month of January 2021, the Graffiti Abatement Team abated 26 issues consisting of 87 tags measuring 335 square feet of graffiti-covered surfaces. The tags were distributed throughout the City in the following Council Districts: Month One Two Three Four Five Six January 12 0 3 2 6 2 SUSTAINABILITY SERVICES ENVIRONMENTAL SERVICES 2021 Earth Day Challenge Feeling disconnected from friends and family during COVID? Enjoy playing games? Join the 2021 Earth Day Challenge, an online climate action competition to reduce greenhouse gas emissions. Create an Earth Day Challenge team, make an impact, and win prizes like a free year of composting or grocery store gift cards at shiftfoco.com. You can connect with others from the safety of your own home and become part of a growing community of people who are making Fort Collins a healthier, more affordable and more sustainable place. Find out more at fcgov.com/shift. Volunteers Needed for City’s Healthy Homes Program The City of Fort Collins’ Healthy Homes program is looking for enthusiastic community members to volunteer to become Master Home Educators. The Healthy Homes Program helps people in Fort Collins learn easy ways to improve the air quality in their homes. Month Access FC Hotline Pro-Active Total January 7 2 17 26 CITY MANAGER’S UPDATE 23 This fun and informative online training will provide you with a wealth of information to prepare you to conduct healthy homes assessments. Each assessment helps improve the indoor air quality and safety of Fort Collins homes. For more information on how to sign-up and learn more about the program, please call 970-224-6129 or email healthyhomes@fcgov.com. SOCIAL SUSTAINABILITY Housing Strategic Plan Since the fall of 2020, the City has been updating the Housing Strategic Plan that guides housing policy, sets housing goals, and creates a framework for City investments in the housing system. Over the few weeks, many people will be working diligently on drafting and finalizing the new plan while incorporating community feedback – adoption by City Council is planned for February 16, 2021. Find out more about housing in Fort Collins at fcgov.com/housing. ECONOMIC HEALTH Larimer County Moves to Level Yellow Saturday, February 6, 2021 The Colorado Department of Public Health and Environment (CDPHE) has released the COVID-19 Dial 2.0. The new dial will consequently moved Larimer County from Level Orange to Level Yellow effective Saturday, February 6, 2021. To view the changes for Larimer County residents & businesses, click here. The Larimer County Health Department will be working with businesses to work through the new capacity limitations. Please contact the Health Department through one of these options:  Call the Joint Information Center: 970-498-5500 (open Monday - Friday, 9:00 am - 4:30 pm)  Text us questions: 970-999-1770  Email us: Submit your general questions and concerns about the COVID-19 Dial 2.0 and reopening guidance here. UTILITIES CUSTOMER CONNECTIONS In 2021, Utilities Customer Connections has reached 67 participants through 4 outreach events and programs. The sprinkler audit program has started planning for the 2021 season. This year we’re evaluating gaps and barriers to equity, diversity, and inclusion (EDI) with the City’s Rapid Response Team on Feb. 16. The findings will inform recommendations to improve EDI, which will be incorporated into the program’s 2021 season. The 2021 residential Xeriscape Incentive Program is open for enrollment. Utilities water customers are eligible to receive a rebate for swapping out high-water landscape for low-water xeriscape. Participants are required to take a class to be eligible for the rebate. So far, 79 customers are registered for virtual spring classes through May and 41 customers are enrolled in the program to complete a water-saving landscape project. In Q4 2020, Staff launched two new programs for commercial customers (direct install program for hotels and double toilet rebates). Through these programs over 400 high efficiency showerheads and CITY MANAGER’S UPDATE 24 aerators and over 350 toilets were installed throughout our business community. These upgrades are estimated to save 5 million gallons of water a year! Double toilet rebates have concluded, but direct install for hotels will continue through 2021. In the month of February, Utilities will offer the following engagement opportunities:  February 3 – CSU Virtual Housing Fair: Utilities staff joined property management companies, landlords, realtors and other community resources to provide CSU students with information about Utilities Affordability Programs and Time-of-Day electric pricing during the 36th annual CSU Housing Fair.  Feb. 3 - Automated Benchmarking Support Session: Building Energy and Water Scoring Program staff share how energy benchmarking with Xcel Energy can save time when complying with Fort Collins Building Energy and Water Scoring Ordinance.  February 4 – Floodplain Management Public Information Committee Annual Meeting: Each year Utilities floodplain management team engages a group of internal and external stakeholders to develop, guide and implement a public information plan for floodplain safety and education.  Feb. 18 – Building Benchmarking Overview: Utilities staff provides an overview of the Building Energy and Water Program, including requirements, benefits, and easy steps to request and report your data.  February 22 – UAP Road Show: Utilities Affordability Programs (UAP) staff present program information to Sharing is Caring, a group of service providers that connect community members to critical resources.  February 23 - Residential Water Supply Requirement Focus Group: This will be the fourth focus group in a four-part series providing impacted stakeholders the opportunity to share feedback on new water supply requirement process considerations. COMMUNITY SERVICES RECREATION  Despite COVID capacity restrictions and reservation requirements, drop ins during January 2021 were only 48% lower than drop ins during January 2020  Camp FunQuest Learning Journey ended onsite remote childcare on January 19, completing 34 consecutive weeks of childcare for the community. PARKS  Forestry staff member, Rafael McLeod (pictured here), saved a community member that had fallen through the ice at Fossil Creek.  Rolland Moore ballfield roof replacement completed.  Received a Nature in the City grant for Spring Canyon Community Park dog pond outfall improvements.  Wreaths Across America included 856 wreaths placed on veteran's graves in Grandview Cemetery.  Completed a project in coordination with Stormwater to improve flow in two drainage channels on the southern boundary of Fossil Creek Community Park. CITY MANAGER’S UPDATE 25 CULTURAL SERVICES Introduction to Beekeeping The Gardens on Spring Creek  The Lincoln Center will be presenting the Fort Collins Symphony’s Love Notes concert as a virtual performance February 12-14. The concert is an example of The Lincoln Center’s ability during COVID-19 to support arts in the community by videoing and streaming high quality virtual productions. The Lincoln Center is also open to the community for scheduled events and meetings.  In addition to being open to the public, the Gardens on Spring Creek is continuing to offer in- person and online classes and programs this winter. For adults and children, the programs range from Read and Seed Story Time, to beekeeping and watercolor classes, to Tai Chi on the Great Lawn on Saturday mornings. NATURAL AREAS Natural Areas Bark Rangers are Volunteer Ranger Assistants and their canines that educate fellow natural areas visitors about dog etiquette. This is a new program that started in 2020 despite the pandemic. 2020 Volunteerism & Participation Remained Strong Volunteers really stepped up to serve the community and natural areas last year, even in a global pandemic! Natural Areas staff appreciates those who stayed home to prevent the spread of COVID-19 and those who volunteered safely to support the Natural Areas Department’s operations. Volunteers contributed 6,482 hours in 2020. Volunteer hours donated can be valued at $29.50 each in Colorado (independentsector.org/resource/vovt_details/), a value of $191,219 in 2020. CITY MANAGER’S UPDATE 26 By The Numbers  Number of natural areas volunteers: 372  Average volunteer contribution: 21 hours  Number of volunteer assignments: 2,469  Full-time employee hours equivalent: 3.11  Top three types of volunteer hours: 1. Volunteer Ranger Assistants 2. Volunteer Naturalist Assistants 3. Volunteer Naturalists In 2020, the Natural Areas Department saw changes in its tradition of offering year-round programming such as free guided hikes, family activities, and volunteer projects. Since natural areas activities were all offered in-person previously, COVID-19 brought an expansion of virtual activities while offering limited in-person options. In December, the Natural Areas Department provided 12 activities for 464 participants. In 2019, 9,927 people participated in 400 activities and in 2020, Natural Areas provided 245 activities for 6,069 people. The strong volunteerism and programming participation in 2020 show the community’s outstanding appreciation of and commitment to stewarding their natural areas. Thank you, Fort Collins! PUBLIC ENGAGEMENT MLK Celebration 2021 As part of the community wide MLK Day Celebration, the City of Fort Collins collaborated with Colorado State University’s Black/African American Cultural Center (BAACC), CSU Police Department, Poudre School District, Poudre River Public Library District, and New Eyes Village, among other organizations, to put together a series of activities to commemorate the day and honor the legacy of Dr. King. City-led activities included the following:  Mayor’s MLK Proclamation  City of Fort Collins – Local Black/African American History Website & Virtual Tour  MLK Candlelight Vigil BROADBAND – FORT COLLINS CONNEXION Industry News Colman Keane, Broadband Executive Director, was featured on the cover of the January 2021 issue of ISE magazine! The article highlights our ongoing contract vendor relationships, the impact COVID-19 has had on construction and installations, accessibility and affordability, and the ongoing relationship management with homeowners’ associations. You can read this ISE article here! https://www.isemag.com CITY MANAGER’S UPDATE 27 Industry Events On Wednesday, January 27, Colman Keane presented a case study: Building a Fiber-to-the-home Network at the virtual 2020 EUCI Broadband Deployment Symposium. Outside Plant It has been chilly outside lately and with our network being 100% underground including from the street to the side of your house, we do run into issues with frozen ground during the winter months. If frozen ground is an issue, we can run a temporary drop “above ground” for Connexion service. This temporary drop will be installed underground permanently once the ground has thawed. Our OnTrac, Inc. crews are regularly monitoring areas to determine if ground has thawed enough to complete the installation and complete the direct-bury process. Social Media Follow us on Facebook and Twitter! Join the Connexion community—get updates and information on services and more! @FCConnexion @ConnexionFC COMMUNITY DASHBOARD HIGHLIGHT The Community Dashboard features performance data and information that highlights how the City is doing in achieving its seven Outcome areas: Neighborhood Livability and Social Health, Culture and Recreation, Economic Health, Environmental Health, Safe Community, Transportation, and High Performing Government. The Dashboard is made up of 36 total metrics that are published quarterly and demonstrate where the City is doing well and where there are opportunities to improve. The color status of performance for each metric is determined based on the actual result for the quarter compared with the target. The color status of performance for the Outcome is determined based on the average calculation of the performance of each metric within that Outcome. Each month the City Manager’s Update will highlight a metric from the Community Dashboard. This month’s feature is from the Safe Community Outcome Area. CITY MANAGER’S UPDATE 28 Analysis:  This is a quarterly metric, currently reflecting Q3 2020 data.  Measuring the rate per 1000 residents provides a contextual way to view the amount of crime occurring while reflecting changes in the City's population over time.  Crime rates can fluctuate greatly when measured on a quarterly basis, due to seasonality and other factors. For this reason, Fort Collins Police Services compares the actual rates to expected normal ranges per quarter.  When COVID-19 related restrictions went into place in March, FCPS experienced slight decreases in calls-for-service as well. As some restrictions have been lifted and citizens are resuming more activities, the calls have started to return to more typical levels. As there are sometimes delays in reporting, we will continue to refresh the 2020 numbers to monitor this measure.  On 05/08/20, we began using slightly different methodology than had been used in previous quarterly updates on this metric. In order to maintain consistency so that each quarter can be compared across the entire time period, all the data in the above graph was recalculated using the new methodology. Definition: Part 1 crimes are defined by the FBI as: Aggravated Assault, Arson, Auto Theft, Burglary, Homicide, Rape, Robbery, and Theft. Part 1 crimes are the common set of criminal offenses that law enforcement agencies across the county collect data and report statistics for on an annual basis. Why is this metric important? This data is collected from every law enforcement agency in the country and reported by the FBI. It provides a standardized definition to generate crime rate statistics across agencies. It is useful as a barometer for measuring reporting rates of similarly sized cities. It is often used as a leading social indicator of community safety. City’s impact on this metric: Medium – Fort Collins Police Services provides services and deploys strategies to help maintain community safety. However, the crime rate is heavily influenced by outside factors. CITY MANAGER’S UPDATE 29 Benchmarks: Benchmark data is collected on an annual basis and is not available until late the following year. As such, this metric does not use outside benchmarking comparable data. To view the entire Dashboard, please visit: http://fortcollins.clearpointstrategy.com/