HomeMy WebLinkAboutCOUNCIL - AGENDA ITEM - 08/20/2019 - RESOLUTION 2019-087 AUTHORIZING THE CITY MANAGER TAgenda Item 15 Item # 15 Page 1 AGENDA ITEM SUMMARY August 20, 2019 City Council STAFF Mark Kempton, Water Production Manager Eric Potyondy, Legal SUBJECT Resolution 2019-087 Authorizing the City Manager to Execute an Agreement for Funding Improvements to the Munroe Canal Diversion Structure. EXECUTIVE SUMMARY The purpose of this item is to approve an intergovernmental agreement between the City of Fort Collins, Northern Colorado Water Conservancy District, North Poudre Irrigation Company (NPIC), East Larimer County Water District (ELCO), the Fort Collins-Loveland Water District (FCLWD), and North Weld County Water District. The purpose of the agreement is to fund improvements to the Munroe Canal Diversion Structure on the Cache la Poudre River. The Structure is located approximately one mile west (upstream) of Gateway Natural Area on the Cache la Poudre River. The improvement project will upgrade the Structure to prevent debris from flowing into the Structure and to safeguard the Structure from adjacent vehicular traffic. The Structure delivers Poudre River water to the City’s Water Treatment Facility for treatment and is an integral part of the City’s Fort Collins Utilities water supply system. The total estimated cost to the City is $133,250 which is one-sixth of the total design and construction cost of $799,500. STAFF RECOMMENDATION Staff recommends adoption of the Resolution. BACKGROUND / DISCUSSION Northern Water, which owns the Structure, is planning to perform upgrades in October 2019. The upgrades include covering both sides of the open Structure with a concrete roof to prevent debris or vehicles from entering and plugging up the downstream tunnel. In 2012, the High Park Fire burned the drainage basin immediately upstream of the Structure, leaving it susceptible to debris flows after severe rain events. In July 2013, a rainstorm over the basin caused a large debris flow which entered the Structure and filled the downstream tunnel with debris and soil for a distance of over 300 feet. The cleanup took several weeks, cost thousands of dollars, and resulted in an inability to divert Poudre River water at the Structure for several weeks. Fortunately, the City was able to continue to divert water from the Poudre River through the City’s Poudre River Pipeline for deliver to the City’s Water Treatment Facility for treatment. That event also impacted the Tri-Districts, two of which (ELCO and FCLWD) supply treated water to portions of Fort Collins and the Growth Management Area. The upstream basin has been treated with several post-wildfire mitigation projects; however, due to the severity of the burned area and the steep nature of the basin, debris flow risks remain. To protect the long-term health of the Structure and to ensure a continuous Poudre River water supply from the Structure, the proposed improvements will prevent future debris flows from entering the tunnel and thus will help ensure continued water supplies to the City’s Water Treatment Facility. An overview of the proposed improvements can be found in Attachment 3. Agenda Item 15 Item # 15 Page 2 The design and construction costs of the proposed improvements will be shared between Northern Water (the owner of the Structure ), NPIC (the operator and a user of the Structure), and the Pleasant Valley Pipeline Enterprise (a user of the Structure, of which the City is a 50% owner in conjunction with the Tri-Districts). Northern Water will coordinate the design and construction of the project and will act as the contract administrator and project manager. CITY FINANCIAL IMPACTS The total design and construction cost, including a contingency of $62,500, is $799,500. The City is responsible for one-sixth of the total cost which amounts to $133,250. Existing appropriated Fort Collins Utilities Replacement and/or Minor Capital funds will be used for the City’s portion of the project costs. The rationale for the funding arrangements and processes to share potential cost overruns are described in the agreement. BOARD / COMMISSION RECOMMENDATION At its July 18, 2019, meeting, the Water Board voted unanimously to recommend approval of the agreement. (Attachment 2) PUBLIC OUTREACH No public outreach has been performed at this time. Northern Water, the project sponsor and manager will be performing all public outreach on this project. City staff will work closely with Northern Water staff to inform the public about the proposed improvements. The biggest impact to the public will likely be traffic control around the project site, which will be coordinated directly with the Colorado Department of Transportation. ATTACHMENTS 1. Location map (PDF) 2. Water Board Minutes, July 18, 2019 (draft) (PDF) 3. Background - City Council Munroe IGA, August 2019 (PDF) UMunroe Tunnel Vicinity Maps U U ATTACHMENT 1 Board Member Bruxvoort moved that Water Board recommend the Utilities Executive Director adopt the NCDID, Buckingham/Lincoln Outfall, and Stone Creek Stormwater master plan updates. Board Member Ortman seconded the motion. Discussion on the motion: None Vote on the Motion: It passed unanimously, 8-0  Intergovernmental Agreement with Northern Water for Improvements to the Munroe Canal Inlet Structure (Attachments available upon request) Water Production Manager Mark Kempton shared that the project protects the Munroe Canal Inlet Structure from debris flows and vehicle accidents. The structure is part of the Pleasant Valley (PV) Pipeline system and is owned by Northern Water. North Poudre Irrigation Company operates and maintains it. The City of Fort Collins and the Tri-Districts (East Larimer County Water District, Fort Collins-Loveland Water District, North Weld County Water District) pull water from it through the PV Pipeline. It is located within the High Park Fire burn area. The High Park Fire in June 2012 burned 87,415 acres of the Poudre River Watershed. In July 2013 a storm caused wildfire debris to fill the entire basin intake. To protect the diversion, Northern Water has designed a steel grate, beams headworks cover and a corrugated steel flume cover with an access hatch. The project is scheduled to start in October and work into early spring 2020. Cost estimate is $800,000. As a Tri- District participant of the PV Pipeline, Fort Collins would contribute a sixth of the cost. Discussion Highlights: Board members commented on and inquired about various related topics including whether the flume could be diverted under the tunnel without a huge open pit at the bottom of the drainage (the tunnel contains a large partial flume; a large flume is needed to measure the amount of water that flows through); the life expectancy of the corrugated steel (the bridge-like corrugated steel structures could last 50 plus years or more if maintained well); why concrete wasn’t used instead (concrete is more expensive and would take longer to place); what would occur if the debris flow was heavier than planned (Mr. Kempton assumed they took into account a safety factor for taking on additional load; the structures are designed to take on more than 3 feet of cover and have actual truck loadings and various weights on it). Board Member Brett moved that the Water Board recommend City Council ATTACHMENT 2 DRAFT MINUTES WATER BOARD REGULAR MEETING 07/18/2019 – DRAFT MINUTES Page 5 adopt the resolution authorizing the City Manager to execute an agreement between the City of Fort Collins, the East Larimer County Water District, the Fort Collins-Loveland Water District, the North Weld County Water District, Norther Colorado Water Conservancy District, and North Poudre Irrigation Company regarding improvements to the Monroe Canal Diversion Structure. Board Member Bruxvoort seconded the motion. Discussion on the Motion: None Vote on the Motion: It passed unanimously, 8-0 7. OTHER BUSINESS a. Chairperson Brown and Ms. Connor discussed a scheduling conflict. The August 15 Water Board regular meeting falls on the same day as the City’s employee and volunteer appreciation event, which the Water Board has been invited to. Ms. Connor will check with Northern Water on rescheduling date options. Board Member Ortman asked that Ms. Connor not schedule Northern’s presentation during the October regular meeting, because she will be out of town. The board agreed to cancel the August regular meeting and receive the regular staff reports via email. 8. BOARD MEMBER REPORTS None. 9. ADJOURNMENT 7:30 p.m. Monroe Diversion Structure Project – Fall 2019 Mark Kempton, P.E., Director of Plant Operations August 18, 2019 ATTACHMENT 3 Protect diversion structure from debris flows and vehicle accidents Project Purpose July 2013 Debris Flow November 2018 2 Munroe Canal Facts 12.6-miles Long 250-cfs Capacity Delivers Water to the PleasantValley Pipeline and North Poudre Irrigation Company Located within burn area of High Park Fire (June 2012) Vicinity Map & Canal Facts 3 Vicinity Map North Diversion Structure 4 Project Background 5 High Park Fire Facts Located in Foothills west of Fort Collins Started June 9, 2012 (LightningStrike) Burned for almost 1-month Burned about 87,415-acres (Poudre River Watershed) Aftermath of High Park Fire High Park Fire July 2013 Debris Flow November 2018 Post-Wildfire Debris Flow July 2013 Storm 31-Acre Drainage Basin 31-acre Drainage Basin 6 Cleanup of post-wildfire debris flow July 2013 Debris Flow Cleanup July 2013 Debris Flow Cleanup 7 High Park Fire Cleanup of post-wildfire debris flow High Park Fire July 2013 Debris Flow Cleanup July 2013 Debris Flow Cleanup 8 Canal Flume Canal Headworks Project Purpose Protect diversion structure from debris flows and vehicle accidents November 2018, View Looking East 9 Project Purpose Protect diversion structure from debris flows and vehicle accidents Canal Headworks Canal Flume November 2018, View Looking West 10 Design Criteria North Diversion Structure 11 Improve Debris Flow Protection Improve TrafficProtection Adequate Structural Capacity Preserve Hydraulic Capacity (250-cfs) Preserve Flow Measurement Capabilities Preserve Access forMaintenance Limit Confined Space Challenges Address Construction Constraints (limited space) North Diversion Structure Concept Design Headworks Cover Flume Cover Flow Traffic Protection Measurement 12 Concept Design Headworks Cover 13 Concept Design Headworks Cover Cover ¾ Steel Grate & Beams (galvanized) ¾ Removable to preserve equipment access 14 Concept Design Flume Cover 15 Concept Design Flume Cover Option 2 ArchCover ¾ Concrete or Corrugated Steel ¾ Founded outside flume walls and lower elevation ¾ Doesn’t load existing structure ¾ Minimizes backfill ¾ Provides headroom/clearance inside 16 Concept Design Flume Cover Option 2 17 Concept Design Flume Cover Option 2 20 Project Schedule (Anticipated) 2019 2020 Activity J FMAMJJASONDJFMAMJ Design Bid Construction Canal Outage 19 Cost Estimate: ~$800,000 ($120K Design & $680KConstruction) Funding: Cost SharingAgreement negotiations are in progress with Northern Water (1/3), NPIC (1/3), and Pleasant Valley PipelineParticipants (1/3). 20 Cost Estimate & Funding Strategic Alignment 4.5 - Develop strategies to improve the community’s climate resiliency 4.6 - Provide a reliable, high-quality water supply. 5.5 - Address water, wastewater and stormwater infrastructure needs for the protection of people, property and the environment -1- RESOLUTION 2019-087 OF THE COUNCIL OF THE CITY OF FORT COLLINS AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT FOR FUNDING IMPROVEMENTS TO THE MUNROE CANAL DIVERSION STRUCTURE WHEREAS, the diversion structure for the Munroe Canal, also known as the North Poudre Supply Canal (“Structure”), diverts water from the Cache la Poudre River upstream of the canyon mouth and delivers water to, among other locations, the Pleasant Valley Pipeline for delivery to the City’s Water Treatment Facility; and WHEREAS, various other entities also have interests in the Structure, including: the Northern Colorado Water Conservancy District (“Northern Water”), which owns the Structure; the North Poudre Irrigation Company (“North Poudre”), which operates and maintains the Structure pursuant to agreements with Northern Water; and the East Larimer County Water District, the Fort Collins-Loveland Water District, and the North Weld County Water District (collectively, “Tri-Districts”), which, similar to the City, use the Structure and the Pleasant Valley Pipeline to deliver water to their Soldier Canyon Filter Plant; and WHEREAS, the City, Northern Water, North Poudre, and the Tri-Districts (collectively, “Parties”) have evaluated the Structure and determined that various improvements to it are needed to, among other reasons, prevent debris from flowing into it and to safeguard it from adjacent vehicular traffic; and WHEREAS, such improvements to the Structure will benefit ratepayers of the City’s water utility by, among other reasons, improving the reliance and reliability of the Structure, and reducing the risk of future water supply disruptions and additional costs; and WHEREAS, staff from the Parties have negotiated an agreement for funding such improvements to the Structure, as set for the in draft Agreement attached hereto as Exhibit “A”. NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF FORT COLLINS as follows: Section 1. That the City Council hereby makes and adopts the determinations and findings contained in the recitals set forth above. Section 2. That the City Council hereby authorizes the City Manager to execute an agreement substantially in the form of Exhibit “A”, with such modifications and additional terms and conditions as the City Manager, in consultation with the City Attorney, determines to be necessary and appropriate to protect the interests of the City or effectuate the purposes of this Resolution. -2- Passed and adopted at a regular meeting of the Council of the City of Fort Collins this 20th day of August, A.D. 2019. _________________________________ Mayor ATTEST: _____________________________ City Clerk Page 1 of 10 AGREEMENT FOR FUNDING IMPROVEMENTS TO THE MUNROE CANAL DIVERSION STRUCTURE THIS AGREEMENT ("Agreement") is entered into this _____ day of ____________, 2019 (“Effective Date”) by and among the Northern Colorado Water Conservancy District (“Northern Water”), a quasi-municipal entity and political subdivision of the State of Colorado whose address is 220 Water Avenue, Berthoud, Colorado 80513, the North Poudre Irrigation Company (“NPIC”), a Colorado mutual ditch and reservoir company whose address is 3729 Cleveland Avenue, Wellington, Colorado 80549, the City of Fort Collins (“Fort Collins”), a municipal corporation of the State of Colorado whose address is 300 LaPorte Avenue, Fort Collins, Colorado 80521, the Fort Collins-Loveland Water District, acting by and through the Fort Collins-Loveland Water District Enterprise, the North Weld County Water District, acting by and through the North Weld County Water District Enterprise, and the East Larimer County Water District, acting by and through the East Larimer County Water District Water Activity Enterprise, water activity enterprises of special districts organized under Title 32, Article 1, Colorado Revised Statutes (collectively, the “Tri-Districts”) whose addresses are set forth in Paragraph 15 below. The parties to this Agreement may be referenced individually herein as a “Party” or, collectively, as “the Parties”. RECITALS WHEREAS, the Parties propose to plan, design, and construct improvements to a portion of the Munroe Canal, also known as the North Poudre Supply Canal and Diversion Works, as more specifically depicted on Appendix A attached hereto and incorporated herein by this reference; and WHEREAS, the improvements are necessary for the purpose of upgrading and protecting the Munroe Canal Diversion Structure, open channel, and Parshall flume to prevent debris from flowing into the Munroe Canal Diversion Structure and to safeguard the structure from adjacent vehicular traffic; and WHEREAS, the Munroe Canal Diversion Structure is a water diversion and distribution facility that is owned by Northern Water as part of Northern Water's Colorado-Big Thompson Project, a federal reclamation project, and WHEREAS, the Munroe Canal Diversion Structure is operated and maintained by NPIC pursuant to the Operating Agreement executed on December 9, 1987, and the Amendment to Operating Agreement executed on February 11, 2005; and WHEREAS, the Tri-Districts and Fort Collins are participants in the Pleasant Valley Pipeline, which delivers water from the Cache la Poudre River through the Munroe Canal Diversion Structure and the Munroe Canal for delivery to municipal water suppliers; and WHEREAS, the Parties have agreed to share in the costs necessary for the improvement and protection of these structures; and EXHIBIT A Page 2 of 10 WHEREAS, pursuant to discussions with the Parties, Northern Water has begun developing preliminary designs for the improvements necessary to protect these structures; and WHEREAS, the purpose of this Agreement is to set forth the terms and conditions under which the Parties agree to complete the work required to improve the Munroe Canal Diversion Structure, open channel, and Parshall flume (“Project”), and the allocation of costs necessary for the completion and implementation of the Project. NOW THEREFORE, in consideration of the promises and mutual covenants and agreements set forth herein, the Parties covenant and agree as follows: AGREEMENT 1. Definitions. a. Design Costs. All costs associated with the design, engineering, review, and permitting necessary for the development of the Project. b. Construction Costs. All costs for labor, materials, and equipment required for the construction of the Project incurred by the contractor mutually selected by the Parties. c. Project Management and Construction Administration Costs. All costs associated with construction management services performed by Northern Water and Consultants for contract administration and field inspections necessary during the construction phase of the Project. d. Total Maximum Project Costs. All Design Costs, Construction Costs, and Project Management and Construction Administration Costs necessary for the completion and implementation of the Project, excluding any preliminary planning and design costs incurred by Northern Water prior to the Effective Date of this Agreement. 2. Allocation of Costs. To improve the Munroe Canal Diversion Structure, open channel, and Parshall flume for the mutual benefit of the Parties, Northern Water, NPIC, the Tri-Districts, and Fort Collins agree to share in the Total Maximum Project Costs as set forth below: a. Northern Water has previously incurred conceptual-level preliminary design costs for the Project, which costs shall be borne by Northern Water alone and shall not be deemed part of the “Total Maximum Project Costs.” b. The Design Costs are $128,000. Page 3 of 10 c. The Engineer’s Opinion of Probable Construction Cost, based on the 90% Design Submittal (dated June 27, 2019), is $524,000. d. Project Management and Construction Administration costs are estimated to be $85,000 e. A contingency of $62,500 is recommended for budgeting. f. As of the Effective Date of this Agreement, the estimated Total Maximum Project Cost is not anticipated to exceed a maximum of $799,500. The Parties will share in the Total Maximum Project Costs in the following proportions, subject to the terms of Paragraphs 3 and 4 of this Agreement. i. Northern Water shall be responsible for one-third of the Total Maximum Project Costs, which as of the Effective Date of this Agreement is estimated to total a maximum of $266,500. ii. NPIC shall be responsible for one-third of the Total Maximum Project Costs, which as of the Effective Date of this Agreement is estimated to total a maximum of $266,500. iii. The Tri-Districts, collectively, shall be responsible for one-sixth of the Total Maximum Project Costs, which as of the Effective Date of this Agreement is estimated to total a maximum of $133,250. iv. Fort Collins shall be responsible for one-sixth of the Total Maximum Project Costs, which as of the Effective Date of this Agreement is estimated to total a maximum of $133,250. 3. Construction Bids. Northern Water shall be responsible for soliciting bids for the construction and completion of the Project. After receiving the construction bids, Northern Water shall determine whether the estimated Total Maximum Project Cost stated in paragraph 2.f will be exceeded. If the maximum Total Maximum Project Cost in Paragraph 2.f. is not exceeded, then Northern Water shall select a contractor for the Project and notify the Parties of the anticipated date that construction shall begin. 4. Exceedance of estimated Total Maximum Project Costs. In the event that the construction bids received by Northern Water indicate that the Total Maximum Project Costs may be greater than the amount stated in Paragraph 2.f, Northern Water shall promptly notify all other Parties in writing. Upon receiving such notice, other Parties (the “Withdrawing Parties”) shall have the right to withdraw from participation in the Project by giving written notice to Northern Water within seven (7) days following receipt of such notice. Page 4 of 10 a. In the event that NPIC, Fort Collins, and the Tri-Districts elect to withdraw from the Project as a result of the construction bids exceeding the Total Maximum Project Costs stated in Paragraph 2.f, this Agreement shall terminate, and Northern Water shall not be obligated under this Agreement to complete the Project. b. Any Party that desires to continue with the completion of the Project and does not elect to withdraw from this Agreement in accordance with Paragraph 4.a (“Participating Parties”) shall be contacted by Northern Water prior to Northern Water’s entering into a contract with the selected contractor to discuss their contribution of additional funds for the completion of the Project and, to the extent necessary, the amendment of Paragraph 2.f hereof to reflect the new Total Maximum Project Costs of this Project. By electing to complete the Project, the Participating Parties agree to contribute additional funds such that the construction of the Project is fully funded. 5. Payment of Total Maximum Project Costs. Within thirty (30) days of the date a contract is awarded for the construction of this Project, all Participating Parties shall pay to Northern Water the full amount of their respective Total Maximum Project Costs set forth in Paragraph 2.f, as such amount may be amended in accordance with Paragraph 4.b. In the alternative, upon the consent of Northern Water, which consent shall not be unreasonably withheld, any Party may remit the required payment to Northern Water in two installments of fifty percent (50%) of its share of the Total Maximum Project Costs set forth in Paragraph 2.f, the first installment of which shall be due within thirty (30) days of the award of a contract for this Project’s construction, and the second of which shall be due sixty (60) days thereafter. All funds shall be deposited by Northern Water into an account established for the purpose of funding this Project. If, at the time of completion of the Project, any funds contributed by the Parties remain in the account established pursuant to this Paragraph, Northern Water shall reimburse the Parties in accordance with their proportion of the contributions of the Total Maximum Project Costs. 6. Records of Expenditures. Northern Water shall maintain a record with an itemized breakdown of the expenses incurred in relation to the Project. This record shall include a section entitled “Design Costs,” a section entitled “Construction Costs,” and a section entitled “Total Maximum Project Costs,” which shall document the expenses incurred by Northern Water in the design, construction, and completion of the Project. Northern Water shall submit a copy of this record to the Parties on a monthly basis until the Project is completed, along with a statement of the remaining funds contributed by the Parties. 7. Construction. The Parties hereby mutually agree to the construction of the Project, as shown generally in Appendix A. Northern Water, or its consultants, contractors, agents, or assigns, shall perform all construction activity required to improve the Munroe Canal Diversion Structure as shown on the attached Appendix A. All design, construction, review, testing, and timing of work shall be at Northern Water’s sole discretion, provided that in no event shall such construction Page 5 of 10 result in the inability to obtain water through the Munroe Canal Diversion Structure during the period of October 1, 2020 through November 30, 2020. a. No Liability. In the event construction of the Project results in either NPIC’s inability to deliver water, or a delay in NPIC’s ability to deliver water, through the Munroe Canal Diversion Structure to either Fort Collins or the Tri-Districts under its separate agreements with those parties, such event shall not be a breach of those agreements. Fort Collins and the Tri-Districts hereby agree that neither NPIC nor Northern Water shall be liable for such inability to deliver or any delay in delivery of water to Fort Collins or the Tri-Districts. Fort Collins and the Tri-Districts acknowledge and accept that construction of the Project presents risks to the delivery of water through the Munroe Canal Diversion Structure and further agree that, in the event that water deliveries are delayed or cannot be completed due to the construction of the Project, they shall pursue any claims against the contractor for the Project pursuant to the terms of the construction agreement. 8. Ownership. Northern Water shall retain complete ownership of the Munroe Canal Diversion Structure and any easements associated therewith, including the improvements constructed pursuant to this Agreement. 9. Notice. Northern Water shall notify the Parties in writing fourteen (14) days prior to initiating construction of the Project and fourteen (14) days following the date that the Project has been completed. 10. Appropriations. The respective financial obligations of the Parties under this Agreement that are payable after the current fiscal year are contingent upon funds for that purpose being appropriated, budgeted, and otherwise made available for use. 11. Term of Agreement. The term of this Agreement shall commence on the Effective Date and, except as provided in Paragraph 4 above, shall terminate upon Northern Water’s notice to the Parties, pursuant to Paragraph 8, that the Project has been completed. 12. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event any Party should fail or refuse to perform according to the material terms of this Agreement, such Party may be declared in default thereof by the other Parties by a written notice. 13. Remedies. In the event a Party has been declared in default hereof, such defaulting Party shall be allowed a period of thirty (30) days within which to correct, or commence correcting, said default. In the event that the default has not been corrected or begun to be corrected, or the defaulting Party has ceased to pursue the correction with due diligence, the non-defaulting Parties may seek damages and avail themselves of any other remedy at law or equity. Page 6 of 10 14. Laws, Regulations and Permits. Each Party shall comply with all applicable federal, state and local codes, statutes, rules, regulations, ordinances, permits and orders in its operations under this Agreement. 15. Assignment. Neither this Agreement nor any Party's rights, obligations, duties or authority hereunder may be assigned in whole or in part without the prior written consent of the other Parties. 16. Notice. All notices or invoices required to be given under this Agreement shall be made in writing, and shall be deemed to have been given (a) when delivered personally to the other Party to whom addressed; or (b) upon receipt when sent by United States mail, postage prepaid, as certified or registered mail, properly addressed as follows; or (c) upon confirmation when sent by email and receipt is confirmed by return email. a. If to Northern Water, to: Northern Colorado Water Conservancy District Attn: Amy Johnson 220 Water Ave. Berthoud, CO 80513 Facsimile: 877-851-0015 Email: ajohnson@northernwater.org With a copy to: Trout Raley Peggy E. Montano, Esq. Lisa M. Thompson, Esq. 1120 Lincoln St., Ste. 1600 Denver, CO 80203 Facsimile: 303-832-4465 Email: pmontano@troutlaw.com lthompson@troutlaw.com b. If to North Poudre Irrigation Company, to: North Poudre Irrigation Company Attn: Loren Maxey, President 3729 Cleveland Ave. Wellington, CO 80549 Email: info@npicwater.com Page 7 of 10 With a copy to: Hoskin Farina & Kampf P.C. Attn: John P. Justus Post Office Box 40 Grand Junction, Colorado 81502 Email: jjustus@hfak.com c. If to the Tri-Districts, to: Fort Collins-Loveland Water District Attn: District Manager 5150 Snead Drive Fort Collins, CO 80525 Email: chrism@fclwd.com With a copy to: Collins Cockrel & Cole, P.C. Attn: Robert G. Cole 390 Union Boulevard, Ste. 400 Denver, CO 80228-1556 Email: rcole@cccfirm.com AND North Weld County Water District Attn: District Manager 32825 CR 39 P.O. Box 56 Lucerne, CO 80646 Email: water@nwcwd.org With a copy to: Hasler, Fonfara and Goddard LLP Attn: Joseph H. Fonfara 125 S. Howes Street, 6th Floor (Zip Code: 80521) P.O. Box 2267 Fort Collins, CO 80522 Email: JoeF@HFGLawfirm.com AND East Larimer County Water District Attn: District Manager 232 S. Link Lane (Zip Code: 80524) P.O. Box 2044 Fort Collins, CO 80522 Email: mikes@elcowater.org Page 8 of 10 With a copy to: Hasler, Fonfara and Goddard LLP Attn: Joseph H. Fonfara 125 S. Howes Street, 6th Floor (Zip Code: 80521) P.O. Box 2267 Fort Collins, CO 80522 Email: JoeF@HFGLawfirm.com d. If to City of Fort Collins, to: City of Fort Collins Attn: Mark Kempton, PE, CWP Director of Plant Operations 4316 LaPorte Avenue Fort Collins, CO 80521 Email: mkempton@fcgov.com With a copy to: Fort Collins City Attorney’s Office Attn: Eric Potyondy 300 LaPorte Avenue Fort Collins, CO 80521 Email: epotyondy@fcgov.com or to such other persons or addresses as the foregoing addressees may have designated by written notice. 17. Other Agreements. Except as specifically addressed herein with respect to the Project as it relates to the maintenance, repair, and replacement of the North Poudre Supply Canal and Diversion Works, the Parties other agreements, regarding the operation and maintenance of the North Poudre Supply Canal and Diversion Works are not modified or otherwise amended by this agreement. 18. Entire Agreement. This Agreement and the attached Appendices constitutes the entire agreement among the Parties regarding the construction project described herein and may be modified only by an instrument in writing executed by all Parties hereto. 19. Governing Law. This Agreement shall be interpreted in accordance with, and be governed by, the law of the State of Colorado. Page 9 of 10 20. Governmental Immunity. Nothing in this Agreement shall constitute a waiver, in whole or in part, of the governmental immunities, rights, or protections provided to any Party by the Colorado Governmental Immunity Act, C.R.S. §§ 24-10-101 to -120, or any successor or similar statutes of the State of Colorado. 21. Force Majeure. If any Party is prevented or restricted from carrying out all or any of its obligations resulting from this Agreement from any cause beyond the reasonable control of that Party including, without limiting the generality of the foregoing, floods, fire, war, civil war, civil violence, riots, insurrection, acts of sabotage, acts of God, explosions, then the Party so affected shall be relieved of such obligations hereunder during the period that such event and its consequences continue plus a reasonable time following the conclusion of the event in order to resume carrying out the obligations, and shall be under no liability for any delay or failure in the performance of such obligations. 22. Severability. If any provision of this Agreement shall be held invalid or unenforceable, the remainder of this Agreement shall not be affected thereby, and there shall be deemed substituted for the affected provision a valid and enforceable provision as similar as possible to the affected provision 23. Counterparts. This Agreement may be executed in one or more counterparts, each of which when so executed shall be deemed an original, and such counter parts together shall constitute one and the same instrument. 24. Headings for Convenience. The headings and captions in this Agreement are for convenience only and shall not be considered in interpreting the provisions hereof. IN WITNESS WHEREOF, the Parties have executed this Agreement as of the day and year first above written. NORTHERN COLORADO WATER CONSERVANCY DISTRICT By: ________________________________________ Title: _______________________________________ NORTH POUDRE IRRIGATION COMPANY By: ________________________________ Title: _______________________________ Page 10 of 10 CITY OF FORT COLLINS Approved as to Form: By: ________________________________ By: ________________________________ Eric Potyondy Title: _______________________________ Assistant City Attorney FORT COLLINS-LOVELAND WATER DISTRICT, acting by and through the Fort Collins- Loveland Water District Enterprise By: ________________________________ Title: _______________________________ NORTH WELD COUNTY WATER DISTRICT, acting by and through the North Weld County Water District Enterprise By: ________________________________ Title: _______________________________ EAST LARIMER COUNTY WATER DISTRICT, acting by and through the East Larimer County Water District Water Activity Enterprise By: ________________________________ Title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now what's 5 ,1'(;2)'5$:,1*6 G-1 &29(56+((7 G-2 GENERAL NOTES C-1 OVERALL SITE PLAN C-2 HEADWORKS PLAN C-3 FLUME DEMO PLAN C-4 FLUME GRADING PLAN C-5 FLUME COVER PLAN C-6 FLUME COVER PROFILE C-7 FLUME STRUCTURE SECTIONS C-8 FLUME STRUCTURE SECTIONS C-9 FLUME COVER DETAILS C-10 FLUME COVER DETAILS C-11 INSTRUMENTATION BUILDING C-12 HEADWORKS COVER ELEVATIONS C-13 HEADWORKS DETAILS S-1 INSTRUMENTATION BUILDING FOUNDATION GENERAL NOTES S-2 INSTRUMENTATION BUILDING FOUNDATION GENERAL NOTES AND ABBREVIATIONS S-3 INSTRUMENTATION BUILDING FOUNDATION PLAN AND DETAILS E-1 ELECTRICAL SITE PLAN E-2 ELECTRICAL POWER AND LIGHTING PLANS SHEET TITLE DATE DATE CHECKED BY DESIGNED BY SHEET DRAWN BY PROJECT REVISION OWNER CLIENT PROJECT NO.: LOCATION: 90% SUBMITTAL 6/12/19 PROGRESS SUBMITTAL 6/03/19 30% SUBMITTAL 5/19/19 ISSUED FOR BID 7/02/19 COVER SHEET JRC ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS ASSM ASSEMBLY BK BACK BNDY BOUNDARY BOP BOTTOM OF PIPE BOV BLOW OFF VALVE BFV BUTTERFLY VALVE BOW BOTTOM OF WALL CATV CABLE TELEVISION CB CATCH BASIN CBC CONCRETE BOX CULVERT CDOT COLORADO DEPARTMENT OF TRANSPORTATION CFS CUBIC FEET PER SECOND CL CENTER LINE CLR CLEAR CMP CORRUGATED METAL PIPE C.O. CLEAN OUT CONC CONCRETE CSP CORRUGATED STEEL PIPE CY CUBIC YARD DE DRAINAGE EASEMENT DIA DIAMETER Ø DIAMETER DIP DUCTILE IRON PIPE E EAST EA EACH EF EXHAUST FAN EGL ENERGY GRADE LINE EL ELEVATION ELEC ELECTRIC EOA EDGE OF ASPHALT ESMT EASEMENT EST ESTIMATE EX EXISTING FES FLARED END SECTION FG FINISHED GRADE FL FLOWLINE GB GRADE BREAK GL GAS LINE GPS GLOBAL POSITIONING SYSTEM GV GATE VALVE HCL HORIZONTAL CONTROL LINE HDPE HIGH DENSITY POLYETHYLENE HGL HYDRAULIC GRADE LINE HP HIGH POINT IINLET IE IRRIGATION EASEMENT INV INVERT LP LOW POINT LS LUMP SUM LT LEFT MAX MAXIMUM MIN MINIMUM NNORTH OHE OVERHEAD ELECTRIC OHU OVERHEAD UTILITY PC POINT OF CURVATURE / PHOTOCELL PE PROFESSIONAL ENGINEER PGL PROPOSED GRADE LINE *$7( +($':25.6 +($':25.63/$1& &29(5'(7$,/& ,167580(17$7,21%8,/',1* 6((& )/80($5($72%( &29(5('6((& )25)/80('(026((& )/80(*5$',1*6((& *$7( ',9(56,21*$7( *$7( SHEET TITLE DATE DATE CHECKED BY DESIGNED BY SHEET DRAWN BY PROJECT REVISION OWNER CLIENT PROJECT NO.: LOCATION: 90% SUBMITTAL 6/12/19 PROGRESS SUBMITTAL 6/03/19 30% SUBMITTAL 5/19/19 ISSUED FOR BID 7/02/19 OVERALL SITE PLAN JRC JE LJV 06/2019 %Ä MUNROE CANAL DIVERSION STRUCTURE IMPROVEMENTS 65420199 LARIMER COUNTY, CO 1 29(5$//6,7(3/$1  *$7( *8<:,5( (;,67,1* &+$,1/,1.)(1&( 6((127( +$1'5$,/ 6((127( (/(&75,&$/ %8,/',1* *(1(5$725 %8,/',1* +($':25.6(1/$5*('3/$1 6((':*& (;,67,1* /,*+732/( 7<3 ('*(2) $63+$/7 (;,67,1* 6,*1 (;,67,1* 5$,/,1*$1' &+$,1/,1.)(1&( *8$5'5$,/ 127( 3+272$ 3+272% (;,67,1*&21',7,216 6((3+2726$$1'% $3352;,0$7( &'2752: *$7( )/2: 127( 6$:&87&21&5(7()25 %($032&.(76 6((':*& 7<32) 127(6  &2175$&725723527(&7+$1'5$,/$1'6(&85($5($:+,/(:25.,1*  *8<:,5(29(5+($'&225',1$7(:,7+328'5(9$//(<5($  &2175$&725726(&85($5($)25'85$7,212)352-(&7 (;,67,1**$7(6$1'(/(&75,&$/72%(3527(&7(',13/$&( SHEET TITLE DATE DATE CHECKED BY DESIGNED BY SHEET DRAWN BY PROJECT REVISION OWNER CLIENT PROJECT NO.: LOCATION: 90% SUBMITTAL 6/12/19 PROGRESS SUBMITTAL 6/03/19 30% SUBMITTAL 5/19/19 ISSUED FOR BID 7/02/19 HEADWORKS PLAN JRC JE APPROXIMATE EDGE OF CDOT ROW PAVEMENT EXISTING GUARDRAIL TO REMAIN PROTECT IN PLACE TELECOM BURIED AND EXPOSED, PROTECT IN PLACE CONTRACTOR MAY REMOVE CONCRETE BLOCKS AND SOIL DIVERSION BERM AS NECESSARY FOR ACCESS TO THE WORK. BLOCKS AND BERM TO BE REPLACED AND RESTORED TO EXISTING CONDITIONS WHEN COMPLETE ROCK STACK TO BE SALVAGED. COORDINATION WITH OWNER REQUIRED, SEE NOTE 1 OWNER TO DISCONNECT AND REMOVE EXISTING INSTRUMENTATION IN TIN WHISTLE REMOVE ROCK STACK WALLS AND CONCRETE WALLS EDGE OF ASPHALT REMOVE EXISTING ROCK STEPS SEE NOTE 1 EXISTING UTILITY BOX GEOTECH BOREHOLE *$7( EXISTING FENCE SEE NOTE 2 REMOVE MANHOLE RING REMOVE AND REUSE 228 L.F. OF EXISTING CHAIN LINK FENCE AND 3 STRAND BARBED WIRE, SEE NOTE 3 REMOVE AND REUSE EXISTING DOUBLE-SWING GATE AND 3 STRAND BARBED WIRE. SEE NOTE 3 REMOVE EXISTING TIN WHISTLES AND MANHOLE RING 127(6  52&.67(3652&.67$&.:$//$1'&21&5(7(67$&.%/2&.6 )520:$//72%(5(029('$1'672&.3,/('211257+6,'(2) &2175$&72567$*,1*$5($&2175$&7256+$//&225',1$7( 5(029$/2)672&.3,/(0$7(5,$/:,7+1257+(51:$7(5$1' 1257+328'5(,55,*$7,21&203$1< &2175$&725726(&85($5($)25'85$7,212)352-(&7 (;,67,1*'28%/(6:,1**$7(&+$,1/,1.)(1&($1'675$1' %$5%:,5(6+$//%(5(029('$1'5(86('6((6+((7& SHEET TITLE DATE DATE CHECKED BY ,167580(17$7,21 %8,/',1* 6((':*& (;,67,1* &+$,1/,1. )(1&( 7(/(&20 %25(+2/( *5$9(/ 67$,5:$<$&&(66 6((& )8785(/3*$67$1.$1'3$' 127,1&2175$&7 (;,67,1* 7(/(3+21( 87,/,7<3527(&7 ,13/$&( $3352;,0$7( &'27 52: 4.0% 4.4% 1.2% 5.6% 22.4% 8.3% 3.9% 10.7% 8.4% 6.5% 2.9% 4.9% 1.2% 10.7% 1.1% 13.4% 4.9% 5.5% 4.1% 1.4% 5(029($1'5(86( &+$,1/,1.)(1&( *$7( (;7(1762))/80( &29(5 %(/2: *5$'(  :$/.*$7(  '28%/(*$7( 6((127( 6((127( *5$'(6:$/(72 '5$,11257+,172 67$*,1*$5($ 127(6  3529,'(1(:&21),*85$7,216)25&+$,1/,1.)(1&(87,/,=((;,67,1* 5(029(')(1&($608&+$63266,%/(  &+$,1/,1.)(1&($1'*$7(672%(,1$&&25'$1&(:,7+&'2767$1'$5'6 3/$11203/86675$1'%$5%(':,5()(1&(72%( S1 C-7 S4 C-8 E1 C-6 D7 C-10 6+00 6+10 6+20 6+30 6+50 D3 C-9 S2 C-7 S3 C-8 EXISTING PARSHALL FLUME COVER FOUNDATION COVER APPROX. CONCRETE WALL EXTENTS TELECOMMUNICATION UTILITY EXISTING STILLING WELLS APPROX. APPROX. ROCK WALL EXTENTS CDOT GUARDRAIL PROTECT IN PLACE CONCRETE ACCESS STAIRWELL (NOTE 4) ACCESS BRIDGE ACCESS WALKWAY (RECYCLED ASPHALT) ACCESS WALKWAY RECYCLED ASPHALT EXISTING FENCE LINE (REMOVE AND REUSE) NOTE 6 APPROX. CDOT ROW 6+00 6+10 6+20 6+30 6+40 6+50 6+60 INSTRUMENTATION BUILDING APPROX. (C-11) APPROX. ROCK WALL EXTENTS CO HIGHWAY 14 POUDRE CANYON ROAD 2" Ø PVC CASING FOR FUEL LINE CONCRETE WALL NOTE 8 NOTE 8 EXISTING GUARDRAIL FLOW 6+70 APPROX. FENCE LINE EXTENTS, SHEET C-4 26'-3" APPROX. NOTES: 1. THE COVER FOUNDATION SHALL EXTEND THROUGH EXISTING BACKFILL MATERIAL AND BEAR ON COMPETENT BEDROCK. SPECIFIC BEDROCK ELEVATIONS ARE UNKNOWN. BEDROCK FOUNDATION ELEVATIONS SHOWN ARE APPROXIMATE. SEE COVER SECTION DRAWINGS FOR APPROXIMATE MAXIMUM FOUNDATION DEPTHS. 2. THE CONCRETE ACCESS STAIRWELL SHALL HAVE ONE HANDRAIL INSTALLED ACCORDING TO OSHA REGULATIONS. THE CONTRACTOR SHALL DETERMINE THE SIDE OF THE ACCESS STAIRWELL THAT THE HANDRAIL IS PLACED. S4 C-8 BULKHEAD 6+10 6+30 6+40 6+50 5430 6+00 5420 6+20 5450 5450 5420 5440 5440 5430 6+60 BULKHEAD CONCRETE ACCESS STAIRWELL (BEYOND) D2 C-9 D2 C-9 EXISTING GUARDRAIL PROTECT IN PLACE WEST EAST 5+85 5+90 6+70 EXISTING FENCE NOTE 6, C-5 EXISTING TELECOMMUNICATION UTILITY APPROX. CDOT GUARDRAIL PRE-ENGINEERED STAIRS (AS SPECIFIED) 32.0°± EXISTING CONCRETE BLOCKS (2'X2'X6' APPROX.) CUT AND REMOVE EXISTING GUARDRAIL LOCALLY (NOTE 8, C-5) ZONE B BACKFILL ZONE A BACKFILL S2 C-7 S1 C-7 S3 C-8 D6 C-10 D8 C-10 D9 -20 -10 0 10 20 5420 5430 5440 5448 5420 5430 5440 5448 ZONE A MINIMUM BACKFILL EXTENTS NOTE 3 MAXIMUM STILLING WELL STRUCTURE EXTENTS MAXIMUM FLUME STRUCTURE EXTENT EXISTING GROUND SURFACE (APPROX.) SOUTH NORTH PROPOSED FLUME BRIDGE BEYOND (NOTE 6) FINAL GRADE 0'-6" APPROX. -30 30 FLUME COVER STRUCTURE 6'-8" 6'-8" MIN. MIN. 2'-3" MIN. (NOTE 1) 3'-9" APPROX. CONCRETE ACCESS STAIRWELL ACCESS HATCH STEEL PLATE BULKHEAD (BEHIND) SEE DETAIL ON C-9 ACCESS ADIT (NOTE 8) CIP OR PRECAST CONCRETE STAIRWELL FOUNDATION (SEE DETAIL D10, SHEET C-9) ELEVATION (FEET) ELEVATION (FEET) ELEV.: 5433.63 PREFABRICATED ALUMINUM STAIRS MINIMUM INTERNAL CLEARANCE ENVELOPE (TYP.) 6'-8" MIN. ANTICIPATED EXISTING BEDROCK SURFACE ANTICIPATED EXISTING BEDROCK SURFACE ZONE B BACKFILL 1'-0" MIN. ELEV. MIN: 5430.1 2'-0" MIN. ZONE A MINIMUM BACKFILL EXTENTS NOTE 3 MAXIMUM STILLING WELL STRUCTURE EXTENT 1'-0" MIN. 8" APPROX. 1'-3" APPROX. D1 0'-6" MIN. C-9 -20 -10 01020 5425 5430 5440 5450 5425 5430 5440 5450 30 SOUTH NORTH -30 SEE NOTE 5 ELEV. MIN.: 5428.6 BULKHEAD (BEYOND) SEE DETAIL 2 ON C-9 ANTICIPATED EXISTING BEDROCK SURFACE ANTICIPATED EXISTING BEDROCK SURFACE ELEV. MIN: 5430.1 ELEVATION (FEET) ELEVATION (FEET) RECLAIMED ASPHALT PAVEMENT (RAP) 0'-6" APPROX. FLUME COVER STRUCTURE EXISTING CULVERT HEADWALL EXISTING CONCRETE BLOCKS (2'X2'X6' APPROX.) ZONE A MINIMUM BACKFILL EXTENT (NOTE 3) FLUME COVER FOUNDATION (NOTE 5, SEE D1, SHEET C-9) EXISTING DOUBLE BOX CULVERT EXISTING GROUND SURFACE (APPROX.) 2'-3" MIN. (NOTE 1) FINAL GRADE ZONE B BACKFILL -20 -10 01020 5425 5430 #6 GRADE 60 REBAR COVER CONNECTION POCKET COVER CONCRETE FOUNDATION CONCRETE (NOTE 2) BEARING ON BEDROCK COVER FOUNDATION SECTION SCALE: 1" = 0.5' S1 -- 8" MIN. 3" MIN. 3" MIN. SOIL/FLOWFILL BACKFILL MATERIAL PER SPECIFICATION S2 -- COVER BULKHEAD DETAIL SCALE: 1" = 0.5' D2 -- L6x6x5 8 BRACKET 5 8" THICK GALVANIZED STEEL PLATE BULKHEAD COVER 1 STEEL PLATE TO 4 COVER CONNECTION 2'-6" MIN. S1 -- COVER FOUNDATION DETAIL SCALE: 1" = 0.5' D1 -- 6" MAX. 6" MIN. 3'-0" MIN. 3" MIN. 4" MIN. 10" MIN. 4,000 PSI GROUT COVER 4,000 PSI CONCRETE COVER CONNECTION POCKET 3" MAX. #6 GRADE 60 REBAR 9" MIN. #6 GRADE 60 REBAR U @ 8" O.C. L6x6x5 8 S1 -- 2" MIN. (TYP.) 2" MIN. (TYP.) STILLING WELL GRATE COVER DETAIL SCALE: 1" = 1' D7 -- ALUMINUM L2x2x3 8 BRACKET REMOVABLE 19A S4 ALUMINUM GRATING 1 1 2 " x 1 8" BEARING BAR 1 3 16" BAR SPACING 2" MIN. (TYP.) 2" MIN. (TYP.) OPENING IN GRATE FOR INSTRUMENTATION AND VENT PIPES PER C-11 REMOVE STILLING WELL COVER 2" MIN. (TYP.) 1 1 2" MIN. (TYP.) 3 8" MIN. (TYP.) 2x2x3 8 L BRACKET CONCRETE ANCHORS COUNTERSUNK @ 1'-0" O.C. REMOVABLE ALUMINUM GRATING STILLING WELL GRATE COVER SECTION SCALE: 1" = 0.5" S1 -- STILLING WELL STRUCTURE 2" MIN. (TYP.) 2" MIN. (TYP.) ACCESS ADIT AND FLUME COVER OPENING SUPPORT SCALE: 1" = 1' D6 -- FLUME COVER OPENING SUPPORT (DESIGNED BY MANUFACTURE) 4'-0" MIN. FLUME COVER OPENING SUPPORT   39&&$55,(53,3( )25/(9(/ ,167580(177<3 6((127(6$1' )/$1*(' &211(&7,216)25 39&$7)/2256(( 6(&7,21% *$ ; '225   (;,67,1*67,//,1* :(//%(/2:$7 )/80((/(9$7,21 12786(' (;,67,1*67,//,1* :(//%(/2:$7 )/80((/(9$7,21    3/(;,*/$666+(/) 6,=('$61(('(')25 /(9(/,167580(17$7,21 ,167$//$7,21  ‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡ -20 -10 0 10 20 30 (;,67,1*72& ‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡ (/(&75,&$/ &21'8,76((':*( )25'(7$,/6(( (1/$5*('6(&7,21 6(((1/$5*(' 6(&7,21)25 3,3('(7$,/ 7(50,1$7(39& &$55,(53,3(6$1' 78%,1* $%29( *5$',1* 7<3 (;,67,1*)/80( (;,67,1* 67,//,1*:(// &225',1$7(3(1(75$7,216$1' &211(&7,216:,7+)/80(&29(5 0$18)$&785(5&$55,(53,3($1'78%,1* 72%()$67(1('$1'6833257('72 )281'$7,21,1,167580(17$7,21%8,/',1* 3529,'(*$6.(7$5281'3(1(75$7,216$7 )/80(&29(5 7+$1'/(9$/9( :5(1&+  $%29(*5$7,1*21 19'-0" APPROX. 17'-0" APPROX. 1'-0" APPROX. 16'-0" APPROX. 1'-0" APPROX. D10 REMOVABLE 15W4 GALVANIZED STEEL GRATING C-13 REMOVABLE GALVANIZED STEEL W10X45 BEAM (TYP.) CONCRETE BEAM POCKET WITH GALVANIZED STEEL PLATE LINING (NOTE 1) EXISTING RAILING PROTECT IN PLACE 14'-0" APPROX. 6'-0" TYP. 4'-8" TYP. 4'-8" TYP. 4'-8" TYP. D12 C-13 REMOVABLE 15W4 GALVANIZED STEEL GRATING REMOVABLE GALVANIZED STEEL W10X45 BEAM (TYP.) RADIAL GATE EXISTING RAILING PROTECT IN PLACE HEADWORKS ELEVATION 1 SCALE: 1" = 2.5' E1 -- E2 -- HEADWORKS ELEVATION 2 SCALE: 1" = 2.5' E1 -- E2 -- D11 C-13 D13 C-13 0'-3" MIN. 4'-8" MAX. 4'-8" MAX. 4'-8" MAX. 0'-3" MIN. REMOVABLE GALVANIZED STEEL GRATING (NOTES 3 AND 4) REMOVABLE GALVANIZED STEEL BEAM (TYP.) BEAM POCKET EXISTING RAILING PROTECT IN PLACE EXISTING CONDUIT PROTECT IN PLACE GRATE NOTCH (NOTE 5) GRATE NOTCH (NOTE 5) HEADWORKS PLAN SCALE: 1" = 2.5' P1 -- BEAM POCKET DETAIL SCALE: 1" = 3" D10 -- 2" MIN. (TYP.) 15W4 GALVANIZED STEEL GRATING 2" x 3 8" BEARING BAR 15 16" BAR SPACING W10X45 GALVANIZED STEEL BEAM 1'-0" MIN. S1 -- 6" MIN. 6" MIN. 1'-0" MIN. 1 STEEL PLATE 4 CONNECTION 0.5-INCH THICK GALVANIZED STEEL PLATE (NOTE 3) EXISTING GROUND ASPHALTIC COATING GRATE D-RING CONNECTION SCALE: 1" = 1" D13 -- 15W4 GRATING 1 4 D-RING TO STEEL PLATE CONNECTION 1 4 STEEL PLATE TO GRATING CONNECTION D-RING 0.25-INCH THICK STEEL PLATE 1 4 STEEL PLATE TO GRATING CONNECTION 2" MIN. HEADWORKS CONDUIT PROTECTION DETAIL SCALE: 1" = 2" D11 -- S2 -- SHEET TITLE DATE REVISION DATE CHECKED BY DESIGNED BY SHEET DRAWN BY PROJECT REVISION OWNER CLIENT PROJECT NO.: LOCATION: ISSUED FOR BID 7/2/2019 INSTRUMENTATION BUILDING FOUNDATION GENERAL NOTES ADG DJC PIF 6/27/19 5Ä MUNROE CANAL DIVERSION STRUCTURE IMPROVEMENTS 65420199 LARIMER COUNTY, CO MERRICKR :7+$9(18(68,7(%'(19(5&2  ZZZPHUULFNFRP (QJLQHHULQJ_$UFKLWHFWXUH_'HVLJQ%XLOG_6XUYH\LQJ_3ODQQLQJ_*HRVSDWLDO6ROXWLRQV 30% 7/2/2019 SHEET TITLE DATE REVISION DATE CHECKED BY DESIGNED BY SHEET DRAWN BY PROJECT REVISION OWNER CLIENT PROJECT NO.: LOCATION: INSTRUMENTATION ISSUED FOR BID 7/2/2019 BUILDING FOUNDATION GENERAL NOTES AND ABBREVIATIONS ADG DJC PIF 6/27/19 5Ä MUNROE CANAL DIVERSION STRUCTURE IMPROVEMENTS 65420199 LARIMER COUNTY, CO MERRICKR :7+$9(18(68,7(%'(19(5&2  ZZZPHUULFNFRP (QJLQHHULQJ_$UFKLWHFWXUH_'HVLJQ%XLOG_6XUYH\LQJ_3ODQQLQJ_*HRVSDWLDO6ROXWLRQV 30% 7/2/2019 SHEET TITLE DATE REVISION DATE CHECKED BY DESIGNED BY SHEET DRAWN BY PROJECT REVISION OWNER CLIENT PROJECT NO.: LOCATION: ISSUED FOR BID 7/2/2019 INSTRUMENTATION BUILDING FOUNDATION PLAN AND DETAILS ADG DJC PIF 6/27/19 5Ä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Ä MUNROE CANAL DIVERSION STRUCTURE IMPROVEMENTS 65420199 LARIMER COUNTY, CO 1 )/80(32:(5$1'/,*+7,1*3/$1 6&$/(  ,167580(17$7,21%8,/',1*32:(5$1'/,*+7,1*3/$1 (1/$5*('  1  $//&21'8,772%( ,167$//(',1%2; &21'8,781'(552$' 6,0,/$572(;,67,1* 67$,5$&&(66 +$7&+ 127(6  1257+(51:$7(572',6&211(&7(;,67,1*,167580(17$7,21,167,//,1*:( $1'5(029(7+(15(,167$//%27+/(9(/,1',&$7256  &,167580(17$7,21$1'&21752/*$6021,7256/(9(/021,725 63$5(  $//)$67(1(56$1'6833257672%(&25526,215(6,67$17$1'68,7$%/( )25:(7(19,5210(17 SHEET TITLE DATE DATE CHECKED BY DESIGNED BY SHEET DRAWN BY PROJECT REVISION OWNER CLIENT PROJECT NO.: LOCATION: 90% SUBMITTAL 6/12/19 PROGRESS SUBMITTAL 6/03/19 30% SUBMITTAL 5/19/19 ISSUED FOR BID 7/02/19 ELECTRICAL SITE PLAN JRC JE LJV 06/2019 'Ä MUNROE CANAL DIVERSION STRUCTURE IMPROVEMENTS 65420199 LARIMER COUNTY, CO (/(&75,&$/6,7(3/$1 1    3" MIN. TOP OF EXISTING HEADWORKS STRUCTURE L6X6X1 2 BRACKET CONCRETE ANCHOR CONDUITS PROTECT IN PLACE 1'-0" MIN. BEAM POCKET SECTION SCALE: 1" = 3" S1 -- 6" MIN. 1 STEEL PLATE 4 CONNECTION EXISTING HEADWORKS STRUCTURE SAW CUT BEAM POCKET INTO EXISTING FLUME WALL CONCRETE 6" 1'-0" MIN. MIN. HEADWORKS CONDUIT PROTECTION SECTION SCALE: 1" = 2" S2 -- TOP OF EXISTING HEADWORKS STRUCTURE NOTES: 1. ALL METALS PRESENTED ON THIS SHEET SHALL HAVE A MINIMUM YIELD STRENGTH OF 36 KSI UNLESS OTHERWISE SPECIFIED IN THE PROJECT SPECIFICATIONS AND BE GALVANIZED STEEL. 2. BEAM POCKET CONCRETE ANCHORS SHALL BE COUNTERSUNK AND EXTEND A MINIMUM OF 2-INCHES BELOW THE BASE OF THE STEEL PLATE. 3. WELD CONNECTIONS BETWEEN THE STEEL PLATES OF THE BEAM POCKET SHALL BE COATED IN THE FIELD WITH AN ASPHALTIC COATING TO PROVIDE CORROSION RESISTANCE. 4. EACH PANEL OF STEEL GRATING OVER THE HEADWORKS STRUCTURE SHALL HAVE A MINIMUM OF 4 D-RINGS THAT ARE WELDED TO THE GRATING. EACH D-RING SHALL BE RATED TO A MINIMUM OF 1000 POUNDS. SEE SHEET C-12 FOR D-RING PLACEMENT. 3" MAX. 6" MIN. HEADWORKS GRATE NOTCH DETAIL SCALE: 1" = 2" D12 -- 2" MIN. (TYP.) 3" MIN. L3X3X3 8 BRACKET 3 8" Ø MIN. CONCRETE ANCHOR SPACED 48-INCHES ON CENTER EXISTING HEADWORKS STRUCTURE 15W4 GRATING FORT COLLINS, COLORADO 80526 2625 REDWING ROAD, SUITE 160 970.373.3195 SHEET TITLE DATE REVISION DATE CHECKED BY DESIGNED BY SHEET DRAWN BY PROJECT REVISION OWNER CLIENT PROJECT NO.: LOCATION: HEADWORKS DETAILS DF LH RD 07/01/19 %Ä MUNROE DIVERSION STRUCTURE IMPROVEMENTS 18104 LARIMER COUNTY, CO 30% REVISION 05/02/19 60% PROGRESS SET 06/04/19 90% PROGRESS SET 06/12/19 NOTES: 1. SAW CUT BEAM POCKET INTO TOP OF EXISTING CONCRETE WALL SEE DETAIL 10, SHEET C-13, AND INSERT GALVANIZED STEEL PLATE LINING. 2. REMOVABLE BEAMS SHALL BE GALVANIZED STEEL W10X45 SECTIONS WITH A MINIMUM YIELD STRENGTH OF 50 KSI. 3. REMOVABLE GALVANIZED STEEL GRATING SHALL BE A SIZE 15W4 WITH A MINIMUM YIELD STRENGTH OF 36 KSI. REMOVABLE STEEL GRATING HAS A LOADING RATING OF 100 PSF. 4. THE REMOVABLE GRATING SHALL BE DIVIDED INTO THREE SEPARATE PANELS ALONG THE LONGEST DIMENSION OF THE HEADWORKS OPENING WITH WIDTHS SPECIFIED HEREIN. 5. THE PICK WEIGHT OF THE REMOVABLE STEEL GRATING AND STEEL BEAMS ARE APPROXIMATELY 1550 LBS. AND 850 LBS. 6. SAW CUT NOTCH FOR GRATE INTO TOP OF EXISTING CONCRETE WALL AND INSTALL SEATING BRACKET ALONG FULL LENGTH OF GRATE (SEE DETAIL 10, C-13). FORT COLLINS, COLORADO 80526 2625 REDWING ROAD, SUITE 160 970.373.3195 SHEET TITLE DATE REVISION DATE CHECKED BY DESIGNED BY SHEET DRAWN BY PROJECT REVISION OWNER CLIENT PROJECT NO.: LOCATION: HEADWORKS COVER ELEVATIONS DF LH RD 07/01/19 %Ä MUNROE DIVERSION STRUCTURE IMPROVEMENTS 18104 LARIMER COUNTY, CO 0 SCALE 1" = 2.5' 2.5 5 30% REVISION 05/02/19 60% PROGRESS SET 06/04/19 90% PROGRESS SET 06/12/19 67,//,1*:(// 7)/80(&29(5 0$,17$,1 %$&.),// &29(5)520)/80(&29(5 72%8,/',1*)281'$7,21     6/$%522) 87,/,7<%8,/',1* 0(7$/'225 ;  *$7(9$/9(6 %5$66   (0%('$1&+2572 6/$% 7<3 (;7(1')/86+5,6(56 7+528*+6+(/) 352-(&75,6(56$%29(6+(/) 7(50,1$7(:,7+1370(1'6)851,6+ &$3:,7+31(80$7,&48,&. &283/,1* 7<3   3/(;,*/$66+(/)02817 726,'(62)%8,/',1*     ‡‡ ‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡ 522)6/23( )) 6((6758&785$/':*6)25 )281'$7,21 &233(5)/86+5,6(56 *$/967((/3,3( & ‡ ‡‡‡ ‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡‡ /(9(/ ,167580(17$7,21 6((127(  ; $/80,180/289(5   ;6467/78%,1* 7<3 6((127( )/$1*(' &211(&7,2172 )/225 &25('5,//(;,67,1*)/80( 7267,//,1*:(//:,7+ 67((/3,3()/$1*(,17(5,25 2)67,//,1*:(//:$//72 3529,'()/86+,1*3,3( &$55,(53,3()25 ,167$//$7,21(;7(1'72 %(/2:6+(/) 5287(5,6(5672%( &$55,(',164 78%,1* 127(6  1257+(51:$7(572',6&211(&7(;,67,1*,167580(17$7,21,167,//,1* :(//$1'5(029(%27+/(9(/,1',&$7256 %8,/',1*72%(35(&$6725&,3&21&5(7(60227+),1,6+3529,'( (0%('6)25)281'$7,216((':*6  ,17(172)78%,1*,672%(3529,'(6833257$1'3527(&7,21)25)/86+ 5,6(56%(7:((1)/80($5($81'(5&29(5%$&.),//$1'8372 ,167580(17$7,21%8,/',1*  39&&$55,(53,3(6$5(723529,'(&+$11(/)25/(9(/,167580(17$7,21 $1'7$3(72(;7(1')5206+(/)'2:17+528*+%$&.),//7+528*+ )/80(&29(5$1',17267,//,1*:(//$7)/80(%27720(/(9$7,21 &225',1$7(/2&$7,212)(;,67,1*67,//,1*:(//:,7+,167$//$7,212) &$55,(53,3( SHEET TITLE DATE DATE CHECKED BY DESIGNED BY SHEET DRAWN BY PROJECT REVISION OWNER CLIENT PROJECT NO.: LOCATION: 90% SUBMITTAL 6/12/19 PROGRESS SUBMITTAL 6/03/19 30% SUBMITTAL 5/19/19 ISSUED FOR BID 7/02/19 INSTRUMENTATION BUILDING JRC JE LJV 06/2019 & MUNROE CANAL DIVERSION STRUCTURE IMPROVEMENTS 65420199 LARIMER COUNTY, CO ,167580(17$7,21%8,/',1*6(&7,21   ,167580(17$7,21%8,/',1*(1/$5*('3/$1   1  ,167580(17$7,21%8,/',1*29(5$//6(&7,21   3,3(6+2:167$**(5(')25 &/$5,7<,167$//3(5(1/$5*(' 3/$1%87$7(/(9$7,216,1',&$7(' ,16(&7,21% (DESIGNED BY FLUME COVER MANUFACTURE) FLUME COVER ACCESS ADIT FOUNDATION (DESIGNED BY FLUME COVER MANUFACTURER) SHALL BE INTEGRATED WITH FLUME COVER FOUNDATION. COVER FOUNDATION PRECAST CONCRETE BOX (SEE NOTE 4) 6'-8" MIN. FLUME COVER OPENING SUPPORT (DESIGNED BY MANUFACTURE) BOLTED STEEL SECTIONS (TYP, SEE NOTE 4) ACCESS ADIT STRUCTURE (DESIGNED BY FLUME COVER MANUFACTURER) 6" MIN. PRE-ENGINEERED AND MANUFACTURED GALVANIZED STEEL HATCH AS SPECIFIED CONCRETE COLLAR SLOPED AWAY FROM HATCH OPENING ACCESS STAIRWELL HATCH SCALE: 1" = 2' D5 -- CLEAR OPENING WIDTH 3'-0" MIN. CLEAR OPENING LENGTH 10'-0" MIN. HATCH DOUBLE DOOR SAFETY RAILING NOTES: 1. THE ELEVATION OF THE ACCESS STAIRWELL HATCH AND SURROUNDING COLLAR SHALL BE A MINIMUM OF 3-INCHES ABOVE THE CONCRETE STAIRWELL COVER AND AND SLOPED AWAY FROM THE HATCH TO PREVENT PONDING ON TOP OF OR AROUND THE HATCH. 2. A CONCRETE COLLAR SHALL BE POURED AROUND THE HATCH TO PREVENT SURFACE RUNOFF INFILTRATING AROUND THE PERIMETER OF THE ACCESS STAIRWELL. 3. THE STRUCTURES AND CONNECTIONS ASSOCIATED WITH THE ACCESS ADIT AND THE ACCESS STAIRWELL SHALL BE DESIGNED FOR AASHTO HS-20 LIVE LOADS AND ASSOCIATED DEAD LOADS. 4. THE ACCESS ADIT AND SUPPORT SHALL DESIGNED BY THE MANUFACTURER OF THE SELECTED COVER ALTERNATIVE. 5. THE ACCESS ADIT AND COVER OPENING SUPPORT DESIGN SHOWN IS FOR REFERENCE ONLY. PRE-CAST OR CAST-IN-PLACE CONCRETE, OR PRE-ENGINEERED AND PRE-FABRICATED CORRUGATED STEEL PLATE ARCH STRUCTURES ARE ACCEPTABLE ACCESS ADITS; THESE AND OTHER PROPOSED ACCESS ADIT STRUCTURE DESIGNS ARE SUBJECT TO ENGINEER APPROVAL. 6. ALL METALS ASSOCIATED WITH THE STILLING WELL COVER SHALL BE ALUMINUM HAVE A MINIMUM YIELD STRENGTH OF 35 KSI. 7. L-SECTIONS ASSOCIATED WITH THE STILLING WELL COVER SHALL BE ANCHORED TO THE EXISTING STILLING WELL WITH CONCRETE ANCHORS THAT ARE COUNTERSUNK INTO THE L-SECTION. CONCRETE ANCHORS SHALL EXTEND A MINIMUM OF 2-INCHES INTO THE CONCRETE FROM THE BOTTOM OF THE L-SECTION. 8. ALL METALS ASSOCIATED WITH THE PREFABRICATED STAIRS SHALL BE ALUMINUM. 9. THE CONTRACTOR SHALL SUBMIT A DESIGN FOR THE ALUMINUM STAIRCASE TO BE APPROVED BY THE ENGINEER. STAIR CONNECTION DETAIL SCALE: 1" = 3" D8 -- 11" MIN. ALUMINUM BRACKET ALUMINUM CHANNEL PREFABRICATED ALUMINUM STAIRS ALUMINUM CHANNEL BOLTED CONNECTION ALUMINUM ALUMINUM I-BEAM GRATING BOLTED CONNECTION STAIRS TO STAIRWELL CONNECTION (DETAIL S2) HANDRAIL CONNECTION DETAIL SCALE: 1" = 3" D9 -- 1 2"Ø CONCRETE ANCHOR 0.5-INCH THICK ALUMINUM PLATE 1 HANDRAIL TO PLATE 4 CONNECTION HANDRAIL 2" MIN. (TYP.) CONCRETE ANCHORS COUNTERSUNK @ 2'-0" O.C. ALUMINUM CHANNEL STAIRS TO STAIRWELL CONNECTION DETAIL SCALE: 1" = 0.5" S2 -- CONCRETE STAIRWELL SIDEWALL FORT COLLINS, COLORADO 80526 2625 REDWING ROAD, SUITE 160 970.373.3195 SHEET TITLE DATE REVISION DATE CHECKED BY DESIGNED BY SHEET DRAWN BY PROJECT REVISION OWNER CLIENT PROJECT NO.: LOCATION: FLUME COVER DETAILS DF LH RD 07/01/19 %Ä MUNROE DIVERSION STRUCTURE IMPROVEMENTS 18104 LARIMER COUNTY, CO 30% REVISION 05/02/19 60% PROGRESS SET 06/04/19 90% PROGRESS SET 06/12/19 BRACKET COVER BULKHEAD SECTION SCALE: 1" = 0.5' S2 -- 1 4 STEEL PLATE TO BRACKET CONNECTION 5 8" THICK GALVANIZED STEEL PLATE COVER 6'-0" MAX. NOTES: 1. THE COVER FOUNDATION PRESENTED IN DETAIL 1 OF THIS SHEET IS FOR REFERENCE BASED ON THE MANUFACTURER DESIGN. THE FOUNDATION SHALL BE DESIGNED BY THE MANUFACTURER. ALL SHOP DRAWINGS OF THE FOUNDATION AND CONNECTION SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL. 2. ALL CONCRETE EXTENDING PAST THE MINIMUM 2-FOOT FOUNDATION DEPTH WILL BE UNREINFORCED. COVER FOUNDATION CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 4000 PSI. 3. ALL REINFORCEMENT FOR COVER FOUNDATIONS SHALL HAVE A MINIMUM YIELD STRENGTH OF 60 KSI. 4. AT BULKHEAD LOCATIONS, L-BRACKETS IN ACCORDANCE WITH SPECIFICATIONS SHALL BE BOLTED 6-FEET ON CENTER AROUND THE INSIDE OF THE COVER AS A MEANS OF MOUNTING THE GALVANIZED STEEL PLATE BULKHEAD TO THE COVER. 5. THE GALVANIZED STEEL PLATE BULKHEAD SHALL BE A MINIMUM OF 5/8-INCH THICK, HAVE A YIELD STRENGTH OF 50 KSI, AND SHALL HAVE AN ASPHALTIC CORROSION PROTECTION COATING APPLIED TO THE EXTERIOR. 6. ONCE THE BULKHEAD IS MOUNTED TO THE L-BRACKETS ON THE COVER, BACKFILL, IN ACCORDANCE WITH PROJECT SPECIFICATIONS, SHALL BE PLACED ON THE OUTSIDE OF THE COVER UP TO THE FINAL GRADE LINE. 7. THE FLUME BRIDGE AND ALL ASSOCIATED COMPONENTS PRESENTED HEREIN SHALL BE ALUMINUM AND DESIGNED BY THE CONTRACTOR AND APPROVED BY THE ENGINEER. THE REFERENCED DESIGN PRESENTED IN THESE DRAWINGS IS BASED ON A PREFABRICATED PEDESTRIAN BRIDGE OPTION MANUFACTURED BY CMI MANTLE. 8. THE FLUME BRIDGE SHALL BE DESIGNED TO WITHSTAND AASHTO PEDESTRIAN LIVE LOADING. 9. THE FLUME BRIDGE SHALL FOLLOW OSHA REGULATIONS FOR ACCESS BRIDGES. 10. THE FLUME BRIDGE SHALL REST ON A CAST IN PLACE OR PRECAST FOOTING. 11. IF CONCRETE COVER AND SLAB FOR THE STAIRWELL ARE PRECAST, CONTRACTOR SHALL SUBMIT REINFORCEMENT LAYOUT AND SCHEDULE FOR ENGINEER APPROVAL. CIP CONCRETE FOUNDATION AND STEPS D4 -- HANDRAIL EXISTING FLUME STRUCTURE 3" MIN. (TYP.) FLUME BRIDGE SCALE: 1" = 1.5' D3 -- TOE KICK 3'-6" MIN. EQUAL BAR SPACING 3" MIN. 9" MIN. 8'-0" MAX. PREFABRICATED PEDESTRIAN BRIDGE MANUFACTURED BY CMI GATORBRIDGE 3" MIN. 9" MIN. #4 GRADE 60 REBAR 6-INCHES O.C. E.W. MAX. (TYP.) HANDRAIL 4'-0" MAX. BRIDGE CONNECTION DETAIL SCALE: 1" = 0.5' D4 -- TOE KICK 4" MAX. CONCRETE ANCHOR 4-INCH MIN. EMBEDMENT BRIDGE FOOTING RUBBER 4'-0" MIN. DAMPENER PAD #4 GRADE 60 REBAR @ 12" O.C. E.W. (NOTE 11) CONCRETE STAIRWELL COVER AND FOUNDATION SECTION SCALE: 1" = 0.5' D10 -- 3" MIN. 3" MIN. PRE-CAST CONCRETE STAIRWELL 1'-0" MIN. #4 GRADE 60 REBAR @ 12" O.C. E.W. (NOTE 11) 3" MIN. 3" MIN. #4 GRADE 60 DOWEL EPOXYED MIN. 4" INTO PRECAST STAIRWELL AND EMBEDDED MIN. 4" INTO CIP COVER @ 12" O.C (NOTE 11) 8" MIN. CIP OR PRECAST CONCRETE FOUNDATION CIP OR PRECAST CONCRETE COVER CIP OR PRECAST CONCRETE FOUNDATION BEARING ON COMPETENT SUBGRADE FORT COLLINS, COLORADO 80526 2625 REDWING ROAD, SUITE 160 970.373.3195 SHEET TITLE DATE REVISION DATE CHECKED BY DESIGNED BY SHEET DRAWN BY PROJECT REVISION OWNER CLIENT PROJECT NO.: LOCATION: FLUME COVER DETAILS DF LH RD 07/01/19 %Ä MUNROE DIVERSION STRUCTURE IMPROVEMENTS 18104 LARIMER COUNTY, CO 30% REVISION 05/02/19 60% PROGRESS SET 06/04/19 90% PROGRESS SET 06/12/19 5440 5450 5425 5430 5440 5450 ZONE A MINIMUM BACKFILL EXTENTS NOTE 3 MAXIMUM STILLING WELL MAXIMUM FLUME STRUCTURE EXTENT STRUCTURE EXTENT 30 SOUTH NORTH 0'-6" 1'-0" MIN. MIN. ZONE B BACKFILL RECLAIMED ASPHALT PAVEMENT (RAP) -30 ANTICIPATED EXISTING BEDROCK SURFACE ANTICIPATED EXISTING BEDROCK SURFACE 2'-3" MIN. (NOTE 1) 2'-0" MIN. 0'-6" APPROX. FLUME COVER STRUCTURE ELEVATION (FEET) ELEVATION (FEET) 6'-8" MIN. 6'-8" MIN. 2'-0" MIN. SEE NOTE 5 EXISTING CONCRETE BLOCKS (2'X2'X6' APPROX.) ZONE A MINIMUM BACKFILL EXTENT (NOTE 3) FLUME COVER FOUNDATION (NOTE 5, SEE D1, SHEET C-9) FINAL GRADE EXISTING GUARDRAIL EXISTING GROUND SURFACE (APPROX.) ELEV. MIN: 5430.1 ELEV. MIN: 5430.1 FLUME COVER SECTION STA 6+20.5 SCALE: 1" = 3' S3 -- FLUME COVER SECTION STA 6+06.5 SCALE: 1" = 3' S4 -- NOTES: 1. THE COVER SHALL HAVE A MINIMUM OF 2'-3" OF ZONE A OVERBURDEN MEASURED FROM THE INSIDE OF THE CORRUGATION. 2. ZONE A BACKFILL IS DEFINED AS THE MINIMUM AMOUNT OF BACKFILL REQUIRED PER THE COVER MANUFACTURER SPECIFICATIONS. ZONE B BACKFILL IS DEFINED AS ANY ADDITIONAL BACKFILL TO ATTAIN THE FINAL DESIGN GRADE AS SPECIFIED ON SHEET C-4. 3. ZONE A LATERAL EXTENTS SHALL BE A MINIMUM OF 8-FEET HORIZONTAL FROM THE BOTTOM OF THE FLUME COVER ARCH FOR COMPACTED SOIL OR 6-FEET IF FLOWFILL IS UTILIZED. 4. 4.THE MINIMUM BACKFILL EXTENTS FOR EXCAVATIONS WITHIN BEDROCK SHALL BE TO THE BEDROCK SURFACE AS SHOWN. THE MINIMUM BACKFILL EXTENTS FOR EXCAVATIONS WITHIN SOIL SHALL BE THE LATERAL EXTENTS AS STATED IN NOTE 3. 5. THE MINIMUM FOUNDATION DEPTHS PRESENTED MAY BE CONSTRUCTED AT HIGHER (MORE SHALLOW) ELEVATIONS IF COMPETENT BEDROCK IS ENCOUNTERED ACROSS THE ENTIRE FOUNDATION WIDTH, AS DETERMINED BY THE ENGINEER. 6. VERTICAL CLEARANCES FROM THE TOP OF THE RECYCLED ASPHALT TO THE COVER'S INSIDE CORRUGATION SHALL BE A MINIMUM OF 6'-8" FOR A WIDTH OF 2'-0" MEASURED FROM THE OUTSIDE OF THE FLUME STRUCTURE BETWEEN APPROXIMATE STATIONS 6+26 AND 6+60. THE ONLY EXCEPTION TO THE MINIMUM CLEARANCES IS AT THE STILLING WELL STRUCTURE. FORT COLLINS, COLORADO 80526 2625 REDWING ROAD, SUITE 160 970.373.3195 SHEET TITLE DATE REVISION DATE CHECKED BY DESIGNED BY SHEET DRAWN BY PROJECT REVISION OWNER CLIENT PROJECT NO.: LOCATION: FLUME STRUCTURE SECTIONS DF LH RD 07/01/19 %Ä MUNROE DIVERSION STRUCTURE IMPROVEMENTS 18104 LARIMER COUNTY, CO 0 SCALE 1" = 3' 3 6 30% REVISION 05/02/19 60% PROGRESS SET 06/04/19 90% PROGRESS SET 06/12/19 0'-6" MIN. ELEV. MIN: 5430.1 2'-0" MIN. SEE NOTE 5 CONCRETE STAIRWELL SHALL BE FOUNDED AND UNIFORMLY BEARING ON ROCK, BACKFILL OVER-EXCAVATION (NOTE 10) FLUME COVER FOUNDATION (NOTE 5, SEE D1, SHEET C-9) D5 C-10 EXISTING GUARDRAIL (BEYOND) 1'-0" MIN. ABOVE FINAL GRADE ZONE A MINIMUM BACKFILL EXTENTS NOTE 3 MAXIMUM STILLING WELL STRUCTURE EXTENTS MAXIMUM FLUME STRUCTURE EXTENTS 0'-6" APPROX. -20 -10 01020 5425 5430 5440 5450 5425 5430 5440 5450 30 SOUTH NORTH -30 SEE NOTE 5 STILLING WELL COVER 2'-3" MIN. (NOTE 1) ELEVATION (FEET) ELEVATION (FEET) ANTICIPATED EXISTING BEDROCK SURFACE ANTICIPATED EXISTING BEDROCK SURFACE 1'-0" MIN. ELEV. MIN: 5430.1 2'-0" MIN. 6'-8" MIN. ELEV. MIN: 5427.8 EXISTING CONCRETE BLOCKS (2'X2'X6' APPROX.) ZONE A MINIMUM BACKFILL EXTENT (NOTE 3) FLUME COVER FOUNDATION (NOTE 5, SEE D1, SHEET C-9) STILLING WELL RECLAIMED ASPHALT PAVEMENT (RAP) ZONE B BACKFILL FINAL GRADE FLUME COVER STRUCTURE EXISTING GUARDRAIL INSTRUMENTATION BUILDING NOT SHOWN FOR CLARITY EXISTING GROUND SURFACE (APPROX.) 0'-6" MIN. FLUME COVER SECTION STA 6+58.5 SCALE: 1" = 3' S1 -- FLUME COVER SECTION STA 6+27.5 SCALE: 1" = 3' S2 -- NOTES: 1. THE COVER SHALL HAVE A MINIMUM OF 2'-3" OF ZONE A OVERBURDEN MEASURED FROM THE INSIDE OF THE CORRUGATION. 2. ZONE A BACKFILL IS DEFINED AS THE MINIMUM AMOUNT OF BACKFILL REQUIRED PER THE COVER MANUFACTURER SPECIFICATIONS. ZONE B BACKFILL IS DEFINED AS ANY ADDITIONAL BACKFILL TO ATTAIN THE FINAL DESIGN GRADE AS SPECIFIED HEREIN. 3. ZONE A LATERAL EXTENTS SHALL BE A MINIMUM OF 8-FEET FOR COMPACTED SOIL OR 6-FEET IF FLOWFILL IS UTILIZED. 4. THE MINIMUM BACKFILL EXTENTS FOR EXCAVATIONS WITHIN BEDROCK SHALL BE TO THE BEDROCK SURFACE AS SHOWN. THE MINIMUM BACKFILL EXTENTS FOR EXCAVATIONS WITHIN SOIL SHALL BE THE LATERAL EXTENTS AS STATED IN NOTE 3. 5. THE MINIMUM FOUNDATION DEPTHS PRESENTED MAY BE CONSTRUCTED AT HIGHER (MORE SHALLOW) ELEVATIONS IF COMPETENT BEDROCK IS ENCOUNTERED ACROSS THE ENTIRE FOUNDATION WIDTH, AS DETERMINED BY THE ENGINEER. 6. VERTICAL CLEARANCES FROM THE TOP OF THE RECYCLED ASPHALT TO THE COVER'S INSIDE CORRUGATION SHALL BE A MINIMUM OF 6'-8" FOR A WIDTH OF 2'-0" MEASURED FROM THE OUTSIDE OF THE FLUME STRUCTURE BETWEEN APPROXIMATE STATIONS 6+26 AND 6+60. THE ONLY EXCEPTION TO THE MINIMUM CLEARANCES IS AT THE STILLING WELL STRUCTURE. 7. THE FLUME BRIDGE CROSSING SHALL BE CENTERED ON STATION 6+51.9 AND DESIGNED TO WITHSTAND 100 PSF PEDESTRIAN LIVE LOADING. ASSOCIATED BRIDGE COMPONENTS SHALL COMPLY WITH OSHA GUIDELINES. 8. THE ACCESS ADIT BETWEEN THE CONCRETE ACCESS STAIRWELL STRUCTURE AND FLUME COVER ARCH SHALL BE DESIGNED BY THE FLUME COVER MANUFACTURER, CONNECTED TO THE FLUME COVER, AND DESIGNED AS AN INTEGRAL PART OF THE SUPPORT SYSTEM FOR THE OPENING PENETRATION IN THE SIDE OF THE COVER (SEE DETAIL 6, SHEET C-10). 9. CONCRETE STAIRWELL (BY CONTRACTOR) MAY BE PRE-CAST OR CAST-IN PLACE AND SHALL BE DESIGNED BY CONTRACTOR TO MEET SPECIFIED REQUIREMENTS AND ACCOMMODATE CONTRACTOR PROPOSED PRE-ENGINEERED ACCESS STAIRWELL. FLUME COVER OPENING SHALL BE DESIGNED BY THE COVER MANUFACTURER AND MEET MANUFACTURER GUIDELINES. 10. BACKFILL ALL OVER-EXCAVATION BENEATH THE CONCRETE ACCESS STAIRWELL AND ACCESS ADIT, AND SURROUNDING THE FLUME COVER FOUNDATION WITH FLOWFILL, LEAN CONCRETE, OR STRUCTURAL CONCRETE. INTEGRATE THE ACCESS STAIRWELL AND ACCESS ADIT FOUNDATIONS WITH THE FLUME COVER FOUNDATION. FORT COLLINS, COLORADO 80526 2625 REDWING ROAD, SUITE 160 970.373.3195 SHEET TITLE DATE REVISION DATE CHECKED BY DESIGNED BY SHEET DRAWN BY PROJECT REVISION OWNER CLIENT PROJECT NO.: LOCATION: FLUME STRUCTURE SECTIONS DF LH RD 07/01/19 %Ä MUNROE DIVERSION STRUCTURE IMPROVEMENTS 18104 LARIMER COUNTY, CO 30% REVISION 05/02/19 0 SCALE 1" = 3' 3 6 60% PROGRESS SET 06/04/19 90% PROGRESS SET 06/12/19 C-10 D10 C-9 NOTE 8, C-5 FLOW NOTE 2 EXISTING PARSHALL FLUME APPROX. FLUME COVER (NOTE 1-3, C-5) FOUNDATION APPROX. (NOTE 1) EXISTING STILLING WELLS STRUCTURE APPROX. EXISTING GRADE EXISTING TUNNEL EXISTING PORTAL HEADWALL STRUCTURE (PROTECT IN PLACE) FINAL GRADE INSTRUMENTATION BUILDING APPROX. (C-11) 2" Ø PVC CASING (TEMPORARILY CAPPED) FOR FUTURE FUEL LINE (BY OTHERS) EXTENDABLE LADDER SAFETY POST SAFETY RAILING AROUND HATCH (SEE DETAIL D5 SHEET C-10) 53' APPROX. 11'-1" CDOT ROW APPROX. HWY 14 APPROX. 2'-8"± 2'-0"± 2'-9"± SCALE: 1" = 3' E1 -- FLUME COVER PROFILE FORT COLLINS, COLORADO 80526 2625 REDWING ROAD, SUITE 160 970.373.3195 SHEET TITLE DATE REVISION DATE CHECKED BY DESIGNED BY SHEET DRAWN BY PROJECT REVISION OWNER CLIENT PROJECT NO.: LOCATION: FLUME COVER PROFILE DF LH RD 07/01/19 %Ä MUNROE DIVERSION STRUCTURE IMPROVEMENTS 18104 LARIMER COUNTY, CO 0 SCALE 1" = 3' 3 6 30% REVISION 05/02/19 60% PROGRESS SET 06/04/19 90% PROGRESS SET 06/12/19 23'-9" APPROX. 4'-0" APPROX. 6'-8" APPROX. 8'-8" APPROX. 3'-0" APPROX. 53' APPROX. 24'-0" APPROX. ACCESS GATE 12'-0" APPROX. ACCESS GATE 3'-0" APPROX. FLUME COVER PLAN SCALE: 1" = 8' P1 -- NOTES: 1. FLUME COVER SHALL BE AN APPROVED ENGINEERED AND PRE-FABRICATED, SEGMENTAL, CORRUGATED, GALVANIZED STEEL ARCH (OR ALTERNATE AS APPROVED) MEETING THE SPECIFIED REQUIREMENTS AND DIMENSIONS AND TOLERANCES. THE REFERENCE DESIGN PRESENTED IN THESE DRAWINGS IS BASED ON A CONTECH BRIDGECOR COVER WITH A 11'-1" RISE AND A 26'-3" SPAN AND IS AN ACCEPTABLE OPTION. 2. THE CONTRACTOR PROPOSED FLUME COVER AND ASSOCIATED COMPONENTS SHALL BE RATED FOR AASHTO HS-20 LIVE LOADS AND APPROPRIATE DEAD LOADS PER AASHTO LRFD BRIDGE SPECIFICATIONS. 3. CORROSION PROTECTIVE ASPHALTIC COATING SHALL BE FIELD APPLIED TO THE FULL EXTERIOR OF THE FLUME COVER AND BULKHEADS FOLLOWING ASSEMBLY AS SPECIFIED. 4. CONCRETE ACCESS STAIRWELL SHALL BE DESIGNED BY THE CONTRACTOR, SUBJECT TO ENGINEER APPROVAL, TO ACCOMODATE CONTRACTOR PROPOSED ENGINEERED AND PRE-FABRICATED ACCESS STAIRS AND HATCH, AND MEET THE SPECIFIED REQUIREMENTS. 5. PROTECT IN PLACE THE EXISTING CDOT GUARDRAIL AND TELECOMMUNICATION UTILITY AS SHOWN ON THIS SHEET. 6. TO THE EXTENT POSSIBLE, REMOVE AND REUSE THE EXISTING FENCE LINE AS SHOWN ON THIS SHEET. ANY ADDITIONAL FENCING OR FENCING THAT CANNOT BE REUSED SHALL BE REPLACED OR FURNISHED IN KIND. THE LOCATION OF THE FINAL PLACEMENT OF FENCING SHALL BE AS SHOWN. 7. DETERMINE THE EXTENT OF THE EXISTING ROCK WALL AND CONCRETE WALL THAT WILL NEED TO BE REMOVED. ANY REMOVED MATERIAL SHALL BE STOCKPILED ONSITE IN SEPARATE STOCKPILES FOR FUTURE HAUL OFF BY THE OWNER. 8. EXISTING GUARDRAIL SHALL BE REMOVED TO THE NEAREST POST. FINAL PLACEMENT OF THE EXISTING GUARDRAIL SHALL MAINTAIN A MAXIMUM DISTANCE OF 6-INCHES BETWEEN THE NEAREST GUARDRAIL POST AND FLUME BRIDGE STRUCTURE. FORT COLLINS, COLORADO 80526 2625 REDWING ROAD, SUITE 160 970.373.3195 SHEET TITLE DATE REVISION DATE CHECKED BY DESIGNED BY SHEET DRAWN BY PROJECT REVISION OWNER CLIENT PROJECT NO.: LOCATION: FLUME COVER PLAN DF LH RD 07/01/19 %Ä MUNROE DIVERSION STRUCTURE IMPROVEMENTS 18104 LARIMER COUNTY, CO 0 SCALE 1" = 3' 3 6 30% REVISION 05/02/19 60% PROGRESS SET 06/04/19 90% PROGRESS SET 06/12/19 +,*+72 0$7&+(;,67,1*5(86( *$7($''1(: :$/.*$7( SHEET TITLE DATE DATE CHECKED BY DESIGNED BY SHEET DRAWN BY PROJECT REVISION OWNER CLIENT PROJECT NO.: LOCATION: 90% SUBMITTAL 6/12/19 PROGRESS SUBMITTAL 6/03/19 30% SUBMITTAL 5/19/19 ISSUED FOR BID 7/02/19 FLUME GRADING PLAN JRC JE LJV 06/2019 %Ä MUNROE CANAL DIVERSION STRUCTURE IMPROVEMENTS 65420199 LARIMER COUNTY, CO 1 )/80(*5$',1*3/$1 6&$/(   DESIGNED BY SHEET DRAWN BY PROJECT REVISION OWNER CLIENT PROJECT NO.: LOCATION: 90% SUBMITTAL 6/12/19 PROGRESS SUBMITTAL 6/03/19 30% SUBMITTAL 5/19/19 ISSUED FOR BID 7/02/19 FLUME DEMO PLAN JRC JE LJV 06/2019 %Ä MUNROE CANAL DIVERSION STRUCTURE IMPROVEMENTS 65420199 LARIMER COUNTY, CO 1 )/80('(023/$1  LJV 06/2019 %Ä MUNROE CANAL DIVERSION STRUCTURE IMPROVEMENTS 65420199 LARIMER COUNTY, CO 1 (;,67,1*7(/(&20$1' (/(&75,&$/&21'8,7 3527(&7,13/$&($5($6 2)1(:&21'8,76((( *(1(5$725 %8,/',1* (/(&75,&$/ %8,/',1* 3+272$ 3+272% +($':25.63/$1 6(&7,21  PI POINT OF INTERSECTION PL PROPERTY LINE PR PROPOSED PT POINT OF TANGENCY PVC POLYVINYL CHLORIDE RRADIUS RCP REINFORCED CONCRETE PIPE ROW RIGHT OF WAY RT RIGHT SSOUTH STE STEEL SF SQUARE FEET ST STREET STA STATION STM STORM SEWER SY SQUARE YARD SY-IN SQUARE YARD INCH TEL TELEPHONE TOA TOP OF ASPHALT TOB TOP OF BOX TOC TOP OF CURB OR CONCRETE TOF TOP OF FOUNDATION TOP TOP OF PIPE TSP TWISTED PAIR TW TOP OF WALL TYP TYPICAL UNO UNLESS NOTED OTHERWISE UGE UNDERGROUND ELECTRIC VTC VEHICLE TRACKING CONTROL W WEST WS WATER SURFACE WSE WATER SURFACE ELEVATION WTR WATER YR YEAR GENERAL NOTES: ABBREVIATIONS 1. ALL CONTRACTORS AND SUBCONTRACTORS SHALL HAVE A SET OF APPROVED CONSTRUCTION DOCUMENTS ON SITE AT ALL TIMES. 2. THE PROJECT PLANS AND SPECIFICATIONS ARE INTENDED TO PROVIDE THE COMPLETED PROJECT IN A COMPLETE AND OPERABLE CONDITION. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL MATERIALS AND PROVIDE ALL LABOR NECESSARY TO COMPLETE THE PROJECT IN A NEAT AND WORKMANLIKE MANNER, INCLUDING ALL INCIDENTALS NECESSARY TO COMPLETE THE WORK, WITHOUT ADDITIONAL COST TO THE OWNER UNO. 3. UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED BEFORE CONSTRUCTION, OR TO THE GRADES AND CONDITION AS REQUIRED BY THESE PLANS. EXISTING FENCES, STRUCTURES, AND IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT SHALL BE REPLACED OR RESTORED IN LIKE KIND AT THE OWNER'S EXPENSE, UNLESS OTHERWISE INDICATED ON THESE PLANS. 4. LITHOS AND MERRICK & COMPANY ARE NOT RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OR FOR SAFETY PRECAUTIONS OR PROGRAMS UTILIZED IN CONNECTION WITH THE WORK. LITHOS AND MERRICK WILL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S FAILURE TO CARRY OUT THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 5. THE CONTRACTOR SHALL HAVE ONSITE AT ALL TIMES SHALL HAVE EACH OF THE FOLLOWING: 5.a. THE NOTICE OF INTENT (NOI) 5.b. ONE (1) SIGNED COPY OF THE APPROVED PLANS 5.c. ONE (1) COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS 5.d. A COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB.  ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE NORTHERN COLORADO WATER CONSERVANCY DISTRICT STANDARDS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE MOST RESTRICTIVE STANDARD SHALL APPLY. 7. THE BOUNDARY AND TOPOGRAPHIC INFORMATION ON THESE PLANS IS TAKEN FROM FIELD SURVEYS PREPARED BY MERRICK & COMPANY, DATED APRIL 4, 2019. 8. THE CONTRACTOR SHALL OBTAIN ALL PERMITS NECESSARY TO COMPLETE THE WORK AND SHALL COMPLY WITH ALL LOCAL, STATE AND FEDERAL REGULATIONS. A COPY OF ALL PERMITS SHALL BE MAINTAINED ON-SITE AT ALL TIMES. 9. THE CONTRACTOR IS RESPONSIBLE FOR SAFETY OF ALL PERSONNEL AND EQUIPMENT ON THE PROJECT SITE AT ALL TIMES, AND IS NOT LIMITED TO NORMAL WORKING HOURS. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL SAFETY AND HEALTH REGULATIONS. 10. THE CONTRACTOR SHALL CALL THE NATIONWIDE UTILITY CONTACT NUMBER (811) OR LOCAL UTILITY LOCATE SERVICE, TO REQUEST LOCATES OF ALL UNDERGROUND UTILITIES AT LEAST 72 HOURS PRIOR TO COMMENCEMENT OF ANY LAND DISTURBING ACTIVITY. 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES, INCLUDING DEPTH. THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE ONLY AND ARE NOT RELIABLE FOR CONSTRUCTION PURPOSES. THE UTILITIES SHOWN ON THE PLANS ARE FROM THE BEST AVAILABLE INFORMATION AND MAY NOT INCLUDE ALL UTILITIES THAT EXIST ON THE PROJECT SITE. IT SHALL BE THE RESPONSIBILITY OF THE OWNER TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF THE WORK BEFORE COMMENCING NEW CONSTRUCTION. THE OWNER SHALL BE RESPONSIBLE FOR UNKNOWN UNDERGROUND UTILITIES. 12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION AND FOR COORDINATING WITH THE APPROPRIATE UTILITY COMPANY FOR ANY UTILITY CROSSINGS REQUIRED. 13. TRAFFIC CONTROL STANDARDS FOR THIS PROJECT SHALL COMPLY WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, LATEST EDITION. A TRAFFIC CONTROL PLAN APPROVED BY THE LOCAL ENTITY EXERCISING JURISDICTION SHALL BE OBTAINED BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER. 14. INSTALL SEDIMENTATION AND EROSION CONTROL MEASURES PRIOR TO INITIATING ANY WORK ON THE PROJECT SITE. MAINTAIN ALL EROSION CONTROL MEASURES UNTIL FINAL ACCEPTANCE OF THE PROJECT BY THE OWNER. 15. THE OWNER SHALL BE RESPONSIBLE FOR INSURING THAT NO MUD OR DEBRIS SHALL BE TRACKED ONTO HWY 14. MUD AND DEBRIS MUST BE REMOVED BY THE END OF EACH WORKING DAY BY AN APPROPRIATE MECHANICAL METHOD (I.E. MACHINE BROOM SWEEP, LIGHT DUTY FRONT-END LOADER, ETC.) OR AS APPROVED BY THE LOCAL ENTITY STREET INSPECTOR. 16. ALL WASTE MATERIALS SHALL BE PROPERLY DISPOSED OF IN AN APPROVED LANDFILL PERMITTED TO ACCEPT THAT PARTICULAR TYPE OF WASTE. 17. WHERE CONFLICTS EXIST BETWEEN GENERAL NOTES AND THE NOTES OF SPECIFIC GOVERNING JURISDICTIONS, THE GREATER STANDARD OR REQUIREMENT SHALL PREVAIL. WHERE CONFLICTS BETWEEN THE PLANS AND SPECIFICATIONS AND THE NOTES OR REQUIREMENTS OF SPECIFIC GOVERNING JURISDICTIONS OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER OR OWNER IMMEDIATELY AND REQUEST CLARIFICATION. PROPOSED (;,67,1* 29(5+($'(/(&75,&&20081,&$7,216 81'(5*5281'(/(&75,& ),%(5237,&/,1(:75$)),&&21752/%2; 7(/(3+21(/,1(:3('(67$/ ( ( ( 2+( 2+( 2+(& 2+(& 8( 8( 8( 7 7 7 /(*(1' (/(&75,&/,1(:%2;0(7(5$1'/,*+7 29(5+($'(/(&75,&:,7+32/(  &2172856 8' 8' 8' 8' 8' 8' 81'(5*5281')/80( )(1&(/,1( 5,*+72):$< 6327(/(9$7,21 *8$5'5$,/ 3& /,*+7  :$<6:,7&+ 3+272&(// - -81&7,21%2; '83/(;5(&(37$&/( SHEET TITLE DATE DATE CHECKED BY DESIGNED BY SHEET DRAWN BY PROJECT REVISION OWNER CLIENT PROJECT NO.: LOCATION: 90% SUBMITTAL 6/12/19 PROGRESS SUBMITTAL 6/03/19 30% SUBMITTAL 5/19/19 ISSUED FOR BID 7/02/19 GENERAL NOTES JRC JE LJV 06/2019 )Ä MUNROE CANAL DIVERSION STRUCTURE IMPROVEMENTS 65420199 LARIMER COUNTY, CO  JE LJV 06/2019 )Ä MUNROE CANAL DIVERSION STRUCTURE IMPROVEMENTS 65420199 LARIMER COUNTY, CO 1 MUNROE CANAL DIVERSION STRUCTURE IMPROVEMENTS 9,&,1,7<0$3 176  "11&/%*9"