HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 06/06/2017 - ITEMS RELATING TO THE MULBERRY STREET/STATE HIGHWAAgenda Item 7 Item # 7 Page 1 AGENDA ITEM SUMMARY June 6, 2017 City Council STAFF Kyle Lambrecht, Civil Engineer Dean Klingner, Engineer & Capital Project Manager Link Mueller, Utilities Special Projects Manager SUBJECT Items Relating to the Mulberry Street/State Highway 14 Bridge over the Poudre River. EXECUTIVE SUMMARY A. Resolution 2017-050 Authorizing the Mayor to Execute a Contract Amendment to the Intergovernmental Agreement Between the City and the Colorado Department of Transportation for Construction of the Mulberry Street Bridge Across the Poudre River. B. First Reading of Ordinance No. 071, 2017, Appropriating Unanticipated Revenue in the Wastewater Fund for the State Highway 14 Bridge over the Poudre River Project. The purpose of this item is to reconcile the City’s financial contribution to the Colorado Department of Transportation’s (CDOT) State Highway (SH) 14 Bridge over the Poudre River Project. The original Intergovernmental Agreement (IGA) estimated a base project cost of $1,210,000, excluding a $100,000 credit for work to be performed by the City. This Contract Amendment will amend the existing IGA between the City and CDOT to reflect a final reimbursement amount of $1,155,885, the actual cost of the improvements excluding project credits. This item will also appropriate $83,044 into the Wastewater Fund for work performed by the City. STAFF RECOMMENDATION Staff recommends adoption of the Resolution and Ordinance on First Reading. BACKGROUND / DISCUSSION In 2009, CDOT initiated a project to reconstruct the existing Mulberry Bridge spanning the Poudre River. The goals for the project included additional travel lanes, multimodal facilities, and lengthening/raising the bridge to better protect it from flooding. In addition, roadway and multimodal improvements were included along Mulberry Street from Lemay Avenue to Riverside Avenue. Minimal urban design features were identified as part of the original CDOT plans. The City recognized an opportunity to collaborate with CDOT to enhance the new bridge and Mulberry Street through the addition of urban design treatments, irrigated landscape improvements, and frontage improvements along the City’s Mulberry Water Reclamation Facility. These improvements would be constructed by CDOT and funded by the City. The urban design treatments and irrigated landscape improvements would be funded with 2013/2014 City Budget and Keeping Fort Collins Great (KFCG) funds, while the frontage improvements would be funded through a combination of Wastewater, Street Oversizing, and General Transportation funds. Agenda Item 7 Item # 7 Page 2 Resolution 2015-096 authorized the City to enter into an Intergovernmental Agreement (IGA) with CDOT. The purpose of the IGA was to define the improvements eligible for reimbursement, outline long term maintenance responsibilities, and identify an estimated reimbursement amount for the improvements. City and CDOT staff estimated the base cost for the reimbursable improvements to be $1,210,000. This value was developed using construction costs for similar styled and scaled improvements. A $100,000 credit was included in the IGA for the City to relocate of an existing security gate at the Mulberry Water Reclamation Facility and to relocate existing City traffic fiber lines. The total City reimbursement amount to CDOT as identified by the original IGA was $1,110,000. Once construction was completed, City staff worked with CDOT staff to reconcile the City’s reimbursement amount using actual CDOT construction costs for the work. Actual CDOT construction costs for City improvements were $1,155,885. As opposed to including a credit in the final reimbursement amount, CDOT instead issued a direct payment to the City for $83,044, the cost for the City to relocate the security gate and traffic fiber lines. This item will amend the existing IGA between the City and CDOT to reflect a reimbursement amount of $1,155,885.26, the actual cost of the improvements excluding project credits. This item will also appropriate $83,044.27 into the Wastewater Fund for work performed by the City. These funds, considered unanticipated revenue, will ultimately be reimbursed to CDOT. The net result of this item is a savings to the City of $37,159.01. CITY FINANCIAL IMPACTS The City of Fort Collins will reimburse CDOT for urban design and frontage improvements constructed as part of the State’s SH 14 Bridge over the Poudre River Project. The following summarizes the reimbursement: Estimated Actual Difference Base Project Cost $1,210,000 $1,155,885 ($54,115) Original IGA Credit ($100,000) $0 $100,000 Unanticipated Revenue Reimbursable to CDOT $0 ($83,044) ($83,044) Total Net Project Cost $1,110,000 $1,072,811 ($37,159) The net result is a savings to the City. BOARD / COMMISSION RECOMMENDATION Boards and commissions were not contacted for comments on this item. PUBLIC OUTREACH The City and CDOT coordinated on public outreach throughout the project. The City conducted a joint public open house meeting with CDOT prior to the beginning of construction, met individually with impacted business owners, conducted stakeholder meetings, developed project press releases, and provided project updates to both CDOT and City project websites. ATTACHMENTS 1. Location map (PDF) 2. Resolution 2015-096 (PDF) S LemayAve Riverside Ave SH 14 / E Mulberry St E Myrtle St Endicott St Cowan St Colorado St Hoffman Mill Rd E Magnolia St Lesser Dr W oodward Way State Highway 14 Bridge over the Poudre River Project Location Map 0 100 200 400 600 800 Feet ³ 1:4,000 Legend Project Location SH14 Bridge Poudre River ATTACHMENT 1 ATTACHMENT 2 -1- RESOLUTION 2017-050 OF THE COUNCIL OF THE CITY OF FORT COLLINS AUTHORIZING THE MAYOR TO EXECUTE A CONTRACT AMENDMENT TO THE INTERGOVERNMENTAL AGREEMENT BETWEEN THE CITY AND THE COLORADO DEPARTMENT OF TRANSPORTATION FOR CONSTRUCTION OF THE MULBERRY STREET BRIDGE ACROSS THE POUDRE RIVER WHEREAS, Resolution 2015-096 approved the execution of an intergovernmental agreement between the City and the Colorado Department of Transportation (“CDOT”) regarding CDOT’s construction of the bridge, roadway, and urban design improvements crossing the Poudre River (collectively the “Project”) and located on Mulberry Street, also known as State Highway 14, between Riverside Avenue and Lemay Avenue where the City and CDOT agreed to certain urban design, landscaping, and pedestrian facility enhancements (collectively the “Enhancements”) to the Project to be paid for by the City (the “Agreement”); and WHEREAS, the Agreement estimated the City’s total financial contribution to CDOT for the Enhancements to be $1,210,000; and WHEREAS, associated with the Enhancements, the City agreed to relocate an existing security gate at the Mulberry Water Reclamation Facility and existing City traffic fiber lines shown to be in conflict with planned bridge improvements and CDOT agreed to apply an estimated credit of $100,000 against the estimated $1,210,000 for such relocation (the “Credit”); and WHEREAS, Resolution 2015-096 estimated the City’s financial contribution to the Enhancements, after applying the Credit, to be $1,110,000; and WHEREAS, the actual CDOT construction costs for the Enhancements, excluding the Credit, was $1,155,885.26; and WHEREAS, the actual Credit amount was $83,044, which amount CDOT paid directly to the City, will be appropriated into the Wastewater Fund by separate Ordinance; and WHEREAS, the City Council desires to execute an amendment to the Agreement to replace the estimated costs of the Enhancements, including the Credit, with the actual costs of the Enhancements, excluding the Credit, and further authorizing staff to reimburse CDOT consistent with the Agreement, and the amendment thereto (the “Amendment”). NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF FORT COLLINS as follows: Section 1. That the City Council hereby makes and adopts the determinations and findings contained in the recitals set forth above. Section 2. The City Council hereby authorizes the Mayor to execute the Amendment to the Agreement between the City and CDOT, substantially in the form attached hereto as -2- Exhibit “A,” together with such modifications and additions as the City Manager, in consultation with the City Attorney, determines necessary and appropriate to protect the interests of the City or further the purposes of this Resolution, as set forth above. Passed and adopted at a regular meeting of the Council of the City of Fort Collins this 6th day of June, A.D. 2017. _________________________________ Mayor ATTEST: _____________________________ City Clerk OLA #: 331001397 Routing #: 15-HA4-XC-00136-M0001 Page 1 of 3 STATE OF COLORADO AMENDMENT Amendment #: 1 Project #: 18085 SIGNATURE AND COVER PAGE State Agency Department of Transportation Amendment Routing Number 15-HA4-XC-00136-M0001 Contractor CITY OF FORT COLLINS Original Agreement Routing Number 15-HA4-XC-00136 Agreement Maximum Amount Initial term State Fiscal Year Extension terms State Fiscal Year State Fiscal Year State Fiscal Year State Fiscal Year Total for all state fiscal years $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Agreement Performance Beginning Date The later of the effective date or November 17, 2015 Initial Agreement expiration date Completion and final acceptance of the Project by the State, FHWA and the Local Agency. THE PARTIES HERETO HAVE EXECUTED THIS AMENDMENT Each person signing this Amendment represents and warrants that he or she is duly authorized to execute this Amendment and to bind the Party authorizing his or her signature. CONTRACTOR CITY OF FORT COLLINS ____________________________________________ By: , Date: _________________________ STATE OF COLORADO John W. Hickenlooper, Governor Department of Transportation Shailen P. Bhatt, Executive Director ___________________________________________ Joshua Laipply, P.E., Chief Engineer Date: _________________________ In accordance with §24-30-202 C.R.S., this Amendment is not valid until signed and dated below by the State Controller or an authorized delegate. STATE CONTROLLER Robert Jaros, CPA, MBA, JD By:_________N/A__________________________________ Department of Transportation Effective Date:_____________________ EXHIBIT A OLA #: 331001397 Routing #: 15-HA4-XC-00136-M0001 Page 2 of 3 1) PARTIES This Amendment (the “Amendment”) to the Original Agreement shown on the Signature and Cover Page for this Amendment (the “Agreement”) is entered into by and between the Contractor and the State. 2) TERMINOLOGY Except as specifically modified by this Amendment, all terms used in this Amendment that are defined in the Agreement shall be construed and interpreted in accordance with the Agreement. 3) EFFECTIVE DATE AND ENFORCEABILITY A. Amendment Effective Date This Amendment shall not be valid or enforceable until the Amendment Effective Date shown on the Signature and Cover Page for this Amendment. The State shall not be bound by any provision of this Amendment before that Amendment Effective Date, and shall have no obligation to pay Contractor for any Work performed or expense incurred under this Amendment either before or after of the Amendment term shown in §3.B of this Amendment B. Amendment Term The Parties’ respective performances under this Amendment and the changes to the Agreement contained herein shall commence on the Amendment Effective Date shown on the Signature and Cover Page for this Amendment and shall terminate on the termination of the Agreement. 4) PURPOSE A. The Parties entered into the Agreement for replacing a structurally deficient bridge on State Highway 14 (Mulberry Street) over the Poudre River in Fort Collins as part of the Colorado Bridge Enterprise (CBE). B. The Parties now desire to delete and replace Section 4. and Section 5. in Exhibit A in their entirety. This will update Local Agency, Total Funds, and not to exceed amounts. C. The Parties now desire to delete Exhibit A in its entirety. This will be replaced with Exhibit A-1 with an updated Fort Collins not to exceed reimbursement amount. 5) MODIFICATIONS Section 4. Project Funding Provisions Section 4. is removed and replaced in its entirety with: A. The Local Agency has estimated the total cost of the work and is prepared to provide the funding for the work, as evidenced by an appropriate ordinance or resolution duly passed and adopted by the authorized representatives of the Local Agency, which expressly authorizes the Local Agency to enter into this contract and to expend its funds for the project. A copy of this ordinance or resolution is attached hereto and incorporated herein as Exhibit B. B. The Local Agency has estimated the total cost of the Work to be $1,155,885.26, which is to be funded as follows: a. Local Agency Funds $1,155,885.26 b. State Funds $ 0.00 Total Funds: $1,155,885.26 C. The maximum amount payable by the Local Agency under this contract shall be $1,155,885.26, unless such amount is increased by an appropriate written modification to this contract executed before any increased cost is incurred. D. The parties hereto agree that this contract is contingent upon all funds designated for the project herein being made available from state sources, as applicable. Should these sources fail to provide necessary funds as agreed upon herein, the contract may be terminated by either party, provided that any party terminating its interest and obligations herein shall not be relieved of any obligations which existed prior to the effective date of such termination or which may occur as a result of such termination. Section 5. Project Payment Provisions Section 5. is removed and replaced in its entirety with: A. The State shall submit invoices to the City as a lump sum cost. Invoices shall be in proportion to the work completed. The $1,155,885.26 is a not to exceed value. OLA #: 331001397 Routing #: 15-HA4-XC-00136-M0001 Page 3 of 3 B. If the Local Agency is to be billed for CDOT incurred costs, the billing procedure shall be as follows: 1. Upon receipt of each bill from the State, the Local Agency will remit to the State the amount billed no later than 60 days after receipt of each bill. Should the Local Agency fail to pay moneys due the State within 60 days of demand or within such other period as may be agreed between the parties hereto, the Local Agency agrees that, at the request of the State, the State Treasurer may withhold an equal amount from future apportionment due the Local Agency from the Highway Users Tax Fund and to pay such funds directly to the State. Interim funds, until the State is reimbursed, shall be payable from the State Highway Supplementary Fund (400). 2. If the Local Agency fails to make timely payment to the State as required by this section (within 60 days after the date of each bill), the Local Agency shall pay interest to the State at a rate of one percent per month on the amount of the payment which was not made in a timely manner, until the billing is paid in full. The interest shall accrue for the period from the required payment date to the date on which payment is made. C. The State will prepare and submit to the Local Agency, no more than monthly, charges for costs incurred relative to the project. The State’s invoices shall include a description of the amounts of services performed, the dates of performance and the amounts and description of reimbursable expenses. The invoices will be prepared in accordance with the State’s standard policies, procedures and standardized billing format. Exhibit A-1 Exhibit A-1 contains the Scope of Work. Exhibit A is removed and replaced in its entirety with Exhibit A-1 attached hereto and incorporated herein by reference. Upon execution of this Amendment, all references in the Agreement to Exhibit A will be replaced with Exhibit A-1. 6) LIMITS OF EFFECT This Amendment is incorporated by reference into the Agreement, and the Agreement and all prior amendments or other modifications to the Agreement, if any, remain in full force and effect except as specifically modified in this Amendment. Except for the Special Provisions contained in the Agreement, in the event of any conflict, inconsistency, variance, or contradiction between the provisions of this Amendment and any of the provisions of the Agreement or any prior modification to the Agreement, the provisions of this Amendment shall in all respects supersede, govern, and control. The provisions of this Amendment shall only supersede, govern, and control over the Special Provisions contained in the Agreement to the extent that this Amendment specifically modifies those Special Provisions. THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK ([KLELW$   6&23(2):25. 7KH&RORUDGR'HSDUWPHQWRI7UDQVSRUWDWLRQLVUHSODFLQJDVWUXFWXUDOO\GHILFLHQWEULGJHRQ6WDWH +LJKZD\ 0XOEHUU\6WUHHW (;+,%,7$1 (Continued) &LW\RI)RUW&ROOLQV0XOEHUU\%ULGJH,PSURYHPHQWV)XQGLQJ5HVSRQVLELOLWLHV 'DWH 0DU Project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xhibit A-1, Page 2 of 3 Project #18085Construction Total = $493,739.52 (;+,%,7$ &RQWLQXHG Project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in 2009, the Colorado Department of Transportation (“CDOT”) initiated a project to reconstruct the existing Mulberry Bridge spanning the Poudre River (the “Project”); and WHEREAS, the City recognized an opportunity to collaborate with CDOT to enhance the new bridge and Mulberry Street through the addition of urban design treatments, irrigated landscape improvements, and frontage improvements along the City’s Mulberry Water Reclamation Facility (the “Enhancements”); and WHEREAS, the Enhancements would be constructed by CDOT and funded by the City; and WHEREAS, Resolution 2015-96 authorized the City to enter into an intergovernmental agreement with CDOT, the purpose of which was to define the Enhancements eligible for reimbursement, to outline long term maintenance responsibilities, and to identify an estimated reimbursement amount for the Enhancements; and WHEREAS, associated with the Enhancements, the City agreed to relocate an existing security gate at the Mulberry Water Reclamation Facility and existing City traffic fiber lines shown to be in conflict with planned bridge improvements and CDOT agreed to apply an estimated credit of $100,000 against the estimated $1,210,000 for such relocation (the “Credit”); and WHEREAS, once construction was completed, City staff worked with CDOT staff to reconcile the City’s reimbursement amount using actual CDOT construction costs for the Enhancements and CDOT subsequently issued a direct payment to the City for $83,044, the actual amount of the Credit; and WHEREAS, this item will appropriate the revenue for the Credit payment from CDOT to the City for $83,044 into the Wastewater Fund for the work performed by the City; and WHEREAS, the City Council finds that expending funds from the Wastewater Fund on the Enhancements relates to, logically connects with, and benefits the utility rate payers by making improvements to the area around the Mulberry Water Reclamation Facility; and WHEREAS, Article V, Section 9, of the City Charter permits the City Council to make supplemental appropriations by ordinance at any time during the fiscal year, provided that the total amount of such supplemental appropriations, in combination with all previous appropriations for that fiscal year, does not exceed the current estimate of actual and anticipated revenues to be received during the fiscal year; and -2- WHEREAS, City staff has determined that the appropriation of the Credit described herein will not cause the total amount appropriated in the Wastewater Fund to exceed the current estimate of actual and anticipated revenues to be received in that fund during the fiscal year. NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT COLLINS as follows: Section 1. That the City Council hereby makes and adopts the determinations and findings contained in the recitals set forth above. Section 2. That there is hereby appropriated from unanticipated revenue in the Wastewater Fund the sum of EIGHTY THREE THOUSAND FORTY-FOUR DOLLARS ($83,044) for expenditure in the Wastewater Fund for the State Highway 14 Bridge over the Poudre River Project. Introduced, considered favorably on first reading, and ordered published this 6th day of June, A.D. 2017, and to be presented for final passage on the 5th day of July, A.D. 2017. __________________________________ Mayor ATTEST: _______________________________ City Clerk Passed and adopted on final reading on the 5th day of July, A.D. 2017. __________________________________ Mayor ATTEST: _______________________________ City Clerk  &/ 6<     )$2Q7KH-RE7UDLQHH +285     6WUXFWXUH([FDYDWLRQ &<     6WUXFWXUH%DFNILOO &ODVV &<     &RQFUHWH&ODVV' :DOO &<     5HLQIRUFLQJ6WHHO (SR[\&RDWHG /%     )HQFH&KDLQ/LQN ,QFK /)    Project #19779 Construction Total = $445,652.74 Project Summary 3URMHFW 7RWDO&RQVWUXFWLRQ&RVW  &RQVWUXFWLRQ(QJLQHHULQJDQG,QGLUHFW&RVWV 23.9%  7RWDO&RVW  3URMHFW 7RWDO&RQVWUXFWLRQ&RVW  &RQVWUXFWLRQ(QJLQHHULQJDQG,QGLUHFW&RVWV 22.1%  7RWDO&RVW  Grand Total $1,155,885.26 Exhibit A-1, Page 3 of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¶VFRQWULEXWLRQV WRWKHSURMHFWZLOOEHDQDPRXQWQRWWRH[FHHGXQOHVVVXFKDPRXQWLVLQFUHDVHG E\DQDSSURSULDWHZULWWHQPRGLILFDWLRQWRWKHFRQWUDFW Exhibit A-1, Page 1 of 3